INSTALLATION PHASE LOCATION 225A B905-2PB-1001 20A 20A 9 11 25 27 29 SPARE 20A 25A 20A 31 SPARE 20A 33 SPARE 20A 35 SPARE 20A 37 SPARE 20A 39 SPARE 20A 41 SPARE 20A 15A 20A 20A 20A 10 12 20 24 26 28 30 32 SPARE 15 20A 20A 20A 20A 20A 34 SPARE 20A 36 SPARE 20A 38 SPARE 20A 40 SPARE 20A 42 SPARE 20A SPARE SPARE SPARE SPARE SPARE SPARE SPARE 225A B905-2PB-1003 33 35 37 39 41 20A 20A 20A 20A 20A 28 30 32 SPARE 20A 20A 20A 20A 34 SPARE 20A 36 SPARE 20A 38 SPARE 20A 40 SPARE 20A 42 SPARE 20A SPARE SPARE 30A 100A B905-2EPB-1001 30A 20A 20A 20A 20A 20A 7 9 11 13 15 17 19 21 23 25 27 29 1, 3 5 20A 20A 20A 20A 20A 31 20A 35 20A 37 20A 39 SPARE 20A 41 SPARE 20A 15A 20A 20A 20A 20A 20A 10 12 14 16 18 28 20A 36 20A 38 20A 40 20A 42 20A (COLD BOX ROOM) CONTROLS DDC CONTROLS DDC CONTROLS DDC 15A 15A 20A 2 4 6 8 RM MONITORING SERVICE RECEPTS, RM MONITORING SERVICE RECEPTS, RM MONITORING SERVICE RECEPTS, RM MONITORING SERVICE RECEPTS, B905-4PB-1001 SPACE 19, 21, 23 25, 27, 29 31, 33, 35 37, 39, 41 SPACE SPACE SPACE SPACE SPACE SPACE SPACE 20, 22, 24 26, 28,30 32, 34, 36 38, 40, 42 B905-4PB-1002 25A 19, 21, 23 37, 39, 41 SPACE SPACE SPACE SPACE SPACE 2, 4, 6 14, 16, 18 20, 22, 24 26, 28,30 32, 34, 36 38, 40, 42 8, 10, 12 15A 20A 20A (COMPRESSOR AUXILIARY EQUIPMENT - PLANT1) 2, 4 6, 8 POWER EXHAUST 1.64kW + 1HP AC-1 PACKAGE IT ROOM 101 FOR UPS, RECEPT L5-30R IT ROOM 101 FOR UPS, RECEPT L5-30R IT ROOM 101 RECEPT, L5-20R WIREMOLD IT ROOM 101 RECEPT, L5-20R WIREMOLD IT ROOM 101 RECEPT, L5-20R WIREMOLD IT ROOM 101 RECEPT, L5-20R WIREMOLD IT ROOM 101 CABINET SECURITY IT ROOM 101 RECEPTS. CONV IT ROOM 101 RECEPTS. CONV CONTROL PANEL FIRE ALARM MONITOR PANEL WIRELESS FIRE ALARM MON RM SERVICE FUTURE CLG JBX, MON RM SERVICE FUTURE CLG JBX, MON RM SERVICE FUTURE WALL BOX, MON RM SERVICE FUTURE WALL BOX, MON RM SERVICE FUTURE WALL BOX, SPARE SPARE SPARE SPARE SPARE CONT'D FROM DWG E-601 FROM B905-4DP-1001 VIA 75 kVA XFMR B905-4TX-1001 CONT'D FROM DWG E-601 FROM B905-4DP-1004 VIA 75 kVA XFMR B905-4TX-1003 CONT'D FROM DWG E-601 FROM B905-4DP-1004 CONT'D FROM DWG E-601 FROM B905-4DP-1004 15A SPARE 22 SPARE SPARE SPARE SPARE SPARE SPARE SPARE (COLD BOX POWER - PLANT1) (COLD BOX POWER - PLANT1) (COLD BOX POWER - PLANT1) SPARE SPARE SPARE SPARE SPARE SPARE SPARE RM 103 CP1 RM 104 CBX RM 105 CP2 RM 103A RM 105A SPARE 1, 3 35A NORTH SLAB FUTURE CP1 CARBON BAKE-OUT 2 - # 8L 1 - # 8N 1 - # 10G 6 kVA 1 " C 20A FUTURE CP1 1 - # 12L 1 - # 12N 1 - # 12G 5 3 / 4 " C 1.5 kVA ARC CELL CABINET 20A FUTURE CP1 1 - # 12L 1 - # 12N 1 - # 12G 7 3 / 4 " C 0.6 kVA AIR DRYER 20A P V C ( B YS L A C ) FUTURE CP1 1 - # 12L 1 - # 12N 1 - # 12G 0.5 kVA 13 D 1 1 " C CMP211 CONTROLS P V C ( B YS L A C ) FUTURE CP1 1 - # 12L 1 - # 12N 1 - # 12G 0.5 kVA D 2 1 " C CMP212 CONTROLS 20A 15 P V C ( B YS L A C ) FUTURE CP1 1 - # 12L 1 - # 12N 1 - # 12G 0.5 kVA D 3 1 " C CMP213 CONTROLS 20A 17 P V C ( B YS L A C ) FUTURE CP1 1 - # 12L 1 - # 12N 1 - # 12G 0.5 kVA D 4 1 " C CMP214 CONTROLS 20A 19 P V C ( B YS L A C ) FUTURE CP1 1 - # 12L 1 - # 12N 1 - # 12G 0.5 kVA D 5 1 " C CMP215 CONTROLS 20A 21 P V C ( B YS L A C ) FUTURE CP1 1 - # 12L 1 - # 12N 1 - # 12G 0.5 kVA D 6 1 " C CMP216 CONTROLS 20A 23 FUTURE CP1 1 - # 12L 1 - # 12N 1 - # 12G 20A 14 1 kVA 3 / 4 " C FUTURE CP1 1 - # 12L 1 - # 12N 1 - # 12G 1 kVA 3 / 4 " C MCC1 CONTROLS FUTURE CP1 2 - # 12L 1 - # 12N 1 - # 12G 20A 3 / 4 " C 1 kVA MCC1 HEATERS 20A FUTURE CP1 - 1 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C 22 GAS MGMT PLC 25A FUTURE CP1 3 - # 10L 1 - # 10N 1 - # 10G 1, 3, 5 3 / 4 " C 80K A BED 25A FUTURE CP1 3 - # 10L 1 - # 10N 1 - # 10G 7, 9, 11 3 / 4 " C 80K B BED 20A FUTURE CP1 3 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C 13, 15, 17 25A FUTURE CP1 3 - # 10L 1 - # 10N 1 - # 10G 3 / 4 " C 19, 21, 23 20K BED 20A FUTURE CP1 2 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C 25, 27 2K CBX 40A FUTURE CP1 2 - # 8L 1 - # 10N 1 - # 10G 29, 31 1 " C DEWAR - 3 - # 1L 1 - # 1N 1 - # 6G 2 " C B905-2ATS-1001 2 " C 3 - # 1L 1 - # 1N 1 - # 6G B905S-2GEN-1001 2" C 3 - # 1L 1 - # 1N 1 - # 6G B905-2UPS-1001 2 " C 3 - # 1L 1 - # 1N 1 - # 6G FUTURE FUTURE AUTOMATIC TRANSFER SWITCH 20A 1 - # 12L 1 - # 12N 1 - # 12G 8 3 / 4 " C NORTH SLAB FUTURE 20A 2 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C NORTH SLAB FUTURE 12, 14 PURIFIER 1 20A - 2 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C NORTH SLAB FUTURE 16, 18 PURIFIER 2 20A 1 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C FUTURE 20 UTILITIES PLC 20A 1 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C 24 2K CBX PLC FUTURE CP1 20A 1 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C 26 4K CBX PLC FUTURE CP1 20A P V C ( B YS L A C ) 1 - # 10L 1 - # 10N 1 - # 10G 3 / 4 " C 33 20A 1 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C FUTURE 20 UTILITIES PLC 20A FUTURE CP1 1 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C 22 GAS MGMT PLC 1 kVA 20A 1 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C 24 2K CBX PLC FUTURE CP1 20A 1 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C 26 4K CBX PLC FUTURE CP1 FUTURE CP2 1 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C GAS MGMT PLC 1 kVA 1 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C 2K CBX PLC FUTURE CP2 1 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C 4K CBX PLC FUTURE CP2 20A 30 20A 32 20A 34 35A FUTURE CP1 3 - # 8L 1 - # 10G 1, 3, 5 COLD CMP1 1 " C PANEL FUTURE CP1 13 kW C A B LET R AY (BY ALATUS) FUTURE CP1 3 - # 8L 1 - # 10G COLD CMP3 1 " C PANEL FUTURE CP1 13 kW C A B LET R AY (BY ALATUS) 35A 7, 9, 11 FUTURE CP1 3 - # 8L 1 - # 10G COLD CMP5 1 " C PANEL FUTURE CP1 13 kW C A B LET R AY (BY ALATUS) 35A 13, 15, 17 FUTURE CP1 3 - # 8L 1 - # 10G COLD CMP2 1 " C PANEL FUTURE CP1 13 kW C A B LET R AY (BY ALATUS) FUTURE CP1 3 - # 8L 1 - # 10G COLD CMP4 1 " C PANEL FUTURE CP1 13 kW C A B LET R AY (BY ALATUS) FUTURE CP1 3 - # 8L 1 - # 10G COLD CMP6 1 " C PANEL FUTURE CP1 13 kW C A B LET R AY (BY ALATUS) 35A 35A 8, 10, 12 35A 14, 16, 18 2, 4, 6 B905-4P-CP1-CC1 B905-4P-CP1-CC3 B905-4P-CP1-CC5 B905-4P-CP1-CC2 B905-4P-CP1-CC4 B905-4P-CP1-CC6 - FUTURE CP1 3 - # 12L 1 - # 12N 1 - # 12G 15A 1, 3, 5 3 / 4 " C NORTH SLAB 5 HP 4K UPPER CBX FUTURE CP1 3 - # 12L 1 - # 12N 1 - # 12G 15A 3 / 4 " C 5 HP 4K LOWER CBX 7, 9, 11 FUTURE CP1 3 - # 12L 1 - # 12N 1 - # 12G 15A 3 / 4 " C 5 HP 13, 15, 17 2K CBX FUTURE CP1 3 - # 4L 1 - # 4N 1 - # 10G 60A PRIMARY 25, 27, 29 1 - 1 / 2 " C TEST HTR FUTURE