Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
Virtual Construction Model Assembly
Virtual Work Package Development
Master Project Schedule
Progress Tracking
Procurement / Site Materials
Quality / Completions
Estimating / Cost Controls
3D Plant Design
Piping Lists
Equipment Lists
Instrument Lists
Civil / Structural Lists
Electrical Lists
Other Engr Data
Document Management
Pipe Isometric Detailing
Pipe Fabrication
Structural Detailing
Steel Fabrication
Modular Design Detailing
Module Fabrication
Suppliers Contractors
Concept Plant LayoutAWP-DT.01
AWP-DT.05
AWP-DT.03
AWP-DT.06
AWP-DT.07
AWP-DT.08
AWP-DT.09
AWP-DT.10
AWP-DT.11
AWP-DT.12
AWP-DT.13
AWP-DT.27
AWP-DT.26
AWP-DT.28
AWP-DT.17
AWP-DT.18
AWP-DT.25
AWP-DT.14
AWP-DT.19
AWP-DT.20
AWP-DT.21
AWP-DT.22AWP-DT.23AWP-DT.16
AWP-DT.04
AWP Control Index, Constraint Management & Predictive Analytics
AWP-DT.02
AWP-DT.24
AWP-DT.15
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
CWA01 Tank DA-50
PictureCWA ID Title
CWA02 Tanks 39-81 & 82
CWA03 Tank D-5
Work Scope Summary
CWA04 Scrubbers
• Demo piping around G-10 & G-11
• Install new pipe lines, filters, instruments, power & controls
• Insulate piping & equipment
• Tie-in DA-50 to existing Pz 168 Lot Tanks 174/175
• Tie-in loading from DA-50 to loading line from Tanks 81 & 82
• Demo piping, level switches & temp transmitters
• Reuse/relocate product filter, pump(s), isolation valves(?),
level transmitter & relief(s)
• Install new equipment including 2+ pumps, a product filter
along with associat3ed piping, instruments, power & controls
• Tie-in headers at pipe bridge and E-W pipe rack locations,
as well as loading / unloading header run
• Demo exiting piping and equipment around Tanks D -5/8
• Install new equipment including feed pump, loading pump
motor (vertical), product filter
• Install and insulate piping for Tank 5 and associated
equipment
• Install instruments, power & controls
• Prepare foundations and grade, lay concrete pads for scrubbers
• Install portable scrubbers, in designated locations
• Install piping to support scrubbers
• Install instruments, power & controls
• Insulate equipment and associated piping
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Deliverables List – Plot Plans with CWAs / CWPs
Deliverable Item Format Timing / Frequency
Critical Input to CWA, CWP, EWP Index Table XLS Draft at POC1, and finalize shortly after
Plot Plan Files with Marked up CWAs PDF Draft at POC1, and finalize shortly after
Work Scope Bullet List by CWA / CWP XLS Draft at POC1, and finalize shortly after
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
CWP -- AT.1191-CWA01-406X-440A-CON-01Demo piping around G-10 & G-11, except for check & isolation valves
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Planned Start:07-Feb-2018
CWP -- AT.1191-CWA01-406X-440A-CON-01Demo piping around G-10 & G-11, except for check & isolation valves
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Deliverables List – P&IDs
Deliverable Item Format Timing / Frequency
PFD (Process Flow Diagrams) Drafts for Early Planning PDF FEL1 & 2
P&IDs for Review, Marked-up where possible to indicate scope of work
PDF P&ID Pass 1 Through 3
P&IDs at IFAs PDF Finalize process design at Pass 4 P&IDs
P&IDs at IFC PDF With EWP IFC Release
Index of P&IDs XLS At issue of P&IDs from Pass 1 to Pass 4
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Field Name Definition Technical RequirementsTag Item Number Equipment Tag number designation Y
Rev Revision of Equipment Design Y
Construction Status The code to specify if the equipent is new, existing and refurbished or modfied. Y
Spec Equipment Specification number Y
P&ID Piping and Instrument Diagram drawing the equipment is on Y
CWA Construction Work Area the Equipment is located Y after CWA identified
System Commissioning & Start-UP System Identified for the equipment tag Y after System identified
Skid Skid tag number the equipment is part of. N
Req Number Requisiton Number Y after Req issued
PO Number Purchase Order Number Y after PO issued
Manufacturer Manufacturer of the equipment i.e. Dresser Rand, Hughes Anderson etc N
Weight Erection Weight of the equipment Y
Weight UOM Unit of Measure Erection Weight Y
Responsible Discipline Responsible Discipline for the equipment N
Equipment Location Plan Location Drawing i.e (B01-xxxx-yyyyy) N
