bank of sanctions as on 01.04.14 for iti works sc/st under...

61
Sr. No. Name of work No. & date of Approval Amount of A/A Rs. Lacs Expenditure up to 3/2014 Rs. Lacs Balance sanction as on 1.4.14 Rs. Lacs Date of start Date of completion Status of work Remarks 1 Construction of I.T.I. at village Pali in District Faridabad (Workshop block under SC/ST Schemed) ITI Pali/SC/ST/372 6.01.12 301.32 297.04 11.12.12 30.06.14 Work in physical progress. 50% Ground floor roof slab casted and shuttering of rest is in progress (Overall 25% work completed) 2 Construction of SC/ST Building of I.T.I at Hathin in Palwal Distt. 1121 20.11.09 523.02 433.56 03.06.10 30.06.14 G.F. slab laid and brick work completed and 1st floor 90% roof slab laid & further work is in progress. 3 Construction of SC/ST wing in Govt. ITI at Kaithal ITI/SC/ST/KTL/2141 03.07.12 586.73 55.18 13.05.13 12.05.14 100% Ground floor slab laid and 80% 2nd floor slab laid. Plastering work & flooring in progress TOTAL 1411.07 785.78 Sr. No. Name of work No. & date of Approval Amount of A/A Rs. Lacs Expenditure up to 3/2014Rs. Lacs Balance sanction as on 1.4.14 Rs. Lacs Status of work Remarks 1 Construction of 1st storey at Tehsil Building at Bilaspur in Yamuna Nagar Distt. 190-R-6-2012 24-Feb-12 85 47.17 Work is in progress 2 Construction of Administrative office Building Phase-II, with Multi Level Parking in Mini Sectt. Complex Sector-1, Panchkula 2427-R-62011/1711 9-Feb-2012 3470.59 3470.59 R/C/E for Rs. 3470.59 Lacs stand submitted for A/A but F.C& Revenue disaster Management 3 Construction of Mini Sectt. (SDO) (Civil) Complex at Samalkha in Panipat F.C. & P.S. no. 7202 24-Aug-2009 847.4 481.44 Work in physical progress. i) 90% Kotah stone work completed and further in progress.ii) The terrazzo flooring in ground & 1st/2nd floor floor in progress.iii) Tile terracing is in progress. 4 (i) Construction of Internal Road (Rigid Pavement) in Judicial complex at Rohtak. (ii) Dismantling/ providing the existing chambers at Rohtak 6/06/2009-5JJ-II 23-Nov-2011 290.54 93.84 Work in physical progress. CC Pavement completed except pavement in between Judicial complex and Litigant hall. (ii) Work completed and inaugurated by Hon’ble Chief Minister, Haryana on 14/07/2012 5 Construction of Surface Car Parking in Mini Sectt. at Rohtak 275-R-6-2012/2006 21-Feb-2012 89.41 60.19 Work in physical progress. Work of boundary wall completed & laying of stone metalled (G-II) in parking completed. Laying of interlocking paver block is in progress. 6 Construction of proposed Judicial Block (Phase - II) on existing Litigant Hall in Mini Sectt. at Rohtak 6/35/2012-5 JJ-II 18-Jun-2012 877.31 877.31 Work administratively approved. Tender re-invited on dated 11/03/2013 7 Construction of additional Judicial Complex at Faridabad 6/8/2006-5JJ-II 24-Jan-2013 3262.08 3233.71 Work in physical progress. Excavation for basement is in progress 8 Construction of Labour courts in Mini Secretariat at Gurgaon A/A No.456-R-2011/1972 17-Feb-2011 1246 486.44 The structure work completed , Finishing work is in progress . Remaining 50% A/A of Rs. 62300000/- Bank of sanctions as on 01.04.14 for ITI works SC/ST under head 4250- C.O. creation of infrasturcuture for Development of Industrial Training (Major Works) Bank of sanctions as on 1.4.14 for Judiciary works under head 4059-C.O. Capital outlay on public works

Upload: nguyenkhanh

Post on 06-Jul-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

Sr. No.

Name of work

No. & date of Approval Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance sanction

as on 1.4.14

Rs. Lacs

Date of start Date of completion

Status of work Remarks

1 Construction of I.T.I. at village Pali in District

Faridabad (Workshop block under SC/ST

Schemed)

ITI Pali/SC/ST/372

6.01.12

301.32 297.04 11.12.12 30.06.14 Work in physical progress. 50% Ground floor roof

slab casted and shuttering of rest is in progress

(Overall 25% work completed)

2 Construction of SC/ST Building of I.T.I at

Hathin in Palwal Distt.

1121

20.11.09

523.02 433.56 03.06.10 30.06.14 G.F. slab laid and brick work completed and 1st floor

90% roof slab laid & further work is in progress.

3 Construction of SC/ST wing in Govt. ITI at

Kaithal

ITI/SC/ST/KTL/2141

03.07.12

586.73 55.18 13.05.13 12.05.14 100% Ground floor slab laid and 80% 2nd floor slab

laid. Plastering work & flooring in progress

TOTAL 1411.07 785.78

Sr. No.

Name of work

No. & date of Approval Amount of A/A

Rs. Lacs

Expenditure up to

3/2014Rs. Lacs

Balance sanction

as on 1.4.14

Rs. LacsStatus of work Remarks

1 Construction of 1st storey at Tehsil Building at

Bilaspur in Yamuna Nagar Distt.

190-R-6-2012

24-Feb-12

85 47.17 Work is in progress

2 Construction of Administrative office Building

Phase-II, with Multi Level Parking in Mini Sectt.

Complex Sector-1, Panchkula

2427-R-62011/1711

9-Feb-2012

3470.59 3470.59 R/C/E for Rs. 3470.59 Lacs stand

submitted for A/A but F.C& Revenue

disaster Management

3 Construction of Mini Sectt. (SDO) (Civil)

Complex at Samalkha in Panipat

F.C. & P.S. no. 7202

24-Aug-2009

847.4 481.44 Work in physical progress. i) 90% Kotah

stone work completed and further in

progress.ii) The terrazzo flooring in

ground & 1st/2nd floor floor in

progress.iii) Tile terracing is in progress.

4 (i) Construction of Internal Road (Rigid

Pavement) in Judicial complex at Rohtak. (ii)

Dismantling/ providing the existing chambers at

Rohtak

6/06/2009-5JJ-II

23-Nov-2011

290.54 93.84 Work in physical progress. CC Pavement

completed except pavement in between

Judicial complex and Litigant hall. (ii)

Work completed and inaugurated by

Hon’ble Chief Minister, Haryana on

14/07/2012

5 Construction of Surface Car Parking in Mini

Sectt. at Rohtak

275-R-6-2012/2006

21-Feb-2012

89.41 60.19 Work in physical progress. Work of

boundary wall completed & laying of stone

metalled (G-II) in parking completed.

Laying of interlocking paver block is in

progress.

6 Construction of proposed Judicial Block (Phase -

II) on existing Litigant Hall in Mini Sectt. at

Rohtak

6/35/2012-5 JJ-II

18-Jun-2012

877.31 877.31 Work administratively approved. Tender

re-invited on dated 11/03/2013

7 Construction of additional Judicial Complex at

Faridabad

6/8/2006-5JJ-II

24-Jan-2013

3262.08 3233.71 Work in physical progress. Excavation for

basement is in progress

8 Construction of Labour courts in Mini

Secretariat at Gurgaon

A/A No.456-R-2011/1972

17-Feb-2011

1246 486.44 The structure work completed , Finishing

work is in progress . Remaining 50% A/A

of Rs. 62300000/-

Bank of sanctions as on 01.04.14 for ITI works SC/ST under head 4250- C.O. creation of infrasturcuture for Development of Industrial Training (Major Works)

Bank of sanctions as on 1.4.14 for Judiciary works under head 4059-C.O. Capital outlay on public works

9 Construction of Judcial Block in the compus of

SDO (Civil Complex) at Hathin in Palwal Distt.

FC/PS No.6/7/2012-5 JJ-II

19-Jun-2012

792.42 740.88 Work is in progress

10 Construction of Judician block including

Malkhana in Mini Sectt. At Palwal in Palwal

District

FS/PS 6/32/2004-5 JJ(II)

26-Nov-2009

2560 2560 Work completed except officers lift

11 Construction of Roads & Parking in Mini Sectt.

Complex (Excluding Residential Area) at Palwal

in Palwal District A/A received from FC&PS to

Govt. Hr. Revenue and Disaster Manaement

Deptt.

FS/PS 6/32/2004-5 JJ(II)

26-Nov-2009

486.69 486.69 Work is in Progress

12 Construction of Securit Guard Room, Check post

& high security boundary wall around judicial

court complex Mini Sectt. at Sirsa in Sirsa Distt

1

29-Dec-2011

134.67 63.69 Work in progress

13 Construction of Check Post, Gurard Room, High

Security Boundary Wall, Judicial Malkhana and

Additional Building in Judicial Complex at Hisar

FCNo.6/92/2011-5JJ-II

6-Jan-2012

716.71 601.05 Work is in progress

14 Constructing Additional work in the Campus of

Mini Sectt. at Bhiwani in Bhiwani Distt

No.2538-P-B-11/11904

3-Nov-2011

114.74 Work in progress

15 Construction of SDO(Civil) Complex

(Administrative-cum-Judicial Complex) at

Tosham in Bhiwani Distt.

No.597-R-6-2012/3083

14-Mar-2012

978.13 978.1 Tender approved. Letter to proceed to be

issued.

16 Construction of SDO (Civil) Complex

(Administrative Block) in the Campus of Mini

Sectt. Charkhi Dadri in Bhiwani Distt.

631-R-6-2012/3170

16-Mar-2012

1055 1052.75 Tender received on 13.03.2013 and under

process

17 Construction of Additional Litigant Hall & Bar

Complex in Mini Secretariate at Narnaul in

Mohindergarh District.

6/33/2012-5-JJ (II)

4-July-2012

317.35 0 317.35 Tender re-invited which will be opened on

10.04.2013

18 Supply & installation of Lifts in Jdicial complex

in Mini Sectt. Palwal

FS/PS 6/32/2004-5 JJ(II)

26-Nov-2009

2560 0 2560 Part of main A&A) Material of 4 Nos lifts

received at site and further installation

work in progress.

19 Pdg. 4 Nos passenger elevators in Admn. block

in Mini Sectt. campus at Palwal.

F C No. 7018

18-Aug-2009

2432 0 2432 Part of main A&A

20 Pdg. 5 Nos. passenger elevators in Judicial

complex at Nuh in Mewat Distt

F C No. 6/50/2005-5JJ(II)

20-Aug-2009

3137.45 0 3137.45 Part of main A&A

21 Pdg. 4 Nos passenger elevators in Admn. block

in Mini Sectt. Nuh

F C No. 7127

21-Aug-2009

2654.65 0 2654.65 Part of main A&A

22 Construction Judicial Courts Complex at

Mohindergarh (Pdg. CC TV system)

FC &PS 6/22/03/-5JJ(II)

11-Oct-2007

392.86 368.18 Work in Physical progress, Only two Nos.

Cameras are to be installed (Estimate Rs.

947000/- )(Part of main A/A Rs. 392.86

Lacs)

23 Construction of 8 Nos. Court Building in Mini

Sectt. At Bhiwani (Pdg. Electrical Installation)

FC&PS A&J 6/56/2003-05

11-Oct-2007

581.92 545.07 Work in progress, Near Completion (part

of Main A/A Rs. 581.92) (Estimate Rs.

231000/- Only)

24 Construction of Judicial Block including

Malkhana in Mini Sectt. Complex at Nuh in

Mewat Distt.

FC&PS No.6/50//JJ (II)

20-Aug-2009

2560.95 2198.86 82% work phy. comp. RCC Slab and brick

work comp. of all floors. Flooring and

Plastering 80% complete and finishing

work is in progress. L.D. imposed

25 Construction of Residential Houses for Judicial

Officers and Officials in Mini Sectt. Complex at

Nuh in Mewat District

No.597-R-6-2012/3083

11-Dec-2012

737.7 737.7 Tender approved. Letter to proceed to be

issued.

26 Construction of Roads & Parking, Campus

Boundary wall, High Security Boundary Wall,

Earth filling, Land Scaping and Estate PH & EI

Services in Mini Sectt. Complex at Nuh in

Mewat Distt.

FC&PS No.6/50/2005-5JJ

20-Aug-2009

576.5 230.59 1. Constn. of 80% comp. all over campus

& 40% Grills has been fixed. Action under

clause-II

2.Road & Parking work 50% Comp.

27 Rough cost estimate for furniture in Judicial

Court Complex at Mini Sectt. at Nuh in Mewat

District.

Add. C.S No.6/14/2013-5JJ

19-Feb-2013

98.54 98.54 D/E resent to S.E.

28 Construction of Judicial Block in the campus of

SDO Civil Complex at Gohana in Sonepat Distt.

F.C.No.6/11/2012-5JJ-II

8-Feb-2012

765 375.36 Work in progress

29 Construction of Judicial Block in the campus of

SDO Civil Complex at Ganaur in Sonepat Distt.

F.C.No.9082-89/WI

5-Dec-2011

765 606.38 Work in progress

30 Construction of additional Eight Court building

in Mini Secretariat at Sonepat Distt.