CP1 3 - # 8L 1 - # 8N 1 - # 10G 40A SHIELD 31, 33, 35 TEST HTR 1 " C 16, 18 B905-103 B905-103 B905-103 B905-103 B905-103 B905-103 B905-103 B905-103 B905-103A B905-103A B905-103 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-103 B905-105 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-103A B905-103 1 kVA 1 kVA 1 kVA 1 kVA 1 kVA 2 kVA 1 kVA B905S B905S 125A NORTH SLAB FUTURE CP1 3 - # 10L 1 - # 10G 3 / 4 " C 6 kVA B905-104 3 - # 10L 1 - # 10G 3 / 4 " C NORTH SLAB FUTURE CP1 6 kVA 3 - # 12L 1 - # 12G 3 / 4 " C FUTURE CP1 2 kVA B905-104 HTR CTRL B905-104 HTR CTRL A E 1 5 10 14 G M 8 6 4 3 5 2 7 C D E F G H 2 A B 8 6 4 3 5 7 1 SHEET OF USED ON ASSY NO. SCALE DWG. NO. SIZE E REV. A B D E F G H C 1 THIRD ANGLE PROJECTION APPROVALS DATE MATERIAL DEBURR & BREAK ALL SHARP EDGES DO NOT SCALE DRAWING TRACKING NO. DRAWN CHECKED APPROVED APPROVED DIM & TOL PER ASME Y14.5 . UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES TOLERANCES ARE: FRACTIONS DECIMAL ANGLES DOCUMENT CONTROL STAMP REV ZONE DESCRIPTION REVISION HISTORY DATE APPROVED EACH SHEET OF MULTI-SHEET DRAWINGS SHALL ALWAYS HAVE THE SAME REVISION LEVEL. United States Department of Energy Newport News Virginia FINISH MACHINED SURFACES UNLESS OTHERWISE NOTED N/A B LCLS-II ELECTRICAL DISTRIBUTION CRYOGENIC BLDG. & INFRASTRUCTURE JLAB SCOPE A. DE LIRA C. SCANLON J. CREEL 79120-D-XXXX 1 4 NOV2016 N/A HTR CTRL 3 - # 10L 1 - # 10G 3 / 4 " C FUTURE CP1 6 kVA B905-104 CABINET HTR CTRL CABINET CABINET CABINET 2 - # 12L 1 - # 12G 3 / 4 " C FUTURE CP1 3 kW B905-104 TEST HTR CTRL CABINET 2K CBX TEST HEATERS 80K A BED HEATERS 80K B BED HEATERS 4K UPPER CBX 4K UPPER CBX 4K LOWER CBX HEATERS 4K LOWER CBX HEATERS 3K SC - HTR CTRL CABINET 2 - # 8L 1 - # 10G FUTURE CP1 6 kW B905-104 - 1 " C DEWAR HEATERS SKID VAC PUMP VAC PUMP SKID VAC PUMP SKID 3 - # 4L FUTURE CP1 45 kW B905-104 1 - 1 / 2 " C 1 - # 4N TEST HTR PRIMARY - CRTL CABINET 1 - # 10G 3 - # 8L FUTURE CP1 30 kW B905-104 1 - 1 / 2 " C 1 - # 8N TEST HTR SHIELD - 1 - # 10G CTRL CABINET 208Y/120V, 3-PH, 4W - - - - - M M M M M 2 kW HTR BOX - 2 kW HTR BOX PURIFIER 1 BOX 1 kVA PLC PANEL 1 - # 12L 1 - # 12N 1 - # 12G 3 / 4 " C NORTH SLAB FUTURE PURIFIER 2 BOX 1 kVA PLC PANEL 20A 10 MCC CONTROLS UPS - 20A NORTH SLAB FUTURE GENERATOR B905 LCLS-II CRYOPLANT BUILDING LAYOUT 2K CBX COLD CMP1 MOTOR 2K CBX COLD CMP3 MOTOR 2K CBX COLD CMP5 MOTOR 2K CBX COLD CMP2 MOTOR 2K CBX COLD CMP4 MOTOR 2K CBX COLD CMP6 MOTOR 20K BED 1 - # 10N (TO SH-1) BATTERY CHARGER B CABINET CABINET CABINET CABINET CABINET CABINET CABINET CABINET CABINET CABINET CABINET 24 kW/30 kVA 1 kVA 1 kVA 1 kVA ALL A FEB 2017 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-2 CP1, PHASE-2 CP2, PHASE-1 CP2, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-1 (TO SH-1) (TO SH-1) (TO SH-1) SPARE SPARE (TO SH-1) CB # 20 B905-2PB-1003 (FROM SH-1) CB # 22 B905-2PB-1001 (FROM SH-1) CB # 24 B905-2PB-1003 (FROM SH-1) CB # 26 B905-2PB-1003 (FROM SH-1) CB # 30 B905-2PB-1007 (FROM SH-2) CB # 32 B905-2PB-1007 (FROM SH-2) CB # 34 B905-2PB-1007 (FROM SH-2) R NORTON C SCANLON CB # 33 B905-2EPB-1001 (FROM SH-1) E-601 ID-905-700-16, REV-A2 LCLS-II CRYOGENIC BLDG. & INFRASTRUCTURE ELECTRICAL SINGLE LINE DIAGRAM 239894E-601.DWG FILE NAME DWG NO. HDR TITLE SLAC DWG NO. E-602 ID-905-700-17, REV-A2 LCLS-II CRYOGENIC BLDG. & INFRASTRUCTURE ELECTRICAL SINGLE LINE DIAGRAM 239894E-602.DWG REFERENCE DRAWINGS GENERAL NOTES: 4. ALL JLAB CONDUITS ARE EMC TYPE UNLESS NOTED OTHERWISE 3. CONDUITS MARKED D1-D6 ARE IN SLAC's SCOPE OF INSTALLATION JLAB's SCOPE OF INSTALLATION 2. BRANCH CIRCUITS AND EQUIPMENT IN SOLID LINES ARE IN SLAC's SCOPE OF INSTALLATION 1. BRANCH CIRCUITS AND EQUIPMENT IN DASHED LINES ARE IN PNL/EQPT LINE 1 PNL/EQPT LINE 2 PNL/EQPT LINE 3 PNL/EQPT LINE 4 PNL/EQPT RATING B905-XXX CP1, PHASE-1 XXX = ROOM # SEE DETAIL "A" ID-905-700-24, REV-A2 239894ESP-001-A.DWG ESP-001-A LCLS-II CRYOGENIC BLDG. & INFRASTRUCTURE ELECTRICAL SITE PLAN FUTURE 3K SUBCOOLER E-401 ID-905-700-11, REV-A1 239894E-401.DWG LCLS-II CRYOGENIC BLDG. & INFRASTRUCTURE ELECTRICAL YARD PLAN 125 A, 4P TEST LOAD RESISTOR DETAIL "B" UPS TYPICAL DIAGRAM ROTATED 90º CW SEE DETAIL "B" 125A 30 kW/30 kVA 208Y/120V, 3-PH, 4W + 10 kW/kVA REDUNDANT PWR MODULE AUTOMATIC TRANSFER SWITCH 8.3 RESIZING DISCONNECTING SWITCH AND THE 8.2. GENERATOR POWER INCREASED TO 30 kVA 8.1. CB 2,4,6 IN B905-2PB-1003 TO 125 A FROM 100 A 8. COORDINATES CHANGES WITH THE UPS INSTALLATION: JLAB SCOPE. 7. ADDS REMAINING CRYOPLANT ELECTRICAL INSTALLTIONS WITHIN PANEL. 6. ADDS A 30 kVA + 10 kVA UPS UNIT FOR THE CRYOPLANT EMERGENCY THE MCC CONTROLS. 5. ADDS 120V/1-PH UPS IN EACH MCC ELECTRICAL ROOM FOR 208V/3-PH FROM 480V/3-PH. 4. THE AC POWER TO THE 3 KL SUBCOOLER HEATER CHANGED TO TO MATCH CB # FROM B905-2EPB-1001. 3. ALLIGNS NON-EMERGENCY 120V CB # FOR PLC CABINETS FROM B905-2EPB-1001. 2. ADDS 120V/20A CIRCUIT FOR THE GENERATOR BATTERY CHARGER 1. ADDS INFO ON CIRCUIT LOCATION IN THE CRYOPLANT BLDG. 2, 4, 6 B905-103 79120-1910 MAR 2017 B to use these works for Governmental purposes but it is not to be released or distributed to the public. NEITHER THE GOVERNMENT NOR THE CONTRACTOR MAKES ANY WARRANTY, EXPRESS OR IMPLIED, OR ASSUMES ANY LIABILITY FOR THE USE OF THESE DESIGNS OR DRAWINGS.(This notice including this sentence must appear on any copies of these designs or drawings.) These designs and drawings were prepared by Jefferson Science Associates, LLC, hereinafter the Contractor, under Contract No. DE-AC05-06OR23177 with the Department of Energy (DOE). All rights in the designs and drawings are reserved by DOE on behalf of the United States Government and the Contractor as provided in the Contract. You are authorized A. DE LIRA 7. ADDED 480 V WELDING OUTLETS IN NORTH SLAB AND TANK YARD. 6. AIR COMPRESSOR #1 FEED MOVED TO B905-4DP-1001 CKT #10. 5. ADD 4K COLDBOX SECONDARY COOLING WATER PUMPS. LOCATIONS. 4. CORRECTED CONDUIT OWNERSHIP (SLAC OR JLAB) IN SEVERAL FROM 8AWG IN GENERATOR AND UPS CONNECTIONS. 3. CORRECTED EQUIPMENT GROUNDING CONDUCTOR SIZES TO 6AWG 2. DISCONNECT SWITCH B905S-2DS-1001 REMOVED. 1. ATS MOVED TO B905-103 FROM THE ELECTRICAL YARD. C SCANLON DETAIL "A" DESCRIPTION LOAD TYPICAL B SH.4 SH.3 SH.1 B905S ELECTRICAL YARD - - - - - B905S 2 kVA CHARGER BATTERY GENERATOR FUTURE CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-2 CP2, PHASE-2 Approved: 4/10/2017; E-Sign ID : 339991; signed by: Ap. 1: C. Scanlon; C.: C. Scanlon; D: T. Fuell |

