Sr. No.
Name of work
No. & date of Approval Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance sanction
as on 1.4.14
Rs. Lacs
Date of start Date of completion
Status of work Remarks
1 Construction of I.T.I. at village Pali in District
Faridabad (Workshop block under SC/ST
Schemed)
ITI Pali/SC/ST/372
6.01.12
301.32 297.04 11.12.12 30.06.14 Work in physical progress. 50% Ground floor roof
slab casted and shuttering of rest is in progress
(Overall 25% work completed)
2 Construction of SC/ST Building of I.T.I at
Hathin in Palwal Distt.
1121
20.11.09
523.02 433.56 03.06.10 30.06.14 G.F. slab laid and brick work completed and 1st floor
90% roof slab laid & further work is in progress.
3 Construction of SC/ST wing in Govt. ITI at
Kaithal
ITI/SC/ST/KTL/2141
03.07.12
586.73 55.18 13.05.13 12.05.14 100% Ground floor slab laid and 80% 2nd floor slab
laid. Plastering work & flooring in progress
TOTAL 1411.07 785.78
Sr. No.
Name of work
No. & date of Approval Amount of A/A
Rs. Lacs
Expenditure up to
3/2014Rs. Lacs
Balance sanction
as on 1.4.14
Rs. LacsStatus of work Remarks
1 Construction of 1st storey at Tehsil Building at
Bilaspur in Yamuna Nagar Distt.
190-R-6-2012
24-Feb-12
85 47.17 Work is in progress
2 Construction of Administrative office Building
Phase-II, with Multi Level Parking in Mini Sectt.
Complex Sector-1, Panchkula
2427-R-62011/1711
9-Feb-2012
3470.59 3470.59 R/C/E for Rs. 3470.59 Lacs stand
submitted for A/A but F.C& Revenue
disaster Management
3 Construction of Mini Sectt. (SDO) (Civil)
Complex at Samalkha in Panipat
F.C. & P.S. no. 7202
24-Aug-2009
847.4 481.44 Work in physical progress. i) 90% Kotah
stone work completed and further in
progress.ii) The terrazzo flooring in
ground & 1st/2nd floor floor in
progress.iii) Tile terracing is in progress.
4 (i) Construction of Internal Road (Rigid
Pavement) in Judicial complex at Rohtak. (ii)
Dismantling/ providing the existing chambers at
Rohtak
6/06/2009-5JJ-II
23-Nov-2011
290.54 93.84 Work in physical progress. CC Pavement
completed except pavement in between
Judicial complex and Litigant hall. (ii)
Work completed and inaugurated by
Hon’ble Chief Minister, Haryana on
14/07/2012
5 Construction of Surface Car Parking in Mini
Sectt. at Rohtak
275-R-6-2012/2006
21-Feb-2012
89.41 60.19 Work in physical progress. Work of
boundary wall completed & laying of stone
metalled (G-II) in parking completed.
Laying of interlocking paver block is in
progress.
6 Construction of proposed Judicial Block (Phase -
II) on existing Litigant Hall in Mini Sectt. at
Rohtak
6/35/2012-5 JJ-II
18-Jun-2012
877.31 877.31 Work administratively approved. Tender
re-invited on dated 11/03/2013
7 Construction of additional Judicial Complex at
Faridabad
6/8/2006-5JJ-II
24-Jan-2013
3262.08 3233.71 Work in physical progress. Excavation for
basement is in progress
8 Construction of Labour courts in Mini
Secretariat at Gurgaon
A/A No.456-R-2011/1972
17-Feb-2011
1246 486.44 The structure work completed , Finishing
work is in progress . Remaining 50% A/A
of Rs. 62300000/-
Bank of sanctions as on 01.04.14 for ITI works SC/ST under head 4250- C.O. creation of infrasturcuture for Development of Industrial Training (Major Works)
Bank of sanctions as on 1.4.14 for Judiciary works under head 4059-C.O. Capital outlay on public works
9 Construction of Judcial Block in the compus of
SDO (Civil Complex) at Hathin in Palwal Distt.
FC/PS No.6/7/2012-5 JJ-II
19-Jun-2012
792.42 740.88 Work is in progress
10 Construction of Judician block including
Malkhana in Mini Sectt. At Palwal in Palwal
District
FS/PS 6/32/2004-5 JJ(II)
26-Nov-2009
2560 2560 Work completed except officers lift
11 Construction of Roads & Parking in Mini Sectt.
Complex (Excluding Residential Area) at Palwal
in Palwal District A/A received from FC&PS to
Govt. Hr. Revenue and Disaster Manaement
Deptt.
FS/PS 6/32/2004-5 JJ(II)
26-Nov-2009
486.69 486.69 Work is in Progress
12 Construction of Securit Guard Room, Check post
& high security boundary wall around judicial
court complex Mini Sectt. at Sirsa in Sirsa Distt
1
29-Dec-2011
134.67 63.69 Work in progress
13 Construction of Check Post, Gurard Room, High
Security Boundary Wall, Judicial Malkhana and
Additional Building in Judicial Complex at Hisar
FCNo.6/92/2011-5JJ-II
6-Jan-2012
716.71 601.05 Work is in progress
14 Constructing Additional work in the Campus of
Mini Sectt. at Bhiwani in Bhiwani Distt
No.2538-P-B-11/11904
3-Nov-2011
114.74 Work in progress
15 Construction of SDO(Civil) Complex
(Administrative-cum-Judicial Complex) at
Tosham in Bhiwani Distt.
No.597-R-6-2012/3083
14-Mar-2012
978.13 978.1 Tender approved. Letter to proceed to be
issued.
16 Construction of SDO (Civil) Complex
(Administrative Block) in the Campus of Mini
Sectt. Charkhi Dadri in Bhiwani Distt.
631-R-6-2012/3170
16-Mar-2012
1055 1052.75 Tender received on 13.03.2013 and under
process
17 Construction of Additional Litigant Hall & Bar
Complex in Mini Secretariate at Narnaul in
Mohindergarh District.
6/33/2012-5-JJ (II)
4-July-2012
317.35 0 317.35 Tender re-invited which will be opened on
10.04.2013
18 Supply & installation of Lifts in Jdicial complex
in Mini Sectt. Palwal
FS/PS 6/32/2004-5 JJ(II)
26-Nov-2009
2560 0 2560 Part of main A&A) Material of 4 Nos lifts
received at site and further installation
work in progress.
19 Pdg. 4 Nos passenger elevators in Admn. block
in Mini Sectt. campus at Palwal.
F C No. 7018
18-Aug-2009
2432 0 2432 Part of main A&A
20 Pdg. 5 Nos. passenger elevators in Judicial
complex at Nuh in Mewat Distt
F C No. 6/50/2005-5JJ(II)
20-Aug-2009
3137.45 0 3137.45 Part of main A&A
21 Pdg. 4 Nos passenger elevators in Admn. block
in Mini Sectt. Nuh
F C No. 7127
21-Aug-2009
2654.65 0 2654.65 Part of main A&A
22 Construction Judicial Courts Complex at
Mohindergarh (Pdg. CC TV system)
FC &PS 6/22/03/-5JJ(II)
11-Oct-2007
392.86 368.18 Work in Physical progress, Only two Nos.
Cameras are to be installed (Estimate Rs.
947000/- )(Part of main A/A Rs. 392.86
Lacs)
23 Construction of 8 Nos. Court Building in Mini
Sectt. At Bhiwani (Pdg. Electrical Installation)
FC&PS A&J 6/56/2003-05
11-Oct-2007
581.92 545.07 Work in progress, Near Completion (part
of Main A/A Rs. 581.92) (Estimate Rs.
231000/- Only)
24 Construction of Judicial Block including
Malkhana in Mini Sectt. Complex at Nuh in
Mewat Distt.
FC&PS No.6/50//JJ (II)
20-Aug-2009
2560.95 2198.86 82% work phy. comp. RCC Slab and brick
work comp. of all floors. Flooring and
Plastering 80% complete and finishing
work is in progress. L.D. imposed
25 Construction of Residential Houses for Judicial
Officers and Officials in Mini Sectt. Complex at
Nuh in Mewat District
No.597-R-6-2012/3083
11-Dec-2012
737.7 737.7 Tender approved. Letter to proceed to be
issued.
26 Construction of Roads & Parking, Campus
Boundary wall, High Security Boundary Wall,
Earth filling, Land Scaping and Estate PH & EI
Services in Mini Sectt. Complex at Nuh in
Mewat Distt.
FC&PS No.6/50/2005-5JJ
20-Aug-2009
576.5 230.59 1. Constn. of 80% comp. all over campus
& 40% Grills has been fixed. Action under
clause-II
2.Road & Parking work 50% Comp.
27 Rough cost estimate for furniture in Judicial
Court Complex at Mini Sectt. at Nuh in Mewat
District.
Add. C.S No.6/14/2013-5JJ
19-Feb-2013
98.54 98.54 D/E resent to S.E.
28 Construction of Judicial Block in the campus of
SDO Civil Complex at Gohana in Sonepat Distt.
F.C.No.6/11/2012-5JJ-II
8-Feb-2012
765 375.36 Work in progress
29 Construction of Judicial Block in the campus of
SDO Civil Complex at Ganaur in Sonepat Distt.
F.C.No.9082-89/WI
5-Dec-2011
765 606.38 Work in progress
30 Construction of additional Eight Court building
in Mini Secretariat at Sonepat Distt.
No.6/48/2012-5JJ-II
4-July-2012
1175 1174.36 Tender under process
TOTAL 35761.61 32670.34
Sr. No.Name of the work
A/A Amount (Rs. in Lacs) No. and date Division
1 Administrative approval of SC/ST wing at
G.I.T.I, Ambala
350 Bhawan/ITI/SC/
ST/Common/101
5
30.08.2013
Ambala
2
Administrative approval of SC/ST wing at
G.I.T.I, Bhiwani
350 Bhawan/ITI/SC/
ST/Common/102
5
30.08.2013
Bhiwani
3
Administrative approval of SC/ST wing at
G.I.T.I, Faridabad
350 Bhawan/ITI/SC/
ST/Common/103
1
30.08.2013
Gurgaon
4
Administrative approval of SC/ST wing at
G.I.T.I, Gurgaon
350 Bhawan/ITI/SC/
ST/Common/103
7
30.08.2013
Gurgaon
5
Administrative approval of SC/ST wing at
G.I.T.I, Mojabad in Distt Gurgaon
350 Bhawan/ITI/SC/
ST/Common/104
3
30.08.2013
Gurgaon
6
Administrative approval of SC/ST wing at
G.I.T.I, Hisar
350 Bhawan/ITI/SC/
ST/Common/104
9
30.08.2013
Hisar
7
Administrative approval of SC/ST wing at
G.I.T.I, Barwala in Distt Hisar
350 Bhawan/ITI/SC/
ST/Common/105
5
30.08.2013
Hisar
8
Administrative approval of SC/ST wing at
G.I.T.I, Piau Majra in Distt Hisar
350 Bhawan/ITI/SC/
ST/Common/106
1
30.08.2013
Hisar, Hansi
List of works recently sanctioned under head P-01-08-4250-51-789-98-51-N-V-Training Building for Schedule Castes Wings-16 Major Works
9
Administrative approval of SC/ST wing at
G.I.T.I, Nalwa in Distt. Hisar
350 Bhawan/ITI/SC/
ST/Common/113
9
30.08.2013
Hisar, Hansi
10
Administrative approval of SC/ST wing at
G.I.T.I, Julana in Distt. Jind
350 Bhawan/ITI/SC/
ST/Common/108
5
30.08.2013
Jind
11
Administrative approval of SC/ST wing at
G.I.T.I, Jind in Distt Jind
350 Bhawan/ITI/SC/
ST/Common/107
9
30.08.2013
Jind
12
Administrative approval of SC/ST wing at
G.I.T.I, Gulha-Cheeka in Distt. Kaithal
350 Bhawan/ITI/SC/
ST/Common/110
3
30.08.2013
Kaithal
13
Administrative approval of SC/ST wing at
G.I.T.I, Karnal in Distt. Karnal
350 Bhawan/ITI/SC/
ST/Common/109
1
30.08.2013
Karnal
14
Administrative approval of SC/ST wing at
G.I.T.I, Sujapur in Distt. Mohindargarh
350 Bhawan/ITI/SC/
ST/Common/110
9
30.08.2013
Narnaul
15
Administrative approval of SC/ST wing at
G.I.T.I, Kalayat in Distt. Kaithal
350 Bhawan/ITI/SC/
ST/Common/
1097
30.08.2013
Narwana
16
Administrative approval of SC/ST wing at
G.I.T.I, Palwal
350 Bhawan/ITI/SC/
ST/Common/111
5
30.08.2013
Palwal
17
Administrative approval of SC/ST wing at
G.I.T.I, Naultha in Distt. Panipat
350 Bhawan/ITI/SC/
ST/Common/112
7
30.08.2013
Panipat
18
Administrative approval of SC/ST wing at
G.I.T.I, Tankri in Distt Rewari
350 Bhawan/ITI/SC/
ST/Common/113
3
30.8.2013
Rewari
19
Administrative approval of SC/ST wing at
G.I.T.I, Sirsa
350 Bhawan/ITI/SC/
ST/Common/107
3
30.08.2013
Sirsa
20
Administrative approval of SC/ST wing at
G.I.T.I, Mundlana in Distt Sonepat
350 Bhawan/ITI/SC/
ST/Common/112
1
30.08.2013
Sonepat
21
Administrative approval of SC/ST wing at
G.I.T.I, Sonepat
350 Bhawan/ITI/SC/
ST/Common/106
7
30.08.2013
Sonepat
22 Administrative approval of SC/ST wing at
Yamuna nagar
350 Yamuna nagar
23 Administrative approval of SC/ST wing at
Sujapur Mohindegarh
350 Mohindergarh
TOTAL 8050
Sr. No. Name of Work No. and dated of
Approval
Amount of A/A
Rs. Lacs
Expenditure upto
3/2014
Rs. Lacs
Balance sanction
as on 1.4.14 Rs.
Lacs + new works
Status of work
1 Construction of Judicial Block in the campus of
SDO Civil Complex at Tohana in Fatehabad
Distt.
6/24/2012-5JJ-II
12.03.2012
765.00 576.88 188.12 Work completed
2 Construction of Check post, guard room, high
security boundary wall, judicial malkhana and
additional building in judicial complex at Hisar
FC No. 6/92/2011-5JJ-II
6-Jan-2012
716.71 427.85 288.86 Work is in progress
3 Construction of 4 Nos. Additional court building
in Mini Sectt. Complex at Jind
ACS No. 6/21/2013-5JJ-11
2-Apr-2013
592.30 2.03 590.27 Foundation work completed, roof slab of
GF in progress
4 Construction of Additional court room in
Judicial complex at Narnaul in Mohindergarh
distt.
6/27/2013-5JJ-II
2-Apr-2013
456.00 0.00 456.00 Tender not yet approved due to code of
conduct
5 Construction of Judicial complex at Sector-12,
Bahadurgarh in Jhajjar
6/08/2012-5JJ-II
15-Mar-2013
1713.82 12.01 1701.81 Tender received on 01.10.2013 & sent to
head office for approval
6 Construction of Judicial Block in the campus of
SDO civil Complex at Gohana at Sonepat Distt.
6/11/2012-5-JJ-II
08.02.2012
765.00 23.39 741.61 Work in progress wiring being done
7 Construction of additional eight court building in
Mini Sectt. At Sonepat Distt.
6/48/2012-5-JJ-II
04-07-2012
1175.00 215.15 959.85 35% work completed and balance work is
in progress
8 Providing Fire alarm system in judicial complex
at Narnaul in Distt. Mohindergarh
6/69/2013-5JJ-II
31.05.2013
15.33 15.33 Tender to be received on 15.11.2013
9 Providing furniture in Judicial Court Complex at
Mini Sectt. At Nuh in Mewat Distt.
6/14/2013-5JJ-II
19.02.2013
98.54 98.54 Work in progress
10 Construction of additional Judicial Complex at
Faridabad
6/8/2006-5JJ-II
24-Jan-2013
3262.08 637.11 2624.97 Work in physical progress. 100%
basement roof slab casted and 80% ground
floor slab completed and 40% first floor
slab completed. Overall 28% work
completed
11 Construction of Judicial complex at Gurgaon 6/13/2012- 5JJ-II 11331.00 0.60 11330.40 Structural design in process
12 Additional alteration in Judicial Complex at
Mohindergarh
6/43/2013- 5JJ- II
11.04.2013
7.05 4.61 2.44 Physically completed
13 Providing furniture in Judicial complex at Nuh in
Mewat district
6/14/2013/5JJ-II
19.02.2013
98.54 98.54
14 Providing and installing 1 No. tubewell and
laying of connecting pipeline to provide driking
water supply facilities in judicial complex at mini
sectt narnaul
6/07/2014-5JJ-II
03.04.2014
10.05 10.05
15 Providing addition and alteration in judicial
complex at Narnaul in Mohindergarh district
6/22/2014-5JJ-II 6.54 6.54
List of Works under head 4059 Administration of Justice 75:25 scheme (part 2)
NOTE:- The architectural drawing of some of the above works have been received recently.None of the above works has been
tendered so far. The standard structural is being prepared by the consultant.
16 Construction of Judicial Malkhana in Mini Sectt
Yamuna nagar
6/19/2013-5JJ-II 51.63 51.63
17 Construction of 10 Nos. Additional court room
at Kurukhetra
6/106/2013-5JJ-II
16.04.2014
1772.63 0.00 1772.63
18 Work providing computer points in various
rooms in Judicial Complex at Ambala City
6/19/2014-5JJ-II
03.04.2014
1.93 0.00 1.93
19 Construction of 8Nos.court building in Mini
Sectt. at Bhiwani
6/18/2014-5JJ-II
03.04.2014
3.945 0.00 3.945
20 Providing false ceiling in the various judges
chamber of judicial complex karnal
6/24/2014-5JJ-II
03.04.2014
5.06 0.00 5.06
TOTAL 22848.16 1899.63 20948.53
Sr. No. Name of Work No. and dated of
Approval
Amount of A/A
Rs. Lacs
Expenditure upto
3/2014
Rs. Lacs
Balance sanction
as on 1.4.14 Rs.
Lacs + new works
Status of work Remarks
1 Construction of Judicial Block in the campus of
SDO Civil Complex at Tohana in Fatehabad
Distt.
6/24/2012-5JJ-II
12.03.2012
765.00 378.5 Finishing in progress
2 Construction of Check post, guard room, high
security boundary wall, judicial malkhana and
additional building in judicial complex at Hisar
FC No. 6/92/2011-5JJ-II
6-Jan-2012
716.71 572.93 Work in progress
3 Construction of 4 Nos. Additional court building
in Mini Sectt. Complex at Jind
ACS No. 6/21/2013-5JJ-11
2-Apr-2013
592.30 592.30 Work recently allotted
4 Construction of Additional court room in
Judicial complex at Narnaul in Mohindergarh
distt.
6/27/2013-5JJ-II
2-Apr-2013
456.00 456.00 Tender re-invited and to be opened on
06.11.2013
5 Construction of Judicial complext at Sector-12,
Bahadurgarh in Jhajjar
6/08/2012-5JJ-II
15-Mar-2013
1713.82 1713.82 Tender received and under approval
6 Construction of Judicial Block in the campus of
SDO civil Complex at Gohana at Sonepat Distt.
6/11/2012-5-JJ-II
08.02.2012
765 375.36 Work in progress
7 Construction of additional eight court building in
Mini Sectt. At Sonepat Distt.
6/48/2012-5-JJ-II
04-07-2012
1175 1174.13 Work is in progress
8 Providing Fire alarm system in judicial complex
at Narnaul in Distt. Mohindergarh
6/69/2013-5JJ-II
31.05.2013
15.33 15.33 Tender to be received on 15.11.2013
9 Providing furniture in Judicial Court Complex at
Mini Sectt. At Nuh in Mewat Distt.
6/14/2013-5JJ-II
19.02.2013
98.54 98.54 Work in progress
10 Construction of additional Judicial Complex at
Faridabad
6/8/2006-5JJ-II
24-Jan-2013
3262.08 3233.45 Work in physical process. Concreting of
foundation beams and slab is in progress
and shuttering of basement roof slab is in
progress.
Sr. No. Name of work No. & date of Approval Amount of A/A Expendiure up to
3/2014
Balance sanction
as on 1.4.2014 +
new works
Status of work Remarks
1 Construction of Govt. Polytechnic at Meham in
Rohtak Distt.
35/62/09-2T.E.
18-Aug-2009
800.00 685.08 114.92 Work in physically progress. (i) Work
completed. (ii) Plastering, tile terracing,
flooring completed. Grill in window, plinth
protection, finishing & P.H. work fitting is
in progress. (iii) Work completed.
List of Works under head 4059 Administration of Justice 75:25 scheme (part 2)
Bank of Sanction as on 01.04.2014 for Education, Sports, Art & Culture (Plan), under Head 4202-C.O. (Polytechnic)
2 Construction of Administrative cum Academic
Block (Block A) and Workshop Block (Block C)
at Govt. Polytechnic, Shergarh Distt. Kaithal
FCPS No. 35/38/2012TE
26-Apr-2012
1550.00 674.54 875.46 Block A&C Parking, Grinding of floor,
wall putty in progress. Block B&D
Ground floor slab laid.
3 Construction of Academic block of Government
Polytechnic Bhiwani in Bhiwani District.
35/45/2008-2TE
7-Jul-2008
1,525.00 600.22 924.78 Finishing work in progress. Building partly
handed over to the client deptt
4 Rough Cost Estimate execution of civil works at
Govt. Polytechnic Jhajjar.
31/01/2013-TE
2-Jan-2013
23.13 23.13 Wok in physical progress. Admin. Block-
Completed , Boys Hostel- Completed.
Girls Hostel- Completed, Residences -75%
work completed and finshing is in
progress. Statue work completed. not in mis list
5 Construction work of Govt. Polytechnic, at
village Mandkola, Distt. Palwal.
35/26/2013-4TE
12-April-2013
1,554.13 4.66 1549.47 Estimate and DNIT is under process
6 Construction work of Govt. Polytechnic, at
village Indri, Distt. Mewat.
