balancing sheet
TRANSCRIPT
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 1/30
DISCOVER-100 LINE BAL
Sr. No. Stage
1 Number punching
2 Bar code scanning
3 Frame loading on conveyor
4 Flag loading
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 2/30
5 Fairing insertion
6 Engine insertion
7
Engine fr. Bkt. Matching
8 Fr. Fender tightening
9 Chain slackness
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 3/30
10 Chaincase Fitment
11 Chaincase Tightening
12 Silencer gaskit fitment
13 Stem nut tightening
14 Thermal sensor connection
15 Handle bar fitment
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 4/30
16 Battery connection
17 Seat cowl fitment
18 GSL fitment
19
20 LH. Bellow insertion
21 CDI fitment
Handle bar routing& Coupler connection
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 5/30
22 Petrol tank fitment
23 Fr. No. platefitment
24 LH Side Panel Fitment
25
Fr.Brake connection
26
On Line Inspection
27
Scanning
1
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 6/30
2
Rear wheel fitment
3Rr. Br. Connection
4
Fork fitment
5
Fr. Fender Fitment
6
Engine insertion
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 7/30
7
Engine Fr. Bkt. Matching
8
Fr. Wheel fitment
9Engine Tightening
10
Focus
11
Rider step
12
Rr. Wheel alignment
13
Silencer fitment
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 8/30
14
RH fender tightening
15
Carburator Tightening
16
Cable routing
17
Coupler connection RH.
18
Throttel connection
19
Throttel cap prefitment
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 9/30
20
Starter motor connection
21Seat cowl tightening
22
Grab handle fitment
23
Clutch connection
24
Kick fitment
25
On Line inspection
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 10/30
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 11/30
NCING at 7.7 m/min CONVEYOR SPEED
Activity Time (in sec)
LH 1 2 3 4
Frame unloading and move towards m/c 6.4 8.3 8.8 3.1
Bearing race collection 1.9 2.8 3 3.2
Race on m/c and clamp and cycle start 3 1.1 4.6 2.6
A.C. box polybeg remove 5.3 5.3 4.6 5.2
Move back to trolley 4.5 4 2.3 3.2
TOTAL TIME 21.1 21.5 23.3 21.4
Move towards conveyor
Unload kitbin empty
bar code scan & puton p v card
Move towards m/c
PV card on veh
Rubber band removal
Declamp frame and unload frame
7.7 10.6 9.9 7.6Move towards conveyor
Open main stand and matching with rear wheel
Rear axle from kitbin5.4 4.8 5.7 4.8
Chain removal from sprocket and rear axle insertion
Remove tackle and move back 5.1 5.8 5.7 5.4
TOTAL TIME 18.2 21.2 21.3 17.8
Tackle on flag and flag on conveyor 4.1 4.8 6 5.5
Ball cage on head pipe
Paint application on number punched 2.4 4.8 3.9 6.6
Fitment of battery acid drain pipe 5.9 6.7 6.7 4.5
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 12/30
Move back 4.3 4.1 4.1 3.4
TOTAL TIME 18.6 20.4 20.7 20
Pick fairing from trolley 6.5 6.3 11.2 6.9
Stem nut and washer prefit 5.6 8.1 2.2 5.9
Placing battery pad 3.1 2.6 2.8 3.5
Move back 3 3 3 3.3
TOTAL TIME 18.2 20 19.2 19.6
Engine 14 mm Rr. 2 bolt insertion 7.7 12.6 8.1 15.5
Magneto coupler connection 11.2 4.6 11.1 4.4
TOTAL TIME 18.9 17.2 19.2 19.9
Engine fr. Bkt. Insertion with 12mm 3 bolt. 8.2 4.9 10.8 9.2
Clutch wire bracket connection 7.7 8.2 6.7 5.7
Declamp fix.5.4 3.7 3.2 3.3
Move back
TOTAL TIME 21.3 16.8 20.7 18.2
LH. Fender 2bolt prefitment & tightening 3.9 6.7 6.8 4.5
Clutch wire bkt. Tightening 4 4.6 4.5 6.1
Engine rr. Bkt. 2 bolt tightening 6 5.3 4.2 6
Shari Guard bkt. Bolt tightening 6.5 5.1 5.2 4.2
TOTAL TIME 20.4 21.7 20.7 20.8
Picking & inserting 2 bolts in front fork & Engine holding LH. Side 5.1 6.5 13.7 4.5
