aviation article : getting the right picture

7
Civil Aviation & Meteorology Authority )Yemen( October - December 2012, issue 17 COP 18 IN DOHA AIRLINE STARTUP A JURNEY TO WADI DO’AN www.camamagazine.com largest development projects at a cost of 15.5$ billion New Doha International Airport

Upload: mohammed-hadi

Post on 15-Jan-2017

521 views

Category:

Business


3 download

TRANSCRIPT

Civil Aviation & Meteorology Authority )Yemen( October - December 2012, issue 17

COP 18 IN DOHA

AIRLINE STARTUP

A JURNEY TO WADI DO’AN

www.camamagazine.com

largest development projects at a cost of 15.5$ billion

New Doha International Airport

26 study

AIRLINE STARTUPThe issue of airline startup is very complicated, it is manage by a huge aviation consultant companies and airline manufactures such

Boeing and Airbus. that customize the results to fitted to their interests and products, off course their aircraft are the best in the world but when the airlines falls to make a profits, then it become a management issue, so either to make good start for new established

airlines or implement turn around program for existing one.So to make a good start for an airline both manufactures lunch an outstanding teams to facilitate the starting up phase, they do that as

they care about their brand name ( Boeing or Airbus ), so they want to ensure that the airline industry business is healthy in spite of the tight margin of profit. Everyone has its own way for analysis of starting up of airline, we are going to address road map by Boeing , start me up by Airbus, one from airline industry, and finally a new approach that based on the airline inputs only.

Mohammed Salem AwadResearch Scholar Aviation Management

“Airline Idea”

General Industry & Competitive Analysis

Target Market Analysis and Service Offering

Route StructureDevelopment

Schedule Development

Marketing Strategy and SWOT Analysis

Aircraft Evaluation and Fleet planning

Market share (Revenue) Forecasting

Operating Plan (Expense) Development

Financial Model Development

Management Team Recruiting

Business Capitalization Airline Launch

Startup-Airline “Roadmap”

Enter into Service (EIS)

Airline Operator Certification (AOC)

Aircraft Sourcing

Staffing/Facilities

Business PlanDevelopment

Iterations

1- Airbus Approach:The Start Me Up V- PlanBoth approaches )Airbus and Boeing( started by Airline Idea, the first thing what type of service we want to deliver, is it Legacy Airline, Hybrid, or LCC )Low Cost Carriers( and what business model to follow, what are the trends and the potential in regions/market, can we capture the proposed share, then a business plan should be set up, when the financial model shows a positive signal in first year or may be later )two years(, the business plan should be minimum for 5 years operations, this should include network structure, aircraft selection, and operating model, whence the business plan in hand, then we secure the aircrafts, and involve in AOC process, recruit management, business capitulation, facilities staff operational plan, departments setup, and takeoff.

2- Boeing Approach: Startup Boeing - RoadmapAlso Boeing started by Airline Idea, as mentioned previously, the steps are more explore by Boeing, as General Industry & Competitive Analysis, Target Market Analysis and Service Offering, Route Structure Development, Schedule Development, Market Strategy and SWOT Analysis, Aircraft Evaluation and Fleet Planning, Market Share )Revenue( Forecasting, Operating Plan )Expense(, Financial Model Development, Development, Management Team RecruitingThat most of steps mentioned by Airbus, the new thing is the Business Plan Development Iterations, the model can be adjusted to meet the demand and get right picture of business. Whence the investors are comfortable, the process can be extended further to Business Capitalization, Airline Operator certification, aircraft sourcing, staff/Facilities and Inter into the Service.

go / no go

airline idea

Project feasibility

Business plan

Network structure

Aircraft evaluation

Operating model

Financial model

Take-off

Entry into services

Department set up

Operations plan

Business capitalization

Recruit management

AOC process

Source aircraft

the start me up v-plan

CAMA Magazine | issue 17 | December, 2012

27study

3- Airline Industry ApproachMost of consultancy firm follow two stages approach e.g: )www.eagleconsulting.aero( in the following outline:

Planning • Concept Formulation• Feasibility Assessment • Business Plan Development

Implementation

• Implementation Planning.• Funding Soured • Management Recruitment• Air Operating Certification • Aircraft Sourced• Operational Set Up

4- U curve Approach:Based on my experience and published research papers, airline can be define by four categories i.e Demands, Fares, Distances, and Cost.Which developed the optimum operating curve of the proposed network of airline startup.