Upload: others

Post on 21-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: B905-2PB-1003 · 2017/6/1  · 2 4 6 8 RM MONITORING SERVICE RECEPTS, RM MONITORING SERVICE RECEPTS, RM MONITORING RM MONITORING B905-4PB-1001 SPACE 19, 21, 23 25, 27, 29 31, 33,

INSTALLATION PHASE

LOCATION

225A

B905-2PB-1001

20A 20A

9 11 25 27 29

SPARE

20A 25A 20A

31

SPARE

20A

33

SPARE

20A

35

SPARE

20A

37

SPARE

20A

39

SPARE

20A

41

SPARE

20A 15A 20A 20A 20A

10 12 20 24 26 28 30 32

SPARE

15 20A 20A 20A 20A 20A

34

SPARE

20A

36

SPARE

20A

38

SPARE

20A

40

SPARE

20A

42

SPARE

20A

SPARE SPARE SPARE SPARESPARE SPARESPARE

225A

B905-2PB-1003

33 35 37 39 41

20A 20A 20A 20A 20A

28 30 32

SPARE

20A 20A 20A 20A

34

SPARE

20A

36

SPARE

20A

38

SPARE

20A

40

SPARE

20A

42

SPARE

20A

SPARE SPARE

30A

100A

B905-2EPB-1001

30A 20A 20A 20A 20A 20A

7 9 11 13 15 17 19 21 23 25 27 291, 3 5

20A 20A 20A 20A 20A

31

20A

35

20A

37

20A

39

SPARE

20A

41

SPARE

20A 15A 20A 20A 20A 20A 20A

10 12 14 16 18 28

20A

36

20A

38

20A

40

20A

42

20A

(COLD BOX ROOM)

CONTROLS

DDC

CONTROLS

DDC

CONTROLS

DDC

15A 15A20A

2 4 6 8

RM

MONITORING

SERVICE

RECEPTS,

RM

MONITORING

SERVICE

RECEPTS,

RM

MONITORING

SERVICE

RECEPTS,

RM

MONITORING

SERVICE

RECEPTS,

B905-4PB-1001

SPACE

19, 21, 23 25, 27, 29 31, 33, 35 37, 39, 41

SPACE SPACE SPACE SPACE SPACE SPACE SPACE

20, 22, 24 26, 28,30 32, 34, 36 38, 40, 42

B905-4PB-1002

25A

19, 21, 23 37, 39, 41

SPACE SPACE SPACE SPACE SPACE

2, 4, 6 14, 16, 18 20, 22, 24 26, 28,30 32, 34, 36 38, 40, 428, 10, 12

15A 20A 20A

(COMPRESSOR AUXILIARY EQUIPMENT - PLANT1)

2, 4 6, 8

POWER EXHAUST

1.64kW + 1HP

AC-1

PACKAGE

IT ROOM 101

FOR UPS,

RECEPT

L5-30R

IT ROOM 101

FOR UPS,

RECEPT

L5-30R

IT ROOM 101

RECEPT,

L5-20R

WIREMOLD

IT ROOM 101

RECEPT,

L5-20R

WIREMOLD

IT ROOM 101

RECEPT,

L5-20R

WIREMOLD

IT ROOM 101

RECEPT,

L5-20R

WIREMOLD

IT ROOM 101

CABINET

SECURITY

IT ROOM 101

RECEPTS.

CONV

IT ROOM 101

RECEPTS.

CONV

CONTROL PANEL

FIRE ALARM

MONITOR PANEL

WIRELESS

FIRE ALARM

MON RM

SERVICE

FUTURE

CLG JBX,

MON RM

SERVICE

FUTURE

CLG JBX,

MON RM

SERVICE

FUTURE

WALL BOX,

MON RM

SERVICE

FUTURE

WALL BOX,

MON RM

SERVICE

FUTURE

WALL BOX,

SPARE

SPARE SPARE

SPARE SPARE

CONT'D FROM DWG E-601

FROM B905-4DP-1001 VIA 75 kVA XFMR B905-4TX-1001

CONT'D FROM DWG E-601

FROM B905-4DP-1004 VIA 75 kVA XFMR B905-4TX-1003

CONT'D FROM DWG E-601

FROM B905-4DP-1004

CONT'D FROM DWG E-601

FROM B905-4DP-1004

15A

SPARE

22

SPARESPARE

SPARE SPARE SPARE SPARE SPARE

(COLD BOX POWER - PLANT1)

(COLD BOX POWER - PLANT1) (COLD BOX POWER - PLANT1)

SPARE SPARE SPARE

SPARE

SPARE SPARE

SPARE

RM 103

CP1

RM 104

CBX

RM 105

CP2

RM 103A RM 105A

SPARE

1, 3

35A

NORTH SLAB

FUTURE CP1

CARBON

BAKE-OUT

2 - # 8L

1 - # 8N

1 - # 10G

6 kVA

1" C

20A

FUTURE CP1

1 - # 12L

1 - # 12N

1 - # 12G

5

3/4" C

1.5 kVA

ARC CELL

CABINET

20A

FUTURE CP1

1 - # 12L

1 - # 12N

1 - # 12G

7

3/4" C

0.6 kVA

AIR

DRYER

20A

PV

C(B

Y S

LA

C)

FUTURE CP1

1 - # 12L

1 - # 12N

1 - # 12G

0.5 kVA

13

D1

1" C

CMP211

CONTROLS

PV

C(B

Y S

LA

C)

FUTURE CP1

1 - # 12L

1 - # 12N

1 - # 12G

0.5 kVA

D2

1" C

CMP212

CONTROLS

20A

15

PV

C(B

Y S

LA

C)

FUTURE CP1

1 - # 12L

1 - # 12N

1 - # 12G

0.5 kVA

D3

1" C

CMP213

CONTROLS

20A

17

PV

C(B

Y S

LA

C)

FUTURE CP1

1 - # 12L

1 - # 12N

1 - # 12G

0.5 kVA

D4

1" C

CMP214

CONTROLS

20A

19

PV

C(B

Y S

LA

C)

FUTURE CP1

1 - # 12L

1 - # 12N

1 - # 12G

0.5 kVA

D5

1" C

CMP215

CONTROLS

20A

21

PV

C(B

Y S

LA

C)

FUTURE CP1

1 - # 12L

1 - # 12N

1 - # 12G

0.5 kVA

D6

1" C

CMP216

CONTROLS

20A

23

FUTURE CP1

1 - # 12L

1 - # 12N

1 - # 12G

20A

14

1 kVA

3/4" C

FUTURE CP1

1 - # 12L

1 - # 12N

1 - # 12G

1 kVA

3/4" C

MCC1

CONTROLS

FUTURE CP1

2 - # 12L

1 - # 12N

1 - # 12G

20A

3/4" C

1 kVA

MCC1

HEATERS

20A

FUTURE CP1

-

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

22

GAS MGMT PLC

25A

FUTURE CP1

3 - # 10L

1 - # 10N

1 - # 10G

1, 3, 5

3/4" C

80K A BED

25A

FUTURE CP1

3 - # 10L

1 - # 10N

1 - # 10G

7, 9, 11

3/4" C

80K B BED

20A

FUTURE CP1

3 - # 12L

1 - # 12N

1 - # 12G

3/4" C

13, 15, 17

25A

FUTURE CP1

3 - # 10L

1 - # 10N

1 - # 10G

3/4" C

19, 21, 23

20K BED

20A

FUTURE CP1

2 - # 12L

1 - # 12N

1 - # 12G

3/4" C

25, 27

2K CBX

40A

FUTURE CP1

2 - # 8L

1 - # 10N

1 - # 10G

29, 31

1" C

DEWAR

-

3 - # 1L

1 - # 1N

1 - # 6G

2" C

B905-2ATS-1001

2" C

3 - # 1L

1 - # 1N

1 - # 6G

B905S-2GEN-1001

2" C

3 - # 1L

1 - # 1N

1 - # 6G

B905-2UPS-1001

2" C

3 - # 1L

1 - # 1N

1 - # 6G

FUTUREFUTURE

AUTOMATIC TRANSFER SWITCH

20A

1 - # 12L

1 - # 12N

1 - # 12G

8

3/4" C

NORTH SLAB

FUTURE

20A

2 - # 12L

1 - # 12N

1 - # 12G

3/4" C

NORTH SLAB

FUTURE

12, 14

PURIFIER 1

20A

-

2 - # 12L

1 - # 12N

1 - # 12G

3/4" C

NORTH SLAB

FUTURE

16, 18

PURIFIER 2

20A

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

FUTURE

20

UTILITIES PLC

20A

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

24

2K CBX PLC

FUTURE CP1

20A

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

26

4K CBX PLC

FUTURE CP1

20A

PV

C(B

Y S

LA

C)

1 - # 10L

1 - # 10N

1 - # 10G

3/4" C

33

20A

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

FUTURE

20

UTILITIES PLC

20A

FUTURE CP1

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

22

GAS MGMT PLC

1 kVA

20A

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

24

2K CBX PLC

FUTURE CP1

20A

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

26

4K CBX PLC

FUTURE CP1 FUTURE CP2

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

GAS MGMT PLC

1 kVA

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

2K CBX PLC

FUTURE CP2

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

4K CBX PLC

FUTURE CP2

20A

30

20A

32

20A

34

35A

FUTURE CP1

3 - # 8L

1 - # 10G

1, 3, 5

COLD CMP1

1" C

PANEL

FUTURE CP1

13 kW

CA

BLE T

RA

Y

(BY ALATUS)

