b905-2pb-1003 · 2017/6/1 · 2 4 6 8 rm monitoring service recepts, rm monitoring service...
TRANSCRIPT
INSTALLATION PHASE
LOCATION
225A
B905-2PB-1001
20A 20A
9 11 25 27 29
SPARE
20A 25A 20A
31
SPARE
20A
33
SPARE
20A
35
SPARE
20A
37
SPARE
20A
39
SPARE
20A
41
SPARE
20A 15A 20A 20A 20A
10 12 20 24 26 28 30 32
SPARE
15 20A 20A 20A 20A 20A
34
SPARE
20A
36
SPARE
20A
38
SPARE
20A
40
SPARE
20A
42
SPARE
20A
SPARE SPARE SPARE SPARESPARE SPARESPARE
225A
B905-2PB-1003
33 35 37 39 41
20A 20A 20A 20A 20A
28 30 32
SPARE
20A 20A 20A 20A
34
SPARE
20A
36
SPARE
20A
38
SPARE
20A
40
SPARE
20A
42
SPARE
20A
SPARE SPARE
30A
100A
B905-2EPB-1001
30A 20A 20A 20A 20A 20A
7 9 11 13 15 17 19 21 23 25 27 291, 3 5
20A 20A 20A 20A 20A
31
20A
35
20A
37
20A
39
SPARE
20A
41
SPARE
20A 15A 20A 20A 20A 20A 20A
10 12 14 16 18 28
20A
36
20A
38
20A
40
20A
42
20A
(COLD BOX ROOM)
CONTROLS
DDC
CONTROLS
DDC
CONTROLS
DDC
15A 15A20A
2 4 6 8
RM
MONITORING
SERVICE
RECEPTS,
RM
MONITORING
SERVICE
RECEPTS,
RM
MONITORING
SERVICE
RECEPTS,
RM
MONITORING
SERVICE
RECEPTS,
B905-4PB-1001
SPACE
19, 21, 23 25, 27, 29 31, 33, 35 37, 39, 41
SPACE SPACE SPACE SPACE SPACE SPACE SPACE
20, 22, 24 26, 28,30 32, 34, 36 38, 40, 42
B905-4PB-1002
25A
19, 21, 23 37, 39, 41
SPACE SPACE SPACE SPACE SPACE
2, 4, 6 14, 16, 18 20, 22, 24 26, 28,30 32, 34, 36 38, 40, 428, 10, 12
15A 20A 20A
(COMPRESSOR AUXILIARY EQUIPMENT - PLANT1)
2, 4 6, 8
POWER EXHAUST
1.64kW + 1HP
AC-1
PACKAGE
IT ROOM 101
FOR UPS,
RECEPT
L5-30R
IT ROOM 101
FOR UPS,
RECEPT
L5-30R
IT ROOM 101
RECEPT,
L5-20R
WIREMOLD
IT ROOM 101
RECEPT,
L5-20R
WIREMOLD
IT ROOM 101
RECEPT,
L5-20R
WIREMOLD
IT ROOM 101
RECEPT,
L5-20R
WIREMOLD
IT ROOM 101
CABINET
SECURITY
IT ROOM 101
RECEPTS.
CONV
IT ROOM 101
RECEPTS.
CONV
CONTROL PANEL
FIRE ALARM
MONITOR PANEL
WIRELESS
FIRE ALARM
MON RM
SERVICE
FUTURE
CLG JBX,
MON RM
SERVICE
FUTURE
CLG JBX,
MON RM
SERVICE
FUTURE
WALL BOX,
MON RM
SERVICE
FUTURE
WALL BOX,
MON RM
SERVICE
FUTURE
WALL BOX,
SPARE
SPARE SPARE
SPARE SPARE
CONT'D FROM DWG E-601
FROM B905-4DP-1001 VIA 75 kVA XFMR B905-4TX-1001
CONT'D FROM DWG E-601
FROM B905-4DP-1004 VIA 75 kVA XFMR B905-4TX-1003
CONT'D FROM DWG E-601
FROM B905-4DP-1004
CONT'D FROM DWG E-601
FROM B905-4DP-1004
15A
SPARE
22
SPARESPARE
SPARE SPARE SPARE SPARE SPARE
(COLD BOX POWER - PLANT1)
(COLD BOX POWER - PLANT1) (COLD BOX POWER - PLANT1)
SPARE SPARE SPARE
SPARE
SPARE SPARE
SPARE
RM 103
CP1
RM 104
CBX
RM 105
CP2
RM 103A RM 105A
SPARE
1, 3
35A
NORTH SLAB
FUTURE CP1
CARBON
BAKE-OUT
2 - # 8L
1 - # 8N
1 - # 10G
6 kVA
1" C
20A
FUTURE CP1
1 - # 12L
1 - # 12N
1 - # 12G
5
3/4" C
1.5 kVA
ARC CELL
CABINET
20A
FUTURE CP1
1 - # 12L
1 - # 12N
1 - # 12G
7
3/4" C
0.6 kVA
AIR
DRYER
20A
PV
C(B
Y S
LA
C)
FUTURE CP1
1 - # 12L
1 - # 12N
1 - # 12G
0.5 kVA
13
D1
1" C
CMP211
CONTROLS
PV
C(B
Y S
LA
C)
FUTURE CP1
1 - # 12L
1 - # 12N
1 - # 12G
0.5 kVA
D2
1" C
CMP212
CONTROLS
20A
15
PV
C(B
Y S
LA
C)
FUTURE CP1
1 - # 12L
1 - # 12N
1 - # 12G
0.5 kVA
D3
1" C
CMP213
CONTROLS
20A
17
PV
C(B
Y S
LA
C)
FUTURE CP1
1 - # 12L
1 - # 12N
1 - # 12G
0.5 kVA
D4
1" C
CMP214
CONTROLS
20A
19
PV
C(B
Y S
LA
C)
FUTURE CP1
1 - # 12L
1 - # 12N
1 - # 12G
0.5 kVA
D5
1" C
CMP215
CONTROLS
20A
21
PV
C(B
Y S
LA
C)
FUTURE CP1
1 - # 12L
1 - # 12N
1 - # 12G
0.5 kVA
D6
1" C
CMP216
CONTROLS
20A
23
FUTURE CP1
1 - # 12L
1 - # 12N
1 - # 12G
20A
14
1 kVA
3/4" C
FUTURE CP1
1 - # 12L
1 - # 12N
1 - # 12G
1 kVA
3/4" C
MCC1
CONTROLS
FUTURE CP1
2 - # 12L
1 - # 12N
1 - # 12G
20A
3/4" C
1 kVA
MCC1
HEATERS
20A
FUTURE CP1
-
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
22
GAS MGMT PLC
25A
FUTURE CP1
3 - # 10L
1 - # 10N
1 - # 10G
1, 3, 5
3/4" C
80K A BED
25A
FUTURE CP1
3 - # 10L
1 - # 10N
1 - # 10G
7, 9, 11
3/4" C
80K B BED
20A
FUTURE CP1
3 - # 12L
1 - # 12N
1 - # 12G
3/4" C
13, 15, 17
25A
FUTURE CP1
3 - # 10L
1 - # 10N
1 - # 10G
3/4" C
19, 21, 23
20K BED