No.6/48/2012-5JJ-II

4-July-2012

1175 1174.36 Tender under process

TOTAL 35761.61 32670.34

Sr. No.Name of the work

A/A Amount (Rs. in Lacs) No. and date Division

1 Administrative approval of SC/ST wing at

G.I.T.I, Ambala

350 Bhawan/ITI/SC/

ST/Common/101

5

30.08.2013

Ambala

2

Administrative approval of SC/ST wing at

G.I.T.I, Bhiwani

350 Bhawan/ITI/SC/

ST/Common/102

5

30.08.2013

Bhiwani

3

Administrative approval of SC/ST wing at

G.I.T.I, Faridabad

350 Bhawan/ITI/SC/

ST/Common/103

1

30.08.2013

Gurgaon

4

Administrative approval of SC/ST wing at

G.I.T.I, Gurgaon

350 Bhawan/ITI/SC/

ST/Common/103

7

30.08.2013

Gurgaon

5

Administrative approval of SC/ST wing at

G.I.T.I, Mojabad in Distt Gurgaon

350 Bhawan/ITI/SC/

ST/Common/104

3

30.08.2013

Gurgaon

6

Administrative approval of SC/ST wing at

G.I.T.I, Hisar

350 Bhawan/ITI/SC/

ST/Common/104

9

30.08.2013

Hisar

7

Administrative approval of SC/ST wing at

G.I.T.I, Barwala in Distt Hisar

350 Bhawan/ITI/SC/

ST/Common/105

5

30.08.2013

Hisar

8

Administrative approval of SC/ST wing at

G.I.T.I, Piau Majra in Distt Hisar

350 Bhawan/ITI/SC/

ST/Common/106

1

30.08.2013

Hisar, Hansi

List of works recently sanctioned under head P-01-08-4250-51-789-98-51-N-V-Training Building for Schedule Castes Wings-16 Major Works

9

Administrative approval of SC/ST wing at

G.I.T.I, Nalwa in Distt. Hisar

350 Bhawan/ITI/SC/

ST/Common/113

9

30.08.2013

Hisar, Hansi

10

Administrative approval of SC/ST wing at

G.I.T.I, Julana in Distt. Jind

350 Bhawan/ITI/SC/

ST/Common/108

5

30.08.2013

Jind

11

Administrative approval of SC/ST wing at

G.I.T.I, Jind in Distt Jind

350 Bhawan/ITI/SC/

ST/Common/107

9

30.08.2013

Jind

12

Administrative approval of SC/ST wing at

G.I.T.I, Gulha-Cheeka in Distt. Kaithal

350 Bhawan/ITI/SC/

ST/Common/110

3

30.08.2013

Kaithal

13

Administrative approval of SC/ST wing at

G.I.T.I, Karnal in Distt. Karnal

350 Bhawan/ITI/SC/

ST/Common/109

1

30.08.2013

Karnal

14

Administrative approval of SC/ST wing at

G.I.T.I, Sujapur in Distt. Mohindargarh

350 Bhawan/ITI/SC/

ST/Common/110

9

30.08.2013

Narnaul

15

Administrative approval of SC/ST wing at

G.I.T.I, Kalayat in Distt. Kaithal

350 Bhawan/ITI/SC/

ST/Common/

1097

30.08.2013

Narwana

16

Administrative approval of SC/ST wing at

G.I.T.I, Palwal

350 Bhawan/ITI/SC/

ST/Common/111

5

30.08.2013

Palwal

17

Administrative approval of SC/ST wing at

G.I.T.I, Naultha in Distt. Panipat

350 Bhawan/ITI/SC/

ST/Common/112

7

30.08.2013

Panipat

18

Administrative approval of SC/ST wing at

G.I.T.I, Tankri in Distt Rewari

350 Bhawan/ITI/SC/

ST/Common/113

3

30.8.2013

Rewari

19

Administrative approval of SC/ST wing at

G.I.T.I, Sirsa

350 Bhawan/ITI/SC/

ST/Common/107

3

30.08.2013

Sirsa

20

Administrative approval of SC/ST wing at

G.I.T.I, Mundlana in Distt Sonepat

350 Bhawan/ITI/SC/

ST/Common/112

1

30.08.2013

Sonepat

21

Administrative approval of SC/ST wing at

G.I.T.I, Sonepat

350 Bhawan/ITI/SC/

ST/Common/106

7

30.08.2013

Sonepat

22 Administrative approval of SC/ST wing at

Yamuna nagar

350 Yamuna nagar

23 Administrative approval of SC/ST wing at

Sujapur Mohindegarh

350 Mohindergarh

TOTAL 8050

Sr. No. Name of Work No. and dated of

Approval

Amount of A/A

Rs. Lacs

Expenditure upto

3/2014

Rs. Lacs

Balance sanction

as on 1.4.14 Rs.

Lacs + new works

Status of work

1 Construction of Judicial Block in the campus of

SDO Civil Complex at Tohana in Fatehabad

Distt.

6/24/2012-5JJ-II

12.03.2012

765.00 576.88 188.12 Work completed

2 Construction of Check post, guard room, high

security boundary wall, judicial malkhana and

additional building in judicial complex at Hisar

FC No. 6/92/2011-5JJ-II

6-Jan-2012

716.71 427.85 288.86 Work is in progress

3 Construction of 4 Nos. Additional court building

in Mini Sectt. Complex at Jind

ACS No. 6/21/2013-5JJ-11

2-Apr-2013

592.30 2.03 590.27 Foundation work completed, roof slab of

GF in progress

4 Construction of Additional court room in

Judicial complex at Narnaul in Mohindergarh

distt.

6/27/2013-5JJ-II

2-Apr-2013

456.00 0.00 456.00 Tender not yet approved due to code of

conduct

5 Construction of Judicial complex at Sector-12,

Bahadurgarh in Jhajjar

6/08/2012-5JJ-II

15-Mar-2013

1713.82 12.01 1701.81 Tender received on 01.10.2013 & sent to

head office for approval

6 Construction of Judicial Block in the campus of

SDO civil Complex at Gohana at Sonepat Distt.

6/11/2012-5-JJ-II

08.02.2012

765.00 23.39 741.61 Work in progress wiring being done

7 Construction of additional eight court building in

Mini Sectt. At Sonepat Distt.

6/48/2012-5-JJ-II

04-07-2012

1175.00 215.15 959.85 35% work completed and balance work is

in progress

8 Providing Fire alarm system in judicial complex

at Narnaul in Distt. Mohindergarh

6/69/2013-5JJ-II

31.05.2013

15.33 15.33 Tender to be received on 15.11.2013

9 Providing furniture in Judicial Court Complex at

Mini Sectt. At Nuh in Mewat Distt.

6/14/2013-5JJ-II

19.02.2013

98.54 98.54 Work in progress

10 Construction of additional Judicial Complex at

Faridabad

6/8/2006-5JJ-II

24-Jan-2013

3262.08 637.11 2624.97 Work in physical progress. 100%

basement roof slab casted and 80% ground

floor slab completed and 40% first floor

slab completed. Overall 28% work

completed

11 Construction of Judicial complex at Gurgaon 6/13/2012- 5JJ-II 11331.00 0.60 11330.40 Structural design in process

12 Additional alteration in Judicial Complex at

Mohindergarh

6/43/2013- 5JJ- II

11.04.2013

7.05 4.61 2.44 Physically completed

13 Providing furniture in Judicial complex at Nuh in

Mewat district

6/14/2013/5JJ-II

19.02.2013

98.54 98.54

14 Providing and installing 1 No. tubewell and

laying of connecting pipeline to provide driking

water supply facilities in judicial complex at mini

sectt narnaul

6/07/2014-5JJ-II

03.04.2014

10.05 10.05

15 Providing addition and alteration in judicial

complex at Narnaul in Mohindergarh district

6/22/2014-5JJ-II 6.54 6.54

List of Works under head 4059 Administration of Justice 75:25 scheme (part 2)

NOTE:- The architectural drawing of some of the above works have been received recently.None of the above works has been

tendered so far. The standard structural is being prepared by the consultant.

16 Construction of Judicial Malkhana in Mini Sectt

Yamuna nagar

6/19/2013-5JJ-II 51.63 51.63

17 Construction of 10 Nos. Additional court room

at Kurukhetra

6/106/2013-5JJ-II

16.04.2014

1772.63 0.00 1772.63

18 Work providing computer points in various

rooms in Judicial Complex at Ambala City

6/19/2014-5JJ-II

03.04.2014

1.93 0.00 1.93

19 Construction of 8Nos.court building in Mini

Sectt. at Bhiwani

6/18/2014-5JJ-II

03.04.2014

3.945 0.00 3.945

20 Providing false ceiling in the various judges

chamber of judicial complex karnal

6/24/2014-5JJ-II

03.04.2014

5.06 0.00 5.06

TOTAL 22848.16 1899.63 20948.53

Sr. No. Name of Work No. and dated of

Approval

Amount of A/A

Rs. Lacs

Expenditure upto

3/2014

Rs. Lacs

Balance sanction

as on 1.4.14 Rs.

Lacs + new works

Status of work Remarks

1 Construction of Judicial Block in the campus of

SDO Civil Complex at Tohana in Fatehabad

Distt.

6/24/2012-5JJ-II

12.03.2012

765.00 378.5 Finishing in progress

2 Construction of Check post, guard room, high

security boundary wall, judicial malkhana and

additional building in judicial complex at Hisar

FC No. 6/92/2011-5JJ-II

6-Jan-2012

716.71 572.93 Work in progress

3 Construction of 4 Nos. Additional court building

in Mini Sectt. Complex at Jind

ACS No. 6/21/2013-5JJ-11

2-Apr-2013

592.30 592.30 Work recently allotted

4 Construction of Additional court room in

Judicial complex at Narnaul in Mohindergarh

distt.

6/27/2013-5JJ-II

2-Apr-2013

456.00 456.00 Tender re-invited and to be opened on

06.11.2013

5 Construction of Judicial complext at Sector-12,

Bahadurgarh in Jhajjar

6/08/2012-5JJ-II

15-Mar-2013

1713.82 1713.82 Tender received and under approval

6 Construction of Judicial Block in the campus of

SDO civil Complex at Gohana at Sonepat Distt.

6/11/2012-5-JJ-II

08.02.2012

765 375.36 Work in progress

7 Construction of additional eight court building in

Mini Sectt. At Sonepat Distt.

6/48/2012-5-JJ-II

04-07-2012

1175 1174.13 Work is in progress

8 Providing Fire alarm system in judicial complex

at Narnaul in Distt. Mohindergarh

6/69/2013-5JJ-II

31.05.2013

15.33 15.33 Tender to be received on 15.11.2013

9 Providing furniture in Judicial Court Complex at

Mini Sectt. At Nuh in Mewat Distt.

6/14/2013-5JJ-II

19.02.2013

98.54 98.54 Work in progress

10 Construction of additional Judicial Complex at

Faridabad

6/8/2006-5JJ-II

24-Jan-2013

3262.08 3233.45 Work in physical process. Concreting of

foundation beams and slab is in progress

and shuttering of basement roof slab is in

progress.

Sr. No. Name of work No. & date of Approval Amount of A/A Expendiure up to

3/2014

Balance sanction

as on 1.4.2014 +

new works

Status of work Remarks

1 Construction of Govt. Polytechnic at Meham in

Rohtak Distt.

35/62/09-2T.E.

18-Aug-2009

800.00 685.08 114.92 Work in physically progress. (i) Work

completed. (ii) Plastering, tile terracing,

flooring completed. Grill in window, plinth

protection, finishing & P.H. work fitting is

in progress. (iii) Work completed.

List of Works under head 4059 Administration of Justice 75:25 scheme (part 2)

Bank of Sanction as on 01.04.2014 for Education, Sports, Art & Culture (Plan), under Head 4202-C.O. (Polytechnic)

2 Construction of Administrative cum Academic

Block (Block A) and Workshop Block (Block C)

at Govt. Polytechnic, Shergarh Distt. Kaithal

FCPS No. 35/38/2012TE

26-Apr-2012

1550.00 674.54 875.46 Block A&C Parking, Grinding of floor,

wall putty in progress. Block B&D

Ground floor slab laid.

3 Construction of Academic block of Government

Polytechnic Bhiwani in Bhiwani District.

35/45/2008-2TE

7-Jul-2008

1,525.00 600.22 924.78 Finishing work in progress. Building partly

handed over to the client deptt

4 Rough Cost Estimate execution of civil works at

Govt. Polytechnic Jhajjar.

31/01/2013-TE

2-Jan-2013

23.13 23.13 Wok in physical progress. Admin. Block-

Completed , Boys Hostel- Completed.

Girls Hostel- Completed, Residences -75%

work completed and finshing is in

progress. Statue work completed. not in mis list

5 Construction work of Govt. Polytechnic, at

village Mandkola, Distt. Palwal.

35/26/2013-4TE

12-April-2013

1,554.13 4.66 1549.47 Estimate and DNIT is under process

6 Construction work of Govt. Polytechnic, at

village Indri, Distt. Mewat.

35/25/2013- 4TE

12-April-2013

1,554.13 210.88 1343.25 Found work comp. upto plinth beam in all

blocks. A block slab G.F. casted and

shuttering in progress. Block D, casting of

column in progress and B/wall 90%

completed

7 Const. of Govt. Polytechnic at village Malab

District Mewat

1554.13 3.48 1574.65

Work of foundation and B/wall in progress

Total 8,560.52 2178.86 6405.66

Sr. No.

Name of Work

No. and date of Approval Amount of A/A Expenditure up to

03/2014

Balance sanction

as on 1.4.2014 Status of work Remarks

1 Const. of Govt. Polytechnic Jatal in Distt Panipat P.S. No. 35/3/2010-2TE

16-Apr-2013

1,554.13 0.00 1554.13 Tender to be received on 30.08.2013

2 Const. of Administrative cum Academic Block at

Government Polytechnic at village Neemka in

Faridabad District

35/5/2013-2TE 1,500.00 1475 Work in tender allocation formalities.

Tender on 24.08.2013 and under process

3 Const. of Polytechnic at Lisana in Rewari Distt No. 35/33/2006-2TE

19-May-2008

2,516.46 985.82 Main building completed & Handed over.

Boundary wall in progress

4 Choudhary Ranbir Singh Hooda Govt. Institute

of Irrigation and Power Engineering Hathinikund

Distt Yamuna nagar

35/33/2010-2D

Dated 12.04.2013

1554.13 0 1554.13 DE/DNIT under submission by SE

Chandigarh. Tenders will be called by

20.07.2013

5 Govt. Polytechnic, Dhangar Distt. Fatehabad 35/33/2010-2TE

Dated 16.04.2013

1554.13 0 1554.13 Tender invited and to be received on

12.08.2013

TOTAL 8,678.85 0.00 7123.21

Sr. No.

Name of work

No. & date of Approval Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance sanction

Rs. Lacs 01.04.14 Status of work Remarks

1 Construction of New SDE PWD B&R office at

Pehowa in Distt. Kurukshetra.

FC & PS No. 1/14/2011-

1(W)

14-May-2012

58.56 58.56 Roof slab completed

2 Administrative approval for construction of New

PWD Rest House at village Sirsagarh, Near

Dosarka Mullana in Ambala Distt.

1/29/2010-1 B&R (W) 173.52 128.30 Foundation completed

3 Construction of PWD Rest House at

Chhachhrauli in Yamuna Nagar District

EIC, Hr. no. 4257-62

16-Jun-2011

135.62 135.62 Work completed.

4 Constructing of New Rest House at Fatehabad in

Fatehabad Distt.

FC&PS No. 1/22/2011

6-Mar-2012

179.52 179.52 Structure completed. Flooring in progress

Bank of sanctions as on 01.04.14 under head 4059- C.O. Public Works (Major Works)-Allotted works

5 Constn. of PWD Rest House at Narwana in Jind

Distt.

FC No. 1/1/2011-

1B&R(W) 6-Sep-2011

146.00 146 Finishing work is in progress.

6 Construction of New Block No. II in PWD Rest

House at Kaithal.

FCPS No. 1/2/2009-

1B&R(w) 22-Feb-2012

175.30 175.3 Structure completed. Plaster in progress

7 Construciton of Nirman Sadan PWD B&R

Office Complex at Kaithal.

1/2/2009-1B&R(w)

29-Nov-2012

995.75 995.75 Basement partly completed

8 Construction of New PWD Rest House at Pundri

in Distt. Kaithal.

FC&PS No.1/4/2012-

1B&R 7-May-2012

200.73 200.73 Ground floor slab laid.

