bahan presentasi public expose tahun 2018 pt …

32
BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT KAPUAS PRIMA COAL Tbk

Upload: others

Post on 29-Nov-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT KAPUAS PRIMA COAL Tbk

Page 2: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

PT KAPUAS PRIMA COAL Tbk

www.kapuasprima.co.id

1

PUBLIC EXPOSE

Mercure Hotel – Pantai Indah Kapuk

Rabu, 28 November 2018

Page 3: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

2

Contents

1Company overview, our history dan Board of Directors

About Us

2Januari – October 2018 update

Financial Performance3

4

5

PT Kapuas Prima Coal Tbk Projects Progress

2018 Company Update

Performance Summary , Production and Sales Target

Project Overview

Bonds UsageUsage and Target of the Bonds

Page 4: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

3

Perseroan didirikan untuk melakukan kegiatan usaha

dalam bidang pertambangan dan perdagangan

Established

Kegiatan penambangan dilakukan dengan bijih besi (Fe)

sebagai hasil produksi tambang

Early production

Kegiatan penambangan difokuskan ke Galena (PbS)

disebabkan oleh harga bijih besi yang jatuh drastis dimana

tidak lagi economically beneficial untuk melanjutkan

produksi bijih besi (Fe)

Focus shift

About UsPT Kapuas Prima Coal Tbk adalah perseroan yang melakukan

kegiatan usaha dalam bidang pertambangan dan

perdagangan dimana didirikan sejak tahun 2005.

Hasil produksi kami saat ini adalah Galena (PbS) yang

kemudian dengan pengetahuan, pengalaman dan teknologi

terbaik diolah menjadi tiga macam konsentrat yaitu: Timbal

(Pb), Seng (Zn) dan Perak (Ag).

Wilayah ijin penambangan adalah seluas 5,569 Ha dan

ditambah IPPKH yang disetujui pada bulan Mei 2018 seluas

1,129.25 Ha.

Daerah konsesi pertambangan terletak di Desa Bintang Mengalih,

Kecamatan Belantikan Raya, Kabupaten Lamandau, Provinsi

Kalimantan Tengah, berjarak 190 km dari Pangkalan Bun

2005

2008 - 2014

2014

Page 5: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

4

• Mendapatkan Ijin Ekspor Pertambangan konsentrat Timbal (Pb)

dan Seng (Zn)

• Pengembangan Floatation Plant

• Pengembangan Aset

• Kerjasama dengan PT Indonesia Royal Resources untuk

pembangunan Smelter Timbal (Pb)

Growth

• Pembangunan pabrik flotasi baru yang diperkirakan akan

beroperasi pada akhir tahun 2018 – kontribusi ke peningkatan

produksi konsentrat 20%-35%

2014 - 2018

2016

2018Now – still growing

Page 6: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

5

Peta Lokasi Tambang

View from Google Map

Untuk mencapai lokasi tambang PT. Kapuas Prima Coal (KPC) dapat ditempuh dengan cara:

1. Jakarta – Pangkalan Bun : dengan pesawat terbangselama ± 1 jam.

2. Pangkalan Bun – Site PT KPC: dengan kendaraanroda empat ± 4 – 5 jam.

Daerah konsesi pertambangan terletak di Desa Bintang Mengalih, Kecamatan Belantikan Raya, Kabupaten

Lamandau, Provinsi Kalimantan Tengah, berjarak 190 km dari Pangkalan Bun

Page 7: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

6

Board of Commissioners

WNI usia 51 tahun. Sejak 2005 - 2014, beliau

menjabat sebagai Direktur Utama Perseroan dan

mulai 2014 sampai sekarang menjabat sebagai

Komisaris Utama Perseroan.

Sim Antony

Memperkenalkan Board of Commissioners kami

WNI usia 48 tahun. Memperoleh gelar sarjana ekonomi

tahun 1993 dari Universitas Tarumanegera, Jakarta.

Sejak tahun 2005-2014, beliau menjabat sebagai

Direktur Perseroan dan mulai 2014 sampai sekarang

menjabat sebagai Komisaris Perseroan.

Kioe Nata

Warga Negara Indonesia, usia 55 tahun. Lulus

Sarjana Hukum di tahun 1987 dari Universitas

Padjajaran, Bandung. Sejak tahun 2017 beliau

menjabat sebagai Komisaris Independen

Perseroan.

