austar coal mine a2 maingate roadway development experiences and lessons learned presenter glenn...
TRANSCRIPT
AUSTAR COAL MINE
A2 MAINGATEROADWAY
DEVELOPMENTExperiences and Lessons
LearnedPresenter
Glenn SobeyDevelopment Mining Engineer
Austar Coal Mine
SITE LOCATIONAustar Coal Mine
AUSTAR IN BRIEF
• Owned and operated by Yancoal Australia.
• Better know for the introduction of the LTCC Longwall Face
• Mines the Greta Coal Seam.
• Development to date utilising 2x ABM20 and 1x ABM25 Continuous Miners.
Austar Coal Mine
MINE OVERVIEWAustar Coal Mine
ShaftD/C
N0.2
3. ShaftUC443m
HTCable Hole
Air HoleComp
Tube
451m
448m
435.7m
HoleBallast
434m
1 ShaftD/C
Bundle Hole
<5
Qu
orro
bolo
ng Fa
ult Z
one
<5
<5
>5
Quorrobolong Fault Zone
Swam
p Fault
Indicated by Seismic
& Drilling
Mag
netics
Gro
und
Mag
netics
Gro
und
Seismic
& Drilling
Seism
ic
Cen
tral D
yke
Abernethy Fault Zone
Bellbird Fault Bellbird Branch Fault
Kalingo Fault Zone
Eg
ling
ton
Fau
lt
Lag
oon
'B' Fa
ult
Lag
oon
'A' Fa
ult
Lag
oon
'C' Fa
ult
Barraba Fault Zone
Greenmount Fault Zone
6m
AberdareCentral
CessnockNo 1
( Kalingo )
100 MAINS
20
1 P
anel
20
2 P
anel
101
Pane
l
200
MAI
NS
102
Pane
l
103
Pane
l
104
Pane
l
455m
HTCable Hole& Nitrogen
DeWater
456m455m
4. ShaftD/C453m
272m
2 ShaftD/C474m
Solcen ic, H ODiesel
2
CURRENT WORKINGS PROPOSED WORKINGS OLD ABANDONED WORKINGS
A2 Maingate
A2 MAINGATE
• Total Block Length 1179m• Design Pillar Dimensions of 100m x 35m• Profile – 5m wide x 3.2m high• Mining Horizon – 1.5 > 2m Coal Tops• 2x ABM20 – Twin and Super Unit
Austar Coal Mine
LW_ ATM07241:1500
3/9/2007
D.J OLLIFFE
LONGWALL A1AUTHORITY TO MINE
S:\01 Austar Safety Management System\002 Mining Operations\010 Longwall\001 Authority to Mine\LW_ATM007 030907 A1 LONGWALL.doc
MINING CONDITIONS• Greta Seam Coal Measures
– 5.5m – 7m thick– low strength (5 - 8MPa)– Immediate 15m of roof laminated
(20-60MPa)
• Immediate floor soft mudstone (20MPa)
• Geotechnical Issues – seam highly cleated and jointed– inseam shear zones– High horizontal stresses (40-
50MPa)
Austar Coal Mine
A2 MAINGATE
• Zone 1 – 2>6c/t – Soft Ribs and Soft Floor
Austar Coal Mine
LW_ ATM07241:1500
3/9/2007
D.J OLLIFFE
LONGWALL A1AUTHORITY TO MINE
S:\01 Austar Safety Management System\002 Mining Operations\010 Longwall\001 Authority to Mine\LW_ATM007 030907 A1 LONGWALL.doc
Zone 1 Zone 2 Zone 3
• Zone 2 – 5>9c/t – High Pressure Stress Zone
• Zone 3 – 10>14c/t – Continuous Cavity Zone
ZONE 1
• Zone 1– Characterised by Soft Ribs and Soft Floor– Rib conditions Structure driven– Floor conditions Water driven
Austar Coal Mine
ZONE 1 – Rib ConditionsAustar Coal Mine
ZONE 1 – Rib ConditionsAustar Coal Mine
AUGER STEELSAustar Coal Mine
The Auger Steel cleared the cuttings far more effectively then the standard Scroll Steel in sugary coal.
ZONE 1 – Floor ConditionsAustar Coal Mine
PIT TOP
#2 SHAFT
KITCHENER FACILITY
#3 SHAFT
#4 SHAFT#1 SHAFT
PROPOSED SHAFTS
CHPP
PIT TOP
#2 SHAFT
KITCHENER FACILITY
#3 SHAFT
#4 SHAFT#1 SHAFT
PROPOSED SHAFTS
CHPP Water from the flooded workings immediately Up Dip of the A2 Maingate caused the soft mudstone floor to break up during wheeling.
FLANKING HOLES
• Drilled in advance of the Development Roadways to control the water seepage into the roadways.
• Repeat of the practise adopted for the A1 Maingate.• Peak water make from some of the holes + 5 l/s.
Austar Coal Mine
LW_ ATM07241:1500
3/9/2007
D.J OLLIFFE
LONGWALL A1AUTHORITY TO MINE
S:\01 Austar Safety Management System\002 Mining Operations\010 Longwall\001 Authority to Mine\LW_ATM007 030907 A1 LONGWALL.doc
A1 Flanking Holes
A2 Flanking Holes
ZONE 1 – Floor ConditionsAustar Coal Mine
Skulls and Brattice
ZONE 2
• Zone 2– High Pressure Stress Zone– Cavities forming in front of the Miner– Face busting out 2m ahead of the cutter head
and 2m above the Top of Coal
Austar Coal Mine
ZONE 2 – Roof CavitiesAustar Coal Mine
ZONE 2 – Roof CavitiesAustar Coal Mine
ZONE 2 – Roof CavitiesAustar Coal Mine
ZONE 2 –Cavity RecoveryAustar Coal Mine
MESHXPRESS PLATESAustar Coal Mine
MESHXpress Plates used to pin the mesh to the spot bolts
Wyberex BoltsAustar Coal Mine
Wyberex Bolts installed and PUR’d to form an artificial beam in the roof above the Dosco marker band.
Bolts in the Rib angled out to reinforce the Rib inbye the face.
300mm x 300mm Pattern
Dosco Band
4m Wyberex Bolt
2m Wyberex Bolt
Cavity Recovery Permit
Permit System introduced due to the high risk nature of recovering the Cavities.
•Permit includes:– A minimum number skilled competent and
experienced operators– The correct materials for the task
Austar Coal Mine
ZONE 3
• Zone 3– Continuous Cavity forming between the face
and the last line of support.
Austar Coal Mine
ZONE 3 – CavitiesAustar Coal Mine
ZONE 3 – CavitiesAustar Coal Mine
ZONE 3 – CavitiesAustar Coal Mine
Cavity SupportAustar Coal Mine
CROWN
SUPPORT
EDGE
SUPPORT
CROWN
SUPPORTEDGE
SUPPORT
MESH
PRODUCTIVITYAustar Coal Mine
Average Shift Advance per Miner
0
1
2
3
4
5
6
7
8
9
10
Date
Met
re /
Sh
ift
Average Shift Advance
Zone 1 Zone 2 Zone 3
• Development in Zone 1 and 2 off-set by Twin Miner.
• Modify Sequence to cope with Conditions.
• Zone 3 Driven as Super Unit.
SAFETY• Nil Lost Time Injuries• Nil Disabling Injuries
Key Factors• Training• Attention to Detail• Close Supervision,• Systems
There were 2 First Aid Injuries due to roof material
Austar Coal Mine
CONCLUSION
Safety First and Development will Follow
Austar Coal Mine
QUESTIONS?Austar Coal Mine