aviation support equipment - navy aviation … land based mid range tow tractor - ecass - legacy...

21
Aviation Support Equipment CAPT Mike Belcher PMA260 October 2008 [email protected]

Upload: vanhuong

Post on 25-May-2018

237 views

Category:

Documents


2 download

TRANSCRIPT

Aviation Support Equipment

CAPT Mike BelcherPMA260October [email protected]

2

PMA260 Overview

Provide cost effective aviation common support equipment in support of fleet operations and maintenance activities. Fund requirements for replenishment of peculiar support equipment (PSE) for out ofproduction weapon systems

Scope: – 2,482 total different end items of Aviation Support Equipment – 157 funded programs across the FYDP– 124 current contracts in place– Current Designated Programs:

• 1 ACAT II = Consolidated Automated Support System (CASS) • 4 ACAT IVM

- Hydraulic Power Supply System- Land Based Mid Range Tow Tractor- eCASS- Legacy Automatic Test Equipment Offload to CASS

• 45 Abbreviated Acquisition Programs (AAPs)

3

PMA260 Overview (con’t)

Additional responsibilities – Provide SE leadership role for the Naval Aviation Enterprise– DoD Executive Directorate for Automatic Test Systems– Member of the Joint Panel for Aviation Support Equipment

(JPAVSE) committee // Aviation Common Systems (ACS)//Joint Aeronautical Logistics Commanders (JALC)

– Manage AUTOSERD & SERMIS (SEMS)– Designated as an USD(AT&L) Reduction of Total Ownership

Cost (RTOC) Special Interest Program

OPNAV Sponsors– CDR Richard Dorn – N881C5– LCDR Louis Goncalves – N881C3– Major John McDermott – N881C4

4

= EOB

= NWCF

LEGEND

SecretaryCarla Alvino (GS7)

PMA260S

SecretaryCarla Alvino (GS7)

PMA260SPrincipal Deputy PMDennis Albrecht (GS15)

(PMA260A)

Principal Deputy PMDennis Albrecht (GS15)

(PMA260A)

AVIATION SE PM/ DIR, ATS EDCAPT Mike Belcher, USN

(PMA260)

AVIATION SE PM/ DIR, ATS EDCAPT Mike Belcher, USN

(PMA260)

Program Office Competency

RolesDEPUTY PM FOR ATS Systems

Asst. Dir. for ATS EDBill Ross (GM15)

(PMA260D)Gov’t 164.1 MIL 14.5 CSS 57.3

Deputy PM for CASSCAPT John Smajdek, USN

(PMA 260DA)

DEPUTY PM FOR ATS SystemsAsst. Dir. for ATS ED

Bill Ross (GM15)(PMA260D)

Gov’t 164.1 MIL 14.5 CSS 57.3Deputy PM for CASS

CAPT John Smajdek, USN(PMA 260DA)BFM

Vacant (AIR-7.8)Gov’t- 3, Mil-0, CSS- 0

BFMVacant (AIR-7.8)

Gov’t- 3, Mil-0, CSS- 0

ContractsLCDR M. Axinto (AIR-2.0)

Gov’t-2 Mil-1 CSS-0

ContractsLCDR M. Axinto (AIR-2.0)

Gov’t-2 Mil-1 CSS-0

LegalBrenda Dowdle (AIR-11.0)

Gov’t-1 Mil-0 CSS-0

LegalBrenda Dowdle (AIR-11.0)

Gov’t-1 Mil-0 CSS-0

Cost EstimatingCost Estimating

Engineering & TestMike Flynn AIR-4.0

Gov’t-2.25 Mil-0 CSS-0

Engineering & TestMike Flynn AIR-4.0

Gov’t-2.25 Mil-0 CSS-0

Fleet Support TeamFleet Support Team

LogisticsMark Dobson (AIR-6.0)

LCDR Rick Braunbeck, USNGov’t-3 Mil-1 CSS-1

LogisticsMark Dobson (AIR-6.0)

LCDR Rick Braunbeck, USNGov’t-3 Mil-1 CSS-1

Test & Eval RepTest & Eval Rep

AIRFRAMES & PROPULSION/SEKen Sands (GS14)

(PMA260C2)Gov’t-73 MIL-1.6 CSS-9.3

ARMAMENT, AC WIRING, VIB, WEPS CONT SEBill Englehart (GS 14)