Further my current concern is to address the feasibility parts of Airline Startup.

The approach started by Airline Idea, i.e LCC, Hybrid, Legacy, or Network airline.

Another issue is market estimation – Demand forecasting either on the existing network, or establishing new destinations.The basic analysis formula is:

The model constructed by Five main parts 1- Developing Integer program 2- Implemented U curve technique, and 3- Defining Optimum operating curve 4- Setting Optimum Fare strategy 5- Improve route profitability

The new concept in this model is how to define the right aircraft without the interface and guidance of the manufactures, and it follows by benchmarking study to position the right cost to right the business model based on airline )Fleet/Aircraft( input.

Conclusions:No doubts about the facility that offers by manufactures, but definitely that analysis will be biased, sure we will not get any manufacture analysis support the other competitor manufacture argument. That why a third party should be involve in process of airline startup. While for U curve approach, it relay on the airline side and information that reflects the optimum operating curve and with benchmarking study we can position the other operators cost on line to utilize their operating experience in our figure which gives a correct picture about the business to use the right size of Aircrafts for proposed network.■

U Curve Techniques

Model

Integer ProgramOptim

um Curv

e

Solution

Operational set up

Launch

Concept Formulation

Feasibility Assessment

Business Plan Development

Implementation Planning

Funding Sourced

Management recruitment

Air Operating Certification

Aircraft Sourced

Impl

emen

tatio

n

Plan

ning

Jet BlueA320

Air ArabiaA320

Air AsiaA320

Ryan AirB737-800

Max A/C seat300

250

200

150

100

50

00.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.10

Operating Curve

Num

ber o

f Sea

t

Cost per ASK

Optimum Operating Curve

CAMA Magazine | issue 17 | December, 2012

30

Prepared by: Mohammed Salem AwadResearch Scholar – Aviation Management

Getting The Right Picture

Head to Head analysisSeasonally Adjusted Vs Seasonally Fitted

Airports Forecasting

Furthers to my previous articles, this article will address the difference and compare the Seasonally Adjusted technique Vs Seasonally Fitted. Basically Forecasting model can be defined by four components i.e Trend, Cyclical, Seasonal, and Irregular. A model that treats the time series values as a sum of the components is called an additive component model (Yt=Tt+Ct+St+It) , While a model that treats the time series values as a product of the components is called a multiplicative component model (Yt=Tt×Ct×St×It)

Seasonally Adjusted: Most economic series published by international Organizations ) IATA, ICAO( are seasonally adjusted because seasonal variation is not of primary interest. Rather, it is the general patterned of economic activity, independent of normal seasonal fluctuation that is of interest. So seasonally adjusted is done to simplify data so that they may be more easily interpreted by statistically unsophisticated users without a significant loss of information. e.g – IATA Forecasting.

Seasonally Fitted: General guidance, we set a constrains to measure the Goodness of Fit, this time we use R and Signal Tracking ( R ≥ 80 and 4 ≥ S.T.≥ -4 ). The seasonal model fairly fitted by defining and controlling two main factors for mapping the figure, first is Displacement Factor which can be defined by the value of signal tracking, it is either upper or lower of the base forecasting line. Where the second factor is the rotating angle and that can be monitor by the value of R i.e why both R and signal tracking are displayed in the graph.

Summary: Both methods are fair, so to get the general trend, we use seasonally adjusted but to ensure to get the right picture we have to define the seasonality patterned and define their accuracy measuring factors in terms of R and Signal Tracking, the issue of this method only its applicability for short range period 1-3 years if we exceed the time/period the program should modified and set a new one.

CAMA Magazine | issue 17 | December, 2012

billion’s monthly f/cast

Actual Seasonally Adjusted Forcast

R2 = 90%

Tracking Signal = -0.0000028

Time

billi

on’s

mon

thly

International scheduled passenger traffic (RPKs) Industry totalLatest data April 2011

Time

OumraSession

HajjSession

SummerSession

WinterSession

Actual Year Cycle

Forecasted Year Cycle

Sal

es /

Pas

seng

ers

Back to schoolSession

“Facts are Many but the Truth is One.” Rabindranath Tagore

IATA

IATA

31

Airports Forecasting:Airport forecasting is an important issue in Aviation industry. It becomes an integral parts of transportation planning. It sets targets and goals for the airports, either for long term or medium term planning. The primary statistical methods used in airport aviation activity forecasting are market share approach, econometric modeling, and time series modeling.