9 Construction of PWD B&R Rest House at

Jhajjar

No.1/9/2010-1B&R (W)

4-May-2012

204.00 204 Work is in progress. Over all 30% work

completed

10 Construction of PWD Rest House with 2 Nos.

440 Sft houses and SDO Office at Beri in Jhajjar

District

No.1/37/2010-1 B&R(W)

19-Mar-2013

569.51 569.51 Detailed estimate/DNIT stands submitted

to head office

11 Construction of Nirman Sadan at Rohtak NO. 1/2/2011-1 B&R(W) 1779.8 1779.8 Work just started

12 PWD Rest house at Rai in Sonepat Distt 1099.13 1099.13 Foundation in progress

Total 5717.44 5672.22

Sr. No.

Name of work

No. & date of Approval Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance sanction

Rs. Lacs 01.04.14 Status of work Remarks

1 Construction of New SDE PWD B&R office at

Pehowa in Distt. Kurukshetra.

FC & PS No. 1/14/2011-

1(W) 14-May-2012

58.56 28.62 29.94 Structural work completed. Finishing

work such as plastering and flooring are in

progress

2 Administrative approval for construction of New

PWD Rest House at village Sirsagarh, Near

Dosarka Mullana in Ambala Distt.

1/29/2010-1 B&R (W) 173.52 89.76 83.76 Work in progress

3 Construction of PWD Rest House at

Chhachhrauli in Yamuna Nagar District

EIC, Hr. no. 4257-62

16-Jun-2011

135.62 145.01 0.00 Work completed

4 Construction of 1st floor & 2nd floor of existing

Rest House in Sector -16A, Faridabad

4/23/2006-1B&R(W)

28-Dec-2011

259.80 0.78 259.02 Work in tender/allocation formalities.

Tender received on dated 20.12.2013 and

under process

5 Constructing of New Rest House at Fatehabad in

Fatehabad Distt.

FC&PS No. 1/22/2011

6-Mar-2012

179.52 110.96 68.56 Finishing work is in progress.

6 Constn. of PWD Rest House at Narwana in Jind

Distt.

FC No. 1/1/2011-

1B&R(W)

6-Sep-2011

146.00 86.82 59.18 Physically completed

7 Constn. of PWD Rest House at Uchana in Jind

Distt.

14/02/2008-1B&R(w)

31-Oct-2011

116.50 0.27 116.23 The case of land acquisition has been

admitted on 8.11.12 in Hon'ble Pb. & Hry.

High Court titled as Baljeet Singh V/s

State case No.CWP 3380 of 2012. Next

date 26.5.14

8 Land Acquisition for construction of rest house

(B&R) at Uchana (Jind)

ACS no. 14/02/2008-1

B&R W 31-Oct-2012

62.93 0.00 62.93 Award awaited

9 Construction of New Block No. II in PWD Rest

House at Kaithal.

FCPS No. 1/2/2009-

1B&R(w) 22-Feb-2012

175.30 89.04 86.26 Structure work completed. Floor tile work

in progress.

10 Construciton of Nirman Sadan PWD B&R

Office Complex at Kaithal.

1/2/2009-1B&R(w)

29-Nov-2012

995.75 179.12 816.63 Basement, ground floor and first floor slab

laid

11 Construction of New PWD Rest House at Pundri

in Distt. Kaithal.

FC&PS No.1/4/2012-

1B&R 7-May-2012

200.73 96.22 104.51 Doubly storey building. Main rest house

ground floor slab laid. First floor slab laid.

Boundary wall completed, flooring in

progress

12 Construction of new PWD Rest House at

Charkhi Dadri in Bhiwani Distt.

1/39/2010-1B&R(W)

27-Aug-2012

182.53 3.83 178.70 Detailed estimate & DNIT sent to Head

office. Tender will be called after approval

of DNIT

13 Construction of PWD B&R Rest House at

Jhajjar

No.1/9/2010-1B&R (W)

4-May-2012

204.00 177.60 26.4 100 % work completed.

Bank of sanctions as on 29.04.14 under head 4059- C.O. Public Works (Major Works)

14 Construction of PWD Rest House with 2 Nos.

440 Sft houses and SDO Office at Beri in Jhajjar

District

No.1/37/2010-1 B&R(W)

19-Mar-2013

569.51 173.62 395.89 Work in progress

15 Construction of Nirman Sadan at Rohtak NO. 1/2/2011-1 B&R(W) 1779.8 4.53 1775.27 Work administratively approved. Work

started excavation completed. Footing is

in progress.

16 Construction of New PWD Rest House Gurgaon NO. 1/20/2012-1B&R(W) 737.19 0.00 737.19 Site not finalized yet

17 PWD Rest house at Bahadurgarh 1/6/2010-1B&R(W)

04.06.2013

489.02 0.02 489.00 Tender received and sent to head office for

approval

18 PWD Rest house at Rai in Sonepat Distt Sanction received in UO

form

1099.13 79.80 1019.33 Work is in progress

19 Construction of New Rest House at Hodal in

Palwal Distt.

1/18/11-1B&R (W) 185.55 0.00 185.55 Detailed estimate/DNIT under preparation

20 Construction of Memorial of Sardar Partap

Singh at Village Rasoi in Sonepat Distt.

1/13/2013-1 B&R (W) 415.51 0.69 414.82 Tender to be received on 16.1.14

21 Re-construction of PWD Rest House (Ekant

Bhawan) at Mussorie

1/2/2013-1 B&R (W) 662.51 0.00 662.51 Fresh approval

Total 8828.98 1266.69 7571.68

Sr. No. Name of work No. & date of Approval Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance sanction

as on 1.4.14

Rs. LacsStatus of work

1 Const. of office building of Haryana state Legal

services Authority in Sector-14 Panchkula

20/8/2005-4JJ-I

21-Jan-2013

756.15 106.24 649.91 Work in progress.

2 Construction of proposed Judicial Block (Phase -

II) on existing Litigant Hall in Mini Sectt. at

Rohtak

6/35/2012-5 JJ-II

18-Jun-2012

877.31 103.95 773.36 Slab of FF, S.F. completed and 50% slab

of T.F. laid and mumty of 50% is in

progress. Building of steel bars and T.F. is

in progress. Overall 70%work completed.

3 Construction of Judicial Block in the compus of

SDO (Civil Complex) at Hathin in Palwal

FC/PS No. 6/7/2012-5 JJ-II

19-Jun-2012

792.42 236.30 556.12 Work is in progress.

4 Construction of Security Guard Room, Check

post & high security boundary wall around

judicial court complex Mini Sectt. at Sirsa in

Sirsa Distt

1

29-Dec-2011

134.60 102.89 31.71 Work physically & financially completed

5 Construction of Judicial Block in the campus of

SDO Civil Complex at Ganaur in Sonepat Distt.

F.C. NO. 9082-89/WI

5-Dec-2011

765.00 317.48 447.52 65% work completed and balance work in

progress

6 Construction of Property Room of Judicial

Complex & Police Malkhana in Campus of Mini

Sectt Sirsa

6/110/2012-S JJ-II

26-Oct-2012

67.84 67.68

7 Constructing Additional work in the Campus of

Mini Sectt. at Bhiwani in Bhiwani Distt.

No. 2538-P-B-11/11904

3-Nov-2011

114.74 113.9 Work in progress

8 Construction of Additional Litigant Hall & Bar

complext in Mini Sectt. At Narnaul in

Mohindergarh District

6/33/2012-5-JJ (II)

4-Jul-2012

317.35 78.12 239.23 50% roof slab laid and further work in

progress

9 Const. of Bridge connecting lawyers chambers

and litigant shed in mini sectt. at Karnal

Add. C.S.No. 6/21/ 5JJ II

7-Aug-2013

75.73 1.38 74.35 Excavation of footing and column in

progress 06.02.2014

10 Supply of furniture for two subordiate courts at

new Judicial Complex, Tohana, District

Fatehabad

6/112/2013-5 JJ-II

01.01.2014

11.40 0.00 11.40 Work completed

11 Estimate for Providing Estate PHA Services in

Mini Sectt. (SDO Civil) at Meham Distt,Rohtak

2664-R-6-2013/20989

30.12.2013

51.32 51.32

12 Renovation of office of Advocte General,

Haryana Chandigarh (Level I & II)

2/27/2013- 5 JJ (I)

22.08.2013

50.52 50.52

Bank of sanctions as on 01.04.14 for Administration of Justice under head 4059- C.O. Public Works (Major Works)

13 Renovation of office of Advocte General,

Haryana Chandigarh

2/13/2013-5 JJ (I)

03.01.2014

11.33 11.33

14 Connectivity of electricity pertaining to the Civil

Court Safidon with hotline

6/105/2013-5JJ-II

20.11.2013

12.19 0.00 12.19 Work is in progress.

15 Construction of structure for temporary chamber

for the lawyers in New Judicial Complex, Palwal

6/102/2013- 5 JJ-II

12.11.2013

21.08 21.08

16 Approval for laying of Local area network in the

subordiated courts located in the states of

haryana

6/18/2013-5 JJ- II

12.11.2013

537.00 341.00 196.00 Part payment made

17 Providing addition and alteration in Judicial

Complex at Narnaul (Mohindegarh)

6/70/2013/5JJ- II

26.06.2013

6.33 0.00 6.33 Physically completed.

18 Installation of Grills on the walls of Bar

Room/Complex at Safidon in Jind district

6/88/2013/5JJ-II

13.09.2013

2.70 0.05 2.65 Work is in progress.

19 Connnectivity passage on 2nd floor and district

courts Ambala

6/151/12

dated 26.11.2012

20.17 23.38 0.00 Work physically completed but financial liabilities pending

TOTAL 4625.18 1310.79 3316.6

Sr. No. Name of work No. & date of Approval Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance sanction

as on 1.4.14

Rs. Lacs + new

works

Status of work Remarks

1 Construction of Sub Tehsil Building at Village

Mullana in Ambala District

CS No. 3136 r 6 2012 168

3-Jan-2013

139.64 66.57 73.07 Work in progress.

2 Const. of Tehsil Bldg. at Raipur Rani Distt FC&PS Memo No. 319-F-6-

2013/2651

4-Mar-2013

272.00 0.00 272.00 Work yet not started

3 Constructing of Internal road/Parking in S.D.O.

(Civil) Block at Samalkha in distt. Panipat

FC & PS No. 2367R-6-09-

7209 24

-Aug-2009

98.07 78.39 19.68 Worky physically completed but financial

liabilities pending

4 Const. of EVM Warehouse in the campus of

Mini Sectt. Complex at Panipat

ACS & FCR No. 1155-R-

6/7807 18-Jun-2013

103.70 0.00 103.70 The revised drawing submittred by Chief

architect office to financial commissioner.

Revenue for approval. Still awaited.

5 Construction of Mini Secretariat at Meham in

Rohtak District

FC&PS No.2655-R-6-

10/9831

30-Sep-2010

815.00 607.16 207.84 Work administratively approved. Work

completed except finishing and parking

area. Finishing is in progress.

6 Construction of Surface Car Parking in Mini

Sectt. at Rohtak.

275-R-6-2012/2006

21-Feb-2012

89.41 Work completed.

7 Construction of Tehsil building at Farrukh Nagar

Distt. Gurgaon

No. 2828-R-6-2011/13396

28-Nov-2010

317.95 211.77 106.18 Overall 90% nwork completed.

8 Construction of SDO(Civil) Complex ( Admn.

Block) building at Pataudi in Gurgaon Distt.

T/S vide EIC No.22/WI

3-Jan-2012

531.39 417.80 113.59 Work is in Physical progress. RCC

structure completed. Plaster of ground

floor and first floor completed. Joinery

work of ground floor and floor is in

progress. Flooring work is in progress.

9 Construction of Mini Sectt. (S.D.O.) Civil

Complex (Admn. Block) at Hathin in Palwal

Distt

FC&PS No 721-R-6-

11/3198 24-Mar-2011

899.60 655.09 244.51 Physically completed and hander over to

client department on 05.03.2014

10 Construction of SDO Civil Complex (Admn.

Block) at Tohana in Fatehabad Distt.

FC&PS No. 2537-R-6

9-Nov-2011

914.00 710.38 203.62 Work completed.

11 Construction of ware house for EVM Machine in

Mini Secretariat at Fatehabad

1090-R0602012/7214

3-Jun-2013

150.30 1.23 149.07 D/E submitted

12 Rough cost estimate for construction of Record

room of SDM office in DAC building Hisar

Endst. 696-R-6-2012/356

26.03.2012

71.25 0.00 71.25

Bank of sanctions as on 01.04.14 for District Administration under head 4059- C.O. Public Works (Major Works)

13 Construction of Tehsil Building at Uklana Distt

Hisar.

FC &PS memo No. 57-R-6-

2013/1241

30-Jan-2013

420.53 0.60 419.93 Work allotted but it will be started after

mode of conduct

14 Construction of Tehsil Office cum Revenue

record room in Tehsil Julana Distt. Jind

FC&PS No191-R-6-

2012/2186

24-Feb-2012

381.60 250.94 130.66 100% B/wall completed and 2nd floor roof

slab laid further work is in progress.

15 Extension/Expansion of New Mini Sectt. at Jind

in Jind Distt.

ACSP No.3292-R-

6/2012/172

3-Jan-2013

1,050.75 1.64 1049.11 Tender under approval in Head office

16 Constructing Additional work in the Campus of

Mini Sectt. at Bhiwani in Bhiwani Distt.

No.2538-P-B-11/11904

3-Nov-2011

114.74 74.63 40.11 90% work completed. Further work is in

progress

17 Construction of 2nd Floor on SDO (Civil) &

Tehsil Complex at Charkhi Dadri in Distt.

Bhiwani

FC&PS No.2844-R/13400

28-Nov-2011

98.27 51.97 46.30 Worky physically completed.

18 Construction of SDO (Civil) Complex

(Administrative Block) in the Campus of Mini

Sectt. Charkhi Dadri in Bhiwani Distt.

631-R-6-2012/3170

16-Mar-2012

1,055.00 555.91 499.09 703/703 piles & 175/175 piers cap casted.

Further work is in progress.

19 Construction of SDO Civil complex (Admin

Block) building at Sector 12 Bahadurgarh Jhajjar

Distt.

FC &PS memo No. 3247-R-

6-2012/312

31-Jan-2013

1288.83 328.16 960.67 Slab of ground floor laid. RCC work in

first storey is in progree

20 Construction of Tehsil Building at Beri in Jhajjar

District.

FC&PS No. 1372

13-Feb-2009

177.50 0.18 177.32 Work not yet started. Decision is pending

with LA with distt admn.

21 Construction of ware house for EVM Machine in

Mini Secretariat at Jhajjar

No. 3154-R-6-2012/1246

30-Jan-2013

88.95 89.62 0.00 Work is in progress. Overall 20% work

completed.

22 Construction of Administration Block in SDC

(C) Complex at Beri in Jhajjar District

No.105-R-6-2012/1768

12-Feb-2013

1,525.85 159.46 1366.39 Tender case stands submitted to head

office vide SE(J) letter No. 1729 dated

12.09.13

23 Constn. of mini Sectt. Admn. Block at Sonipat R/A F.C. No. 12046

4-Nov-2010

1,329.80 1,182.78 147.02 Structure completed. Flooring and

plastering in progress.

