AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Upload: lita

Post on 16-Mar-2016

23 views

Category:

Documents


2 download

DESCRIPTION

AWBA Water Supply and Demand Study. October 4, 2011 AWBA Meeting. Comparison 1997 Base to Base. 1997 Base. Base. 2012 Reservoir Elevation 23,724 AF Indian Firming Indian Firming Thru 2108 Shortage Sharing Proposal Stepped Shortage Determination. 1997 Reservoir Elevations - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: AWBA Water Supply and Demand Study

AWBA Water Supply and Demand Study

October 4, 2011AWBA Meeting

Page 2: AWBA Water Supply and Demand Study

Comparison 1997 Base to Base

1997 Base

• 1997 Reservoir Elevations• 15,000 AF Indian Firming• Indian Firming thru 2097 • Pro Rata CAP/On-River• Probability Base Shortage

Determination

Base

• 2012 Reservoir Elevation• 23,724 AF Indian Firming• Indian Firming Thru 2108• Shortage Sharing Proposal• Stepped Shortage

Determination

Page 3: AWBA Water Supply and Demand Study

First Shortage YearBase vs. 1997 Base

Page 4: AWBA Water Supply and Demand Study

Shortage VolumeBase vs. 1997 Base

Page 5: AWBA Water Supply and Demand Study

Number of ShortagesBase vs. 1997 Base

Page 6: AWBA Water Supply and Demand Study

Credits RemainingBase vs. 1997 Base

Page 7: AWBA Water Supply and Demand Study

General Assumptions

• Starting Reservoir Elevation Jan. 2012• Shortage Triggers• CAP Shortage Distribution• No Yuma Desalter• M&I Firming thru 2097• Indian Firming thru 2108• Indian Firming 23,724 AF

Page 8: AWBA Water Supply and Demand Study

Base vs. Scenarios

Base• On-River/CAP shortage

distribution pro rata based on demand

Scenarios• Director’s Shortage

Sharing Recommendation

Page 9: AWBA Water Supply and Demand Study

ScenariosScenario Upper Basin

Depletion ScheduleOn-River Tribal

ScheduleLake Mead Shortage

CriteriaMexico Shares in

ShortageModel Run Completed

A AWBA Upper Basin Assumption Ten Tribes Interim Guidelines

Extended Yes 8/29/2011

B AWBA Upper Basin Assumption Ten Tribes Interim Guidelines

Extended No 8/29/2011

C AWBA Upper Basin Assumption

ADWR 2010-2011 Update

Interim Guidelines Extended Yes 8/30/2011

D AWBA Upper Basin Assumption

ADWR 2010-2011 Update

Interim Guidelines Extended No  

E Upper Basin Schedule Ten Tribes Interim Guidelines

Extended Yes 8/29/2011

F Upper Basin Schedule Ten Tribes Interim Guidelines

Extended No 8/29/2011

G Upper Basin Schedule

ADWR 2010-2011 Update

Interim Guidelines Extended Yes 8/29/2011

H Upper Basin Schedule

ADWR 2010-2011 Update

Interim Guidelines Extended No 8/30/2011

Page 10: AWBA Water Supply and Demand Study

Shortage VolumeBase, Scenario A and Scenario C

Page 11: AWBA Water Supply and Demand Study

First Shortage YearBase, Scenario A and Scenario C

Page 12: AWBA Water Supply and Demand Study

Number of ShortagesBase, Scenario A and Scenario C

Page 13: AWBA Water Supply and Demand Study

Credits RemainingBase, Scenario A and Scenario C

Page 14: AWBA Water Supply and Demand Study

Shortage VolumeMedian Traces

Page 15: AWBA Water Supply and Demand Study

First Shortage YearMedian Traces

Page 16: AWBA Water Supply and Demand Study

Number of ShortagesMedian Trace

Page 17: AWBA Water Supply and Demand Study

Credits RemainingBase, Scenario A and Scenario C

Page 18: AWBA Water Supply and Demand Study

Discussion