ax-s4 mms - ucaiug promo content...unicare, solomon smith barney) d01 post load billing i04 home...
TRANSCRIPT
IEC 60870-5-7
IEC 61850
IEC 61970
IEC 61968
IEC 62351
IEC 62325
IEC 61850-7-420
IEC 61850-8-2
IEC 61850-7-410
IEC 62445
IEC 60495, 60663, 62488
IEC 62746
IEC 61400-25
TC
57
Arc
hitectu
re
Communications
IEC 61850
CIM
ICCP
TASE.2
Central Generating Station
Step-Up Transformer
Distribution Substation
Receiving Station
Distribution Substation
Distribution Substation
Commercial
Industrial Commercial
Gas Turbine
Recip Engine
Cogeneration
Recip Engine
Fuel cell
Micro- turbine
Flywheel
Residential
Photo voltaics
Batteries
UML – Unified Modeling Language
Scope of CIM
Read TSUB23PHA4023
Read TSUB23PHB4023
Read TSUB23PHC4023
Read TSUB24PHA6187
Read TSUB76PHB5865
Read TSUB76PHC5865
Read TSUB76PHA5977
Read TSUB76PHB5977
Read TSUB76PHC5977
.
.
.
.
.
Read All Transformer Voltages
Other algorithms
possible. But,
regardless of algorithm,
programs must contain
hard coded references
to either names or
tables to access.
Everything needed to
access data is contained in
the model
North Area
Airport
Substation Main
Substation
Breakers Loads Breakers Transformers Transformers
TC57 Physical
Model
Company X
Read All Transformer Voltages
Find Next
Substation
Find Next
Transformer
Find Next
Voltage
Read
Every name defined
in the model
SCADA
I need the primary current
of the 345KV transformer
in the airport substation
With lots of paper
documentation and manual
maintenance effort subject
to manual error detection
and correction.
Client Hierarchy changes with
network model changes
SCADA
Device or
other system
related views
supported
Access by Description
Bus
XFMR XFMR XFMR XFMR
Bus
Substation
ERP
Consumer
Assets
(metering)
Documen-
tation
Core2
OAG
Generation
Load
Outage
Protection
SCADA
Measurements
Topology
Core
Domain
Financial
Energy Scheduling
Reservation
IEC 61970 from IEC TC57 WG13
IEC 61968 from IEC TC57 WG14
Market
Operations
IEC 62325
from
IEC TC57
WG16
Wires
Distribution EMS, Transmission & Planning Markets (Euro & NA)
→
Generic Interface Definition
(GID) being withdrawn. To be
replaced with 502-8 based on
SCADA use cases.
CIM UML
Model
Profile
CIM-RDF
Schema &
Instances
Syntax to suit the use case
Used to specify file formats (full model,
partial model, or incremental model)
Message syntax
Mapping to technology (e.g. RDF)
This is what
is tested
XFMRWinding
Substation
Transformer
VoltageLevels
Measurement
Has
SuperClass
of
Has
Associated
with
Power System
Resource (logical)
SuperClass
of
Equipment
Container
Conducting
Equipment
SuperClass
of
Has
XFMRWinding
Substation
Transformer
VoltageLevels
Measurement
Has
SuperClass
of
Has
Associated
with
Power System
Resource (logical)
SuperClass
of
Equipment
Container
Conducting
Equipment
SuperClass
of
Has
RealizedBy
RealizedBy
RealizedBy
RealizedBy
Airport
Substation
Has
13KV
Has
RealizedBy
Object Instances
XFR 123 Has
Winding ABC
Tag 567
EMS
#1
Import Export
EMS
#2
Export Import
Power System 1 Power System 2
EMS
#1
Exchange
Model
EMS
#2
Exchange
Model
NERC CPSM Profile – IEC 61970-452 Interconnection Point(s)
Instance File
Instance File
DMS
#1
Import Export
DMS
#2
Export Import
Power System 1 Power System 2
DMS
#1
Exchange
Model
DMS
#2
Exchange
Model
IEC CDPSM Profile – IEC 61968-13 Interconnection Point(s)
Instance File
Instance File
(AM)
Records &
Asset
Management
(OP)
Operational
Planning &
Optimization
(NO)
Network
Operations
(MC)
Maintenance
&
Construction
(EMS)
Energy
Management &
Energy Trading
(RET)
Retail
(SC)
Supply
Chain &
Logistics
Interface Standard
Part 3
Interface Standard
Part 4
Interface Standard
Part 5
Interface Standard
Part 6
Interface Standard
61970-502-8??