FUTURE CP1

3 - # 8L

1 - # 10G

COLD CMP3

1" C

PANEL

FUTURE CP1

13 kW

CA

BLE T

RA

Y

(BY ALATUS)

35A

7, 9, 11

FUTURE CP1

3 - # 8L

1 - # 10G

COLD CMP5

1" C

PANEL

FUTURE CP1

13 kW

CA

BLE T

RA

Y

(BY ALATUS)

35A

13, 15, 17

FUTURE CP1

3 - # 8L

1 - # 10G

COLD CMP2

1" C

PANEL

FUTURE CP1

13 kW

CA

BLE T

RA

Y

(BY ALATUS)

FUTURE CP1

3 - # 8L

1 - # 10G

COLD CMP4

1" C

PANEL

FUTURE CP1

13 kW

CA

BLE T

RA

Y

(BY ALATUS)

FUTURE CP1

3 - # 8L

1 - # 10G

COLD CMP6

1" C

PANEL

FUTURE CP1

13 kW

CA

BLE T

RA

Y

(BY ALATUS)

35A 35A

8, 10, 12

35A

14, 16, 182, 4, 6

B905-4P-CP1-CC1 B905-4P-CP1-CC3 B905-4P-CP1-CC5 B905-4P-CP1-CC2 B905-4P-CP1-CC4 B905-4P-CP1-CC6

-

FUTURE CP1

3 - # 12L

1 - # 12N

1 - # 12G

15A

1, 3, 5

3/4" C

NORTH SLAB

5 HP

4K UPPER CBX

FUTURE CP1

3 - # 12L

1 - # 12N

1 - # 12G

15A

3/4" C

5 HP

4K LOWER CBX

7, 9, 11

FUTURE CP1

3 - # 12L

1 - # 12N

1 - # 12G

15A

3/4" C

5 HP

13, 15, 17

2K CBX

FUTURE CP1

3 - # 4L

1 - # 4N

1 - # 10G

60A

PRIMARY

25, 27, 29

1-1/2" C

TEST HTR

FUTURE CP1

3 - # 8L

1 - # 8N

1 - # 10G

40A

SHIELD

31, 33, 35

TEST HTR

1" C

16, 18

B905-103 B905-103 B905-103 B905-103 B905-103 B905-103 B905-103 B905-103

B905-103A B905-103A

B905-103

B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104

B905-104 B905-104 B905-104 B905-104 B905-104B905-103 B905-105

B905-104 B905-104 B905-104 B905-104 B905-104 B905-104

B905-104 B905-104 B905-104 B905-104 B905-104 B905-104

B905-104 B905-104 B905-104 B905-104

B905-103A

B905-103

1 kVA 1 kVA 1 kVA 1 kVA 1 kVA

2 kVA

1 kVA

B905S

B905S

125A

NORTH SLAB

FUTURE CP1

3 - # 10L

1 - # 10G

3/4" C

6 kVA

B905-104

3 - # 10L

1 - # 10G

3/4" C

NORTH SLAB

FUTURE CP1

6 kVA

3 - # 12L

1 - # 12G

3/4" C

FUTURE CP1

2 kVA

B905-104

HTR CTRL

B905-104

HTR CTRL

A

E

1 5 10 14

G

M

8 6 4 35 27

C

D

E

F

G

H

2

A

B

8 6 4 357 1

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

EREV.

A

B

D

E

F

G

H

C

1

THIRD ANGLE PROJECTION

APPROVALS DATE

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

TRACKING NO.

DRAWN

CHECKED

APPROVED

APPROVED

DIM & TOL PER ASME Y14.5 .

UNLESS OTHERWISE SPECIFIED

DIMENSIONS ARE IN INCHES

TOLERANCES ARE:

FRACTIONS DECIMAL ANGLES

DOCUMENT CONTROL STAMP

REVZONE DESCRIPTION

REVISION HISTORY

DATE APPROVED

EACH SHEET OF MULTI-SHEET DRAWINGS SHALL ALWAYS HAVE THE SAME REVISION LEVEL.

United States

Department

of Energy

Newport News

Virginia

FINISH

MACHINED

SURFACES

UNLESS

OTHERWISE

NOTED

TITLE BLOCK DATA

N/A

B

LCLS-II

ELECTRICAL DISTRIBUTION

CRYOGENIC BLDG. & INFRASTRUCTURE

JLAB SCOPE

A. DE LIRA

C. SCANLON

J. CREEL 79120-D-XXXX 1 4

NOV2016

N/A

HTR CTRL

3 - # 10L

1 - # 10G

3/4" C

FUTURE CP1

6 kVA

B905-104

CABINET

HTR CTRL

CABINETCABINETCABINET

2 - # 12L

1 - # 12G

3/4" C

FUTURE CP1

3 kW

B905-104

TEST HTR CTRL

CABINET

2K CBX

TEST HEATERS80K A BED

HEATERS

80K B BED

HEATERS

4K UPPER CBX 4K UPPER CBX 4K LOWER CBX

HEATERS

4K LOWER CBX

HEATERS

3K SC

-

HTR CTRL

CABINET

2 - # 8L

1 - # 10G

FUTURE CP1

6 kW

B905-104

-

1" C

DEWAR

HEATERS

SKID

VAC PUMP VAC PUMP

SKID

VAC PUMP

SKID

3 - # 4L

FUTURE CP1

45 kW

B905-104

1-1/2" C

1 - # 4N

TEST HTR

PRIMARY

-

CRTL CABINET

1 - # 10G

3 - # 8L

FUTURE CP1

30 kW

B905-104

1-1/2" C

1 - # 8N

TEST HTR

SHIELD

-

1 - # 10G

CTRL CABINET

208Y/120V, 3-PH, 4W

- - - - -

M M M M M

2 kW

HTR BOX

-

2 kW

HTR BOX

PURIFIER 1

BOX

1 kVA

PLC PANEL

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

NORTH SLAB

FUTURE

PURIFIER 2

BOX

1 kVA

PLC PANEL

20A

10

MCC CONTROLS

UPS

-

20A

NORTH SLAB

FUTURE

GENERATOR

B905

LCLS-II CRYOPLANT BUILDING LAYOUT

2K CBX

COLD CMP1

MOTOR

2K CBX

COLD CMP3

MOTOR

2K CBX

COLD CMP5

MOTOR

2K CBX

COLD CMP2

MOTOR

2K CBX

COLD CMP4

MOTOR

2K CBX

COLD CMP6

MOTOR

20K BED

1 - # 10N

(TO SH-1)

BATTERY

CHARGER

B

CABINET

CABINET CABINET CABINET

CABINET CABINET CABINET CABINET CABINET CABINET CABINET

24 kW/30 kVA

1 kVA 1 kVA1 kVA

ALL A FEB 2017

CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1

CP1, PHASE-1 CP1, PHASE-1

CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2

CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2

CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-2 CP1, PHASE-2

CP1, PHASE-1

CP1, PHASE-1

CP1, PHASE-1

CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-2 CP1, PHASE-2 CP2, PHASE-1 CP2, PHASE-2

CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2

CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2

CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2

CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2

CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2

CP1, PHASE-2 CP1, PHASE-2

CP1, PHASE-1

(TO SH-1) (TO SH-1) (TO SH-1)

SPARESPARE

(TO SH-1)

CB # 20

B905-2PB-1003

(FROM SH-1)

CB # 22

B905-2PB-1001

(FROM SH-1)

CB # 24

B905-2PB-1003

(FROM SH-1)

CB # 26

B905-2PB-1003

(FROM SH-1)

CB # 30

B905-2PB-1007

(FROM SH-2)

CB # 32

B905-2PB-1007

(FROM SH-2)

CB # 34

B905-2PB-1007

(FROM SH-2)

R NORTON

C SCANLON

CB # 33

B905-2EPB-1001

(FROM SH-1)

E-601 ID-905-700-16, REV-A2 LCLS-II CRYOGENIC BLDG. & INFRASTRUCTURE ELECTRICAL SINGLE LINE DIAGRAM239894E-601.DWG

FILE NAMEDWG NO.

HDRTITLESLAC DWG NO.

E-602 ID-905-700-17, REV-A2 LCLS-II CRYOGENIC BLDG. & INFRASTRUCTURE ELECTRICAL SINGLE LINE DIAGRAM239894E-602.DWG

REFERENCE DRAWINGS

GENERAL NOTES:

4. ALL JLAB CONDUITS ARE EMC TYPE UNLESS NOTED OTHERWISE

3. CONDUITS MARKED D1-D6 ARE IN SLAC's SCOPE OF INSTALLATION

JLAB's SCOPE OF INSTALLATION

2. BRANCH CIRCUITS AND EQUIPMENT IN SOLID LINES ARE IN

SLAC's SCOPE OF INSTALLATION

1. BRANCH CIRCUITS AND EQUIPMENT IN DASHED LINES ARE IN

PNL/EQPT LINE 1

PNL/EQPT LINE 2

PNL/EQPT LINE 3

PNL/EQPT LINE 4

PNL/EQPT RATING

B905-XXX

CP1, PHASE-1

XXX = ROOM #

SEE DETAIL "A"

ID-905-700-24, REV-A2239894ESP-001-A.DWG ESP-001-A LCLS-II CRYOGENIC BLDG. & INFRASTRUCTURE ELECTRICAL SITE PLAN

FUTURE

3K SUBCOOLER

E-401 ID-905-700-11, REV-A1239894E-401.DWG LCLS-II CRYOGENIC BLDG. & INFRASTRUCTURE ELECTRICAL YARD PLAN

125 A, 4P

TEST

LOAD

RESISTOR

DETAIL "B"

UPS TYPICAL DIAGRAM

ROTATED 90º CW

SEE DETAIL "B"

125A

30 kW/30 kVA

208Y/120V, 3-PH, 4W

+ 10 kW/kVA REDUNDANT PWR MODULE

AUTOMATIC TRANSFER SWITCH

8.3 RESIZING DISCONNECTING SWITCH AND THE

8.2. GENERATOR POWER INCREASED TO 30 kVA

8.1. CB 2,4,6 IN B905-2PB-1003 TO 125 A FROM 100 A

8. COORDINATES CHANGES WITH THE UPS INSTALLATION:

JLAB SCOPE.