35/25/2013- 4TE
12-April-2013
1,554.13 210.88 1343.25 Found work comp. upto plinth beam in all
blocks. A block slab G.F. casted and
shuttering in progress. Block D, casting of
column in progress and B/wall 90%
completed
7 Const. of Govt. Polytechnic at village Malab
District Mewat
1554.13 3.48 1574.65
Work of foundation and B/wall in progress
Total 8,560.52 2178.86 6405.66
Sr. No.
Name of Work
No. and date of Approval Amount of A/A Expenditure up to
03/2014
Balance sanction
as on 1.4.2014 Status of work Remarks
1 Const. of Govt. Polytechnic Jatal in Distt Panipat P.S. No. 35/3/2010-2TE
16-Apr-2013
1,554.13 0.00 1554.13 Tender to be received on 30.08.2013
2 Const. of Administrative cum Academic Block at
Government Polytechnic at village Neemka in
Faridabad District
35/5/2013-2TE 1,500.00 1475 Work in tender allocation formalities.
Tender on 24.08.2013 and under process
3 Const. of Polytechnic at Lisana in Rewari Distt No. 35/33/2006-2TE
19-May-2008
2,516.46 985.82 Main building completed & Handed over.
Boundary wall in progress
4 Choudhary Ranbir Singh Hooda Govt. Institute
of Irrigation and Power Engineering Hathinikund
Distt Yamuna nagar
35/33/2010-2D
Dated 12.04.2013
1554.13 0 1554.13 DE/DNIT under submission by SE
Chandigarh. Tenders will be called by
20.07.2013
5 Govt. Polytechnic, Dhangar Distt. Fatehabad 35/33/2010-2TE
Dated 16.04.2013
1554.13 0 1554.13 Tender invited and to be received on
12.08.2013
TOTAL 8,678.85 0.00 7123.21
Sr. No.
Name of work
No. & date of Approval Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance sanction
Rs. Lacs 01.04.14 Status of work Remarks
1 Construction of New SDE PWD B&R office at
Pehowa in Distt. Kurukshetra.
FC & PS No. 1/14/2011-
1(W)
14-May-2012
58.56 58.56 Roof slab completed
2 Administrative approval for construction of New
PWD Rest House at village Sirsagarh, Near
Dosarka Mullana in Ambala Distt.
1/29/2010-1 B&R (W) 173.52 128.30 Foundation completed
3 Construction of PWD Rest House at
Chhachhrauli in Yamuna Nagar District
EIC, Hr. no. 4257-62
16-Jun-2011
135.62 135.62 Work completed.
4 Constructing of New Rest House at Fatehabad in
Fatehabad Distt.
FC&PS No. 1/22/2011
6-Mar-2012
179.52 179.52 Structure completed. Flooring in progress
Bank of sanctions as on 01.04.14 under head 4059- C.O. Public Works (Major Works)-Allotted works
5 Constn. of PWD Rest House at Narwana in Jind
Distt.
FC No. 1/1/2011-
1B&R(W) 6-Sep-2011
146.00 146 Finishing work is in progress.
6 Construction of New Block No. II in PWD Rest
House at Kaithal.
FCPS No. 1/2/2009-
1B&R(w) 22-Feb-2012
175.30 175.3 Structure completed. Plaster in progress
7 Construciton of Nirman Sadan PWD B&R
Office Complex at Kaithal.
1/2/2009-1B&R(w)
29-Nov-2012
995.75 995.75 Basement partly completed
8 Construction of New PWD Rest House at Pundri
in Distt. Kaithal.
FC&PS No.1/4/2012-
1B&R 7-May-2012
200.73 200.73 Ground floor slab laid.
9 Construction of PWD B&R Rest House at
Jhajjar
No.1/9/2010-1B&R (W)
4-May-2012
204.00 204 Work is in progress. Over all 30% work
completed
10 Construction of PWD Rest House with 2 Nos.
440 Sft houses and SDO Office at Beri in Jhajjar
District
No.1/37/2010-1 B&R(W)
19-Mar-2013
569.51 569.51 Detailed estimate/DNIT stands submitted
to head office
11 Construction of Nirman Sadan at Rohtak NO. 1/2/2011-1 B&R(W) 1779.8 1779.8 Work just started
12 PWD Rest house at Rai in Sonepat Distt 1099.13 1099.13 Foundation in progress
Total 5717.44 5672.22
Sr. No.
Name of work
No. & date of Approval Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance sanction
Rs. Lacs 01.04.14 Status of work Remarks
1 Construction of New SDE PWD B&R office at
Pehowa in Distt. Kurukshetra.
FC & PS No. 1/14/2011-
1(W) 14-May-2012
58.56 28.62 29.94 Structural work completed. Finishing
work such as plastering and flooring are in
progress
2 Administrative approval for construction of New
PWD Rest House at village Sirsagarh, Near
Dosarka Mullana in Ambala Distt.
1/29/2010-1 B&R (W) 173.52 89.76 83.76 Work in progress
3 Construction of PWD Rest House at
Chhachhrauli in Yamuna Nagar District
EIC, Hr. no. 4257-62
16-Jun-2011
135.62 145.01 0.00 Work completed
4 Construction of 1st floor & 2nd floor of existing
Rest House in Sector -16A, Faridabad
4/23/2006-1B&R(W)
28-Dec-2011
259.80 0.78 259.02 Work in tender/allocation formalities.
Tender received on dated 20.12.2013 and
under process
5 Constructing of New Rest House at Fatehabad in
Fatehabad Distt.
FC&PS No. 1/22/2011
6-Mar-2012
179.52 110.96 68.56 Finishing work is in progress.
6 Constn. of PWD Rest House at Narwana in Jind
Distt.
FC No. 1/1/2011-
1B&R(W)
6-Sep-2011
146.00 86.82 59.18 Physically completed
7 Constn. of PWD Rest House at Uchana in Jind
Distt.
14/02/2008-1B&R(w)
31-Oct-2011
116.50 0.27 116.23 The case of land acquisition has been
admitted on 8.11.12 in Hon'ble Pb. & Hry.
High Court titled as Baljeet Singh V/s
State case No.CWP 3380 of 2012. Next
date 26.5.14
8 Land Acquisition for construction of rest house
(B&R) at Uchana (Jind)
ACS no. 14/02/2008-1
B&R W 31-Oct-2012
62.93 0.00 62.93 Award awaited
9 Construction of New Block No. II in PWD Rest
House at Kaithal.
FCPS No. 1/2/2009-
1B&R(w) 22-Feb-2012
175.30 89.04 86.26 Structure work completed. Floor tile work
in progress.
10 Construciton of Nirman Sadan PWD B&R
Office Complex at Kaithal.
1/2/2009-1B&R(w)
29-Nov-2012
995.75 179.12 816.63 Basement, ground floor and first floor slab
laid
11 Construction of New PWD Rest House at Pundri
in Distt. Kaithal.
FC&PS No.1/4/2012-
1B&R 7-May-2012
200.73 96.22 104.51 Doubly storey building. Main rest house
ground floor slab laid. First floor slab laid.
Boundary wall completed, flooring in
progress
12 Construction of new PWD Rest House at
Charkhi Dadri in Bhiwani Distt.
1/39/2010-1B&R(W)
27-Aug-2012
182.53 3.83 178.70 Detailed estimate & DNIT sent to Head
office. Tender will be called after approval
of DNIT
13 Construction of PWD B&R Rest House at
Jhajjar
No.1/9/2010-1B&R (W)
4-May-2012
204.00 177.60 26.4 100 % work completed.
Bank of sanctions as on 29.04.14 under head 4059- C.O. Public Works (Major Works)
14 Construction of PWD Rest House with 2 Nos.
440 Sft houses and SDO Office at Beri in Jhajjar
District
No.1/37/2010-1 B&R(W)
19-Mar-2013
569.51 173.62 395.89 Work in progress
15 Construction of Nirman Sadan at Rohtak NO. 1/2/2011-1 B&R(W) 1779.8 4.53 1775.27 Work administratively approved. Work
started excavation completed. Footing is
in progress.
16 Construction of New PWD Rest House Gurgaon NO. 1/20/2012-1B&R(W) 737.19 0.00 737.19 Site not finalized yet
17 PWD Rest house at Bahadurgarh 1/6/2010-1B&R(W)
04.06.2013
489.02 0.02 489.00 Tender received and sent to head office for
approval
18 PWD Rest house at Rai in Sonepat Distt Sanction received in UO
form
1099.13 79.80 1019.33 Work is in progress
19 Construction of New Rest House at Hodal in
Palwal Distt.
1/18/11-1B&R (W) 185.55 0.00 185.55 Detailed estimate/DNIT under preparation
20 Construction of Memorial of Sardar Partap
Singh at Village Rasoi in Sonepat Distt.
1/13/2013-1 B&R (W) 415.51 0.69 414.82 Tender to be received on 16.1.14
21 Re-construction of PWD Rest House (Ekant
Bhawan) at Mussorie
1/2/2013-1 B&R (W) 662.51 0.00 662.51 Fresh approval
Total 8828.98 1266.69 7571.68
Sr. No. Name of work No. & date of Approval Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance sanction
as on 1.4.14
Rs. LacsStatus of work
1 Const. of office building of Haryana state Legal
services Authority in Sector-14 Panchkula
20/8/2005-4JJ-I
21-Jan-2013
756.15 106.24 649.91 Work in progress.
2 Construction of proposed Judicial Block (Phase -
II) on existing Litigant Hall in Mini Sectt. at
Rohtak
6/35/2012-5 JJ-II
18-Jun-2012
877.31 103.95 773.36 Slab of FF, S.F. completed and 50% slab
of T.F. laid and mumty of 50% is in
progress. Building of steel bars and T.F. is
in progress. Overall 70%work completed.
3 Construction of Judicial Block in the compus of
SDO (Civil Complex) at Hathin in Palwal
FC/PS No. 6/7/2012-5 JJ-II
19-Jun-2012
792.42 236.30 556.12 Work is in progress.
4 Construction of Security Guard Room, Check
post & high security boundary wall around
judicial court complex Mini Sectt. at Sirsa in
Sirsa Distt
1
29-Dec-2011
134.60 102.89 31.71 Work physically & financially completed
5 Construction of Judicial Block in the campus of
SDO Civil Complex at Ganaur in Sonepat Distt.
F.C. NO. 9082-89/WI
5-Dec-2011
765.00 317.48 447.52 65% work completed and balance work in
progress
6 Construction of Property Room of Judicial
Complex & Police Malkhana in Campus of Mini
Sectt Sirsa
6/110/2012-S JJ-II
26-Oct-2012
67.84 67.68
7 Constructing Additional work in the Campus of
Mini Sectt. at Bhiwani in Bhiwani Distt.
No. 2538-P-B-11/11904
3-Nov-2011
114.74 113.9 Work in progress
8 Construction of Additional Litigant Hall & Bar
complext in Mini Sectt. At Narnaul in
Mohindergarh District
6/33/2012-5-JJ (II)
4-Jul-2012
317.35 78.12 239.23 50% roof slab laid and further work in
progress
9 Const. of Bridge connecting lawyers chambers
and litigant shed in mini sectt. at Karnal
Add. C.S.No. 6/21/ 5JJ II
7-Aug-2013
75.73 1.38 74.35 Excavation of footing and column in
progress 06.02.2014
10 Supply of furniture for two subordiate courts at
new Judicial Complex, Tohana, District
Fatehabad
6/112/2013-5 JJ-II
01.01.2014
11.40 0.00 11.40 Work completed
11 Estimate for Providing Estate PHA Services in
Mini Sectt. (SDO Civil) at Meham Distt,Rohtak
2664-R-6-2013/20989
30.12.2013
51.32 51.32
12 Renovation of office of Advocte General,
Haryana Chandigarh (Level I & II)
2/27/2013- 5 JJ (I)
22.08.2013
50.52 50.52
Bank of sanctions as on 01.04.14 for Administration of Justice under head 4059- C.O. Public Works (Major Works)
13 Renovation of office of Advocte General,
Haryana Chandigarh
2/13/2013-5 JJ (I)
03.01.2014
11.33 11.33
14 Connectivity of electricity pertaining to the Civil
Court Safidon with hotline
6/105/2013-5JJ-II
20.11.2013
12.19 0.00 12.19 Work is in progress.
15 Construction of structure for temporary chamber
for the lawyers in New Judicial Complex, Palwal
6/102/2013- 5 JJ-II
12.11.2013
21.08 21.08
16 Approval for laying of Local area network in the
subordiated courts located in the states of
haryana
6/18/2013-5 JJ- II
12.11.2013
537.00 341.00 196.00 Part payment made
17 Providing addition and alteration in Judicial
Complex at Narnaul (Mohindegarh)
6/70/2013/5JJ- II
26.06.2013
6.33 0.00 6.33 Physically completed.
18 Installation of Grills on the walls of Bar
Room/Complex at Safidon in Jind district
6/88/2013/5JJ-II
13.09.2013
2.70 0.05 2.65 Work is in progress.
19 Connnectivity passage on 2nd floor and district
courts Ambala
6/151/12
dated 26.11.2012
20.17 23.38 0.00 Work physically completed but financial liabilities pending
TOTAL 4625.18 1310.79 3316.6
Sr. No. Name of work No. & date of Approval Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance sanction
as on 1.4.14
Rs. Lacs + new
works
Status of work Remarks
1 Construction of Sub Tehsil Building at Village
Mullana in Ambala District
CS No. 3136 r 6 2012 168
3-Jan-2013
139.64 66.57 73.07 Work in progress.
2 Const. of Tehsil Bldg. at Raipur Rani Distt FC&PS Memo No. 319-F-6-
2013/2651
4-Mar-2013
272.00 0.00 272.00 Work yet not started
3 Constructing of Internal road/Parking in S.D.O.
(Civil) Block at Samalkha in distt. Panipat
FC & PS No. 2367R-6-09-
7209 24
-Aug-2009
98.07 78.39 19.68 Worky physically completed but financial
liabilities pending
4 Const. of EVM Warehouse in the campus of
Mini Sectt. Complex at Panipat
ACS & FCR No. 1155-R-
6/7807 18-Jun-2013
103.70 0.00 103.70 The revised drawing submittred by Chief
architect office to financial commissioner.
Revenue for approval. Still awaited.
5 Construction of Mini Secretariat at Meham in
Rohtak District
FC&PS No.2655-R-6-
10/9831
30-Sep-2010
815.00 607.16 207.84 Work administratively approved. Work
completed except finishing and parking
area. Finishing is in progress.
6 Construction of Surface Car Parking in Mini
Sectt. at Rohtak.
275-R-6-2012/2006
21-Feb-2012
89.41 Work completed.
7 Construction of Tehsil building at Farrukh Nagar
Distt. Gurgaon
No. 2828-R-6-2011/13396
28-Nov-2010
317.95 211.77 106.18 Overall 90% nwork completed.
8 Construction of SDO(Civil) Complex ( Admn.
Block) building at Pataudi in Gurgaon Distt.
T/S vide EIC No.22/WI
3-Jan-2012
531.39 417.80 113.59 Work is in Physical progress. RCC
structure completed. Plaster of ground
floor and first floor completed. Joinery
work of ground floor and floor is in
progress. Flooring work is in progress.
9 Construction of Mini Sectt. (S.D.O.) Civil
Complex (Admn. Block) at Hathin in Palwal
Distt
FC&PS No 721-R-6-
11/3198 24-Mar-2011
899.60 655.09 244.51 Physically completed and hander over to
client department on 05.03.2014
10 Construction of SDO Civil Complex (Admn.
Block) at Tohana in Fatehabad Distt.
FC&PS No. 2537-R-6
9-Nov-2011
914.00 710.38 203.62 Work completed.
11 Construction of ware house for EVM Machine in
Mini Secretariat at Fatehabad
1090-R0602012/7214
3-Jun-2013
150.30 1.23 149.07 D/E submitted
12 Rough cost estimate for construction of Record
room of SDM office in DAC building Hisar
Endst. 696-R-6-2012/356
26.03.2012
71.25 0.00 71.25
Bank of sanctions as on 01.04.14 for District Administration under head 4059- C.O. Public Works (Major Works)
13 Construction of Tehsil Building at Uklana Distt
Hisar.
FC &PS memo No. 57-R-6-
2013/1241
30-Jan-2013
420.53 0.60 419.93 Work allotted but it will be started after
mode of conduct
14 Construction of Tehsil Office cum Revenue
record room in Tehsil Julana Distt. Jind
FC&PS No191-R-6-
2012/2186
24-Feb-2012
381.60 250.94 130.66 100% B/wall completed and 2nd floor roof
slab laid further work is in progress.
15 Extension/Expansion of New Mini Sectt. at Jind
in Jind Distt.
ACSP No.3292-R-
6/2012/172
3-Jan-2013
1,050.75 1.64 1049.11 Tender under approval in Head office
16 Constructing Additional work in the Campus of
Mini Sectt. at Bhiwani in Bhiwani Distt.
No.2538-P-B-11/11904
3-Nov-2011
114.74 74.63 40.11 90% work completed. Further work is in
progress
17 Construction of 2nd Floor on SDO (Civil) &
Tehsil Complex at Charkhi Dadri in Distt.
Bhiwani
FC&PS No.2844-R/13400
28-Nov-2011
98.27 51.97 46.30 Worky physically completed.
18 Construction of SDO (Civil) Complex
(Administrative Block) in the Campus of Mini
Sectt. Charkhi Dadri in Bhiwani Distt.
631-R-6-2012/3170
16-Mar-2012
1,055.00 555.91 499.09 703/703 piles & 175/175 piers cap casted.
Further work is in progress.
19 Construction of SDO Civil complex (Admin
Block) building at Sector 12 Bahadurgarh Jhajjar
Distt.
FC &PS memo No. 3247-R-
6-2012/312
31-Jan-2013
1288.83 328.16 960.67 Slab of ground floor laid. RCC work in
first storey is in progree
20 Construction of Tehsil Building at Beri in Jhajjar
District.
FC&PS No. 1372
13-Feb-2009
177.50 0.18 177.32 Work not yet started. Decision is pending
with LA with distt admn.
21 Construction of ware house for EVM Machine in
Mini Secretariat at Jhajjar
No. 3154-R-6-2012/1246
30-Jan-2013
88.95 89.62 0.00 Work is in progress. Overall 20% work
completed.
22 Construction of Administration Block in SDC
(C) Complex at Beri in Jhajjar District
No.105-R-6-2012/1768
12-Feb-2013
1,525.85 159.46 1366.39 Tender case stands submitted to head
office vide SE(J) letter No. 1729 dated
12.09.13
23 Constn. of mini Sectt. Admn. Block at Sonipat R/A F.C. No. 12046
4-Nov-2010
1,329.80 1,182.78 147.02 Structure completed. Flooring and
plastering in progress.
24 Construction of SDO Civil complex (Admn
Block) at Ganaur in Sonepat Distt.
F.C. memo No. 13184
22-Nov-2011
898.77 201.02 697.75 40% work completed and balance work in
progress.
25 Construction of SDO Civil complex at Gohana in
Sonepat Distt
F.C. memo No. 12504
16-Nov-2010
692.25 702.51 0.00 Work physically completed.
26 Construction extention of litigant hall at Distt.
Administrative complex in Mini. Sectt. Sonepat
FC.No. 11460
18-Oct-2011
139.70 95.29 44.41 Physically completed.
27 Providing & fixing aluminium partition all doors,
high mast lighting audio & conference system
AC, RO & invertor in Admn Block in Mini Sectt.
at Sonepat
F.C. No.1969-R-6-
12/12704
15-Oct-2012
258.88 112.59 146.29 Physically completed.
28 Construction of ware house for EVM Machine in
Mini Secretariat at Sonepat
No. 594-R-6-2013/4646
10-Apr-2013
219.88 0.00 219.88 DNIT and detailed estimate are under
preparation.
29 Replacement of lift no. 3 in New Sectt. Bldg.,
Haryana Sec-17, Chandigarh
740-CT-N-2012/3625
27-Mar-2012
76.08 76.08 Work in progress.
not in mis list
30 Construction of Administrative office building
phase II with multi level parking in the campus of
mini sectt sector 1 panchkula
2665-R-6-2013/20994
30.12.2013
4162.05 0.00 4162.05 Work yet not started. Str. Design under
preparation
31 Estimate for providing Estate Water Supply,
Sewerage, and Fire Fighting arrangement in
Administration Block (Phase-II) in the campus of
Mini Sectt. Fatehabad District
2565-R-6-2013/20547
18.12.2013
37.93 37.93
not in mis list
TOTAL 18419.67 6555.69 11785.5
Sr. No. Name of work No. & date of Approval Amount of
A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction Rs.
Lacs 01.04.14
Status of work Remarks
1 Construction of New SDE PWD B&R office at
Pehowa in Distt. Kurukshetra.
FC & PS No. 1/14/2011-1(W)14-
May-2012
58.56 28.62 29.94 Structural work completed. Finishing
work such as plastering and flooring are in
progress
2 Administrative approval for construction of New
PWD Rest House at village Sirsagarh, Near
Dosarka Mullana in Ambala Distt.
1/29/2010-1 B&R (W) 173.52 89.76 83.76 Work in progress
3 Construction of 1st floor & 2nd floor of existing
Rest House in Sector -16A, Faridabad
4/23/2006-1B&R(W)
28-Dec-2011
259.80 0.78 259.02 Tender received on dated 20.12.2013 and
under process
4 Constructing of New Rest House at Fatehabad in
Fatehabad Distt.
FC&PS No. 1/22/2011
6-Mar-2012
179.52 110.96 68.56 Finishing work is in progress.
5 Constn. of PWD Rest House at Uchana in Jind
Distt.
14/02/2008-1B&R(w)
31-Oct-2011
116.50 0.27 116.23 The case of land acquisition has been
admitted on 8.11.12 in Hon'ble Pb. & Hry.
High Court titled as Baljeet Singh V/s
State case No.CWP 3380 of 2012. Next
date 26.5.14
6 Land Acquisition for construction of rest house
(B&R) at Uchana (Jind)
ACS no. 14/02/2008-1 B&R W
31-Oct-2012
62.93 0.00 62.93 Case for land acquisition is in Hon’ble
Punjab and Haryana High court. The next
date of hearing is 26.5.14
7 Construction of New Block No. II in PWD Rest
House at Kaithal.
FCPS No. 1/2/2009-1B&R(w)
22-Feb-2012
175.30 89.04 86.26 Structure work completed. Floor tile work
in progress.
8 Construciton of Nirman Sadan PWD B&R
Office Complex at Kaithal.