Chain routing9 8.9 4.5 10.8
Chain adjustmentMove back 1 2 1 1.5
TOTAL TIME 15.1 17.4 19.2 16.8
Chaincase from trolley to vehicle
10.5 16.7 10.3 11.9Lower chaincase fitment and 2 bolts prefit
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 13/30
Upper chaincase fitment
Stick barcode on head pipe 5.2 4.5 4.6 3.9
Move back & collect bolts 1.6 2.4 2.8 2.6
TOTAL TIME 17.3 23.6 17.7 18.4
tighten 4 bolts 11.3 6.1 6.2 4.8
Rr. Axle holding 4.8 9 11.2 7.3
Move back & collect bolts 2.2 2.4 2.1 3.2
TOTAL TIME 18.3 17.5 19.5 15.3
silencer gaskit fitment 4.2 3.6 6 5.2
brither pipe connection 7.4 5.6 6.7 3.5
TPS coupling 6.7 6.9 7.9 7.2
handle holder on frame 4.7 4.1 2.1 3.3
TOTAL TIME 23 20.2 22.7 19.2
Stem nut and fork upper bolts (2) tightening 7.6 7.2 7.4 6.7
Stem nut torque check
Silencer front prefitment 7.6 7.9 7.7 8.2
Move back 3.2 2.5 3.1 3.4
TOTAL TIME
tightening of silencer with gun 3.5 3.2 3.8 4
Thermal sensor connection 11.3 12.7 13.5 13.6
Move back 2.8 2 2.1 2.2
TOTAL TIME 17.6 17.9 19.4 19.8
Handle bar from trolley to frame 5.2 5.3 5.5 5.9Fork rotation
Handle holder on handle bar from frame 6.6 4.6 5.9 4.1
Handle bar bolts tightening (4) 4 5.3 4.7 4.9
Move back 1.50 1.50 1.40 1.50
TOTAL TIME 17.30 16.7 17.5 16.4
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 14/30
battery fitment 7.8 7.5 6.5
R.R cover tightening 10.7 5.3 7.7
Move back 1.5 2.5 2.2
TOTAL TIME 20.00 15.3 16.4
seat cowl from flag & spark plug connection
19.2 19.9 18.8 20.2seat cowl fitment
tail lamp coupler connection
TOTAL TIME 19.2 19.9 18.8 20.2
GSL fitment 8.4 8.1 8.8
arrester & flasher fitment 9.8 8.8 9.9
MOVE back 2 1.8 2.2
TOTAL TIME 20.2 18.7 20.9
tie band 4.4 3.9 3.5 4.4
SPM cable routing 13.5 14.5 13.2 11.2
3 coupler connection 3.9 3.4 2.5 3.1
TOTAL TIME21.8 21.8 19.2 20.4
Throttal cap tightening 2.4 2.1 1.9 1.8
GSL tightening 5.7 3.4 3.2 3
bellow insertion & clamping 7.2 7.6 10.4 8.3
clutch cable routing 2.1 4 2.4 5
move back 3.5 2.5 4.1 2.4
TOTAL TIME 20.9 19.6 22 20.5
CDI connection & fitment 3.4 3.4 4 2.5
carburetter tightening 16.2 14.1 13.3 14.6
Move back 2.3 2.9 2.6 2.3
TOTAL TIME 21.9 20.4 19.9 19.4
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 15/30
reflector tightening 4.3 5.9 3.9 4.2
insertion of SPM wire 2.8 6 3.4 3.2
petrol tank fitment 12.9 7.1 13.1 13.4
Move back 1.6 1.5 1.2 1.1
TOTAL TIME 21.6 20.5 21.6 21.9
front no. plate tightening 9.6 9 5.4 7.8
Cable clamping 2.7 3.4 2.7 2.8
petrol tank lock fitment 7.6 5.8 7 5
Move back 1.5 1.9 1.1 1.6
TOTAL TIME 21.4 20.1 16.2 17.2
Picking lock from fairy and unpacking it 3.6 3.7 3.9 3.5
putting lock washer chromate in side panel 10.8 10.5 11.7 9.8
lock fitment in side panel & P.T. 5.3 4.7 5.7 5
move back 1.5 1.8 1 1.9
TOTAL TIME 21.2 20.7 22.3 20.3
Fr. Br. Connection 11.6 13.3 12.2
flag unloading 4.3 3.5 3.7
Move back 2.1 1.9 1.4
