Bank of Baroda Transaction Banking Department
Sr.NO Page No. Point/Section Clarification point as stated in the tender document Description oQueries/ Suggestion/Deviationf Query/
Clarification sought by the bidder
Bank Comments/ Amendments
1 6 Date of
Submission
Date of submission of bids We request the Bank to extend the submission date by atleast
2 weeks from the date of release of pre-bid clarifications in
order to allow sufficient time to all bidders
Last date of submission is extended to 10th Aug 2015 at 2:00 PM
2 6 Date of
opening
Date of opening of elegibility cum technical bid Eligible and technical bid shall be opened on 10th August 2015 at 3.00
PM in Bank of Baroda, Transaction Banking Departmetn, Baroda Sun
Tower, Bandra Kurla Complex, Mumbai
3 8 2 This RFP is to deploy 1,000 Offsite / Onsite CDs across
the country on end to end deployment of Cash
Dispensers inclusive of managed services & TIS under
OPEX MODEL or Transaction Pricing Model with end-
to-end solution.
Request the Bank to clarify the ONSITE:OFFSITE deployment
ratio considered under this RFP to asertain the Cost to the
bidder.
Bank is planning for approximately 80-85 % offsite deployments
however, the percenage is indicative and bank has sole discretion to
change the deployment plan between offsite and onsite based on the
business requirement.
4 8 2 The payments shall be made by the Bank for successful
financial and non-financial transactions of the
cardholder at these proposed outsourced CDs as per
terms of payment mentioned on clause 21 of this RFP.
There will be no profit sharing arising out of acquiring
transactions. The indicative number of CDs to be
installed in each zone in India, of the bank is indicated
in Annexure L. Bank reserves the right to change the
number of CDs deployment in zones at any time at its
sole discretion
We presume that the financial and non-financial transactions
mentioned refer to all transactions and not limited to "on us"
transactions. Request the bank to clarify.
We clarify that financial and non financial transaction include "on us" as
well as "off us" transactions.
5 8 Scope of
work,
hardware and
software
requirements
This inter alia means that the ownership / leasehold /
freehold rights of CD & Other related peripherals and
Site will remain with the bidder for off-site locations
Does this mean that the bidder needs to own the asset, invest
capex etc?
Yes, Bidder is to own Assets and invest in CAPEX etc.
6 9 2 The Bank may increase or decrease the number of CDs
to be deployed during the period of the contract.
Request to modify as below:
"The Bank may increase or decrease the number of CDs to be
deployed during the period of the contract."
Bidder needs to understand the specific numbers to arrive at
a competitiive pricing.
RFP Terms remain unchanged
Bank of Baroda Transaction Banking Department, Baroda Sun Tower, Bandra Kurla Complex, Mumbai
Response of prebid queries of RFP No. BCC/TBD/ATM/107/542 dated 11th July 2015 for End to end deployment of Cash Dispensers inclusive of Managed Service & TIS under OPEX model
Page 1 of 30
Bank of Baroda Transaction Banking Department7 9 3 The Bidder shall provide required technical assistance
for connecting CDs to DR Switch as and when the Bank
requires.
Connectivity of the ATM/ CDs to the DR is a function of the
Bank's switch and the corresponding natting would need to be
done at the Bank's network level. What is expected from the
bidder to enable connecting the CDs to the DR switch?
While bank will do the necessary configuration on the Switch at DC & DR,
the selected bidder need to support in doing the necessary technical
changes if any in their network for routing the network traffic to Banks
DC / DR.
8 9 3 The arrangement is proposed for a period of 5 (five)
years and after completion of 5 years, Bank shall at its
sole discretion exercise its right to continue on
mutually agreed terms
We understand that 5 years contract term starts from go live
of last CD. Request Bank to kindly confirm
5 year terms starts from the date of acceptance of purchase order which
is the effective date as per RFP term clause 32
9 9 Scope of
work,
hardware and
software
requirements
Bank shall notify the sites for deployment of caretaker
and its shifts.
Would the bidder need to include the caretaker charges
within its pricing? Or can the Bank pay for the same at actuals.
If the bidder has to pay, for which all sites should caretaker be
considered?
Bank shall identify the site where caretaker is to be deployed. The
transaction charges shall be paid accordingly, as per agreed terms and
conditions. Bank shall not pay any caretaker charges
10 10 4 The bidder to customize and deploy the display
screens in CDs
Whether Bank is expecting bidder to design and customize the
screens or just deploy the screens developed by bank?
Bidder shall deploy the screens developed by Bank
11 10 4 Loading of TMKs We suggest to supply the TMKs to Service providers on
request instead of bank officials involving in the process of
loading TMKs
Shall be finalised with successful bidder
12 10 Clause 10:
Installation
The CD supplied by the Bidder should support Bio-
metric functions ….. not limited to OS hardening,
Password management, disabling of USB port, anti
virus updation , to protect any attempt by outsider
from unauthorized access to CD.
Request Bank to state the Password management
requirement clearly so that we can scope the same in the
offer
To ensure adequate control over logical access of ATMs bidder to
implement centralised password management system for admin and
bios password also. Bidder is to disable USB ports
13 11 4 Related parties cannot submit bids. In case they do so
both/all bids submitted by related parties are liable to
be rejected at any stage.
Request the bank to clarify the definition of Related Party In the following circumstances bank will have discretion to reject the
entire bid or accept the bid with some conditions stipulated by bank.
1 Bid submitted by holding company and its subsidiary
2 Bids submitted by one or more companies having common director/s
3 Bids submitted by one or more partnership firms / LLPs having
common partners
4 Bids submitted by one or more companies in the same group of
promoters / management
5 Any other bid in the sole discretion of the bank is in the nature of
multiple bids.
Related parties cannot submit bids. In case they do so both/all bids
submitted by related parties are liable to be rejected at any stage.
Page 2 of 30
Bank of Baroda Transaction Banking Department14 11 5 Bidder should have a prior experience of installing and
maintaining at-least 500 ATMs for a minimum period
of one year as on as on date of RFP in India under total
outsourcing plan ( OPEX in transaction pricing method)
Bidder has deployed and mainitianing more than 10,000 CDs
and CDMs and Cash Recyclers for SBI and its assoicate bank
under CAPEX model. BIdder has significant experience in
deploying, installing and maintaining ATMs across India.
Bidder is also the largest Cash Management company in India.
In this regard, we request the bank to please change this
clause to "Bidder should have a prior experience of installing
and maintaining at-least 500 ATMs for a minimum period of
one year as on as on date of RFP "
RFP term remain unchanged
15 11 5. Eligibility
Criteria
Bidder should have a prior experience of installing and
maintaining at-least 500 ATMs for a minimum period
of one year as on as on date of RFP in India under total
outsourcing plan ( OPEX in transaction pricing method)
Bidder should have a Managed Service Center
operational in India and must be performing managed
services of ATMs including but not limited to 24 X 7
monitoring, call escalation, FLM, SLM, replacing
consumables, housekeeping, EJ pulling, cash
forecasting and cash replenishment etc for atleast 500
ATMs as on date of RFP
Request the Bank to amend this clause as Bidder/ OEM's
authorized agent/ Consortium should have a prior experience
of installing and maintaining at-least 500 ATMs as on date of
this RFP in India under total outsourcing plan ( OPEX in
transaction pricing method)
Bidder/ OEM's authorized agent/ Consortium hould have a
Managed Service Center operational in India and must be
performing managed services of ATMs including but not
limited to 24 X 7 monitoring, call escalation, FLM, SLM,
replacing consumables, housekeeping, EJ pulling, cash
forecasting and cash replenishment etc for atleast 500 ATMs
as on date of RFP.
Bank may look at stipulating Teaming Agreements to be
submitted at the time of RFP submission by the consortium
players.
RFP Terms remain unchanged
16 11 Point 5 Bidder Should have a prior experience of installing and
maintaining at least 500 ATMs for a minimum period
of one year as on date of RFP in India under total
outsourcing plan(OPEX in transaction pricing method)
Bidder should have experience of managing more than 500
ATM's as on date of RFP OR the bank should consider
consortium partnership with established companies
RFP Terms remain unchanged
17 11 Point 5 Bidder Should have Managed Service Centre
operational in India and must be performing managed
services of ATM's in cluding but not limited to 24X7
monitoring,call escalation, FLM,SLM,replacing
consumables,housekeeping,EJ pulling,Cash forecasting
and Cash replenishment etc for atleast 500 ATM's as
on date of RFP
Bidder should be allowed to form a teaming arrangement
with an established service provider managing more than
10,000 ATM's for EJ Pulling and ATM monitoring as the
balance activities mentioned in the criteria is done by us for
more than 18,000 ATM's as on date for the last 13 years.
RFP Terms remain unchanged
18 13 10 The bidder shall furnish Earnest Money Deposit (EMD)
of Rs.25,00,000/-(Rupees Fifty Lakhs only) by way of
irrevocable Bank Guarantee/ Bank Draft issued by
scheduled bank in favour of Bank of Baroda
The EMD deposit amount specified in words and figure is
mismatched. Considering the repeated use of Rs. 25 lacs in
figures in the RFP, the EMD to be furnished is taken as Rs. 25
lacs. Please confirm.
The bidder shall furnish Earnest Money Deposit (EMD) of Rs.25,00,000/-
(Rupees Twenty five Lakhs only) by way of irrevocable Bank Guarantee/
Bank Draft issued by scheduled bank in favour of Bank of Baroda. No
interest is payable on EMD. In Case the EMD is submitted in the form of
Irrevocable Bank Guarantee the same is to be issued by First Class
Scheduled Bank in India for Rs.25 Lakhs with validity for a minimum
period of 6 months inclusive of the claim period from the last date for
submission of offer.
Page 3 of 30
Bank of Baroda Transaction Banking Department19 15 J Audited financial statements ( Balance Sheet and
Profit & Loss Account) for the last 3 year.
As per Government Norms, there is a statuatory period
available to file Audited Balance sheet till September 2015,
hence request bank to accept provisional balance sheet for
the last financial year 2014-15 and audited balance sheet for
2012-13 and 2013-14.
If last year audited balance sheed is not yet finalised, bidder can submit
provisional balance sheed duly certified by Charterrred Accountant
20 18 15 In respect of onsite CDs the rates will be 70% of rates
quoted for offsite CDs of respective category (with
caretaker / without caretaker).
As per industry standards, for Onsite CDs the electricity is paid
by the Bank as the site is owned by the Bank. However if the
bank insists that electricity is payable by the vendor, then
Onsite CD requires all the cost except for rental. Considering
that rental alone will not be 30% of the overall cost for Offsite
CDs requests the bank to consider 85% of rates quoted for
Offsite CD for Onsite CD.
in case of onsite CD, the electricity cost shall be borne by Bank
21 18 15 The bidder who has quoted the lowest cost will be
arrived based on the Rates quoted for the financial
transactions in offsite CDs as per commercial bid.
We presume the "Rates Quoted" referred is the per
transaction rate. Request the bank to clarify.
Please clarify the scenario where one bidder has quoted
lowest in one category and another bidder has quoted lowest
in other category, considering there are four categories (with
and without caretaker services)
We clarify thatTotal Monthly payout arrived as per Table 1 of the
Commercial Bid ( Annexure K) shall be used to determine L1, L2, L3.