1/2/2009-1B&R(w)
29-Nov-2012
995.75 179.12 816.63 Basement, ground floor and first floor slab
laid
BANK OF SANCTIONS AS ON 29.04.14 UNDER HEAD 4059- C.O. PUBLIC WORKS (MAJOR WORKS)
9 Construction of New PWD Rest House at Pundri
in Distt. Kaithal.
FC&PS No.1/4/2012-1B&R
7-May-2012
200.73 96.22 104.51 Doubly storey building. Main rest house
ground floor slab laid. First floor slab
laid. Boundary wall completed, flooring
in progress
10 Construction of new PWD Rest House at
Charkhi Dadri in Bhiwani Distt.
1/39/2010-1B&R(W)
27-Aug-2012
182.53 3.83 178.70 Detailed estimate & DNIT under
preparation
11 Construction of PWD Rest House with 2 Nos.
440 Sft houses and SDO Office at Beri in Jhajjar
District
No.1/37/2010-1B&R(W)
19-Mar-2013
569.51 173.62 395.89 Work in progress
12 Construction of Nirman Sadan at Rohtak NO. 1/2/2011-1 B&R(W) 1779.8 4.53 1775.27 Work administratively approved. Work
started excavation completed. Footing is
in progress.
13 Construction of New PWD Rest House Gurgaon NO. 1/20/2012-1B&R(W) 737.19 0.00 737.19 Site not finalized yet
14 PWD Rest house at Bahadurgarh 1/6/2010-1B&R(W)
04.06.2013
489.02 0.02 489.00 Tender received and under process
15 PWD Rest house at Rai in Sonepat Distt Sanction received in UO form 1099.13 79.80 1019.33 Work is in progress
16 Construction of New Rest House at Hodal in
Palwal Distt.
1/18/11-1B&R (W) 185.55 0.00 185.55 Detailed estimate/DNIT under preparation
17 Construction of Memorial of Sardar Partap
Singh at Village Rasoi in Sonepat Distt.
1/13/2013-1 B&R (W) 415.51 0.69 414.82 Work in progress
18 Re-construction of PWD Rest House (Ekant
Bhawan) at Mussorie
1/2/2013-1 B&R (W) 662.51 0.00 662.51 Approval of local authorities is being
taken
Total 8343.36 857.26 7486.10
Name of work
No. & date of Approval
Amount of
A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs + new
works
Status of work
Remarks
1 Construction of road for Govt
Engineering College of Silani Kesho in
Jhajar District
C13/2013/1220
14.06.2013
133.29 0.00 133.29 Work is in progress
Bank of sanctions as on 01.04.14 under head 4202- Capital outlay, on education, sports, art, and culture for the year 2014-15
2 Foundation stone laying ceremony of
Extension campus (Research &
Development) of IIT Delhi at village
Badhsa
C13/2014/22463
20.12.2013
5.00 2.87 2.13
3 Providing & fixing RCC Posts and
topographic survey for Govt Engineering
College at Jainabad in Rewari Distt
C14/2013/21481
16.07.2013
2.39 0.00 2.39 Work is in progress
4 Contruction of Rao Birender Singh State
Institute of Engineering & Technology,
Jainabad in Rewari District
C14/2013/21838
03.09.2013
1200 0.00 1200 Administrative approval received
Tentative. R/C/E based based on
Architectural drawings component
wise stands submitted to Director
General Technical Education
Haryana vide EIC No. 1466 dated
18.02.2012, 1674-80, 1682-86,
dated 25.02.14, 1723-27/W-I dated
28.2.14
5 Construction of boundary wall and check
post for Rao Birender Singh State
Institute of Engineering & Technology at
village Zainabad, distrist Rewari
35/3/2010-2 TE
09.01.2014
208.40 0.00 208.40 Detail estimate and DNIT stands re-
submitted to Head office on dated
07.04.2014
6 Construction of Foundation stone laying
ceremony for indian institute of
information technology at village
kiloharad distt sonepat and other works
C15/2014/22446
20.12.2013
15.00 0.00 15.00
TOTAL 1564.08 2.87 1561.21
Name of work
No. & date of Approval
Amount
of A/A
Rs. Lacs
Expenditure up
to 3/2014
Rs. Lacs
Balance
sanction as
on 1.4.14
Rs. Lacs +
new works
Status of work
Remarks
Bank of sanctions as on 01.04.14 under head 4235 and 2235- Social welfare deposit works for the year 2014-15
1 Construction of building of observation
home for children at Madhuban in Karnal
504/SW (3)
22.03.14
416.05 0 416.05 New work
4235
2 Construction of building of special home
for children at Madhuban in Karnal
503/SW (3)
22.03.14
333.09 0 333.09 New work
4235
3 Construction of building of Children
Home, Faridabad
10454 ICPS/2014
24.03.14
234 197.27 New work2235
4 Construction of building of Children
Home, Gurgaon
10449/ICPS
24.03.14
366 324.30 New work2235
5 Construction of building of Special
Home, Karnal
10459 ICPS/2014
24.03.14
333.09 291.29 New work2235
TOTAL 1682.23 1562
Name of work
No. & date of Approval
Amount
of A/A
Rs. Lacs
Expenditure up
to 3/2014
Rs. Lacs
Balance
sanction as
on 1.4.14
Rs. Lacs +
new works
Status of work
Remarks
1 Alteration in old and new Mini Secretariat,
Gurgaon
3/51/2013-3 Lab 55.74 0 55.74 Fresh approval
2 Construction of Labour court complex at
faridabad
3/46/2008-3 Lab 1406 0 1406 Work in physical progress. RCC
foundations complete, 50 % RCC wall of
basement casted and casting of RCC
columns of basement is in progress.
Name of work
No. & date of Approval
Amount
of A/A
Rs. Lacs
Expenditure
up to 3/2014
Rs. Lacs
Balance
sanction as
on 1.4.14
Rs. Lacs +
new works
Status of work
Remarks
Bank of sanctions as on 01.04.14 under head 4250- Capital outlay, " 201-Labour Sub-Head 96 construction of Labour Court complex for the year 2014-15
Bank of sanctions as on 01.04.14 for Education works under head 4202- C.O. Higher Education (Major Works)
1 Construction of Govt. College
Building at Chhachhrauli (Double
storey building)
R/A/AF&C1/4-06-Works
(2)
20-Jul-2012
878.45 677.46 200.99 Work completed.
2 Construction of P.G. Block in Govt.
College Sector-14, Karnal
C&S No. 4/33-06
4-Sep-2008252.11 467.82 0.00 Work is in progress. Outside
plaster work is in progress
3 Construction of Multipurpose / Auditorium Hall
in Govt. College Karnal
C&S No. 4/33-06
4-Sep-2008
383.79 287.7 96.09 Work is in progress. Ground floor
completed and FF slab 50% completed.
Work 2nd storey in progress
4 Construction of 6 No. Class rooms in Govt.
College at Matak Majri in Karnal Distt
FCPS No. KW-4/7-08Works-2
14-Nov-2011
137.25 131.3 5.95 Physically completed.
5 Construction of 8 No. Class rooms in Govt.
College Sector-14, Karnal.
FC&PS No. KW/4/7-08 (W)
14-Nov-2011
151.66 25.27 126.39 Work is in progress. Roof slab 100%
completed. Cement plaster is in progress.
6 Construction of the building of Govt. College
Bapoli in distt. Panipat
FC&PS No.1/13-2010
4-Oct-2011
1366.62 243.17 1123.45 82% work of boundary wall & 100%
columns casted upto G.F. roof level, 65%
column casted upto 1st floor, 75% ground
floor slab laid and 30% slab 1st floor laid,
Earth filling completed, brick work in
ground/1st floor in progress.
7 Constg. Govt. College at Sector-18 at Panipat in
distt. Panipat.
FC&PS No. 1/5-2008
3-Oct-2011
1433.89 673.61 760.28 90% Work of Boundary wall completed.
Structure completed. Kota stone
flooring/plaster work & road & parking
work in progress.
8 Construction of Govt. Women College at
Lakhan Majra in Rohtak Distt.
1/6-2008 works (2)
27-Feb-2012
866.5 574.14 292.36 Work completed and inaugurated by
Hon'ble CM Haryana on dated 27.9.2012.
Work administratively approved. Work is
in progress. PCC work completed. 100%
column upto roof level has been
completed & 80% slab of GF completed.
9 Construction of Teaching Block/Class Rooms in
Govt. College for women at Rohtak
KW 4/7-08 Works (2)
14-Nov-2011
217.81 201.82 15.99 Work in physical completed.
10 Construction of Teaching Block/Class Rooms in
Govt. College for Boys at Rohtak
KW 4/7-08 Works (2)
14-Nov-2011
217.81 211.9 5.91 Work in physical completed.
11 Construction of S.C. / B.C. Hostel in I.C. Govt.
Women College at Rohtak
1/17-99 Works (2)
26-May-2011
160.31 50.68 109.63 Work in physical completed.
12 Construction of Multipurpose Hall (Auditorium)
in Govt. College at Meham in Rohtak Distt.
KW4/90-2007 works (2)
24-Nov-2011
385.08 203.26 181.82 Work in physical progress. RCC column
completed. First upto slab level complete
and second level slab completed. Stage
side structure work completed. 3rd level
slab in front side completed & in middle
portion slab is completed.
13 Construction of Teaching-cum-Admn. Block
with check post & main gate in Pt. Neki Ram
Sharma Govt. College, Rohtak
4/8-2007 works (2)
27-Jun-2012
784.54 460.59 323.95 Work in physical progress. Structure
work completed. 80% brick work
completed, 70% flooring completed. 70%
plaster completed. Balance in progress &
tile trassing is in progress.
14 Const. of Commerce teaching block (12 Room)
in Govt. College Meham in Rohtak Distt.
4/13-13 works (2)
8-May-2013
217.81 101.3 116.51 Work is in progress. Excavation work
completed. PCC work completed. RCC
footing & plinth level been completed.
Column upto roof level has been laid.
G.F. slab has been completed. Column
upto F.F. slab is in progress
15 Const. of Govt. College at Sampla 1/2-12 works (2)
5-June-2013
1366 0.78 1365.22 Work administratively approved. Work
allotted to the agency and excavation of B.
wall is in progress. 25% B. wall of
foundation of B wall completed upto DPC
level.
16 Construction of building of Government
College, Kheri Gujran in Faridabad District
FC&PS Memo No. 10510/WI
11-Dec-2012
1292.4 407.23 885.17 Work in physical progress. Casting of
ground floor roof slab 90% completed and
casting of 1st floor roof slab 80%
completed. Shuttering of rest of the slab is
in progress. Overall 40% work
completed.
17 Construction of Mulitipurpose Hall in Govt.
College Sector-14 Gurgaon
A/A 4/114-2007-W(2)
24-Nov-2011
726.03 390.27 335.76 Finishing work is in progress
18 Construciton of the Building of Dr. B.R.
Ambedkar Govt. College , Palwal
1/4-2011 works (2)
13-Oct-2011
1306.66 955.82 350.84 Physically completed & handed over to
client deptt on 05.03.2014
19 Construction of the Building of Govt. College
for Women, Hathin in Palwal Distt.
PS, HR/1/2-11 works (2)
8-Aug-2013
1272.62 0 1272.62 Estimate and DNIT under preparation
20 Construction of the Building of Govt. College
for Women at Ratia in Fatehabad Distt.
FS No. 1/1-12
16-May-2013
1051 4.04 1046.96 No tender received on 30.09.2013, and
06.12.2013. Tender received on
28.01.2014 and under process.
21 Construction of Govt. College at Dabwali Distt.
Sirsa.
3/46-98-works-02
8-Nov-2011
1512.3 784.91 727.39 Finishing work pending.
22 Construction of Building of Women Wing of
Govt. National College at Sirsa in Sirsa Distt
2/5-07 works (2)
12-Aug-2013
1740 0 1740 Detailed estimate submitted to Head office
for Technical Sanction.
23 Construction of Govt. College at Barwala in
Distt. Hisar
FC No 1/7-2007 Works (2)
17-Oct-2011
1376.52 1114.56 261.96 Work is in progress
24 Construction of Teaching block/ Class room at
Jind
FC KW4/7-08 Works (2)
14-Nov-2011
217.81 200.75 17.6 Work completed.
25 Construction of Govt. College for Women at
Safidon in Jind Distt.
FC&PS No. 1/8-11 works (2)
6-Feb-2013
1630.84 230.86 1399.98 Column completed and roof slab in G.F. in progress
26 Constn. of Teaching Block/Class Rooms in
Govt. College at Narwana
FC KW4/7-08 Works (2)
14-Nov-2011
217.81 209.48 8.33 Finishing work is in progress.
27 Constn. of Boundary wall in Govt. College,
Narwana (Jind)
DG No. 4/30-2008 Works (2)
17-May-2012
53.37 39.62 13.75 Physically completed
28 Construction of Ch. Bansi Lal Govt. College for
women at Tosham District Bhiwani.
FC&PS No. 1/2-06 Works (2)
28-Jul-2011
1027.57 818.13 209.44 Tender for balance work is under process
at risk and cost of agency
29 Construction of 6 class rooms in Govt. College
Loharu in Bhiwani Distt.
KW 4/7-08 Works (2)
14-Nov-2011
137.25 82.22 55.03 Physically completed
30 Construction of the Building of Govt. College
for Women, Behal in Bhiwani Distt
1/3-12 Works (2)
30-May-2013
862.27 4.04 858.23 DNIT approved by Head office. Fresh
sanction of planning and finance
department has been sought for inviting
tenders vide se bhiwani memo No9. 4306
dt 5.12.13, which is awaited
31 Construction of the building of Govt. College
for women, Bwani Khera (Bhiwani)
Memo No. 1/4-07 works (2)
10.05.2013
1116.12 5.06 1111.06 Approval of finance department
32 Construction of Building for Govt. College for
Women, Mohindergarh (District Mohindergarh).
FC&PS 10/50-08 Works (2)
27-Sep-201
656.77 617.8 38.97 Physically completed.
33 Construction of teaching block in Govt. College,
Mahindergarh.
FC&PS KW 4/7-08 Works (2)
14-Nov-2011
217.81 117.07 100.74 Physically completed.
34 Construction of teaching block in Govt. College,
Narnaul.
FC&PS No. 4/1/10-2 (2)
17-Feb-2012
217.81 163.19 54.62 Physically completed.
35 Construction of Art Block of 12 Rooms in Govt.
College for Women at Narnaul in Mohindergarh
District
FC&PS No. 4/1/10-2(2)
17-Feb-2012
217.81 142.14 75.67 Physically completed.
36 Const. of the science block in Govt. College,
Nangal Chaudhary (Mahindergarh)
1/8-12 works (2)
19-July-2013
322.18 0 322.18 Relaxation in FD instructions not yet
received
37 Construction of Building of Govt. College at
Badli in jhajjar distt.
FC&PS E D No. 4/38-08 W2
25-Jul-2012
892.35 713.66 178.69 Building completed. Boundary
wall/scooter stand is in progress
38 Constructing of Commerce Block, Computer
Lab & Language Lab in Govt. College at
Bahadurgarh
FCPS No. KW 4/7-08
14-Feb-2011
197.04 104.77 92.27 Physically completed.
39 Construction of Govt. College (Women Wing)
Bahadurgarh in Jhajjar District.
FS &PS No. 4/27-2008 (W)
7-Oct-2011
1162 8.87 1153.13 Work in progress.
40 Construction of 12 Nos. Class Rooms/Arts
Block & Multipurpose Hall in Govt. College,
Jhajjar
FC No. KW4/51-08
30-Aug-2010
1137.43 427.86 709.57 Work upto lintel level, 1st slab level
completed. Overall 30% work completed.
41 Construction of Teaching Block & 12 Nos.
Class room in Govt. College, Jhajjar
FCPS No. KW-4/7-08Works-
4-Feb-2011
150 177.64 0 Work in progress. Over all 95% work
completed.
42 Construction of 8 Class Rooms in Govt.
College, Dujana in Jhajjar District.
FCPS No. KW4/7-08 Works
14-Feb-2011
100 142.83 0 Work completed
43 Construction of Admn. Block, Library,
Computer lab in Govt. college Dubaldhan in
Jhajjar Distt.
FC & PS Memo No. 4/96/2006
works (2)
30.11.2012
245.42 148.65 96.77 Work is in progress. Overall 25% work
completed.
44 Const. of Govt. College at Bahu in Jhajjar
district
1/11-12-works (II)
19-July-2013
1272.62 290.32 982.3 Work recently allotted.
45 Construction of the Science block in Govt.
College Jhajjar
Memo No. 1/8-12 works (2)
19.07.2013
322.18 0 322.18
46 Construction of 8 Nos. Class Room and 2 Nos.
Computer Labs in Govt. College at Nagina in
Mewat District.
FC&PS No. 1309-15/WI
9-Feb-2012
207.81 137.88 69.93 Structure alongwith brick work plastering,
flooring completed and finishing in
progress. Principal government college
provided site free from trees on
30.11.2013
47 Construction of the Building for Govt. College
for Women, Salaheri in Mewat District.
FC&PS No. 1/7-10 Works (2)
31-Jan-2012
1204 320.3 883.7 Slab of Ground floor casted and shuttering
of 1st floor is in progress. 70% boundary
wall in progress
48 Construction of Govt. College for women at
Rewari
NO. 01/1-07 works (2)
2-Jan-2012
1770.56 1159.83 610.73 Main building completed & partially
handed over to the client deptt & Girls
hostel work will be completed upto
30/06/2014. The work of Boundary wall
completed. Revised A/A received is Rs.
17.71 Cr.
49 Construction of building for Govt. College for
Women at Gurawra in Rewari Distt.
1/9/08 (W) 2
4-Oct-2011
577.57 505.58 71.99 College Building completed. Boundary
wall, road & parking is in process.
50 Construction of building of Govt. college
Kharkhara (Rewari).
No. 1/10-10 Works (2)
24-Jan-2011
1063.78 383.16 680.62 G.F. Slab 90% laid, 1st floor slab 70%
and 2nd floor slab 70% laid. Brick
wall/plaster in progress in GF, FF and
second floor
51 Constrction of Govt. College Kosli in Rewari
Distt.
FC& PS No. Memo No.
1/6/2011
03-Apr-2013
1366.62 171.68 1194.94 Ground floor and FF roof slab is in
progress.
52 Construction of Govt. College (Boys) in Village
Barota (Gohana) in Sonepat Distt.
4/11-11 Works (2)
21-Aug-2012
1355.11 263.42 1091.69 Work is in progress
53 Construction of Govt. College Kharkhauda in
Village Pipli Block Kharkhauda in Sonepat
Distt.
1/3-11 Works (2)
21-Aug-2012
1393.91 479.55 914.36 Work is in progress
54 Construction of back side parking in the campus
of shikha Sadan, Sector-5, Panchkula
Memo No. KW 3/35-2003
works (2)
1309.2013
21.03 0 21.03 New sanction
55 Construction of Govt. College Chhara Jhajjar Memo No. 1/15-12 Works (2) 1366 0 1366 Detail estimate and design is under
preparation with the consultant
56 Construction of the Buildings of Govt. College
Jasaur Kheri Jhajjar
1/7-13
dated 30.12.13
1272.62 0 1272.62 Detail estimate and design is under
preparation with the consultant
57 Special repair for raising and fencing of
boundary wall of Govt. College Sector-1,
Panchkula
4/5-13 works (2)
13.11.2013
38.95 0 38.95 New sanction
TOTAL 43109.58 16033.99 27362.31
Sr. No. Name of work
No. & date of Approval
Amount of
A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs
Status of work
Remarks
1 Construction of 8 Nos. Class Rooms of Govt.
Girl Sr. Sec.School at village Kiloi in Rohtak
District
2/43-2013 works (2)
19-Jul-2013
92.79 91.38 1.41 Work completed except fitting of EI and
PH Services
Bank of sanctions as on 01.04.14 for Secondary Education under head 4202- C.O. Public Works (Major Works)
2 Construction of Govt. High School at Baland in
Rohtak Distt.
9//4-2011 works (2)
21-Mar-2012
374.63 144.7 229.93 Work in physical progress. Excavation
completed &RCC footing completed upto
plinth beam. 95% plinth beam completed.
Column of east south and west side
completed. Flooring work in progress.
50% slab to east side laid
3 Const. of Govt. Girls Sec. School at Rohtak 2/43-2013 works (2)
19-July-2013
873.44 166.88 706.56 Work administratively approved. PCC
comleted for all blocks and RCC footing
completed and one side block completed
upto roof level. Right side of roof slab
completed. Binding of steel of front block
is in progress
4 Construction of Govt. Sr. Sec. School at
Kalanaur in Rohtak
2/43-2013 works (2)
19-July-2013
568.08 0.00 568.08 Work adminsitratively approved. Detail
estimate and DNIT sent to head office for
approval
5 Addition/construction/alteration of Govt. Girls.
Sr. Sec. School at Dabwali in Sirsa
9/6-20-WII
23-Feb-2011
220.88 170.97 49.91 Work physicall completed but financial
liabilities pending
6 Construction of Building of Govt. Girls Sr. Sec.
School Mandothi in Jhajjar District
FC&PS Govt. No. 9/4-2011
20-Sep-2011
142.24 95.81 46.43 Physically completed.