Ifiandiaz NazsirKomisaris Utama

Komisaris Komisaris Independen

Page 8: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

7

Board of Directors

WNI usia 47 tahun. Memperoleh gelar Sarjana

Ekonomi tahun 1993 dari Universitas Tarumanagara

Jakarta. Tugas tanggungjawab sebagai Direktur

Utama dijabat sejak tahun 2016 untuk melakukan

koordinasi kegiatan direksi dalam pengurusan

Perseroan.

Harjanto Widjaja

Memperkenalkan Board of Directors kami

WNI usia 33 tahun. Memperoleh gelar Bachelor Of

Commerce Accounting Macquarie University, Sydney,

Australia di tahun 2005 dan mendapatkan Certified Public

Accountant (CPA) di Australia. Tugas tanggungjawab

sebagai Direktur Keuangan dijabat sejak tahun 2016 untuk

melakukan semua kegiatan keuangan Perseroan.

Hendra S William

WNI usia 40 tahun. Memperoleh gelar sarjana Teknik Sipil

jurusan Teknik di tahun 2011 dari Universitas Darul Ulum

Jombang dan gelar Magister Managemen di Sekolah

Tinggi Ilmu Ekonomi (STIE) Artha Body Iswara, Surabaya

pada tahun 2013. Tugas tanggungjawab sebagai Direktur

Operasional dijabat sejak 2016 untuk melakukan semua

kegiatan projek Perseroan.

Padli NoorDirektur Utama

Direktur Keuangan Direktur Operasional

Page 9: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

8

JANUARI – OKTOBER 2018 UPDATE

1. KCMI – RESOURCE & RESERVE REPORT by Geomine (January & April 2018 )

Cut off Grade Pb + Zn ≥ 6%Sumber : SMGC – KCMI Agustus 2017

Category Tonnage (Mt)

Zn (%) Pb (%) Ag (ppm)

Zn Eq* (%)

SumberDaya

10,77 4,89 3,10 97,34 9.38

Terkira 6,52 2,19 3,58 74,32 6,86

*) Cut Off Grade Zn Eq* ≥ 3%Sumber : Geomine – KCMI April 2018

Page 10: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

9

2. Perluasan IPPKH dari 390 Ha menjadi 1,519.25 Ha pada bulan Mei 2018

: 390,00 Ha

: 1.129,25 Ha

Page 11: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

10

3. Performa Finansial

Summary kinerja perusahaan:

1. Revenue

2. EBITDA

3. Net profit after tax

2016 2017 Sep 2018

Revenues 138,274,461,933 435,867,897,835 514,801,498,105

Net Profit After Tax (34,936,525,224) 45,241,799,522 99,529,336,850

EBITDA 8,759,206,497 99,306,739,018 160,740,301,594

IDR 138,274,461,933

IDR 435,867,897,835

IDR 514,801,498,105

(IDR 34,936,525,224)

IDR 45,241,799,522

IDR 99,529,336,850

IDR 8,759,206,497

IDR 99,306,739,018

IDR 160,740,301,594

-IDR 100,000,000,000

IDR 0

IDR 100,000,000,000

IDR 200,000,000,000

IDR 300,000,000,000

IDR 400,000,000,000

IDR 500,000,000,000

IDR 600,000,000,000

2016 2017 Sep-18

PT KAPUAS PRIMA COAL Tbk

Revenues Net Profit EBITDA

Page 12: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

11

Target produksi & Sales

2018 2019 2020

Revenues 804,801,498,105 1,412,052,771,694 2,244,464,230,874

Net Profit After Tax 133,875,374,997 277,025,656,008 507,546,519,234

EBITDA 199,526,389,341 405,169,523,137 735,267,096,036

IDR 804,801,498,105

IDR 1,412,052,771,694

IDR 2,244,464,230,874

IDR 133,875,374,997

IDR 277,025,656,008

IDR 507,546,519,234

IDR 199,526,389,341

IDR 405,169,523,137

IDR 735,267,096,036

IDR 0

IDR 500,000,000,000

IDR 1,000,000,000,000

IDR 1,500,000,000,000

IDR 2,000,000,000,000

IDR 2,500,000,000,000

2018 2019 2020

PT KAPUAS PRIMA COAL Tbk

Revenues Net Profit EBITDA

Page 13: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

4. Project Progress

• PT Kapuas Prima Citra merupakan perusahan

pengolahan dan pemurnian Timbal/Lead (Pb).

• Input capacity: 40,000 ton Lead (Pb) concentrates.

• Output capacity: 20,000 ton Lead (Pb) ingots.