22 19 20 Project Completion period Successful bidder & Bank need to jointly discuss the scope,
challenges, technical integration, NW connectivity etc. after
declaration of the bidder. This may take a minimum period of
2-3 months.
Therefore, request the bank to consider at least 12 months
from the date of signing of SLA
RFP Terms remain unchanged
23 19 20 Effective date of Purchase Order: Request Bank to
confirm the purchase order will be issued for all
allocated sites all in one go or shall be given in piece
meal.
Suggest Bank to provide the PO for all location in one go in
order for better planning and logistics arranagement
Bank would give purchase order containing terms and conditions and
total number of deployments. Bank would provide list of locations where
CDs are to be installed subsequently based on requirement.
24 19 Completion
Period
Upon acceptance of the site by Bank, the bidder shall
install the CD within 2 months of the acceptance by
Bank.
Installation period should be 3 months for offsite and 2
months for onsite from the date of Bank approval for offsite
location and release of site order for onsite post readiness
RFP Terms remain unchanged
Page 4 of 30
Bank of Baroda Transaction Banking Department25 19 Completion
Period
Time is the essence of the Contract. Time Period for
delivery, installation, configuration, commissioning
and acceptance shall also be indicated separately by
the bidder and the same shall also be firm and binding.
The successful bidders shall co-ordinate all the
activities relating to implementation of END TO END
DEPLOYMENT OF CASH DISPENSERS INCLUSIVE OF
MANAGED SERVICES & TIS UNDER OPEX MODEL
within the scope. Such facilities and activities shall be
specifically listed out by the Bidders at the time of
submission of the tender in the technical proposal.
Acceptance of site/location in case of OFF site CDs and
location details in case of ON site CDs will be provided
by the Bank. Upon acceptance of the site by Bank, the
bidder shall install the CD within 2 months of the
acceptance by Bank.
The successful bidder is also required to comply the
following time schedule
• 20% of the installations within 2 months from the
effective date.
• 50% of the installations within 4 months from the
effective date.
• 100% within 6 months from the effective date.
The effective date will be from the date of acceptance
of the purchase order and the purchase order is to be
accepted by the selected bidders within 7 days from
the date of purchase order invariably, else the bank
shall treat that the date of acceptance as the 7th day
from date of order for all purposes.
The delay in implementation will attract penalty
/Liquidated Damages as per Terms & Conditions
(clause 53)
Request the Bank to indicate the penalty considerations for
delayed installation as this is not mentioned either in clause
20 or in clause 53.1
Time is the essence of the Contract. Time Period for delivery, installation,
configuration, commissioning and acceptance shall also be indicated
separately by the bidder and the same shall also be firm and binding.
The successful bidders shall co-ordinate all the activities relating to
implementation of END TO END DEPLOYMENT OF CASH DISPENSERS
INCLUSIVE OF MANAGED SERVICES & TIS UNDER OPEX MODEL within
the scope. Such facilities and activities shall be specifically listed out by
the Bidders at the time of submission of the tender in the technical
proposal.
Acceptance of site/location in case of OFF site CDs and location details in
case of ON site CDs will be provided by the Bank. Upon acceptance of the
site by Bank, the bidder shall install the CD within 2 months of the
acceptance by Bank.
The successful bidder is also required to comply the following time
schedule
• 20% of the installations within 2 months from the effective date.
• 50% of the installations within 4 months from the effective date.
• 100% within 6 months from the effective date.
The effective date will be from the date of acceptance of the purchase
order and the purchase order is to be accepted by the selected bidders
within 7 days from the date of purchase order invariably, else the bank
shall treat that the date of acceptance as the 7th day from date of order
for all purposes.
The delay in implementation will attract penalty /Liquidated Damages as
per Terms & Conditions (clause 53.1)
26 20 21 The payments to the bidder will be made on monthly
basis in arrears on aggregated basis by the Bank
centrally after submission of invoices along with the
monthly downtime reports, after deducting applicable
LD if any.
Request bank to provide payment within 7 days after the
invoice submission.
RFP Terms remain unchanged
27 21 20 The payments to the bidder will be made on monthly
basis in arrears on aggregated basis by the Bank
centrally after submission of invoices along with the
monthly downtime reports, after deducting applicable
LD if any.
1. We request bank to share the transaction data on daily
basis
2.What will be the course of action in case the payment is
delayed by bank despite all necessary document and details
submitted by MSP. Would bank be paying pre-defined interest
on the delayed payment
RFP Terms remain unchanged
28 21 20 Bank will check the report submitted by the vendor
with the reports from the Switch / other monitoring
tool and any discrepancy the reports from the Bank
will be final.
We request bank to allow representation by MSP before
concluding banks report as final
RFP Terms remain unchanged
Page 5 of 30
Bank of Baroda Transaction Banking Department29 21 23 Security deposit if submitted in the form of
Performance Bank Guarantee, the guarantee period
should be for entire contract period with additional
claim period of 12 months i.e. 72 months from the
effective date
Request to modify the guarantee period for the entire
contract period + 12 months on a year on year basis, from
effective date.
RFP Terms remain unchanged
30 21 Point 23 The succesful bidders should submit a security deposit
by way of Fixed Deposit/Performance Guarantee
issued by scheduled commercial Bank in India, for Rs
50,000/- per Cash Dispenser in advance
The Bank should consider a Guarantee of Rs 25,000 per cash
dispenser
RFP Terms remain unchanged
31 21 Security
Deposit /
Performance
Bank
Gaurantee
The Security Deposit/ Performance bank guarantee for
the entire order should be submitted within fifteen
working days from the date of receipt of the order.
We suggest that the clause be changed to "The Security
Deposit/ Performance bank guarantee for the entire order
should be submitted within fifteen working days from the
date of Signinig of Contract" as BG process can be initiated
with issuing bank only after contract is signed.
RFP Terms remain unchanged
32 24 32 Within 21 days from the date of acceptance of the
Order, the selected bidder shall sign a stamped SLA
with the Bank
Request to modify as below:
"Within 21 days from the date of acceptance of the Order, the
selected bidder shall sign a stamped SLA with the Bank on
mutually agreed terms and conditions."
Negotiation rights of bidder is silent in the RFP.
RFP Terms remain unchanged
33 24 32 The purchase order is to be accepted by the selected
bidders within 7 days from the date of purchase order
invariably, else the bank shall treat that the date of
acceptance as the 7th day from date of order for all
purposes.
Within 21 days from the date of acceptance of the
Order, the selected bidder shall sign a stamped SLA
with the Bank.
The SLA shall come into effect from the date of
acceptance of the purchase order.
We presume that the "effective date" mentioned in this
clause and throughout the RFP is the date of acceptance of
offer as mentioned in this clause. From the SLA perspective,
we request that the effective date of the contract can be from
the date of installation of going live with the first ATM and
continue up to 5 years from the date of go-live of the last
ATM.
RFP Terms remain unchanged
34 24 33 Price quoted by the bidder shall be inclusive of all
taxes except service tax.
We request the Bank to also reimburse any tax introduced in
lieu of Service Tax or any new tax regime introduced which is
outside the bidder’s control. Also request that Bank to
reimburse the Octroi charges, if any at actuals
RFP Terms remain unchanged
35 25 21 "Proposal Ownership: The proposal and all supporting
documentation submitted by the bidder shall become
the property of the Bank."
The BIDDER requests that the BID including the pricing details
shared by the BIDDER to be treated as proprietary and
confidential information of the BIDDER.
RFP Terms remain unchanged
36 25 36 Right to alter quantities Request to specify the minimum quantity to arrive at a
competitive bid.
RFP Terms remain unchanged
37 25 37 "AWARD OF CONTRACT" The BIDDER requests that the terms and conditions of the
contract to be based on the mutual discussion between the
parties.
RFP Terms remain unchanged
Page 6 of 30
Bank of Baroda Transaction Banking Department38 25 36. RIGHT TO
ALTER
QUANTITIES /
LOCATION
In the event of changes in plans of the Bank, bidders
performance or any other reason, Bank at its sole
discretion may change the allocation of zones /
quantities of CD as follows:
We request Bank to consider changes in clause, once the CD is
out of warehouse, change of location can’t be accepted, If at
all Bank still requires to change the location then such
changes shall be at the cost of the Bank and timelines for
delivery shall not be applicable for such CDs.
RFP Terms remain unchanged
39 26 39 The Bank reserves its right to cancel the entire /
unexecuted part of Purchase Order at any time by
assigning appropriate reasons in the event of one or
more of the following conditions:
Delay in Implementation of the Project beyond the
specified periods.
Non satisfactory performance of the Project during
implementation.
Failure to integrate / implement the project as per
the requirements of the Bank.
Serious discrepancies noted in the implementation
of the project
Breaches in the terms and conditions of the Order.
Non satisfactory performance of the Project in terms
of affecting the Core Systems of the Bank or the Core
Business of the Bank and the functioning of the
Branches/Offices of the Bank.
Request to modify as below:
"The Bank reserves its right to cancel the entire / unexecuted
part of Purchase Order at any time by assigning appropriate
reasons in the event of one or more of the following
conditions:
Delay in Implementation of the Project beyond the specified
periods.
Non adherence to agreed SLA terms during performance
of the Project during implementation.
Failure to integrate / implement the project as per the
requirements of the Bank as per agreed SLA terms .
Serious discrepancies noted in the implementation of the
project
Breaches in the terms and conditions of the Order.
Non adherence to the agreed SLA terms affecting the
Core Systems of the Bank or the Core Business of the Bank and
the functioning of the Branches/Offices of the Bank.
Any delay or failure to meet the obligations by the bidder due
to a reason attributable to bank shall not be considered as
grounds for termination/cancellation of order"
satisfactory is a relative term, hence request for specification.
RFP Terms remain unchanged
40 26 39 The Bank reserves its right to cancel the entire /
unexecuted part of Purchase Order at any time by
assigning appropriate reasons
Bidders will incur significant investments for procuring ATMs/
assets/ site sourcing/ site preparation and operationalizing
the ATMs and will face severe losses in case the contract is
terminated by the Bank mid way. We request the Bank to
provide a minimum tenure of five (5) years for the contract
and not terminate for convenience.
RFP Terms remain unchanged
41 26 40 LOCAL SUPPORT We assume that by local support bank means functioning of
ATM 24X7X365 with support of central monitoring setup
Local support means availability of engineer / other resources as per the
requirement immediately, locally
Page 7 of 30
Bank of Baroda Transaction Banking Department42 26 41 The successful bidder’s aggregate liability in
connection with obligations undertaken as a part of
this Project whether arising under this project
regardless of the form or nature of the action giving
rise to such liability (whether in contract, tort or
otherwise), shall be actual.
The successful bidder liability in case of claims against
the bank resulting from its willful misconduct or gross
negligence, loss suffered by bank due to damage to
real or tangible or intangible property by successful
bidder , its employees and/ or subcontractors or loss
suffered by bank due to infringement of patents,
trademarks, copyrights or such other Intellectual
Property Rights or breach of confidentiality obligations
shall be unlimited.
Request the bank to limit the liability of the bidder to 20% of
the contract value.