(PMA260C1)Gov’t-62.0 MIL3.6 CSS-7.4

AIRCRAFT WIRING/Corrosion ControlJay Losee (GS13)

(PMA260C12)Gov’t-11.9 MIL-.5 CSS-1.7

Airframes & Electrical CSE

Greg Bauer (GS13)(PMA260C23)

Gov’t-18.0 MIL-.5 CSS-1.9

ARMAMENT/ Weapon Cont CSE

LT Tilley, USN(PMA260C11)

Gov’t 21.7 MIL1.4 CSS 2.7

PROPULSION CSEMike Kopan (GS13)

(PMA260C22)Gov’t-35.9 MIL-0 CSS-4.0

Hydraulics, Cryogenics & RCM

LCDR Tony Kelly, USN(PMA260C21)

Gov’t-19.1 MIL1.1 CSS-3.4

EW/COM/NAV CSE LT Bittle, USN(PMA260C13 )

Gov’t-27.4 MIL1.7 CSS-3.0

ASST FOR ATEPLANNING PM

Pat Weaver (GS14)(PMA260D3)

Gov’t 24.1 MIL 1.8 CSS 10.5

TPS Phase II PMKevin Dusch (GS13)

(PMA260D22)Gov’t 6.9 MIL 0 CSS .7

PHASE II OFFLOAD TEAM PM

Bob Augustine (GS14)(PMA260D2)

Gov’t 16.6 MIL 2 CSS5.7

SE InstallsAVCM Frank KadiUSN (PMA260E11)

Gov’t 2.6 MIL 3 CSS 0

NCSO/AMMRLShawn Durand (GS13)

(PMA260E1)Gov’t 17.7 MIL 3 CSS 2

MPF/MALSP/NALMEB

Vacant(PMA260E12)

Gov’t 0 MIL 3 CSS 0

PMA260IPT Structure

DEPUTY FOR FLEET INTERFACEBill Fennimore (GS14)

(PMA260E)Gov’t 25.3 MIL 9.0 CSS 2.0

DEPUTY FOR FLEET INTERFACEBill Fennimore (GS14)

(PMA260E)Gov’t 25.3 MIL 9.0 CSS 2.0

DEPUTY FOR CSEDavid Sutherland (GS15)

(PMA260C)Gov’t-153.3 MIL-5.2 CSS-27.9

DEPUTY FOR CSEDavid Sutherland (GS15)

(PMA260C)Gov’t-153.3 MIL-5.2 CSS-27.9

Acquisition/PMDennis Albrecht

Gov’t- 2, Mil- 0, CSS- 1

Acquisition/PMDennis Albrecht

Gov’t- 2, Mil- 0, CSS- 1

CASS PRODN PMChris Giggey (GS14)

(PMA260D3)Gov’t 79.4 MIL10.7 CSS22

RT CASS PRODN PMMaj. Rick Jayroe USMC

(PMA260D32)Gov’t42.7 MIL4.8 CSS10.6

eCASS DIPTCDR Carl Nolte, USN

(PMA260D )Gov’t 10.6 MIL2.8 CSS 9.1

eCASSJeff Llewelyn (GS13 )

Gov’t 4.9 MIL0 CSS 2.2

CASSCDR Hugh Clarke, USN

(PMA260D33)Gov’t 17.4 MIL1 CSS .8

5

6

Near-Term CGSE Deliveries

IOC – 4th QTR FY09Instrumentation package being installed in T24 and T16 engine test cells. Supports testing of T-700 and T-64 engines

Shaft Engine Test Instrumentation (SETI)

20 systems installed including 11 CN/CVNs

Instrumentation package being installed in T-1, T-6, T-10 and T-36 engine test cells. Supports testing of F414, F404, J52, F405 & F402 engines

Jet Engine Test Instrumentation (JETI)

IOC – 3rd QTR FY09A/M32C-17 Diesel Air Conditioner in support of C130, P-3, P-8 and E-2C/D aircraft

Large Landbased Air Conditioner

IOC – Dec 08MMG-1A Mobile Motor GeneratorMobile Frequency Converter

107 Diesel, 59 Electric, and 60 Purifiers delivered thru May 08

A/M27T-5/5A & 7/7A Power SuppliesA/M27T-14 (Electric) and A/M27T-15 (Diesel) Hydraulic Power Supplies A/M27T-11 Purifier

