Bandula S. TilakasenaProject Director
Trincomalee Coal Power Project Ceylon Electricity Board
21 October, 2007
Pricing policy for renewable energy: Avoided Cost based Tariff
Introduction
Classification of Renewable Energy
Main Features of the current Standardized Power Purchase Agreement (SPPA)
Tariff based on CEB’s avoided costs
Historical trends
Classification of Renewable Energy Plants
Grid Connected :Connected to the integrated electricity distribution grid and deliver electricity exclusively to the grid
Self Generating :Connected to the grid and while delivering electricity to the grid, a part of the electricity generated is used by the developer
Off- Grid : Operate in isolation
CEB/SPPA.bst
Standardized Power Purchase Agreement: Eligibility
Capacity Limit : Less than 10 MW
Energy produced from :
Mini Hydro
Bio mass
Cogeneration
Standardized Power Purchase Agreement
Main Features…
All energy produced by the Facility will be purchased by CEB
The power plant is not subject to dispatch
The Power Purchase tariff is based on the Avoided Costs of CEB, and is announced each year
The cost of transmission interconnection has to be borne by the Developer
Electrical interconnections to comply with the CEB Guide for Interconnection of Embedded Generators –December 2000
The floor tariff over the term is 90% of the initial year Tariff
Standardized Power Purchase Agreement
Main Features…
Tariff calculation methodology - Step 1
Calculate the cost of a unit generated by each plant in operation using applicable fuel costs and other plant data such as heat rates.
Tariff calculation methodology - Step 2
Compute the expected plant factors for each month in the year under consideration using projections prepared by CEB’s System Control Centre.
Tariff calculation methodology- Step 3
Calculate the fraction of time that each plant operates in the margin during a given month using the expected monthly plant factors.
Estimate the avoided costs for wet and dry seasons separately by taking the arithmetic average of the months in each season
Allowances made on account of Transmission Losses and Overheads incurred by CEB
May -January
February ,March-April
Seasonal Tariff – Step 4
Tariff calculation methodology - Step 5
Allowances made on account of Station Losses, Transmission Losses and overheads incurred by CEB are as follows:
Station Losses 3.0 %
Transmission Losses 3.2 %
CEB Overheads 1.5 %
Tariff calculation methodology - Step 6
Tariff offered each year is the arithmetic average of :
Avoided cost of generation for the year, calculated according to the methodology described above, and
Avoided costs of generation used for estimating the price offered in the previous two years
Tariff calculation work sheet for year 2007 Tariff Calculation Sheet
YearDry
Season Wet Season
1996 2.90 2.90
1997 3.38 2.89
1998 3.51 3.14
1999 3.22 2.74
2000 3.11 2.76
2001 4.20 4.00
2002 5.13 4.91
2003 6.06 5.85
2004 5.70 4.95
2005 6.05 5.30
2006 6.73 5.82
2007 7.64 6.94
Variations of SPPA tariff 1996-2007 Rs/kWh
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007
Year
Rs
./k
Wh
Wet Season
Dry Season
Variations of SPPA tariff 1996-2007 Rs/kWh
Thank You
Energy Purchases Branch
Transmission Division
Ceylon Electricity Board
Web: www.ceb.lk