Motor Tag Tag of the Motor on Equipement..i.e Pump Compressor Y if a motor exists
Support Drawing Support Drawing Number N
Grout Drawing Grout Drawing Number N
Grounding Drawing Grounding Drawing Number N
Electrical Drawing Electrical Drawing Number N
Paint Code Required Paint Spec number. Designates color and specific mill thickness requirements Y if paint required
Insulation Class (Shell) Type of Insulation on Shell Side of Tube Heat Exchanger Y if insulation required
Insulation Class (Channel) Type of Insulation on Tube Side of Tube Exchanger Y if insulation required
Tracing Code Heat Tracing Code ID that specifies the type of heat tracing required Y if tracing required
Fireproof Code Heat Tracing Code ID that specifies the type of fireproofing required Y if fireproofing required
Equipment List - Data Field Definitions
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Field Name Definition Technical RequirementsTag Item Number Equipment Tag number designation Y
Rev Revision of Equipment Design Y
Construction Status The code to specify if the equipent is new, existing and refurbished or modfied. Y
Spec Equipment Specification number Y
P&ID Piping and Instrument Diagram drawing the equipment is on Y
CWA Construction Work Area the Equipment is located Y after CWA identified
System Commissioning & Start-UP System Identified for the equipment tag Y after System identified
Skid Skid tag number the equipment is part of. N
Req Number Requisiton Number Y after Req issued
PO Number Purchase Order Number Y after PO issued
Manufacturer Manufacturer of the equipment i.e. Dresser Rand, Hughes Anderson etc N
Weight Erection Weight of the equipment Y
Weight UOM Unit of Measure Erection Weight Y
Responsible Discipline Responsible Discipline for the equipment N
Equipment Location Plan Location Drawing i.e (B01-xxxx-yyyyy) N
Motor Tag Tag of the Motor on Equipement..i.e Pump Compressor Y if a motor exists
Support Drawing Support Drawing Number N
Grout Drawing Grout Drawing Number N
Grounding Drawing Grounding Drawing Number N
Electrical Drawing Electrical Drawing Number N
Paint Code Required Paint Spec number. Designates color and specific mill thickness requirements Y if paint required
Insulation Class (Shell) Type of Insulation on Shell Side of Tube Heat Exchanger Y if insulation required
Insulation Class (Channel) Type of Insulation on Tube Side of Tube Exchanger Y if insulation required
Tracing Code Heat Tracing Code ID that specifies the type of heat tracing required Y if tracing required
Fireproof Code Heat Tracing Code ID that specifies the type of fireproofing required Y if fireproofing required
Equipment List - Data Field Definitions
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Deliverables List – Engineering Lists
Deliverable Item Format Timing / Frequency
Mechanical Equipment List XLS Throughout project at specified frequency
Piping Line List XLS “ ”
Instrument Index XLS “ ”
Cable Schedule XLS “ ”
Electrical Equipment List XLS “ ”
Lighting & Devices List XLS “ ”
Conduit & Trays List XLS “ ”
Grounding List XLS “ ”
Electrical Heat Trace Schedule XLS “ ”
Pilings List XLS “ ”
Modules Index XLS “ ”
Foundations Index XLS “ ”
Primary Structures Index XLS “ ”
Secondary Structures and Supports XLS “ ”
Engineering Lists Demarked at Key Stages of Design PDF / XLS 30%, 60%, 90% Design Reviews
Engineering Lists Demarked at IFC PDF / XLS With EWP IFC Releases
Engineering List Revisions PDF / XLS At issue of P&IDs from Pass 1 to Pass 4
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Finalize (baseline)
RefineDefine
Path of Construction Development
Level 2 Schedule by
Discipline
Level 3 Schedule by CWAs, CWPs,
EWPs & PWPs
InteractivePlanning
Schedule Development
CWAs, CWPs,EWPs,TOPS
Path of Construction Working Sessions
RefineRefine
POC 2POC 1
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
CWA 03A
CWP P02.03A.01Install Large Bore Pipe in CWA 03A
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
The following checklist facilitates backward pass alignment of the engineering EWP with this CWP:
❑ List the target engineering deliverables for this CWP (this forms the EWP)
❑ Identify baseline ‘delivery’ date required for the EWP in order to allow the CWP (and requisite purchase and material delivery) to proceed according to schedule
❑ List all input dependencies to the EWP deliverables