7. ADDS REMAINING CRYOPLANT ELECTRICAL INSTALLTIONS WITHIN

PANEL.

6. ADDS A 30 kVA + 10 kVA UPS UNIT FOR THE CRYOPLANT EMERGENCY

THE MCC CONTROLS.

5. ADDS 120V/1-PH UPS IN EACH MCC ELECTRICAL ROOM FOR

208V/3-PH FROM 480V/3-PH.

4. THE AC POWER TO THE 3 KL SUBCOOLER HEATER CHANGED TO

TO MATCH CB # FROM B905-2EPB-1001.

3. ALLIGNS NON-EMERGENCY 120V CB # FOR PLC CABINETS

FROM B905-2EPB-1001.

2. ADDS 120V/20A CIRCUIT FOR THE GENERATOR BATTERY CHARGER

1. ADDS INFO ON CIRCUIT LOCATION IN THE CRYOPLANT BLDG.

2, 4, 6

B905-103

79120-1910

MAR 2017B

to use these works for Governmental purposes but it is not to be released or distributed to the public. NEITHER THE GOVERNMENT NOR THE CONTRACTOR MAKES ANY WARRANTY, EXPRESS OR IMPLIED, OR ASSUMES ANY LIABILITY FOR THE USE OF THESE DESIGNS OR DRAWINGS.(This notice including this sentence must appear on any copies of these designs or drawings.)

These designs and drawings were prepared by Jefferson Science Associates, LLC, hereinafter the Contractor, under Contract No. DE-AC05-06OR23177 with the Department of Energy (DOE). All rights in the designs and drawings are reserved by DOE on behalf of the United States Government and the Contractor as provided in the Contract. You are authorized

A. DE LIRA

7. ADDED 480 V WELDING OUTLETS IN NORTH SLAB AND TANK YARD.

6. AIR COMPRESSOR #1 FEED MOVED TO B905-4DP-1001 CKT #10.

5. ADD 4K COLDBOX SECONDARY COOLING WATER PUMPS.

LOCATIONS.

4. CORRECTED CONDUIT OWNERSHIP (SLAC OR JLAB) IN SEVERAL

FROM 8AWG IN GENERATOR AND UPS CONNECTIONS.

3. CORRECTED EQUIPMENT GROUNDING CONDUCTOR SIZES TO 6AWG

2. DISCONNECT SWITCH B905S-2DS-1001 REMOVED.

1. ATS MOVED TO B905-103 FROM THE ELECTRICAL YARD. C SCANLON

DETAIL "A"

DESCRIPTION

LOAD

TYPICAL

B

SH.4

SH.3

SH.1

B905SELECTRICAL YARD

- - - - -

B905S

2 kVA

CHARGER

BATTERY

GENERATOR

FUTURE

CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1

CP1, PHASE-2

CP2, PHASE-2 Approved: 4/10/2017; E-Sign ID : 339991; signed by: Ap. 1: C. Scanlon; C.: C. Scanlon; D: T. Fuell |

Page 2: B905-2PB-1003 · 2017/6/1  · 2 4 6 8 RM MONITORING SERVICE RECEPTS, RM MONITORING SERVICE RECEPTS, RM MONITORING RM MONITORING B905-4PB-1001 SPACE 19, 21, 23 25, 27, 29 31, 33,

8 6 4 35 27

C

D

E

F

G

H

2

A

B

8 6 4 357 1

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

EREV.

A

B

D

E

F

G

H

C

1

THIRD ANGLE PROJECTION

APPROVALS DATE

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

TRACKING NO.

DRAWN

CHECKED

APPROVED

APPROVED

DIM & TOL PER ASME Y14.5 .

UNLESS OTHERWISE SPECIFIED

DIMENSIONS ARE IN INCHES

TOLERANCES ARE:

FRACTIONS DECIMAL ANGLES

DOCUMENT CONTROL STAMP

EACH SHEET OF MULTI-SHEET DRAWINGS SHALL ALWAYS HAVE THE SAME REVISION LEVEL.

United States

Department

of Energy

Newport News

Virginia

FINISH

MACHINED

SURFACES

UNLESS

OTHERWISE

NOTED

TITLE BLOCK DATA

N/A

B

LCLS-II

ELECTRICAL DISTRIBUTION

CRYOGENIC BLDG. & INFRASTRUCTURE

JLAB SCOPE

A. DE LIRA

C. SCANLON

J. CREEL 79120-D-XXXX 2 4

NOV2016

N/A

REVZONE DESCRIPTION

REVISION HISTORY

DATE APPROVED

225A

B905-2PB-1007

20A 20A

9 11 25 27 29

SPARE

20A 25A 20A

31

SPARE

20A

33

SPARE

20A

35

SPARE

20A

37

SPARE

20A

39

SPARE

20A

41

SPARE

20A 15A 20A 20A 20A

10 12 20 24 26 28 32

SPARE

15 20A 20A 20A 20A

34

SPARE

20A

36

SPARE

20A

38

SPARE

20A

40

SPARE

20A

42

SPARE

20A

SPARE SPARE SPARESPARESPARE SPARESPARE

225A

B905-2PB-1006

33 35 37 39 41

20A 20A 20A 20A 20A

28 30

20A 20A 20A

36

SPARE

20A

38

SPARE

20A

40

SPARE

20A

42

SPARE

20A

SPARE SPARE

(COMPRESSOR AUXILIARY EQUIPMENT - PLANT2)

2, 4 6, 8

SPARE

SPARE SPARE

SPARE SPARE

CONT'D FROM DWG E-602

FROM B905-4DP-1008 VIA 75 kVA XFMR B905-4TX-1007

CONT'D FROM DWG E-602

FROM B905-4DP-1007 VIA 75 kVA XFMR B905-4TX-1006

SPARE

22

SPARESPARE

(COLD BOX POWER - PLANT2)

SPARE

SPARE SPARE

SPARE

1, 3

35A

NORTH SLAB

FUTURE CP2

CARBON

BAKE-OUT

2 - # 8L

1 - # 8N

1 - # 10G

6 kVA

1" C

20A

FUTURE CP2

1 - # 12L

1 - # 12N

1 - # 12G

5

3/4" C

1.5 kVA

ARC CELL

CABINET

20A

FUTURE CP2

1 - # 12L

1 - # 12N

1 - # 12G

7

3/4" C

0.6 kVA

AIR

DRYER

20A

PV

C(B

Y S

LA

C)

FUTURE CP2

1 - # 12L

1 - # 12N

1 - # 12G

0.5 kVA

13

D1

1" C

CMP211

CONTROLS

PV

C(B

Y S

LA

C)

FUTURE CP2

1 - # 12L

1 - # 12N

1 - # 12G

0.5 kVA

D2

1" C

CMP212

CONTROLS

20A

15

PV

C(B

Y S

LA

C)

FUTURE CP2

1 - # 12L

1 - # 12N

1 - # 12G

0.5 kVA

D3

1" C

CMP213

CONTROLS

20A

17

PV

C(B

Y S

LA

C)

FUTURE CP2

1 - # 12L

1 - # 12N

1 - # 12G

0.5 kVA

D4

1" C

CMP214

CONTROLS

20A

19

PV

C(B

Y S

LA

C)

FUTURE CP2

1 - # 12L

1 - # 12N

1 - # 12G

0.5 kVA

D5

1" C

CMP215

CONTROLS

20A

21

PV

C(B

Y S

LA

C)