7 Construction of Building of Govt. Girls Sr. Sec.
School Khudan in Jhajjar District
2/43/2013
09.07.2013
397.33 69.10 328.23 Work is in progress
TOTAL 2669.39 738.84 1930.55
Name of work
No. & date of Approval
Amount of
A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs + new
works
Status of work
Remarks
1 Construction of District Headquarter office
building for excise & taxation department sector -
12 faridabad
2795-ET-4-2014/15199 3131 0 3131 Fresh approval
2 Construction of District level office building for
Excise & Taxation department, sector 32 at
Gurgaon
3/46/2008-3 Lab 3681 0 3681 Fresh approval
TOTAL 6812 0 6812
Name of work
No. & date of Approval
Amount
of A/A
Rs. Lacs
Expenditure up
to 3/2014
Rs. Lacs
Balance
sanction as
on 1.4.14
Rs. Lacs +
new works
Status of work
Remarks
Bank of sanctions as on 01.04.14 under head 4059- Excise &Taxation-16 Major works for the year 2014-15
Bank of sanctions as on 01.04.14 under head 4059- Excise &Taxation-16 Major works for the year 2014-15
1 Construction of District Headquarter office
building for excise & taxation department sector -
12 faridabad
2795-ET-4-2014/15199 3131 0 3131 Fresh approval
2 Construction of District level office building for
Excise & Taxation department, sector 32 at
Gurgaon
3/46/2008-3 Lab 3681 0 3681 Fresh approval
TOTAL 6812 0 6812
Sr. No. Name of work
No. & date of Approval
Amount of
A/A
Rs. Lacs
Bank of sanctions
as on 01.04.14 for
under head 4210-
C.O. Medical -
Hospital &
Dispensary
Balance
sanction as on
1.4.14
Rs. Lacs
Status of work
Remarks
1 Construction of Additional block in the campus
of existing Civil Hospital at Sohna in Gurgaon
District
No. 20/93/2013-5 HB III
26.07.2013
102.27 0 102.27 Detail estimate/ DNIT received vide EIC
memo No. 520/WI dated 21/01/2014
unapproved with the remark that resubmit
the detailed estimate / DNIT after receipt
of approval from the client department /
Govt, as per FD instructions issued vide
letter No. 5/6/2005-5 B&C dated
14/10/2013
Tender to be called after model code of conduct is over
2 Construction of 50 bedded Hospital at Tosham
in Bhiwani
No. 20/171/2013- 5HB III
24.10.2013
1222.43 50 1172.43 Tender to be called after model code of conduct is over
3 Construction of 50 bedded Hospital at Bawani
Khera with additional ward of 20 bedded in
Bhiwani Distt.
No. 20/93/2013-5 HB III
8.07.2013
102.27 0 102.27 Approval to finance department awaited Tender to be called after model code of conduct is over
4 Construction of SHC, Gangicha Jaat Distt.
Rewari
No. 20/134/2013-5 HB
09.09.2013
24.22 0 24.22 Work started
5 Construction of SHC Luhari, Ukhal Chana,
Kutani, Ahri and Salodha Distt. Jhajjar
No. 20/158/2013-5HB III
Dated 07.10.2013
185.52 12.37 173.15 Tender invited
6 Construction of PHC with residential
accomodation at Village Bahrana District Jhajjar
No. 20/167/2013-5 HB III
07.10.2013
380.7 146.72 233.98 Work started
7 Construction of SHC Jhatti Pur, Atolapur,
Karhans, Jorasi Sarf Khas Distt. Panipat
No. 20/125/2013-5HB III
12.08.2013
128 0 128 Tender approved
8 Constn. of Community Health Centre along with
Residential accommodation in village Naraina in
Panipat distt
ACS No. 20/206/2013
04-March-2014
695.19 0 695.19 Detailed estimate and DNIT under process Tender to be called after model code of conduct is over
9 Constuction of CHC Bapoli at Panipat D.G.H.S. No. 20/200/2012
19.-Dec-2012
690.85 0 690.85 Tender received to be approved after
model code of conduct is over
10 Construction of PHC at Dhotter (Sirsa) No. 20/111/2013-5 HB III
11.09.2013
339.22 0 339.22 Tender received on 04.12.2013 and under
process in circle office
11 Construction of PHC at Jui Kalan (Bhiwani) No. 20/131/2013-5HB III
29.08.2013
375.4 0 375.4 Approval of finance department awaited Tender to be called after model code of conduct is over
12 Construction of PHC and Residential Building,
Khairati Khaira (Fatehabad)
No. 20/92/2013- 5 HB III
16.08.2013
207.27 0 207.27 Tender received on 18.11.2013 and under
process in Head office
Tender received to be approved after model code of
conduct is over
13 Construction of CHC Jhansa with residential
accomodation at Jhansa in district Kurukshetra
No. 20/99/2013-5 HB III
08.07.2013
690.85 0.01 690.84 Work at DPC level
14 Construction of SHC Raiya (Jhajjar) No. 20/98/2013-5 HB II
08.07.2013
27.7 0 27.7 Work in progress
15 Construction of PHC Talu (Bhiwani) with
residential accomodation
No. 20/95/2013-5 HB III
24.06.2013
354.98 0 354.98 Tender approved
16 Up gradation of CHD into 50 bedded hospital at
Assandh in Karnal
PS HD No. 20/85/13 5 HB III
08.10.2013
77.8 0 77.8 DNIT/Detailed estimate under process Tender received to be approved after model code of
conduct is over
17 Up gradation of CHD into 50 bedded hospital at
Nilokheri in Karnal District
No. 20/83/2013-5 HB III
18.06.2013
73.99 0.12 73.87 DNIT under process Tender received to be approved after model code of
conduct is over
18 Construction of Primary Health Centre Nindana
Tigari Distt. Rohtak
No. 20/7/2014- 5HB III
17.01.2014
360 0 360 Tender received to be approved after
model code of conduct is over
19 Construction of Sub Health Centre Kultana
Distt. Rohtak
No. 20/7/2014- 5 HB II
17.01.2014
35 0 35 DNIT under approval
20 Construction of Primary Health Centre Jahajgarh
Disstt. Jhajjar with residendial accomodation
No. 20/7/2014- 5 HB II
17.01.2014
321.64 0 321.64 Tender approved
21 Construction of Primary Health Centre Ismila
Distt. Rohtak
No. 20/7/2014- 5 HB II
17.01.2014
360 0 360 Tender received to be approved after
model code of conduct is over
TOTAL 5430.6 159.22 5271.38
Sr. No. Name of work No. & date of Approval Amount of
A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs + new
works
Status of work Remarks
1 Construction of residential quarter in the campus
of Tehsil building at Gharaunda in Karnal Distt.
FC & PS No. 348
11-Jan-2012
148.06 0.09 147.97 Work recently allotted to the agency
2 Construction of residential houses for Distt.
Administration Revenue officers in the campus
os (Residential colony) Mini Secretariat at
Panipat
EIC No. 482/WI
12-Jan-2012
406.02 226.98 179.04 Plastering and flooring work in progress
in DC, SDM, CTM Residence and 4 Nos.
1900 sft residence slab laid of 1st floor, 1
no houses columns of 1st storey
completed upto roof level and work in
ADC house upto plinth beam
Bank of sanctions as on 01.04.14 under head 4216- C.O. on Housing-(Plan) District Administration-Major Works
3 Construction of house (24 Nos. 450 sft, 36 Nos.
650 sft, 36 Nos, 800 sft & 20 Nos. 1300 sft area)
in officers colony, Sector-15 A, Faridabad
30-R-6-2012/1753
10-Feb-2012
2256.78 9.34 2247.44 Work administratively approved but not
tendered yet. Detailed estimate and DNIT
received back from Head office with the
remarks that the same may be sent to next
financial year due to paucity of funds
4 Construction of House (2 Nos. 2800 sft area) in
officers colony, Sector 15-A Faridabad
887-R-6-2012/5296
31-May-2012
137.23 63.51 73.72 Structure completed including internal
plastering and external plastering is in
progress. Overall 55% work completed
5 Construction of (130 Nos.) Residential House
for revenue staff in Mini Sectt. At Sirsa Distt.
330-R-6-2013/2655
4-Mar-2013
2461.17 5.32 2455.85 Detailed esimate and DNIT submitted to
Head office vide Hisar No. 2267 dated
3.9.13
TOTAL 5409.26 305.24 5104.02
Sr. No. Name of work
No. & date of Approval
Amount
of A/A
Rs. Lacs
Expenditure up
to 3/2014
Rs. Lacs
Balance
sanction as
on 1.4.14
Rs. Lacs
Status of work
Remarks
1 Construction of 1 no. JMIC houses for CJM in
the Judicial Complex at Pehowa in Distt.
Kurukshetra
Addl. Ch. Secy. 6/42/11-5
21-Dec-2012
61.83 34.34 27.49 Structural work completed. Finishing are
in progress
2 Constn. Of 9 nos. Houses (6 nos. JMIC/CJM &3
nos. ADJ houses) in D.C. Colony, Kurukshetra
FC&PS 6/47/2008-5JJ-II
21-Nov-2011
569.73 390.37 179.36 6 Nos. JMIC houses structure work
completed upto plastering stage and
marble stone flooring and heat resistance
tile terracing is in progress and 3 Nos.
ADJ houses structure work completed and
marble stone flooring is in progress.
3 Construction of Judicial Houses in Sector -15A,
Faridabad
6/1/2009-5JJ-II
18-Jun-2012
761.61 379.37 382.24 Work in physical progress. (i) Work of 3
Nos. ADJ Houses completed upto 1st
floor roof level. (ii) Work of 5 Nos. JMIC
houses completed upto 1st floor roof level
and 5 Nos. JMIC houses completed upto
Ground floor roof level and plastering is
in progress.
4 Construction of Judicial officers Residence in
SDO(civil) cum Judicial Complex at Ratia
F.C. 6/55/2008-5jj(ii)
8-Dec-2008
54.58 64.98 0.00 Work in progress
5 Construction of Judicial officers residence in the
campus of SDO Civil-Cum Judicial at Tohana in
Fatehabad Distt.
FC&PS No. 6/14/2012
22-Feb-2012
106.09 150.81 0.00 Structure completed. Work in progress
6 Construction of 3 Nos. 1900 sft houses in
Judicial Complex at Hansi.
FC&PS No. 6/75/2011
9-Dec-2011
167.10 161.01 6.09 Work completed.
Bank of sanctions as on 01.04.2014 for Housing-Administration of Justice Works under head 4216-C.O. (Major Works)
7 Constn. of Judicial Houses at Ellenabad in Sirsa
Distt.
No. 6/89/2011-5JJ-II
6-Jan-2012
113.07 119.06 0.00 90% work completed-Work is in progress
8 Construction of proposed house type 1900 sft.
covered area for Civil Judge Senior and Junior
Division at Safidon in Jind Distt.
FC&PS No. 6/18/2012-5JJ-II
22-Feb-2012
142.00 121.70 20.30 Plaster work completed. Floor finishing
in progress
9 Construction of 2 Nos. A.D.J. Residential
Houses and 4 Nos. Civil Judge (Jr. Divin.) in
Civil Station area at Jind in Jind Distt.
A.C.S. No 6/40/2012-5JJ
19-Jun-2012
480.28 324.05 156.23 Joinery flooring and finishing is in
progress
10 Constn. of 1900 sft. area Judicial Residential
House(CJM/Senior Divn. Judge) in SDO(Civil)
Complex at Narwana
6/27/2008-5JJ-II
13-Dec-2011
127.39 91.15 36.34 Physically completed.
12 Construction of Residence of District and
Sessions Judge at Bhiwani
FC&PS 6/63/09-5JJ-II
4-Jun-2010
79.32 99.37 0.00 Building completed. Finishing work in progress
13 Construction of 3 Nos. residence for Addl. Distt.
& Session Judge and 3 Nos. for Chief Judicial
Magistrate at Bhiwani
6/63/2009-5JJ-II
9-Nov-2011
415.34 445.36 0.00 90% work completed. Further work in progress
14 Construction of 7 Nos. House for Judicial
Officers, ADJs (3 Nos.) CJM (1 No.) and 3 Nos.
for Civil Judge Junior Division in Mini Sectt. at
Narnaul in Mohindergarh Distt.
6/13/2013-5JJ-II
15-Mar-2013
432.58 0.46 432.12 Tender not yet approved due to code of
conduct
15 Construction of 5 Nos. House for Judicial
Officers (1) No. for Civil Judge (Sr. Division)
and 4 Nos. for Civil Judge (Jr. Division) in
Judicial Complex at Mohindergarh in
Mohindergarh District.
6/10/2013-5JJ-II
18-Mar-2013
296.36 0.46 295.90 Tender not yet approved due to code of
conduct
17 Constn. of 1 No. for Civil Judge (Senior
Division) & 2 Nos. houses (Junior division)
1900 sft area house at Gohana in Sonepat Distt.
No. 6/35/2012-5jj-II
13-Jun-2012
189.75 159.96 29.79 95% work completed and balance work is
in progress
18 Constn. of 1 No. for Civil Judge (Senior
Division) & 2 Nos. houses (Junior division)
1900 sft area house at Ganaur in Sonepat Distt.
NO. 6/392012-5JJ-II
19-Jun-2012
129.00 30.61 98.39 15% work completed and balance work is
in progress
19 Constn. of 10 Nos. Residential houses for
judicial officers or various categories in Mini
Sectt at Sonepat
No. 6/36/2012-5JJ-II 791.25 318.76 472.49 80% work completed and balance work is
in progress
21 Const. of Houses for C.J.M. Division Judge at
Kosli in Rewari Distt
6/11/2013-5JJ-11
15-Mar-2013
138.68 0.00 138.68 Tender received from head office for
extending the validity
22 Const. of ADJ 4 No., SDJ 2 No. and CJM 2 No.
Judicial houses at Rewari in Rewari Distt.
6/12/2013-5JJ-11
15-Mar-2013
610.30 2.51 607.79 Work allotted recently. Some
modification in site desired by District and
session judge/DC rewari
23 Const. of 14 Nos. houses for Judicial officers, 2
Nos. for ADJs, 2 for CJSD, 1 No. for CJM, 9 for
CJJD at Hisar
6/24/2013-5JJ
15-Mar-2013
838.21 133.97 704.24 Work in progress
24 Const. of 6 No. houses having 1900 sft. Area of
each house for CJM and Senior division judge at
yamuna nagar
C.Sec.Govt.Hr.6/73/2013
24-Jun-2013
418.41 0.01 418.40 Tender received back due to non approval
25 Const. of residential houses of various categoreis
for the judicial officers in the campus of
(Residendial Colony) Mini Sectt. Panipat
T/S vide EIC No. 8041
9-Nov-2011
1465.34 1314.12 151.22 Work completed except misc. work
internal public health EI joinery and road
junction
26 Construction of Senior Judge Residence (CJM)
1900 sft area House in the campus of Judicial
Complex at Assandh District Karnal
A/A C.S. No. 6/59/12-5
19-June-2012
48.06 41.24 6.82 Work is in progress
27 Const. of 1 Nos. CJM House and 4 Noss. JMIC
Houses in Sector-13, Part-B at Bahadurgarh in
Jhajjar Distt.
6/82/2013-5-JJ-II.
8-Jul-2013
387.89 0.97 386.92 Tender received and pending due to
shortage of funds
28 Rough cost estimate for construction of Judicial
Residences at Sector 12-A Panchkula
6/46/2012-5JJ-II
29.08.2013
1736.34 0.00 1736.34 Work yet not started. Str. Design under
preparation
29 construction of 1990 sft area judicial residential
house in SDO complex at Guhla in district
kaithal
6/74/2013-5JJ-II
21.10.2013
63.88 0.00 63.88 D/E and DNIT sent to Head office
30 Renovation of entrance gate and construction of
check post in New Sessions House at Ambala
City
6/21/2014-5JJ-II
03.04.2014
3.82 0.00 3.82
TOTAL 10628.21 4384.64 6354.85
Sr. No. Name of work
No. & date of Approval
Amount of
A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs
Status of work
Remarks
1 Construction of Superintending Engineer
Residence in PWD B& R colony at Kaithal
4/11/2009-1B&R (w) 46.57 29.91 Floor work in progress
2 Costruction of PWD (B&R) Colony at Kaithal 4/11/2009-1 B&R (W) 761.84 0.05 761.79 Work allotted
TOTAL 808.41 0.05 791.7
Sr. No. Name of work
No. & date of Approval
Amount of
A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs
Status of work
Remarks
1 Administrative approval for the construction of
Govt. Industrial Training Institute Mustafabad
Distt Yamuna nagar
Bhawan/ITI/Mustafabad/824
24.07.2013
805.13 0.55 804.58 Project not taken up due to non
availability of funds
2 Construction of new building of ITI Bharapur
(Naraingargh) in Ambala Distt.
Bhawan/ITI
11-Dec-2008
997.55 135.92 861.63 Work shop block excavation in foundation
is in progress
3 Construction of Industrial training Institute at
village Jaisinghpura in Distt. Karnal
A/A IT Deptt. No. 86
24-Jan-2013
428.56 0.28 428.28 Project not taken up due to non
availability of funds
Bank of sanctions as on 01.04.2014 for Housing Works under head 4216-C.O. Public works (Major Works)
Bank of sanctions as on 01.04.14 for ITI works under head 4250- C.O. creation of infrasturcuture for Development of Industrial Training (Major Works)
4 Construction of building of ITI at Madina in
Rohtak Distt.
Bhawan/ITI/Madina/466
29-Mar-2012
764.09 509.17 254.92 Work in physical progress. RCC of
column upto roof level completed and
shuttering is in progress.
5 Construction of Admn. & Workshop Block in
ITI at village Kansala in Rohtak District
B/ITI/Kansala654-57-B
6-May-2010
677.17 260.56 416.61 Work in physical progress. Admn block
slab completed. Front and back boundary
wall completed and plaster of Admn block
completed. Slab of G.F. laid for
workshop block. Parking of admn block
completed. Shuttering of F.F. two span is
in progress.
6 Construction of Admn. & Workshop Block in
ITI at Hassangarh in Rohtak District
B/ITI/Hassangarh/2013
2-Feb-2011
560.00 75.01 484.99 Work administratively approved. Work is
in progress. Slab GF and FF of workshop
block completed and admn block slab
completed. The brick work of GF is in
progress.
7 Construction of I.T.I at Fatehpur Billoch
Faridabad
NewITI/F.P. Billoach
10-Jun-2007
493.26 392.39 100.87 Work in physical progress. Work is in
progress on risk and ost of M/s Deep
Builders
8 Construction of ITI at Uncha Majra in Gurgaon
Distt.
FC &PS No. T-9
4-May-2010
1033.53 143.66 889.87 Work is in progress. 95% boundary wall
completed. 50% RCC slab of ground
floor of work shop laid. RCC column
work of rest portion up to roof level
completed. Foundation work of
administrative block is in progress.
Overall 25% work completed.
9 Construction of I.T.I. at village Pali in District
Faridabad (Administration Block, One
Workshop, Boundary wall & road parking etc.)
ITI/Pali/Expansion/365
6-Jan-2012
502.45 7.21 495.24 Tender case received back from head
office with the remarks to submit the same
after receipt of approval from client
department as per FD instructions issued
vide letter No. 5/6/5005-5 dated
14.10.2013
10 Administrative approval for the construction of
Govt. Industrial Training Institute Moujabad,
Distt Gurgaon
Bhawan/ITI/Moujabad/454
15.04.2013
424.36 0.28 424.08 Detailed estimate and DNIT received back
from Head office due to shortage of funds
11 Construction of ITI at Kushak in Palwal Distt. FC & PS IT & VE No. Nil 21-
Jun-2007
532.02 597.31 0.00 98% admn and work shop block and 95%
boundary wall completed and further work
is in progress
12 Construction in ITI Bhirdana in Fatehabad Bhawan/ITI/Bhirdana
5-03-2013
457.88 186.48 271.40 Ground floor slab laid.
13 Constn. of I.T.I. at Majra Piau (Narnaund) F.C. No. 1680
6-Oct-2011
504.60 511.65 0.00 Work completed.
14 Construction of New Govt. ITI Rania Distt Sirsa Bhawan/ITI/Rania/946
29.08.2013
732.26 0.42 731.84 Tender received unapproved due to non
availability of funds
15 Construction of I.T.I. Pinjupura (Kalayat) In
Kaithal Distt.
FCPS No. Bhawan/ITI/505
20-Sep-2011
738.71 512.72 225.99 Finishing work is in progress
16 Construction of ITI Bir Bangra at Rajound Distt.
Kaithal
PS to Govt. No. 4390
25-Oct-2012
644.98 240.82 404.16 Administrative block. Single storey, work
shop double storey. Administration block
slab laid and brick work completed and
momty roof slab laid. Work shop ground
floor slab laid and 2nd storey 75% roof
slab laid and B/W completed.
17 Administrative approval for the construction of
ITI Pabnawa Distt. Kaithal Bhawan/ITI/Pabnawa/637
26.06.2013
551.43 9.98 542.45 Approval received from financial
department and tender case sent to circle
office.
18 Construction of Ch. Surender Singh Memorial
I.T.I. Building at Tosham in Bhiwani District
(Workshop block only)
FC/New/ITI/Tosham/1106
1-Jul-2011
502.27 359.62 142.65 Work in progress. G floor and 1st floor
completed. Finishing in progress. Clause
II imposed vide No. 1758 dated 19.8.10
19 Constn. of Hospitality wing in at Siwani Khera
(Siwani) district Bhiwnai
Bhawan/ITI/Khera/547
24-Jan-2013
683.65 2.92 680.73 Project not taken up due to non
availability of funds and guidelines of
finance department
20 Administrative approval for the construction of
Govt. Industrial Training Institute Jamalapur
Distt Bhiwani
Bhawan/ITI/Jamalpur/748
17.07.2013
300.00 0.00 300.00 Project not taken up due to non
availability of funds and guidelines of
finance department
21 Construction of building of new I.T.I. at
Malrabas District Mohindergarh
Bhawan/ITI/Khera/457
13-Jul-2007
525.00 153.70 371.30 Work in progress departmentally. 100%
slab of Admn block laid. Plastering is in
progress
22 Construction of I.T.I. Assaudha in Jhajjar
District.
B/ITIAssaudah/1953
12-Oct-2011
281.60 267.32 14.28 Physically completed.
23 Construction of ITI Building at Bhaproda in
Jhajjar District
F.C. No. Bhaproad 5201
12-Aug-2009
658.60 487.93 170.67 Work in progress 95% work done. Work
for internal road/parking physically
completed
24 Construction of ITI at Dubaldhan in Jhajjar
District
PS Govt Hry No. 4577
24-Dec-2012
424.37 284.53 139.84 Work is in progress. Overall 25% work
completed.
25 Construction of ITI at village Pahadipur in
Jhajjar District
FC & PC No. 41-44
10-Jan-2013
578.00 238.72 339.28 Work is in progress. Overall 15% work
completed.
26 Construction of Administration Block &
Workshop Block in ITI at village Khudan in
Jhajjar District
FC&PC No. 58
2-Feb-2013
659.60 309.36 350.24 Work is in progress. Overall 15% work
completed.
27 Construction of Pandit Jage Ram Govt. ITI
Jahangirpur in Distt. Jhajjar
Bhawan/ITI/Jahangirpur
25-01-2013
416.72 160.55 256.17 Work is in progress
28 Expansion of Building of ITI, Kund Manethi in
Distt. Rewari
IT/KundManethi/1294-B-I
14-Dec-2009
768.08 572.86 195.22 Work physically completed.