24 Construction of SDO Civil complex (Admn

Block) at Ganaur in Sonepat Distt.

F.C. memo No. 13184

22-Nov-2011

898.77 201.02 697.75 40% work completed and balance work in

progress.

25 Construction of SDO Civil complex at Gohana in

Sonepat Distt

F.C. memo No. 12504

16-Nov-2010

692.25 702.51 0.00 Work physically completed.

26 Construction extention of litigant hall at Distt.

Administrative complex in Mini. Sectt. Sonepat

FC.No. 11460

18-Oct-2011

139.70 95.29 44.41 Physically completed.

27 Providing & fixing aluminium partition all doors,

high mast lighting audio & conference system

AC, RO & invertor in Admn Block in Mini Sectt.

at Sonepat

F.C. No.1969-R-6-

12/12704

15-Oct-2012

258.88 112.59 146.29 Physically completed.

28 Construction of ware house for EVM Machine in

Mini Secretariat at Sonepat

No. 594-R-6-2013/4646

10-Apr-2013

219.88 0.00 219.88 DNIT and detailed estimate are under

preparation.

29 Replacement of lift no. 3 in New Sectt. Bldg.,

Haryana Sec-17, Chandigarh

740-CT-N-2012/3625

27-Mar-2012

76.08 76.08 Work in progress.

not in mis list

30 Construction of Administrative office building

phase II with multi level parking in the campus of

mini sectt sector 1 panchkula

2665-R-6-2013/20994

30.12.2013

4162.05 0.00 4162.05 Work yet not started. Str. Design under

preparation

31 Estimate for providing Estate Water Supply,

Sewerage, and Fire Fighting arrangement in

Administration Block (Phase-II) in the campus of

Mini Sectt. Fatehabad District

2565-R-6-2013/20547

18.12.2013

37.93 37.93

not in mis list

TOTAL 18419.67 6555.69 11785.5

Sr. No. Name of work No. & date of Approval Amount of

A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction Rs.

Lacs 01.04.14

Status of work Remarks

1 Construction of New SDE PWD B&R office at

Pehowa in Distt. Kurukshetra.

FC & PS No. 1/14/2011-1(W)14-

May-2012

58.56 28.62 29.94 Structural work completed. Finishing

work such as plastering and flooring are in

progress

2 Administrative approval for construction of New

PWD Rest House at village Sirsagarh, Near

Dosarka Mullana in Ambala Distt.

1/29/2010-1 B&R (W) 173.52 89.76 83.76 Work in progress

3 Construction of 1st floor & 2nd floor of existing

Rest House in Sector -16A, Faridabad

4/23/2006-1B&R(W)

28-Dec-2011

259.80 0.78 259.02 Tender received on dated 20.12.2013 and

under process

4 Constructing of New Rest House at Fatehabad in

Fatehabad Distt.

FC&PS No. 1/22/2011

6-Mar-2012

179.52 110.96 68.56 Finishing work is in progress.

5 Constn. of PWD Rest House at Uchana in Jind

Distt.

14/02/2008-1B&R(w)

31-Oct-2011

116.50 0.27 116.23 The case of land acquisition has been

admitted on 8.11.12 in Hon'ble Pb. & Hry.

High Court titled as Baljeet Singh V/s

State case No.CWP 3380 of 2012. Next

date 26.5.14

6 Land Acquisition for construction of rest house

(B&R) at Uchana (Jind)

ACS no. 14/02/2008-1 B&R W

31-Oct-2012

62.93 0.00 62.93 Case for land acquisition is in Hon’ble

Punjab and Haryana High court. The next

date of hearing is 26.5.14

7 Construction of New Block No. II in PWD Rest

House at Kaithal.

FCPS No. 1/2/2009-1B&R(w)

22-Feb-2012

175.30 89.04 86.26 Structure work completed. Floor tile work

in progress.

8 Construciton of Nirman Sadan PWD B&R

Office Complex at Kaithal.

1/2/2009-1B&R(w)

29-Nov-2012

995.75 179.12 816.63 Basement, ground floor and first floor slab

laid

BANK OF SANCTIONS AS ON 29.04.14 UNDER HEAD 4059- C.O. PUBLIC WORKS (MAJOR WORKS)

9 Construction of New PWD Rest House at Pundri

in Distt. Kaithal.

FC&PS No.1/4/2012-1B&R

7-May-2012

200.73 96.22 104.51 Doubly storey building. Main rest house

ground floor slab laid. First floor slab

laid. Boundary wall completed, flooring

in progress

10 Construction of new PWD Rest House at

Charkhi Dadri in Bhiwani Distt.

1/39/2010-1B&R(W)

27-Aug-2012

182.53 3.83 178.70 Detailed estimate & DNIT under

preparation

11 Construction of PWD Rest House with 2 Nos.

440 Sft houses and SDO Office at Beri in Jhajjar

District

No.1/37/2010-1B&R(W)

19-Mar-2013

569.51 173.62 395.89 Work in progress

12 Construction of Nirman Sadan at Rohtak NO. 1/2/2011-1 B&R(W) 1779.8 4.53 1775.27 Work administratively approved. Work

started excavation completed. Footing is

in progress.

13 Construction of New PWD Rest House Gurgaon NO. 1/20/2012-1B&R(W) 737.19 0.00 737.19 Site not finalized yet

14 PWD Rest house at Bahadurgarh 1/6/2010-1B&R(W)

04.06.2013

489.02 0.02 489.00 Tender received and under process

15 PWD Rest house at Rai in Sonepat Distt Sanction received in UO form 1099.13 79.80 1019.33 Work is in progress

16 Construction of New Rest House at Hodal in

Palwal Distt.

1/18/11-1B&R (W) 185.55 0.00 185.55 Detailed estimate/DNIT under preparation

17 Construction of Memorial of Sardar Partap

Singh at Village Rasoi in Sonepat Distt.

1/13/2013-1 B&R (W) 415.51 0.69 414.82 Work in progress

18 Re-construction of PWD Rest House (Ekant

Bhawan) at Mussorie

1/2/2013-1 B&R (W) 662.51 0.00 662.51 Approval of local authorities is being

taken

Total 8343.36 857.26 7486.10

Name of work

No. & date of Approval

Amount of

A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs + new

works

Status of work

Remarks

1 Construction of road for Govt

Engineering College of Silani Kesho in

Jhajar District

C13/2013/1220

14.06.2013

133.29 0.00 133.29 Work is in progress

Bank of sanctions as on 01.04.14 under head 4202- Capital outlay, on education, sports, art, and culture for the year 2014-15

2 Foundation stone laying ceremony of

Extension campus (Research &

Development) of IIT Delhi at village

Badhsa

C13/2014/22463

20.12.2013

5.00 2.87 2.13

3 Providing & fixing RCC Posts and

topographic survey for Govt Engineering

College at Jainabad in Rewari Distt

C14/2013/21481

16.07.2013

2.39 0.00 2.39 Work is in progress

4 Contruction of Rao Birender Singh State

Institute of Engineering & Technology,

Jainabad in Rewari District

C14/2013/21838

03.09.2013

1200 0.00 1200 Administrative approval received

Tentative. R/C/E based based on

Architectural drawings component

wise stands submitted to Director

General Technical Education

Haryana vide EIC No. 1466 dated

18.02.2012, 1674-80, 1682-86,

dated 25.02.14, 1723-27/W-I dated

28.2.14

5 Construction of boundary wall and check

post for Rao Birender Singh State

Institute of Engineering & Technology at

village Zainabad, distrist Rewari

35/3/2010-2 TE

09.01.2014

208.40 0.00 208.40 Detail estimate and DNIT stands re-

submitted to Head office on dated

07.04.2014

6 Construction of Foundation stone laying

ceremony for indian institute of

information technology at village

kiloharad distt sonepat and other works

C15/2014/22446

20.12.2013

15.00 0.00 15.00

TOTAL 1564.08 2.87 1561.21

Name of work

No. & date of Approval

Amount

of A/A

Rs. Lacs

Expenditure up

to 3/2014

Rs. Lacs

Balance

sanction as

on 1.4.14

Rs. Lacs +

new works

Status of work

Remarks

Bank of sanctions as on 01.04.14 under head 4235 and 2235- Social welfare deposit works for the year 2014-15

1 Construction of building of observation

home for children at Madhuban in Karnal

504/SW (3)

22.03.14

416.05 0 416.05 New work

4235

2 Construction of building of special home

for children at Madhuban in Karnal

503/SW (3)

22.03.14

333.09 0 333.09 New work

4235

3 Construction of building of Children

Home, Faridabad

10454 ICPS/2014

24.03.14

234 197.27 New work2235

4 Construction of building of Children

Home, Gurgaon

10449/ICPS

24.03.14

366 324.30 New work2235

5 Construction of building of Special

Home, Karnal

10459 ICPS/2014

24.03.14

333.09 291.29 New work2235

TOTAL 1682.23 1562

Name of work

No. & date of Approval

Amount

of A/A

Rs. Lacs

Expenditure up

to 3/2014

Rs. Lacs

Balance

sanction as

on 1.4.14

Rs. Lacs +

new works

Status of work

Remarks

1 Alteration in old and new Mini Secretariat,

Gurgaon

3/51/2013-3 Lab 55.74 0 55.74 Fresh approval

2 Construction of Labour court complex at

faridabad

3/46/2008-3 Lab 1406 0 1406 Work in physical progress. RCC

foundations complete, 50 % RCC wall of

basement casted and casting of RCC

columns of basement is in progress.

Name of work

No. & date of Approval

Amount

of A/A

Rs. Lacs

Expenditure

up to 3/2014

Rs. Lacs

Balance

sanction as

on 1.4.14

Rs. Lacs +

new works

Status of work

Remarks

Bank of sanctions as on 01.04.14 under head 4250- Capital outlay, " 201-Labour Sub-Head 96 construction of Labour Court complex for the year 2014-15

Bank of sanctions as on 01.04.14 for Education works under head 4202- C.O. Higher Education (Major Works)

1 Construction of Govt. College

Building at Chhachhrauli (Double

storey building)

R/A/AF&C1/4-06-Works

(2)

20-Jul-2012

878.45 677.46 200.99 Work completed.

2 Construction of P.G. Block in Govt.

College Sector-14, Karnal

C&S No. 4/33-06

4-Sep-2008252.11 467.82 0.00 Work is in progress. Outside

plaster work is in progress

3 Construction of Multipurpose / Auditorium Hall

in Govt. College Karnal

C&S No. 4/33-06

4-Sep-2008

383.79 287.7 96.09 Work is in progress. Ground floor

completed and FF slab 50% completed.

Work 2nd storey in progress

4 Construction of 6 No. Class rooms in Govt.

College at Matak Majri in Karnal Distt

FCPS No. KW-4/7-08Works-2

14-Nov-2011

137.25 131.3 5.95 Physically completed.

5 Construction of 8 No. Class rooms in Govt.

College Sector-14, Karnal.

FC&PS No. KW/4/7-08 (W)

14-Nov-2011

151.66 25.27 126.39 Work is in progress. Roof slab 100%

completed. Cement plaster is in progress.

6 Construction of the building of Govt. College

Bapoli in distt. Panipat

FC&PS No.1/13-2010

4-Oct-2011

1366.62 243.17 1123.45 82% work of boundary wall & 100%

columns casted upto G.F. roof level, 65%

column casted upto 1st floor, 75% ground

floor slab laid and 30% slab 1st floor laid,

Earth filling completed, brick work in

ground/1st floor in progress.

7 Constg. Govt. College at Sector-18 at Panipat in

distt. Panipat.

FC&PS No. 1/5-2008

3-Oct-2011

1433.89 673.61 760.28 90% Work of Boundary wall completed.

Structure completed. Kota stone

flooring/plaster work & road & parking

work in progress.

8 Construction of Govt. Women College at

Lakhan Majra in Rohtak Distt.

1/6-2008 works (2)

27-Feb-2012

866.5 574.14 292.36 Work completed and inaugurated by

Hon'ble CM Haryana on dated 27.9.2012.

Work administratively approved. Work is

in progress. PCC work completed. 100%

column upto roof level has been

completed & 80% slab of GF completed.

9 Construction of Teaching Block/Class Rooms in

Govt. College for women at Rohtak

KW 4/7-08 Works (2)

14-Nov-2011

217.81 201.82 15.99 Work in physical completed.

10 Construction of Teaching Block/Class Rooms in

Govt. College for Boys at Rohtak

KW 4/7-08 Works (2)

14-Nov-2011

217.81 211.9 5.91 Work in physical completed.

11 Construction of S.C. / B.C. Hostel in I.C. Govt.

Women College at Rohtak

1/17-99 Works (2)

26-May-2011

160.31 50.68 109.63 Work in physical completed.

12 Construction of Multipurpose Hall (Auditorium)

in Govt. College at Meham in Rohtak Distt.

KW4/90-2007 works (2)

24-Nov-2011

385.08 203.26 181.82 Work in physical progress. RCC column

completed. First upto slab level complete

and second level slab completed. Stage

side structure work completed. 3rd level

slab in front side completed & in middle

portion slab is completed.

13 Construction of Teaching-cum-Admn. Block

with check post & main gate in Pt. Neki Ram

Sharma Govt. College, Rohtak

4/8-2007 works (2)

27-Jun-2012

784.54 460.59 323.95 Work in physical progress. Structure

work completed. 80% brick work

completed, 70% flooring completed. 70%

plaster completed. Balance in progress &

tile trassing is in progress.

14 Const. of Commerce teaching block (12 Room)

in Govt. College Meham in Rohtak Distt.

4/13-13 works (2)

8-May-2013

217.81 101.3 116.51 Work is in progress. Excavation work

completed. PCC work completed. RCC

footing & plinth level been completed.

Column upto roof level has been laid.

G.F. slab has been completed. Column

upto F.F. slab is in progress

15 Const. of Govt. College at Sampla 1/2-12 works (2)

5-June-2013

1366 0.78 1365.22 Work administratively approved. Work

allotted to the agency and excavation of B.

wall is in progress. 25% B. wall of

foundation of B wall completed upto DPC

level.

16 Construction of building of Government

College, Kheri Gujran in Faridabad District

FC&PS Memo No. 10510/WI

11-Dec-2012

1292.4 407.23 885.17 Work in physical progress. Casting of

ground floor roof slab 90% completed and

casting of 1st floor roof slab 80%

completed. Shuttering of rest of the slab is

in progress. Overall 40% work

completed.

17 Construction of Mulitipurpose Hall in Govt.

College Sector-14 Gurgaon

A/A 4/114-2007-W(2)

24-Nov-2011

726.03 390.27 335.76 Finishing work is in progress

18 Construciton of the Building of Dr. B.R.

Ambedkar Govt. College , Palwal

1/4-2011 works (2)

13-Oct-2011

1306.66 955.82 350.84 Physically completed & handed over to

client deptt on 05.03.2014

19 Construction of the Building of Govt. College

for Women, Hathin in Palwal Distt.

PS, HR/1/2-11 works (2)

8-Aug-2013

1272.62 0 1272.62 Estimate and DNIT under preparation

20 Construction of the Building of Govt. College

for Women at Ratia in Fatehabad Distt.