RFP Terms remain unchanged
43 26 41 "Indemnity: The selected bidder shall keep and hold
the Bank indemnified and harmless from time to time
and at all times against all actions, proceedings,
claims, suits, liabilities (including statutory liability),
penalties, demands, charges, costs (including legal
costs) and expenses, damages, losses and any other
expenses which may be caused to or suffered by or
made or taken against the Bank arising out of: (i) The
breach, default or non-performance of undertakings,
warranties, covenants or obligations by the bidder; (ii)
Any contravention or Non compliance with any
applicable laws, regulations, rules, statutory or legal
requirements by the bidder; Further, the bidder shall
indemnify, protect and save the Bank against all
claims, losses, costs, damages, expenses, action suits
and other proceedings, resulting from infringement of
any law pertaining to patent, trademarks, copyrights
etc. or such other statutory infringements, losses
incurred due to malfunctioning / negligence of the
bidder in respect of CD and other related equipments
by them."
BIDDER would like to clarify that BIDDER is willing to
indemnify only for any breach of any intellectual property of
products as delivered by BIDDER provided such breach of IPR
is solely caused by any act or omission of the BIDDER.
Further, the BIDDER would like to clarify that its
indemnification obligation will be limited to direct claim
amount finally awarded by the court of law and subject to the
Bank: (i) notifies the BIDDER immediately after the claim is
asserted or threatened, (ii) BIDDER has full control over the
defense, settlement or other resolution of the claim, (iii) Bank
does not take a position that is adverse to BIDDER, (iv) at
BIDDER's request, Bank assists the BIDDER in defending,
settling or otherwise resolving the claim, and (v) there is no
modification to the Services without the written authorization
of the BIDDER.
RFP Terms remain unchanged
44 26 39. Order
Cancellation
The Bank reserves its right to cancel the entire /
unexecuted part of Purchase Order at any time by
assigning appropriate reasons.
Any order for the CD which is raised by the Bank and accepted
by the Bidder cannot be cancel, we request bank to accept the
change.
RFP Terms remain unchanged
Page 8 of 30
Bank of Baroda Transaction Banking Department45 26 41. Indemnity Under no circumstances Bank shall be liable to the
successful bidder for direct, indirect, incidental,
consequential, special or exemplary damages arising
from termination of this Agreement, even if Bank has
been advised of the possibility of such damages, such
as, but not limited to, loss of revenue or anticipated
profits or lost business.
The Bank shall also indemnify the Bidder for the following:
1. Any death/ injury or damage to any person or property
of the personnel of Bidder while on the premises of the Bank
2. Indemnity for the breach of IPR by the Bank.
Unauthorized modification, copying of the software, using the
same software on more than one hardware.
RFP Terms remain unchanged
46 27 41 All indemnities shall survive notwithstanding expiry or
termination of the contract and bidder shall continue
to be liable under the indemnities.
Request to modify as follows:
"All indemnities shall survive notwithstanding expiry or
termination of the contract and bidder shall continue to be
liable under the indemnities for a further period of 1 (one)
year ."
RFP Terms remain unchanged
47 27 41 Limitation of Liability
The successful bidder’s aggregate liability in
connection with obligations undertaken as a part of
this Project whether arising under this project
regardless of the form or nature of the action giving
rise to such liability (whether in contract, tort or
otherwise), shall be actual.
The successful bidder liability in case of claims against
the bank resulting from its willful misconduct or gross
negligence, loss suffered by bank due to damage to
real or tangible or intangible property by successful
bidder , its employees and/ or subcontractors or loss
suffered by bank due to infringement of patents,
trademarks, copyrights or such other Intellectual
Property Rights or breach of confidentiality obligations
shall be unlimited.
Under no circumstances Bank shall be liable to the
successful bidder for direct, indirect, incidental,
consequential, special or exemplary damages arising
from termination of this Agreement, even if Bank has
been advised of the possibility of such damages, such
as, but not limited to, loss of revenue or anticipated
profits or lost business
Request to modify as below:
"The successful bidder’s aggregate liability in connection with
obligations undertaken as a part of this Project whether
arising under this project regardless of the form or nature of
the action giving rise to such liability (whether in contract, tort
or otherwise), shall be limited to 10% of the total annual
contract value"
"The liability of either party in case of claims against the
other party r esulting from its willful misconduct or gross
negligence, loss suffered by bank due to damage to real or
tangible or intangible property by successful bidder , its
employees and/ or subcontractors or loss suffered by bank
due to infringement of patents, trademarks, copyrights or
such other Intellectual Property Rights or breach of
confidentiality obligations shall be unlimited."
"Under no circumstances either party hall be liable to the
successful bidder for direct, indirect, incidental, consequential,
special or exemplary damages arising from termination of this
Agreement, even if Bank has been advised of the possibility of
such damages, such as, but not limited to, loss of revenue or
anticipated profits or lost business."
Indemnification of bidder for above situations is silent in RFP.
RFP Terms remain unchanged
Page 9 of 30
Bank of Baroda Transaction Banking Department48 27 43 "Assignment: The vendors shall not assign to any one,
in whole or in part, it’s obligations to perform under
the RFP/contract, except with the Bank’s written
consent. If the Bank undergoes a merger,
amalgamation, take-over, consolidation,
reconstruction, change of ownership etc., this RFP
shall be considered to be assigned to the new entity
and such an act shall not affect the rights of the
Vendor under this RFP."
The BIDDER requests to include its right to engage third party
vendors in connection with its performance of contract (as
and when required). Further, the right to assign in favour of
affiliate companies / in the event of corporate transaction to
be made mutual.
RFP Terms remain unchanged
49 27 41. Indemnity The successful bidder liability in case of claims against
the bank resulting from its willful misconduct or gross
negligence, loss suffered by bank due to damage to
real or tangible or intangible property by successful
bidder , its employees and/ or subcontractors or loss
suffered by bank due to infringement of patents,
trademarks, copyrights or such other Intellectual
Property Rights or breach of confidentiality obligations
shall be unlimited
Unlimited liability shall be only in case of Willfull misconduct
and breach of Intellectual Property Rights.
RFP Terms remain unchanged
50 27 Limitation of Liability We request the bank to cap the liability limit RFP Terms remain unchanged
51 28 45 Within 21 days from the date of acceptance of the
Order by the selected Bidder, the selected bidder shall
sign a stamped SLA with the Bank at the time, place
and in the format prescribed by the Bank. Failure to
execute the SLA makes the EMD liable for forfeiture at
the discretion of the Bank and also rejection of the
selected Bidder.
Request to modify as below:
"Within 21 days from the date of acceptance of the Order by
the selected Bidder, the selected bidder shall sign a stamped
SLA with the Bank on mutually agreed terms and conditions.
Failure to execute the SLA makes the EMD liable for forfeiture
at the discretion of the Bank and also rejection of the selected
Bidder."
Negotiation rights for the bidder is silent in the RFP.
RFP Terms remain unchanged
52 28 45 "EXECUTION OF AGREEMENT:
Within 21 days from the date of acceptance of the
Order by the selected Bidder, the selected bidder shall
sign a stamped SLA with the Bank at the time, place
and in the format prescribed by the Bank. Failure to
execute the SLA makes the EMD liable for forfeiture at
the discretion of the Bank and also rejection of the
selected Bidder."
The BIDDER request that the execution of mutually agreed
contract to be completed within a reasonable period time, say
45 days. 21 days period is too short for contract closure.
Format for the SLA shall be mutually agreed and discussed
upon. Clauses shall be mutually agreed upon.
RFP Terms remain unchanged
53 28 Point49 No Escalation in price is permitted for any reason
whatsoever. Prices quoted must be firm till the
completion of the contract including warrantt period
The Bank should consider at least a 10% increase in prices
after completion of 3 years
RFP Terms remain unchanged
54 29 51 Cash out We request bank to exclude the “Cash Out” on account “Less
Cash” provided by bank or there is no access during night
hours / on holidays for onsite locations.
Bank may consider relaxing the penalty where less cash is provided by
Bank against indent. All other scenerio bidder to provide for adequate
cash.
Page 10 of 30
Bank of Baroda Transaction Banking Department55 29 51 Installation of CD Delivery Channel is of critical
importance for the Bank and therefore, it requires an
uptime of minimum of 96% for Metro and Urban areas
and 95% for Semi-Urban and Rural areas (excluding
the first three calendar months in which the CD is
installed) is expected after taking into account the
following exclusions
In addition to the exclusions provided by the Bank, request to
include the mass network downtime during monsoon/ force
majeure situations under the exceptions for uptime guarantee
RFP Terms remain unchanged
56 29 51 it requires an uptime of minimum of 96% for Metro
and Urban areas and 95% for Semi-Urban and Rural
areas (excluding the first three calendar months in
which the CD is installed)
We recommend following uptimes: 95% for Metro and urban
areas & 94% for semi-urban and rural areas
RFP Terms remain unchanged
57 29 51 Power failure above 8 hours. The downtime exclusion provided by Bank for power outage is
beyond 8 hours. However, under 'Power conditioning
equipments' in page 78 of the RFP document, the Bank has
sought 2 KVA UPS with battery back-up for 4 hours. Request
the Bank to clarify
2 KVA UPS is minimum, Bidder may install UPS of higher capacity
58 29 51 Uptime Guarantee We request Bank Following points to be included in the
exclusion list.
1. Vandalism, including Glue applied on the pin pad and
function keys.
2. Downtime due to government related outages like
road/electrical/digging work done in the area.
Shutting down of ATM/shutter being pulled down in sensitive
areas due to security issues in the night.
Following points are included in exclusion list for calcualtion of uptime :
1. Vandalism, including Glue applied on the pin pad and function keys.
2. Downtime due to government related outages like
road/electrical/digging work done in the area.
3.Shutting down of ATM/shutter being pulled down in sensitive areas
due to security issues in the night.
4. Bank dependant outage in switch, core banking, bank managed
network in onsite CD
59 29 52 Failure to ensure minimum availability (post applicable
exclusions for Downtime) per CD calculated on
monthly basis
Request the Bank to cap the penalty at 10% RFP Terms remain unchanged
60 29 52 Failure to ensure minimum availability (post applicable
exclusions for Downtime) per CD calculated on
monthly basis
Since the availability is calculated at per CD level, request that
the penalty be also applicable at CD level
RFP Terms remain unchanged
61 29 52 PENALTY FOR NON MAINTENANCE OF UP-TIME Penalty proposed by bank is very high. Considering the fact
that all investment will be done by the MSP and maintaining
the uptime is in more interest of MSP, penalty on down time
are unwarranted and only adds to transaction loss which MSP
will incur due to down time
RFP Terms remain unchanged
62 29 52.Uptime
Penalty clause
There is no distinction in Penalty clause based on
availability of Overnight Vaulting Facility (OVF).
Request Bank to consider partial exemption in Penalty
for Metro/ Urban ATMs without OVF facility.
OVF will ensure that the ATMs are timely loaded with
minimized downtime due to Cash unavailability. Cases, where
the OVF would not be available, Bidder should be given
exemption in Penalty to ensure operational cost optimization
RFP Terms remain unchanged
63 29 Point 29 Penalty for Non Maintenence of Up- time The penalties are on the higher side and we propose it to as
mentioned below
RFP Terms remain unchanged
Page 11 of 30
Bank of Baroda Transaction Banking Department64 30 53 In case the bidder fails to comply with the time
schedule as per clause 20 on account of factors
attributable to the bidder, Bank may take following
action as a part of penalty:
Cancel unexecuted orders of defaulting bidder and
transfer the same to other bidder.