20A
FUTURE CP1
2 - # 12L
1 - # 12N
1 - # 12G
3/4" C
25, 27
2K CBX
40A
FUTURE CP1
2 - # 8L
1 - # 10N
1 - # 10G
29, 31
1" C
DEWAR
-
3 - # 1L
1 - # 1N
1 - # 6G
2" C
B905-2ATS-1001
2" C
3 - # 1L
1 - # 1N
1 - # 6G
B905S-2GEN-1001
2" C
3 - # 1L
1 - # 1N
1 - # 6G
B905-2UPS-1001
2" C
3 - # 1L
1 - # 1N
1 - # 6G
FUTUREFUTURE
AUTOMATIC TRANSFER SWITCH
20A
1 - # 12L
1 - # 12N
1 - # 12G
8
3/4" C
NORTH SLAB
FUTURE
20A
2 - # 12L
1 - # 12N
1 - # 12G
3/4" C
NORTH SLAB
FUTURE
12, 14
PURIFIER 1
20A
-
2 - # 12L
1 - # 12N
1 - # 12G
3/4" C
NORTH SLAB
FUTURE
16, 18
PURIFIER 2
20A
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
FUTURE
20
UTILITIES PLC
20A
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
24
2K CBX PLC
FUTURE CP1
20A
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
26
4K CBX PLC
FUTURE CP1
20A
PV
C(B
Y S
LA
C)
1 - # 10L
1 - # 10N
1 - # 10G
3/4" C
33
20A
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
FUTURE
20
UTILITIES PLC
20A
FUTURE CP1
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
22
GAS MGMT PLC
1 kVA
20A
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
24
2K CBX PLC
FUTURE CP1
20A
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
26
4K CBX PLC
FUTURE CP1 FUTURE CP2
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
GAS MGMT PLC
1 kVA
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
2K CBX PLC
FUTURE CP2
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
4K CBX PLC
FUTURE CP2
20A
30
20A
32
20A
34
35A
FUTURE CP1
3 - # 8L
1 - # 10G
1, 3, 5
COLD CMP1
1" C
PANEL
FUTURE CP1
13 kW
CA
BLE T
RA
Y
(BY ALATUS)
FUTURE CP1
3 - # 8L
1 - # 10G
COLD CMP3
1" C
PANEL
FUTURE CP1
13 kW
CA
BLE T
RA
Y
(BY ALATUS)
35A
7, 9, 11
FUTURE CP1
3 - # 8L
1 - # 10G
COLD CMP5
1" C
PANEL
FUTURE CP1
13 kW
CA
BLE T
RA
Y
(BY ALATUS)
35A
13, 15, 17
FUTURE CP1
3 - # 8L
1 - # 10G
COLD CMP2
1" C
PANEL
FUTURE CP1
13 kW
CA
BLE T
RA
Y
(BY ALATUS)
FUTURE CP1
3 - # 8L
1 - # 10G
COLD CMP4
1" C
PANEL
FUTURE CP1
13 kW
CA
BLE T
RA
Y
(BY ALATUS)
FUTURE CP1
3 - # 8L
1 - # 10G
COLD CMP6
1" C
PANEL
FUTURE CP1
13 kW
CA
BLE T
RA
Y
(BY ALATUS)
35A 35A
8, 10, 12
35A
14, 16, 182, 4, 6
B905-4P-CP1-CC1 B905-4P-CP1-CC3 B905-4P-CP1-CC5 B905-4P-CP1-CC2 B905-4P-CP1-CC4 B905-4P-CP1-CC6
-
FUTURE CP1
3 - # 12L
1 - # 12N
1 - # 12G
15A
1, 3, 5
3/4" C
NORTH SLAB
5 HP
4K UPPER CBX
FUTURE CP1
3 - # 12L
1 - # 12N
1 - # 12G
15A
3/4" C
5 HP
4K LOWER CBX
7, 9, 11
FUTURE CP1
3 - # 12L
1 - # 12N
1 - # 12G
15A
3/4" C
5 HP
13, 15, 17
2K CBX
FUTURE CP1
3 - # 4L
1 - # 4N
1 - # 10G
60A
PRIMARY
25, 27, 29
1-1/2" C
TEST HTR
FUTURE CP1
3 - # 8L
1 - # 8N
1 - # 10G
40A
SHIELD
31, 33, 35
TEST HTR
1" C
16, 18
B905-103 B905-103 B905-103 B905-103 B905-103 B905-103 B905-103 B905-103
B905-103A B905-103A
B905-103
B905-104 B905-104 B905-104 B905-104 B905-104 B905-104 B905-104
B905-104 B905-104 B905-104 B905-104 B905-104B905-103 B905-105
B905-104 B905-104 B905-104 B905-104 B905-104 B905-104
B905-104 B905-104 B905-104 B905-104 B905-104 B905-104
B905-104 B905-104 B905-104 B905-104
B905-103A
B905-103
1 kVA 1 kVA 1 kVA 1 kVA 1 kVA
2 kVA
1 kVA
B905S
B905S
125A
NORTH SLAB
FUTURE CP1
3 - # 10L
1 - # 10G
3/4" C
6 kVA
B905-104
3 - # 10L
1 - # 10G
3/4" C
NORTH SLAB
FUTURE CP1
6 kVA
3 - # 12L
1 - # 12G
3/4" C
FUTURE CP1
2 kVA
B905-104
HTR CTRL
B905-104
HTR CTRL
A
E
1 5 10 14
G
M
8 6 4 35 27
C
D
E
F
G
H
2
A
B
8 6 4 357 1
SHEET OFUSED ON ASSY NO.SCALE
DWG. NO.SIZE
EREV.
A
B
D
E
F
G
H
C
1
THIRD ANGLE PROJECTION
APPROVALS DATE
MATERIAL
DEBURR & BREAK ALL SHARP EDGES
DO NOT SCALE DRAWING
TRACKING NO.
DRAWN
CHECKED
APPROVED
APPROVED
DIM & TOL PER ASME Y14.5 .
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
TOLERANCES ARE:
FRACTIONS DECIMAL ANGLES
DOCUMENT CONTROL STAMP
REVZONE DESCRIPTION
REVISION HISTORY
DATE APPROVED
EACH SHEET OF MULTI-SHEET DRAWINGS SHALL ALWAYS HAVE THE SAME REVISION LEVEL.
