August 1999. Op Test Overview. I-95 portion of the Capital Beltway Multi-jurisdiction partnership Approximately 25 test vehicles Interoperable network-based communications voice; data; images Three-year development and test project. ALERT System. Vehicles Law enforcement, EMS, Fire - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: August 1999

Capital Beltway Operational TestCapital Beltway Operational Test

August 1999

Page 2: August 1999

2 2

Capital Beltway Operational TestCapital Beltway Operational TestOp Test Overview

• I-95 portion of the Capital Beltway

• Multi-jurisdiction partnership

• Approximately 25 test vehicles

• Interoperable network-based communications– voice; data; images

• Three-year development and test project

Page 3: August 1999

3 3

Capital Beltway Operational TestCapital Beltway Operational TestALERT System

• Vehicles– Law enforcement, EMS, Fire – Motorist Assistance Vehicles (MAVs)

• Data Network– ALERT.NET server/database and CDPD

infrastructure– ALERT Client software– Interfaces at each agency dispatch or operations

center for ALERT interoperability

Page 4: August 1999

4 4

Capital Beltway Operational TestCapital Beltway Operational Test

ALERT In-Vehicle Components

• Core computer with touch screen interface

• ALERT-compliant peripheral equipment

• Standard ITS data bus

• Wireless voice, data and image communications

Page 5: August 1999

5 5

Capital Beltway Operational TestCapital Beltway Operational TestUser Interface

Color TouchScreen Display

Page 6: August 1999

6 6

Capital Beltway Operational TestCapital Beltway Operational Test

ALERT Capabilities for ALL Vehicles

• Functions– Radio systems management– GPS/GIS and AVL– Video imaging and management– Wireless access to data network

• User interfaces– Touch Screen– In-vehicle printer– Wireless hand-held computer

Page 7: August 1999

7 7

Capital Beltway Operational TestCapital Beltway Operational Test

Additional Vehicle Capabilities

• Warning system control– Lightbar; sirens

• Radar control

• Data management– Queries; data collection– Electronic forms

Page 8: August 1999

8 8

Capital Beltway Operational TestCapital Beltway Operational Test

ALERTVehicle

ALERTVehicle

HHU

ALERT.NETServer

WLAN

CDPD CDPD

Op/DispatchCenter

ALERT Data Comm Architecture

Op/DispatchCenter

WirelineWireline

Agency Mgr Desktop

Agency Mgr Desktop

Wireline

Page 9: August 1999

9 9

Capital Beltway Operational TestCapital Beltway Operational Test

ALERT and Current Communications

MD ALERTL.E. Vehicle

ALERT.NETServer

MD SHA

MD ALERTL.E. Vehicle

Standard VAL.E. Vehicle

VA ALERTL.E. Vehicle

VA ALERTL.E. Vehicle

MD L.E.DispatchVA L.E.

Dispatch

VDOT

Standard MDL.E. Vehicle

Page 10: August 1999

10 10

Capital Beltway Operational TestCapital Beltway Operational TestTest Objectives

• Document incident management benefits:– In-vehicle system integration– New in-vehicle capabilities– Multi-jurisdiction interoperability

• Obtain user feedback:– New procedures and organizational frameworks– Enhancements to ALERT system

Page 11: August 1999

11 11

Capital Beltway Operational TestCapital Beltway Operational TestAnticipated Benefits

• Incident management effectiveness– Quicker response and clearance– More efficient resource allocation

• Responder safety enhancement

• Responder efficiency– Improved incident data collection– Fast and accurate reporting

• User acceptance

Page 12: August 1999

12 12

Capital Beltway Operational TestCapital Beltway Operational TestProject Overview

Major Area• Technical development,

testing and production– ALERT vehicles

– ALERT.NET

– ALERT client software

• Procedures development, testing and implementation

• Operational test preparation and execution

Leads

FHWA/TTI; installation contractor

Beltway agencies

Beltway agencies

Page 13: August 1999

13 13

Capital Beltway Operational TestCapital Beltway Operational Test

Beltway Agency Responsibilities

• Own and operate ALERT vehicles

• Develop and implement ALERT operating procedures– vehicle, agency, multi-jurisdiction levels

• Provide non-ALERT baseline and concurrent incident management evaluation data

• Provide assigned personnel– technical liaison, officers, supervisors, support

Page 14: August 1999

14 14

Capital Beltway Operational TestCapital Beltway Operational Test

Project Plan and Schedule (1 of 2)

• Phase I (FY 1999-2000)– Complete ALERT vehicle and ALERT.NET design,

development and laboratory testing• Fire, EMS, MAV• Wireless LAN application

– Prepare for operations:• Deliver multiple vehicles to MD & VA State Police• Conduct user training• Develop and test initial operational procedures

– Establish Center/ALERT.NET interoperability for each participating agency

– Prepare test and evaluation plan

Page 15: August 1999

15 15

Capital Beltway Operational TestCapital Beltway Operational Test

Project Plan and Schedule (2 of 2)

• Phase II (FY 2001)– Deliver all vehicles to participating law

enforcement, fire, EMS, and MAV agencies– Train all users– Implement and refine operating and data

collection procedures

• Phase III (FY 2002)– Conduct operational test and evaluation– Analyze and report benefits

Page 16: August 1999

16 16

Capital Beltway Operational TestCapital Beltway Operational TestOrganization

Field Test Management and Operations

Independent Evaluations

Outreach/PR Project Steering Group

System Development and Production

ALERT In-Vehicle System

Phase I Installation and Testing

Phase II/III Production & Installation

ALERT.NET and Client Software

Engineering and Testing

Installation and Support

Operational and Data Procedure

Development

Project Administration

User Training

FHWA Evaluation

Regional Evaluation