Terminate the contract.
All the above penalties are independent of each
other and are applicable separately and concurrently.
Above penalty is not applicable for the reasons
attributable to the Bank and Force Majeure.
Request to modify as below:
"In case the bidder fails to comply with the time schedule ,
including extensions if any, as per clause 20 on account of
factors attributable to the bidder, Bank may take following
action as a part of penalty:
Cancel unexecuted orders of defaulting bidder and transfer
the same to other bidder.
Terminate the contract.
All the above penalties are independent of each other and
are applicable separately and concurrently.
Above penalty is not applicable for the reasons attributable
to the Bank and Force Majeure.
The overall penalty chargeable in accordance with the terms
of this RFP shall be limited to 10% of the total annual
contract value "
RFP Terms remain unchanged
65 30 53.2 If the successful bidder fails to complete the due
performance as per this Agreement, bank reserves the
right to terminate the contract and recover Liquidated
Damages 10 % of contract value.
Request to modify as below:
"If the successful bidder fails to complete the due
performance as per this Agreement, bank reserves the right to
terminate the contract and recover Liquidated Damages 10 %
of total annual contract value."
RFP Terms remain unchanged
66 30 53.2 Liquidated Damages Bank has stipulated 10% of order value as penalty for non
performance. Such a penalty is very high and unsustainable to
any SP. Hence, request the bank to suggest an alternate
method like 500 per month for delay
RFP Terms remain unchanged
67 30 54 Cash Forecasting/indenting Request the bank to add a clause for loss of transactions due
to unavailability or limited cash provided by nodal branch, the
bidder must be allowed to bill for the opportunity loss for that
period/day.
RFP Terms remain unchanged
68 30 54 CASH FORECASTING We request bank to omit the cash out penalty as this would
only add to loss. Also all denomination out to be considered
as cash out
RFP Terms remain unchanged
69 30 53.2
Liquidated
Damages
The decision taken by BOB in this regard shall be final
and Service Provider shall not dispute the same
We request Bank to consider the clause, In case the Bidder is
able to prove that the Bidder is not responsible then the Bank
shall not be entitled to levy penalties and claim liquidated
damages.
RFP Terms remain unchanged
Page 12 of 30
Bank of Baroda Transaction Banking Department70 30 53.2
Liquidated
Damages
If the successful bidder fails to perform its obligation
as per this Agreement then bank reserves the right to
get the balance work executed by another service
provider as per choice of bank and successful bidder
shall be liable to bear the expenditure which bank may
incur for the execution of balance work and its
completion.
In case the Bank terminates for any reason what so ever, the
Bidder shall only support in migration of the CDs. The Bidder
shall not be liable for any other cost/ expenditure incur by the
Bank in appointing, executing the Contract with another
vendor
RFP Terms remain unchanged
71 31 54 Cash forecasting:If switch receive currency out
message in respect of all configured / present
cassettes in the machine.
1. Based on the switch cash out message, we cannot accept
any cash out penalty. We can accept the penalty on balance
left in the ATM which is less than & equal to Rs 25000 and
ATM is not dispensing.
Cash out will include either of the following situations for the purpose of
imposing penalty:
1.Cash balance is less than Rs.25,000 as per switch / monitoring system
report
2. If switch receive currency out message from all configured / present
cassettes in the machine at any time (need not be simultaneous) during
two consecutive cash loadings.
72 31 54 CD / ATM is out of any denomination 2. Cash out should be accepted where Total Balance is more
less than 25000 and ATM is not dispensing, but denomination
wise cassette out cannot be accepted . Bank to ensure to
provide require denomination as per the ident for the
loadings to be carried out as per the agreement and to avoid
cash outs.
The clause of CD / ATM is out of any denomination for cash out is
removed
73 31 54 The bidders forecasting shall ensure that adequate
cash is loaded during weekends/continuous
holidays/festivals etc. The bidder shall ensure
maximum cost benefit to the Bank.
Is bank providing us any target on CER? This needs to be
checked because accordingly our loading runs will be planned.
It is clarified that the vendor is to make utmost efforts to ensure
optimum cash is loaded in Cash Dispensers and ensure maximum cost
benefit to the Bank.
74 31 54 For cash out of CDs a penalty of Rs 1,000/- per
instance / per day will be levied
Request the Bank to exclude the condition of Bank not being
in a position to provide the cash as per the denomination
indented by the MSP from the penalty calculation
RFP Terms remain unchanged
75 31 54 The bidders forecasting shall ensure that the ATMs are
not deficient of cash at any point of time except in
case of force majeure situations. For cash out of CDs a
penalty of Rs 1,000/- per instance / per day will be
levied
Penalty for cashout of Rs.1,000/- per instance is way high.
Request the bank to reduce it to Rs.500/- per instance. Also
link branch is required to provide cash to CRA as per indent in
a timely manner else the penalty should not be imposed
RFP Terms remain unchanged
76 31 55 In case counterfeit currency is dispensed from CD, the
responsibility will be of the vendor and penalty of Rs
10000/- per instance would be levied.
The cash management services are subcontracted to CRA
vendors and the bidder always try to acertain by the means of
audits that the processess are not breached, request the bank
to have a nominal penalty for this.
RFP Terms remain unchanged
Page 13 of 30
Bank of Baroda Transaction Banking Department77 31 55 Bank has adopted clean note policy as per RBI
directives i.e. the note packets are not stapled or
stitched and instead sorted and banded horizontally.
As such while receiving the cash the Successful Bidder
would count the currency notes and ensure that there
is no fake currency note in the packet in the Bank’s
premises itself. Bank will not provide any
infrastructure in the Banks Premises to check fake
currency. Bidder should ensure correctness,
genuineness of the cash and shall take the CD fit
currency notes to its possession. Once the note
packets are taken out of Bank’s premises the Bidder
would be responsible for shortage and fake currency if
any, noticed subsequently. In case counterfeit
currency is dispensed from CD, the responsibility will
be of the vendor and penalty of Rs 10000/- per
instance would be levied.
Bank is supposed to provide sorted cash to CRA and Bank
should provide required space for CRA to check all cash in
atm. We can ask CRA to do the sorting of cash in Branch
permises, Bank has to provide required space and
infrastructure to check and count all notes .
RFP Terms remain unchanged
78 31 55 The insurance shall be on amount equal to 100% of
the total value of equipments on “all risks” basis,
including war risks and theft and robbery clauses, valid
for a period up to the contract period. The bidder /
vendor should ensure that the entire cash of the Bank
handled by it , in transit, in vault and in CD is
adequately insured with the bank as beneficiary and
Loss Payee endorsement in favour of the Bank. Copy
of the insurance should be submitted to the Bank.
Insurance value should be as per the actual value of
cash being handled at each vault location and or in
transit. In case of any loss/cash loss, the bidder should
reimburse the loss amount to the Bank within five
days of the loss, without waiting for settlement of
Insurance claim. The cost of premium for such
insurance shall be borne by the bidder / vendor
Bidder / Vendor shall maintain, at their expenses
insurance cover for the deliverables including CDs and
accessories, UPS and other infrastructure deployed at
the site. Vendor shall maintain at their expense such
insurance as will fully protect it from any claims for
damage for bodily injury, including death or for
property damage that may arise from operations
under this project. Though the Bank has a right to
demand Vendor to produce certificate of insurance or
self-insurance for Banks inspection, it shall not create
CRA will ensure about Cash In Transit and Cash in Vault
insurance, But we need to take care on Insurance of Cash in
ATM/CD which will be aditional cost which need to be
included in the Cash management cost .
RFP Terms remain unchanged
79 31 55 CLEAN NOTE POLICY Penalty proposed by bank is very high. Penalty, if any to be
levied only post proper investigation and proof available with
bank
RFP Terms remain unchanged
Page 14 of 30
Bank of Baroda Transaction Banking Department80 31 55 the responsibility will be of the vendor and penalty of
Rs 10000/- per instance would be levied.
It is difficult to identify Fake note during cash withdrawal.
Customer who has withdrawn cash and found suspect / fake
note has to be captured in CCTV else MSP / CRA is not liable
for losses and penalty.
RFP Terms remain unchanged
81 31 56 The bidder / vendor should ensure that the entire cash
of the Bank handled by it , in transit, in vault and in CD
is adequately insured with the bank as beneficiary and
Loss Payee endorsement in favour of the Bank.
Vendor is required to reimburse the bank without waiting for
settlement of Insurance claim. Therefore, keeping Bank as the
beneficiary is not be required.Also, we take an umbreall policy
that covers all of our customers
so its administratively difficult to have a specific policy having
bank as the beneficiary
Before settling the amount, there will be a minimum
formalities to be completed which may at least take a month.
So, request the bank to amend this to 30 days
RFP Terms remain unchanged
82 31 56 INSURANCE Bank will be made loss payee only for the insurance pertaining
to cash i.e Cash in ATM/Cash in Transit/ Cash in Vault. For the
equipment and site the loss payee will be MSP
RFP Terms remain unchanged
83 31 55. Clean note
policy
As such while receiving the cash the Successful Bidder
would count the currency notes and ensure that there
is no fake currency note in the packet in the Bank’s
premises itself. Bank will not provide any
infrastructure in the Banks Premises to check fake
currency. Bidder should ensure correctness,
genuineness of the cash and shall take the CD fit
currency notes to its possession.
In case any verification is required to be done by the Vendor
for any fake/ forged note/ shortage then the Bank shall be
required for provide the note sorting machine. For vendor its
not possible to carry the note sorting machines to bank
premises.
RFP Terms remain unchanged
84 31 Insurance In case of any loss/cash loss, the bidder should
reimburse the loss amount to the Bank within five
days of the loss, without waiting for settlement of
Insurance claim.
We request bank to increase the timeline for reimburesment
to 7 days.
RFP Terms remain unchanged
85 31 Point 55 In Case of Counterfeit currency is dispensed from CD,
the responsibility will be of the vendor and penalty of
Rs10,000/- per instance would be levied
We recommend that the penalty should be toned down to Rs
5000/- per instance
RFP Terms remain unchanged
86 32 58. Negligence the Bank shall have the right to cancel the Contract
holding the Contractor liable for the damages that the
Bank may sustain in this behalf. Thereafter, the Bank
may make good the failure at the risk and cost of the
Contractor.
Bidder shall only be liable for the transition cost and shall not
be liable for any other cost which may have incurred by the
Bank.
RFP Terms remain unchanged
87 33 60 Termination Clause is silent regarding the cure period. Request to provide
30 days prior notice for remedying any breach of terms
under the SLA
Shall be discussed with successful bidder/s
88 33 60 The bank may takeover the CD, UPS and VSAT at an
aggregate value of Rs.1000/- per site plus taxes at the
end of the term
Request bank to consider revising the takeover price to
Rs.5000/- for each CD post completion of the term.
RFP Terms remain unchanged
Page 15 of 30
Bank of Baroda Transaction Banking Department89 33 60 The Bank reserves its right to cancel the entire /
unexecuted part of the Purchase Order/LOI at any
time by assigning appropriate reasons and recover
expenditure incurred by the Bank
Request the bank to clarify what is the expenditure
mentioned in this clause
RFP Terms remain unchanged
90 33 61 It is the responsibility of the bidder to rectify the audit
observations at the earliest.