FUTURE CP2

1 - # 12L

1 - # 12N

1 - # 12G

0.5 kVA

D6

1" C

CMP216

CONTROLS

20A

23

FUTURE CP2

1 - # 12L

1 - # 12N

1 - # 12G

20A

14

1 kVA

3/4" C

FUTURE CP2

1 - # 12L

1 - # 12N

1 - # 12G

1 kVA

3/4" C

MCC2

CONTROLS

FUTURE CP2

2 - # 12L

1 - # 12N

1 - # 12G

20A

3/4" C

1 kVA

MCC2

HEATERS

20A

FUTURE CP2

-

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

30

GAS MGMT PLC

25A

FUTURE CP2

3 - # 10L

1 - # 10N

1 - # 10G

1, 3, 5

3/4" C

80K A BED

25A

FUTURE CP2

3 - # 10L

1 - # 10N

1 - # 10G

7, 9, 11

3/4" C

80K B BED

20A

FUTURE CP2

3 - # 12L

1 - # 12N

1 - # 12G

3/4" C

13, 15, 17

25A

FUTURE CP2

3 - # 10L

1 - # 10N

1 - # 10G

3/4" C

19, 21, 23

3K SC20K BED

20A

FUTURE CP2

2 - # 12L

1 - # 12N

1 - # 12G

3/4" C

25, 27

2K CBX

40A

FUTURE CP2

2 - # 8L

1 - # 10N

1 - # 10G

29, 31

1" C

DEWAR

20A

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

32

2K CBX PLC

FUTURE CP2

20A

1 - # 12L

1 - # 12N

1 - # 12G

3/4" C

34

4K CBX PLC

FUTURE CP2

-

16, 18

B905-105 B905-105 B905-105 B905-105 B905-105 B905-105 B905-105 B905-105

B905-105A B905-105A

B905-105

B905-104 B905-104 B905-104 B905-104 B905-104 B905-104

B905-105A

1 kVA

NORTH SLAB

FUTURE CP2

3 - # 10L

1 - # 10G

3/4" C

6 kVA

B905-104

3 - # 10L

1 - # 10G

3/4" C

NORTH SLAB

FUTURE CP2

6 kVA

3 - # 12L

1 - # 12G

3/4" C

FUTURE CP2

2 kVA

B905-104

HTR CTRL

B905-104

HTR CTRL HTR CTRL

3 - # 10L

1 - # 10G

3/4" C

FUTURE CP2

6 kVA

B905-104

CABINET

HTR CTRL

CABINETCABINETCABINET

2 - # 12L

1 - # 12G

3/4" C

FUTURE CP2

3 kW

B905-104

TEST HTR CTRL

CABINET

2K CBX

TEST HEATERS80K A BED

HEATERS

80K B BED

HEATERS

4K UPPER CBX 4K UPPER CBX 4K LOWER CBX

HEATERS

4K LOWER CBX

HEATERS

3K SC

-

HTR CTRL

CABINET

2 - # 8L

1 - # 10G

FUTURE CP2

6 kW

B905-104

-

1" C

DEWAR

HEATERS

- - - - -

MCC CONTROLS

UPS

-

B905-4PB-1003

SPACE

19, 21, 23 25, 27, 29 31, 33, 35 37, 39, 41

SPACE SPACE SPACE SPACE SPACE SPACE SPACE

20, 22, 24 26, 28,30 32, 34, 36 38, 40, 42

B905-4PB-1004

25A

19, 21, 23 37, 39, 41

SPACE SPACE SPACE SPACE SPACE

2, 4, 6 14, 16, 18 20, 22, 24 26, 28,30 32, 34, 36 38, 40, 428, 10, 12

15A 20A 20A

CONT'D FROM DWG E-602

FROM B905-4DP-1007

CONT'D FROM DWG E-602

FROM B905-4DP-1007

(COLD BOX POWER - PLANT2) (COLD BOX POWER - PLANT2)

SPARE SPARE SPARESPARE

35A

FUTURE CP2

3 - # 8L

1 - # 10G

1, 3, 5

COLD CMP1

1" C

PANEL

FUTURE CP2

13 kW

CA

BLE T

RA

Y

(BY ALATUS)

FUTURE CP2

3 - # 8L

1 - # 10G

COLD CMP3

1" C

PANEL

FUTURE CP2

13 kW

CA

BLE T

RA

Y

(BY ALATUS)

35A

7, 9, 11

FUTURE CP2

3 - # 8L

1 - # 10G

COLD CMP5

1" C

PANEL

FUTURE CP2

13 kW

CA

BLE T

RA

Y

(BY ALATUS)

35A

13, 15, 17

FUTURE CP2

3 - # 8L

1 - # 10G

COLD CMP2

1" C

PANEL

FUTURE CP2

13 kW

CA

BLE T

RA

Y

(BY ALATUS)

FUTURE CP2

3 - # 8L

1 - # 10G

COLD CMP4

1" C

PANEL

FUTURE CP2

13 kW

CA

BLE T

RA

Y

(BY ALATUS)

FUTURE CP2

3 - # 8L

1 - # 10G

COLD CMP6

1" C

PANEL

FUTURE CP2

13 kW

CA

BLE T

RA

Y

(BY ALATUS)

35A 35A

8, 10, 12

35A

14, 16, 182, 4, 6

B905-4P-CP2-CC1 B905-4P-CP2-CC3 B905-4P-CP2-CC5 B905-4P-CP2-CC2 B905-4P-CP2-CC4 B905-4P-CP2-CC6

FUTURE CP2

3 - # 12L

1 - # 12N

1 - # 12G

15A

1, 3, 5

3/4" C

NORTH SLAB

5 HP

4K UPPER CBX

FUTURE CP2

3 - # 12L

1 - # 12N

1 - # 12G

15A

3/4" C

5 HP

4K LOWER CBX

7, 9, 11

FUTURE CP2

3 - # 12L

1 - # 12N

1 - # 12G

15A

3/4" C

5 HP

13, 15, 17

2K CBX

FUTURE CP2

3 - # 4L

1 - # 4N

1 - # 10G

60A

PRIMARY

25, 27, 29

1-1/2" C

TEST HTR

FUTURE CP2

3 - # 8L

1 - # 8N

1 - # 10G

40A

SHIELD

31, 33, 35

TEST HTR

1" C

B905-104 B905-104 B905-104 B905-104 B905-104 B905-104

B905-104 B905-104 B905-104 B905-104 B905-104 B905-104

B905-104 B905-104 B905-104 B905-104

M

SKID

VAC PUMP VAC PUMP

SKID

VAC PUMP

SKID

3 - # 4L

FUTURE CP2

45 kW

B905-104

1-1/2" C

1 - # 4N

TEST HTR

PRIMARY

-

CRTL CABINET

1 - # 10G

3 - # 8L

FUTURE CP2

30 kW

B905-104

1-1/2" C

1 - # 8N

TEST HTR

SHIELD

-

1 - # 10G

CTRL CABINET

M M M M M

22

100A

SPARE

20A

20

SPARE

20A

SPARE

20A

SPARE

20A

10

SPARE

20A

8 12, 14 16, 182, 4, 6

SPARE SPARE

20A

24

SPARE

20A

26

2K CBX

COLD CMP1

MOTOR

2K CBX

COLD CMP3

MOTOR

2K CBX

COLD CMP5

MOTOR

2K CBX

COLD CMP2

MOTOR

2K CBX

COLD CMP4

MOTOR

2K CBX

COLD CMP6

MOTOR

20K BED

1 - # 10N

CABINET

CABINET CABINET

CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2

CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2

CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2

CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2

CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2

CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2

CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2

CP2, PHASE-2 CP2, PHASE-2

CP2, PHASE-1 CP2, PHASE-1 CP2, PHASE-1 CP2, PHASE-1 CP2, PHASE-1 CP2, PHASE-1 CP2, PHASE-1 CP2, PHASE-1

CP2, PHASE-1 CP2, PHASE-1

CP2, PHASE-1CP2, PHASE-1

(TO SH-1) (TO SH-1)

(TO SH-1)

RM 103

CP1

RM 104

CBX

RM 105

CP2

RM 103A RM 105AA

E

1 5 10 14NORTH SLAB

B905

LCLS-II CRYOPLANT BUILDING LAYOUT

1 kVA 1 kVA

79120-1910

to use these works for Governmental purposes but it is not to be released or distributed to the public. NEITHER THE GOVERNMENT NOR THE CONTRACTOR MAKES ANY WARRANTY, EXPRESS OR IMPLIED, OR ASSUMES ANY LIABILITY FOR THE USE OF THESE DESIGNS OR DRAWINGS.(This notice including this sentence must appear on any copies of these designs or drawings.)

These designs and drawings were prepared by Jefferson Science Associates, LLC, hereinafter the Contractor, under Contract No. DE-AC05-06OR23177 with the Department of Energy (DOE). All rights in the designs and drawings are reserved by DOE on behalf of the United States Government and the Contractor as provided in the Contract. You are authorized

B905SELECTRICAL YARD

- - - - -

CP2, PHASE-1 Approved: 4/10/2017; E-Sign ID : 339991; signed by: Ap. 1: C. Scanlon; C.: C. Scanlon; D: T. Fuell |

Page 3: B905-2PB-1003 · 2017/6/1  · 2 4 6 8 RM MONITORING SERVICE RECEPTS, RM MONITORING SERVICE RECEPTS, RM MONITORING RM MONITORING B905-4PB-1001 SPACE 19, 21, 23 25, 27, 29 31, 33,

SPACE SPACE SPACE SPACE

RM 103

CP1

RM 104

CBX

RM 105

CP2

RM 103A RM 105AA

E

1 5 10 14

8 6 4 35 27

C

D

E

F

G

H

2

A

B

8 6 4 357 1

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

EREV.

A

B

D

E

F

G

H

C

1

THIRD ANGLE PROJECTION

APPROVALS DATE

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

TRACKING NO.

DRAWN

CHECKED

APPROVED

APPROVED

DIM & TOL PER ASME Y14.5 .

UNLESS OTHERWISE SPECIFIED

DIMENSIONS ARE IN INCHES

TOLERANCES ARE:

FRACTIONS DECIMAL ANGLES

DOCUMENT CONTROL STAMP

REVZONE DESCRIPTION

REVISION HISTORY

DATE APPROVED

EACH SHEET OF MULTI-SHEET DRAWINGS SHALL ALWAYS HAVE THE SAME REVISION LEVEL.

United States

Department

of Energy

Newport News

Virginia

FINISH

MACHINED

SURFACES

UNLESS

OTHERWISE

NOTED

TITLE BLOCK DATA

N/A

B

LCLS-II

ELECTRICAL DISTRIBUTION

CRYOGENIC BLDG. & INFRASTRUCTURE

JLAB SCOPE

A. DE LIRA

C. SCANLON

J. CREEL 79120-D-XXXX 3 4

NOV2016

N/ANORTH SLAB

B905

LCLS-II CRYOPLANT BUILDING LAYOUT

(SEE DWG E-601)

FROM B905-4MSG-1001

(COMPRESSOR AUXILIARY - PLANT1)

800A

FUTURE CP1

3 - # 12L

1 - # 12G

1" C

20A

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

1

A1

5 HP

CMP211

OIL

PUMP

FUTURE CP1

3 - # 12L

1 - # 12G

1" C

15A

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

2

A2

4 kW

CMP211

OIL

HTR

1 - # 12N

FUTURE CP1

3 - # 12L

1 - # 12G

1" C

20A

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

A3

5 HP

CMP212

OIL

PUMP

FUTURE CP1

3 - # 12L

1 - # 12G

1" C

15A

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

A4

4 kW

CMP212

OIL

HTR

1 - # 12N

3 4

FUTURE CP1

3 - # 12L

1 - # 12G

1" C

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

CMP215

OIL

PUMP

FUTURE CP1

3 - # 12L

1 - # 12G

1" C

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

A6

4 kW

CMP215

OIL

HTR

1 - # 12N

20A

A5

15A

5 6

7.5 HP

1 - # 3G

2" C

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

7

225A

LSIG

150 HP

FUTURE

RECOVERY

COMP # 1

-

3 - # 4/0L

1 - # 8G

2" C

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

FUTURE

PROCESSOR

-

9

60A

3 - # 6L

30 HP

OIL

11 12 13 14

B905-4TX-1001

8

B905-4DP-1001

LSIG

SPACE SPACE

(SEE DWG E-601)

