COMPANY BACKGROUND PT. ALSTOM Power Energy Systems Indonesia

Upload: indra-ramdhan

Post on 10-Apr-2016

7 views

Category:

Documents


4 download

DESCRIPTION

Boiler

TRANSCRIPT

Page 1: B BackGround

COMPANY BACKGROUNDPT. ALSTOM Power Energy Systems Indonesia

Page 2: B BackGround

B A C K G R O U N DB A C K G R O U N D

•PT ENERGY SYSTEMS INDONESIAFounded in 1985 A Joint Venture Company: Combustion Engineering, Inc. PT PAL Indonesia PT BARATA Indonesia

Page 3: B BackGround

B A C K G R O U N DB A C K G R O U N D

Changed in 1995 to: PT ABB ESIA Joint Venture Company:

Asea Brown Boveri Limited PT PAL Indonesia PT BARATA Indonesia

•PT ABB Alstom Power (1999)

•PT ALSTOM Power Energy Systems Indonesia

Page 4: B BackGround

COMPANY MISSION

TO BE THE ALSTOM MANUFACTURING CENTER IN SOUTHEAST ASIA FOR UTILITY BOILERS, INDUSTRIAL BOILERS AND HEAT RECOVERY STEAM GENERATORS.TO BE THE SUPPLIER OF CHOICE IN INDONESIAFOR UTILITY & INDUSTRIAL BOILERS, INDUSTRIAL TURBINES, AND OTHER POWER PLANT EQUIPMENT, AS WELL AS POWER PLANT SERVICE, THROUGH THE SUPPLY OF SUPERIOR PRODUCTS, DELIVERED ON-TIME, AT ACCEPTABLE PRICES

Page 5: B BackGround

ONE LEGAL ENTITY PT ALSTOM Power ESI

BOARD OF COMMISSIONER

VICE PRESIDENT &COUNTRY MANAGER

R. Moenaf

HUMAN RECOURCES

K. Mangkoesoebroto

FINANCE & IT

P. Allen

COMMUNICATION &SALES CORDINATOR

N. Rachman

BOARD OF DIRECTORPRESIDENT DIRECTOR

W. Martokoesoemo

BUSINESS DEV.

CUSTOMER SERVICE

M.Rahardjo

BOILER

Reza Moenaf

EngineeringMuharronif

COMMERCIALJohan T. BMANUFACTURING

Djoko. R Soeroso

QA & QCDjoni Pratomo

Site FacilityUmar Chusnan

Process ImprovementTBD

Account ManagerArief F Nugroho

Service OperationChusnu Himawan

Sengkang O & MBoris Meyer

- Project Management- SM&P - Sales & Proposal- Project Admin & Log

- Production- Production Control- Manufacturing Eng,- Welding Eng.- Product Cost Control- Plant Eng & Maintenance- Safety Coordinator

C Segment Sales

BOILER CONSULTANT

Walt Siddall

SERVICE CONSULTANT

Greg Hunter

Page 6: B BackGround

BUSINESSESMANUFACTURING

- UTILITY BOILERS- INDUSTRIAL BOILERS- HEAT RECOVERY STEAM GENERATORS- REGENERATIVE AIR HEATERS

DESIGN• INDUSTRIAL BOILERS• HRSG

SERVICES •GAS PLANT (CGP)•INDUSTRIAL PLANT (CIP)•STEAM PLANT (CSP)

Page 7: B BackGround

QUALITY ASSURANCE

ISO-9001 CERTIFIED AUTHORIZED ASME FACILITY (“U”,

“PP”, “R” AND “S” STAMPS) FULL TIME HARTFORD STEAM BOILER

INSPECTOR ON SITE DEPNAKER CERTIFIED PROCEDURES OVER 100 ASME QUALIFIED WELDERS

Page 8: B BackGround

• 35 MUSD INVESTED35 MUSD INVESTED • 22,950 M2 WORLD CLASS BOILER MANUFACTURING PLANT• PRODUCT ENGINEERING CENTER • FULL SERVICE CAPABILITY

FACILITY

Page 9: B BackGround

1

2

10 Tons

25 Tons

10 Tons

25 Tons

50/16 Tons

50/16 Tons

5 Tons

25 Tons

5

5,400 M2 5,400 M2 5,400 M2 5,400 M2 5,400 M2

1,35

0 M

2

Finning Machine = 5, 400M2

Lay down area=5,400 M2

Boiler = 17,500 M2

4

Slabonly

Offi

ce B

uild

ing

Mez

zani

ne o

ffice

=2.

5 le

vels

= 36

00 M

2

Receiving & Facilities

GEN

SET

Show

er

3

Externalcraneway

Externalcraneway

Externalcraneway

25 Tons

7

Security

Smal

l Par

ts

Stor

age

Lunc

heon

Mosque

Radi

ogra

phy

Vau

lt

PWH

T Fu

rnac

e

Paint Building

Boiler, Air Heater Line

Boiler, Water Wall Bay

Boiler, SH, RH, Econ. Bay

Boiler, HRSG's, PB, & BOP

Laydown area

Finning Machine

Bay Purpose 1.

2.

3.

4.

5.

7.

TOTAL COVERED MFG SPACE: 22,950 M2

TOTAL LAND: 99'900 M2

General Facility Lay-Out

Page 10: B BackGround

Product Capability

Waterwall PanelWaterwall Panel

SuperheaterSuperheaterElementsElements

EconomiserEconomiserElementsElements

Generating BankGenerating Bank

Drum & HeadersDrum & HeadersRisers & PipingRisers & Piping

Air PreheaterAir Preheater

Fan CasingFan Casing

DuctingDucting

Page 11: B BackGround

Product Capability

StackBy PassStack