The bidder would not be privy to the audit observations at the
time of bidding for the RFP. Request the bank to confirm
whether the audit observation can be complied at mutually
agreed terms and conditions, & cost of audit to be borne by
Bank.
RFP Terms remain unchanged
91 33 61 "INSPECTION & AUDIT OF THE SERVICES: The Bidder
shall extend full cooperation to the Bank’s authorised
personnel, its auditors (internal and external), and
authorised personnel from regulatory and statutory
authorities to inspect and audit the solution/facilities
in their site. In case any of the services are outsourced
/ assigned / subcontracted to third party vendor by the
Bidder, it will be the responsibility of the Bidder to
ensure that the authorities / officials as mentioned
above are allowed to inspect the third party products
and related process. It is the responsibility of the
bidder to rectify the audit observations at the earliest."
Any inspection / audit will be cooperative of BIDDER’s
confidentiality and security restrictions and guidelines; and
any other conditions as to bearing of costs shall be subject to
parties mutually agreed terms.
RFP Terms remain unchanged
92 34 62 Non disclosure of information Request to make this clause mutual as bidder also shares its
confidential and proprietory information
RFP Terms remain unchanged
93 34 62 "NON-DISCLOSURE INFORMATION" The BIDDER requests that the confidentiality obligtion to be
made mutual.
RFP Terms remain unchanged
94 36 Repeat Order Bank at its discretion may go for repeat order of
maximum of 1,000 Cash Dispensers under the same
terms and conditions.
We request the bank to clarify the time line by which
additional order will be placed and the end date for execution
of the aditional order
RFP Terms remain unchanged
95 48 8 d) Deposit Pickup Request the bank to clarify the scope as the CDs will not have
any depository module so bidder is not liable for this service.
The requirement is removed
96 50 1.1 There could be few exceptions like premises in Malls,
Shopping Centre etc where infrastructure facilities like
lifts, escalators are available
Request bank to confirm whether Stand alone ATM without
TIS (Shop N Shop) shall be allowed in Mall locations
Bidder shall be allowed to install CDs at high potential areas with proper
casing / enclosures as per Bank's branding and approval
97 50 1.1 Request bank to share the active card holder base to
the bidder for the location allocated.
1. Request the Bank to share the active card base for each of
the alloted locations.
2. Request Bank to also share the existing ATM locations to
avoid additional site identification in the same location.
Available detail shall be shared with successful bidder
Page 16 of 30
Bank of Baroda Transaction Banking Department98 50 1.1 Bidder to take Banks in principal approval before
finalization of site.
Bidder can send an email for approval of the site identified to
a designated authority centrally. Request Bank to allow
deemed acceptance if a site selected if there is no response
beyond 7 days from intimation by MSP to the Bank. Request
Bank to have a dedicate SPOC at central office for site
approval coordination with Banks zonal office.
Bank's regional office shall approve the site. Therefore bidder is to
coordinate with regions for approval of the sites.
99 50 1.1 The bidder should get in-principle approval from the
Bank for the site before proceeding with the final
installation
Request bank to give free hand on selection of Off Site
locations as it is a outsourced Project and since the revenue is
based on Transactions. Approval for offsite locations from
regional offices or branches will become additional process
and will lead to delay in implementation
RFP Terms remain unchanged
100 50 1.1 The site should be such that a minimum of 150
successful transactions per day should happen. Lead
time of 3 months will be given to attain minimum of
150 daily transactions
While the Vendor would select sites for getting maximum
transactions, but factors like customer behaviour, card issued
base, active cards, and such factors would be beyond
Vendor’s control. Hence we request that this clause be
deleted .
It is desirable to get 150 transactions per day.
101 50 1.1 There could be few exceptions like premises in Malls,
Shopping Centre etc where infrastructure facilities like
lifts, escalators are available
Request the bank to quantify how many number of such site
would be required. Also request the bank to indicate the
threshold for the rent in such locations beyond which the
bank will bear the charges
Installation at high footfall centres like shopping Mall is to ensure high
usage of CDs. Bank will not bear any rent either partly or fully for such
installations
102 50 Annexure-I -
1.1
Scope: WE request the bank to fix a timeline for in-principle approval.
If not, the site would be deemed approved.
Bank would advise the approval within maximum of 14 working days
after offer is made to bank. In case approval is not given by bank within
agreed period, it would be deemed as site is not approved by bank
103 51 2.1 Off-Site Location We request Bank to consider the Maximum Rent Cap for
identify the sites at suitable locations
RFP Terms remain unchanged
104 51 2.2 ON-SITE LOCATIONS Request the bank to clarify if the Bank will provide LAN
cabling & port till the ATM site.
At onsite ATM, LAN cabling & port shall be provided by Bank
105 51 2.3 The bidder will not transfer or sell or surrender or
vacate the site or enter into any contract or order with
any other Bank or entity for the site without Bank’s
prior permission
Such factors in some cases will depend on the span of
contract with the landlord and hence the Vendor may have to
surrender if the landlord does not intend to continue with the
lease arrangements and for any other such factors
RFP Terms remain unchanged
106 51 2.3 The Bank also may request/advise the bidder to
relocate the CD to any other location due to
administrative exigencies. Under such circumstances
bank will bear the cost.
The consent for relocation ATM has to be mutually agreed by
both parties. We also request bank to allow MSP to relocation
of low transacting site in if required.
Bidder may relocate the site after obtaining formal approval from bank.
The cost of relocation in such case shall be borne by Bidder
107 51 2 - 2.1 Payment of Rent Request the bank to clarify the outmost limit of rent the
bidder is expected to pay for sites. Please modify the clause
and add the upper limit post which bank is liable to pay rent
for those sites requested by zones or regional offices.
RFP Terms remain unchanged
Page 17 of 30
Bank of Baroda Transaction Banking Department108 51 Annexure -
I:Scope of
Work / SITE
IDENTIFICATI
ON AND
IMPLEMENTA
TION
SERVICES /
2.2 On-Site
Location
The Bank at its own cost will make arrangements for
providing electrical power supply upto the CD Room
and separate meter / sub meter for the onsite CD.
We request that stable power be provided by Bank as well. RFP Terms remain unchanged
109 51 Annexure -I:
Scope of Work
/SITE
IDENTIFICATI
ON AND
IMPLEMENTA
TION
SERVICES / 2.1
Offsite
Location
Identification of site at suitable locations and entering
into lease agreement/ownership after obtaining
Bank’s approval for the centers where new CDs are
proposed to be deployed.
We request clarification if specific offsite approvals are to be
obtained from Bank
Bidder shall take approval from the bank before finalising the site
110 51 I-2.1a a. Identification of site at suitable locations and
entering into lease agreement/ownership after
obtaining Bank’s approval for the centers where new
CDs are proposed to be deployed
We request the bank to please clarify that whether there will
be a cap on site rental value. We request the bank to consider
this cap and beyond this cap, the bank should pay additionally
or as top up per transacaction for premium location or bank
mandated sites.
RFP Terms remain unchanged
111 51 i-2.3 The Bank also may request/advise the bidder to
relocate the CD to any other location due to
administrative exigencies. Under such circumstances
bank will bear the cost.
We request the bank to clarify what relocation means. Does it
mean that entire apyment for site relocation including rental
advance will be apid by the bank. Also, will the bank pay for
new TIS on site along with the shifting cost.
In such case, bank shall only pay the actual cost of transporation of
equipments to new place
112 52 2.3 The relocation should be executed within 30 working
days from the date of the approval provided by the
Bank, failing which that CD shall be considered as
under downtime from the 31st working day onwards.
In case of relocation to those states where waybill
requirements are applicable, bank is requested to provide
grace period for such states. Also the bank will be required to
arrange for the waybill.
RFP Terms remain unchanged
113 53 3 However the Bank reserves the right to change the
switching interface at any point of time. In such cases
it will be binding upon the selected Bidder to provide
the required support to commission the CDs with new
switching interface without any additional cost to the
Bank
Since a new Switch interface will involve effort and time from
the Bidder’s end, we request the Bank to discuss the cost
mutually. Also the bidder will not be privy to the capabilities
and interface requirements of the new switch.
RFP Terms remain unchanged
Page 18 of 30
Bank of Baroda Transaction Banking Department114 53 4 All off – site CDs should be networked by using reliable
connectivity. The acceptable network technologies are
Leased Line, CDMA, RF with licensed frequency, VSAT
[Ext-C band, Ku band VSAT]. Any other newer
technologies like 3G / 4G may be acceptable. However
all the technologies should be implemented subject to
IT security policy of Bank
Can existing connectivity be utilized between bank DC/ DR
and bidder data center or does bank expect the Bidder to
setup whole new network infrastructure and establish
connectivity across all sites?
If bidder has any network infra already provided to bank, the same may
be utilized, however the requisite backhaul bandwidth for the new
requirement needs to be factored as part of the commercials.
115 53 I.4.i The backhaul connectivity between the bidders
NOC/POP to the Bank’s DC and DRC should be
provided by the bidder and end to end should be
secured and also should support IP Sec , 3DES, etc.
Does the bank intend to use IPSEC? Yes, Bank intend to use IPSEC
116 53 I-4 NETWORKING FOR CONNECTIVITY OF CDS
All off – site CDs should be networked by using reliable
connectivity. The acceptable network
technologies are Leased Line, CDMA, RF with licensed
frequency, VSAT [Ext-C band, Ku band VSAT]. Any
other newer technologies like 3G / 4G may be
acceptable. However all the technologies should be
implemented subject to IT security policy of Bank.
We request the bank to clarify what will be the minimum
bandwidth required for the Cash Dispenser according to
requirements of the RFP
Bidder is to provide sufficient bandwidth for smooth CD operation
according to make of CD being deployed.
117 54 I.4.n The backhaul links should have in-built redundancy.
One link should be wired line from one service
provider and redundant link should be wired from
another service provider in both DC and DRC.
We request Bank to confirm whether bidder can provide
single router for terminating both SP last mile
No. Bank requires redundancy both on router as well as link level.
118 54 I.4.n The backhaul links should have in-built redundancy.
One link should be wired line from one service
provider and redundant link should be wired from
another service provider in both DC and DRC.
We request Bank to confirm whether bidder can use existing
DC & DR physical last mile & Router --- by creating a logical
partition and different MPLS VRF for this project.
If the existing MOF Router can be used with logical partician
for WAN, please confirm whether we can use the same LAN
interface for routing of traffic.
MPLS is OK. But the network should be capable for supporting IPSec. DC
& DR network should be identical.
119 54 I.4.t Network should adhere to the following security
aspects IPSec Tunnel for the CD traffic
Please confirm if IPSEC is to be initiated from VSAT modem to
DC Router.
Yes, IPSEC is to be initiated from VSAT modem to DC router
120 55 Annexure-I Archival and retrieval of images / video footage The EJ pulling/Software distribution solution does not pull
images and videos. Hence, request the bank to delete this
requirement.
RFP Terms remain unchanged
121 55 Annexure-I: 6-
B
Preventive Maintenance Normally, PM will be carried out for CDs once in a quarter.