650 (out of 1,249) tractors delivered thru May 08

A/S32A-30A SE and A/S32A-42 Mid Range Tow Tractors

A/S32A-45 Mid Range Tow Tractor

Delivery StatusLegacy SE ReplacedNew SE Item

7

Near-Term CGSE Deliveries

Depot field team installation began Nov 07

Replace obsolete components (monitor, computer, printer, keyboard, software, hard drive)

A/F27T-10 Hydraulic Component Test Stand SEC 5701

IOC: Sep 08PON-6 & HSU-1Separate servicing units for transmission, engine oil, hydraulic fluid and rotor fluid

Aircraft Fluid Servicing Units

Sink IOC: 2nd QTR FY00Large Aqueous IOC: 2nd

QTR FY09 Solvent IOC: 2nd QTR FY10

Replaces various units divisions to be installed:Sink: 400, 500 & 600Large Aqueous: 500 & 900Solvent: 500

Parts WashersSinkLarge AqueousSolvent

IOC – 4th QTR FY09A/E27M-9 Tube BenderCL215 Bench Mounted Tube Bender

Hydraulic Tube Bender

IOC – 4th QTR FY09Digitizes radiographic images of inspected components. Replaces wet method development of radiography film.

Computed Radiography

IOC – 2nd QTR FY10Replaces the Oxygen Component Test Stand “Green Monster”

Portable Oxygen Regulator Test Set (PORTS)

Delivery StatusLegacy SE ReplacedNew SE Item

8

Near-Term CGSE Deliveries

ECP kits currently being delivered to Kitting facility.New LALS III units to be delivered SEP 2008 through 2011

Replaces the GFK-21/E32K-7 LALS II Loader. Provides improved tensioner and Aircraft Interface Unit to improve system operation and reliability. Existing LALS II Loaders will be upgraded to LALS III configuration via ECP.

LALS III Loader

Deliveries complete for EA-6B, E-2, C-2, and H-60 applications.Integration efforts against remaining aircraft to be complete 1st quarter FY09 with deliveries to follow.

Replaces TTU-378A/E and A/E24T-159 for O-level testing and troubleshooting of aircraft fuel quantity probes and indicators.

TTU-597E Fuel Control Test Set

Deliveries of all 777 units to be complete by October 2009.ECP in work to support emerging AV-8B Litening Pod, MH-60 Torpedo, and P-3C Harpoon & Maverick requirements.

Replaces obsolete AWM-92, -96A, -98, - 100, -101, ASM-464, A/E-24T-216, TS3519, and MK432 Mod 6 to allow for checkout of weapons release and control interfaces prior to weapons loading.

AN/AWM-103 Stores Management Subassembly Test Set (SMSTS)

Delivery StatusLegacy SE ReplacedNew SE Item

9

R&D effort with multiple vendors was completed to demonstrate achievability of goals.Production contract scheduled for 1st

quarter FY09 with Full Rate Production Decision planned for 1st

quarter FY10.

Will replace multiple PSE and CSE borescopes in an effort to meet the following goals: 1) Improve Survivability, 2) Reduce Proliferation/inventory, 3) Reduction of Maintenance Cost, 4) Improve Training & Reliability, 5) Upgradeable Design, 6) Maximize Commonality of O/I-Levels.

Common Video Borescope Set (CVBS)

Tracking new maintenance requirements through NAVAIR Fiber Optics Working Group. Full Rate Production Decisions Planned for FY10.

New capability required to support the installation of fiber networks on new and emerging platforms. Sets will contain tools/instruments required to test, troubleshoot, and repair fiber optic cabling.

Fiber Optic Test Set (FOTS) and Fiber Optic Repair Set (FORS)

Full Rate Production Decision planned for 3rd quarter FY09.

Replaces existing 3174AS300 Wire Test Set and 3174AS3200 Switching Unit to provide a tester that will analyze the integrity of wiring harnesses based on “pin-out” and electrical characteristics.

Automatic Wire Test Set (AWTS)

Full Rate Production Decision planned for 2nd quarter FY09.

Replaces Tektronix 1502 TDR for diagnosing aircraft wiring faults by detecting opens and shorts. Provides a new capability to determine the distance to these faults.

Handheld Aircraft Wire Tester (HAWT)

Program StatusLegacy SE ReplacedNew SE Item

On-Going CGSE Modernization Efforts

10

Design, development, and contractor testing efforts on-going. Navy development test on full CRAFT scheduled to begin 2nd

quarter for FY-09 with Full Rate Production Decision planned for the end of FY09.