Interface Standard
Part 10
Interface Standard
Part 10
Interface Standard
Part 7
Interface Standard
Part 8
Interface Standard
Part 9
Interface Standard
Part 10
Interface Standard
Part 10
Interface Standard
Part 10
Interface Standard
Part 10
(CS)
Customer
Support
(MR)
Meter
Reading &
Control
(NE)
Network
Extension
Planning
(ACT)
Customer
Account
Management
(FIN)
Financial
(PRM)
Premises
(HR)
Human
Resources
Electric Distribution Network, Planning,
Constructing, Maintaining, and Operating
Generation and Transmission Management, Enterprise Resource
Planning, Supply Chain, and General Corporate Services
Business Functions External To Distribution
Management Distribution Management Business Functions
IEC 61968-100 Compliant Middleware Services
From IEC 61968-X
Interface Spec
(WSDL)
From a profile of the model
(CIM-UML)
IEC 61970-452 or
IEC 61968-13, etc.
ConductingEquipment
(from Core)
Equipment
(from Core)
PowerSystemResource
(from Core)
RegulationSchedule
TapChanger
0..1
0..n
+RegulationSchedule
0..1
+TapChangers
0..n
WindingTest
HeatExchanger
TransformerWinding
0..n
1
+TapChangers
0..n
+TransformerWinding
1
1
0..n
+From_TransformerWinding
1
+From_WindingTests0..n1
0..n
+To_WindingTest1
+To_TransformeWindings0..n
PowerTransformer
0..1
1
+HeatExchanger 0..1
+PowerTransformer 1
1..n
1
+Contains_TransformerWindings
1..n
+MemberOf_PowerTransformer
1
MaintenanceRequest
MaintenanceRequest
MaintenanceWork Order
MaintenanceWork Order
MaintenanceResponse
MaintenanceResponse
May be generated for0..n
1..1
1..1
1..1
EquipmentClass Property
EquipmentClass Property
EquipmentProperty
EquipmentProperty
EquipmentCapability Test
Specification
EquipmentCapability Test
Specification
EquipmentClass
EquipmentClass
Has
values for
0..n
0..n
0..n
0..n
0..n
EquipmentEquipment
EquipmentCapability Test
Result
EquipmentCapability Test
Result
0..n
0..n1..n
Has
propertiesof
Is tested
by a
Maps to
Defined by
Records the
execution of
0..n
0..n May result in
0..1
May be up of Is against
Is made
against
0..n
0..n
Defines a
procedure forobtaining a
CIM
S.95
OMS
WMS
EMS
CIS
GIS
Systems Need Integration. Each application uses it own internal data representation.
DMS
OMS
WMS
EMS
CIS
GIS
N*(N-1) Different Model
Transformations Required.
Each Application must convert between its model and its peer’s models
DMS
Flexible connectivity
infrastructure for integrating
applications and services to
power SOA
CONVERTING transport protocols between requestor and service
ROUTING messages between services
TRANSFORMING message format between requestor and service
HANDLING business events from disparate sources
Use an ESB to Simplify!
OMS
WMS
EMS CIS
GIS
6 Integration Points. Still N(N-1) transformations in the ESB.
DMS
ESB
Scope of CIM
E01-EDI
Data Warehouse(Interfaces to and from the
Data Warehouse are not
displayed on this diagram)
DRAFT Best Buy - Application Diagram V4 DRAFT
November 10, 1999
G02 - General
Ledger
A05 - AP
S01 - Sales
Corrections
I01 PO
Receiving
I03 Return to
Vendor
I06 Warehouse
Management
Mainframe apps - Blue
PC/NT apps - Green
Unix apps - Yellow
3rd party interface - Orange
Lines: Colors have no special meaning.
They are to help make the diagram easier to
read.
