auto board power testing george madden principle engineer
TRANSCRIPT
![Page 1: Auto Board Power Testing George Madden Principle Engineer](https://reader036.vdocuments.net/reader036/viewer/2022072013/56649e455503460f94b3a55e/html5/thumbnails/1.jpg)
Auto Board Power TestingGeorge Madden
Principle Engineer
![Page 2: Auto Board Power Testing George Madden Principle Engineer](https://reader036.vdocuments.net/reader036/viewer/2022072013/56649e455503460f94b3a55e/html5/thumbnails/2.jpg)
CHALLENGE
Boards are becoming ever complex Board level power (Point of Loads) solutions
are increasing dramatically Typical complex board have 50+ supplies Time to market ever decreasing
![Page 3: Auto Board Power Testing George Madden Principle Engineer](https://reader036.vdocuments.net/reader036/viewer/2022072013/56649e455503460f94b3a55e/html5/thumbnails/3.jpg)
Current Day Solution
Increase power engineer staff to test Reduce test coverage by eliminating some
test cases and do targeted testing of certain supplies
Test only at one range (either minimum input or maximum input)
Push testing to IC vendors
![Page 4: Auto Board Power Testing George Madden Principle Engineer](https://reader036.vdocuments.net/reader036/viewer/2022072013/56649e455503460f94b3a55e/html5/thumbnails/4.jpg)
Current Day Solution
Using power engineers to perform repetitive testing is not a good use of resource
Reducing test coverage results in reduction of quality, leaves gaps in test coverage and potentially affect yields
Ultimately will cost the company money as problems from manufacturing, field failures and reputation
Push testing to IC vendors will cause delay since most boards use different IC vendors (e.g. LT, Maxim, ADI, Infineon, International Rectifier, MPS, etc), same board will need to be passed between IC vendors to test, further adding additional delay
In addition, IC vendors will in turn bear the burden of test and will need to increase their resources
![Page 5: Auto Board Power Testing George Madden Principle Engineer](https://reader036.vdocuments.net/reader036/viewer/2022072013/56649e455503460f94b3a55e/html5/thumbnails/5.jpg)
ABT
![Page 6: Auto Board Power Testing George Madden Principle Engineer](https://reader036.vdocuments.net/reader036/viewer/2022072013/56649e455503460f94b3a55e/html5/thumbnails/6.jpg)
ABT is a high speed fully automated board level power test and report generation tool
WHAT IS ABT
![Page 7: Auto Board Power Testing George Madden Principle Engineer](https://reader036.vdocuments.net/reader036/viewer/2022072013/56649e455503460f94b3a55e/html5/thumbnails/7.jpg)
Interacts and controls all test equipment Gathers and stores data in database Automatically generates report Testing can be done at a fraction of the time
as compared with manual testing
ABT Overview
![Page 8: Auto Board Power Testing George Madden Principle Engineer](https://reader036.vdocuments.net/reader036/viewer/2022072013/56649e455503460f94b3a55e/html5/thumbnails/8.jpg)
TESTs include: Startup Shutdown Switch Node Load Regulation Transient Short Circuit Loop Response Efficiency Above tests done at both min and maximum
input voltages
TESTS
![Page 9: Auto Board Power Testing George Madden Principle Engineer](https://reader036.vdocuments.net/reader036/viewer/2022072013/56649e455503460f94b3a55e/html5/thumbnails/9.jpg)
Quick turn around confidence test results Test report can be completed in DAYS rather
than in weeks Much money can be saved in terms of test
time for the company doing the testing (design team or IC vendor)
Time saved better used to focus on other design challenges
BENEFITS TO CUSTOMERS
![Page 10: Auto Board Power Testing George Madden Principle Engineer](https://reader036.vdocuments.net/reader036/viewer/2022072013/56649e455503460f94b3a55e/html5/thumbnails/10.jpg)
One Power Supply Demo From initiation to report generation less than
10 min
Video Demo of ABT
![Page 11: Auto Board Power Testing George Madden Principle Engineer](https://reader036.vdocuments.net/reader036/viewer/2022072013/56649e455503460f94b3a55e/html5/thumbnails/11.jpg)
Video Demo of ABT