FS No. 1/1-12

16-May-2013

1051 4.04 1046.96 No tender received on 30.09.2013, and

06.12.2013. Tender received on

28.01.2014 and under process.

21 Construction of Govt. College at Dabwali Distt.

Sirsa.

3/46-98-works-02

8-Nov-2011

1512.3 784.91 727.39 Finishing work pending.

22 Construction of Building of Women Wing of

Govt. National College at Sirsa in Sirsa Distt

2/5-07 works (2)

12-Aug-2013

1740 0 1740 Detailed estimate submitted to Head office

for Technical Sanction.

23 Construction of Govt. College at Barwala in

Distt. Hisar

FC No 1/7-2007 Works (2)

17-Oct-2011

1376.52 1114.56 261.96 Work is in progress

24 Construction of Teaching block/ Class room at

Jind

FC KW4/7-08 Works (2)

14-Nov-2011

217.81 200.75 17.6 Work completed.

25 Construction of Govt. College for Women at

Safidon in Jind Distt.

FC&PS No. 1/8-11 works (2)

6-Feb-2013

1630.84 230.86 1399.98 Column completed and roof slab in G.F. in progress

26 Constn. of Teaching Block/Class Rooms in

Govt. College at Narwana

FC KW4/7-08 Works (2)

14-Nov-2011

217.81 209.48 8.33 Finishing work is in progress.

27 Constn. of Boundary wall in Govt. College,

Narwana (Jind)

DG No. 4/30-2008 Works (2)

17-May-2012

53.37 39.62 13.75 Physically completed

28 Construction of Ch. Bansi Lal Govt. College for

women at Tosham District Bhiwani.

FC&PS No. 1/2-06 Works (2)

28-Jul-2011

1027.57 818.13 209.44 Tender for balance work is under process

at risk and cost of agency

29 Construction of 6 class rooms in Govt. College

Loharu in Bhiwani Distt.

KW 4/7-08 Works (2)

14-Nov-2011

137.25 82.22 55.03 Physically completed

30 Construction of the Building of Govt. College

for Women, Behal in Bhiwani Distt

1/3-12 Works (2)

30-May-2013

862.27 4.04 858.23 DNIT approved by Head office. Fresh

sanction of planning and finance

department has been sought for inviting

tenders vide se bhiwani memo No9. 4306

dt 5.12.13, which is awaited

31 Construction of the building of Govt. College

for women, Bwani Khera (Bhiwani)

Memo No. 1/4-07 works (2)

10.05.2013

1116.12 5.06 1111.06 Approval of finance department

32 Construction of Building for Govt. College for

Women, Mohindergarh (District Mohindergarh).

FC&PS 10/50-08 Works (2)

27-Sep-201

656.77 617.8 38.97 Physically completed.

33 Construction of teaching block in Govt. College,

Mahindergarh.

FC&PS KW 4/7-08 Works (2)

14-Nov-2011

217.81 117.07 100.74 Physically completed.

34 Construction of teaching block in Govt. College,

Narnaul.

FC&PS No. 4/1/10-2 (2)

17-Feb-2012

217.81 163.19 54.62 Physically completed.

35 Construction of Art Block of 12 Rooms in Govt.

College for Women at Narnaul in Mohindergarh

District

FC&PS No. 4/1/10-2(2)

17-Feb-2012

217.81 142.14 75.67 Physically completed.

36 Const. of the science block in Govt. College,

Nangal Chaudhary (Mahindergarh)

1/8-12 works (2)

19-July-2013

322.18 0 322.18 Relaxation in FD instructions not yet

received

37 Construction of Building of Govt. College at

Badli in jhajjar distt.

FC&PS E D No. 4/38-08 W2

25-Jul-2012

892.35 713.66 178.69 Building completed. Boundary

wall/scooter stand is in progress

38 Constructing of Commerce Block, Computer

Lab & Language Lab in Govt. College at

Bahadurgarh

FCPS No. KW 4/7-08

14-Feb-2011

197.04 104.77 92.27 Physically completed.

39 Construction of Govt. College (Women Wing)

Bahadurgarh in Jhajjar District.

FS &PS No. 4/27-2008 (W)

7-Oct-2011

1162 8.87 1153.13 Work in progress.

40 Construction of 12 Nos. Class Rooms/Arts

Block & Multipurpose Hall in Govt. College,

Jhajjar

FC No. KW4/51-08

30-Aug-2010

1137.43 427.86 709.57 Work upto lintel level, 1st slab level

completed. Overall 30% work completed.

41 Construction of Teaching Block & 12 Nos.

Class room in Govt. College, Jhajjar

FCPS No. KW-4/7-08Works-

4-Feb-2011

150 177.64 0 Work in progress. Over all 95% work

completed.

42 Construction of 8 Class Rooms in Govt.

College, Dujana in Jhajjar District.

FCPS No. KW4/7-08 Works

14-Feb-2011

100 142.83 0 Work completed

43 Construction of Admn. Block, Library,

Computer lab in Govt. college Dubaldhan in

Jhajjar Distt.

FC & PS Memo No. 4/96/2006

works (2)

30.11.2012

245.42 148.65 96.77 Work is in progress. Overall 25% work

completed.

44 Const. of Govt. College at Bahu in Jhajjar

district

1/11-12-works (II)

19-July-2013

1272.62 290.32 982.3 Work recently allotted.

45 Construction of the Science block in Govt.

College Jhajjar

Memo No. 1/8-12 works (2)

19.07.2013

322.18 0 322.18

46 Construction of 8 Nos. Class Room and 2 Nos.

Computer Labs in Govt. College at Nagina in

Mewat District.

FC&PS No. 1309-15/WI

9-Feb-2012

207.81 137.88 69.93 Structure alongwith brick work plastering,

flooring completed and finishing in

progress. Principal government college

provided site free from trees on

30.11.2013

47 Construction of the Building for Govt. College

for Women, Salaheri in Mewat District.

FC&PS No. 1/7-10 Works (2)

31-Jan-2012

1204 320.3 883.7 Slab of Ground floor casted and shuttering

of 1st floor is in progress. 70% boundary

wall in progress

48 Construction of Govt. College for women at

Rewari

NO. 01/1-07 works (2)

2-Jan-2012

1770.56 1159.83 610.73 Main building completed & partially

handed over to the client deptt & Girls

hostel work will be completed upto

30/06/2014. The work of Boundary wall

completed. Revised A/A received is Rs.

17.71 Cr.

49 Construction of building for Govt. College for

Women at Gurawra in Rewari Distt.

1/9/08 (W) 2

4-Oct-2011

577.57 505.58 71.99 College Building completed. Boundary

wall, road & parking is in process.

50 Construction of building of Govt. college

Kharkhara (Rewari).

No. 1/10-10 Works (2)

24-Jan-2011

1063.78 383.16 680.62 G.F. Slab 90% laid, 1st floor slab 70%

and 2nd floor slab 70% laid. Brick

wall/plaster in progress in GF, FF and

second floor

51 Constrction of Govt. College Kosli in Rewari

Distt.

FC& PS No. Memo No.

1/6/2011

03-Apr-2013

1366.62 171.68 1194.94 Ground floor and FF roof slab is in

progress.

52 Construction of Govt. College (Boys) in Village

Barota (Gohana) in Sonepat Distt.

4/11-11 Works (2)

21-Aug-2012

1355.11 263.42 1091.69 Work is in progress

53 Construction of Govt. College Kharkhauda in

Village Pipli Block Kharkhauda in Sonepat

Distt.

1/3-11 Works (2)

21-Aug-2012

1393.91 479.55 914.36 Work is in progress

54 Construction of back side parking in the campus

of shikha Sadan, Sector-5, Panchkula

Memo No. KW 3/35-2003

works (2)

1309.2013

21.03 0 21.03 New sanction

55 Construction of Govt. College Chhara Jhajjar Memo No. 1/15-12 Works (2) 1366 0 1366 Detail estimate and design is under

preparation with the consultant

56 Construction of the Buildings of Govt. College

Jasaur Kheri Jhajjar

1/7-13

dated 30.12.13

1272.62 0 1272.62 Detail estimate and design is under

preparation with the consultant

57 Special repair for raising and fencing of

boundary wall of Govt. College Sector-1,

Panchkula

4/5-13 works (2)

13.11.2013

38.95 0 38.95 New sanction

TOTAL 43109.58 16033.99 27362.31

Sr. No. Name of work

No. & date of Approval

Amount of

A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs

Status of work

Remarks

1 Construction of 8 Nos. Class Rooms of Govt.

Girl Sr. Sec.School at village Kiloi in Rohtak

District

2/43-2013 works (2)

19-Jul-2013

92.79 91.38 1.41 Work completed except fitting of EI and

PH Services

Bank of sanctions as on 01.04.14 for Secondary Education under head 4202- C.O. Public Works (Major Works)

2 Construction of Govt. High School at Baland in

Rohtak Distt.

9//4-2011 works (2)

21-Mar-2012

374.63 144.7 229.93 Work in physical progress. Excavation

completed &RCC footing completed upto

plinth beam. 95% plinth beam completed.

Column of east south and west side

completed. Flooring work in progress.

50% slab to east side laid

3 Const. of Govt. Girls Sec. School at Rohtak 2/43-2013 works (2)

19-July-2013

873.44 166.88 706.56 Work administratively approved. PCC

comleted for all blocks and RCC footing

completed and one side block completed

upto roof level. Right side of roof slab

completed. Binding of steel of front block

is in progress

4 Construction of Govt. Sr. Sec. School at

Kalanaur in Rohtak

2/43-2013 works (2)

19-July-2013

568.08 0.00 568.08 Work adminsitratively approved. Detail

estimate and DNIT sent to head office for

approval

5 Addition/construction/alteration of Govt. Girls.

Sr. Sec. School at Dabwali in Sirsa

9/6-20-WII

23-Feb-2011

220.88 170.97 49.91 Work physicall completed but financial

liabilities pending

6 Construction of Building of Govt. Girls Sr. Sec.

School Mandothi in Jhajjar District

FC&PS Govt. No. 9/4-2011

20-Sep-2011

142.24 95.81 46.43 Physically completed.

7 Construction of Building of Govt. Girls Sr. Sec.

School Khudan in Jhajjar District

2/43/2013

09.07.2013

397.33 69.10 328.23 Work is in progress

TOTAL 2669.39 738.84 1930.55

Name of work

No. & date of Approval

Amount of

A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs + new

works

Status of work

Remarks

1 Construction of District Headquarter office

building for excise & taxation department sector -

12 faridabad

2795-ET-4-2014/15199 3131 0 3131 Fresh approval

2 Construction of District level office building for

Excise & Taxation department, sector 32 at

Gurgaon

3/46/2008-3 Lab 3681 0 3681 Fresh approval

TOTAL 6812 0 6812

Name of work

No. & date of Approval

Amount

of A/A

Rs. Lacs

Expenditure up

to 3/2014

Rs. Lacs

Balance

sanction as

on 1.4.14

Rs. Lacs +

new works

Status of work

Remarks

Bank of sanctions as on 01.04.14 under head 4059- Excise &Taxation-16 Major works for the year 2014-15

Bank of sanctions as on 01.04.14 under head 4059- Excise &Taxation-16 Major works for the year 2014-15

1 Construction of District Headquarter office

building for excise & taxation department sector -

12 faridabad

2795-ET-4-2014/15199 3131 0 3131 Fresh approval

2 Construction of District level office building for

Excise & Taxation department, sector 32 at

Gurgaon

3/46/2008-3 Lab 3681 0 3681 Fresh approval

TOTAL 6812 0 6812

Sr. No. Name of work

No. & date of Approval

Amount of

A/A

Rs. Lacs

Bank of sanctions

as on 01.04.14 for

under head 4210-

C.O. Medical -

Hospital &

Dispensary

Balance

sanction as on

1.4.14

Rs. Lacs

Status of work

Remarks

1 Construction of Additional block in the campus

of existing Civil Hospital at Sohna in Gurgaon

District

No. 20/93/2013-5 HB III

26.07.2013

102.27 0 102.27 Detail estimate/ DNIT received vide EIC

memo No. 520/WI dated 21/01/2014

unapproved with the remark that resubmit

the detailed estimate / DNIT after receipt

of approval from the client department /

Govt, as per FD instructions issued vide

letter No. 5/6/2005-5 B&C dated

14/10/2013

Tender to be called after model code of conduct is over

2 Construction of 50 bedded Hospital at Tosham

in Bhiwani

No. 20/171/2013- 5HB III

24.10.2013

1222.43 50 1172.43 Tender to be called after model code of conduct is over

3 Construction of 50 bedded Hospital at Bawani

Khera with additional ward of 20 bedded in

Bhiwani Distt.

No. 20/93/2013-5 HB III

8.07.2013

102.27 0 102.27 Approval to finance department awaited Tender to be called after model code of conduct is over

4 Construction of SHC, Gangicha Jaat Distt.

Rewari

No. 20/134/2013-5 HB

09.09.2013

24.22 0 24.22 Work started

5 Construction of SHC Luhari, Ukhal Chana,

Kutani, Ahri and Salodha Distt. Jhajjar

No. 20/158/2013-5HB III

Dated 07.10.2013

185.52 12.37 173.15 Tender invited

6 Construction of PHC with residential

accomodation at Village Bahrana District Jhajjar

No. 20/167/2013-5 HB III

07.10.2013

380.7 146.72 233.98 Work started

7 Construction of SHC Jhatti Pur, Atolapur,

Karhans, Jorasi Sarf Khas Distt. Panipat

No. 20/125/2013-5HB III

12.08.2013

128 0 128 Tender approved

8 Constn. of Community Health Centre along with

Residential accommodation in village Naraina in

Panipat distt

ACS No. 20/206/2013

04-March-2014

695.19 0 695.19 Detailed estimate and DNIT under process Tender to be called after model code of conduct is over

9 Constuction of CHC Bapoli at Panipat D.G.H.S. No. 20/200/2012

19.-Dec-2012

690.85 0 690.85 Tender received to be approved after

model code of conduct is over

10 Construction of PHC at Dhotter (Sirsa) No. 20/111/2013-5 HB III

11.09.2013

339.22 0 339.22 Tender received on 04.12.2013 and under

process in circle office

11 Construction of PHC at Jui Kalan (Bhiwani) No. 20/131/2013-5HB III

29.08.2013

375.4 0 375.4 Approval of finance department awaited Tender to be called after model code of conduct is over

12 Construction of PHC and Residential Building,

Khairati Khaira (Fatehabad)

No. 20/92/2013- 5 HB III

16.08.2013

207.27 0 207.27 Tender received on 18.11.2013 and under

process in Head office

Tender received to be approved after model code of

conduct is over

13 Construction of CHC Jhansa with residential

accomodation at Jhansa in district Kurukshetra

No. 20/99/2013-5 HB III

08.07.2013

690.85 0.01 690.84 Work at DPC level

14 Construction of SHC Raiya (Jhajjar) No. 20/98/2013-5 HB II

08.07.2013

27.7 0 27.7 Work in progress

15 Construction of PHC Talu (Bhiwani) with

residential accomodation

No. 20/95/2013-5 HB III

24.06.2013

354.98 0 354.98 Tender approved

16 Up gradation of CHD into 50 bedded hospital at

Assandh in Karnal

PS HD No. 20/85/13 5 HB III

08.10.2013

77.8 0 77.8 DNIT/Detailed estimate under process Tender received to be approved after model code of

conduct is over

17 Up gradation of CHD into 50 bedded hospital at

Nilokheri in Karnal District

No. 20/83/2013-5 HB III

18.06.2013

73.99 0.12 73.87 DNIT under process Tender received to be approved after model code of

conduct is over

18 Construction of Primary Health Centre Nindana

Tigari Distt. Rohtak

No. 20/7/2014- 5HB III

17.01.2014

360 0 360 Tender received to be approved after

model code of conduct is over

19 Construction of Sub Health Centre Kultana

Distt. Rohtak

No. 20/7/2014- 5 HB II

17.01.2014

35 0 35 DNIT under approval

20 Construction of Primary Health Centre Jahajgarh

Disstt. Jhajjar with residendial accomodation

No. 20/7/2014- 5 HB II

17.01.2014

321.64 0 321.64 Tender approved

21 Construction of Primary Health Centre Ismila

Distt. Rohtak

No. 20/7/2014- 5 HB II

17.01.2014

360 0 360 Tender received to be approved after

model code of conduct is over

TOTAL 5430.6 159.22 5271.38

Sr. No. Name of work No. & date of Approval Amount of

A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs + new

works

Status of work Remarks

1 Construction of residential quarter in the campus

of Tehsil building at Gharaunda in Karnal Distt.