United States
Department
of Energy
Newport News
Virginia
FINISH
MACHINED
SURFACES
UNLESS
OTHERWISE
NOTED
TITLE BLOCK DATA
N/A
B
LCLS-II
ELECTRICAL DISTRIBUTION
CRYOGENIC BLDG. & INFRASTRUCTURE
JLAB SCOPE
A. DE LIRA
C. SCANLON
J. CREEL 79120-D-XXXX 1 4
NOV2016
N/A
HTR CTRL
3 - # 10L
1 - # 10G
3/4" C
FUTURE CP1
6 kVA
B905-104
CABINET
HTR CTRL
CABINETCABINETCABINET
2 - # 12L
1 - # 12G
3/4" C
FUTURE CP1
3 kW
B905-104
TEST HTR CTRL
CABINET
2K CBX
TEST HEATERS80K A BED
HEATERS
80K B BED
HEATERS
4K UPPER CBX 4K UPPER CBX 4K LOWER CBX
HEATERS
4K LOWER CBX
HEATERS
3K SC
-
HTR CTRL
CABINET
2 - # 8L
1 - # 10G
FUTURE CP1
6 kW
B905-104
-
1" C
DEWAR
HEATERS
SKID
VAC PUMP VAC PUMP
SKID
VAC PUMP
SKID
3 - # 4L
FUTURE CP1
45 kW
B905-104
1-1/2" C
1 - # 4N
TEST HTR
PRIMARY
-
CRTL CABINET
1 - # 10G
3 - # 8L
FUTURE CP1
30 kW
B905-104
1-1/2" C
1 - # 8N
TEST HTR
SHIELD
-
1 - # 10G
CTRL CABINET
208Y/120V, 3-PH, 4W
- - - - -
M M M M M
2 kW
HTR BOX
-
2 kW
HTR BOX
PURIFIER 1
BOX
1 kVA
PLC PANEL
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
NORTH SLAB
FUTURE
PURIFIER 2
BOX
1 kVA
PLC PANEL
20A
10
MCC CONTROLS
UPS
-
20A
NORTH SLAB
FUTURE
GENERATOR
B905
LCLS-II CRYOPLANT BUILDING LAYOUT
2K CBX
COLD CMP1
MOTOR
2K CBX
COLD CMP3
MOTOR
2K CBX
COLD CMP5
MOTOR
2K CBX
COLD CMP2
MOTOR
2K CBX
COLD CMP4
MOTOR
2K CBX
COLD CMP6
MOTOR
20K BED
1 - # 10N
(TO SH-1)
BATTERY
CHARGER
B
CABINET
CABINET CABINET CABINET
CABINET CABINET CABINET CABINET CABINET CABINET CABINET
24 kW/30 kVA
1 kVA 1 kVA1 kVA
ALL A FEB 2017
CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1
CP1, PHASE-1 CP1, PHASE-1
CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2
CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2
CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-2 CP1, PHASE-2
CP1, PHASE-1
CP1, PHASE-1
CP1, PHASE-1
CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-2 CP1, PHASE-2 CP2, PHASE-1 CP2, PHASE-2
CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2
CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2
CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2
CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2
CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2 CP1, PHASE-2
CP1, PHASE-2 CP1, PHASE-2
CP1, PHASE-1
(TO SH-1) (TO SH-1) (TO SH-1)
SPARESPARE
(TO SH-1)
CB # 20
B905-2PB-1003
(FROM SH-1)
CB # 22
B905-2PB-1001
(FROM SH-1)
CB # 24
B905-2PB-1003
(FROM SH-1)
CB # 26
B905-2PB-1003
(FROM SH-1)
CB # 30
B905-2PB-1007
(FROM SH-2)
CB # 32
B905-2PB-1007
(FROM SH-2)
CB # 34
B905-2PB-1007
(FROM SH-2)
R NORTON
C SCANLON
CB # 33
B905-2EPB-1001
(FROM SH-1)
E-601 ID-905-700-16, REV-A2 LCLS-II CRYOGENIC BLDG. & INFRASTRUCTURE ELECTRICAL SINGLE LINE DIAGRAM239894E-601.DWG
FILE NAMEDWG NO.
HDRTITLESLAC DWG NO.
E-602 ID-905-700-17, REV-A2 LCLS-II CRYOGENIC BLDG. & INFRASTRUCTURE ELECTRICAL SINGLE LINE DIAGRAM239894E-602.DWG
REFERENCE DRAWINGS
GENERAL NOTES:
4. ALL JLAB CONDUITS ARE EMC TYPE UNLESS NOTED OTHERWISE
3. CONDUITS MARKED D1-D6 ARE IN SLAC's SCOPE OF INSTALLATION
JLAB's SCOPE OF INSTALLATION
2. BRANCH CIRCUITS AND EQUIPMENT IN SOLID LINES ARE IN
SLAC's SCOPE OF INSTALLATION
1. BRANCH CIRCUITS AND EQUIPMENT IN DASHED LINES ARE IN
PNL/EQPT LINE 1
PNL/EQPT LINE 2
PNL/EQPT LINE 3
PNL/EQPT LINE 4
PNL/EQPT RATING
B905-XXX
CP1, PHASE-1
XXX = ROOM #
SEE DETAIL "A"
ID-905-700-24, REV-A2239894ESP-001-A.DWG ESP-001-A LCLS-II CRYOGENIC BLDG. & INFRASTRUCTURE ELECTRICAL SITE PLAN
FUTURE
3K SUBCOOLER
E-401 ID-905-700-11, REV-A1239894E-401.DWG LCLS-II CRYOGENIC BLDG. & INFRASTRUCTURE ELECTRICAL YARD PLAN
125 A, 4P
TEST
LOAD
RESISTOR
DETAIL "B"
UPS TYPICAL DIAGRAM
ROTATED 90º CW
SEE DETAIL "B"
125A
30 kW/30 kVA
208Y/120V, 3-PH, 4W
+ 10 kW/kVA REDUNDANT PWR MODULE
AUTOMATIC TRANSFER SWITCH
8.3 RESIZING DISCONNECTING SWITCH AND THE
8.2. GENERATOR POWER INCREASED TO 30 kVA
8.1. CB 2,4,6 IN B905-2PB-1003 TO 125 A FROM 100 A
8. COORDINATES CHANGES WITH THE UPS INSTALLATION:
JLAB SCOPE.
7. ADDS REMAINING CRYOPLANT ELECTRICAL INSTALLTIONS WITHIN
PANEL.
6. ADDS A 30 kVA + 10 kVA UPS UNIT FOR THE CRYOPLANT EMERGENCY
THE MCC CONTROLS.
5. ADDS 120V/1-PH UPS IN EACH MCC ELECTRICAL ROOM FOR
208V/3-PH FROM 480V/3-PH.
4. THE AC POWER TO THE 3 KL SUBCOOLER HEATER CHANGED TO
TO MATCH CB # FROM B905-2EPB-1001.
3. ALLIGNS NON-EMERGENCY 120V CB # FOR PLC CABINETS
FROM B905-2EPB-1001.
2. ADDS 120V/20A CIRCUIT FOR THE GENERATOR BATTERY CHARGER
1. ADDS INFO ON CIRCUIT LOCATION IN THE CRYOPLANT BLDG.
2, 4, 6
B905-103
79120-1910
MAR 2017B
to use these works for Governmental purposes but it is not to be released or distributed to the public. NEITHER THE GOVERNMENT NOR THE CONTRACTOR MAKES ANY WARRANTY, EXPRESS OR IMPLIED, OR ASSUMES ANY LIABILITY FOR THE USE OF THESE DESIGNS OR DRAWINGS.(This notice including this sentence must appear on any copies of these designs or drawings.)
These designs and drawings were prepared by Jefferson Science Associates, LLC, hereinafter the Contractor, under Contract No. DE-AC05-06OR23177 with the Department of Energy (DOE). All rights in the designs and drawings are reserved by DOE on behalf of the United States Government and the Contractor as provided in the Contract. You are authorized
A. DE LIRA
7. ADDED 480 V WELDING OUTLETS IN NORTH SLAB AND TANK YARD.
6. AIR COMPRESSOR #1 FEED MOVED TO B905-4DP-1001 CKT #10.
5. ADD 4K COLDBOX SECONDARY COOLING WATER PUMPS.
LOCATIONS.
4. CORRECTED CONDUIT OWNERSHIP (SLAC OR JLAB) IN SEVERAL
FROM 8AWG IN GENERATOR AND UPS CONNECTIONS.