Model Used:Based on a historical data of the airports, )3 years on monthly bases( the mathematical model is developed where its fairness and goodness of fit can be defined by two important factors:

R2 )Coeff. Of Determination( > 80%S. T (Signal Tracking) ..(- 4 ≥ S.T. ≤ 4) This time we try to set )S.T.( to Zero

Oslo Airport, Gardermoen)Norwegian: Oslo lufthavn, Gardermoen; IATA: OSL, ICAO: ENGM(, also known as Gardermoen Airport, is the principal airport serving Oslo, the capital of and most populous city in Norway. Oslo is also served by the low-cost Torp Airport and Rygge Airport. Gardermoen acts as the main domestic hub and international airport for Norway, and is the second-busiest airport in the Nordic countries.

R2 = 93%, S.T.= 02013 )F( = 23,717,975 Pax

Munich Airport)IATA: MUC, ICAO: EDDM( )German: Flughafen München(, is an international airport located 28.5 km )17.7 mi( northeast of Munich, Germany, and is a hub for Lufthansa and Star Alliance partner airlines. It is located near the old city of Freising and is named in memory of the former Bavarian Prime minister Franz Josef Strauss. The airport is located on the territory of four different municipalities: Oberding )location of the terminals; district of Erding(, Hallbergmoos, Freising and Marzling )district of Freising(.

R2 = 94%, S.T.= 02013 )F( = 42,565,394 Pax

Paris Orly Airport)French: Aéroport de Paris-Orly( )IATA: ORY, ICAO: LFPO( is an international airport located partially in Orly and partially in Villeneuve-le-Roi, 7 NM )13 km; 8.1 mi) south of Paris, France. It has flights to cities in Europe, the Middle East, Africa, the Caribbean, North America and Southeast Asia. Prior to the construction of Charles de Gaulle Airport, Orly was the main airport of Paris.

R2 = 91%, S.T.= 02013 )F( = 29,120,442 Pax

Passengers Forecasting 2013Oslo Airport

1,000,000

1,200,000

1,400,000

1,600,000

1,800,000

2,000,000

2,200,000

2,400,000

No

of P

asse

nger

s

TIME (Month)

ForecastActual

R2 = 93 %S.T.= 02013(F) = 23,717,975 Pax

Passengers Forecasting 2013Munich Airport

1,200,000

1,700,000

2,200,000

2,700,000

3,200,000

3,700,000

4,200,000

4,700,000

No

of P

asse

nger

s

TIME (Month)

ForecastActual

R2 = 94 %S.T.= 02013(F) = 42,565,394 Pax

Passengers Forecasting 2013Orly Airport

1,200,000

1,400,000

1,600,000

1,800,000

2,000,000

2,200,000

2,400,000

2,600,000

2,800,000

3,000,000

3,200,000

No

of P

asse

nger

s

TIME (Month)

ForecastActual

R2 = 91 %S.T.= 02013(F) = 29,120,442 Pax

CAMA Magazine | issue 17 | December, 2012

Airport forecAsting

32

Edinburgh Airport

)Scottish Gaelic: Port-adhair Dhùn Èideann( )IATA: EDI, ICAO: EGPH( is located at Turnhouse in the City of Edinburgh, Scotland, and was the busiest airport in Scotland in 2011, handling just under 9.4 million passengers in that year. It was also the sixth busiest airport in the UK by passengers and the fifth busiest by aircraft movements. It is located 5 nautical miles )9.3 km; 5.8 mi( west of the city centre and is situated just off the M8 motorway.

R2= 93%S.T.= 02013)F( = 9,688,572 Pax

Avinor – (airports traffic)

AS is a state-owned limited company that operates most of the civil airports in Norway. The Norwegian state, via the Norwegian Ministry of Transport and Communications, controls 100 percent of the share capital. Avinor was created on 1 January 2003, by the privatization of the Norwegian Civil Aviation Administration known as Luftfartsverket. Its head office is in Bjørvika, Oslo, located on the seaside of Oslo Central Station.