The other equipment's may be removed from the mandatory
PM requirement. Moreover, as the model is transaction
based, the responsibility may be left with SP
RFP Terms remain unchanged
122 55 Clause 5:
Security
Mandatory Physical Security Requirements as per
guidelines issued by NPCI
We request the Bank to state the requirement in detail or
refer to specific NPCI guidelines
Shall be shared with successful bidder
Page 19 of 30
Bank of Baroda Transaction Banking Department123 55 I.5 In future, Bank may carry out design modification
and/or application addition to the Bank’s network,
including modification for the security policy
implementation. Accordingly, bidder should carry out
necessary configuration changes in their network, as
advised by the Bank time to time and no additional
cost will be borne by the Bank in this regard
Request bank to consider such modification at mutually
agreed T&C.
RFP Terms remain unchanged
124 55 I.5 Mandatory Physical Security Requirements as per
guidelines issued by NPCI
We request the Bank to state the requirement in detail or
refer to specific NPCI guidelines
Shall be shared with successful bidder
125 56 I.6.D. FLM and
SLM
Monthly submission of the video images to the
Branches with acknowledgment.
Request the Bank to consider submission of the video images
once in 90 days instead of monthly. Additionally the vendor
can provide the video footage on case to case basis on
request from Bank
Vendor is to submit the video image once on a quarter.However on
specific requirement of images / foogtages on case to case basis at the
request of bank, Bidder is to provide the same immediately.
126 56 I.6.E. Online
Monitoring of
CDs
Consolidation of settlement, reconciliation reports and
data.
Request the Bank to elaborate the scope of setlement and
reconciliation
Bidder shall provide all information / necessary documents as required
for reconciliation / settlement / dispute resolution etc. by bank or bank's
service provider. The document may include but not limited to, Cash
replenishment report, Journal, cash counter report etc.
127 56 vi. Centralized monitoring and control over access to
safes.
This need to be added in comercial , as we need to instal OTC
lock (SNG/MHL etc)
RFP Terms remain unchanged
128 57 i Cash replenishment at CDs and ensuring cash
efficiency.
Need clarification on CER. Has bank provided any target? Utmost effort is to be made by the bidder to keep optimum amount of
cash in cash dispensers.
129 57 iv Forecast and recommend suitable cash level for each
CD based on the evaluation subject to compliance of
internal procedure / limit set for cash retention for
individual CD.
Does MSP need to provide ATM limit (based on the bank
provided dispense pattern of last 6 month) or bank will
provide ATM wise cash limit for all ATM.
Shall be discussed with successful bidder
130 57 v. There should not be a gap of more than 2 days
between each EODs. There should be minimum of 15
cash replenishments in a month. The bidders should
furnish the details of the replenishments made during
the month along with the bills for payment. Penalty of
Rs 500/- will be collected per shortfall in the
replenishments cycle.
We will schedule loading/EOD on every alternate day but MSP
should not be ressposnible for any penalty where loading
/EOD not done due to Power/Any technical issue in ATM
RFP Terms remain unchanged
Page 20 of 30
Bank of Baroda Transaction Banking Department131 57 x. The CRS agency shall take adequate insurance policy
with Bank Clause for the value of entire cash
throughout the Cash Replenishment Services Cycle for
all sorts of risks including fidelity clause arising from
acts of omission / commission / dishonesty of its
employees and / or its authorised agents. The loss-
payee endorsement of such insurance policies shall be
in favour of the Bank and it shall be ensured that the
amount of claim, if any, shall be paid by the insurance
companies directly to the Bank. Copy of the Insurance
policy should be submitted to the Bank. The CRS
agency shall pay the premium for obtaining insurance
cover. Insurance policy should be in force.
CRA agency is taking required insurance on CASH IN
TRANSIT,CASH IN CRA VAULT AND FIDELITY INSURANCE.
RFP Terms remain unchanged
132 57 24 x 7 continuous monitoring of availability of cash in
the network of CDs through Incident Management
Tool and ensuring no cash out scenario for any of the
CD.
On line Cash feed also should be provided by Bank for Cash
monitoring,
Bank is exploring the possiblity of providing real time availibility of cash
balance, detail shall be shared with successful vendor
133 58 6.I.V Penalty of Rs 500/- will be collected per shortfall in the
replenishments cycle
We request bank to omit said clause RFP Terms remain unchanged
134 58 Annexure-I: 6-
I.v
CRA: There should be minimum of 15 cash loadings CRA is very expensive and hence mandating 15 loadings esp.
in rural and S-urban areas would be a big challenge.
Therefore, bank may fix a minimum of 6-8 loadings per
month. Alternatively, the bank can fix a minimum level of 5
lacs in the ATM at any point of time. Additionally, we request
you to waive the penalty proposed for shortfall
Metro / Urban areas - Minimum 15 loading
Rural / Semi urban - Minimum 12 loading
However, bidder is to ensure adequate cash at all times including
weekend, holidays etc.
135 59 Annexure-I: 6-
I.xiii
BG-50000 Under Clause 23, bank has already stipulated a BG. Therefore,
as requested, bank may have a comprehensive BG @ 10000
per CD which may be renewable on yearly basis
RFP Terms remain unchanged
136 59 I.6.K(I)
e.Surveillance
The successful bidder through its partner or
subcontractor has to provide e-surveillance services
for the sites wherever care taker is not deployed and is
to take complete responsibilities for the security of the
sites.
1.Request bank to confirm no of cameras for e-Surveillance &
Sensors & alarm .
2.Is Full-time monitoring of site is required by backoffice
team.
3. Would e surveillance be also required in sites where the
caretakers are deployed?
1. Minimum two cameras, more cameras may are to be provided if
required by Bank.
2. Real time e-surveillance by back office.
3. e-Surveillance at caretaker site is optional
137 59 I.6.K(I)
e.Surveillance
K (i) V 180 days video footage Request bank to consider keeping for 90 to 120 days to
reduce operational cost and back up capacity.
RFP Terms remain unchanged
138 59 K e-Surveillance Request the bank to clarify whether the requirement is of
High end E-Surveillance monitoring solution or video
recording through internal & external cameras would suffice.
Bidder shall monitor the site with High end e-surveillance with real time
monitoring
Page 21 of 30
Bank of Baroda Transaction Banking Department139 59 K(i)(viii).e-
Surveillence/
Dispute non
redressal
penalty
Bank is requested to revisit the Turn Around Time for
providing footage in case of disputes. Also, Bank is
requested to limit the penalty on non delivery of
footages to dispute amount.
Retrieving images from CDs located in remote/ restricted
accesibility locations may involve visits to site, which will be
difficult to be serviced with in 1 day
RFP Terms remain unchanged
140 59 K(I).VIII To provide all information on video footage / images
to Bank, Police authorities or any regulatory authorizes
within 1 day of request whenever demanded.
Request the Bank to amend TAT for providing footage /
images to be made 2 days. Request the Bank to accept either
one of external or internal camera footages.
RFP Terms remain unchanged
141 60 Annexure-I: 6-
L
Customisation While bidder can absorb the customization cost at its end, i.e.
customization of its monitoring tool, but bidder would have
no idea whether there is customization required at bank
switch end and the connected cost. Hence request bank to
bear the cost of Switch customization, if any
RFP Terms remain unchanged
142 60 K(I).VIII Bank may be imposed penalty on failure to provide the
video footage / image. In such case penalty of
Rs.10,000 or amount of dispute along penalty
whichever is higher shall be imposed on the bidder.
In case of non-providing of video footage / image MSP will be
responsible for disputed amount. Request the Bank to delete
the penalty of Rs. 10000 for such incidents.
RFP Terms remain unchanged
143 61 Annexure-I: 6-
M
Change in infrastructure SP can supply all HW and SW as per the current regulatory
requirement. No SP can factor the cost for future requirement
and hence such upgrades or regulatory requirements should
be mutually discussed for commercials, timelines etc.
RFP Terms remain unchanged
144 61 I.6.O Shifting
of CD / Site
As an ongoing process, the Bank will review the
performance of the off-stie CDs on daily basis. In case
number of transactions in a CD does not surpass the
targeted level i.e. hits are low / performance is low or
any other reason, the Bank may direct to shift the off-
site CD. The Bidder will shift the CD to a new site, at
their expenses within the time frame agreed with the
Bank
The low hits in an ATM could be a result of various factors not
attibutable to the bidder. It also could depend on another
Bank ATM deployed near the Bank's ATM site, which would
be beyond the bidder's control. Hence relocation under this
category should be agreed on mutual basis
RFP Terms remain unchanged
145 61 O In case of shifting of any CD is required to be carried
out from one site to another due to any reason not
attributed to the Bank, selected bidder will be required
to again follow the process mentioned in point 2.3
above. No additional cost will be paid by the Bank for
the relocation
Cases like road widening/ building
redevelopment/Demolition, etc that are beyond control of
MSP. Request the Bank to consider @ actual expense incurred
for shifting and relocation of site.
RFP Terms remain unchanged
Page 22 of 30
Bank of Baroda Transaction Banking Department146 62 J.A.6 Windows 7 or above with latest service Pack.
Compatible with Base24 Switch
Connectivity. V-SAT / Leased Line / ISDN / CDMA
technology.
Reversal Message of Transactions.
Multi-Lingual software for customer display apart from
Hindi & English.
Remote retrieval of Journal particulars Electronically.
Should support checking transactions for Hot cards,
Warm
Cards, Expired Cards, Skimmed Cards, Account Type,
and service
restriction Online or Offline mode.
100Mbps Ethernet controller.
OS hardening (with firewall).
Linux OS, provides lowest TCO, on account of lower power
consumption(due to lower resource utilization of CPU/RAM),
no recurring costs on ugrades(typically twice in life of ATM) &
lower virus threats. Linux is an integral part of IDRBT's
recommendation re 'green banking framework' for banks.
Linux also enables compliance with Government of India's
recent guideline of PSU's usage of Open source operating
systems. (Since this, all PSU's are including open source
operating software in their ATM procurement tenders.
Linux O/s offers features as any windows systems with
enhanced security and efficiency. Hence request bank to
allow, linux o/s also an option with commitment to support all
features and upgrades. Linux ATMs are plugged successfully
into Base 24 switch network and has been deployed in
volumes.
Hence request the Bank to also consider Linux OS for the
ATM.
RFP Terms remain unchanged
147 63 Annexure J,
Section A,
Clause 9:
Dispenser
Friction Technology We request bank to amend the clause as Friction /Vacuum
technology
Friction / Vaccume technology.
Mode: (Stack and Present/Bunch)
Can dispense old / new / mixed notes.
Delivery speed: not less than 5 per second.
Delivery notes it dispenses at a time: (should not be less than 40 notes at
a time)
Note retraction facility/feature by CD should be disabled
148 63 J.A.10 Alarm sensors for temperature
status, vibration status and chest
open status while sending
signal/messages to Switch/
Management Centre
Request the Bank to consider Alarm sensors only for Chest
Open Status.
RFP Terms remain unchanged
149 63 J.A.7
CURRENCY
CHEST
S-&-G / MAS Hamilton (KANMAS- CENCON) capable of
having combination of 6+6 digits. 6+6 Electronic
combination Lock
We understand that the intention is to have a certified
electronic lock (UL) which has the functions of 6 + 6 functions.