For More Information: See the database
containing information about each
application: Application V4.mdb
S06 - Credit App
P15 EES Employee
Change Notice
OTHER APPS - PC
AP - Collections/Credit
TM - Credit Card DB
ACCTS REC APPS - PC
990COR
Bad Debt
Benefical Fees
Beneficial Reconcil
JEAXF
JEBFA
JEBKA
JEDVA
JESOA
JEVSA
JEVSF
NSF
TeleCredit Fees
INVENTORY CONTROL APPS - PC
Code Alarm
Debit Receivings
Devo Sales
Display Inventory
In Home
Junkouts
Merchandise Withdrawl
Promo Credits
RTV Accrual
Shrink
AP Research - Inv Cntrl
AP Research-Addl Rpts
Book to Perpetual Inventory
Close Out Reporting
Computer Intelligence Data
Count Corrections
Cross Ref for VCB Dnlds
Damage Write Off
Debit Receivings
DFI Vendor Database
Display Inventory Reconcil
Display Inventory Reporting
INVENTORY CONTROL APPS - PC
DPI/CPI
IC Batching
Inventory Adj/Count Correct
Inventory Control Reports
Inventory Levels
Inventory Roll
Merchandise Withdrawl
Open Receivings
PI Count Results
PI Time Results from Inv
Price Protection
Sales Flash Reporting
Shrink Reporting
SKU Gross Margin
SKU Shrink Level Detail
USM
VCB Downloads
Journal Entry Tool Kit
Scorecard - HR
L02-Resource
Scheduling
(Campbell)
P09 - P17
Cyborg
M02 - Millennium
M03 - Millennuim 3.0
Banks - ACH and Pos to
Pay
Cobra
B01 - Stock
Status
S03-Polling
P14 On-line New
Hire Entry
CTS
Plan Administrators
(401K, PCS, Life,
Unicare, Solomon
Smith Barney)
D01 Post Load
Billing
I04 Home
Deliveries
I02 -
Transfers
Arthur Planning
I07 Purchase
Order
I12 Entertainment
Software
I05
Inventory Info
E13
E3 Interface
S04 - Sales Posting
V01-Price Management
System
I10 Cycle Physical
Inventory
I55 SKU
Information
K02
Customer Repair
TrackingI35 Early Warning
System
B02 Merchandise
Analysis
I13- Auto
Replenishment
U18 - CTO
Intercept
I09 Cycle Counts
E02-Employee
Purchase
Texlon 3.5
ACH
Stock Options
I17 Customer Perceived
In-Stock
U16-Texlon
SiteSeer
C02 - Capital
Projects
F06 - Fixed
Assets
US Bank Recon
File
Star Repair
EDI
Coordinator
Mesa Data
NEW Soundscan
NPD Group
AIG Warranty Guard
Resumix
Optika
Store Budget
Reporting
P16 - Tally Sheet
Cash Receipts/Credit
S05 - House
Charges
Ad Expense
L01-Promo
Analysis
V02-Price
Marketing
Support
BMP - Bus
performance Mngt
Store
Scorecard
I11 Price
Testing
Valley Media
P09
Bonus/HR
I15 Hand Scan
Apps
Roadshow
POS
S08 - Vertex
Sales
Tax
A04 - Cust
Refund Chks
Equifax
ICMS Credit
Cellular
Rollover
S09 - Digital
Satellite
System
NPD,
SoundScan
Sterling VAN
Mailbox (Value)
I18
SKU Rep
X92-X96
Host to AS400
Communication
S02 -
Layaways
Washington,
RGIS,
Ntl Bus Systems
V04-Sign
System
I14 Count CorrectionsNARM
P01-
Employee
Masterfile
I06 - Customer
Order
Frick
Co
UAR - Universal Account
Reconcilliation
Depository
Banks
S07 - Cell
Phones
S11 - ISP
Tracking
AAS
Fringe PO
Cash Over/
Short
L60 MDF
CoopSKU Selection
Tool
SKU
Performance
Supplier
Compliance
1
I35 - CEI
ASIS
Misc Accounting/Finance Apps - PC/NT
COBA (Corp office Budget Assistant)
PCBS(Profit Center Budget System)
Merchandising Budget
AIMS
Merch Mngr Approval
Batch Forcasting
Ad Measurement
AIMS Admin
AIMS
ReportingAd
Launcher
V03- Mkt
Reactions
Spec
Source
CTO2.Bestbuy.
com
Rebate
Transfer
Sign
System
CopyWriter's
Workspace
ELT
PowerSuite
Store
Monitor
AIS Calendar
Stores & Mrkts
Due Dates
Smart Plus
Insertions
Orders
Budget
Analysis Tool
Print Costing
Invoice App
AIS Reports
Broadcast
Filter
Smart Plus
Launcher
General
Maintenance
Printer PO
Printer
Maintenance
Vendor
Maintenance
Vendor Setup
Connect 3
Connect 3
ReportsConnect 3
PDF Transfe
Spec Source
SKU Tracking
S20-Sales
Polling
Prodigy
PSP
In-Home
Repair
Warranty
Billing
System
Process Servers
(Imaging)
Prepared by Michelle Mills
Page 1 of 2
Actual Business Process From a Real Company
Applications use Tags
Why do I want the “complexity” of
the CIM and all this modeling
stuff? Tags are simple!
If it takes 15 seconds to configure a tag, it would take 26 man-years to configure 2M
meters!
OMS
WMS
EMS CIS
GIS
N Integration Points. N Adapters. N Transformations.
DMS
CIM + ESB
Adapter Adapter Adapter
Adapter Adapter Adapter
谢谢您
Danke
Merci
有り難う
Dank u
감사합니다
dziękuję
спасибо děkuji
תודה
شكرا