Replaces legacy SM-511, SM-511A, ID-1956, AN/ASM-663, AN/ARM-201, AN/UKM-7, andAN/APM-480A and provides new capability to support Mode 5 IFF testing. IFF only variant also being developed to support shipboard Mode 5 applications. IFF only variants to be delivered in FY09 to support Mode 5 OPEVAL.

AN/USM-708 CNI/RF Avionics Flightline Tester (CRAFT)

Navy developmental testing scheduled for 2nd quarter of FY09. Full Rate production Decision to follow successful completion of testing.

Replaces obsolete AN/ARM-155, AN/ARM-156, 972(V)-1 and DTS-200 TACAN test sets and provides automated I-level capability for testing and troubleshooting of ARN-118, -136, & - 153 TACAN systems.

AN/ARM-206 I-Level TACAN Test Set (ITATS)

Full Rate Production Decision planned for 1st quarter FY09.

Replaces obsolete AN/USM-482, -482A, and -638 for testing and troubleshooting on aircraft of RF transmission lines, in-line components, and antennas. Required only for aircraft that do not use JSECST.

AN/USM-713 Signal Generator Test Set

CDR scheduled for Nov 08.Full Rate Production Decision planned for 1st quarter FY09.

Replaces the obsolete MKIII Rocket Pod Tester for confidence testing of 2.75” and 5.0” Airborne Rocket Launchers. Additional inventory required to support new requirement for rocket pod loading on CVN and L-Class ships.

AN/USM-715 Rocket Pod Test Set

Program StatusLegacy SE ReplacedNew SE Item

On-Going CGSE Modernization Efforts

11

Currently working with USAF to develop a variant of their CAPRE system to meet Navy requirements. IOC would be in 1st quarter FY11.

Replaces the AN/USQ-131B Memory Loader-Verifier Set (MLVS) due to obsolescence issues and to support emerging software loading protocols (Gigabit Ethernet, Fiber Channel, 1553, RS-422, RS-232, JTAG, Serial RS-485, and USB )

Next Generation Software Loader

Currently in the design and development phase with IOC planned for 2nd quarter FY11.

Replaces legacy A/E37T-17 and A/E37T-19 turpoprob engine test systems.

Turboprop Test Instrumentation (TPTI)

Full Rate Production Decision planned for 1st

quarter FY09.Replaces various PSE test sets procured in small quantities by individual platforms with a common solution for locating insufficient p-static bonded components on airframes of blunt nose aircraft.

TS-4543/G Precipitation Static (P-Static) Diagnostic Test Set

Initially being developed for support of F/A-18E/F ALR-67(V)3. Navy Developmental Test scheduled for 3rd quarter of FY10. Addition applications to be developed following successful testing. Full Rate Production Decision planned for 1st quarter FY11.

Replaces requirement for various handheld PSE test sets to provide a pre-flight check to ensure that the aircraft’s EW systems (RWR, ESM, ECS) are operating properly to detect expect threats.

Handheld Radar Simulator

Program StatusLegacy SE ReplacedNew SE Item

On-Going CGSE Modernization Efforts

12

Extensive testing program to start 1st

quarter FY09 with Full Rate Production Decision planned for 1st quarter FY10.

Replaces the USMC A/M32K-4A Prime Munitions Trailer due to the redesign of the USMC prime mover MTVR 7-ton truck.

A/M32K-10 Munitions Trailer

Contract award scheduled for 1st quarter FY09 with Full Rate Production Decision planned for 4th quarter FY10.

New item required to spot H-60 aircraft in close proximity in shipboard hanger bays.

Shipboard HELO Handler

Contract award scheduled for 1st quarter FY09 with Full Rate Production Decision planned for 3rd quarter FY10.

Replaces A/S32A-31B for moving aircraft up to 74,500 lbs on the flight deck aboard all CV/CVN, LHA, LHD, & LHP ships.