3. CORRECTED EQUIPMENT GROUNDING CONDUCTOR SIZES TO 6AWG
2. DISCONNECT SWITCH B905S-2DS-1001 REMOVED.
1. ATS MOVED TO B905-103 FROM THE ELECTRICAL YARD. C SCANLON
DETAIL "A"
DESCRIPTION
LOAD
TYPICAL
B
SH.4
SH.3
SH.1
B905SELECTRICAL YARD
- - - - -
B905S
2 kVA
CHARGER
BATTERY
GENERATOR
FUTURE
CP1, PHASE-1 CP1, PHASE-1 CP1, PHASE-1
CP1, PHASE-2
CP2, PHASE-2 Approved: 4/10/2017; E-Sign ID : 339991; signed by: Ap. 1: C. Scanlon; C.: C. Scanlon; D: T. Fuell |
8 6 4 35 27
C
D
E
F
G
H
2
A
B
8 6 4 357 1
SHEET OFUSED ON ASSY NO.SCALE
DWG. NO.SIZE
EREV.
A
B
D
E
F
G
H
C
1
THIRD ANGLE PROJECTION
APPROVALS DATE
MATERIAL
DEBURR & BREAK ALL SHARP EDGES
DO NOT SCALE DRAWING
TRACKING NO.
DRAWN
CHECKED
APPROVED
APPROVED
DIM & TOL PER ASME Y14.5 .
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
TOLERANCES ARE:
FRACTIONS DECIMAL ANGLES
DOCUMENT CONTROL STAMP
EACH SHEET OF MULTI-SHEET DRAWINGS SHALL ALWAYS HAVE THE SAME REVISION LEVEL.
United States
Department
of Energy
Newport News
Virginia
FINISH
MACHINED
SURFACES
UNLESS
OTHERWISE
NOTED
TITLE BLOCK DATA
N/A
B
LCLS-II
ELECTRICAL DISTRIBUTION
CRYOGENIC BLDG. & INFRASTRUCTURE
JLAB SCOPE
A. DE LIRA
C. SCANLON
J. CREEL 79120-D-XXXX 2 4
NOV2016
N/A
REVZONE DESCRIPTION
REVISION HISTORY
DATE APPROVED
225A
B905-2PB-1007
20A 20A
9 11 25 27 29
SPARE
20A 25A 20A
31
SPARE
20A
33
SPARE
20A
35
SPARE
20A
37
SPARE
20A
39
SPARE
20A
41
SPARE
20A 15A 20A 20A 20A
10 12 20 24 26 28 32
SPARE
15 20A 20A 20A 20A
34
SPARE
20A
36
SPARE
20A
38
SPARE
20A
40
SPARE
20A
42
SPARE
20A
SPARE SPARE SPARESPARESPARE SPARESPARE
225A
B905-2PB-1006
33 35 37 39 41
20A 20A 20A 20A 20A
28 30
20A 20A 20A
36
SPARE
20A
38
SPARE
20A
40
SPARE
20A
42
SPARE
20A
SPARE SPARE
(COMPRESSOR AUXILIARY EQUIPMENT - PLANT2)
2, 4 6, 8
SPARE
SPARE SPARE
SPARE SPARE
CONT'D FROM DWG E-602
FROM B905-4DP-1008 VIA 75 kVA XFMR B905-4TX-1007
CONT'D FROM DWG E-602
FROM B905-4DP-1007 VIA 75 kVA XFMR B905-4TX-1006
SPARE
22
SPARESPARE
(COLD BOX POWER - PLANT2)
SPARE
SPARE SPARE
SPARE
1, 3
35A
NORTH SLAB
FUTURE CP2
CARBON
BAKE-OUT
2 - # 8L
1 - # 8N
1 - # 10G
6 kVA
1" C
20A
FUTURE CP2
1 - # 12L
1 - # 12N
1 - # 12G
5
3/4" C
1.5 kVA
ARC CELL
CABINET
20A
FUTURE CP2
1 - # 12L
1 - # 12N
1 - # 12G
7
3/4" C
0.6 kVA
AIR
DRYER
20A
PV
C(B
Y S
LA
C)
FUTURE CP2
1 - # 12L
1 - # 12N
1 - # 12G
0.5 kVA
13
D1
1" C
CMP211
CONTROLS
PV
C(B
Y S
LA
C)
FUTURE CP2
1 - # 12L
1 - # 12N
1 - # 12G
0.5 kVA
D2
1" C
CMP212
CONTROLS
20A
15
PV
C(B
Y S
LA
C)
FUTURE CP2
1 - # 12L
1 - # 12N
1 - # 12G
0.5 kVA
D3
1" C
CMP213
CONTROLS
20A
17
PV
C(B
Y S
LA
C)
FUTURE CP2
1 - # 12L
1 - # 12N
1 - # 12G
0.5 kVA
D4
1" C
CMP214
CONTROLS
20A
19
PV
C(B
Y S
LA
C)
FUTURE CP2
1 - # 12L
1 - # 12N
1 - # 12G
0.5 kVA
D5
1" C
CMP215
CONTROLS
20A
21
PV
C(B
Y S
LA
C)
FUTURE CP2
1 - # 12L
1 - # 12N
1 - # 12G
0.5 kVA
D6
1" C
CMP216
CONTROLS
20A
23
FUTURE CP2
1 - # 12L
1 - # 12N
1 - # 12G
20A
14
1 kVA
3/4" C
FUTURE CP2
1 - # 12L
1 - # 12N
1 - # 12G
1 kVA
3/4" C
MCC2
CONTROLS
FUTURE CP2
2 - # 12L
1 - # 12N
1 - # 12G
20A
3/4" C
1 kVA
MCC2
HEATERS
20A
FUTURE CP2
-
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
30
GAS MGMT PLC
25A
FUTURE CP2
3 - # 10L
1 - # 10N
1 - # 10G
1, 3, 5
3/4" C
80K A BED
25A
FUTURE CP2
3 - # 10L
1 - # 10N
1 - # 10G
7, 9, 11
3/4" C
80K B BED
20A
FUTURE CP2
3 - # 12L
1 - # 12N
1 - # 12G
3/4" C
13, 15, 17
25A
FUTURE CP2
3 - # 10L
1 - # 10N
1 - # 10G
3/4" C
19, 21, 23
3K SC20K BED
20A
FUTURE CP2
2 - # 12L
1 - # 12N
1 - # 12G
3/4" C
25, 27
2K CBX
40A
FUTURE CP2
2 - # 8L
1 - # 10N
1 - # 10G
29, 31
1" C
DEWAR
20A
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
32
2K CBX PLC
FUTURE CP2
20A
1 - # 12L
1 - # 12N
1 - # 12G
3/4" C
34
4K CBX PLC
FUTURE CP2
-
16, 18
B905-105 B905-105 B905-105 B905-105 B905-105 B905-105 B905-105 B905-105
B905-105A B905-105A
B905-105
B905-104 B905-104 B905-104 B905-104 B905-104 B905-104
B905-105A
1 kVA
NORTH SLAB
FUTURE CP2
3 - # 10L
1 - # 10G
3/4" C
6 kVA
B905-104
3 - # 10L
1 - # 10G
3/4" C
NORTH SLAB
FUTURE CP2
6 kVA
3 - # 12L
1 - # 12G
3/4" C
FUTURE CP2
2 kVA
B905-104
HTR CTRL
B905-104
HTR CTRL HTR CTRL
3 - # 10L
1 - # 10G
3/4" C
FUTURE CP2
6 kVA
B905-104
CABINET
HTR CTRL
CABINETCABINETCABINET
2 - # 12L
1 - # 12G
3/4" C
FUTURE CP2
3 kW
B905-104
TEST HTR CTRL
CABINET
2K CBX
TEST HEATERS80K A BED
HEATERS
80K B BED
HEATERS
4K UPPER CBX 4K UPPER CBX 4K LOWER CBX
HEATERS
4K LOWER CBX