Project 01 – Lead (Pb) Smelter Project 02 – New Flotation

• Flotasi baru akan beroperasi pada akhir tahun

2018

• Input capacity : 2.000 ton Ore / Hari

www.kapuasprima.co.id

12

Page 14: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

13

Total persentase kemajuan fisik

pembangunan fasilitas pemurnian yang

telah diverifikasi hingga 30 Agustus

2018 adalah sebesar 99.28%

01. Project Lead SmelterProgress update

No DESCRIPTIONWEIGHT

(%)

Status Verifikasi

Plan Actual Bobot

A Persiapan Awal (Preliminary) 14,84% 14,84% 14,84% 100,00%

B Persiapan Proyek (Project Preparation) 54,91% 54,91% 54,91% 100,00%

C Pelaksanaan Proyek (Insite Battery Limit ) 12,42% 12,42% 12,42% 100,00%

D Utilitas (Utility) 3,93% 3,93% 3,93% 100,00%

E Infrastruktur Pendukung (Offsite battery limit) 11,06% 11,06% 11,06% 100,00%

F Commissioning and Start Up 2,84% 2,84% 2,12% 74,72%

ACCUMULATIVE PROGRESS PLAN 100,00% 100,00%

ACCUMULATIVE REALIZATION 100,00% 100,00% 99,28%

Page 15: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

14

Peta lokasiPT Kapuas Prima Citra

Kalap

View from Google Map

Page 16: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

Project 1 (photos update)Proportioning System

www.kapuasprima.co.id

15

Page 17: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

Project 1 (photos update)Sintering Machine System

www.kapuasprima.co.id

16

Page 18: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

Project 1 (photos update)Blast Furnace

www.kapuasprima.co.id

17

Page 19: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

18

September 2017 Desember 2017 Februari 2018 Oktober 2018 November 2018

Meeting & Data Gathering

Planning

Construction

Testing

Operate on

Project 02. NEW FLOTATION PLAN

Progress Update – Flotation Plant

Page 20: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

Project 2 photos (New Flotation)

Gambar update project dari site

www.kapuasprima.co.id

19

Page 21: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

20

BA

FE

DC

Peningkatan kapasitas produksi PT KPC dari 2500 ton

per hari menjadi 5000 ton per hari

B. Meningkatkan produksi

• Pembangunan smelter Seng/Zinc (Zn)

• Upgrade smelter Timbal/Lead (Pb)

D. Pembangunan & upgrade smelter

• Pembaharuan alat2 berat

• Efisiensi peralatan tambang

• Akuisisi perusahaan lain dengan jenis mineral yang sama

• Mencari potensi cadangan tembaga dan emas

F. Lain2

Tujuan nya adalah untuk menambah cadangan

mineral dari lahan eksplorasi 390 Ha menjadi

1.519,25 Ha

A. Ekspansi eksplorasi

Pembelanjaan modal untuk memberi nilai tambah yang

bersinergi terhadap strategi perseroan

C. Modal kerja

Pembangunan pabrik konsentrat Zinc Oxyde

E. Pembangunan pabrik

5. Rencana Ekspansi Perseroan

Target investasi adalah USD$80 juta atau setara dengan IDR1,2T yang akan digunakanuntuk:

Page 22: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

21

Tipe Periode

Seri A

Seri B

Seri C

Seri D

Seri E

370 hari

1 tahun 1 bulan

2 tahun

3 tahun

5 tahun

Tabelperbandinganobligasi

Struktur obligasi

Sampai dengan IDR 600 Miliar

Nominal Obligasi(dalam Juta Rupiah)

IDR 15.000.-

IDR 100,000.-

IDR 350,000.-

IDR 60,000.-

IDR 75,000.-

*) suku bunga obligasi akan di tentukan kemudian

Page 23: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

Penggunaan Dana untuk Eksplorasi area IPPKH 1.129,25 Ha

www.kapuasprima.co.id

22

Page 24: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

23

MAPPING

Page 25: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

www.kapuasprima.co.id

24

DRILLING

Page 26: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

Terima kasih

PT Kapuas Prima Coal Tbk

5th Ffloor, Elang Laut Boulevard Building No A32-33

Jl. Pantai Indah Selatan 1

PIK, Jakarta Utara

Page 27: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

FOTO-FOTO KEGIATAN PUBLIC EXPOSE TAHUNAN PT KAPUAS PRIMA COAL Tbk

Page 28: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …
Page 29: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

DAFTAR TAMU YANG HADIR DALAM PUBLIC EXPOSE TAHUNAN PT KAPUAS PRIMA COAL Tbk

Page 30: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …
Page 31: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …
Page 32: BAHAN PRESENTASI PUBLIC EXPOSE TAHUN 2018 PT …

PUBLIKASI BERITA DI HARIAN NASIONAL