❑ Identify latest possible ‘Need Dates’ for the input dependencies in order to be able to meet the required EWP delivery date
❑ Incorporate the EWP into the overall EWP Delivery plan, along with the target ‘Delivery Date’ and Input Need Dates for the input dependencies
❑ Track and iterate with recurring reporting of EWP Delivery Plan and EWP Constraints out from the responsible engineer for the EWP
CWA 03A
CWP P02.03A.01Install Large Bore Pipe in CWA 03A
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Deliverables List – Schedule with EWP
Deliverable Item Format Timing / Frequency
Sample Export of Engineering Schedule and WBS XLS After POC 1 and before POC 2
Documentation on project Schedule WBS and Column configuration for CWPs, EWPs, etc …
PDF After POC 1 and before POC 2
Periodic Exports during Schedule Development PDF / XLS Following Engineering IAP Session
Baseline Schedule of Engineering after IAP PDF / XLS Following Engineering IAP Session
Routine Export of Engineering Schedule Progress PDF / XLS Bi-Weekly from Start of Detailed Design
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Plant design models provide the basic input for AWP automation tools for 3D work package development.
Smart PlantE3D
Revit
3D Plant Design Model Processing
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Model Attributes
Pipe System Attributes
ISO Number*
Line NumberArea /Unit*
CWACWPModuleBore Size 1*
Bore Size 2Bore Size 3Schedule*
Fluid CodeFromToPID*
Specification*
PhaseTest Pressure*
Test Type*
Insulation TypeInsulation ThicknessPainting SpecHeat TracingNotes
Pipe Part Level AttributesName/Tag*(e.g. /QV-1100620; /TRUNNION/3P10-1265)
CWA (e.g. 01)CWP ISO Number* (e.g. /3P10A/80-DMW-110-00013-013470Z-N-01)Line NumberBore Size 1*
Bore Size 2Bore Size 3Sched 1Sched 2Sched 3Pressure Rating 1Pressure Rating 2Pressure Rating 3Specification (e.g. /013470Z/PP3-0000LL_1)Commodity Code (e.g. /013470Z/VLAJ4-F1L270000LL_1) Description* (e.g. Globe Flg, BS 1873, RF, 150 Lbs, Bolted Bonnet, Trim No.: 12, Acc. to API 600, 602, -, Swivel Plug Disc, Stem: O.S./..)Material* (e.g. ASTM A351 Gr. CF8M)
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Deliverables List – Schedule with EWP
Deliverable Item Format Timing / Frequency
Sample export of 3D plant design modelNWD / VUE + XLS
After POC 1 and before POC 2
Documentation on project 3D plant design model organization, component types and attribution
PDF After POC 1 and before POC 2
Routine export of 3D plant design modelNWD / VUE + XLS
Bi-Weekly from Start of Detailed Design
3D model export demarked at key stages of designNWD / VUE + XLS
30%, 60%, 90% Design Reviews
3D model export demarked at IFC of one or more EWPs
NWD / VUE + XLS
At EWP(s) IFC Release
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Deliverables List – Vendor Data Deliverables
Deliverable Item Format Timing / Frequency
Index of Equipment Vendors, Parts and Materials Suppliers
XLSAs vendors are selected for bid inquiry or PO award on the project
Supplier information on ETA (Estimated Time of Arrival) for planned shipments
XLS Updated daily or weekly
List of documents associated with the equipment, materials or parts with status on design / approvals
XLSUpdated as vendor document deliverables are added to the PO line items and further identified post PO award
List of 'Ship Loose' parts and part container / boxes associated with the primary equipment or p
XLSUpdated as vendor shipment lots and ‘ship loose’ materials are identified post PO award
List of 'Spares' parts associated with the primary equipment or part
XLSUpdated as vendor shipment lots and ‘ship loose’ materials are identified post PO award
Digital Pipe Isometrics
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Page 1 or 2 Page 2 or 2
https://www.alias.ltd.uk/pcf.asp
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Critical to understand if pipe spool demarcation is done by engineering or
separate detailing shop with fabrication scope
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Deliverables List – Digital Pipe Isometrics
Deliverable Item Format Timing / Frequency
Sample digital pipe isometricIDF / PCF files
Before Issuance of IFC EWP
List of digital isometrics with EWP Release XLS At IFC Release of EWP(s)
Set of digital isometrics with EWP ReleasePDF files + IDF / PCF files