Shipboard Tow Tractor

Program StatusLegacy SE ReplacedNew SE Item

On-Going CGSE Modernization Efforts

13

Reducing the CGSE Footprint

I-LevelTACAN

Test Sets

• AN/ARM-155• AN/ARM-156• 972(V)-1• DTS-200

AN/ARM-206I-Level TACAN

Test Set (ITATS)4 1

60% Inventory Reduction

O-LevelCNI

Test Sets

AN/ARM-206I-Level TACAN

Test Set (ITATS)7 1

59% Inventory Reduction

• SM-511• SM-511A• ID-1956• AN/ASM-663• AN/ARM-201• AN/UKM-7• AN/APM-480A

O-LevelEW

Test SetsAN/USM-713

Signal GeneratorTest Set

(All other a/c not supported by JSECST)

4 2 8% Inventory Reduction• AN/USM-482• AN/USM482A• AN/USM-406• AN/USM-638

AN/USM-670JSECST

(F/A-18, EA-6B, AV-8B, & E-2)

14

Reducing the CGSE Footprint

O-LevelWeaponsRelease &

ControlTest Sets

AN/AWM-103Stores Management

Subassembly Test Set9 1

57% Inventory Reduction

• AN/AWM-92• AN/AWM-96A• AN/AWM-98• AN/AWM-100• AN/AWM-101• AN/ASM-464• A/E-24T-216• TS-3519• MK-432 Mod 4/6

O & I LevelBorescope

Sets

CommonVideo Borescope

Set (CVBS)>8 1

>13% Inventory Reduction

• 1998AS100-1• 2023AS100-1• 3353AS100-1• 3354AS100-1• 3355AS100-1• 3356AS100-1• 3358AS100-1• Additional PSE

Borescope Sets

15

Replacing Legacy ATE with CASS

APM-469 RSTSAN/USM247 VASTAAM-60 EOSTSAN/USM470(v)2 TMVAN/USM614 ESTSAN/USM403 HATSAN/USM470v(1) ATSAN/USM604 EETS AN/APM446 RSTSAN/AWM23 RFTS AN/AWM23 LFTS AN/AWM23 C&D TS AN/AWM23 CTS AN/ASM-686 IATSAN/USM484 HTSAN/USM629 EOTS (F/A-18)AN/USM467 RADCOMAN/USM429 CAT IIIDAN/USM458 NEWTS OJ-615 EA-6B HPOJ-510 DTB APM457 S-3 AN/ASM-608 IMUTSA/E24T-205 Electrical Test SetAN/ARM-146 Decoder TS GACT/GRAD

$3.8B Reduced Total Ownership Costs

NECs - 41Tech Pubs - 624Personnel - 105Space - 2,700 ft2

Spares - 30,000

NECs - 5Tech Pubs - 4 disksPersonnel - 54Space - 1,900 ft2

Spares - 3,800

Offload not CompleteOffload not Complete

16

UUT

TPSTypical CVNOTPS

Inventory

F/A-18: 39E-2C: 29

EA-6B: 25MH-60: 13HH-60: 1

Common: 5

Typical CVNOTPS

Inventory

F/A-18: 39E-2C: 29

EA-6B: 25MH-60: 13HH-60: 1

Common: 5

TMS Specific Operational Test Program Sets (OTPS)

PMA260 manages the CASS programTMS PMAs manage their own specific OTPS that provide the:– Hardware interface between the CASS station and the Unit Under Test

(WRA/SRA)– Software test program for the Unit Under Test

17

Legacy ATE Retirement

Anticipated completion of removal of I-Level stations:

– EOTS FY-09, 1st QTR– TMV FY-09– DTB FY-10– IMUTS FY-10 – ARM-146 FY-10– NEWTS FY-11– RADCOM FY-11– IATS FY-12– CAT IIID FY-12– HTS FY-12

18

Mainframe CASS Modernization

(Procured 1990 – 2003)

(Procured 2003 – 2011)

(Procure 2014 - 2020)

Mainframe CASS(Hybrid – RF – CNI – HP – EO)

RTCASS

(2004 – 2008 demo)

[160+ ]

[ 553 ]

[ 2 prototypes ]

ARGCS ACTD

[368 ]

eCASS(notional)

(tech demo)

19

Completed Carrier SE inventory allowance Reductions

Carrier Vessel Support Equipment Productive Ratio Initiative

• CVN SE allowance reductions implemented with CNAF concurrence based upon fleet utilization rates• O&S Cost savings of 938K per year, CV fleet wide (AVDLR, AFM, MHRS)• 107 End Items removed from each Aircraft Carrier• 975 square feet footprint reduction per carrier