So, the manufacturers names in the tender (S & G / MAS
Hamilton) are a reference and not mandatory, only for
reference. If this is the case, it is allow to use other
manufacturers with the same techniques functions since is
certified by UL too.
RFP Terms remain unchanged
150 64 Annexure J,
Section A,
Clause 11:
Printers
Receipt Printing in Hindi and Local Languages Request the Bank to confirm if static icon based multi-lingual
receipt printing is required. Switch changes required for the
same to be done by Bank.
Yes, receipt printing in Hindi and local language shall be static icon
based.Switch changes shall be done by Bank
151 64 J.A.10 The Cassette shall be compatible for cassette-swap
implementation.
As a industry practise Add cash system is followed. Cassette
swap , if needed, at additional commercials which will be
discussed with the Bank as and when cassette swap is
required.
RFP Terms remain unchanged
Page 23 of 30
Bank of Baroda Transaction Banking Department152 64 J.A.10 Sensor to send low-cash supply message to the Switch
centre
Requesting bank to modifiy the clause as "Sensor/Software
counter to send low-cash supply message to the Switch
centre"
RFP Terms remain unchanged
153 64 J-A.12 16 keys and above
Type:
Privacy in operation if key board with key guard.
The CD should have PIN Pad Shield covering all three
sides to avoid
shoulder surfing or capture by the external camera.
Metallic stainless-steel/poly carbonate PIN Pad.
All CDs must have PCI compliant Encrypting PIN Pad
(EPP) and 3DES
double length keys for protecting the PIN data with
PIN pad shield.
Rear view mirrors will allow CD users to see what is
happening behind him/her when he/she enters the
PIN(Shoulder surfing). All CDs would have rear view
mirrors covering majority area of CD site.
Please clarify on ` Provacy in operation of keyboard with key
guard'
The PIN pad shield is to cover three sides to avoid any shoulder surfing
154 65 Annexure J,
Section A,
Clause 13
Operational Keys
Touch Screen / Eight keys FDK- Both are required
Most banks today going with new technology with touch
screen interface. Customers are familiar with touch interface
with proliferation of affordable mobile phones which are
coming with touch interface. Request Bank to make this as
Touch only instead of FDK which is also future proof from
many new functionalities like virtual keyboard for VAS services
Bidder shall provide toruch screen and FDK keys both as per RFP terms
155 65 J-A.14 14. ATMs ready for using the EMV chip cardsDip card
reader with anti skimming device installed and
integrated with the card reader of the recycler. Details
of anti-skimming technology/device to be enclosed
We request the bank to please clarify if anti-skimming device
is to be provided along with the CD or it is a later
requirement. There seems to be a mistake mentioning
"Recycler" instead of Cash Dispenser in this clause.
Cash Dispensers should be ready for using the EMV chip cardsDip card
reader with anti skimming device installed and integrated with the card
reader of the Cash Dispenser .
156 66 Annexure J,
Section A,
Clause 25 A:
Voice
Guidance
Should be capable of Audio guidance Cash Dispenser is capable of supporting Voice Guidance. Bank
to provide the standard WAV files and corresponding switch
changes
Bank shall provide standard Wav files
157 66 J.A.21 Should be mechanically and electrically capable of
functioning 24 X 365 basis.
Should enable voice using software of Bank's choice
and should support for audio.
Requesting the bank to name the software which will be
installed for enabling voice.
Shall be shared with successful bidder
158 66 J-A.18 EJDC need clarity whether this refer to normal EJ..? Compatible for remote Electronic Data Capture of Journal.
Page 24 of 30
Bank of Baroda Transaction Banking Department159 67 J-A.25.D 25. Others D.
Diebold shall provide required mesh to cover the holes
available in the CD to prevent the dust/ insects/ rat/
lizards entering into the CD.
Please clarify on `Diebold' Bidder shall provide required mesh to cover the holes available in the CD
to prevent the dust/ insects/ rat/ lizards entering into the CD.
160 67 J-A.24 Cash Dispensers must have Biometric authentication
capability with finger print reader as per Aadhaar
specification.
Biometric scanners to be provided in the machine.
Whenever the solution is ready the machine should
support biometric authentication.
We request the bank to please clarify if biometric scanner is to
be povided in the machine. We request the bank to please
provide the functional and technical requirements of the
biometric scanner
Machine should support biomatric authentication to implement the
same whenever there is a requirement.
161 67 J-A.25.E 25. Others E.
Energy saving features like sleep mode.
Please kindly clarify on this. The energy saving feature of the machhine is optional
162 68 B. OTHER
SPECIFICATIO
N
CASH DISPENSER Scalable of One to One Marketing.
Client when Loaded on CASH DISPENSERS should be
able to interact with different CRM sources using open
standard messaging standards.
Request the Bank to elaborate the requirement The facility of machine to interact with different CRM is optional
163 68 J-A.25.B B. Other Specifications
7. Key Board for day to day operations
Operator panel can be used of day-to-day operations. So
Please consider to remove this clause.
The requirement is optional
164 69 Annexure J,
Section B,
Clause 16:
Vinyl Wraps
Vinyl Wraps Request the Bank to change this requirement to Front side
vinyl wrap only. We also request you to share artwork for
creating vinyl for the Bank
Bidder is to provide front site Vinyle wrap in sites. In case of deployment
at shopping malls etc. where CD is to be visibele for all the sites, tree
sides wrapping would be required.
165 69 Annexure J,
Section B,
Clause 8:
Cameras
CASH DISPENSERS should have pilfer proof camera at
the cash dispensation slots
Please confirm if the machine to have one internal portrait
camera and one lobby camera. The lobby camera should be
positioned such that cash taken by customer can be captured.
Bidder is to provide one face camera and one lobbey comera. Third cash
slot camera is optional
166 70 5 3. All operating system upgrades / proprietary
software upgrades / patches/ licenses will be vided
free of cost and also installed in all the CASH
DISPENSERS at no cost to the Bank for the entire
period of support committed. OS Hardening has to be
done for the CASH DISPENSERS the selected bidder is
responsible for ensuring that system does not get
affected by virus/malware.
We request the bank to remove operating system upgrades as
per the Windows 7 upgrade issues provided in the previous
query
RFP Terms remain unchanged
167 70 6 Road permit We request the bank to issue necessary documents as
required by various States, for such permits
RFP Terms remain unchanged
Page 25 of 30
Bank of Baroda Transaction Banking Department168 70 Clause 4
Installation
In the event of Microsoft ceasing support to the
existing operating system the bidder shall upgrade and
install the latest higher version of operating ….
Microsoft Operating system version releases and end of life is
not controlled by ATM vendors. Any new releases of Microsoft
Operating system comes at an extra cost. Request the bank to
remove the clause of supporting this at no extra cost.
Any hardware upgrade that may be required to support new
releases of Microsoft operating system cannot be factored at
this point of time and hence request the bank to amend this
clause accordingly.
RFP Terms remain unchanged
169 70 Software
Support
In the event of Microsoft ceasing support to the
existing operating system BIDDER shall upgrade and
install the latest higher version of operating system
and all application software supporting the operating
software for satisfactory function of Cash Dispensers
on all Cash Dispensers deployed for one time with no
extra cost to Bank. BIDDER shall also upgrade
hardware required to support the higher version of
operating system at no extra cost to Bank
As per industry standard the bidder can provide windows 7
OS, For any future upgradation of OS request Bank to bear the
cost. Microsoft Operating system version releases and end of
life is not controlled by ATM vendors. Any new releases of
Microsoft Operating system comes at an extra cost. Request
the bank to remove the clause of supporting this at no extra
cost.
Any hardware upgrade that may be required to support new
releases of Microsoft operating system cannot be factored at
this point of time and hence request the bank to amend this
clause accordingly.
RFP Terms remain unchanged
170 72 Aircon
Louvers
P and F 150mm powder coated Aluminium louvers of
approved color.
Need to know Exact Size 2ftx 6inch or 4ftx6inc Presently at most of the sites 2ft X 6 inch size is being used. Howevever
actual size may differ depending to the area of the site.
171 72 point "a" Tiles 450mm x 450mm OR approximate 600mm x 600mm
vitrified tiled flooring with 100mm skirting of Johnson
Tile Skirting should be avoided as Paneling work has to be
done.
Yes, skirting does not required as paneling work has to be done.
172 72 Point "g" Main
Door
Providing and fixing Poly-carbonated door laminated
with clear anti-shatter film on one side comprising of
approximate 150 mm bottom and middle member,
approximate 85mm top and vertical members,
aluminum Black powder coated members, floor spring
of Hemco, Everite, Hyper or ISI approved make, clip
sections, , providing and fixing color customized door
handle to fit on Door.
Poly carbonated Sheets are expensive not available easily in
semi urban or rural area, suggested to to use glass instead
Poly carbonate, Door Size is also not mentioned as per
standards 7ft x3ft required. Can we use 7x3 door size
In rural and Semiurban area, Glass of 8 mm thickness supported by
transparent 3 mm film may be used in place of Poly cabonated sheeets
173 72 Tiles Tiles specs for Back room Can we go for simple PCC or keep existing tile if present or
can cover it with vitrified tile same as customer lobby.
RFP Terms remain unchanged
Page 26 of 30
Bank of Baroda Transaction Banking Department174 73 1. Machine
Sites (M)
Paneling with enamel paint :
Providing and fixing Aluminum Composite Panel
(ACP) comprising of 50mm x 50mm hardwood frame
work, 12 mm with trap door with magnetic catch /
tower bolt arrangement, finished with enamel paint.
Ply to be IS 303, BWR Grade (For inside work), Ply to
be IS 710 Grade (For external work exposed to
atmosphere). (Trap door to be given only if the
above item is used for shutter covering outside the
ATM center.)
Two materials are clubbed for paneling work- 1st is Aluminum
composite panel (ACP) & 2nd is Ply finished with enamel paint.
Need clarification on the details specification-which will be
applicable?
The Item shall be read as Providing and fixing 50mm x 50mm hardwood
frame work, 12 mm with trap door with magnetic catch / tower bolt
arrangement, finished with enamel paint matching to the shade. Ply to
be IS 303, BWR Grade (For inside work), Ply to be IS 710 Grade (For
external work exposed to atmosphere). (Trap door to be given only if the
above item is used for shutter covering outside the ATM center.)
175 73 1. Machine
Sites (R)
Paneling with 1.0 mm laminate :
Providing and fixing in position ply paneling with
hardwood framing of 50mm x 38mm section at
600mm c/c both ways, 12 mm plywood with 1.0 mm
laminate of approved shade and make, in plumb, line
and level complete as directed. Ply to be of IS 303,
BWR grade. Paneling above false ceiling will be
covered with 12mm ply without laminate.
We Suggest Bank, walls paneling should be done with
Aluminum composite panel (ACP), because other work will be
done in ACP material (Back Partition, Shutter boxing), so it’s
always advisable to do wall paneling also with ACP.
Yes, ACP panelling is to be done as per ACP detail on page 73 in RFP
176 73 ACP –
Partition
ACP Door 3'X7' made of Aluminum frame. ACP Door should be 7x2ft , as it is industry practice, depend
on the backroom sizes
RFP Terms remain unchanged
177 73 Black Granite
Flooring /
front entrance
side walls
Entrance Side walls granite should be use at entrance steps or floor only , as
entrance Side walls will be covered with ACP
Yes, Entrance side wall shalll be covered with ACP. Granite shall be used
for entrance steps and floor.