HEATERS
3K SC
-
HTR CTRL
CABINET
2 - # 8L
1 - # 10G
FUTURE CP2
6 kW
B905-104
-
1" C
DEWAR
HEATERS
- - - - -
MCC CONTROLS
UPS
-
B905-4PB-1003
SPACE
19, 21, 23 25, 27, 29 31, 33, 35 37, 39, 41
SPACE SPACE SPACE SPACE SPACE SPACE SPACE
20, 22, 24 26, 28,30 32, 34, 36 38, 40, 42
B905-4PB-1004
25A
19, 21, 23 37, 39, 41
SPACE SPACE SPACE SPACE SPACE
2, 4, 6 14, 16, 18 20, 22, 24 26, 28,30 32, 34, 36 38, 40, 428, 10, 12
15A 20A 20A
CONT'D FROM DWG E-602
FROM B905-4DP-1007
CONT'D FROM DWG E-602
FROM B905-4DP-1007
(COLD BOX POWER - PLANT2) (COLD BOX POWER - PLANT2)
SPARE SPARE SPARESPARE
35A
FUTURE CP2
3 - # 8L
1 - # 10G
1, 3, 5
COLD CMP1
1" C
PANEL
FUTURE CP2
13 kW
CA
BLE T
RA
Y
(BY ALATUS)
FUTURE CP2
3 - # 8L
1 - # 10G
COLD CMP3
1" C
PANEL
FUTURE CP2
13 kW
CA
BLE T
RA
Y
(BY ALATUS)
35A
7, 9, 11
FUTURE CP2
3 - # 8L
1 - # 10G
COLD CMP5
1" C
PANEL
FUTURE CP2
13 kW
CA
BLE T
RA
Y
(BY ALATUS)
35A
13, 15, 17
FUTURE CP2
3 - # 8L
1 - # 10G
COLD CMP2
1" C
PANEL
FUTURE CP2
13 kW
CA
BLE T
RA
Y
(BY ALATUS)
FUTURE CP2
3 - # 8L
1 - # 10G
COLD CMP4
1" C
PANEL
FUTURE CP2
13 kW
CA
BLE T
RA
Y
(BY ALATUS)
FUTURE CP2
3 - # 8L
1 - # 10G
COLD CMP6
1" C
PANEL
FUTURE CP2
13 kW
CA
BLE T
RA
Y
(BY ALATUS)
35A 35A
8, 10, 12
35A
14, 16, 182, 4, 6
B905-4P-CP2-CC1 B905-4P-CP2-CC3 B905-4P-CP2-CC5 B905-4P-CP2-CC2 B905-4P-CP2-CC4 B905-4P-CP2-CC6
FUTURE CP2
3 - # 12L
1 - # 12N
1 - # 12G
15A
1, 3, 5
3/4" C
NORTH SLAB
5 HP
4K UPPER CBX
FUTURE CP2
3 - # 12L
1 - # 12N
1 - # 12G
15A
3/4" C
5 HP
4K LOWER CBX
7, 9, 11
FUTURE CP2
3 - # 12L
1 - # 12N
1 - # 12G
15A
3/4" C
5 HP
13, 15, 17
2K CBX
FUTURE CP2
3 - # 4L
1 - # 4N
1 - # 10G
60A
PRIMARY
25, 27, 29
1-1/2" C
TEST HTR
FUTURE CP2
3 - # 8L
1 - # 8N
1 - # 10G
40A
SHIELD
31, 33, 35
TEST HTR
1" C
B905-104 B905-104 B905-104 B905-104 B905-104 B905-104
B905-104 B905-104 B905-104 B905-104 B905-104 B905-104
B905-104 B905-104 B905-104 B905-104
M
SKID
VAC PUMP VAC PUMP
SKID
VAC PUMP
SKID
3 - # 4L
FUTURE CP2
45 kW
B905-104
1-1/2" C
1 - # 4N
TEST HTR
PRIMARY
-
CRTL CABINET
1 - # 10G
3 - # 8L
FUTURE CP2
30 kW
B905-104
1-1/2" C
1 - # 8N
TEST HTR
SHIELD
-
1 - # 10G
CTRL CABINET
M M M M M
22
100A
SPARE
20A
20
SPARE
20A
SPARE
20A
SPARE
20A
10
SPARE
20A
8 12, 14 16, 182, 4, 6
SPARE SPARE
20A
24
SPARE
20A
26
2K CBX
COLD CMP1
MOTOR
2K CBX
COLD CMP3
MOTOR
2K CBX
COLD CMP5
MOTOR
2K CBX
COLD CMP2
MOTOR
2K CBX
COLD CMP4
MOTOR
2K CBX
COLD CMP6
MOTOR
20K BED
1 - # 10N
CABINET
CABINET CABINET
CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2
CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2
CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2
CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2
CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2
CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2
CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2 CP2, PHASE-2
CP2, PHASE-2 CP2, PHASE-2
CP2, PHASE-1 CP2, PHASE-1 CP2, PHASE-1 CP2, PHASE-1 CP2, PHASE-1 CP2, PHASE-1 CP2, PHASE-1 CP2, PHASE-1
CP2, PHASE-1 CP2, PHASE-1
CP2, PHASE-1CP2, PHASE-1
(TO SH-1) (TO SH-1)
(TO SH-1)
RM 103
CP1
RM 104
CBX
RM 105
CP2
RM 103A RM 105AA
E
1 5 10 14NORTH SLAB
B905
LCLS-II CRYOPLANT BUILDING LAYOUT
1 kVA 1 kVA
79120-1910
to use these works for Governmental purposes but it is not to be released or distributed to the public. NEITHER THE GOVERNMENT NOR THE CONTRACTOR MAKES ANY WARRANTY, EXPRESS OR IMPLIED, OR ASSUMES ANY LIABILITY FOR THE USE OF THESE DESIGNS OR DRAWINGS.(This notice including this sentence must appear on any copies of these designs or drawings.)
These designs and drawings were prepared by Jefferson Science Associates, LLC, hereinafter the Contractor, under Contract No. DE-AC05-06OR23177 with the Department of Energy (DOE). All rights in the designs and drawings are reserved by DOE on behalf of the United States Government and the Contractor as provided in the Contract. You are authorized
B905SELECTRICAL YARD
- - - - -
CP2, PHASE-1 Approved: 4/10/2017; E-Sign ID : 339991; signed by: Ap. 1: C. Scanlon; C.: C. Scanlon; D: T. Fuell |
SPACE SPACE SPACE SPACE
RM 103
CP1
RM 104
CBX
RM 105
CP2
RM 103A RM 105AA
E
1 5 10 14
8 6 4 35 27
C
D
E
F
G
H
2
A
B
8 6 4 357 1
SHEET OFUSED ON ASSY NO.SCALE
DWG. NO.SIZE
EREV.
A
B
D
E
F
G
H
C
1
THIRD ANGLE PROJECTION
APPROVALS DATE
MATERIAL
DEBURR & BREAK ALL SHARP EDGES
DO NOT SCALE DRAWING
TRACKING NO.