At IFC Release of EWP(s)
Technical support to include AWP requirements in pipe fabrication contracts for delivery of digital data
XLS / DOC / PDF
At Inquiry Issue for fabrication contracts
Set of ‘modified’ digital isometrics with from detailing provided if spool demarcation is included in fabricator scope of work
PDF files + IDF / PCF files
Upon detailing of isometric by fabricator
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Critical to request digital structural detail models from
steel fabricator, by CWA
http://dcom.arch.gatech.edu/aisc/idm/process_map
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
https://www.caddigest.com/3-new-releases-for-tekla-users/
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Deliverables List – Digital Structural Details
Deliverable Item Format Timing / Frequency
Technical support to include AWP requirements in steel fabrication contracts for delivery of digital data for structural detailing and fabrication tracking
XLS / DOC / PDF
At Inquiry Issue for fabrication contracts
Sample digital structural details filesIFC BIMSTeelfiles
Before Issuance of steel fabrication contracts
Digital structural detailing file(s) exported from 3D steel detailing application (Tekla or equivalent)http://dcom.arch.gatech.edu/aisc/content/em11_final_steel_detailing_model
IFC BIMSTeelfiles
Upon detailing of isometric by fabricator
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Work in Progress
Specialist design team, fabricators
and specialty contractors
Specialist design team, fabricators
and specialty contractors
Work in Progress
Specialist design teams, fabricators and construction
contractors
Published
Validated design output for use by
Project Team, suitable for Tender and Construction.
Client Archive
Project history maintained for
knowledge, regulatory and legal
requirements.
Shared
Non-verified design data and documents
used by in-house design teams only
Work in Progress
Non-verified design data and documents
used by in-house design teams only V
eri
fie
d
Au
tho
rize
dA
uth
ori
zed
Authorized
Approved
Ap
pro
ved
Tier 1 Contract
Work in Progress
Non-verified design data and documents
used by in-house design teams only
Work in Progress
Non-verified design data and documents
used by in-house design teams only
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Deliverables List – Documents Register
Deliverable Item Format Timing / Frequency
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
CWP
CWA
CWPCWPCWPCWPCWP
CWPCWPEWP
CWPCWPPWP
TOP 1
TOP 2
TOP xIWP 1
IWP 2
IWP x
CWP
Dwg 1
Dwg 2
Dwg 3
Dwg x
PO 1
PO 2
PO 3
PO x
PredecessorWork Scope
RequisiteDrawings
SuccessorWork Scope
RequisiteMaterials
WorkSequences
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
CWP
CWP
CWPExternal
EngineeringCWPEWP
CWPCWPPWP
TOP 1
TOP 2
TOP x
EWP
InterfacingWork Scope
InterfacingWork Scope
MaterialRequisitionRequests
Turnover Requirements
Construction Requirements
Vendor Data
Material Requirements
Engineering Analyses
Specifications
Drawings
EWP deliverables roll-into the CWPCWP boundaries define the EWP
EngineeringDeliverables
PO 1PO 2PO 3
PO x
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Deliverables List – Digital EWPs
Deliverable Item Format Timing / Frequency
Routine publishing of advanced revision log
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Advanced Revision Notices
Provide status information back to engineering on IWP Plans.
Immediately notify field supervision where IWP are released to build. Escalate notifications where work has been started.
Provide weekly report for WFP Team to update IWPs that are not yet released to build.
Documents& Drawings
WFP Team
Field Change Notices
Field Crews
1
2
3
4
Assemble into IWPs
Drawings Issued for Construction Release IWPs
to Build
Engineering Changes
Detect IWPs To Update
Report Status of
IWPs4
Issue Advanced Revision Notices / Holds once engineering determines a design / drawing change is underway.
1 23
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Deliverables List – Advanced Revisions Log
Deliverable Item Format Timing / Frequency
Routine publishing of advanced revision log XLSOn demand when revisions / holds are assessed to impact construction
AWP Primers – Engineering Deliverables
Plot Plans with CWAs / CWPs
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log