FROM B905-4MSG-1001

(COMPRESSOR AUXILIARY - PLANT1)

800A

FUTURE CP1

3 - # 12L

1 - # 12G

1" C

20A

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

1

B1

5 HP

CMP213

OIL

PUMP

FUTURE CP1

3 - # 12L

1 - # 12G

1" C

15A

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

2

B2

4 kW

CMP213

OIL

HTR

1 - # 12N

FUTURE CP1

3 - # 12L

1 - # 12G

1" C

20A

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

B3

5 HP

CMP214

OIL

PUMP

FUTURE CP1

3 - # 12L

1 - # 12G

1" C

15A

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

B4

4 kW

CMP214

OIL

HTR

1 - # 12N

3 4

FUTURE CP1

3 - # 12L

1 - # 12G

1" C

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

CMP216

OIL

PUMP

FUTURE CP1

3 - # 12L

1 - # 12G

1" C

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

B6

4 kW

CMP216

OIL

HTR

1 - # 12N

20A

B5

15A

5 6

7.5 HP

1 - # 3G

2" C

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

7

225A

LSIG

150 HP

FUTURE

RECOVERY

COMP # 2

-

3 - # 4/0L

1 - # 6G

2" C

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

FUTURE

COMP # 1

-

8

75 HP

AIR

13 14

B905-4DP-1002

LSIG

150A

3 - # 1/0L

1 - # 10G

1" C

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

FUTURE

15 HP

9

30A

3 - # 10L

GUARD

VACUUM

PUMP # 1

1 - # 10G

1" C

B905-103

CP1, PHASE-1

PV

C(B

Y S

LA

C)

FUTURE

15 HP

3 - # 10L

GUARD

VACUUM

PUMP # 2

30A

10

SPACE SPACE SPACE SPACE

(SEE DWG E-601)

FROM B905S-4MSG-1001

(COMPRESSOR AUXILIARY - PLANT2)

800A

FUTURE CP2

3 - # 12L

1 - # 12G

1" C

20A

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

1

A1

5 HP

CMP211

OIL

PUMP

FUTURE CP2

3 - # 12L

1 - # 12G

1" C

15A

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

2

A2

4 kW

CMP211

OIL

HTR

1 - # 12N

FUTURE CP2

3 - # 12L

1 - # 12G

1" C

20A

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

A3

5 HP

CMP212

OIL

PUMP

FUTURE CP2

3 - # 12L

1 - # 12G

1" C

15A

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

A4

4 kW

CMP212

OIL

HTR

1 - # 12N

3 4

FUTURE CP2

3 - # 12L

1 - # 12G

1" C

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

CMP215

OIL

PUMP

FUTURE CP2

3 - # 12L

1 - # 12G

1" C

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

A6

4 kW

CMP215

OIL

HTR

1 - # 12N

20A

A5

15A

5 6

7.5 HP

11 12 13 14

SPACE

10

B905-4TX-1007

8

125A

B905-4DP-1008

LSIG

SPACE SPACE

(SEE DWG E-601)

FROM B905-4MSG-1001

(COMPRESSOR AUXILIARY - PLANT2)

800A

FUTURE CP2

3 - # 12L

1 - # 12G

1" C

20A

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

1

B1

5 HP

CMP213

OIL

PUMP

FUTURE CP2

3 - # 12L

1 - # 12G

1" C

15A

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

2

B2

4 kW

CMP213

OIL

HTR

1 - # 12N

FUTURE CP2

3 - # 12L

1 - # 12G

1" C

20A

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

B3

5 HP

CMP214

OIL

PUMP

FUTURE CP2

3 - # 12L

1 - # 12G

1" C

15A

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

B4

4 kW

CMP214

OIL

HTR

1 - # 12N

3 4

FUTURE CP2

3 - # 12L

1 - # 12G

1" C

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

CMP216

OIL

PUMP

FUTURE CP2

3 - # 12L

1 - # 12G

1" C

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

B6

4 kW

CMP216

OIL

HTR

1 - # 12N

20A

B5

15A

5 6

7.5 HP

1 - # 6G

2" C

B905-105

CP2, PHASE-1

PV

C(B

Y S

LA

C)

FUTURE

COMP # 2

-

8

75 HP

AIR

13 14

B905-4DP-1009

LSIG

150A

3 - # 1/0L

SPACE

9

225A

7

LSIG

SPACE

10

SPACE

9

225A

LSIG

7

79120-1910

1 - # 12G

1" C

B905-103

CP1, PHASE-2

EM

T(B

Y J

LA

B)

FUTURE

3 HP

3 - # 12L

PUMP # 1

15A

11

1 - # 12G

1" C

B905-103

CP1, PHASE-2

EM

T(B

Y J

LA

B)

FUTURE

3 HP

3 - # 12L

PUMP # 2

15A

12

1 - # 12G

1" C

B905-105

CP2, PHASE-2

EM

T(B

Y J

LA

B)

FUTURE

3 HP

3 - # 12L

PUMP # 1

1 - # 12G

1" C

B905-105

CP2, PHASE-2

EM

T(B

Y J

LA

B)

FUTURE

3 HP

3 - # 12L

PUMP # 2

15A

11

15A

12

4K CBX SEC

COOL WATER

4K CBX SEC

COOL WATER

4K CBX SEC

COOL WATER

4K CBX SEC

COOL WATER

B

SPACE

8

B B

B

B B B B B B

BBBBBB

BBBBBB

BBBBBB

to use these works for Governmental purposes but it is not to be released or distributed to the public. NEITHER THE GOVERNMENT NOR THE CONTRACTOR MAKES ANY WARRANTY, EXPRESS OR IMPLIED, OR ASSUMES ANY LIABILITY FOR THE USE OF THESE DESIGNS OR DRAWINGS.(This notice including this sentence must appear on any copies of these designs or drawings.)

These designs and drawings were prepared by Jefferson Science Associates, LLC, hereinafter the Contractor, under Contract No. DE-AC05-06OR23177 with the Department of Energy (DOE). All rights in the designs and drawings are reserved by DOE on behalf of the United States Government and the Contractor as provided in the Contract. You are authorized

SPACE

(SEE DWG E-601)

FROM B905-4MSG-1001

800A

1 - # 10G

CP1, PHASE-1

RM

C(B

Y J

LA

B)

FUTURE

60A

3 - # 4L

11 12 148

60A

B905-4DP-1003

LSIG

B

OUTLET

WELD

OUTLET

WELD

60A

7 9

60A

OUTLET

WELD

60A

OUTLET

WELD

10

60A

2HP

SP-1

PUMP

SUMP B905-4TX-1002

125A125A 15A

1

5HP

REF-1

FAN

EXH

5HP

REF-2

FAN

EXH

15A

2

5HP

REF-3

FAN

EXH

15A

3

5HP

REF-4

FAN

EXH

15A

4

25A

5

15A

6

5HP

CRANE

5-TON

1/2HP

DOOR

ROLLUP

(COMPRESSOR HOUSE POWER - PLANT1)

(SEE DWG E-601)

FROM B905-4MSG-1001

800A

11 12 148

60A

B905-4DP-1005

LSIG

B

OUTLET

WELD

OUTLET

WELD

60A

7 9

60A

OUTLET

WELD B905-4TX-1004

125A15A

1

5HP

REF-5

FAN

EXH

5HP

REF-6

FAN

EXH

15A

2

35A

4 5

15A

6

1/2HP

DOOR

ROLLUP

(COLD BOX HOUSE POWER - PLANT1)

SPACESPACE SPACE

RM)

MONITOR

SERVICE

(SERVICES

PUMP HP-1

HEAP

13

B905-NS

40 kVA

WELD

OUTLET

N. SLAB

1-1/2" C

1 - # 10G

CP1, PHASE-1

RM

C(B

Y J

LA

B)

FUTURE

60A

3 - # 4L

10

B905-NS

40 kVA

WELD

OUTLET

N. SLAB

1-1/2" C

SPACE SPACE

13

SPACE

(SEE DWG E-601)

FROM B905-4MSG-1001

800A

1 - # 10G

CP1, PHASE-1

RM

C(B

Y J

LA

B)

FUTURE

60A

3 - # 4L

11 12 148

60A

B905-4DP-1010

LSIG

B

OUTLET

WELD

OUTLET

WELD

60A

7 9

60A

OUTLET

WELD

60A

OUTLET

WELD

10

15A

2HP

SP-2

PUMP

SUMP B905-4TX-1008

125A15A

1

5HP

REF-8

FAN

EXH

5HP

REF-9

FAN

EXH

15A

2

5HP

REF-10

FAN

EXH

15A

3

5HP

REF-11

FAN

EXH

15A

4

25A

5

15A

6

10HP

CRANE

5-TON

1/2HP

DOOR

ROLLUP

(COMPRESSOR HOUSE POWER - PLANT2)

(SEE DWG E-601)

FROM B905-4MSG-1001

800A

11 12 148

60A

B905-4DP-1006

LSIG

B

OUTLET

WELD

OUTLET

WELD

60A

7 9

60A

OUTLET

WELD B905-4TX-1005

125A15A

1

5HP

REF-7

FAN

EXH

4 5

15A

6

1/2HP

DOOR

ROLLUP

(COLD BOX HOUSE POWER - PLANT2)

SPACESPACE

13

B905-NS

40 kVA

WELD

OUTLET

N. SLAB

1-1/2" C

1 - # 10G

CP1, PHASE-1

RM

C(B

Y J

LA

B)

FUTURE

60A

3 - # 4L

10

B905-NS

40 kVA

WELD

OUTLET

N. SLAB

1-1/2" C

SPACE

13

B

1 - # 10G

CP1, PHASE-1

RM

C(B

Y J

LA

B)

FUTURE

3 - # 4L

B905-TY

40 kVA

WELD

OUTLET

1-1/2" C

60A

2

TANK YARD

25A

10HP

CRANE

5-TON

B905SELECTRICAL YARD

Approved: 4/10/2017; E-Sign ID : 339991; signed by: Ap. 1: C. Scanlon; C.: C. Scanlon; D: T. Fuell |

Page 4: B905-2PB-1003 · 2017/6/1  · 2 4 6 8 RM MONITORING SERVICE RECEPTS, RM MONITORING SERVICE RECEPTS, RM MONITORING RM MONITORING B905-4PB-1001 SPACE 19, 21, 23 25, 27, 29 31, 33,

8 6 4 35 27

C

D

E

F

G

H

2

A

B

8 6 4 357 1

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

EREV.