DRAWN
CHECKED
APPROVED
APPROVED
DIM & TOL PER ASME Y14.5 .
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
TOLERANCES ARE:
FRACTIONS DECIMAL ANGLES
DOCUMENT CONTROL STAMP
REVZONE DESCRIPTION
REVISION HISTORY
DATE APPROVED
EACH SHEET OF MULTI-SHEET DRAWINGS SHALL ALWAYS HAVE THE SAME REVISION LEVEL.
United States
Department
of Energy
Newport News
Virginia
FINISH
MACHINED
SURFACES
UNLESS
OTHERWISE
NOTED
TITLE BLOCK DATA
N/A
B
LCLS-II
ELECTRICAL DISTRIBUTION
CRYOGENIC BLDG. & INFRASTRUCTURE
JLAB SCOPE
A. DE LIRA
C. SCANLON
J. CREEL 79120-D-XXXX 3 4
NOV2016
N/ANORTH SLAB
B905
LCLS-II CRYOPLANT BUILDING LAYOUT
(SEE DWG E-601)
FROM B905-4MSG-1001
(COMPRESSOR AUXILIARY - PLANT1)
800A
FUTURE CP1
3 - # 12L
1 - # 12G
1" C
20A
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
1
A1
5 HP
CMP211
OIL
PUMP
FUTURE CP1
3 - # 12L
1 - # 12G
1" C
15A
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
2
A2
4 kW
CMP211
OIL
HTR
1 - # 12N
FUTURE CP1
3 - # 12L
1 - # 12G
1" C
20A
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
A3
5 HP
CMP212
OIL
PUMP
FUTURE CP1
3 - # 12L
1 - # 12G
1" C
15A
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
A4
4 kW
CMP212
OIL
HTR
1 - # 12N
3 4
FUTURE CP1
3 - # 12L
1 - # 12G
1" C
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
CMP215
OIL
PUMP
FUTURE CP1
3 - # 12L
1 - # 12G
1" C
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
A6
4 kW
CMP215
OIL
HTR
1 - # 12N
20A
A5
15A
5 6
7.5 HP
1 - # 3G
2" C
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
7
225A
LSIG
150 HP
FUTURE
RECOVERY
COMP # 1
-
3 - # 4/0L
1 - # 8G
2" C
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
FUTURE
PROCESSOR
-
9
60A
3 - # 6L
30 HP
OIL
11 12 13 14
B905-4TX-1001
8
B905-4DP-1001
LSIG
SPACE SPACE
(SEE DWG E-601)
FROM B905-4MSG-1001
(COMPRESSOR AUXILIARY - PLANT1)
800A
FUTURE CP1
3 - # 12L
1 - # 12G
1" C
20A
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
1
B1
5 HP
CMP213
OIL
PUMP
FUTURE CP1
3 - # 12L
1 - # 12G
1" C
15A
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
2
B2
4 kW
CMP213
OIL
HTR
1 - # 12N
FUTURE CP1
3 - # 12L
1 - # 12G
1" C
20A
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
B3
5 HP
CMP214
OIL
PUMP
FUTURE CP1
3 - # 12L
1 - # 12G
1" C
15A
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
B4
4 kW
CMP214
OIL
HTR
1 - # 12N
3 4
FUTURE CP1
3 - # 12L
1 - # 12G
1" C
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
CMP216
OIL
PUMP
FUTURE CP1
3 - # 12L
1 - # 12G
1" C
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
B6
4 kW
CMP216
OIL
HTR
1 - # 12N
20A
B5
15A
5 6
7.5 HP
1 - # 3G
2" C
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
7
225A
LSIG
150 HP
FUTURE
RECOVERY
COMP # 2
-
3 - # 4/0L
1 - # 6G
2" C
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
FUTURE
COMP # 1
-
8
75 HP
AIR
13 14
B905-4DP-1002
LSIG
150A
3 - # 1/0L
1 - # 10G
1" C
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
FUTURE
15 HP
9
30A
3 - # 10L
GUARD
VACUUM
PUMP # 1
1 - # 10G
1" C
B905-103
CP1, PHASE-1
PV
C(B
Y S
LA
C)
FUTURE
15 HP
3 - # 10L
GUARD
VACUUM
PUMP # 2
30A
10
SPACE SPACE SPACE SPACE
(SEE DWG E-601)
FROM B905S-4MSG-1001
(COMPRESSOR AUXILIARY - PLANT2)
800A
FUTURE CP2
3 - # 12L
1 - # 12G
1" C
20A
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
1
A1
5 HP
CMP211
OIL
PUMP
FUTURE CP2
3 - # 12L
1 - # 12G
1" C
15A
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
2
A2
4 kW
CMP211
OIL
HTR
1 - # 12N
FUTURE CP2
3 - # 12L
1 - # 12G
1" C
20A
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
A3
5 HP
CMP212
OIL
PUMP
FUTURE CP2
3 - # 12L
1 - # 12G
1" C
15A
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
A4
4 kW
CMP212
OIL
HTR
1 - # 12N
3 4
FUTURE CP2
3 - # 12L
1 - # 12G
1" C
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
CMP215
OIL
PUMP
FUTURE CP2
3 - # 12L
1 - # 12G
1" C
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
A6
4 kW
CMP215
OIL
HTR
1 - # 12N
20A
A5
15A
5 6
7.5 HP
11 12 13 14
SPACE
10
B905-4TX-1007
8
125A
B905-4DP-1008
LSIG
SPACE SPACE
(SEE DWG E-601)
FROM B905-4MSG-1001
(COMPRESSOR AUXILIARY - PLANT2)
800A
FUTURE CP2
3 - # 12L
1 - # 12G
1" C
20A
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
1
B1
5 HP
CMP213
OIL
PUMP
FUTURE CP2
3 - # 12L
1 - # 12G
1" C
15A
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
2
B2
4 kW
CMP213
OIL
HTR
1 - # 12N
FUTURE CP2
3 - # 12L
1 - # 12G
1" C
20A
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
B3
5 HP
CMP214
OIL
PUMP
FUTURE CP2
3 - # 12L
1 - # 12G
1" C
15A
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
B4
4 kW
CMP214
OIL
HTR
1 - # 12N
3 4
FUTURE CP2
3 - # 12L
1 - # 12G
1" C
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
CMP216
OIL
PUMP
FUTURE CP2
3 - # 12L
1 - # 12G
1" C
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
B6
4 kW
CMP216
OIL
HTR
1 - # 12N
20A
B5
15A
5 6
7.5 HP
1 - # 6G
2" C
B905-105
CP2, PHASE-1
PV
C(B
Y S
LA
C)
FUTURE
COMP # 2
-
8
75 HP
AIR
13 14
B905-4DP-1009
LSIG
150A
3 - # 1/0L
SPACE
9
225A
7
LSIG
SPACE
10
SPACE
9
225A
LSIG
7
79120-1910
1 - # 12G
1" C
B905-103
CP1, PHASE-2
EM
T(B
Y J
LA
B)
FUTURE
3 HP
3 - # 12L
PUMP # 1
15A
11
1 - # 12G
1" C
B905-103
CP1, PHASE-2
EM
T(B
Y J
LA
B)
FUTURE
3 HP
3 - # 12L
PUMP # 2
15A
12
1 - # 12G
1" C
B905-105
CP2, PHASE-2
EM
T(B
Y J
LA
B)
FUTURE
3 HP
3 - # 12L
PUMP # 1
1 - # 12G
1" C
B905-105
CP2, PHASE-2
EM
T(B
Y J
LA
B)
FUTURE
3 HP
3 - # 12L
PUMP # 2
15A
11
15A
12
4K CBX SEC
COOL WATER
4K CBX SEC
COOL WATER
4K CBX SEC
COOL WATER
4K CBX SEC
COOL WATER
B
SPACE
8
B B
B
B B B B B B
BBBBBB
BBBBBB
BBBBBB
to use these works for Governmental purposes but it is not to be released or distributed to the public. NEITHER THE GOVERNMENT NOR THE CONTRACTOR MAKES ANY WARRANTY, EXPRESS OR IMPLIED, OR ASSUMES ANY LIABILITY FOR THE USE OF THESE DESIGNS OR DRAWINGS.(This notice including this sentence must appear on any copies of these designs or drawings.)