FC & PS No. 348

11-Jan-2012

148.06 0.09 147.97 Work recently allotted to the agency

2 Construction of residential houses for Distt.

Administration Revenue officers in the campus

os (Residential colony) Mini Secretariat at

Panipat

EIC No. 482/WI

12-Jan-2012

406.02 226.98 179.04 Plastering and flooring work in progress

in DC, SDM, CTM Residence and 4 Nos.

1900 sft residence slab laid of 1st floor, 1

no houses columns of 1st storey

completed upto roof level and work in

ADC house upto plinth beam

Bank of sanctions as on 01.04.14 under head 4216- C.O. on Housing-(Plan) District Administration-Major Works

3 Construction of house (24 Nos. 450 sft, 36 Nos.

650 sft, 36 Nos, 800 sft & 20 Nos. 1300 sft area)

in officers colony, Sector-15 A, Faridabad

30-R-6-2012/1753

10-Feb-2012

2256.78 9.34 2247.44 Work administratively approved but not

tendered yet. Detailed estimate and DNIT

received back from Head office with the

remarks that the same may be sent to next

financial year due to paucity of funds

4 Construction of House (2 Nos. 2800 sft area) in

officers colony, Sector 15-A Faridabad

887-R-6-2012/5296

31-May-2012

137.23 63.51 73.72 Structure completed including internal

plastering and external plastering is in

progress. Overall 55% work completed

5 Construction of (130 Nos.) Residential House

for revenue staff in Mini Sectt. At Sirsa Distt.

330-R-6-2013/2655

4-Mar-2013

2461.17 5.32 2455.85 Detailed esimate and DNIT submitted to

Head office vide Hisar No. 2267 dated

3.9.13

TOTAL 5409.26 305.24 5104.02

Sr. No. Name of work

No. & date of Approval

Amount

of A/A

Rs. Lacs

Expenditure up

to 3/2014

Rs. Lacs

Balance

sanction as

on 1.4.14

Rs. Lacs

Status of work

Remarks

1 Construction of 1 no. JMIC houses for CJM in

the Judicial Complex at Pehowa in Distt.

Kurukshetra

Addl. Ch. Secy. 6/42/11-5

21-Dec-2012

61.83 34.34 27.49 Structural work completed. Finishing are

in progress

2 Constn. Of 9 nos. Houses (6 nos. JMIC/CJM &3

nos. ADJ houses) in D.C. Colony, Kurukshetra

FC&PS 6/47/2008-5JJ-II

21-Nov-2011

569.73 390.37 179.36 6 Nos. JMIC houses structure work

completed upto plastering stage and

marble stone flooring and heat resistance

tile terracing is in progress and 3 Nos.

ADJ houses structure work completed and

marble stone flooring is in progress.

3 Construction of Judicial Houses in Sector -15A,

Faridabad

6/1/2009-5JJ-II

18-Jun-2012

761.61 379.37 382.24 Work in physical progress. (i) Work of 3

Nos. ADJ Houses completed upto 1st

floor roof level. (ii) Work of 5 Nos. JMIC

houses completed upto 1st floor roof level

and 5 Nos. JMIC houses completed upto

Ground floor roof level and plastering is

in progress.

4 Construction of Judicial officers Residence in

SDO(civil) cum Judicial Complex at Ratia

F.C. 6/55/2008-5jj(ii)

8-Dec-2008

54.58 64.98 0.00 Work in progress

5 Construction of Judicial officers residence in the

campus of SDO Civil-Cum Judicial at Tohana in

Fatehabad Distt.

FC&PS No. 6/14/2012

22-Feb-2012

106.09 150.81 0.00 Structure completed. Work in progress

6 Construction of 3 Nos. 1900 sft houses in

Judicial Complex at Hansi.

FC&PS No. 6/75/2011

9-Dec-2011

167.10 161.01 6.09 Work completed.

Bank of sanctions as on 01.04.2014 for Housing-Administration of Justice Works under head 4216-C.O. (Major Works)

7 Constn. of Judicial Houses at Ellenabad in Sirsa

Distt.

No. 6/89/2011-5JJ-II

6-Jan-2012

113.07 119.06 0.00 90% work completed-Work is in progress

8 Construction of proposed house type 1900 sft.

covered area for Civil Judge Senior and Junior

Division at Safidon in Jind Distt.

FC&PS No. 6/18/2012-5JJ-II

22-Feb-2012

142.00 121.70 20.30 Plaster work completed. Floor finishing

in progress

9 Construction of 2 Nos. A.D.J. Residential

Houses and 4 Nos. Civil Judge (Jr. Divin.) in

Civil Station area at Jind in Jind Distt.

A.C.S. No 6/40/2012-5JJ

19-Jun-2012

480.28 324.05 156.23 Joinery flooring and finishing is in

progress

10 Constn. of 1900 sft. area Judicial Residential

House(CJM/Senior Divn. Judge) in SDO(Civil)

Complex at Narwana

6/27/2008-5JJ-II

13-Dec-2011

127.39 91.15 36.34 Physically completed.

12 Construction of Residence of District and

Sessions Judge at Bhiwani

FC&PS 6/63/09-5JJ-II

4-Jun-2010

79.32 99.37 0.00 Building completed. Finishing work in progress

13 Construction of 3 Nos. residence for Addl. Distt.

& Session Judge and 3 Nos. for Chief Judicial

Magistrate at Bhiwani

6/63/2009-5JJ-II

9-Nov-2011

415.34 445.36 0.00 90% work completed. Further work in progress

14 Construction of 7 Nos. House for Judicial

Officers, ADJs (3 Nos.) CJM (1 No.) and 3 Nos.

for Civil Judge Junior Division in Mini Sectt. at

Narnaul in Mohindergarh Distt.

6/13/2013-5JJ-II

15-Mar-2013

432.58 0.46 432.12 Tender not yet approved due to code of

conduct

15 Construction of 5 Nos. House for Judicial

Officers (1) No. for Civil Judge (Sr. Division)

and 4 Nos. for Civil Judge (Jr. Division) in

Judicial Complex at Mohindergarh in

Mohindergarh District.

6/10/2013-5JJ-II

18-Mar-2013

296.36 0.46 295.90 Tender not yet approved due to code of

conduct

17 Constn. of 1 No. for Civil Judge (Senior

Division) & 2 Nos. houses (Junior division)

1900 sft area house at Gohana in Sonepat Distt.

No. 6/35/2012-5jj-II

13-Jun-2012

189.75 159.96 29.79 95% work completed and balance work is

in progress

18 Constn. of 1 No. for Civil Judge (Senior

Division) & 2 Nos. houses (Junior division)

1900 sft area house at Ganaur in Sonepat Distt.

NO. 6/392012-5JJ-II

19-Jun-2012

129.00 30.61 98.39 15% work completed and balance work is

in progress

19 Constn. of 10 Nos. Residential houses for

judicial officers or various categories in Mini

Sectt at Sonepat

No. 6/36/2012-5JJ-II 791.25 318.76 472.49 80% work completed and balance work is

in progress

21 Const. of Houses for C.J.M. Division Judge at

Kosli in Rewari Distt

6/11/2013-5JJ-11

15-Mar-2013

138.68 0.00 138.68 Tender received from head office for

extending the validity

22 Const. of ADJ 4 No., SDJ 2 No. and CJM 2 No.

Judicial houses at Rewari in Rewari Distt.

6/12/2013-5JJ-11

15-Mar-2013

610.30 2.51 607.79 Work allotted recently. Some

modification in site desired by District and

session judge/DC rewari

23 Const. of 14 Nos. houses for Judicial officers, 2

Nos. for ADJs, 2 for CJSD, 1 No. for CJM, 9 for

CJJD at Hisar

6/24/2013-5JJ

15-Mar-2013

838.21 133.97 704.24 Work in progress

24 Const. of 6 No. houses having 1900 sft. Area of

each house for CJM and Senior division judge at

yamuna nagar

C.Sec.Govt.Hr.6/73/2013

24-Jun-2013

418.41 0.01 418.40 Tender received back due to non approval

25 Const. of residential houses of various categoreis

for the judicial officers in the campus of

(Residendial Colony) Mini Sectt. Panipat

T/S vide EIC No. 8041

9-Nov-2011

1465.34 1314.12 151.22 Work completed except misc. work

internal public health EI joinery and road

junction

26 Construction of Senior Judge Residence (CJM)

1900 sft area House in the campus of Judicial

Complex at Assandh District Karnal

A/A C.S. No. 6/59/12-5

19-June-2012

48.06 41.24 6.82 Work is in progress

27 Const. of 1 Nos. CJM House and 4 Noss. JMIC

Houses in Sector-13, Part-B at Bahadurgarh in

Jhajjar Distt.

6/82/2013-5-JJ-II.

8-Jul-2013

387.89 0.97 386.92 Tender received and pending due to

shortage of funds

28 Rough cost estimate for construction of Judicial

Residences at Sector 12-A Panchkula

6/46/2012-5JJ-II

29.08.2013

1736.34 0.00 1736.34 Work yet not started. Str. Design under

preparation

29 construction of 1990 sft area judicial residential

house in SDO complex at Guhla in district

kaithal

6/74/2013-5JJ-II

21.10.2013

63.88 0.00 63.88 D/E and DNIT sent to Head office

30 Renovation of entrance gate and construction of

check post in New Sessions House at Ambala

City

6/21/2014-5JJ-II

03.04.2014

3.82 0.00 3.82

TOTAL 10628.21 4384.64 6354.85

Sr. No. Name of work

No. & date of Approval

Amount of

A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs

Status of work

Remarks

1 Construction of Superintending Engineer

Residence in PWD B& R colony at Kaithal

4/11/2009-1B&R (w) 46.57 29.91 Floor work in progress

2 Costruction of PWD (B&R) Colony at Kaithal 4/11/2009-1 B&R (W) 761.84 0.05 761.79 Work allotted

TOTAL 808.41 0.05 791.7

Sr. No. Name of work

No. & date of Approval

Amount of

A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs

Status of work

Remarks

1 Administrative approval for the construction of

Govt. Industrial Training Institute Mustafabad

Distt Yamuna nagar

Bhawan/ITI/Mustafabad/824

24.07.2013

805.13 0.55 804.58 Project not taken up due to non

availability of funds

2 Construction of new building of ITI Bharapur

(Naraingargh) in Ambala Distt.

Bhawan/ITI

11-Dec-2008

997.55 135.92 861.63 Work shop block excavation in foundation

is in progress

3 Construction of Industrial training Institute at

village Jaisinghpura in Distt. Karnal

A/A IT Deptt. No. 86

24-Jan-2013

428.56 0.28 428.28 Project not taken up due to non

availability of funds

Bank of sanctions as on 01.04.2014 for Housing Works under head 4216-C.O. Public works (Major Works)

Bank of sanctions as on 01.04.14 for ITI works under head 4250- C.O. creation of infrasturcuture for Development of Industrial Training (Major Works)

4 Construction of building of ITI at Madina in

Rohtak Distt.

Bhawan/ITI/Madina/466

29-Mar-2012

764.09 509.17 254.92 Work in physical progress. RCC of

column upto roof level completed and

shuttering is in progress.

5 Construction of Admn. & Workshop Block in

ITI at village Kansala in Rohtak District

B/ITI/Kansala654-57-B

6-May-2010

677.17 260.56 416.61 Work in physical progress. Admn block

slab completed. Front and back boundary

wall completed and plaster of Admn block

completed. Slab of G.F. laid for

workshop block. Parking of admn block

completed. Shuttering of F.F. two span is

in progress.

6 Construction of Admn. & Workshop Block in

ITI at Hassangarh in Rohtak District

B/ITI/Hassangarh/2013

2-Feb-2011

560.00 75.01 484.99 Work administratively approved. Work is

in progress. Slab GF and FF of workshop

block completed and admn block slab

completed. The brick work of GF is in

progress.

7 Construction of I.T.I at Fatehpur Billoch

Faridabad

NewITI/F.P. Billoach

10-Jun-2007

493.26 392.39 100.87 Work in physical progress. Work is in

progress on risk and ost of M/s Deep

Builders

8 Construction of ITI at Uncha Majra in Gurgaon

Distt.

FC &PS No. T-9

4-May-2010

1033.53 143.66 889.87 Work is in progress. 95% boundary wall

completed. 50% RCC slab of ground

floor of work shop laid. RCC column

work of rest portion up to roof level

completed. Foundation work of

administrative block is in progress.

Overall 25% work completed.

9 Construction of I.T.I. at village Pali in District

Faridabad (Administration Block, One

Workshop, Boundary wall & road parking etc.)

ITI/Pali/Expansion/365

6-Jan-2012

502.45 7.21 495.24 Tender case received back from head

office with the remarks to submit the same

after receipt of approval from client

department as per FD instructions issued

vide letter No. 5/6/5005-5 dated

14.10.2013

10 Administrative approval for the construction of

Govt. Industrial Training Institute Moujabad,

Distt Gurgaon

Bhawan/ITI/Moujabad/454

15.04.2013

424.36 0.28 424.08 Detailed estimate and DNIT received back

from Head office due to shortage of funds

11 Construction of ITI at Kushak in Palwal Distt. FC & PS IT & VE No. Nil 21-

Jun-2007

532.02 597.31 0.00 98% admn and work shop block and 95%

boundary wall completed and further work

is in progress

12 Construction in ITI Bhirdana in Fatehabad Bhawan/ITI/Bhirdana

5-03-2013

457.88 186.48 271.40 Ground floor slab laid.