TOTAL TIME 18 18.7 17.3
15.9 16.3 21.2 15.6
Scanning 3.9 4.2 4.6 5.1
S P M Screw tightening 2.8 3.1 2.6 3
TOTAL TIME 6.7 7.3 7.2 8.1
R. H.
Rear wheel loading 4.69 6.39 3.41
kitbin loading 4.21 4.47 6.44
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 16/30
Rear wheel panel on wheel 1.6 2.81 3.15
Move back 3.1 1.45 2.3
TOTAL TIME 13.6 15.12 15.3
rear wheel matching 4.8 4.6 7 6.6
adjuster fitment 4.8 4.8 6.5 3.6
nut & washer fitment8.4 8.2 3.8 6.6
move back
TOTAL TIME 18.1 17.7 17.3 16.8
To put carburator in kitbin 2 2.7 2.1
bearing cage in upper bearing of head pipe 1.3 1 0.9 1.2
carburator clip 4.2 4.8 2.2
rear brake fitment 13.8 13.4 14.6
Move back 1.5 2.2 2.3
TOTAL TIME 22.8 24.1 22.1
Collect fork from trolley to frame
Collect lug nut, dust cap and bearing cone from kitbin
Insert fork in head pipe 21.6 20.9 21.9 21.8
Prefit nut, tighten and torque reset by torque wrench
Move back
fuel pipe in carburetter 2.5 1.7 2.6 1.9
front fender to frame & Insertion of fender in fork 6.9 8.6 8.2 6.9
Prefit bolts (2) 4.1 6.9 4.7 4.4
Carburator positionning on ac box bellow
6.7 4.6 3.8 7.6Rr. Wheel nut washer prefitment
Move back
TOTAL TIME 20.2 21.8 19.3 20.8
Engine from trolley to vehicle and carburetor clip isert in engine bello
18.3 18.2 20.1 18.6Engine insertion with matching to carburetor
Move back to trolley
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 17/30
Engine Fr. Bkt. Match with LH. Bkt.11.9 16.5 13 13.5
3 nut prefitment
Torque rod bolt insert in pannel & torque rod 8.4 6.3 6.2 6.5
TOTAL TIME 20.3 22.8 19.2 20
Fr. Wheel from trolly 5.4 4 4.1 3
match brake pannel & speser 9 9.9 9.1 9.8
axle insertion & nut washer prefitment 6.5 8.6 5.6 6.5
move back 1.9 1.4 3.7 1.2
TOTAL TIME 22.8 23.9 22.5 20.5
Engine Tightening complete 17.8 17.7 19.2 18.4
focus bolt insertion 4.9 3.1 5.1
nut washer prefitment 3.2 2.5 3.1
torque rod bolt nut washer prefitment 5 4.7 7.3
TOTAL TIME 13.1 10.3 15.5
Fr. Wheel tightening 1.5 1.9 2 1.3Rider step 2 bolt prefitment & tightening 19 15.3 17.8 16
TOTAL TIME 20.5 17.2 19.8 17.3
right side reflector 6.1 3.4 5.3 3.7
Rr.wheel alignment & tightening 8.2 10.3 7.9 8.4
Torque rod tightening 3.9 3.3 3.6 4.7
Rr. Br. Play adjusment 1.9 1.4 2.2 2.8
move back 1.5 1.3 1.2 1.3TOTAL TIME 21.6 19.7 20.2 20.9
Silencer front matching with engine stud 6.6 7.1 7.1
Silencer Rr.bolt , nut & washer prefitment & clamp fix.& move back 14.4 13.5 13.5
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 18/30
TOTAL TIME 21 20.6 20.6
2 bolt tightening of fender 6.3 6.8 5.6
3 coupler connection & move back 16.4 15.9 16.2
TOTAL TIME 22.7 22.7 21.8
insulator insertion 7.7 12.4 7.5 8.9
Carburator clip Tightening & carburator tightening 10.9 6.7 10.9 9.6
TOTAL TIME 18.6 19.1 18.4 18.5
RH. Cable routing 17.1 15.9 14.7
silencer rear bolt tightening 3.7 3.4 3.8move back 1.5 2 2.2