A

B

D

E

F

G

H

C

1

THIRD ANGLE PROJECTION

APPROVALS DATE

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

TRACKING NO.

DRAWN

CHECKED

APPROVED

APPROVED

DIM & TOL PER ASME Y14.5 .

UNLESS OTHERWISE SPECIFIED

DIMENSIONS ARE IN INCHES

TOLERANCES ARE:

FRACTIONS DECIMAL ANGLES

DOCUMENT CONTROL STAMP

EACH SHEET OF MULTI-SHEET DRAWINGS SHALL ALWAYS HAVE THE SAME REVISION LEVEL.

United States

Department

of Energy

Newport News

Virginia

FINISH

MACHINED

SURFACES

UNLESS

OTHERWISE

NOTED

TITLE BLOCK DATA

N/A

B

LCLS-II

ELECTRICAL DISTRIBUTION

CRYOGENIC BLDG. & INFRASTRUCTURE

JLAB SCOPE

A. DE LIRA

C. SCANLON

J. CREEL 79120-D-XXXX 4 4

NOV2016

N/A

REVZONE DESCRIPTION

REVISION HISTORY

DATE APPROVED

B905-41MCC-1001

GENERAL NOTES:

B905-103A

CP1, PHASE-1

PVC

(BY SLAC)

4160V, 3-PH, 3W

THHN

B905S-41MSG-1001

113FT

CONCRETE ENCASED

(3) - 3 - # 750KCMIL

5KV, CU, EPR 133% INS.

123FT

(3) - 1 - # 4/0G

1200A

MAIN FEEDER # 1

41P5

CP1, PHASE-1

PVC

(BY SLAC)

4160V, 3-PH, 3W

THHN

B905S-41MSG-1002

(3) - 5" C 110FT

CONCRETE ENCASED

(3) - 3 - # 750KCMIL

5KV, CU, EPR 133% INS.

120FT

(3) - 1 - # 4/0G

1200A

MAIN FEEDER # 2

41P6

B905-103

CP1, PHASE-1

PVC

(BY SLAC)

THHN

138FT

5KV, CU, EPR 133% INS.

149FT

(1 CONDUCTOR PER PHASE)

800 HP

FUTURE CP1

CMP211

MOTOR

-

IN-SLAB

CABINET #3 TOP

200A-9R

5" C

3 - # 2L

1 - # 6G

B905-103

CP1, PHASE-1

PVC

(BY SLAC)

THHN

123FT

5KV, CU, EPR 133% INS.

134FT

(1 CONDUCTOR PER PHASE)

800 HP

FUTURE CP1

CMP212

MOTOR

-

IN-SLAB

200A-9R

5" C

3 - # 2L

1 - # 6G

CABINET #3 BOTTOM

B905-103

CP1, PHASE-1

PVC

(BY SLAC)

THHN

106FT

5KV, CU, EPR 133% INS.

117FT

(1 CONDUCTOR PER PHASE)

800 HP

FUTURE CP1

CMP213

MOTOR

-

IN-SLAB

200A-9R

5" C

3 - # 2L

1 - # 6G

CABINET #4 TOP

B905-103

CP1, PHASE-1

PVC

(BY SLAC)

THHN

92FT

5KV, CU, EPR 133% INS.

103FT

(1 CONDUCTOR PER PHASE)

1000 HP

FUTURE CP1

CMP214

MOTOR

-

IN-SLAB

5" C

3 - # 1L

1 - # 4G

CABINET #4 BOTTOM

230A-12R

B905-103

CP1, PHASE-1

PVC

(BY SLAC)

THHN

64FT

5KV, CU, EPR 133% INS.

75FT

(1 CONDUCTOR PER PHASE)

2500 HP

FUTURE CP1

CMP215

MOTOR

-

IN-SLAB

5" C

1 - # 2G

450A-24R

CABINET # 5

3 - # 350KCMIL

B905-103

CP1, PHASE-1

PVC

(BY SLAC)

THHN

81FT

5KV, CU, EPR 133% INS.

92FT

(1 CONDUCTOR PER PHASE)

2500 HP

FUTURE CP1

CMP216

MOTOR

-

IN-SLAB

5" C

1 - # 2G

450A-24R

CABINET # 6

3 - # 350KCMIL

M M M M M M

79120-S006

JLAB SPEC #

B905-41MCC-1002

B905-105A

CP2, PHASE-1

PVC

(BY SLAC)

4160V, 3-PH, 3W

B905S-41MSG-1003

274FT

CONCRETE ENCASED

(3) - 3 - # 750KCMIL

5KV, CU, EPR 133% INS.

284FT

(3) - 1 - # 4/0G

1200A

MAIN FEEDER # 1

41P7

CP2, PHASE-1

PVC

(BY SLAC)

4160V, 3-PH, 3W

B905S-41MSG-1004

271FT

CONCRETE ENCASED

(3) - 3 - # 750KCMIL

5KV, CU, EPR 133% INS.

281FT

(3) - 1 - # 4/0G

1200A

MAIN FEEDER # 2

41P8

B905-105

CP2, PHASE-1

PVC

(BY SLAC)

THHN

133FT

5KV, CU, EPR 133% INS.

144FT

(1 CONDUCTOR PER PHASE)

800 HP

FUTURE CP2

CMP211

MOTOR

-

IN-SLAB

CABINET #3 TOP

200A-9R

5" C

3 - # 2L

1 - # 6G

B905-105

CP2, PHASE-1

PVC

(BY SLAC)

THHN

118FT

5KV, CU, EPR 133% INS.

129FT

(1 CONDUCTOR PER PHASE)

800 HP

FUTURE CP2

CMP212

MOTOR

-

IN-SLAB

200A-9R

5" C

3 - # 2L

1 - # 6G

CABINET #3 BOTTOM

B905-105

CP2, PHASE-1

PVC

(BY SLAC)

THHN

101FT

5KV, CU, EPR 133% INS.

112FT

(1 CONDUCTOR PER PHASE)

800 HP

FUTURE CP2

CMP213

MOTOR

-

IN-SLAB

200A-9R

5" C

3 - # 2L

1 - # 6G

CABINET #4 TOP

B905-105

CP2, PHASE-1

PVC

(BY SLAC)

THHN

87FT

5KV, CU, EPR 133% INS.

98FT

(1 CONDUCTOR PER PHASE)

1000 HP

FUTURE CP2

CMP214

MOTOR

-

IN-SLAB

5" C

3 - # 1L

1 - # 4G

CABINET #4 BOTTOM

230A-12R

B905-105

CP2, PHASE-1

PVC

(BY SLAC)

THHN

59FT

5KV, CU, EPR 133% INS.

70FT

(1 CONDUCTOR PER PHASE)

2500 HP

FUTURE CP2

CMP215

MOTOR

-

IN-SLAB

5" C

1 - # 2G

450A-24R

CABINET # 5

3 - # 350KCMIL

B905-105

CP2, PHASE-1

PVC

(BY SLAC)

THHN

76FT

5KV, CU, EPR 133% INS.

87FT

(1 CONDUCTOR PER PHASE)

2500 HP

FUTURE CP2

CMP216

MOTOR

-

IN-SLAB

5" C

1 - # 2G

450A-24R

CABINET # 6

3 - # 350KCMIL

M M M M M M

79120-S006

JLAB SPEC #

THHN THHN

B905S B905S

B905SB905S

(3) - 1 - 5" C

(3 CONDUCTORS PER PHASE) (3 CONDUCTORS PER PHASE)

3. THE ESTIMATED CONDUCTOR LENGTHS INDICATED ARE ONE-WAY DISTANCES (POINT-TO-POINT)

SIZES AND MANUFACTURER FOR THE LCLS-II CRYOPLANT MCC MIGHT DIFFER

2. FUSE RATINGS AND TYPE ARE BASED ON JLAB CHL-2 MCC INSTALLATION. ACTUAL FUSE RATINGS,

RELEASE OF THIS DRAWING

1. THE ELECTRICAL DESIGN FOR THE LCLS-II CRYOPLANT MCCs IS NOT FINALIZED AS OF THE

(3) - 1 - 5" C

(3 CONDUCTORS PER PHASE)

(3) - 1 - 5" C

(3 CONDUCTORS PER PHASE)

RM 103

CP1

RM 104

CBX

RM 105

CP2

RM 103A RM 105AA

E

1 5 10 14NORTH SLAB

B905

LCLS-II CRYOPLANT BUILDING LAYOUT

79120-1910

to use these works for Governmental purposes but it is not to be released or distributed to the public. NEITHER THE GOVERNMENT NOR THE CONTRACTOR MAKES ANY WARRANTY, EXPRESS OR IMPLIED, OR ASSUMES ANY LIABILITY FOR THE USE OF THESE DESIGNS OR DRAWINGS.(This notice including this sentence must appear on any copies of these designs or drawings.)

These designs and drawings were prepared by Jefferson Science Associates, LLC, hereinafter the Contractor, under Contract No. DE-AC05-06OR23177 with the Department of Energy (DOE). All rights in the designs and drawings are reserved by DOE on behalf of the United States Government and the Contractor as provided in the Contract. You are authorized

B B

B905SELECTRICAL YARD

Approved: 4/10/2017; E-Sign ID : 339991; signed by: Ap. 1: C. Scanlon; C.: C. Scanlon; D: T. Fuell |