13 Constn. of I.T.I. at Majra Piau (Narnaund) F.C. No. 1680

6-Oct-2011

504.60 511.65 0.00 Work completed.

14 Construction of New Govt. ITI Rania Distt Sirsa Bhawan/ITI/Rania/946

29.08.2013

732.26 0.42 731.84 Tender received unapproved due to non

availability of funds

15 Construction of I.T.I. Pinjupura (Kalayat) In

Kaithal Distt.

FCPS No. Bhawan/ITI/505

20-Sep-2011

738.71 512.72 225.99 Finishing work is in progress

16 Construction of ITI Bir Bangra at Rajound Distt.

Kaithal

PS to Govt. No. 4390

25-Oct-2012

644.98 240.82 404.16 Administrative block. Single storey, work

shop double storey. Administration block

slab laid and brick work completed and

momty roof slab laid. Work shop ground

floor slab laid and 2nd storey 75% roof

slab laid and B/W completed.

17 Administrative approval for the construction of

ITI Pabnawa Distt. Kaithal Bhawan/ITI/Pabnawa/637

26.06.2013

551.43 9.98 542.45 Approval received from financial

department and tender case sent to circle

office.

18 Construction of Ch. Surender Singh Memorial

I.T.I. Building at Tosham in Bhiwani District

(Workshop block only)

FC/New/ITI/Tosham/1106

1-Jul-2011

502.27 359.62 142.65 Work in progress. G floor and 1st floor

completed. Finishing in progress. Clause

II imposed vide No. 1758 dated 19.8.10

19 Constn. of Hospitality wing in at Siwani Khera

(Siwani) district Bhiwnai

Bhawan/ITI/Khera/547

24-Jan-2013

683.65 2.92 680.73 Project not taken up due to non

availability of funds and guidelines of

finance department

20 Administrative approval for the construction of

Govt. Industrial Training Institute Jamalapur

Distt Bhiwani

Bhawan/ITI/Jamalpur/748

17.07.2013

300.00 0.00 300.00 Project not taken up due to non

availability of funds and guidelines of

finance department

21 Construction of building of new I.T.I. at

Malrabas District Mohindergarh

Bhawan/ITI/Khera/457

13-Jul-2007

525.00 153.70 371.30 Work in progress departmentally. 100%

slab of Admn block laid. Plastering is in

progress

22 Construction of I.T.I. Assaudha in Jhajjar

District.

B/ITIAssaudah/1953

12-Oct-2011

281.60 267.32 14.28 Physically completed.

23 Construction of ITI Building at Bhaproda in

Jhajjar District

F.C. No. Bhaproad 5201

12-Aug-2009

658.60 487.93 170.67 Work in progress 95% work done. Work

for internal road/parking physically

completed

24 Construction of ITI at Dubaldhan in Jhajjar

District

PS Govt Hry No. 4577

24-Dec-2012

424.37 284.53 139.84 Work is in progress. Overall 25% work

completed.

25 Construction of ITI at village Pahadipur in

Jhajjar District

FC & PC No. 41-44

10-Jan-2013

578.00 238.72 339.28 Work is in progress. Overall 15% work

completed.

26 Construction of Administration Block &

Workshop Block in ITI at village Khudan in

Jhajjar District

FC&PC No. 58

2-Feb-2013

659.60 309.36 350.24 Work is in progress. Overall 15% work

completed.

27 Construction of Pandit Jage Ram Govt. ITI

Jahangirpur in Distt. Jhajjar

Bhawan/ITI/Jahangirpur

25-01-2013

416.72 160.55 256.17 Work is in progress

28 Expansion of Building of ITI, Kund Manethi in

Distt. Rewari

IT/KundManethi/1294-B-I

14-Dec-2009

768.08 572.86 195.22 Work physically completed.

29 Construction of New building of Rao Abhay

Singh Govt ITI, Saharanwas in Rewari Distt

PS Endst No: Bhawan/2172

9-Aug-2012

473.20 172.22 300.98 Ground floor roof slab and brick work

complated and first floor slab is in

progress

30 Administrative approval for construction of

Govt. Industrial Training Institute Kharkhara

Distt Rewari

Bhawan/ITI/Kharkhara/885

08.08.2013

500.00 0.00 500.00 A/A received on normative basis.

Detailed Drawings are awaited from Chief

Architect, Haryana. RCE is under

preparation

31 Construction of building of new I.T.I. at Rajlu

Garhi in Sonepat Distt

No. KC/Bhawan/ITI

14-Jan-2009

386.41 229.88 156.53 Action under clause II taken vide T.O. No.

5825 dated 19.7.2010. 1st storey and 2nd

storey slab completed. 3rd storey in

progress. D/E submitted by 31.1.2011

32 Admnistrative approval for construction of

special repair and new construction Raising of

boundary wall and earthwork filling in open

yard at Govt. ITI Julana in Jind

Bhawan/ITI/Julana/952

29.08.2013

18.35 0.00 18.35 Tender process of allotment

33 Administrative approval for the construction of

Pgd. Electrical Sub station in Govt. Industrial

Training Institute Behal Distt. Bhiwani

Bhawan/ITI/Behal/874

03.06.2013

21.55 0.00 21.55 Not taken up due to shortage of funds.

TOTAL 18045.38 6824.02 11294.70

Sr. No. Name of work No. & date of Approval Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction Rs.

Lacs 01.04.14

Status of work Remarks

1 Construction of New SDE PWD B&R office at

Pehowa in Distt. Kurukshetra.

FC & PS No. 1/14/2011-1(W)

14-May-2012

58.56 28.62 29.94 Structural work completed. Finishing

work such as plastering and flooring are in

progress

2 Administrative approval for construction of New

PWD Rest House at village Sirsagarh, Near

Dosarka Mullana in Ambala Distt.

1/29/2010-1 B&R (W) 173.52 89.76 83.76 Work in progress

3 Construction of 1st floor & 2nd floor of existing

Rest House in Sector -16A, Faridabad

4/23/2006-1B&R(W)

28-Dec-2011

259.80 0.78 259.02 Tender received on dated 20.12.2013 and

under process

4 Constructing of New Rest House at Fatehabad in

Fatehabad Distt.

FC&PS No. 1/22/2011

6-Mar-2012

179.52 110.96 68.56 Finishing work is in progress.

5 Constn. of PWD Rest House at Uchana in Jind

Distt.

14/02/2008-1B&R(w)

31-Oct-2011

116.50 0.27 116.23 The case of land acquisition has been

admitted on 8.11.12 in Hon'ble Pb. & Hry.

High Court titled as Baljeet Singh V/s

State case No.CWP 3380 of 2012. Next

date 26.5.14

6 Land Acquisition for construction of rest house

(B&R) at Uchana (Jind)

ACS no. 14/02/2008-1 B&R W

31-Oct-2012

62.93 0.00 62.93 Case for land acquisition is in Hon’ble

Punjab and Haryana High court. The next

date of hearing is 26.5.14

7 Construction of New Block No. II in PWD Rest

House at Kaithal.

FCPS No. 1/2/2009-1B&R(w)

22-Feb-2012

175.30 89.04 86.26 Structure work completed. Floor tile work

in progress.

8 Construciton of Nirman Sadan PWD B&R

Office Complex at Kaithal.

1/2/2009-1B&R(w)

29-Nov-2012

995.75 179.12 816.63 Basement, ground floor and first floor slab

laid

9 Construction of New PWD Rest House at Pundri

in Distt. Kaithal.

FC&PS No.1/4/2012-1B&R

7-May-2012

200.73 96.22 104.51 Doubly storey building. Main rest house

ground floor slab laid. First floor slab

laid. Boundary wall completed, flooring

in progress

BANK OF SANCTIONS AS ON 29.04.14 UNDER HEAD 4059- C.O. PUBLIC WORKS (MAJOR WORKS)

10 Construction of new PWD Rest House at

Charkhi Dadri in Bhiwani Distt.

1/39/2010-1B&R(W)

27-Aug-2012

182.53 3.83 178.70 Detailed estimate & DNIT under

preparation

11 Construction of PWD Rest House with 2 Nos.

440 Sft houses and SDO Office at Beri in Jhajjar

District

No.1/37/2010-1B&R(W)

19-Mar-2013

569.51 173.62 395.89 Work in progress

12 Construction of Nirman Sadan at Rohtak NO. 1/2/2011-1 B&R(W) 1779.8 4.53 1775.27 Work administratively approved. Work

started excavation completed. Footing is

in progress.

13 Construction of New PWD Rest House Gurgaon NO. 1/20/2012-1B&R(W) 737.19 0.00 737.19 Site not finalized yet

14 PWD Rest house at Bahadurgarh 1/6/2010-1B&R(W)

04.06.2013

489.02 0.02 489.00 Tender received and under process

15 PWD Rest house at Rai in Sonepat Distt Sanction received in UO form 1099.13 79.80 1019.33 Work is in progress

16 Construction of New Rest House at Hodal in

Palwal Distt.

1/18/11-1B&R (W) 185.55 0.00 185.55 Detailed estimate/DNIT under preparation

17 Construction of Memorial of Sardar Partap

Singh at Village Rasoi in Sonepat Distt.

1/13/2013-1 B&R (W) 415.51 0.69 414.82 Work in progress

18 Re-construction of PWD Rest House (Ekant

Bhawan) at Mussorie

1/2/2013-1 B&R (W) 662.51 0.00 662.51 Approval of local authorities is being

taken

Total 8343.36 857.26 7486.10

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs + new

works

Status of work

Remarks

1 Construction of road for Govt Engineering

College of Silani Kesho in Jhajar District

C13/2013/1220

14.06.2013

133.29 0.00 133.29 Work is in progress

2 Foundation stone laying ceremony of Extension

campus (Research & Development) of IIT Delhi

at village Badhsa

C13/2014/22463

20.12.2013

5.00 2.87 2.13

3 Providing & fixing RCC Posts and topographic

survey for Govt Engineering College at Jainabad

in Rewari Distt

C14/2013/21481

16.07.2013

2.39 0.00 2.39 Work is in progress

Bank of sanctions as on 01.04.14 under head 4202- Capital outlay, on education, sports, art, and culture for the year 2014-15

4 Contruction of Rao Birender Singh State

Institute of Engineering & Technology, Jainabad

in Rewari District

C14/2013/21838

03.09.2013

1200 0.00 1200 Administrative approval received

Tentative. R/C/E based based on

Architectural drawings component wise

stands submitted to Director General

Technical Education Haryana vide EIC

No. 1466 dated 18.02.2012, 1674-80,

1682-86, dated 25.02.14, 1723-27/W-I

dated 28.2.14

5 Construction of boundary wall and check post

for Rao Birender Singh State Institute of

Engineering & Technology at village Zainabad,

distrist Rewari

35/3/2010-2 TE

09.01.2014

208.40 0.00 208.40 Detail estimate and DNIT stands re-

submitted to Head office on dated

07.04.2014

6 Construction of Foundation stone laying

ceremony for indian institute of information

technology at village kiloharad distt sonepat and

other works

C15/2014/22446

20.12.2013

15.00 0.00 15.00

TOTAL 1564.08 2.87 1561.21

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs + new

works

Status of work

Remarks

1 Construction of building of observation home for

children at Madhuban in Karnal

504/SW (3)

22.03.14

416.05 0 416.05 New work4235

2 Construction of building of special home for

children at Madhuban in Karnal

503/SW (3)

22.03.14

333.09 0 333.09 New work4235

3 Construction of building of Children Home,

Faridabad

10454 ICPS/2014

24.03.14

234 197.27 New work2235

4 Construction of building of Children Home,

Gurgaon

10449/ICPS

24.03.14

366 324.30 New work2235

5 Construction of building of Special Home,

Karnal

10459 ICPS/2014

24.03.14

333.09 291.29 New work2235

TOTAL 1682.23 1562

Bank of sanctions as on 01.04.14 under head 4235 and 2235- Social welfare deposit works for the year 2014-15

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs + new

works

Status of work

Remarks

1 Alteration in old and new Mini Secretariat,

Gurgaon

3/51/2013-3 Lab 55.74 0 55.74 Fresh approval

2 Construction of Labour court complex at

faridabad

3/46/2008-3 Lab 1406 0 1406 Work in physical progress. RCC

foundations complete, 50 % RCC wall of

basement casted and casting of RCC

columns of basement is in progress.

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs + new

works

Status of work

Remarks

1 Construction of Govt. College Building at

Chhachhrauli (Double storey building)

R/A/AF&C1/4-06-Works (2)

20-Jul-2012

878.45 677.46 200.99 Work completed.

2 Construction of P.G. Block in Govt. College

Sector-14, Karnal

C&S No. 4/33-06

4-Sep-2008

252.11 467.82 0.00 Work is in progress. Outside plaster work

is in progress

3 Construction of Multipurpose / Auditorium Hall

in Govt. College Karnal

C&S No. 4/33-06

4-Sep-2008

383.79 287.7 96.09 Work is in progress. Ground floor

completed and FF slab 50% completed.

Work 2nd storey in progress

4 Construction of 6 No. Class rooms in Govt.

College at Matak Majri in Karnal Distt

FCPS No. KW-4/7-08Works-2

14-Nov-2011

137.25 131.3 5.95 Physically completed.

5 Construction of 8 No. Class rooms in Govt.

College Sector-14, Karnal.

FC&PS No. KW/4/7-08 (W)

14-Nov-2011

151.66 25.27 126.39 Work is in progress. Roof slab 100%

completed. Cement plaster is in progress.

Bank of sanctions as on 01.04.14 for Education works under head 4202- C.O. Higher Education (Major Works)

Bank of sanctions as on 01.04.14 under head 4250- Capital outlay, " 201-Labour Sub-Head 96 construction of Labour Court complex for the year 2014-15

6 Construction of the building of Govt. College

Bapoli in distt. Panipat

FC&PS No.1/13-2010

4-Oct-2011

1366.62 243.17 1123.45 82% work of boundary wall & 100%

columns casted upto G.F. roof level, 65%

column casted upto 1st floor, 75% ground

floor slab laid and 30% slab 1st floor laid,

Earth filling completed, brick work in

ground/1st floor in progress.

7 Constg. Govt. College at Sector-18 at Panipat in

distt. Panipat.

FC&PS No. 1/5-2008

3-Oct-2011

1433.89 673.61 760.28 90% Work of Boundary wall completed.

Structure completed. Kota stone

flooring/plaster work & road & parking

work in progress.

8 Construction of Govt. Women College at Lakhan

Majra in Rohtak Distt.

1/6-2008 works (2)

27-Feb-2012

866.5 574.14 292.36 Work completed and inaugurated by

Hon'ble CM Haryana on dated 27.9.2012.

Work administratively approved. Work is

in progress. PCC work completed. 100%

column upto roof level has been

completed & 80% slab of GF completed.

9 Construction of Teaching Block/Class Rooms in

Govt. College for women at Rohtak

KW 4/7-08 Works (2)

14-Nov-2011

217.81 201.82 15.99 Work in physical completed.