178 74 Electric main
switch
Providing and fixing of main switch 63 Amps. 415 volt
T.P.N. with HRC fuses. (Make CPL, L&T or ISI).
We want this item to be optional as we are already using 63
amp ELCB in DB, there is no point to use this main switch,
fuses are already provided with three phase meter.
RFP Terms remain unchanged
179 74 External fixed
glazing
Providing and fixing external fixed glazing comprising
of 8 mm Modifloat, Saint Gobain, Asahi make clear
glass
Can we use 6mm Glass, as 8 mm glass are not available at
most of the places, 6 MM glass can be easily fixed on the
Aluminum frame
RFP Terms remain unchanged
180 74 J-C.O Providing and fixing external fixed glazing comprising
of 8 mm Modifloat, Saint Gobain, Asahi make clear
glass with top, bottom and vertical frame comprising
of black powder coated aluminum members, glass to
be laminated with clear antishatter film on one side.
Approximate 100mm top & bottom member,
approximate
100mm vertical members.
We request the bank to include Equivalent brands as an
option for external fixed glazing.
RFP Terms remain unchanged
181 74 q Area of external paving. Need to specify maximum area of external paving. May be
maximum 60-80 sft.
RFP Terms remain unchanged
Page 27 of 30
Bank of Baroda Transaction Banking Department182 75 CFL Providing & Fixing recessed mounting luminaire with
approximate mirror optics with 4 x 18W Fluorescent
lamps, fixture make Philips, Wipro, Opelite, Crompton,
Clipsal, Bajaj Fluorescent Lamp of Surya, Bajaj,
Crompton, Philips make. The size of the fixture as per
the manufacturers’ standards. Copper Ballast.
Please provide the details of Lights to be used either 4 x 18w
CFl or 2ftx2ft light fixture with 4 tube lights, Also need to
know how many fixtures to be used in ATM lobby
Please provide 2ft X 2ft mirror optics 2 in numbers containing 4 X18W
CFL in each unit
183 75 CFL Providing & Fixing Fluorescent lamp of 40W of Bajaj,
Philips, Clipsal, Wipro, Opelite, Crompton make.
Copper Ballast.
Request the Bank to clarify if Tube light can be used in place of
CFL. If CFL is to be used, can it be of 18w capacity?
RFP Terms remain unchanged
184 75 Electricals
with UPS
cabling
Providing and Fixing, MK, CPL, Anchor, Crabtree
Havells, Clipsal make switches / sockets, wires of
Anchor, Crabtree Havells, Finolex, Polyplast, Polycab,
Pagoda make, 5/15 A 6 pin socket with 16 A switch - 9
points comprising as Machines - 2 nos, NIU - 2 nos,
one each for Monitor, Camera, Text interface, Card
Access and Spare power point, 4 nos. Metal clad with
20A MCB - 2 each for Aircons & UPS input and output,
4 nos. light points comprising of 6A Single switch for
Tube lights, spotlights, signage, internal earthing with
1/18 earthing wire, 4 mm2 - 3 core cable for aircons,
and 1.5 mm2 wire for light points, 3 phase 4 Way
Distribution box of MDS, Crabtree Havells, Indo Krupp,
Indo Asian make with 4 Pole ELCB 63 A 300 mA,
appropriate nos. of 20 - 30 A SP MCBs, 40A 2 pole
MCB - 1 nos, MCB makes all the wiring to be in PVC
conduit with proper saddling and bends wherever
necessary. For UPS - Providing and Fixing SPN DB with
appropriate MCBs, 2 nos. 15 A tops, cables for input
and output to and from UPS.
2 Timers are required one for Aircons and other for Signage
which is not mentioned in RFP, 63amp ELCB can be replaced
with isolater or MCB, as ELCB will trip for small spark or
voltage fluctuation and need to reset physically, Metal clad for
AC Stabilizer Input and Out put connection not mentioned in
this. need to be added
2 Timers are to be provided by the bidder for aircon and signages. RFP
terms remain unchanged for other matter
Page 28 of 30
Bank of Baroda Transaction Banking Department185 75 J-c.AB Providing and Fixing, MK, CPL, Anchor, Crabtree
Havells, Clipsal make
switches / sockets, wires of Anchor, Crabtree Havells,
Finolex, Polyplast, Polycab, Pagoda make, 5/15 A 6 pin
socket with 16 A switch
- 9 points comprising as Machines - 2 nos, NIU - 2 nos,
one each for
Monitor, Camera, Text interface, Card Access and
Spare power point,
4 nos. Metal clad with 20A MCB - 2 each for Aircons &
UPS input and output, 4 nos. light points comprising
of 6A Single switch for Tube lights, spotlights, signage,
internal earthing with 1/18 earthing wire, 4 mm2 - 3
core cable for aircons, and 1.5 mm2 wire for light
points, 3 phase 4 Way Distribution box of MDS,
Crabtree Havells, Indo
Krupp, Indo Asian make with 4 Pole ELCB 63 A 300
mA, appropriate nos. of 20 - 30 A SP MCBs, 40A 2 pole
MCB - 1 nos, MCB makes all the wiring to be in PVC
conduit with proper saddling and bends wherever
necessary. For UPS - Providing and Fixing SPN DB with
appropriate MCBs, 2 nos. 15 A tops, cables for input
and output to and from UPS.
We request the bank to include Equivalent brands as an
option for Electricals with UPS
RFP Terms remain unchanged
186 75 SITE
IMPLEMENTA
TION SERVICE
FOR NEW
SITES
Stabilizer for AC In page 75 of the RFP the Bank has sought stabilizer with 4
KVA capacity, whereas in page 77 the specifications are for 3
KVA. Request the Bank to clarify if the bidder needs to provide
for 3 KVA or 4 KVA.
Bidder is to provide sufficient capacity of stabiliser suitable for
Airconditioners
187 76 Fire
Extinguishers
5 kg. capacity CO2 gas type Fire Extinguisher of
Minimax, Ceasefire or New age make
2kg ABC gas type FE can be replaced with this item / and
easily available in the local market and will provide the same
result. Request the Bank to consider.
RFP Terms remain unchanged
188 76 General 1) LAN point or I/O – not mentioned any where in RFP.
2)Main power Cable – Armor cable to connect DB to Meter is
not mentioned in RFP.
1. Lan cabling is to be done by the bidder in the offsite ATM.
2. Bidder is to arrange for the armor cable to connect DB to meter for
offsite ATM.
189 76 J-C.III Optional Items We request the bank to clarify if these optional items will be
paid for separately in TIS work.
Items are desirable as per requirement of the site. Bank will not pay any
charges for the same
190 76 Storage
Cabinet
Wooden Storage Cabinet made with ply, on all four
sides, 4 shelves inside with wire manager slots,
finished with enamel paint in interior and 1.0 mm
laminate finish on exterior, appropriate slots to be
made for air circulation on either sides, approximate
size 610mm x 762mm x 1524mm, Size of cabinet and
nos. of shelves subject to size of UPS, batteries and
NIU.
If we are Using ACP Paneling we can also make the Storage
cabinet in ACP, as this is industry practice.
Cabinet may be made in ACP however shelf should be provided in
plywood to bear the weight of battery and UPS
Page 29 of 30
Bank of Baroda Transaction Banking Department191 77 2 1.0T High Wall Split ACs with 5 Star EER (W/W)
Minimum to Maximum 5 Star ***** 3.5 & more with
cordless remote of reputed make. Copper, drain pipe
length up to 3 Rmt.
Request the bank to modify the clause for 1.0T High Wall Split
Acs of minimum 3 star rating of reputed make with remote
RFP Terms remain unchanged
192 77 3/Signage Only signage is mentioned. Lollypop/Flange is not
mentioned.
Please clarify whether flange/lollypop required/Not required. Bidder is to provide lollypop / flange whereever required for better
visibility of the ATM site
193 78 A 2KVA UPS of reputed make with 4 hours battery
backup on full load (Does not include bypassing
equipment like servo stabilizer and isolation
transformer)
Request the bank to modify the requirement of 2 KVA ups to 1
KVA UPS as it would suffice the purpose of battery backup of
4 hours for lights & CD
Bank specify for minimum capacity of 2 KVA UPS
194 78 J-C.3 ONLY 3 M materials is to be used We request the bank to include Equivalent brands as an
option for signage.
RFP Terms remain unchanged
195 82 Annexure K-
Commercial
Bid
No of CDs for care taker are only indicative, to
determine L1. Bank reserve its right to deploy care
taker for CDs.
We request the Bank to either keep Caretaker as optional and
out of the TCV calculation OR by including it not keep it as
indicative but let the bidder deploy the caretakers
RFP Terms remain unchanged
196 82 Annexure K.
Commercial
Bid
Definition of financial transactions Request bank to share the switch codes considered for billable
transaction payable by the Bank.
Shall be shared with successful bidder
197 82 ANNEXURE. K
.
COMMERCIAL
BID
There is no guarantee by Bank on minimum hits or
minimum amount payble.
We request the Bank to provide minimum guarantee
transactions of 100 per CD per day (in the ratio of 70:30 for
cash and non-cash transactions). This provision will ensure the
Bank will get good quotes in this bid, as the Bidder will have
assurance of some minimum revenues. This would also assist
the Vendors in taking risks in deploying in new branches and
rural locations, where the transaction ramp up will be
extremely uncertain.
RFP Terms remain unchanged
198 82 Annexure-K Average Transaction on above has been taken for
determination of L1 only. There is no guarantee by
Bank on minimum hits or minimum amount payble.
Bank may require onsite ATMs for proposed new branches. In
such cases, it may take at least 1 year to acquire adequate
customer base etc. Therefore, we request a minimum
guarantee of 100 transaction for 12 months for all ATMs
RFP Terms remain unchanged
199 82 k-2 Average Transaction on above has been taken for
determination of L1 only. There is no guarantee by
Bank on minimum hits or minimum amount payble
We request the bank to consider a minimum commitment on
transactions to be paid by the bank to the successful bidder.
Bank gives no guarantee for minimum hits or minimum amount payable
200 89 General VSAT Specifications Request to bank to please share the minimum specifications
for VSAT IDU and ODU
The specifications / size of the antena would depend upon location of the
site. The bidder is to arrange VSAT accordingly
201 89 General VSAT IDU - DVB -S2 The earlier DVB-S platform has been upgraded to the latest
standard DVB-S2 which has enhanced features and it is a
bandwidth efficient technology as compared to DVB-S and we
request bank to kindly consider it.
May be considered. DVB-S /DVB -S2
202 General General What will be the maximum lobby area or % split
between lobby and backroom area.
As lobby will be with paneling, this has a major cost impact if
area varies. In MoF project we restricted lobby area to 60-70
sft and back room to 30-40 sft.
The ideal size for customer lobbey is approximately 80 sq ft. However
actual size may vary according to the location of site and will finalised on
case to case basis with successful bidder.
Please contact: Manoj Sharma Chief Manager at 66981578 at [email protected] or [email protected] for detail
Page 30 of 30