29 Construction of New building of Rao Abhay
Singh Govt ITI, Saharanwas in Rewari Distt
PS Endst No: Bhawan/2172
9-Aug-2012
473.20 172.22 300.98 Ground floor roof slab and brick work
complated and first floor slab is in
progress
30 Administrative approval for construction of
Govt. Industrial Training Institute Kharkhara
Distt Rewari
Bhawan/ITI/Kharkhara/885
08.08.2013
500.00 0.00 500.00 A/A received on normative basis.
Detailed Drawings are awaited from Chief
Architect, Haryana. RCE is under
preparation
31 Construction of building of new I.T.I. at Rajlu
Garhi in Sonepat Distt
No. KC/Bhawan/ITI
14-Jan-2009
386.41 229.88 156.53 Action under clause II taken vide T.O. No.
5825 dated 19.7.2010. 1st storey and 2nd
storey slab completed. 3rd storey in
progress. D/E submitted by 31.1.2011
32 Admnistrative approval for construction of
special repair and new construction Raising of
boundary wall and earthwork filling in open
yard at Govt. ITI Julana in Jind
Bhawan/ITI/Julana/952
29.08.2013
18.35 0.00 18.35 Tender process of allotment
33 Administrative approval for the construction of
Pgd. Electrical Sub station in Govt. Industrial
Training Institute Behal Distt. Bhiwani
Bhawan/ITI/Behal/874
03.06.2013
21.55 0.00 21.55 Not taken up due to shortage of funds.
TOTAL 18045.38 6824.02 11294.70
Sr. No. Name of work No. & date of Approval Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction Rs.
Lacs 01.04.14
Status of work Remarks
1 Construction of New SDE PWD B&R office at
Pehowa in Distt. Kurukshetra.
FC & PS No. 1/14/2011-1(W)
14-May-2012
58.56 28.62 29.94 Structural work completed. Finishing
work such as plastering and flooring are in
progress
2 Administrative approval for construction of New
PWD Rest House at village Sirsagarh, Near
Dosarka Mullana in Ambala Distt.
1/29/2010-1 B&R (W) 173.52 89.76 83.76 Work in progress
3 Construction of 1st floor & 2nd floor of existing
Rest House in Sector -16A, Faridabad
4/23/2006-1B&R(W)
28-Dec-2011
259.80 0.78 259.02 Tender received on dated 20.12.2013 and
under process
4 Constructing of New Rest House at Fatehabad in
Fatehabad Distt.
FC&PS No. 1/22/2011
6-Mar-2012
179.52 110.96 68.56 Finishing work is in progress.
5 Constn. of PWD Rest House at Uchana in Jind
Distt.
14/02/2008-1B&R(w)
31-Oct-2011
116.50 0.27 116.23 The case of land acquisition has been
admitted on 8.11.12 in Hon'ble Pb. & Hry.
High Court titled as Baljeet Singh V/s
State case No.CWP 3380 of 2012. Next
date 26.5.14
6 Land Acquisition for construction of rest house
(B&R) at Uchana (Jind)
ACS no. 14/02/2008-1 B&R W
31-Oct-2012
62.93 0.00 62.93 Case for land acquisition is in Hon’ble
Punjab and Haryana High court. The next
date of hearing is 26.5.14
7 Construction of New Block No. II in PWD Rest
House at Kaithal.
FCPS No. 1/2/2009-1B&R(w)
22-Feb-2012
175.30 89.04 86.26 Structure work completed. Floor tile work
in progress.
8 Construciton of Nirman Sadan PWD B&R
Office Complex at Kaithal.
1/2/2009-1B&R(w)
29-Nov-2012
995.75 179.12 816.63 Basement, ground floor and first floor slab
laid
9 Construction of New PWD Rest House at Pundri
in Distt. Kaithal.
FC&PS No.1/4/2012-1B&R
7-May-2012
200.73 96.22 104.51 Doubly storey building. Main rest house
ground floor slab laid. First floor slab
laid. Boundary wall completed, flooring
in progress
BANK OF SANCTIONS AS ON 29.04.14 UNDER HEAD 4059- C.O. PUBLIC WORKS (MAJOR WORKS)
10 Construction of new PWD Rest House at
Charkhi Dadri in Bhiwani Distt.
1/39/2010-1B&R(W)
27-Aug-2012
182.53 3.83 178.70 Detailed estimate & DNIT under
preparation
11 Construction of PWD Rest House with 2 Nos.
440 Sft houses and SDO Office at Beri in Jhajjar
District
No.1/37/2010-1B&R(W)
19-Mar-2013
569.51 173.62 395.89 Work in progress
12 Construction of Nirman Sadan at Rohtak NO. 1/2/2011-1 B&R(W) 1779.8 4.53 1775.27 Work administratively approved. Work
started excavation completed. Footing is
in progress.
13 Construction of New PWD Rest House Gurgaon NO. 1/20/2012-1B&R(W) 737.19 0.00 737.19 Site not finalized yet
14 PWD Rest house at Bahadurgarh 1/6/2010-1B&R(W)
04.06.2013
489.02 0.02 489.00 Tender received and under process
15 PWD Rest house at Rai in Sonepat Distt Sanction received in UO form 1099.13 79.80 1019.33 Work is in progress
16 Construction of New Rest House at Hodal in
Palwal Distt.
1/18/11-1B&R (W) 185.55 0.00 185.55 Detailed estimate/DNIT under preparation
17 Construction of Memorial of Sardar Partap
Singh at Village Rasoi in Sonepat Distt.
1/13/2013-1 B&R (W) 415.51 0.69 414.82 Work in progress
18 Re-construction of PWD Rest House (Ekant
Bhawan) at Mussorie
1/2/2013-1 B&R (W) 662.51 0.00 662.51 Approval of local authorities is being
taken
Total 8343.36 857.26 7486.10
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs + new
works
Status of work
Remarks
1 Construction of road for Govt Engineering
College of Silani Kesho in Jhajar District
C13/2013/1220
14.06.2013
133.29 0.00 133.29 Work is in progress
2 Foundation stone laying ceremony of Extension
campus (Research & Development) of IIT Delhi
at village Badhsa
C13/2014/22463
20.12.2013
5.00 2.87 2.13
3 Providing & fixing RCC Posts and topographic
survey for Govt Engineering College at Jainabad
in Rewari Distt
C14/2013/21481
16.07.2013
2.39 0.00 2.39 Work is in progress
Bank of sanctions as on 01.04.14 under head 4202- Capital outlay, on education, sports, art, and culture for the year 2014-15
4 Contruction of Rao Birender Singh State
Institute of Engineering & Technology, Jainabad
in Rewari District
C14/2013/21838
03.09.2013
1200 0.00 1200 Administrative approval received
Tentative. R/C/E based based on
Architectural drawings component wise
stands submitted to Director General
Technical Education Haryana vide EIC
No. 1466 dated 18.02.2012, 1674-80,
1682-86, dated 25.02.14, 1723-27/W-I
dated 28.2.14
5 Construction of boundary wall and check post
for Rao Birender Singh State Institute of
Engineering & Technology at village Zainabad,
distrist Rewari
35/3/2010-2 TE
09.01.2014
208.40 0.00 208.40 Detail estimate and DNIT stands re-
submitted to Head office on dated
07.04.2014
6 Construction of Foundation stone laying
ceremony for indian institute of information
technology at village kiloharad distt sonepat and
other works
C15/2014/22446
20.12.2013
15.00 0.00 15.00
TOTAL 1564.08 2.87 1561.21
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs + new
works
Status of work
Remarks
1 Construction of building of observation home for
children at Madhuban in Karnal
504/SW (3)
22.03.14
416.05 0 416.05 New work4235
2 Construction of building of special home for
children at Madhuban in Karnal
503/SW (3)
22.03.14
333.09 0 333.09 New work4235
3 Construction of building of Children Home,
Faridabad
10454 ICPS/2014
24.03.14
234 197.27 New work2235
4 Construction of building of Children Home,
Gurgaon
10449/ICPS
24.03.14
366 324.30 New work2235
5 Construction of building of Special Home,
Karnal
10459 ICPS/2014
24.03.14
333.09 291.29 New work2235
TOTAL 1682.23 1562
Bank of sanctions as on 01.04.14 under head 4235 and 2235- Social welfare deposit works for the year 2014-15
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs + new
works
Status of work
Remarks
1 Alteration in old and new Mini Secretariat,
Gurgaon
3/51/2013-3 Lab 55.74 0 55.74 Fresh approval
2 Construction of Labour court complex at
faridabad
3/46/2008-3 Lab 1406 0 1406 Work in physical progress. RCC
foundations complete, 50 % RCC wall of
basement casted and casting of RCC
columns of basement is in progress.
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs + new
works
Status of work
Remarks
1 Construction of Govt. College Building at
Chhachhrauli (Double storey building)
R/A/AF&C1/4-06-Works (2)
20-Jul-2012
878.45 677.46 200.99 Work completed.
2 Construction of P.G. Block in Govt. College
Sector-14, Karnal
C&S No. 4/33-06
4-Sep-2008
252.11 467.82 0.00 Work is in progress. Outside plaster work
is in progress
3 Construction of Multipurpose / Auditorium Hall
in Govt. College Karnal
C&S No. 4/33-06
4-Sep-2008
383.79 287.7 96.09 Work is in progress. Ground floor
completed and FF slab 50% completed.
Work 2nd storey in progress
4 Construction of 6 No. Class rooms in Govt.
College at Matak Majri in Karnal Distt
FCPS No. KW-4/7-08Works-2
14-Nov-2011
137.25 131.3 5.95 Physically completed.
5 Construction of 8 No. Class rooms in Govt.
College Sector-14, Karnal.
FC&PS No. KW/4/7-08 (W)
14-Nov-2011
151.66 25.27 126.39 Work is in progress. Roof slab 100%
completed. Cement plaster is in progress.
Bank of sanctions as on 01.04.14 for Education works under head 4202- C.O. Higher Education (Major Works)
Bank of sanctions as on 01.04.14 under head 4250- Capital outlay, " 201-Labour Sub-Head 96 construction of Labour Court complex for the year 2014-15
6 Construction of the building of Govt. College
Bapoli in distt. Panipat
FC&PS No.1/13-2010
4-Oct-2011
1366.62 243.17 1123.45 82% work of boundary wall & 100%
columns casted upto G.F. roof level, 65%
column casted upto 1st floor, 75% ground
floor slab laid and 30% slab 1st floor laid,
Earth filling completed, brick work in
ground/1st floor in progress.
7 Constg. Govt. College at Sector-18 at Panipat in
distt. Panipat.
FC&PS No. 1/5-2008
3-Oct-2011
1433.89 673.61 760.28 90% Work of Boundary wall completed.
Structure completed. Kota stone
flooring/plaster work & road & parking
work in progress.
8 Construction of Govt. Women College at Lakhan
Majra in Rohtak Distt.
1/6-2008 works (2)
27-Feb-2012
866.5 574.14 292.36 Work completed and inaugurated by
Hon'ble CM Haryana on dated 27.9.2012.
Work administratively approved. Work is
in progress. PCC work completed. 100%
column upto roof level has been
completed & 80% slab of GF completed.
9 Construction of Teaching Block/Class Rooms in
Govt. College for women at Rohtak
KW 4/7-08 Works (2)
14-Nov-2011
217.81 201.82 15.99 Work in physical completed.
10 Construction of Teaching Block/Class Rooms in
Govt. College for Boys at Rohtak
KW 4/7-08 Works (2)
14-Nov-2011
217.81 211.9 5.91 Work in physical completed.
11 Construction of S.C. / B.C. Hostel in I.C. Govt.
Women College at Rohtak
1/17-99 Works (2)
26-May-2011
160.31 50.68 109.63 Work in physical completed.
12 Construction of Multipurpose Hall (Auditorium)
in Govt. College at Meham in Rohtak Distt.
KW4/90-2007 works (2)
24-Nov-2011
385.08 203.26 181.82 Work in physical progress. RCC column
completed. First upto slab level complete
and second level slab completed. Stage
side structure work completed. 3rd level
slab in front side completed & in middle
portion slab is completed.
13 Construction of Teaching-cum-Admn. Block
with check post & main gate in Pt. Neki Ram
Sharma Govt. College, Rohtak
4/8-2007 works (2)
27-Jun-2012
784.54 460.59 323.95 Work in physical progress. Structure
work completed. 80% brick work
completed, 70% flooring completed. 70%
plaster completed. Balance in progress &
tile trassing is in progress.
14 Const. of Commerce teaching block (12 Room)
in Govt. College Meham in Rohtak Distt.
4/13-13 works (2)
8-May-2013
217.81 101.3 116.51 Work is in progress. Excavation work
completed. PCC work completed. RCC
footing & plinth level been completed.
Column upto roof level has been laid.
G.F. slab has been completed. Column
upto F.F. slab is in progress
15 Const. of Govt. College at Sampla 1/2-12 works (2)
5-June-2013
1366 0.78 1365.22 Work administratively approved. Work
allotted to the agency and excavation of B.
wall is in progress. 25% B. wall of
foundation of B wall completed upto DPC
level.
16 Construction of building of Government
College, Kheri Gujran in Faridabad District
FC&PS Memo No. 10510/WI
11-Dec-2012
1292.4 407.23 885.17 Work in physical progress. Casting of
ground floor roof slab 90% completed and
casting of 1st floor roof slab 80%
completed. Shuttering of rest of the slab is
in progress. Overall 40% work
completed.
17 Construction of Mulitipurpose Hall in Govt.
College Sector-14 Gurgaon
A/A 4/114-2007-W(2)
24-Nov-2011
726.03 390.27 335.76 Finishing work is in progress
18 Construciton of the Building of Dr. B.R.
Ambedkar Govt. College , Palwal
1/4-2011 works (2)
13-Oct-2011
1306.66 955.82 350.84 Physically completed & handed over to
client deptt on 05.03.2014
19 Construction of the Building of Govt. College
for Women, Hathin in Palwal Distt.
PS, HR/1/2-11 works (2)
8-Aug-2013
1272.62 0 1272.62 Estimate and DNIT under preparation
20
Construction of the Building of Govt. College
for Women at Ratia in Fatehabad Distt.
FS No. 1/1-12
16-May-2013
1051 4.04 1046.96 No tender received on 30.09.2013, and
06.12.2013. Tender received on
28.01.2014 and under process.
21 Construction of Govt. College at Dabwali Distt.
Sirsa.
3/46-98-works-02
8-Nov-2011
1512.3 784.91 727.39 Finishing work pending.
22 Construction of Building of Women Wing of
Govt. National College at Sirsa in Sirsa Distt
2/5-07 works (2)
12-Aug-2013
1740 0 1740 Detailed estimate submitted to Head office
for Technical Sanction.
23 Construction of Govt. College at Barwala in
Distt. Hisar
FC No 1/7-2007 Works (2)
17-Oct-2011
1376.52 1114.56 261.96 Work is in progress
24 Construction of Teaching block/ Class room at
Jind
FC KW4/7-08 Works (2) 14-
Nov-2011
217.81 200.75 17.6 Work completed.
25 Construction of Govt. College for Women at
Safidon in Jind Distt.
FC&PS No. 1/8-11 works (2)
6-Feb-2013
1630.84 230.86 1399.98 Column completed and roof slab in G.F.
in progress
26 Constn. of Teaching Block/Class Rooms in
Govt. College at Narwana
FC KW4/7-08 Works (2) 14-
Nov-2011
217.81 209.48 8.33 Finishing work is in progress.
27 Constn. of Boundary wall in Govt. College,
Narwana (Jind)
DG No. 4/30-2008 Works (2)
17-May-2012
53.37 39.62 13.75 Physically completed
28 Construction of Ch. Bansi Lal Govt. College for
women at Tosham District Bhiwani.
FC&PS No. 1/2-06 Works (2)
28-Jul-2011
1027.57 818.13 209.44 Tender for balance work is under process
at risk and cost of agency
29 Construction of 6 class rooms in Govt. College
Loharu in Bhiwani Distt.
KW 4/7-08 Works (2)
14-Nov-2011
137.25 82.22 55.03 Physically completed
30 Construction of the Building of Govt. College
for Women, Behal in Bhiwani Distt
1/3-12 Works (2)
30-May-2013
862.27 4.04 858.23 DNIT approved by Head office. Fresh
sanction of planning and finance
department has been sought for inviting
tenders vide se bhiwani memo No9. 4306
dt 5.12.13, which is awaited
31 Construction of the building of Govt. College for
women, Bwani Khera (Bhiwani)
Memo No. 1/4-07 works (2)
10.05.2013
1116.12 5.06 1111.06 Approval of finance department
32 Construction of Building for Govt. College for
Women, Mohindergarh (District Mohindergarh).
FC&PS 10/50-08 Works (2)
27-Sep-201
656.77 617.8 38.97 Physically completed.
33 Construction of teaching block in Govt. College,
Mahindergarh.
FC&PS KW 4/7-08 Works (2)
14-Nov-2011
217.81 117.07 100.74 Physically completed.
34 Construction of teaching block in Govt. College,
Narnaul.
FC&PS No. 4/1/10-2 (2)
17-Feb-2012
217.81 163.19 54.62 Physically completed.
35 Construction of Art Block of 12 Rooms in Govt.
College for Women at Narnaul in Mohindergarh
District
FC&PS No. 4/1/10- 2(2)
17-Feb-2012
217.81 142.14 75.67 Physically completed.
36 Const. of the science block in Govt. College,
Nangal Chaudhary (Mahindergarh)
1/8-12 works (2)
19-July-2013
322.18 0 322.18 Relaxation in FD instructions not yet
received
37 Construction of Building of Govt. College at
Badli in jhajjar distt.
FC&PS E D No. 4/38-08 W2
25-Jul-2012
892.35 713.66 178.69 Building completed. Boundary
wall/scooter stand is in progress
38 Constructing of Commerce Block, Computer
Lab & Language Lab in Govt. College at
Bahadurgarh
FCPS No. KW 4/7-08
14-Feb-2011
197.04 104.77 92.27 Physically completed.
39 Construction of Govt. College (Women Wing)
Bahadurgarh in Jhajjar District.
FS &PS No. 4/27-2008 (W)
7-Oct-2011
1162 8.87 1153.13 Work in progress.
40 Construction of 12 Nos. Class Rooms/Arts
Block & Multipurpose Hall in Govt. College,
Jhajjar
FC No. KW4/51-08
30-Aug-2010
1137.43 427.86 709.57 Work upto lintel level, 1st slab level
completed. Overall 30% work completed.
41 Construction of Teaching Block & 12 Nos. Class
room in Govt. College, Jhajjar
FCPS No. KW-4/7-08Works-
4-Feb-2011
150 177.64 0 Work in progress. Over all 95% work
completed.
42 Construction of 8 Class Rooms in Govt. College,
Dujana in Jhajjar District.
FCPS No. KW4/7-08 Works
14-Feb-2011
100 142.83 0 Work completed
43 Construction of Admn. Block, Library,
Computer lab in Govt. college Dubaldhan in
Jhajjar Distt.
FC & PS Memo No. 4/96/2006
works (2)
30.11.2012
245.42 148.65 96.77 Work is in progress. Overall 25% work
completed.
44 Const. of Govt. College at Bahu in Jhajjar
district
1/11-12-works (II)
19-July-2013
1272.62 290.32 982.3 Work recently allotted.
45 Construction of the Science block in Govt.
College Jhajjar
Memo No. 1/8-12 works (2)
19.07.2013
322.18 0 322.18
46 Construction of 8 Nos. Class Room and 2 Nos.
Computer Labs in Govt. College at Nagina in
Mewat District.
FC&PS No. 1309-15/WI
9-Feb-2012
207.81 137.88 69.93 Structure alongwith brick work plastering,
flooring completed and finishing in
progress. Principal government college
provided site free from trees on
30.11.2013
47 Construction of the Building for Govt. College
for Women, Salaheri in Mewat District.
FC&PS No. 1/7-10 Works (2)
31-Jan-2012
1204 320.3 883.7 Slab of Ground floor casted and shuttering
of 1st floor is in progress. 70% boundary
wall in progress
48 Construction of Govt. College for women at
Rewari
NO. 01/1-07 works (2)
2-Jan-2012
1770.56 1159.83 610.73 Main building completed & partially
handed over to the client deptt & Girls
hostel work will be completed upto
30/06/2014. The work of Boundary wall
completed. Revised A/A received is Rs.
17.71 Cr.
49 Construction of building for Govt. College for
Women at Gurawra in Rewari Distt.
1/9/08 (W) 2
4-Oct-2011
577.57 505.58 71.99 College Building completed. Boundary
wall, road & parking is in process.
50 Construction of building of Govt. college
Kharkhara (Rewari).
No. 1/10-10 Works (2)
24-Jan-2011
1063.78 383.16 680.62 G.F. Slab 90% laid, 1st floor slab 70%
and 2nd floor slab 70% laid. Brick
wall/plaster in progress in GF, FF and
second floor
51 Constrction of Govt. College Kosli in Rewari
Distt.
FC& PS No. Memo No.
1/6/2011
03-Apr-2013
1366.62 171.68 1194.94 Ground floor and FF roof slab is in
progress.
52 Construction of Govt. College (Boys) in Village
Barota (Gohana) in Sonepat Distt.
4/11-11 Works (2)
21-Aug-2012
1355.11 263.42 1091.69 Work is in progress
53 Construction of Govt. College Kharkhauda in
Village Pipli Block Kharkhauda in Sonepat
Distt.
1/3-11 Works (2)
21-Aug-2012
1393.91 479.55 914.36 Work is in progress
54 Construction of back side parking in the campus
of shikha Sadan, Sector-5, Panchkula
Memo No. KW 3/35-2003
works (2)
1309.2013
21.03 0 21.03 New sanction
55 Construction of Govt. College Chhara Jhajjar Memo No. 1/15-12 Works (2) 1366 0 1366 Detail estimate and design is under
preparation with the consultant
56 Construction of the Buildings of Govt. College
Jasaur Kheri Jhajjar
1/7-13
dated 30.12.13
1272.62 0 1272.62 Detail estimate and design is under
preparation with the consultant
57 Special repair for raising and fencing of
boundary wall of Govt. College Sector-1,
Panchkula
4/5-13 works (2)
13.11.2013
38.95 0 38.95 New sanction
TOTAL 43109.58 16033.99 27362.31
Sr. No.
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs
Status of work
Remarks
1 Construction of 8 Nos. Class Rooms of Govt.
Girl Sr. Sec.School at village Kiloi in Rohtak
District
2/43-2013 works (2)
19-Jul-2013
92.79 91.38 1.41 Work completed except fitting of EI and
PH Services
2 Construction of Govt. High School at Baland in
Rohtak Distt.
