AUDITKIT 1process.doc Page 1
AUDIT PREPARATION???? is used within the guideline documents to indicate required changes for each audit
Activity Guideline
Obtain Audit number from EPT-AVAgree Terms of Reference and timing Standard Terms of
Reference
Select and agree team members:For HSE MS audit leader and one other must be from outside OU
Request short CVs of eachDefine sub teams (e.g. 3 teams of 2) Reconfirm availability three weeks before audit
Prepare budget & open account number Budget form .xls
Identify persons to be interviewed request organisation chartsGet audit report number (from report library)Confirm availability of documents needed List of relevant HSE
documents
Set up Audit using Auditkit_2000 question data base (MS Access)
Auditkit_2000.mdb Auditkit_2000_manual.doc
Make interview schedule: allow one hour at start of each day to plan
days interviews; allow 30 minutes between interviews; each sub team to have no more than 5/6
one hour interviews per day; schedule one hour team review meeting
at end of each day.Site visits interviews: allow time for travel between sites; interview at persons place of work; interviews with workers/labour -30
minutes only.
Auditkit_2000.mdb Auditkit_2000_manual.doc
Request OU audit focal point to arrange interviews as per schedule
e-mail interview schedule as *.xls sheet(exported from Access)
Set up draft report template: audit team, TOR in appendix 4, report number in headers etc.
Report template (excluding 3.1, 3.2 findings tables)
Report tables: 3.1 HSE MS tables
3.2 Seismic tables
AUDITKIT 1process.doc Page 2
3.2 Drilling tables
3.2 Facilities tables
Issue Tables (Positive/ Areas of Concern)can be used to collate issues during audit phase and used to debrief on-site staff at end of major site visits.
HSE MS
Seismic land
Seismic marine
Findings analysis tool HSE audit findings analyses spread sheet
If required E-mail the mini team member data base files and report tables to each team member
Draft e-mail text
Set-up opening and closing presentations opening presentation
closing presentation
Update if required team briefing presentation team briefing
Brief team SIEP and 3rd party membersArrange and confirm travel plans
AUDITKIT 1process.doc Page 3
Prepare team member handoutsuggested contents under 7 tabs:
Tab 1 (fix a disk pocket to tab)- Draft interview schedule- HSE MS task assignment
(Auditkit_2000.mdb)- Business area task assignment
(Auditkit_2000.mdb)- TOR
Tab 2- Blank issue tables issuetables
Tab 3- Copy of team briefing slides (handout)
Tab 4- HSE MS question for team member
Auditkit_2000.mdb)
Tab 5- Business area questions
(Auditkit_2000.mdb)
Tab 6- Report writing tips and hints
Style hints
Format hintsWord usage
Appendix 2 from report
Classify_doc
Tab 7- Appendix from draft report- HSE MS Self Assessment Questionnai
SIEP
Appendix from report
Confirm availability of LCD projector
AUDIT EXECUTION
Activity Guideline
PRELIMINARY
Introductions, arrangements and logisticsOpening presentation to management Management viewgraph
set with TORopenpres
Initial team briefing and discussion Team viewgraph set teambriefAudit activity list (activity.doc)
AUDITKIT 1process.doc Page 4
Review documentation requirements and check availability
Standard list of required documents
HSEdocs
Understand operation Presentation by AuditeeHazop (when required) EP 55000-17
PLANNINGConfirm Logistics Closing presentation invitation
Travel/accommodation for site visits Read documents Focus on assigned areasIf relevant to audit request auditee to prepare a short summary of the project / work (max. ¼page).Review interview schedule and confirm what info is required from each intervieweePrepare for interviews Select/ develop questions
to ask each intervieweeAuditkit_2000.mdb: team member .mdb (optional)
INTERVIEWING & SITE ACTIVITYConduct office interviews interviewschedIntroductory presentation at site shortened version of
opening presentation openpres
Site visits interviewschedDiscuss issues and confirm plansInterviews Interview prompt cardEmergency response drillComplete issue tables issuetables
VERIFICATIONSite feedback meeting Use issue tables issuetablesReview/confirm key findings with site mgt before leavingTest/verifyTeam briefing on report writing teambriefReconfirm each team member knows which part they need to write (can be done as a sub team, own choice)
Use the questionnaires as a guide and the issue tables so that nothing is missed. Use table 3.1 and relevant 3.2 table
report_tables
REPORTINGTeam review and editing process (1.5 -2 days required).
Merge 3.1 / 3.2 competed tables with report template.
report_template
Include project summary prepared by auditee in introduction.Classify recommendations Report Appendix 2Count and analyses findings:Check that the 3.1 and 3.2 tables are both continuous in the report file
select columns 1-5, of 3.1 table, copy and past in finding analysis .xls
select columns 1-5, of 3.2 table, copy and past after the 3.1 entries in finding analysis .xls
findings_analysis_tool
Each team members read whole report
AUDITKIT 1process.doc Page 5
Each team member/sub team completes SIEP HSE self assessment questionnaireproduce a agreed team self assessment score for each sub element
Enter scores into finding analysis spread sheet
findings_analysis_tool
Rating discussion Report Appendix 1Finalise draft report (two team members) Correct
grammar/spelling Compete appendix 5
(Glossary) Complete Appendix 6
Prepare executive summary and closing presentation (team leader)
closepres
Review executive summary and closing presentation with teamAgree main findings with auditee department and relevant contractor mgtFinal presentationGive auditee a paper copy of draft report and disk with the closing presentation
Team debrief: what went well and what could be improved in the processLeaveFinalise the report, include key closing presentation VGs as Appendix 8 of final report printed in handout format (6 VGS /page).
Appendix 8