These designs and drawings were prepared by Jefferson Science Associates, LLC, hereinafter the Contractor, under Contract No. DE-AC05-06OR23177 with the Department of Energy (DOE). All rights in the designs and drawings are reserved by DOE on behalf of the United States Government and the Contractor as provided in the Contract. You are authorized
SPACE
(SEE DWG E-601)
FROM B905-4MSG-1001
800A
1 - # 10G
CP1, PHASE-1
RM
C(B
Y J
LA
B)
FUTURE
60A
3 - # 4L
11 12 148
60A
B905-4DP-1003
LSIG
B
OUTLET
WELD
OUTLET
WELD
60A
7 9
60A
OUTLET
WELD
60A
OUTLET
WELD
10
60A
2HP
SP-1
PUMP
SUMP B905-4TX-1002
125A125A 15A
1
5HP
REF-1
FAN
EXH
5HP
REF-2
FAN
EXH
15A
2
5HP
REF-3
FAN
EXH
15A
3
5HP
REF-4
FAN
EXH
15A
4
25A
5
15A
6
5HP
CRANE
5-TON
1/2HP
DOOR
ROLLUP
(COMPRESSOR HOUSE POWER - PLANT1)
(SEE DWG E-601)
FROM B905-4MSG-1001
800A
11 12 148
60A
B905-4DP-1005
LSIG
B
OUTLET
WELD
OUTLET
WELD
60A
7 9
60A
OUTLET
WELD B905-4TX-1004
125A15A
1
5HP
REF-5
FAN
EXH
5HP
REF-6
FAN
EXH
15A
2
35A
4 5
15A
6
1/2HP
DOOR
ROLLUP
(COLD BOX HOUSE POWER - PLANT1)
SPACESPACE SPACE
RM)
MONITOR
SERVICE
(SERVICES
PUMP HP-1
HEAP
13
B905-NS
40 kVA
WELD
OUTLET
N. SLAB
1-1/2" C
1 - # 10G
CP1, PHASE-1
RM
C(B
Y J
LA
B)
FUTURE
60A
3 - # 4L
10
B905-NS
40 kVA
WELD
OUTLET
N. SLAB
1-1/2" C
SPACE SPACE
13
SPACE
(SEE DWG E-601)
FROM B905-4MSG-1001
800A
1 - # 10G
CP1, PHASE-1
RM
C(B
Y J
LA
B)
FUTURE
60A
3 - # 4L
11 12 148
60A
B905-4DP-1010
LSIG
B
OUTLET
WELD
OUTLET
WELD
60A
7 9
60A
OUTLET
WELD
60A
OUTLET
WELD
10
15A
2HP
SP-2
PUMP
SUMP B905-4TX-1008
125A15A
1
5HP
REF-8
FAN
EXH
5HP
REF-9
FAN
EXH
15A
2
5HP
REF-10
FAN
EXH
15A
3
5HP
REF-11
FAN
EXH
15A
4
25A
5
15A
6
10HP
CRANE
5-TON
1/2HP
DOOR
ROLLUP
(COMPRESSOR HOUSE POWER - PLANT2)
(SEE DWG E-601)
FROM B905-4MSG-1001
800A
11 12 148
60A
B905-4DP-1006
LSIG
B
OUTLET
WELD
OUTLET
WELD
60A
7 9
60A
OUTLET
WELD B905-4TX-1005
125A15A
1
5HP
REF-7
FAN
EXH
4 5
15A
6
1/2HP
DOOR
ROLLUP
(COLD BOX HOUSE POWER - PLANT2)
SPACESPACE
13
B905-NS
40 kVA
WELD
OUTLET
N. SLAB
1-1/2" C
1 - # 10G
CP1, PHASE-1
RM
C(B
Y J
LA
B)
FUTURE
60A
3 - # 4L
10
B905-NS
40 kVA
WELD
OUTLET
N. SLAB
1-1/2" C
SPACE
13
B
1 - # 10G
CP1, PHASE-1
RM
C(B
Y J
LA
B)
FUTURE
3 - # 4L
B905-TY
40 kVA
WELD
OUTLET
1-1/2" C
60A
2
TANK YARD
25A
10HP
CRANE
5-TON
B905SELECTRICAL YARD
Approved: 4/10/2017; E-Sign ID : 339991; signed by: Ap. 1: C. Scanlon; C.: C. Scanlon; D: T. Fuell |
8 6 4 35 27
C
D
E
F
G
H
2
A
B
8 6 4 357 1
SHEET OFUSED ON ASSY NO.SCALE
DWG. NO.SIZE
EREV.
A
B
D
E
F
G
H
C
1
THIRD ANGLE PROJECTION
APPROVALS DATE
MATERIAL
DEBURR & BREAK ALL SHARP EDGES
DO NOT SCALE DRAWING
TRACKING NO.
DRAWN
CHECKED
APPROVED
APPROVED
DIM & TOL PER ASME Y14.5 .
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
TOLERANCES ARE:
FRACTIONS DECIMAL ANGLES
DOCUMENT CONTROL STAMP
EACH SHEET OF MULTI-SHEET DRAWINGS SHALL ALWAYS HAVE THE SAME REVISION LEVEL.
United States
Department
of Energy
Newport News
Virginia
FINISH
MACHINED
SURFACES
UNLESS
OTHERWISE
NOTED
TITLE BLOCK DATA
N/A
B
LCLS-II
ELECTRICAL DISTRIBUTION
CRYOGENIC BLDG. & INFRASTRUCTURE
JLAB SCOPE
A. DE LIRA
C. SCANLON
J. CREEL 79120-D-XXXX 4 4
NOV2016
N/A
REVZONE DESCRIPTION
REVISION HISTORY
DATE APPROVED
B905-41MCC-1001
GENERAL NOTES:
B905-103A
CP1, PHASE-1
PVC
(BY SLAC)
4160V, 3-PH, 3W
THHN
B905S-41MSG-1001
113FT
CONCRETE ENCASED
(3) - 3 - # 750KCMIL
5KV, CU, EPR 133% INS.
123FT
(3) - 1 - # 4/0G
1200A
MAIN FEEDER # 1
41P5
CP1, PHASE-1
PVC
(BY SLAC)
4160V, 3-PH, 3W
THHN
B905S-41MSG-1002
(3) - 5" C 110FT
CONCRETE ENCASED
(3) - 3 - # 750KCMIL
5KV, CU, EPR 133% INS.