9//4-2011 works (2)
21-Mar-2012
374.63 144.7 229.93 Work in physical progress. Excavation
completed &RCC footing completed upto
plinth beam. 95% plinth beam completed.
Column of east south and west side
completed. Flooring work in progress.
50% slab to east side laid
3 Const. of Govt. Girls Sec. School at Rohtak 2/43-2013 works (2)
19-July-2013
873.44 166.88 706.56 Work administratively approved. PCC
comleted for all blocks and RCC footing
completed and one side block completed
upto roof level. Right side of roof slab
completed. Binding of steel of front block
is in progress
4 Construction of Govt. Sr. Sec. School at
Kalanaur in Rohtak
2/43-2013 works (2)
19-July-2013
568.08 0.00 568.08 Work adminsitratively approved. Detail
estimate and DNIT sent to head office for
approval
5 Addition/construction/alteration of Govt. Girls.
Sr. Sec. School at Dabwali in Sirsa
9/6-20-WII
23-Feb-2011
220.88 170.97 49.91 Work physicall completed but financial
liabilities pending
6 Construction of Building of Govt. Girls Sr. Sec.
School Mandothi in Jhajjar District
FC&PS Govt. No. 9/4-2011
20-Sep-2011
142.24 95.81 46.43 Physically completed.
7 Construction of Building of Govt. Girls Sr. Sec.
School Khudan in Jhajjar District
2/43/2013
09.07.2013
397.33 69.10 328.23 Work is in progress
TOTAL 2669.39 738.84 1930.55
Bank of sanctions as on 01.04.14 for Secondary Education under head 4202- C.O. Public Works (Major Works)
Bank of sanctions as on 01.04.14 under head 4059- Excise &Taxation-16 Major works for the year 2014-15
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs + new
works
Status of work
Remarks
1 Construction of District Headquarter office
building for excise & taxation department sector -
12 faridabad
2795-ET-4-2014/15199 3131 0 3131 Fresh approval
2 Construction of District level office building for
Excise & Taxation department, sector 32 at
Gurgaon
3/46/2008-3 Lab 3681 0 3681 Fresh approval
TOTAL 6812 0 6812
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs + new
works
Status of work
Remarks
1 Construction of District Headquarter office
building for excise & taxation department sector -
12 faridabad
2795-ET-4-2014/15199 3131 0 3131 Fresh approval
2 Construction of District level office building for
Excise & Taxation department, sector 32 at
Gurgaon
3/46/2008-3 Lab 3681 0 3681 Fresh approval
TOTAL 6812 0 6812
Sr. No.
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Bank of sanctions
as on 01.04.14 for
under head 4210-
C.O. Medical -
Hospital &
Dispensary
Balance
sanction as on
1.4.14
Rs. Lacs
Status of work
Remarks
1 Construction of Additional block in the campus
of existing Civil Hospital at Sohna in Gurgaon
District
No. 20/93/2013-5 HB III
26.07.2013
102.27 0 102.27 Detail estimate/ DNIT received vide EIC
memo No. 520/WI dated 21/01/2014
unapproved with the remark that resubmit
the detailed estimate / DNIT after receipt
of approval from the client department /
Govt, as per FD instructions issued vide
letter No. 5/6/2005-5 B&C dated
14/10/2013
Tender to be called after model code of conduct is over
Bank of sanctions as on 01.04.14 under head 4059- Excise &Taxation-16 Major works for the year 2014-15
2 Construction of 50 bedded Hospital at Tosham
in Bhiwani
No. 20/171/2013- 5HB III
24.10.2013
1222.43 50 1172.43 Tender to be called after model code of conduct is over
3 Construction of 50 bedded Hospital at Bawani
Khera with additional ward of 20 bedded in
Bhiwani Distt.
No. 20/93/2013-5 HB III
8.07.2013
102.27 0 102.27 Approval to finance department awaited Tender to be called after model code of conduct is over
4 Construction of SHC, Gangicha Jaat Distt.
Rewari
No. 20/134/2013-5 HB
09.09.2013
24.22 0 24.22 Work started
5 Construction of SHC Luhari, Ukhal Chana,
Kutani, Ahri and Salodha Distt. Jhajjar
No. 20/158/2013-5HB III
Dated 07.10.2013
185.52 12.37 173.15 Tender invited
6 Construction of PHC with residential
accomodation at Village Bahrana District Jhajjar
No. 20/167/2013-5 HB III
07.10.2013
380.7 146.72 233.98 Work started
7 Construction of SHC Jhatti Pur, Atolapur,
Karhans, Jorasi Sarf Khas Distt. Panipat
No. 20/125/2013-5HB III
12.08.2013
128 0 128 Tender approved
8 Constn. of Community Health Centre along with
Residential accommodation in village Naraina in
Panipat distt
ACS No. 20/206/2013
04-March-2014
695.19 0 695.19 Detailed estimate and DNIT under process Tender to be called after model code of conduct is over
9 Constuction of CHC Bapoli at Panipat D.G.H.S. No. 20/200/2012
19.-Dec-2012
690.85 0 690.85 Tender received to be approved after
model code of conduct is over
10 Construction of PHC at Dhotter (Sirsa) No. 20/111/2013-5 HB III
11.09.2013
339.22 0 339.22 Tender received on 04.12.2013 and under
process in circle office
11 Construction of PHC at Jui Kalan (Bhiwani) No. 20/131/2013-5HB III
29.08.2013
375.4 0 375.4 Approval of finance department awaited Tender to be called after model code of conduct is over
12 Construction of PHC and Residential Building,
Khairati Khaira (Fatehabad)
No. 20/92/2013- 5 HB III
16.08.2013
207.27 0 207.27 Tender received on 18.11.2013 and under
process in Head office
Tender received to be approved after model code of
conduct is over
13 Construction of CHC Jhansa with residential
accomodation at Jhansa in district Kurukshetra
No. 20/99/2013-5 HB III
08.07.2013
690.85 0.01 690.84 Work at DPC level
14 Construction of SHC Raiya (Jhajjar) No. 20/98/2013-5 HB II
08.07.2013
27.7 0 27.7 Work in progress
15 Construction of PHC Talu (Bhiwani) with
residential accomodation
No. 20/95/2013-5 HB III
24.06.2013
354.98 0 354.98 Tender approved
16 Up gradation of CHD into 50 bedded hospital at
Assandh in Karnal
PS HD No. 20/85/13 5 HB III
08.10.2013
77.8 0 77.8 DNIT/Detailed estimate under process Tender received to be approved after model code of
conduct is over
17 Up gradation of CHD into 50 bedded hospital at
Nilokheri in Karnal District
No. 20/83/2013-5 HB III
18.06.2013
73.99 0.12 73.87 DNIT under process Tender received to be approved after model code of
conduct is over
18 Construction of Primary Health Centre Nindana
Tigari Distt. Rohtak
No. 20/7/2014- 5HB III
17.01.2014
360 0 360 Tender received to be approved after
model code of conduct is over
19 Construction of Sub Health Centre Kultana
Distt. Rohtak
No. 20/7/2014- 5 HB II
17.01.2014
35 0 35 DNIT under approval
20 Construction of Primary Health Centre Jahajgarh
Disstt. Jhajjar with residendial accomodation
No. 20/7/2014- 5 HB II
17.01.2014
321.64 0 321.64 Tender approved
21 Construction of Primary Health Centre Ismila
Distt. Rohtak
No. 20/7/2014- 5 HB II
17.01.2014
360 0 360 Tender received to be approved after
model code of conduct is over
TOTAL 5430.6 159.22 5271.38
Sr. No. Name of work No. & date of Approval Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs + new
works
Status of work Remarks
1 Construction of residential quarter in the campus
of Tehsil building at Gharaunda in Karnal Distt.
FC & PS No. 348
11-Jan-2012
148.06 0.09 147.97 Work recently allotted to the agency
2 Construction of residential houses for Distt.
Administration Revenue officers in the campus
os (Residential colony) Mini Secretariat at
Panipat
EIC No. 482/WI
12-Jan-2012
406.02 226.98 179.04 Plastering and flooring work in progress in
DC, SDM, CTM Residence and 4 Nos.
1900 sft residence slab laid of 1st floor, 1
no houses columns of 1st storey completed
upto roof level and work in ADC house
upto plinth beam
3 Construction of house (24 Nos. 450 sft, 36 Nos.
650 sft, 36 Nos, 800 sft & 20 Nos. 1300 sft area)
in officers colony, Sector-15 A, Faridabad
30-R-6-2012/1753
10-Feb-2012
2256.78 9.34 2247.44 Work administratively approved but not
tendered yet. Detailed estimate and DNIT
received back from Head office with the
remarks that the same may be sent to next
financial year due to paucity of funds
4 Construction of House (2 Nos. 2800 sft area) in
officers colony, Sector 15-A Faridabad
887-R-6-2012/5296
31-May-2012
137.23 63.51 73.72 Structure completed including internal
plastering and external plastering is in
progress. Overall 55% work completed
5 Construction of (130 Nos.) Residential House
for revenue staff in Mini Sectt. At Sirsa Distt.
330-R-6-2013/2655
4-Mar-2013
2461.17 5.32 2455.85 Detailed esimate and DNIT submitted to
Head office vide Hisar No. 2267 dated
3.9.13
TOTAL 5409.26 305.24 5104.02
Sr. No.
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs
Status of work
Remarks
Bank of sanctions as on 01.04.14 under head 4216- C.O. on Housing-(Plan) District Administration-Major Works
Bank of sanctions as on 01.04.2014 for Housing-Administration of Justice Works under head 4216-C.O. (Major Works)
1 Construction of 1 no. JMIC houses for CJM in
the Judicial Complex at Pehowa in Distt.
Kurukshetra
Addl. Ch. Secy. 6/42/11-5
21-Dec-2012
61.83 34.34 27.49 Structural work completed. Finishing are
in progress
2 Constn. Of 9 nos. Houses (6 nos. JMIC/CJM &3
nos. ADJ houses) in D.C. Colony, Kurukshetra
FC&PS 6/47/2008-5JJ-II
21-Nov-2011
569.73 390.37 179.36 6 Nos. JMIC houses structure work
completed upto plastering stage and
marble stone flooring and heat resistance
tile terracing is in progress and 3 Nos.
ADJ houses structure work completed and
marble stone flooring is in progress.
3 Construction of Judicial Houses in Sector -15A,
Faridabad
6/1/2009-5JJ-II
18-Jun-2012
761.61 379.37 382.24 Work in physical progress. (i) Work of 3
Nos. ADJ Houses completed upto 1st floor
roof level. (ii) Work of 5 Nos. JMIC
houses completed upto 1st floor roof level
and 5 Nos. JMIC houses completed upto
Ground floor roof level and plastering is in
progress.
4 Construction of Judicial officers Residence in
SDO(civil) cum Judicial Complex at Ratia
F.C. 6/55/2008-5jj(ii)
8-Dec-2008
54.58 64.98 0.00 Work in progress
5 Construction of Judicial officers residence in the
campus of SDO Civil-Cum Judicial at Tohana in
Fatehabad Distt.
FC&PS No. 6/14/2012
22-Feb-2012
106.09 150.81 0.00 Structure completed. Work in progress
6 Construction of 3 Nos. 1900 sft houses in
Judicial Complex at Hansi.
FC&PS No. 6/75/2011
9-Dec-2011
167.10 161.01 6.09 Work completed.
7 Constn. of Judicial Houses at Ellenabad in Sirsa
Distt.
No. 6/89/2011-5JJ-II
6-Jan-2012
113.07 119.06 0.00 90% work completed-Work is in progress
8 Construction of proposed house type 1900 sft.
covered area for Civil Judge Senior and Junior
Division at Safidon in Jind Distt.
FC&PS No. 6/18/2012-5JJ-II
22-Feb-2012
142.00 121.70 20.30 Plaster work completed. Floor finishing
in progress
9 Construction of 2 Nos. A.D.J. Residential
Houses and 4 Nos. Civil Judge (Jr. Divin.) in
Civil Station area at Jind in Jind Distt.
A.C.S. No 6/40/2012-5JJ
19-Jun-2012
480.28 324.05 156.23 Joinery flooring and finishing is in
progress
10 Constn. of 1900 sft. area Judicial Residential
House(CJM/Senior Divn. Judge) in SDO(Civil)
Complex at Narwana
6/27/2008-5JJ-II
13-Dec-2011
127.39 91.15 36.34 Physically completed.
12 Construction of Residence of District and
Sessions Judge at Bhiwani
FC&PS 6/63/09-5JJ-II
4-Jun-2010
79.32 99.37 0.00 Building completed. Finishing work in
progress
13 Construction of 3 Nos. residence for Addl. Distt.
& Session Judge and 3 Nos. for Chief Judicial
Magistrate at Bhiwani
6/63/2009-5JJ-II
9-Nov-2011
415.34 445.36 0.00 90% work completed. Further work in
progress
14 Construction of 7 Nos. House for Judicial
Officers, ADJs (3 Nos.) CJM (1 No.) and 3 Nos.
for Civil Judge Junior Division in Mini Sectt. at
Narnaul in Mohindergarh Distt.
6/13/2013-5JJ-II
15-Mar-2013
432.58 0.46 432.12 Tender not yet approved due to code of
conduct
15 Construction of 5 Nos. House for Judicial
Officers (1) No. for Civil Judge (Sr. Division)
and 4 Nos. for Civil Judge (Jr. Division) in
Judicial Complex at Mohindergarh in
Mohindergarh District.
6/10/2013-5JJ-II
18-Mar-2013
296.36 0.46 295.90 Tender not yet approved due to code of
conduct
17 Constn. of 1 No. for Civil Judge (Senior
Division) & 2 Nos. houses (Junior division)
1900 sft area house at Gohana in Sonepat Distt.
No. 6/35/2012-5jj-II
13-Jun-2012
189.75 159.96 29.79 95% work completed and balance work is
in progress
18 Constn. of 1 No. for Civil Judge (Senior
Division) & 2 Nos. houses (Junior division)
1900 sft area house at Ganaur in Sonepat Distt.
NO. 6/392012-5JJ-II
19-Jun-2012
129.00 30.61 98.39 15% work completed and balance work is
in progress
19 Constn. of 10 Nos. Residential houses for
judicial officers or various categories in Mini
Sectt at Sonepat
No. 6/36/2012-5JJ-II 791.25 318.76 472.49 80% work completed and balance work is
in progress
21 Const. of Houses for C.J.M. Division Judge at
Kosli in Rewari Distt
6/11/2013-5JJ-11
15-Mar-2013
138.68 0.00 138.68 Tender received from head office for
extending the validity
22 Const. of ADJ 4 No., SDJ 2 No. and CJM 2 No.
Judicial houses at Rewari in Rewari Distt.
6/12/2013-5JJ-11
15-Mar-2013
610.30 2.51 607.79 Work allotted recently. Some
modification in site desired by District and
session judge/DC rewari
23 Const. of 14 Nos. houses for Judicial officers, 2
Nos. for ADJs, 2 for CJSD, 1 No. for CJM, 9 for
CJJD at Hisar
6/24/2013-5JJ
15-Mar-2013
838.21 133.97 704.24 Work in progress
24 Const. of 6 No. houses having 1900 sft. Area of
each house for CJM and Senior division judge at
yamuna nagar
C.Sec.Govt.Hr.6/73/2013
24-Jun-2013
418.41 0.01 418.40 Tender received back due to non approval
25
Const. of residential houses of various categoreis
for the judicial officers in the campus of
(Residendial Colony) Mini Sectt. Panipat
T/S vide EIC No. 8041
9-Nov-2011
1465.34 1314.12 151.22 Work completed except misc. work
internal public health EI joinery and road
junction
26 Construction of Senior Judge Residence (CJM)
1900 sft area House in the campus of Judicial
Complex at Assandh District Karnal
A/A C.S. No. 6/59/12-5
19-June-2012
48.06 41.24 6.82 Work is in progress
27 Const. of 1 Nos. CJM House and 4 Noss. JMIC
Houses in Sector-13, Part-B at Bahadurgarh in
Jhajjar Distt.
6/82/2013-5-JJ-II.
8-Jul-2013
387.89 0.97 386.92 Tender received and pending due to
shortage of funds
28 Rough cost estimate for construction of Judicial
Residences at Sector 12-A Panchkula
6/46/2012-5JJ-II
29.08.2013
1736.34 0.00 1736.34 Work yet not started. Str. Design under
preparation
29 construction of 1990 sft area judicial residential
house in SDO complex at Guhla in district
kaithal
6/74/2013-5JJ-II
21.10.2013
63.88 0.00 63.88 D/E and DNIT sent to Head office
30 Renovation of entrance gate and construction of
check post in New Sessions House at Ambala
City
6/21/2014-5JJ-II
03.04.2014
3.82 0.00 3.82
TOTAL 10628.21 4384.64 6354.85
Sr. No.
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs
Status of work
Remarks
1 Construction of Superintending Engineer
Residence in PWD B& R colony at Kaithal
4/11/2009-1B&R (w) 46.57 29.91 Floor work in progress
2 Costruction of PWD (B&R) Colony at Kaithal 4/11/2009-1 B&R (W) 761.84 0.05 761.79 Work allotted
TOTAL 808.41 0.05 791.7
Sr. No.
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs
Status of work
Remarks
1 Administrative approval for the construction of
Govt. Industrial Training Institute Mustafabad
Distt Yamuna nagar
Bhawan/ITI/Mustafabad/824
24.07.2013
805.13 0.55 804.58 Project not taken up due to non
availability of funds
2 Construction of new building of ITI Bharapur
(Naraingargh) in Ambala Distt.
Bhawan/ITI
11-Dec-2008
997.55 135.92 861.63 Work shop block excavation in foundation
is in progress
3 Construction of Industrial training Institute at
village Jaisinghpura in Distt. Karnal
A/A IT Deptt. No. 86
24-Jan-2013
428.56 0.28 428.28 Project not taken up due to non
availability of funds
4 Construction of building of ITI at Madina in
Rohtak Distt.
Bhawan/ITI/Madina/466
29-Mar-2012
764.09 509.17 254.92 Work in physical progress. RCC of
column upto roof level completed and
shuttering is in progress.
5 Construction of Admn. & Workshop Block in
ITI at village Kansala in Rohtak District
B/ITI/Kansala654-57-B
6-May-2010
677.17 260.56 416.61 Work in physical progress. Admn block
slab completed. Front and back boundary
wall completed and plaster of Admn block
completed. Slab of G.F. laid for workshop
block. Parking of admn block completed.
Shuttering of F.F. two span is in progress.
6 Construction of Admn. & Workshop Block in
ITI at Hassangarh in Rohtak District
B/ITI/Hassangarh/2013
2-Feb-2011
560.00 75.01 484.99 Work administratively approved. Work is
in progress. Slab GF and FF of workshop
block completed and admn block slab
completed. The brick work of GF is in
progress.
7 Construction of I.T.I at Fatehpur Billoch
Faridabad
NewITI/F.P. Billoach
10-Jun-2007
493.26 392.39 100.87 Work in physical progress. Work is in
progress on risk and ost of M/s Deep
Builders
Bank of sanctions as on 01.04.2014 for Housing Works under head 4216-C.O. Public works (Major Works)
Bank of sanctions as on 01.04.14 for ITI works under head 4250- C.O. creation of infrasturcuture for Development of Industrial Training (Major Works)
8 Construction of ITI at Uncha Majra in Gurgaon
Distt.
FC &PS No. T-9
4-May-2010
1033.53 143.66 889.87 Work is in progress. 95% boundary wall
completed. 50% RCC slab of ground
floor of work shop laid. RCC column
work of rest portion up to roof level
completed. Foundation work of
administrative block is in progress.
Overall 25% work completed.
9 Construction of I.T.I. at village Pali in District
Faridabad (Administration Block, One
Workshop, Boundary wall & road parking etc.)
ITI/Pali/Expansion/365
6-Jan-2012
502.45 7.21 495.24 Tender case received back from head
office with the remarks to submit the same
after receipt of approval from client
department as per FD instructions issued
vide letter No. 5/6/5005-5 dated
14.10.2013
10 Administrative approval for the construction of
Govt. Industrial Training Institute Moujabad,
Distt Gurgaon
Bhawan/ITI/Moujabad/454
15.04.2013
424.36 0.28 424.08 Detailed estimate and DNIT received back
from Head office due to shortage of funds
11 Construction of ITI at Kushak in Palwal Distt. FC & PS IT & VE No. Nil
21-Jun-2007
532.02 597.31 0.00 98% admn and work shop block and 95%
boundary wall completed and further work
is in progress
12 Construction in ITI Bhirdana in Fatehabad Bhawan/ITI/Bhirdana
5-03-2013
457.88 186.48 271.40 Ground floor slab laid.
13 Constn. of I.T.I. at Majra Piau (Narnaund) F.C. No. 1680
6-Oct-2011
504.60 511.65 0.00 Work completed.
14 Construction of New Govt. ITI Rania Distt Sirsa Bhawan/ITI/Rania/946
29.08.2013
732.26 0.42 731.84 Tender received unapproved due to non
availability of funds
15 Construction of I.T.I. Pinjupura (Kalayat) In
Kaithal Distt.
FCPS No. Bhawan/ITI/505
20-Sep-2011
738.71 512.72 225.99 Finishing work is in progress
16 Construction of ITI Bir Bangra at Rajound Distt.
Kaithal
PS to Govt. No. 4390
25-Oct-2012
644.98 240.82 404.16 Administrative block. Single storey, work
shop double storey. Administration block
slab laid and brick work completed and
momty roof slab laid. Work shop ground
floor slab laid and 2nd storey 75% roof
slab laid and B/W completed.
17 Administrative approval for the construction of
ITI Pabnawa Distt. Kaithal Bhawan/ITI/Pabnawa/637
26.06.2013
551.43 9.98 542.45 Approval received from financial
department and tender case sent to circle
office.
