Ballast Water Management

State of Affairs

Leading the way; Making a difference

Ballast Water Management - State of Affairs

Overview

1. The Regulatory Environment1. IMO2. USA

2. Ballast Water Technology1. Approved Systems2. Approval Process

Leading the way; Making a difference

Ballast Water Management - State of Affairs

INTERTANKO’s Strategic Plan

1. Tanker industry is able to achieve compliance with current and future discharge standards (bothdischarge standards (both regionally and internationally)

2 Installation and Operation of2. Installation and Operation of appropriate and adequate ballast water management systemswater management systems

3. Compliance and enforcement – need strong well defined and realisticstrong, well defined and realistic international regulations

Leading the way; Making a difference

Ballast Water Management

State of the Regulatory Environment

Remaining challenges and uncertainty:

1. Implementation timelines2 T l id li2. Type approval guidelines 3. Port State Control Sampling and Analysis

4. Regional Regs: the US..( )5. ..and local conflicts (Coastguard vs EPA)

Leading the way; Making a difference

Ballast Water Management - State of Affairs

1. The Regulatory Environment : IMO

Ballast Water Management Convention

• Adopted in 2004• Entry into force requires ratification by

30 countries, 35% world’s grt• Currently, 38 countries, 30.38% grt

Leading the way; Making a difference

Ballast Water Management - State of Affairs

1. Implementation Schedule

1. The Regulatory Environment : IMO

1. Implementation ScheduleScenario 1 - Assuming Entry into Force of the Convention 1st June 2015

Vessel Keel Laid Delivered BWMS Installation DateFirst renewal survey* after 17 May 

Suezmax A 5 Nov 2003 17 May 2004

y y2016 (i.e. first renewal survey following the anniversary date of delivery of the ship in the year ofdelivery of the ship in the year of compliance with the standard applicable to the ship)

S B 5 N 2010 16 J 2012 Fi l f 16 J 2016Suezmax B 5 Nov 2010 16 Jan 2012 First renewal survey after 16 Jan 2016

Suezmax C 25 Dec 2010 1 Mar 2012 First renewal survey after 1 Mar 2016

Leading the way; Making a difference

* Renewal survey associated with the International Oil Pollution Prevention Certificate under MARPOLAnnex I

Ballast Water Management - State of Affairs

1. Implementation Schedule

1. The Regulatory Environment : IMO

1. Implementation ScheduleScenario 2 - Assuming Entry into Force of the Convention 1st June 2016

Vessel Keel Laid Delivered BWMS Installation Date

First renewal survey* following the 1stSuezmax A 5 Nov 2003 17 May 2004

First renewal survey  following the 1st June 2016 (i.e. Entry into Force of the Convention).First renewal survey following the 1stSuezmax B 5 Nov 2010 16 Jan 2012 First renewal survey following the 1June 2016

Suezmax C 25 Dec 2010 1 Mar 2012 First renewal survey following the 1stJ 2016June 2016

* Renewal survey associated with the International Oil Pollution Prevention Certificate under MARPOLAnnex I

Leading the way; Making a difference

Ballast Water Management - State of Affairs

1. The Regulatory Environment : IMO

2. Ballast Water Management System (BWMS) Type Approvals

• Notwithstanding progress at MEPC 65 with greater quantity and quality of information with increasing transparency there remains a needincreasing transparency, there remains a need to review and revise the IMO’s Type ApporvalGuidelines (G8)

• INTERTANKO Council, G8 Guidelines, ‘still not adequate in providing tanker operators with reliable dependable BWMS to install on boardreliable, dependable BWMS to install on board their tankers’.

Leading the way; Making a difference

Ballast Water Management - State of Affairs

1. The Regulatory Environment : IMO

3. Port State Control

• Trial Period (initially for 3 years) following entryTrial Period (initially for 3 years) following entry into force

• To trial sampling and testingTo trial sampling and testing

• During this period, port states will refrain from detaining a ship or initiating criminals sanctionsdetaining a ship or initiating criminals sanctions in the event a BWMS does not meet the discharge standard’.