120FT
(3) - 1 - # 4/0G
1200A
MAIN FEEDER # 2
41P6
B905-103
CP1, PHASE-1
PVC
(BY SLAC)
THHN
138FT
5KV, CU, EPR 133% INS.
149FT
(1 CONDUCTOR PER PHASE)
800 HP
FUTURE CP1
CMP211
MOTOR
-
IN-SLAB
CABINET #3 TOP
200A-9R
5" C
3 - # 2L
1 - # 6G
B905-103
CP1, PHASE-1
PVC
(BY SLAC)
THHN
123FT
5KV, CU, EPR 133% INS.
134FT
(1 CONDUCTOR PER PHASE)
800 HP
FUTURE CP1
CMP212
MOTOR
-
IN-SLAB
200A-9R
5" C
3 - # 2L
1 - # 6G
CABINET #3 BOTTOM
B905-103
CP1, PHASE-1
PVC
(BY SLAC)
THHN
106FT
5KV, CU, EPR 133% INS.
117FT
(1 CONDUCTOR PER PHASE)
800 HP
FUTURE CP1
CMP213
MOTOR
-
IN-SLAB
200A-9R
5" C
3 - # 2L
1 - # 6G
CABINET #4 TOP
B905-103
CP1, PHASE-1
PVC
(BY SLAC)
THHN
92FT
5KV, CU, EPR 133% INS.
103FT
(1 CONDUCTOR PER PHASE)
1000 HP
FUTURE CP1
CMP214
MOTOR
-
IN-SLAB
5" C
3 - # 1L
1 - # 4G
CABINET #4 BOTTOM
230A-12R
B905-103
CP1, PHASE-1
PVC
(BY SLAC)
THHN
64FT
5KV, CU, EPR 133% INS.
75FT
(1 CONDUCTOR PER PHASE)
2500 HP
FUTURE CP1
CMP215
MOTOR
-
IN-SLAB
5" C
1 - # 2G
450A-24R
CABINET # 5
3 - # 350KCMIL
B905-103
CP1, PHASE-1
PVC
(BY SLAC)
THHN
81FT
5KV, CU, EPR 133% INS.
92FT
(1 CONDUCTOR PER PHASE)
2500 HP
FUTURE CP1
CMP216
MOTOR
-
IN-SLAB
5" C
1 - # 2G
450A-24R
CABINET # 6
3 - # 350KCMIL
M M M M M M
79120-S006
JLAB SPEC #
B905-41MCC-1002
B905-105A
CP2, PHASE-1
PVC
(BY SLAC)
4160V, 3-PH, 3W
B905S-41MSG-1003
274FT
CONCRETE ENCASED
(3) - 3 - # 750KCMIL
5KV, CU, EPR 133% INS.
284FT
(3) - 1 - # 4/0G
1200A
MAIN FEEDER # 1
41P7
CP2, PHASE-1
PVC
(BY SLAC)
4160V, 3-PH, 3W
B905S-41MSG-1004
271FT
CONCRETE ENCASED
(3) - 3 - # 750KCMIL
5KV, CU, EPR 133% INS.
281FT
(3) - 1 - # 4/0G
1200A
MAIN FEEDER # 2
41P8
B905-105
CP2, PHASE-1
PVC
(BY SLAC)
THHN
133FT
5KV, CU, EPR 133% INS.
144FT
(1 CONDUCTOR PER PHASE)
800 HP
FUTURE CP2
CMP211
MOTOR
-
IN-SLAB
CABINET #3 TOP
200A-9R
5" C
3 - # 2L
1 - # 6G
B905-105
CP2, PHASE-1
PVC
(BY SLAC)
THHN
118FT
5KV, CU, EPR 133% INS.
129FT
(1 CONDUCTOR PER PHASE)
800 HP
FUTURE CP2
CMP212
MOTOR
-
IN-SLAB
200A-9R
5" C
3 - # 2L
1 - # 6G
CABINET #3 BOTTOM
B905-105
CP2, PHASE-1
PVC
(BY SLAC)
THHN
101FT
5KV, CU, EPR 133% INS.
112FT
(1 CONDUCTOR PER PHASE)
800 HP
FUTURE CP2
CMP213
MOTOR
-
IN-SLAB
200A-9R
5" C
3 - # 2L
1 - # 6G
CABINET #4 TOP
B905-105
CP2, PHASE-1
PVC
(BY SLAC)
THHN
87FT
5KV, CU, EPR 133% INS.
98FT
(1 CONDUCTOR PER PHASE)
1000 HP
FUTURE CP2
CMP214
MOTOR
-
IN-SLAB
5" C
3 - # 1L
1 - # 4G
CABINET #4 BOTTOM
230A-12R
B905-105
CP2, PHASE-1
PVC
(BY SLAC)
THHN
59FT
5KV, CU, EPR 133% INS.
70FT
(1 CONDUCTOR PER PHASE)
2500 HP
FUTURE CP2
CMP215
MOTOR
-
IN-SLAB
5" C
1 - # 2G
450A-24R
CABINET # 5
3 - # 350KCMIL
B905-105
CP2, PHASE-1
PVC
(BY SLAC)
THHN
76FT
5KV, CU, EPR 133% INS.
87FT
(1 CONDUCTOR PER PHASE)
2500 HP
FUTURE CP2
CMP216
MOTOR
-
IN-SLAB
5" C
1 - # 2G
450A-24R
CABINET # 6
3 - # 350KCMIL
M M M M M M
79120-S006
JLAB SPEC #
THHN THHN
B905S B905S
B905SB905S
(3) - 1 - 5" C
(3 CONDUCTORS PER PHASE) (3 CONDUCTORS PER PHASE)
3. THE ESTIMATED CONDUCTOR LENGTHS INDICATED ARE ONE-WAY DISTANCES (POINT-TO-POINT)
SIZES AND MANUFACTURER FOR THE LCLS-II CRYOPLANT MCC MIGHT DIFFER
2. FUSE RATINGS AND TYPE ARE BASED ON JLAB CHL-2 MCC INSTALLATION. ACTUAL FUSE RATINGS,
RELEASE OF THIS DRAWING
1. THE ELECTRICAL DESIGN FOR THE LCLS-II CRYOPLANT MCCs IS NOT FINALIZED AS OF THE
(3) - 1 - 5" C
(3 CONDUCTORS PER PHASE)
(3) - 1 - 5" C
(3 CONDUCTORS PER PHASE)
RM 103
CP1
RM 104
CBX
RM 105
CP2
RM 103A RM 105AA
E
1 5 10 14NORTH SLAB
B905
LCLS-II CRYOPLANT BUILDING LAYOUT
79120-1910
to use these works for Governmental purposes but it is not to be released or distributed to the public. NEITHER THE GOVERNMENT NOR THE CONTRACTOR MAKES ANY WARRANTY, EXPRESS OR IMPLIED, OR ASSUMES ANY LIABILITY FOR THE USE OF THESE DESIGNS OR DRAWINGS.(This notice including this sentence must appear on any copies of these designs or drawings.)
These designs and drawings were prepared by Jefferson Science Associates, LLC, hereinafter the Contractor, under Contract No. DE-AC05-06OR23177 with the Department of Energy (DOE). All rights in the designs and drawings are reserved by DOE on behalf of the United States Government and the Contractor as provided in the Contract. You are authorized
B B
B905SELECTRICAL YARD
Approved: 4/10/2017; E-Sign ID : 339991; signed by: Ap. 1: C. Scanlon; C.: C. Scanlon; D: T. Fuell |