18 Construction of Ch. Surender Singh Memorial
I.T.I. Building at Tosham in Bhiwani District
(Workshop block only)
FC/New/ITI/Tosham/1106
1-Jul-2011
502.27 359.62 142.65 Work in progress. G floor and 1st floor
completed. Finishing in progress. Clause
II imposed vide No. 1758 dated 19.8.10
19 Constn. of Hospitality wing in at Siwani Khera
(Siwani) district Bhiwnai
Bhawan/ITI/Khera/547
24-Jan-2013
683.65 2.92 680.73 Project not taken up due to non
availability of funds and guidelines of
finance department
20 Administrative approval for the construction of
Govt. Industrial Training Institute Jamalapur
Distt Bhiwani
Bhawan/ITI/Jamalpur/748
17.07.2013
300.00 0.00 300.00 Project not taken up due to non
availability of funds and guidelines of
finance department
21 Construction of building of new I.T.I. at
Malrabas District Mohindergarh
Bhawan/ITI/Khera/457
13-Jul-2007
525.00 153.70 371.30 Work in progress departmentally. 100%
slab of Admn block laid. Plastering is in
progress
22 Construction of I.T.I. Assaudha in Jhajjar
District.
B/ITIAssaudah/1953
12-Oct-2011
281.60 267.32 14.28 Physically completed.
23 Construction of ITI Building at Bhaproda in
Jhajjar District
F.C. No. Bhaproad 5201
12-Aug-2009
658.60 487.93 170.67 Work in progress 95% work done. Work
for internal road/parking physically
completed
24 Construction of ITI at Dubaldhan in Jhajjar
District
PS Govt Hry No. 4577
24-Dec-2012
424.37 284.53 139.84 Work is in progress. Overall 25% work
completed.
25 Construction of ITI at village Pahadipur in
Jhajjar District
FC & PC No. 41-44
10-Jan-2013
578.00 238.72 339.28 Work is in progress. Overall 15% work
completed.
26 Construction of Administration Block &
Workshop Block in ITI at village Khudan in
Jhajjar District
FC&PC No. 58
2-Feb-2013
659.60 309.36 350.24 Work is in progress. Overall 15% work
completed.
27 Construction of Pandit Jage Ram Govt. ITI
Jahangirpur in Distt. Jhajjar
Bhawan/ITI/Jahangirpur
25-01-2013
416.72 160.55 256.17 Work is in progress
28 Expansion of Building of ITI, Kund Manethi in
Distt. Rewari
IT/KundManethi/1294-B-I
14-Dec-2009
768.08 572.86 195.22 Work physically completed.
29 Construction of New building of Rao Abhay
Singh Govt ITI, Saharanwas in Rewari Distt
PS Endst No: Bhawan/2172
9-Aug-2012
473.20 172.22 300.98 Ground floor roof slab and brick work
complated and first floor slab is in
progress
30 Administrative approval for construction of
Govt. Industrial Training Institute Kharkhara
Distt Rewari
Bhawan/ITI/Kharkhara/885
08.08.2013
500.00 0.00 500.00 A/A received on normative basis.
Detailed Drawings are awaited from Chief
Architect, Haryana. RCE is under
preparation
31 Construction of building of new I.T.I. at Rajlu
Garhi in Sonepat Distt
No. KC/Bhawan/ITI
14-Jan-2009
386.41 229.88 156.53 Action under clause II taken vide T.O. No.
5825 dated 19.7.2010. 1st storey and 2nd
storey slab completed. 3rd storey in
progress. D/E submitted by 31.1.2011
32 Admnistrative approval for construction of
special repair and new construction Raising of
boundary wall and earthwork filling in open
yard at Govt. ITI Julana in Jind
Bhawan/ITI/Julana/952
29.08.2013
18.35 0.00 18.35 Tender process of allotment
33 Administrative approval for the construction of
Pgd. Electrical Sub station in Govt. Industrial
Training Institute Behal Distt. Bhiwani
Bhawan/ITI/Behal/874
03.06.2013
21.55 0.00 21.55 Not taken up due to shortage of funds.
TOTAL 18045.38 6824.02 11294.70
Sr. No.
Name of work
No. & date of Approval Amount of A/A
Rs. Lacs
Expenditure up to
3/2014Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs
Status of work
Remarks
1 Construction of 1st storey at Tehsil Building at
Bilaspur in Yamuna Nagar Distt.
190-R-6-2012
24-Feb-12
85 47.17 Work is in progress
2 Construction of Administrative office Building
Phase-II, with Multi Level Parking in Mini
Sectt. Complex Sector-1, Panchkula
2427-R-62011/1711
9-Feb-2012
3470.59 3470.59 R/C/E for Rs. 3470.59 Lacs stand
submitted for A/A but F.C& Revenue
disaster Management
3 Construction of Mini Sectt. (SDO) (Civil)
Complex at Samalkha in Panipat
F.C. & P.S. no. 7202
24-Aug-2009
847.4 481.44 Work in physical progress. i) 90% Kotah
stone work completed and further in
progress.ii) The terrazzo flooring in
ground & 1st/2nd floor floor in
progress.iii) Tile terracing is in progress.
4 (i) Construction of Internal Road (Rigid
Pavement) in Judicial complex at Rohtak. (ii)
Dismantling/ providing the existing chambers at
Rohtak
6/06/2009-5JJ-II
23-Nov-2011
290.54 93.84 Work in physical progress. CC Pavement
completed except pavement in between
Judicial complex and Litigant hall. (ii)
Work completed and inaugurated by
Hon’ble Chief Minister, Haryana on
14/07/2012
5 Construction of Surface Car Parking in Mini
Sectt. at Rohtak
275-R-6-2012/2006
21-Feb-2012
89.41 60.19 Work in physical progress. Work of
boundary wall completed & laying of
stone metalled (G-II) in parking
completed. Laying of interlocking paver
block is in progress.
6 Construction of proposed Judicial Block (Phase -
II) on existing Litigant Hall in Mini Sectt. at
Rohtak
6/35/2012-5 JJ-II
18-Jun-2012
877.31 877.31 Work administratively approved. Tender
re-invited on dated 11/03/2013
7 Construction of additional Judicial Complex at
Faridabad
6/8/2006-5JJ-II
24-Jan-2013
3262.08 3233.71 Work in physical progress. Excavation for
basement is in progress
8 Construction of Labour courts in Mini
Secretariat at Gurgaon
A/A No.456-R-2011/1972
17-Feb-2011
1246 486.44 The structure work completed , Finishing
work is in progress . Remaining 50% A/A
of Rs. 62300000/-
9 Construction of Judcial Block in the compus of
SDO (Civil Complex) at Hathin in Palwal Distt.
FC/PS No.6/7/2012-5 JJ-II
19-Jun-2012
792.42 740.88 Work is in progress
10 Construction of Judician block including
Malkhana in Mini Sectt. At Palwal in Palwal
District
FS/PS 6/32/2004-5 JJ(II)
26-Nov-2009
2560 2560 Work completed except officers lift
11 Construction of Roads & Parking in Mini Sectt.
Complex (Excluding Residential Area) at Palwal
in Palwal District A/A received from FC&PS to
Govt. Hr. Revenue and Disaster Manaement
Deptt.
FS/PS 6/32/2004-5 JJ(II)
26-Nov-2009
486.69 486.69 Work is in Progress
Bank of sanctions as on 1.4.14 for Judiciary works under head 4059-C.O. Capital outlay on public works
12 Construction of Securit Guard Room, Check
post & high security boundary wall around
judicial court complex Mini Sectt. at Sirsa in
Sirsa Distt
1
29-Dec-2011
134.67 63.69 Work in progress
13 Construction of Check Post, Gurard Room, High
Security Boundary Wall, Judicial Malkhana and
Additional Building in Judicial Complex at
Hisar
FCNo.6/92/2011-5JJ-II
6-Jan-2012
716.71 601.05 Work is in progress
14 Constructing Additional work in the Campus of
Mini Sectt. at Bhiwani in Bhiwani Distt
No.2538-P-B-11/11904
3-Nov-2011
114.74 Work in progress
15 Construction of SDO(Civil) Complex
(Administrative-cum-Judicial Complex) at
Tosham in Bhiwani Distt.
No.597-R-6-2012/3083
14-Mar-2012
978.13 978.1 Tender approved. Letter to proceed to be
issued.
16 Construction of SDO (Civil) Complex
(Administrative Block) in the Campus of Mini
Sectt. Charkhi Dadri in Bhiwani Distt.
631-R-6-2012/3170
16-Mar-2012
1055 1052.75 Tender received on 13.03.2013 and under
process
17 Construction of Additional Litigant Hall & Bar
Complex in Mini Secretariate at Narnaul in
Mohindergarh District.
6/33/2012-5-JJ (II)
4-July-2012
317.35 0 317.35 Tender re-invited which will be opened on
10.04.2013
18 Supply & installation of Lifts in Jdicial complex
in Mini Sectt. Palwal FS/PS 6/32/2004-5 JJ(II)
26-Nov-2009
2560 0 2560 Part of main A&A) Material of 4 Nos lifts
received at site and further installation
work in progress.
19 Pdg. 4 Nos passenger elevators in Admn. block
in Mini Sectt. campus at Palwal.
F C No. 7018
18-Aug-2009
2432 0 2432 Part of main A&A
20 Pdg. 5 Nos. passenger elevators in Judicial
complex at Nuh in Mewat Distt
F C No. 6/50/2005-5JJ(II)
20-Aug-2009
3137.45 0 3137.45 Part of main A&A
21 Pdg. 4 Nos passenger elevators in Admn. block
in Mini Sectt. Nuh
F C No. 7127
21-Aug-2009
2654.65 0 2654.65 Part of main A&A
22 Construction Judicial Courts Complex at
Mohindergarh (Pdg. CC TV system)
FC &PS 6/22/03/-5JJ(II)
11-Oct-2007
392.86 368.18 Work in Physical progress, Only two Nos.
Cameras are to be installed (Estimate Rs.
947000/- )(Part of main A/A Rs. 392.86
Lacs)
23 Construction of 8 Nos. Court Building in Mini
Sectt. At Bhiwani (Pdg. Electrical Installation)
FC&PS A&J 6/56/2003-05
11-Oct-2007
581.92 545.07 Work in progress, Near Completion (part
of Main A/A Rs. 581.92) (Estimate Rs.
231000/- Only)
24 Construction of Judicial Block including
Malkhana in Mini Sectt. Complex at Nuh in
Mewat Distt.
FC&PS No.6/50//JJ (II)
20-Aug-2009
2560.95 2198.86 82% work phy. comp. RCC Slab and brick
work comp. of all floors. Flooring and
Plastering 80% complete and finishing
work is in progress. L.D. imposed
25 Construction of Residential Houses for Judicial
Officers and Officials in Mini Sectt. Complex at
Nuh in Mewat District
No.597-R-6-2012/3083
11-Dec-2012
737.7 737.7 Tender approved. Letter to proceed to be
issued.
26 Construction of Roads & Parking, Campus
Boundary wall, High Security Boundary Wall,
Earth filling, Land Scaping and Estate PH & EI
Services in Mini Sectt. Complex at Nuh in
Mewat Distt.
FC&PS No.6/50/2005-5JJ
20-Aug-2009
576.5 230.59 1. Constn. of 80% comp. all over campus
& 40% Grills has been fixed. Action
under clause-II
2.Road & Parking work 50% Comp.
27 Rough cost estimate for furniture in Judicial
Court Complex at Mini Sectt. at Nuh in Mewat
District.
Add. C.S No.6/14/2013-5JJ
19-Feb-2013
98.54 98.54 D/E resent to S.E.
28 Construction of Judicial Block in the campus of
SDO Civil Complex at Gohana in Sonepat Distt.
F.C.No.6/11/2012-5JJ-II
8-Feb-2012
765 375.36 Work in progress
29 Construction of Judicial Block in the campus of
SDO Civil Complex at Ganaur in Sonepat Distt.
F.C.No.9082-89/WI
5-Dec-2011
765 606.38 Work in progress
30 Construction of additional Eight Court building
in Mini Secretariat at Sonepat Distt.
No.6/48/2012-5JJ-II
4-July-2012
1175 1174.36 Tender under process
TOTAL 35761.61 32670.34
Sr. No. Name of the work A/A Amount (Rs. in Lacs) No. and date Division
1 Administrative approval of SC/ST wing at
G.I.T.I, Ambala350
Bhawan/ITI/SC/
ST/Common/10
15
30.08.2013
Ambala
2
Administrative approval of SC/ST wing at
G.I.T.I, Bhiwani350
Bhawan/ITI/SC/
ST/Common/10
25
30.08.2013
Bhiwani
3
Administrative approval of SC/ST wing at
G.I.T.I, Faridabad350
Bhawan/ITI/SC/
ST/Common/10
31
30.08.2013
Gurgaon
4
Administrative approval of SC/ST wing at
G.I.T.I, Gurgaon350
Bhawan/ITI/SC/
ST/Common/10
37
30.08.2013
Gurgaon
5
Administrative approval of SC/ST wing at
G.I.T.I, Mojabad in Distt Gurgaon350
Bhawan/ITI/SC/
ST/Common/10
43
30.08.2013
Gurgaon
6
Administrative approval of SC/ST wing at
G.I.T.I, Hisar350
Bhawan/ITI/SC/
ST/Common/10
49
30.08.2013
Hisar
List of works recently sanctioned under head P-01-08-4250-51-789-98-51-N-V-Training Building for Schedule Castes Wings-16 Major Works
7
Administrative approval of SC/ST wing at
G.I.T.I, Barwala in Distt Hisar350
Bhawan/ITI/SC/
ST/Common/10
55
30.08.2013
Hisar
8
Administrative approval of SC/ST wing at
G.I.T.I, Piau Majra in Distt Hisar350
Bhawan/ITI/SC/
ST/Common/10
61
30.08.2013
Hisar, Hansi
9
Administrative approval of SC/ST wing at
G.I.T.I, Nalwa in Distt. Hisar350
Bhawan/ITI/SC/
ST/Common/11
39
30.08.2013
Hisar, Hansi
10
Administrative approval of SC/ST wing at
G.I.T.I, Julana in Distt. Jind350
Bhawan/ITI/SC/
ST/Common/10
85
30.08.2013
Jind
11
Administrative approval of SC/ST wing at
G.I.T.I, Jind in Distt Jind350
Bhawan/ITI/SC/
ST/Common/10
79
30.08.2013
Jind
12
Administrative approval of SC/ST wing at
G.I.T.I, Gulha-Cheeka in Distt. Kaithal350
Bhawan/ITI/SC/
ST/Common/11
03
30.08.2013
Kaithal
13
Administrative approval of SC/ST wing at
G.I.T.I, Karnal in Distt. Karnal350
Bhawan/ITI/SC/
ST/Common/10
91
30.08.2013
Karnal
14
Administrative approval of SC/ST wing at
G.I.T.I, Sujapur in Distt. Mohindargarh350
Bhawan/ITI/SC/
ST/Common/11
09
30.08.2013
Narnaul
15
Administrative approval of SC/ST wing at
G.I.T.I, Kalayat in Distt. Kaithal350
Bhawan/ITI/SC/
ST/Common/
1097
30.08.2013
Narwana
16
Administrative approval of SC/ST wing at
G.I.T.I, Palwal350
Bhawan/ITI/SC/
ST/Common/11
15
30.08.2013
Palwal
17
Administrative approval of SC/ST wing at
G.I.T.I, Naultha in Distt. Panipat350
Bhawan/ITI/SC/
ST/Common/11
27
30.08.2013
Panipat
18
Administrative approval of SC/ST wing at
G.I.T.I, Tankri in Distt Rewari350
Bhawan/ITI/SC/
ST/Common/11
33
30.8.2013
Rewari
19
Administrative approval of SC/ST wing at
G.I.T.I, Sirsa 350
Bhawan/ITI/SC/
ST/Common/10
73
30.08.2013
Sirsa
20
Administrative approval of SC/ST wing at
G.I.T.I, Mundlana in Distt Sonepat350
Bhawan/ITI/SC/
ST/Common/11
21
30.08.2013
Sonepat
21
Administrative approval of SC/ST wing at
G.I.T.I, Sonepat 350
Bhawan/ITI/SC/
ST/Common/10
67
30.08.2013
Sonepat
22 Administrative approval of SC/ST wing at
Yamuna nagar350
Yamuna nagar
23 Administrative approval of SC/ST wing at
Sujapur Mohindegarh 350
Mohindergarh
TOTAL 8050
NOTE:- The architectural drawing of some of the above works have been received recently.None of the above works has been tendered so far. The standard structural is being prepared by the consultant.
Sr. No. Name of Work No. and dated of Approval Amount of A/A
Rs. Lacs
Expenditure upto
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14 Rs. Lacs
+ new works
Status of work
1 Construction of Judicial Block in the campus of
SDO Civil Complex at Tohana in Fatehabad
Distt.
6/24/2012-5JJ-II
12.03.2012
765.00 576.88 188.12 Work completed
2 Construction of Check post, guard room, high
security boundary wall, judicial malkhana and
additional building in judicial complex at Hisar
FC No. 6/92/2011-5JJ-II
6-Jan-2012
716.71 427.85 288.86 Work is in progress
3 Construction of 4 Nos. Additional court building
in Mini Sectt. Complex at Jind
ACS No. 6/21/2013-5JJ-11
2-Apr-2013
592.30 2.03 590.27 Foundation work completed, roof slab of
GF in progress
4 Construction of Additional court room in
Judicial complex at Narnaul in Mohindergarh
distt.
6/27/2013-5JJ-II
2-Apr-2013
456.00 0.00 456.00 Tender not yet approved due to code of
conduct
5 Construction of Judicial complex at Sector-12,
Bahadurgarh in Jhajjar
6/08/2012-5JJ-II
15-Mar-2013
1713.82 12.01 1701.81 Tender received on 01.10.2013 & sent to
head office for approval
6 Construction of Judicial Block in the campus of
SDO civil Complex at Gohana at Sonepat Distt.
6/11/2012-5-JJ-II
08.02.2012
765.00 23.39 741.61 Work in progress wiring being done
7 Construction of additional eight court building
in Mini Sectt. At Sonepat Distt.
6/48/2012-5-JJ-II
04-07-2012
1175.00 215.15 959.85 35% work completed and balance work is
in progress
8 Providing Fire alarm system in judicial complex
at Narnaul in Distt. Mohindergarh
6/69/2013-5JJ-II
31.05.2013
15.33 15.33 Tender to be received on 15.11.2013
9 Providing furniture in Judicial Court Complex at
Mini Sectt. At Nuh in Mewat Distt.
6/14/2013-5JJ-II 19.02.2013 98.54 98.54 Work in progress
10 Construction of additional Judicial Complex at
Faridabad
6/8/2006-5JJ-II
24-Jan-2013
3262.08 637.11 2624.97 Work in physical progress. 100%
basement roof slab casted and 80% ground
floor slab completed and 40% first floor
slab completed. Overall 28% work
completed
11 Construction of Judicial complex at Gurgaon 6/13/2012- 5JJ-II 11331.00 0.60 11330.40 Structural design in process
12 Additional alteration in Judicial Complex at
Mohindergarh
6/43/2013- 5JJ- II
11.04.2013
7.05 4.61 2.44 Physically completed
13 Providing furniture in Judicial complex at Nuh
in Mewat district
6/14/2013/5JJ-II
19.02.2013
98.54 98.54
14 Providing and installing 1 No. tubewell and
laying of connecting pipeline to provide driking
water supply facilities in judicial complex at
mini sectt narnaul
6/07/2014-5JJ-II
03.04.2014
10.05 10.05
15 Providing addition and alteration in judicial
complex at Narnaul in Mohindergarh district
6/22/2014-5JJ-II 6.54 6.54
List of Works under head 4059 Administration of Justice 75:25 scheme (part 2)
16 Construction of Judicial Malkhana in Mini Sectt
Yamuna nagar
6/19/2013-5JJ-II 51.63 51.63
17 Construction of 10 Nos. Additional court room
at Kurukhetra
6/106/2013-5JJ-II
16.04.2014
1772.63 0.00 1772.63
18 Work providing computer points in various
rooms in Judicial Complex at Ambala City
6/19/2014-5JJ-II
03.04.2014
1.93 0.00 1.93
19 Construction of 8Nos.court building in Mini
Sectt. at Bhiwani
6/18/2014-5JJ-II
03.04.2014
3.945 0.00 3.945
20 Providing false ceiling in the various judges
chamber of judicial complex karnal
6/24/2014-5JJ-II
03.04.2014
5.06 0.00 5.06
TOTAL 22848.16 1899.63 20948.53
Sr. No. Name of Work No. and dated of Approval Amount of A/A
Rs. Lacs
Expenditure upto
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14 Rs. Lacs
+ new works
Status of work Remarks
1 Construction of Judicial Block in the campus of
SDO Civil Complex at Tohana in Fatehabad
Distt.
6/24/2012-5JJ-II
12.03.2012
765.00 378.5 Finishing in progress
2 Construction of Check post, guard room, high
security boundary wall, judicial malkhana and
additional building in judicial complex at Hisar
FC No. 6/92/2011-5JJ-II
6-Jan-2012
716.71 572.93 Work in progress
3 Construction of 4 Nos. Additional court building
in Mini Sectt. Complex at Jind
ACS No. 6/21/2013-5JJ-11
2-Apr-2013
592.30 592.30 Work recently allotted
4 Construction of Additional court room in
Judicial complex at Narnaul in Mohindergarh
distt.
6/27/2013-5JJ-II
2-Apr-2013
456.00 456.00 Tender re-invited and to be opened on
06.11.2013
5 Construction of Judicial complext at Sector-12,
Bahadurgarh in Jhajjar
6/08/2012-5JJ-II
15-Mar-2013
1713.82 1713.82 Tender received and under approval
6 Construction of Judicial Block in the campus of
SDO civil Complex at Gohana at Sonepat Distt.
6/11/2012-5-JJ-II
08.02.2012
765 375.36 Work in progress
7 Construction of additional eight court building
in Mini Sectt. At Sonepat Distt.
6/48/2012-5-JJ-II
04-07-2012
1175 1174.13 Work is in progress
8 Providing Fire alarm system in judicial complex
at Narnaul in Distt. Mohindergarh
6/69/2013-5JJ-II
31.05.2013
15.33 15.33 Tender to be received on 15.11.2013
9 Providing furniture in Judicial Court Complex at
Mini Sectt. At Nuh in Mewat Distt.
6/14/2013-5JJ-II 19.02.2013 98.54 98.54 Work in progress
10 Construction of additional Judicial Complex at
Faridabad
6/8/2006-5JJ-II
24-Jan-2013
3262.08 3233.45 Work in physical process. Concreting of
foundation beams and slab is in progress
and shuttering of basement roof slab is in
progress.