TOTAL TIME 22.3 21.3 20.7
2 coupler connection 5.8 6.5 6.5
bellow insertion 11 12.1 11.2
auto-choke coupler connection 5.9 3.6 4.2
move back 1.5 1.2 1.3
TOTAL TIME 24.2 23.4 23.2
tie band of accelerator wire 2.4 2.6 2.8 3.4
Throttel connection 15.4 15.3 13.2 13.2
move back 2.3 3.2 1.9 2.1
TOTAL TIME 20.1 21.1 17.9 18.7
throttel lock pin fitment 4 6.3 6 5.7
Throttel cap prefitment 11.9 14 13.1 13.6
move back 2.9 2.4 2.5 2.2
TOTAL TIME 18.8 22.7 21.6 21.5
Starter motor connection 7.60 7.5 8.90
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 19/30
over flow pipe from carburator to frame 4.60 3.4 3.20
Earthing connection with engine 2.90 3.5 4.00
move back 3.50 2.9 2.60
TOTAL TIME 18.60 17.3 18.7
Seat cowl prefitment & tightening 9.2 11.6 13 11
RH. Adjuster tightening 4 3.2 6 3.8
focus bolt tightening 8.2 6 4.3 9.4
move back 1.9 1.5 1.2 1.2
TOTAL TIME 23.3 22.3 24.5 25.4
RH reflector tightening 2 2.2 2.3
Grab handle pre fitment & tightening with RH. S/P clip insertion 20.2 19.2 20.1
TOTAL TIME 22.2 21.4 22.4
clutch cable routing from outside with clutch play adjustment 19.1 18.2 18.3
move back 2.2 2.5 2.8
TOTAL TIME 21.3 20.7 21.1
RH. S/P fitment & tightening
kick fitment & tightening
Rr. Br. Light adjusment
18.2 17.8 17.3 17.2
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 20/30
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 21/30
MAN/P
AVG.
6.6
2.7
2.8
5.4
3.5 1
21
1
9
5.2
5.5 1
19.6
5.1
4.4
6
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 22/30
4 1
19.5
7.7
5.5
3
3 1
19.2
11
7.8
18.8
8.3
7
3.9 1
19.2
5.5
4.8
5.4
5.2
21 1
7.4
8.3
1.4 1
17
12.4
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 23/30
4.6
2.4 1
19.4
7.1
8
2.5 1
17.6
4.7
5.8
7.2
3.6
21.2
7.3
7.9
3.1
18.3 1
3.6
12.8
2.3 1
18.7
5.5
5.3
4.7
1.50
17.0
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 24/30
7.3
7.9
2
17.2 1
19.5
19.5
8.4
9.5
2
19.9
4
13.1
3.2 1
20.3
2
3.8
8.3
3.4 1
3.1
20.6
3.3
14.5
2.5 1
20.3
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 25/30
4.5
3.8
11.6
1.4
21.2
7.9
2.9 1
6.3
1.5
18.6
3.7
10.7
5.2
1.6
21.1
12.4
3.8
1.8 1
18
17.3 1
4.5
2.9 1
7.6
27
4.8
5
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 26/30
2.5
2.3 1
14.5
5.7
5
6.8
17.5
2.3
1.1
3.8
14
2
23.2 1
21.6
1
2.1
7.6
5
5.7 1
20.3
18.8 1
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 27/30
13.7
6.8 1
20.5
4.1
9.5
6.8
2 1
22.4
18.3 1
4.4
2.9 1
5.7
13
1.6 117
18.6
4.6
8.7
3.8
2 1
1.320.4
7 1
13.8
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 28/30
20.8
6.2
16.2
22.4
9.2
9.5 1
18.7
15.9 1
3.71.9
21.5
6.3 1
11.4
4.5
1.3
23.5
2.8
14.2
2.4 1
19.4
5.5 1
13.2
2.5
21.2
8.0
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 29/30
3.7
3.4
3.0
18.1 1
11.2
4.3
7
1.4 1
23.9
2.1
19.8 1
21.9
18.5 1
2.5
21
1
1
18
25
8/6/2019 Balancing Sheet
http://slidepdf.com/reader/full/balancing-sheet 30/30