STUDY ON REPAIR AND MAINTENANCE OF LPG STORAGE BULLET
PROJECT GUIDES TEAM MEMBERS
INTERNAL GUIDE
Mr.S.KANNAN, M.E., (Ph.D),ASSOCIATE PROFESSOR,
AVC COLLEGE OF ENGG.
EXTERNAL GUIDE
Mr.S.DEEPAK,B.Tech,(MAINT/PLANNING-PROJECTS),
CPCL PANNANGUDI.
M.ANAND (80107144005)
P.SENTHILKUMAR (80107144045)
S.SUDHARSANAN (80107144048)
G.PRABHU (80107144504)FINAL MECHANICAL
April 19, 20232
![Page 3: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/3.jpg)
OBJECTIVE
To study about the Maintenance and Repair of the LPG bullets in Chennai Petroleum Corporation Ltd (CPCL).
To make recommendations for the recurring problem.
April 19, 20233
![Page 4: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/4.jpg)
BULLET
Bullet is a LPG storage unit used in the oil refinery Industries.
It is look like in the shape of diesel or petrol tankers in the lorries.
April 19, 20234
![Page 5: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/5.jpg)
LPG STORAGE BULLET
April 19, 20235
![Page 6: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/6.jpg)
BULLET SPECIFICATIONS
Diameter : 4m
Length : 16m
Wall Thickness : 28 mm to 32 mm
Material : SA 516 Gr70(high quality
carbon steel)
Design code : ASME sec 8 div1-1989
Operating temp : 450c Hydrostatic pressure : 22.5 Kg/cm2April 19, 20236
![Page 7: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/7.jpg)
2D VIEW OF LPG STORAGE BULLET
April 19, 20237
![Page 8: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/8.jpg)
BULLET DIAGRAMS
April 19, 20238
![Page 9: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/9.jpg)
SECTIONAL VIEW OF THE BULLET
April 19, 20239
![Page 10: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/10.jpg)
BULLET MATERIALMATERIAL SA 516 GR 70
It is a high quality carbon steel plate for boiler and pressure vessel.
Carbon : 0.27-0.31% Manganese : 0.79-1.3% Phosphorous : 0.035%max Sulphur : 0.035%max Silicon : 0.13-0.45%
April 19, 202310
![Page 11: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/11.jpg)
Maintenance methodology (Existing)
De commissioning Erection of scaffolding Cleaning inside the bullet for NDT tests Ultrasonic Flaw Detection Testing Ultrasonic thickness measurement Hardness testing Spot Radiography tests Cleaning outside the bullet for NDT tests Nozzle replacement Stress relieving process Hydro testing of bullets Box up the nozzles
April 19, 202311
![Page 12: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/12.jpg)
After studying about the existing maintenance methodology the frequently faced problems were found out.
April 19, 202312
![Page 13: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/13.jpg)
PROBLEMS FACED:
It was observed that shell external, shell nozzles, nozzles flanges were found heavily corroded.
Therefore nozzles and nozzle flanges were replaced with approval from Chief controller of Explosives, Nagpur.
Maintenance cost was increased due to replacement of nozzles.
Downtime is also increased.April 19, 202313
![Page 14: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/14.jpg)
RECOMMENDATION
Insulation to be provided and aluminium sheet to be covered over the insulation (or) to reduce the external corrosion around the bullet every year it should be painted.
April 19, 202314
![Page 15: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/15.jpg)
April 19, 202315
![Page 16: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/16.jpg)
April 19, 202316
![Page 17: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/17.jpg)
April 19, 202317
![Page 18: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/18.jpg)
Existing maintenance cost
For 40 years (the life time of the plant)
Total maintenance action – 8 timesTotal maintenance cost – 2 croresi.e.8times X 25 lakhs = 2 crores.
April 19, 202318
![Page 19: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/19.jpg)
According to our recommendations
Total cost for insulation material with Aluminium cover plate Rs.100000.
Total cost for water sealing compounds with shed arrangement is Rs.20000.
(including labour cost)
April 19, 202319
![Page 20: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/20.jpg)
LIFE TIME OF THE BULLET AND SAVING COST NOZZLES. By providing the insulation with Aluminium cover
plate we can increase the life from 5 years to 8 years.
The capacity of the plant is 40 years.
i.e. for 8 times X 5 years = 2 crores. (25 lakhs per time)
for 5 times X 8 years = 1.25 crores. (25 lakhs per time)
So that the maintenance cost is reduced up to 75 lakhs
April 19, 202320
![Page 21: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/21.jpg)
For providing Aluminium plate covering with insulation
April 19, 202321
![Page 22: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/22.jpg)
By providing the water sealing compounds with the shed type arrangement we can increase the life time of the nozzle form 5 to 6 years.
The capacity of the plant is 40 years.
i.e. for 8 times X 5 years = 2 crores. (25 lakhs per time)
for 7 times X 8 years = 1.75 crores. (25 lakhs per time)
So that the maintenance cost is reduced up to 25 lakhs (approximately.)
April 19, 202322
![Page 23: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/23.jpg)
For providing water sealing compound
April 19, 202323
![Page 24: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/24.jpg)
ADVANTAGES Maintenance cost is reduced. Life time of the nozzle is increased. Downtime is also decreased. It is one of the method to avoid the major LPG
tank accident
April 19, 202324
![Page 25: AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September 20151](https://reader030.vdocuments.net/reader030/viewer/2022013011/56649e0d5503460f94af753f/html5/thumbnails/25.jpg)
April 19, 202325