List of Works under head 4059 Administration of Justice 75:25 scheme (part 2)
Sr. No. Name of work No. & date of Approval Amount of A/A Expendiure up to
3/2014
Balance
sanction as on
1.4.2014 + new
works
Status of work Remarks
1 Construction of Govt. Polytechnic at Meham in
Rohtak Distt.
35/62/09-2T.E.
18-Aug-2009
800.00 685.08 114.92 Work in physically progress. (i) Work
completed. (ii) Plastering, tile terracing,
flooring completed. Grill in window,
plinth protection, finishing & P.H. work
fitting is in progress. (iii) Work
completed.
2 Construction of Administrative cum Academic
Block (Block A) and Workshop Block (Block C)
at Govt. Polytechnic, Shergarh Distt. Kaithal
FCPS no. 35/38/2012-TE
26-Apr-2012
1550.00 674.54 875.46 Block A&C Parking, Grinding of floor,
wall putty in progress. Block B&D
Ground floor slab laid.
3 Construction of Academic block of Government
Polytechnic Bhiwani in Bhiwani District.
35/45/2008-2TE
7-Jul-2008
1,525.00 600.22 924.78 Finishing work in progress. Building
partly handed over to the client deptt
4 Rough Cost Estimate execution of civil works at
Govt. Polytechnic Jhajjar.
31/01/2013-TE
2-Jan-2013
23.13 23.13 Wok in physical progress. Admin. Block-
Completed , Boys Hostel- Completed.
Girls Hostel- Completed, Residences -
75% work completed and finshing is in
progress. Statue work completed. not in mis list
5 Construction work of Govt. Polytechnic, at
village Mandkola, Distt. Palwal.
35/26/2013-4TE
12-April-2013
1,554.13 4.66 1549.47 Estimate and DNIT is under process
6 Construction work of Govt. Polytechnic, at
village Indri, Distt. Mewat.
35/25/2013- 4TE
12-April-2013
1,554.13 210.88 1343.25 Found work comp. upto plinth beam in all
blocks. A block slab G.F. casted and
shuttering in progress. Block D, casting
of column in progress and B/wall 90%
completed
7 Const. of Govt. Polytechnic at village Malab
District Mewat
1554.13 3.48 1574.65 Work of foundation and B/wall in progress
Total 8,560.52 2178.86 6405.66
Sr. No.
Name of Work
No. and date of Approval Amount of A/A Expenditure up to
03/2014
Balance
sanction as on
1.4.2014
Status of work
Remarks
1 Const. of Govt. Polytechnic Jatal in Distt
Panipat
P.S. No. 35/3/2010-2TE
16-Apr-2013
1,554.13 0.00 1554.13 Tender to be received on 30.08.2013
2 Const. of Administrative cum Academic Block
at Government Polytechnic at village Neemka in
Faridabad District
35/5/2013-2TE 1,500.00 1475 Work in tender allocation formalities.
Tender on 24.08.2013 and under process
Bank of Sanction as on 01.04.2014 for Education, Sports, Art & Culture (Plan), under Head 4202-C.O. (Polytechnic)
3 Const. of Polytechnic at Lisana in Rewari Distt No. 35/33/2006-2TE
19-May-2008
2,516.46 985.82 Main building completed & Handed over.
Boundary wall in progress
4 Choudhary Ranbir Singh Hooda Govt. Institute
of Irrigation and Power Engineering
Hathinikund Distt Yamuna nagar
35/33/2010-2D
Dated 12.04.2013
1554.13 0 1554.13 DE/DNIT under submission by SE
Chandigarh. Tenders will be called by
20.07.2013
5 Govt. Polytechnic, Dhangar Distt. Fatehabad 35/33/2010-2TE
Dated 16.04.2013
1554.13 0 1554.13 Tender invited and to be received on
12.08.2013
TOTAL 8,678.85 0.00 7123.21
Sr. No.
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction Rs.
Lacs 01.04.14
Status of work
Remarks
1 Construction of New SDE PWD B&R office at
Pehowa in Distt. Kurukshetra.
FC & PS No. 1/14/2011-1(W)
14-May-2012
58.56 58.56 Roof slab completed
2 Administrative approval for construction of New
PWD Rest House at village Sirsagarh, Near
Dosarka Mullana in Ambala Distt.
1/29/2010-1 B&R (W) 173.52 128.30 Foundation completed
3 Construction of PWD Rest House at
Chhachhrauli in Yamuna Nagar District
EIC, Hr. no. 4257-62
16-Jun-2011
135.62 135.62 Work completed.
4 Constructing of New Rest House at Fatehabad in
Fatehabad Distt.
FC&PS No. 1/22/2011
6-Mar-2012
179.52 179.52 Structure completed. Flooring in progress
5 Constn. of PWD Rest House at Narwana in Jind
Distt.
FC No. 1/1/2011-1B&R(W)
6-Sep-2011
146.00 146 Finishing work is in progress.
6 Construction of New Block No. II in PWD Rest
House at Kaithal.
FCPS No. 1/2/2009-1B&R(w)
22-Feb-2012
175.30 175.3 Structure completed. Plaster in progress
7 Construciton of Nirman Sadan PWD B&R
Office Complex at Kaithal.
1/2/2009-1B&R(w)
29-Nov-2012
995.75 995.75 Basement partly completed
8 Construction of New PWD Rest House at Pundri
in Distt. Kaithal.
FC&PS No.1/4/2012-1B&R
7-May-2012
200.73 200.73 Ground floor slab laid.
9 Construction of PWD B&R Rest House at
Jhajjar
No.1/9/2010-1B&R (W)
4-May-2012
204.00 204 Work is in progress. Over all 30% work
completed
10 Construction of PWD Rest House with 2 Nos.
440 Sft houses and SDO Office at Beri in Jhajjar
District
No.1/37/2010-1B&R(W)
19-Mar-2013
569.51 569.51 Detailed estimate/DNIT stands submitted
to head office
11 Construction of Nirman Sadan at Rohtak NO. 1/2/2011-1 B&R(W) 1779.8 1779.8 Work just started
12 PWD Rest house at Rai in Sonepat Distt 1099.13 1099.13 Foundation in progress
Total 5717.44 5672.22
Bank of sanctions as on 01.04.14 under head 4059- C.O. Public Works (Major Works)-Allotted works
Bank of sanctions as on 29.04.14 under head 4059- C.O. Public Works (Major Works)
Sr. No.
Name of work No. & date of Approval
Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction Rs.
Lacs 01.04.14
Status of work
Remarks
1 Construction of New SDE PWD B&R office at
Pehowa in Distt. Kurukshetra.
FC & PS No. 1/14/2011-1(W)
14-May-2012
58.56 28.62 29.94 Structural work completed. Finishing
work such as plastering and flooring are in
progress
2 Administrative approval for construction of New
PWD Rest House at village Sirsagarh, Near
Dosarka Mullana in Ambala Distt.
1/29/2010-1 B&R (W) 173.52 89.76 83.76 Work in progress
3 Construction of PWD Rest House at
Chhachhrauli in Yamuna Nagar District
EIC, Hr. no. 4257-62
16-Jun-2011
135.62 145.01 0.00 Work completed
4 Construction of 1st floor & 2nd floor of existing
Rest House in Sector -16A, Faridabad
4/23/2006-1B&R(W)
28-Dec-2011
259.80 0.78 259.02 Work in tender/allocation formalities.
Tender received on dated 20.12.2013 and
under process
5 Constructing of New Rest House at Fatehabad in
Fatehabad Distt.
FC&PS No. 1/22/2011
6-Mar-2012
179.52 110.96 68.56 Finishing work is in progress.
6 Constn. of PWD Rest House at Narwana in Jind
Distt.
FC No. 1/1/2011-1B&R(W)
6-Sep-2011
146.00 86.82 59.18 Physically completed
7 Constn. of PWD Rest House at Uchana in Jind
Distt.
14/02/2008-1B&R(w)
31-Oct-2011
116.50 0.27 116.23 The case of land acquisition has been
admitted on 8.11.12 in Hon'ble Pb. & Hry.
High Court titled as Baljeet Singh V/s
State case No.CWP 3380 of 2012. Next
date 26.5.14
8 Land Acquisition for construction of rest house
(B&R) at Uchana (Jind)
ACS no. 14/02/2008-1 B&R W
31-Oct-2012
62.93 0.00 62.93 Award awaited
9 Construction of New Block No. II in PWD Rest
House at Kaithal.
FCPS No. 1/2/2009-1B&R(w)
22-Feb-2012
175.30 89.04 86.26 Structure work completed. Floor tile work
in progress.
10 Construciton of Nirman Sadan PWD B&R
Office Complex at Kaithal.
1/2/2009-1B&R(w)
29-Nov-2012
995.75 179.12 816.63 Basement, ground floor and first floor slab
laid
11 Construction of New PWD Rest House at Pundri
in Distt. Kaithal.
FC&PS No.1/4/2012-1B&R
7-May-2012
200.73 96.22 104.51 Doubly storey building. Main rest house
ground floor slab laid. First floor slab
laid. Boundary wall completed, flooring
in progress
12 Construction of new PWD Rest House at
Charkhi Dadri in Bhiwani Distt.
1/39/2010-1B&R(W)
27-Aug-2012
182.53 3.83 178.70 Detailed estimate & DNIT sent to Head
office. Tender will be called after
approval of DNIT
13 Construction of PWD B&R Rest House at
Jhajjar
No.1/9/2010-1B&R (W)
4-May-2012
204.00 177.60 26.4 100 % work completed.
14 Construction of PWD Rest House with 2 Nos.
440 Sft houses and SDO Office at Beri in Jhajjar
District
No.1/37/2010-1B&R(W)
19-Mar-2013
569.51 173.62 395.89 Work in progress
15 Construction of Nirman Sadan at Rohtak NO. 1/2/2011-1 B&R(W) 1779.8 4.53 1775.27 Work administratively approved. Work
started excavation completed. Footing is
in progress.
16 Construction of New PWD Rest House Gurgaon NO. 1/20/2012-1B&R(W) 737.19 0.00 737.19 Site not finalized yet
17 PWD Rest house at Bahadurgarh 1/6/2010-1B&R(W)
04.06.2013
489.02 0.02 489.00 Tender received and sent to head office for
approval
18 PWD Rest house at Rai in Sonepat Distt Sanction received in UO form 1099.13 79.80 1019.33 Work is in progress
19 Construction of New Rest House at Hodal in
Palwal Distt.
1/18/11-1B&R (W) 185.55 0.00 185.55 Detailed estimate/DNIT under preparation
20 Construction of Memorial of Sardar Partap
Singh at Village Rasoi in Sonepat Distt.
1/13/2013-1 B&R (W) 415.51 0.69 414.82 Tender to be received on 16.1.14
21 Re-construction of PWD Rest House (Ekant
Bhawan) at Mussorie
1/2/2013-1 B&R (W) 662.51 0.00 662.51 Fresh approval
Total 8828.98 1266.69 7571.68
Sr. No. Name of work No. & date of Approval Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs
Status of work
1 Const. of office building of Haryana state Legal
services Authority in Sector-14 Panchkula
20/8/2005-4JJ-I
21-Jan-2013
756.15 106.24 649.91 Work in progress.
2 Construction of proposed Judicial Block (Phase -
II) on existing Litigant Hall in Mini Sectt. at
Rohtak
6/35/2012-5 JJ-II
18-Jun-2012
877.31 103.95 773.36 Slab of FF, S.F. completed and 50% slab
of T.F. laid and mumty of 50% is in
progress. Building of steel bars and T.F.
is in progress. Overall 70%work
completed.
3 Construction of Judicial Block in the compus of
SDO (Civil Complex) at Hathin in Palwal
FC/PS No. 6/7/2012-5 JJ-II
19-Jun-2012
792.42 236.30 556.12 Work is in progress.
4 Construction of Security Guard Room, Check
post & high security boundary wall around
judicial court complex Mini Sectt. at Sirsa in
Sirsa Distt
1
29-Dec-2011
134.60 102.89 31.71 Work physically & financially completed
5 Construction of Judicial Block in the campus of
SDO Civil Complex at Ganaur in Sonepat Distt.
F.C. NO. 9082-89/WI
5-Dec-2011
765.00 317.48 447.52 65% work completed and balance work in
progress
6 Construction of Property Room of Judicial
Complex & Police Malkhana in Campus of Mini
Sectt Sirsa
6/110/2012-S JJ-II
26-Oct-2012
67.84 67.68
7 Constructing Additional work in the Campus of
Mini Sectt. at Bhiwani in Bhiwani Distt.
No. 2538-P-B-11/11904
3-Nov-2011
114.74 113.9 Work in progress
8 Construction of Additional Litigant Hall & Bar
complext in Mini Sectt. At Narnaul in
Mohindergarh District
6/33/2012-5-JJ (II)
4-Jul-2012
317.35 78.12 239.23 50% roof slab laid and further work in
progress
9 Const. of Bridge connecting lawyers chambers
and litigant shed in mini sectt. at Karnal
Add. C.S.No. 6/21/ 5JJ II
7-Aug-2013
75.73 1.38 74.35 Excavation of footing and column in
progress 06.02.2014
Bank of sanctions as on 01.04.14 for Administration of Justice under head 4059- C.O. Public Works (Major Works)
10 Supply of furniture for two subordiate courts at
new Judicial Complex, Tohana, District
Fatehabad
6/112/2013-5 JJ-II
01.01.2014
11.40 0.00 11.40 Work completed
11 Estimate for Providing Estate PHA Services in
Mini Sectt. (SDO Civil) at Meham Distt,Rohtak
2664-R-6-2013/20989
30.12.2013
51.32 51.32
12 Renovation of office of Advocte General,
Haryana Chandigarh (Level I & II)
2/27/2013- 5 JJ (I)
22.08.2013
50.52 50.52
13 Renovation of office of Advocte General,
Haryana Chandigarh
2/13/2013-5 JJ (I)
03.01.2014
11.33 11.33
14 Connectivity of electricity pertaining to the Civil
Court Safidon with hotline
6/105/2013-5JJ-II
20.11.2013
12.19 0.00 12.19 Work is in progress.
15 Construction of structure for temporary chamber
for the lawyers in New Judicial Complex,
Palwal
6/102/2013- 5 JJ-II
12.11.2013
21.08 21.08
16 Approval for laying of Local area network in the
subordiated courts located in the states of
haryana
6/18/2013-5 JJ- II
12.11.2013
537.00 341.00 196.00 Part payment made
17 Providing addition and alteration in Judicial
Complex at Narnaul (Mohindegarh)
6/70/2013/5JJ- II
26.06.2013
6.33 0.00 6.33 Physically completed.
18 Installation of Grills on the walls of Bar
Room/Complex at Safidon in Jind district
6/88/2013/5JJ-II
13.09.2013
2.70 0.05 2.65 Work is in progress.
19 Connnectivity passage on 2nd floor and district
courts Ambala
6/151/12
dated 26.11.2012
20.17 23.38 0.00 Work physically completed but financial liabilities pending
TOTAL 4625.18 1310.79 3316.6
Sr. No. Name of work No. & date of Approval Amount of A/A
Rs. Lacs
Expenditure up to
3/2014
Rs. Lacs
Balance
sanction as on
1.4.14
Rs. Lacs + new
works
Status of work Remarks
1 Construction of Sub Tehsil Building at Village
Mullana in Ambala District
CS No. 3136 r 6 2012 168
3-Jan-2013
139.64 66.57 73.07 Work in progress.
2 Const. of Tehsil Bldg. at Raipur Rani Distt FC&PS Memo No. 319-F-6-
2013/2651
4-Mar-2013
272.00 0.00 272.00 Work yet not started
3 Constructing of Internal road/Parking in S.D.O.
(Civil) Block at Samalkha in distt. Panipat
FC & PS No. 2367R-6-09-7209
24 -Aug-2009
98.07 78.39 19.68 Worky physically completed but financial
liabilities pending
4 Const. of EVM Warehouse in the campus of
Mini Sectt. Complex at Panipat
ACS & FCR No. 1155-R-
6/7807
18-Jun-2013
103.70 0.00 103.70 The revised drawing submittred by Chief
architect office to financial commissioner.
Revenue for approval. Still awaited.
Bank of sanctions as on 01.04.14 for District Administration under head 4059- C.O. Public Works (Major Works)
5 Construction of Mini Secretariat at Meham in
Rohtak District
FC&PS No.2655-R-6-10/9831
30-Sep-2010
815.00 607.16 207.84 Work administratively approved. Work
completed except finishing and parking
area. Finishing is in progress.
6 Construction of Surface Car Parking in Mini
Sectt. at Rohtak.
275-R-6-2012/2006
21-Feb-2012
89.41 Work completed.
7 Construction of Tehsil building at Farrukh
Nagar Distt. Gurgaon
No. 2828-R-6-2011/13396
28-Nov-2010
317.95 211.77 106.18 Overall 90% nwork completed.
8 Construction of SDO(Civil) Complex ( Admn.
Block) building at Pataudi in Gurgaon Distt.
T/S vide EIC No.22/WI
3-Jan-2012
531.39 417.80 113.59 Work is in Physical progress. RCC
structure completed. Plaster of ground
floor and first floor completed. Joinery
work of ground floor and floor is in
progress. Flooring work is in progress.
9 Construction of Mini Sectt. (S.D.O.) Civil
Complex (Admn. Block) at Hathin in Palwal
Distt
FC&PS No 721-R-6-11/3198
24-Mar-2011
899.60 655.09 244.51 Physically completed and hander over to
client department on 05.03.2014
10 Construction of SDO Civil Complex (Admn.
Block) at Tohana in Fatehabad Distt.
FC&PS No. 2537-R-6
9-Nov-2011
914.00 710.38 203.62 Work completed.
11 Construction of ware house for EVM Machine in
Mini Secretariat at Fatehabad
1090-R0602012/7214
3-Jun-2013
150.30 1.23 149.07 D/E submitted
12 Rough cost estimate for construction of Record
room of SDM office in DAC building Hisar
Endst. 696-R-6-2012/356
26.03.2012
71.25 0.00 71.25
13 Construction of Tehsil Building at Uklana Distt
Hisar.
FC &PS memo No. 57-R-6-
2013/1241
30-Jan-2013
420.53 0.60 419.93 Work allotted but it will be started after
mode of conduct
14 Construction of Tehsil Office cum Revenue
record room in Tehsil Julana Distt. Jind
FC&PS No191-R-6-2012/2186
24-Feb-2012
381.60 250.94 130.66 100% B/wall completed and 2nd floor
roof slab laid further work is in progress.
15 Extension/Expansion of New Mini Sectt. at Jind
in Jind Distt.
ACSP No.3292-R-6/2012/172
3-Jan-2013
1,050.75 1.64 1049.11 Tender under approval in Head office
16 Constructing Additional work in the Campus of
Mini Sectt. at Bhiwani in Bhiwani Distt.
No.2538-P-B-11/11904
3-Nov-2011
114.74 74.63 40.11 90% work completed. Further work is in
progress
17 Construction of 2nd Floor on SDO (Civil) &
Tehsil Complex at Charkhi Dadri in Distt.
Bhiwani
FC&PS No.2844-R/13400
28-Nov-2011
98.27 51.97 46.30 Worky physically completed.
18 Construction of SDO (Civil) Complex
(Administrative Block) in the Campus of Mini
Sectt. Charkhi Dadri in Bhiwani Distt.
631-R-6-2012/3170
16-Mar-2012
1,055.00 555.91 499.09 703/703 piles & 175/175 piers cap casted.
Further work is in progress.
19 Construction of SDO Civil complex (Admin
Block) building at Sector 12 Bahadurgarh
Jhajjar Distt.
FC &PS memo No. 3247-R-6-
2012/312
31-Jan-2013
1288.83 328.16 960.67 Slab of ground floor laid. RCC work in
first storey is in progree
20 Construction of Tehsil Building at Beri in
Jhajjar District.
FC&PS No. 1372
13-Feb-2009
177.50 0.18 177.32 Work not yet started. Decision is pending
with LA with distt admn.
21 Construction of ware house for EVM Machine in
Mini Secretariat at Jhajjar
No.3154-R-6-2012/1246
30-Jan-2013
88.95 89.62 0.00 Work is in progress. Overall 20% work
completed.
22 Construction of Administration Block in SDC
(C) Complex at Beri in Jhajjar District
No.105-R-6-2012/1768
12-Feb-2013
1,525.85 159.46 1366.39 Tender case stands submitted to head
office vide SE(J) letter No. 1729 dated
12.09.13
23 Constn. of mini Sectt. Admn. Block at Sonipat R/A F.C. No. 12046
4-Nov-2010
1,329.80 1,182.78 147.02 Structure completed. Flooring and
plastering in progress.
24 Construction of SDO Civil complex (Admn
Block) at Ganaur in Sonepat Distt.
F.C. memo No. 13184
22-Nov-2011
898.77 201.02 697.75 40% work completed and balance work in
progress.
25 Construction of SDO Civil complex at Gohana
in Sonepat Distt
F.C. memo No. 12504
16-Nov-2010
692.25 702.51 0.00 Work physically completed.
26 Construction extention of litigant hall at Distt.
Administrative complex in Mini. Sectt. Sonepat
FC.No. 11460
18-Oct-2011
139.70 95.29 44.41 Physically completed.
27 Providing & fixing aluminium partition all
doors, high mast lighting audio & conference
system AC, RO & invertor in Admn Block in
Mini Sectt. at Sonepat
F.C. No.1969-R-6-12/12704
15-Oct-2012
258.88 112.59 146.29 Physically completed.
28 Construction of ware house for EVM Machine in
Mini Secretariat at Sonepat
No. 594-R-6-2013/4646
10-Apr-2013
219.88 0.00 219.88 DNIT and detailed estimate are under
preparation.
29 Replacement of lift no. 3 in New Sectt. Bldg.,
Haryana Sec-17, Chandigarh
740-CT-N-2012/3625
27-Mar-2012
76.08 76.08 Work in progress.
not in mis list
30 Construction of Administrative office building
phase II with multi level parking in the campus
of mini sectt sector 1 panchkula
2665-R-6-2013/20994
30.12.2013
4162.05 0.00 4162.05 Work yet not started. Str. Design under
preparation
31 Estimate for providing Estate Water Supply,
Sewerage, and Fire Fighting arrangement in
Administration Block (Phase-II) in the campus
of Mini Sectt. Fatehabad District
2565-R-6-2013/20547
18.12.2013
37.93 37.93
not in mis list
TOTAL 18419.67 6555.69 11785.5