b background
DESCRIPTION
BoilerTRANSCRIPT
COMPANY BACKGROUNDPT. ALSTOM Power Energy Systems Indonesia
B A C K G R O U N DB A C K G R O U N D
•PT ENERGY SYSTEMS INDONESIAFounded in 1985 A Joint Venture Company: Combustion Engineering, Inc. PT PAL Indonesia PT BARATA Indonesia
B A C K G R O U N DB A C K G R O U N D
Changed in 1995 to: PT ABB ESIA Joint Venture Company:
Asea Brown Boveri Limited PT PAL Indonesia PT BARATA Indonesia
•PT ABB Alstom Power (1999)
•PT ALSTOM Power Energy Systems Indonesia
COMPANY MISSION
TO BE THE ALSTOM MANUFACTURING CENTER IN SOUTHEAST ASIA FOR UTILITY BOILERS, INDUSTRIAL BOILERS AND HEAT RECOVERY STEAM GENERATORS.TO BE THE SUPPLIER OF CHOICE IN INDONESIAFOR UTILITY & INDUSTRIAL BOILERS, INDUSTRIAL TURBINES, AND OTHER POWER PLANT EQUIPMENT, AS WELL AS POWER PLANT SERVICE, THROUGH THE SUPPLY OF SUPERIOR PRODUCTS, DELIVERED ON-TIME, AT ACCEPTABLE PRICES
ONE LEGAL ENTITY PT ALSTOM Power ESI
BOARD OF COMMISSIONER
VICE PRESIDENT &COUNTRY MANAGER
R. Moenaf
HUMAN RECOURCES
K. Mangkoesoebroto
FINANCE & IT
P. Allen
COMMUNICATION &SALES CORDINATOR
N. Rachman
BOARD OF DIRECTORPRESIDENT DIRECTOR
W. Martokoesoemo
BUSINESS DEV.
CUSTOMER SERVICE
M.Rahardjo
BOILER
Reza Moenaf
EngineeringMuharronif
COMMERCIALJohan T. BMANUFACTURING
Djoko. R Soeroso
QA & QCDjoni Pratomo
Site FacilityUmar Chusnan
Process ImprovementTBD
Account ManagerArief F Nugroho
Service OperationChusnu Himawan
Sengkang O & MBoris Meyer
- Project Management- SM&P - Sales & Proposal- Project Admin & Log
- Production- Production Control- Manufacturing Eng,- Welding Eng.- Product Cost Control- Plant Eng & Maintenance- Safety Coordinator
C Segment Sales
BOILER CONSULTANT
Walt Siddall
SERVICE CONSULTANT
Greg Hunter
BUSINESSESMANUFACTURING
- UTILITY BOILERS- INDUSTRIAL BOILERS- HEAT RECOVERY STEAM GENERATORS- REGENERATIVE AIR HEATERS
DESIGN• INDUSTRIAL BOILERS• HRSG
SERVICES •GAS PLANT (CGP)•INDUSTRIAL PLANT (CIP)•STEAM PLANT (CSP)
QUALITY ASSURANCE
ISO-9001 CERTIFIED AUTHORIZED ASME FACILITY (“U”,
“PP”, “R” AND “S” STAMPS) FULL TIME HARTFORD STEAM BOILER
INSPECTOR ON SITE DEPNAKER CERTIFIED PROCEDURES OVER 100 ASME QUALIFIED WELDERS
• 35 MUSD INVESTED35 MUSD INVESTED • 22,950 M2 WORLD CLASS BOILER MANUFACTURING PLANT• PRODUCT ENGINEERING CENTER • FULL SERVICE CAPABILITY
FACILITY
1
2
10 Tons
25 Tons
10 Tons
25 Tons
50/16 Tons
50/16 Tons
5 Tons
25 Tons
5
5,400 M2 5,400 M2 5,400 M2 5,400 M2 5,400 M2
1,35
0 M
2
Finning Machine = 5, 400M2
Lay down area=5,400 M2
Boiler = 17,500 M2
4
Slabonly
Offi
ce B
uild
ing
Mez
zani
ne o
ffice
=2.
5 le
vels
= 36
00 M
2
Receiving & Facilities
GEN
SET
Show
er
3
Externalcraneway
Externalcraneway
Externalcraneway
25 Tons
7
Security
Smal
l Par
ts
Stor
age
Lunc
heon
Mosque
Radi
ogra
phy
Vau
lt
PWH
T Fu
rnac
e
Paint Building
Boiler, Air Heater Line
Boiler, Water Wall Bay
Boiler, SH, RH, Econ. Bay
Boiler, HRSG's, PB, & BOP
Laydown area
Finning Machine
Bay Purpose 1.
2.
3.
4.
5.
7.
TOTAL COVERED MFG SPACE: 22,950 M2
TOTAL LAND: 99'900 M2
General Facility Lay-Out
Product Capability
Waterwall PanelWaterwall Panel
SuperheaterSuperheaterElementsElements
EconomiserEconomiserElementsElements
Generating BankGenerating Bank
Drum & HeadersDrum & HeadersRisers & PipingRisers & Piping
Air PreheaterAir Preheater
Fan CasingFan Casing
DuctingDucting
Product Capability
StackBy PassStack