R2= 92%S.T.= 02013)F( = 49,847,034 Pax

Gold Coast Airport, or Coolangatta Airport

)IATA: OOL, ICAO: YBCG( is an Australian domestic and international airport at the southern end of the Gold Coast, some 100 km )62 mi( south of Brisbane and 25 km )16 mi( south of Surfers Paradise. The entrance to the airport is situated in the suburb of Bilinga on the Gold Coast. The runway itself straddles five suburbs of twin cities across the state border of Queensland and New South Wales. During summer these states are in two different time zones.

R2= 0.64%S.T.= 02013)F( = 5,551,812 Pax

Passengers Forecasting 2013Edinburgh Airport

Passengers Forecasting 2013Avinor Airport

Passengers Forecasting 2013Gold Coast Airport

400,000

500,000

600,000

700,000

800,000

900,000

1,000,000

1,100,000

No

of P

asse

nger

s

TIME (Month)

ForecastActual

R2 = 93 %S.T.= 02013(F) = 9,688,572 Pax

2,200,000

2,700,000

3,200,000

3,700,000

4,200,000

4,700,000

5,200,000

No

of P

asse

nger

s

TIME (Month)

ForecastActual

R2 = 92 %S.T.= 02013(F) = 49,847,034 Pax

300,000

350,000

400,000

450,000

500,000

550,000

600,000

No

of P

asse

nger

s

TIME (Month)

ForecastActual

R2 = 0.64 %S.T.= 02013(F) = 5,551,812 Pax

CAMA Magazine | issue 17 | December, 2012

Airport forecAsting

Cairns Airport

)IATA: CNS, ICAO: YBCS( is an international airport in Cairns, Queensland, Australia. Formerly operated by the Cairns Port Authority, the airport was sold by the Queensland Government in December 2008 to a private consortium. It is the seventh busiest airport in Australia. The airport is located 2.3 nautical miles )4.3 km; 2.6 mi( north northwest [1] of Cairns or 7 kilometres )4.3 mi( north of the Cairns central business district, in the suburb of Aeroglen. The airport lies between Mount Whitfield to the west and Trinity Bay to the east.

R2= 92%S.T.= 02013)F( = 4,297,288 Pax

[1] http://en.wikipedia.org/wiki/Main_Page

Melbourne Airport

)IATA: MEL, ICAO: YMML(, also known as Tullamarine Airport, is the primary airport serving the city of Melbourne, and the second busiest airport in Australia. It was opened in 1970 to replace the nearby Essendon Airport. Melbourne Airport is the sole international airport of the four airports serving the Melbourne metropolitan area.The airport is 23 km )14 mi( from the city centre. The airport has its own postcode—Melbourne Airport, Victoria )postcode 3045(. This is adjacent to the suburb of Tullamarine.

R2= 83%S.T.= 02013)F( = 29,942,351 Pax

Brisbane Airport

)IATA: BNE, ICAO: YBBN( is the sole passenger airport serving Brisbane and is the third busiest airport in Australia after Sydney Airport and Melbourne Airport. Brisbane Airport has won many awards. Brisbane is currently served with 46 domestic destinations in all States and Territories and 32 international destinations. For the 12 months ending May 2011 total passengers were 20,056,416.

R2= 93%S.T.= 02013)F( = 21,932,169 Pax

33

Passengers Forecasting 2013Brisbane Airport

Passengers Forecasting 2013Cairns Airport

Passengers Forecasting 2013Melbourne Airport

1,200,000

1,300,000

1,400,000

1,500,000

1,600,000

1,700,000

1,800,000

1,900,000

2,000,000

2,100,000

No

of P

asse

nger

s

TIME (Month)

ForecastActual

R2 = 93 %S.T.= 02013(F) = 21,932,169 Pax

200,000

250,000

300,000

350,000

400,000

450,000

No

of P

asse

nger

s

TIME (Month)

ForecastActual

R2 = 92 %S.T.= 02013(F) = 4,297,288 Pax

1,800,000

1,900,000

2,000,000

2,100,000

2,200,000

2,300,000

2,400,000

2,500,000

2,600,000

2,700,000

2,800,000

No

of P

asse

nger

s

TIME (Month)

ForecastActual

R2 = 83 %S.T.= 02013(F) = 29,942,351 Pax

CAMA Magazine | issue 17 | December, 2012

Airport forecAsting