automated railway system
TRANSCRIPT
![Page 1: Automated Railway System](https://reader035.vdocuments.net/reader035/viewer/2022062503/58ef89161a28abbb578b458d/html5/thumbnails/1.jpg)
AUTOMATED RAILWAY
SIGNALING & TRACK
CHANGINGA Project of
EEE 304: Digital Electronics Laboratory
PREPARED FOR PREPARED BYAhmed ZubairLecturer, BUET
&Upal MahbubLecturer, BUET
Noor-A-Junnat (0806139)Imam-uz-zaman 0806140)Ashfiqul Hamid (0806141)Partha Sarathi Sarker (0806142)Ruponti Nath (0806143)Mohammad Wahiduzzaman Khan (0806144)
![Page 2: Automated Railway System](https://reader035.vdocuments.net/reader035/viewer/2022062503/58ef89161a28abbb578b458d/html5/thumbnails/2.jpg)
OUTLINE
Objectives Why necessary? Features Diagram Implementation Costs
![Page 3: Automated Railway System](https://reader035.vdocuments.net/reader035/viewer/2022062503/58ef89161a28abbb578b458d/html5/thumbnails/3.jpg)
getting acquainted with real life digital logic design and implementation practices
digitally implementing the total signaling process and track changing process in a railway system
employing combinational and sequential logic circuitry to shape a purposeful gadget
![Page 4: Automated Railway System](https://reader035.vdocuments.net/reader035/viewer/2022062503/58ef89161a28abbb578b458d/html5/thumbnails/4.jpg)
WHY NECESSARY
![Page 5: Automated Railway System](https://reader035.vdocuments.net/reader035/viewer/2022062503/58ef89161a28abbb578b458d/html5/thumbnails/5.jpg)
WHY NECESSARY A lot of people depend on the
railway for transportation Railway is broadly used for
transporting goods also Technological implementation
in this field is essential Saving time is also another
primary concern Manual control of railway
system is hazardous & time-consuming
![Page 6: Automated Railway System](https://reader035.vdocuments.net/reader035/viewer/2022062503/58ef89161a28abbb578b458d/html5/thumbnails/6.jpg)
FEATURES Compatible for the speed measurement
of trains. Provision for automated signaling. Ensures security by excluding manual
operation system. Ensures a smooth and safe track
changing process where only one train have to be stopped only for some minutes.
![Page 7: Automated Railway System](https://reader035.vdocuments.net/reader035/viewer/2022062503/58ef89161a28abbb578b458d/html5/thumbnails/7.jpg)
Schematic Diagram
![Page 8: Automated Railway System](https://reader035.vdocuments.net/reader035/viewer/2022062503/58ef89161a28abbb578b458d/html5/thumbnails/8.jpg)
COSTS The primary cost incurred is 2500Tk. The application of digital technology in
this case is not very costly. So it is affordable.