• CVN SE allowance reductions implemented with CNAF concurrence based upon fleet utilization rates• O&S Cost savings of 938K per year, CV fleet wide (AVDLR, AFM, MHRS)• 107 End Items removed from each Aircraft Carrier• 975 square feet footprint reduction per carrier

S/ENAVAIR Recommended / CNAF ApprovedTotal Reduced per CVSquare Feet

AIR

CO

ND

ITION

ER

01-208-8705

JENN

Y T-6 01-159-4744

HSU

-1 01-088-4611

TMU

-70 LOX C

AR

T 00-158-0657

HLU

-196/E Battery

Charger

01-494-5201

NA

N C

AR

T A/M

26U-4/A

01-517-9308

T20/3FH

01-064-2889

T20/2FH

00-102-8441

T30-1VH5

00-516-2017

T10-1VH4

00-516-2019

T20/1VH5

00-865-7838

NET-4/3000 EN

GIN

E TR

AILER

00-123-8073

BO

MB

HO

IST (HLU

196) 01-447-4628

BO

MB

HO

IST (HLU

288) 01-161-8623

AD

U-400/E W

EAPO

NS

SKID

00-143-8788

MH

U-191 W

EPS SKID

01-244-3449

TOW

BA

R 15 FT

01-155-2670

2 2 2 3 4 10 5 0 5 9 4 12 8 14 0 250 40

1 2 1 3 1 10 4 5 5 9 1 3 4 4 2 66 2072 3 1 53 30 60 24 30 30 54 60 4 0 4 30 495 20

20

NAN-3/-4/-4ANitrogen Servicing

Unit

A/S32A-37A/C Tow Tractor

A/M32C-17Mobile Air

Conditioning Unit

MMG-1AMobile Electric

Power Plant

NC-10B/CA/S32A-108

Mobile Electric Power Plants

A/S48M-2 & 3Manlift

(Diesel & Electric)

A/M32C-21 Mobile

Air Conditioning

Aircraft Maintenance

Platforms

A/S32A-31AA/C Tow Tractor

AircraftJacks

A/S32A-30AA/C Tow Tractor

A/S32A-42A/C Tow Tractor

A/U26U-1Oxygen Servicing

Cart

MSU 200NAVAir Start Unit

Annual Cost Avoidance Projection of 34 RCM analyses completed through FY 04 (Implemented by FY 07) = $40.7MAnnual Cost Avoidance Actual of RCM analyses completed by FY 04 (Implemented by FY 07) = $28.2M

Note: -Cost savings typically experienced ~2 Yrs after completion of RCM Analysis due to implementation in Fleet.

Annual Cost Avoidance Projection of 34 RCM analyses completed through FY 04 (Implemented by FY 07) = $40.7MAnnual Cost Avoidance Actual of RCM analyses completed by FY 04 (Implemented by FY 07) = $28.2M

Note: -Cost savings typically experienced ~2 Yrs after completion of RCM Analysis due to implementation in Fleet.

TS4508/U ADTS

A/E37T-17 T56 AETSA/S32K-1D

SATS Loader

A/S32M-14Pettibone

A/S37A-3 Shipboard MEPP

PMU-55E Hydraulic Fill Unit

CASS Airflow Sensor System Battery Backup /

MOV’s / GPI / DTU

A/M27T-5 & 7Hyd Servicing Unit (Diesel & Electric)

A/S32A-32 Spotting Dolly

$3.57 $4.81

$32.3

3

$3.70 $5

.30 $8.20 $1

4.20

$14.3

1

$18.9

1 $28.1

8

$7.31 $2

0.49

$25.2

8

$12.7

3

$12.6

2$3

.72

$1.87$0

.37

$0.90

$3.72

$5.10

$7.07

$8.36

$27.5

9

0

5

10

15

20

25

30

35

40

45

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07

Annu

al C

ost A

void

ance

(Mill

ion

$)

Manpower Cost Avoidance Projection

OPTAR/FHP Cost Avoidance Projection

Manpower/OPTAR/FHP Cost AvoidanceActual

ASE RTOC ProgramCSE RCM Analysis Completed

21

Summary

PMA260 is committed to:– Modernizing Common Support Equipment,

including CASS– Mitigating obsolescence– Making our CSE better for the operator– Removing Legacy ATE and reducing the amount of

CSE needed

Bottom LinePMA260 – a great place to work, help the Fleet and advance your career

Bottom LinePMA260 – a great place to work, help the Fleet and advance your career