awba water supply and demand study
DESCRIPTION
AWBA Water Supply and Demand Study. October 4, 2011 AWBA Meeting. Comparison 1997 Base to Base. 1997 Base. Base. 2012 Reservoir Elevation 23,724 AF Indian Firming Indian Firming Thru 2108 Shortage Sharing Proposal Stepped Shortage Determination. 1997 Reservoir Elevations - PowerPoint PPT PresentationTRANSCRIPT
AWBA Water Supply and Demand Study
October 4, 2011AWBA Meeting
Comparison 1997 Base to Base
1997 Base
• 1997 Reservoir Elevations• 15,000 AF Indian Firming• Indian Firming thru 2097 • Pro Rata CAP/On-River• Probability Base Shortage
Determination
Base
• 2012 Reservoir Elevation• 23,724 AF Indian Firming• Indian Firming Thru 2108• Shortage Sharing Proposal• Stepped Shortage
Determination
First Shortage YearBase vs. 1997 Base
Shortage VolumeBase vs. 1997 Base
Number of ShortagesBase vs. 1997 Base
Credits RemainingBase vs. 1997 Base
General Assumptions
• Starting Reservoir Elevation Jan. 2012• Shortage Triggers• CAP Shortage Distribution• No Yuma Desalter• M&I Firming thru 2097• Indian Firming thru 2108• Indian Firming 23,724 AF
Base vs. Scenarios
Base• On-River/CAP shortage
distribution pro rata based on demand
Scenarios• Director’s Shortage
Sharing Recommendation
ScenariosScenario Upper Basin
Depletion ScheduleOn-River Tribal
ScheduleLake Mead Shortage
CriteriaMexico Shares in
ShortageModel Run Completed
A AWBA Upper Basin Assumption Ten Tribes Interim Guidelines
Extended Yes 8/29/2011
B AWBA Upper Basin Assumption Ten Tribes Interim Guidelines
Extended No 8/29/2011
C AWBA Upper Basin Assumption
ADWR 2010-2011 Update
Interim Guidelines Extended Yes 8/30/2011
D AWBA Upper Basin Assumption
ADWR 2010-2011 Update
Interim Guidelines Extended No
E Upper Basin Schedule Ten Tribes Interim Guidelines
Extended Yes 8/29/2011
F Upper Basin Schedule Ten Tribes Interim Guidelines
Extended No 8/29/2011
G Upper Basin Schedule
ADWR 2010-2011 Update
Interim Guidelines Extended Yes 8/29/2011
H Upper Basin Schedule
ADWR 2010-2011 Update
Interim Guidelines Extended No 8/30/2011
Shortage VolumeBase, Scenario A and Scenario C
First Shortage YearBase, Scenario A and Scenario C
Number of ShortagesBase, Scenario A and Scenario C
Credits RemainingBase, Scenario A and Scenario C
Shortage VolumeMedian Traces
First Shortage YearMedian Traces
Number of ShortagesMedian Trace
Credits RemainingBase, Scenario A and Scenario C
Discussion