Leading the way; Making a difference

Regulatory Requirements

Ballast Water Management for owners:Ballast Water Management for owners:

BWM Pl d R d B k f h l• BWM Plan and Record Book for each vessel• BWM System & discharge standards• Compliance schedule to install BWMS• Compliance schedule to install BWMS• Addl. Survey and certification requirements• Addl Port State Control proceduresAddl. Port State Control procedures

=> Uncertainty, Time & Resourcesy,

Leading the way; making a difference

Ballast Water Management - State of Affairs

1. The Regulatory Environment : USA

1. US Coast Guard

• Implementation ScheduleImplementation Schedule• Ballast Water Management Systems

approval

Leading the way; Making a difference

Decision Tree Newbuildings

Leading the way; Making a difference

Ballast Water Management - State of Affairs

1. The Regulatory Environment : USA

1. US Coast Guard

• Implementation Schedule• Decision Tree

M d l E t i R t (MER)• Model Extension Request (MER) Letter

Leading the way; Making a difference

Ballast Water Management - State of Affairs

1. The Regulatory Environment : USA

2. EPANPDES VGP 2013

• New ships (keel laid after December 1, 2013) will need to install a BWMS to comply with the VGPy

• A BWMS “which has been shown to be effective by testing conducted by an independent third party laboratory, test facilityconducted by an independent third party laboratory, test facility or test organization

Leading the way; Making a difference

BW Systems – Owners’ RealityChoosing equipment:

Suitable systems/treatment types ?y / yp

Leading the way; Making a difference

Ballast Water Treatment Guidance

Choosing, installing and operating systems

Leading the way; making a difference

Ballast Water Management - State of Affairs

2. Ballast Water Technology

1. Approved Systems• IMO

T A d (G8) 33 *• Type Approved (G8) 33 *• US

• Coast Guard approved 0• Coast Guard approved 0• Alternate Management Systems (AMS) 13 (+3)

**

* As at 24 May 2013 (MEPC 65)

Leading the way; Making a difference

y ( )** As at 26 September

Ballast Water Management - State of Affairs

2. Ballast Water Technology

2. Approval Process• IMO

• Update requirements for manufacturers submitting• Update requirements for manufacturers submitting information to Administrations (BWM.2/Circ.43)

• Updated information to be included in Type Approval Certification, e.g. BWMS limitations (Resolution MEPC.228(65))

• No Review of G8 plannedNo Review of G8 planned• US

• 2 independent laboratories authorised (US and Norway)

Leading the way; Making a difference

Ballast Water Management - State of Affairs

Overview

1. The Regulatory Environment1. IMO2. USA

2. Ballast Water Technology1. Approved Systems2. Approval Process

Leading the way; Making a difference

BW Systems – Owners’ Reality

Planning & Design Costs, Installation & downtime

Running Costs‐Energygy‐Consumables

Crew training time & focusSource: ABS Ballast Water Treatment Advisory

Maintenance & SparesCrew training, time & focus

Leading the way; Making a difference

Fear of non compliance & criminalisation

BW Systems – Owners’ Reality

Sources of Uncertainty:Sou ces o U ce ta ty:Robustness of Type approved Systems ‐ need to reflect real world on board

• e.g. Total Rated Capacity tested 60m3/hr but approved to 6000m3/hrEffi i i diff li i i (b ki h d f h )• e.g. Efficiency in different salinities (brackish and freshwater tests)

• e.g. Varying water temperatures• e.g. Waters with high sediment loads or high tannin contentg g g

Ongoing concern that Type Approval process separate from PSC process, so approved Systems may not meet PSC analysis once installed on boardapproved Systems may not meet PSC analysis once installed on board

Energy Consumption of Systems: considerations in relation to other IMO instruments, e.g. MARPOL Annex VI and energy efficiency.

Leading the way; Making a difference

Ballast Water Treatment Guidance

INTERTANKO Guidance on the Selection and Installation of Ballast Water Management Systems for Tankers

• Physical Installation• Pumping• Control – system approval and 

certification• Treatment type• Operating practicalities

Leading the way; making a difference

Ballast Water Management Industry Cooperation

Leading the way; making a difference

Source: Dr Daniel Kluza, Biosecurity New Zealand

Leading the way; Making a difference

Ballast Water Management

Concluding remarks

1. Positive developments at IMO, but more work needs to be done and the draft Assembly resolution needs to be adopted !

2. Sharing of operational experience between stakeholders (acceptance of treated discharges by Admin. & PSC essential)

• Do systems work the way they were approved to work ?• Do they meet the discharge standards ?

Wh i l i d b id d f h ?• What operational issues need to be considered for each ?

3. Need a international, uniform approach with strong, well f l l l l ldefined and realistic international regulations, clear timelines 

and the political will of States to solve remaining issues and align regional requirements for a global industry

Leading the way; Making a difference

regional requirements for a global industry

Thank You