10 Construction of Teaching Block/Class Rooms in

Govt. College for Boys at Rohtak

KW 4/7-08 Works (2)

14-Nov-2011

217.81 211.9 5.91 Work in physical completed.

11 Construction of S.C. / B.C. Hostel in I.C. Govt.

Women College at Rohtak

1/17-99 Works (2)

26-May-2011

160.31 50.68 109.63 Work in physical completed.

12 Construction of Multipurpose Hall (Auditorium)

in Govt. College at Meham in Rohtak Distt.

KW4/90-2007 works (2)

24-Nov-2011

385.08 203.26 181.82 Work in physical progress. RCC column

completed. First upto slab level complete

and second level slab completed. Stage

side structure work completed. 3rd level

slab in front side completed & in middle

portion slab is completed.

13 Construction of Teaching-cum-Admn. Block

with check post & main gate in Pt. Neki Ram

Sharma Govt. College, Rohtak

4/8-2007 works (2)

27-Jun-2012

784.54 460.59 323.95 Work in physical progress. Structure

work completed. 80% brick work

completed, 70% flooring completed. 70%

plaster completed. Balance in progress &

tile trassing is in progress.

14 Const. of Commerce teaching block (12 Room)

in Govt. College Meham in Rohtak Distt.

4/13-13 works (2)

8-May-2013

217.81 101.3 116.51 Work is in progress. Excavation work

completed. PCC work completed. RCC

footing & plinth level been completed.

Column upto roof level has been laid.

G.F. slab has been completed. Column

upto F.F. slab is in progress

15 Const. of Govt. College at Sampla 1/2-12 works (2)

5-June-2013

1366 0.78 1365.22 Work administratively approved. Work

allotted to the agency and excavation of B.

wall is in progress. 25% B. wall of

foundation of B wall completed upto DPC

level.

16 Construction of building of Government

College, Kheri Gujran in Faridabad District

FC&PS Memo No. 10510/WI

11-Dec-2012

1292.4 407.23 885.17 Work in physical progress. Casting of

ground floor roof slab 90% completed and

casting of 1st floor roof slab 80%

completed. Shuttering of rest of the slab is

in progress. Overall 40% work

completed.

17 Construction of Mulitipurpose Hall in Govt.

College Sector-14 Gurgaon

A/A 4/114-2007-W(2)

24-Nov-2011

726.03 390.27 335.76 Finishing work is in progress

18 Construciton of the Building of Dr. B.R.

Ambedkar Govt. College , Palwal

1/4-2011 works (2)

13-Oct-2011

1306.66 955.82 350.84 Physically completed & handed over to

client deptt on 05.03.2014

19 Construction of the Building of Govt. College

for Women, Hathin in Palwal Distt.

PS, HR/1/2-11 works (2)

8-Aug-2013

1272.62 0 1272.62 Estimate and DNIT under preparation

20

Construction of the Building of Govt. College

for Women at Ratia in Fatehabad Distt.

FS No. 1/1-12

16-May-2013

1051 4.04 1046.96 No tender received on 30.09.2013, and

06.12.2013. Tender received on

28.01.2014 and under process.

21 Construction of Govt. College at Dabwali Distt.

Sirsa.

3/46-98-works-02

8-Nov-2011

1512.3 784.91 727.39 Finishing work pending.

22 Construction of Building of Women Wing of

Govt. National College at Sirsa in Sirsa Distt

2/5-07 works (2)

12-Aug-2013

1740 0 1740 Detailed estimate submitted to Head office

for Technical Sanction.

23 Construction of Govt. College at Barwala in

Distt. Hisar

FC No 1/7-2007 Works (2)

17-Oct-2011

1376.52 1114.56 261.96 Work is in progress

24 Construction of Teaching block/ Class room at

Jind

FC KW4/7-08 Works (2) 14-

Nov-2011

217.81 200.75 17.6 Work completed.

25 Construction of Govt. College for Women at

Safidon in Jind Distt.

FC&PS No. 1/8-11 works (2)

6-Feb-2013

1630.84 230.86 1399.98 Column completed and roof slab in G.F.

in progress

26 Constn. of Teaching Block/Class Rooms in

Govt. College at Narwana

FC KW4/7-08 Works (2) 14-

Nov-2011

217.81 209.48 8.33 Finishing work is in progress.

27 Constn. of Boundary wall in Govt. College,

Narwana (Jind)

DG No. 4/30-2008 Works (2)

17-May-2012

53.37 39.62 13.75 Physically completed

28 Construction of Ch. Bansi Lal Govt. College for

women at Tosham District Bhiwani.

FC&PS No. 1/2-06 Works (2)

28-Jul-2011

1027.57 818.13 209.44 Tender for balance work is under process

at risk and cost of agency

29 Construction of 6 class rooms in Govt. College

Loharu in Bhiwani Distt.

KW 4/7-08 Works (2)

14-Nov-2011

137.25 82.22 55.03 Physically completed

30 Construction of the Building of Govt. College

for Women, Behal in Bhiwani Distt

1/3-12 Works (2)

30-May-2013

862.27 4.04 858.23 DNIT approved by Head office. Fresh

sanction of planning and finance

department has been sought for inviting

tenders vide se bhiwani memo No9. 4306

dt 5.12.13, which is awaited

31 Construction of the building of Govt. College for

women, Bwani Khera (Bhiwani)

Memo No. 1/4-07 works (2)

10.05.2013

1116.12 5.06 1111.06 Approval of finance department

32 Construction of Building for Govt. College for

Women, Mohindergarh (District Mohindergarh).

FC&PS 10/50-08 Works (2)

27-Sep-201

656.77 617.8 38.97 Physically completed.

33 Construction of teaching block in Govt. College,

Mahindergarh.

FC&PS KW 4/7-08 Works (2)

14-Nov-2011

217.81 117.07 100.74 Physically completed.

34 Construction of teaching block in Govt. College,

Narnaul.

FC&PS No. 4/1/10-2 (2)

17-Feb-2012

217.81 163.19 54.62 Physically completed.

35 Construction of Art Block of 12 Rooms in Govt.

College for Women at Narnaul in Mohindergarh

District

FC&PS No. 4/1/10- 2(2)

17-Feb-2012

217.81 142.14 75.67 Physically completed.

36 Const. of the science block in Govt. College,

Nangal Chaudhary (Mahindergarh)

1/8-12 works (2)

19-July-2013

322.18 0 322.18 Relaxation in FD instructions not yet

received

37 Construction of Building of Govt. College at

Badli in jhajjar distt.

FC&PS E D No. 4/38-08 W2

25-Jul-2012

892.35 713.66 178.69 Building completed. Boundary

wall/scooter stand is in progress

38 Constructing of Commerce Block, Computer

Lab & Language Lab in Govt. College at

Bahadurgarh

FCPS No. KW 4/7-08

14-Feb-2011

197.04 104.77 92.27 Physically completed.

39 Construction of Govt. College (Women Wing)

Bahadurgarh in Jhajjar District.

FS &PS No. 4/27-2008 (W)

7-Oct-2011

1162 8.87 1153.13 Work in progress.

40 Construction of 12 Nos. Class Rooms/Arts

Block & Multipurpose Hall in Govt. College,

Jhajjar

FC No. KW4/51-08

30-Aug-2010

1137.43 427.86 709.57 Work upto lintel level, 1st slab level

completed. Overall 30% work completed.

41 Construction of Teaching Block & 12 Nos. Class

room in Govt. College, Jhajjar

FCPS No. KW-4/7-08Works-

4-Feb-2011

150 177.64 0 Work in progress. Over all 95% work

completed.

42 Construction of 8 Class Rooms in Govt. College,

Dujana in Jhajjar District.

FCPS No. KW4/7-08 Works

14-Feb-2011

100 142.83 0 Work completed

43 Construction of Admn. Block, Library,

Computer lab in Govt. college Dubaldhan in

Jhajjar Distt.

FC & PS Memo No. 4/96/2006

works (2)

30.11.2012

245.42 148.65 96.77 Work is in progress. Overall 25% work

completed.

44 Const. of Govt. College at Bahu in Jhajjar

district

1/11-12-works (II)

19-July-2013

1272.62 290.32 982.3 Work recently allotted.

45 Construction of the Science block in Govt.

College Jhajjar

Memo No. 1/8-12 works (2)

19.07.2013

322.18 0 322.18

46 Construction of 8 Nos. Class Room and 2 Nos.

Computer Labs in Govt. College at Nagina in

Mewat District.

FC&PS No. 1309-15/WI

9-Feb-2012

207.81 137.88 69.93 Structure alongwith brick work plastering,

flooring completed and finishing in

progress. Principal government college

provided site free from trees on

30.11.2013

47 Construction of the Building for Govt. College

for Women, Salaheri in Mewat District.

FC&PS No. 1/7-10 Works (2)

31-Jan-2012

1204 320.3 883.7 Slab of Ground floor casted and shuttering

of 1st floor is in progress. 70% boundary

wall in progress

48 Construction of Govt. College for women at

Rewari

NO. 01/1-07 works (2)

2-Jan-2012

1770.56 1159.83 610.73 Main building completed & partially

handed over to the client deptt & Girls

hostel work will be completed upto

30/06/2014. The work of Boundary wall

completed. Revised A/A received is Rs.

17.71 Cr.

49 Construction of building for Govt. College for

Women at Gurawra in Rewari Distt.

1/9/08 (W) 2

4-Oct-2011

577.57 505.58 71.99 College Building completed. Boundary

wall, road & parking is in process.

50 Construction of building of Govt. college

Kharkhara (Rewari).

No. 1/10-10 Works (2)

24-Jan-2011

1063.78 383.16 680.62 G.F. Slab 90% laid, 1st floor slab 70%

and 2nd floor slab 70% laid. Brick

wall/plaster in progress in GF, FF and

second floor

51 Constrction of Govt. College Kosli in Rewari

Distt.

FC& PS No. Memo No.

1/6/2011

03-Apr-2013

1366.62 171.68 1194.94 Ground floor and FF roof slab is in

progress.

52 Construction of Govt. College (Boys) in Village

Barota (Gohana) in Sonepat Distt.

4/11-11 Works (2)

21-Aug-2012

1355.11 263.42 1091.69 Work is in progress

53 Construction of Govt. College Kharkhauda in

Village Pipli Block Kharkhauda in Sonepat

Distt.

1/3-11 Works (2)

21-Aug-2012

1393.91 479.55 914.36 Work is in progress

54 Construction of back side parking in the campus

of shikha Sadan, Sector-5, Panchkula

Memo No. KW 3/35-2003

works (2)

1309.2013

21.03 0 21.03 New sanction

55 Construction of Govt. College Chhara Jhajjar Memo No. 1/15-12 Works (2) 1366 0 1366 Detail estimate and design is under

preparation with the consultant

56 Construction of the Buildings of Govt. College

Jasaur Kheri Jhajjar

1/7-13

dated 30.12.13

1272.62 0 1272.62 Detail estimate and design is under

preparation with the consultant

57 Special repair for raising and fencing of

boundary wall of Govt. College Sector-1,

Panchkula

4/5-13 works (2)

13.11.2013

38.95 0 38.95 New sanction

TOTAL 43109.58 16033.99 27362.31

Sr. No.

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs

Status of work

Remarks

1 Construction of 8 Nos. Class Rooms of Govt.

Girl Sr. Sec.School at village Kiloi in Rohtak

District

2/43-2013 works (2)

19-Jul-2013

92.79 91.38 1.41 Work completed except fitting of EI and

PH Services

2 Construction of Govt. High School at Baland in

Rohtak Distt.

9//4-2011 works (2)

21-Mar-2012

374.63 144.7 229.93 Work in physical progress. Excavation

completed &RCC footing completed upto

plinth beam. 95% plinth beam completed.

Column of east south and west side

completed. Flooring work in progress.

50% slab to east side laid

3 Const. of Govt. Girls Sec. School at Rohtak 2/43-2013 works (2)

19-July-2013

873.44 166.88 706.56 Work administratively approved. PCC

comleted for all blocks and RCC footing

completed and one side block completed

upto roof level. Right side of roof slab

completed. Binding of steel of front block

is in progress

4 Construction of Govt. Sr. Sec. School at

Kalanaur in Rohtak

2/43-2013 works (2)

19-July-2013

568.08 0.00 568.08 Work adminsitratively approved. Detail

estimate and DNIT sent to head office for

approval

5 Addition/construction/alteration of Govt. Girls.

Sr. Sec. School at Dabwali in Sirsa

9/6-20-WII

23-Feb-2011

220.88 170.97 49.91 Work physicall completed but financial

liabilities pending

6 Construction of Building of Govt. Girls Sr. Sec.

School Mandothi in Jhajjar District

FC&PS Govt. No. 9/4-2011

20-Sep-2011

142.24 95.81 46.43 Physically completed.

7 Construction of Building of Govt. Girls Sr. Sec.

School Khudan in Jhajjar District

2/43/2013

09.07.2013

397.33 69.10 328.23 Work is in progress

TOTAL 2669.39 738.84 1930.55

Bank of sanctions as on 01.04.14 for Secondary Education under head 4202- C.O. Public Works (Major Works)

Bank of sanctions as on 01.04.14 under head 4059- Excise &Taxation-16 Major works for the year 2014-15

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs + new

works

Status of work

Remarks

1 Construction of District Headquarter office

building for excise & taxation department sector -

12 faridabad

2795-ET-4-2014/15199 3131 0 3131 Fresh approval

2 Construction of District level office building for

Excise & Taxation department, sector 32 at

Gurgaon

3/46/2008-3 Lab 3681 0 3681 Fresh approval

TOTAL 6812 0 6812

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs + new

works

Status of work

Remarks

1 Construction of District Headquarter office

building for excise & taxation department sector -

12 faridabad

2795-ET-4-2014/15199 3131 0 3131 Fresh approval

2 Construction of District level office building for

Excise & Taxation department, sector 32 at

Gurgaon

3/46/2008-3 Lab 3681 0 3681 Fresh approval

TOTAL 6812 0 6812

Sr. No.

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Bank of sanctions

as on 01.04.14 for

under head 4210-

C.O. Medical -

Hospital &

Dispensary

Balance

sanction as on

1.4.14

Rs. Lacs

Status of work

Remarks

1 Construction of Additional block in the campus

of existing Civil Hospital at Sohna in Gurgaon

District

No. 20/93/2013-5 HB III

26.07.2013

102.27 0 102.27 Detail estimate/ DNIT received vide EIC

memo No. 520/WI dated 21/01/2014

unapproved with the remark that resubmit

the detailed estimate / DNIT after receipt

of approval from the client department /

Govt, as per FD instructions issued vide

letter No. 5/6/2005-5 B&C dated

14/10/2013

Tender to be called after model code of conduct is over

Bank of sanctions as on 01.04.14 under head 4059- Excise &Taxation-16 Major works for the year 2014-15

2 Construction of 50 bedded Hospital at Tosham

in Bhiwani

No. 20/171/2013- 5HB III

24.10.2013

1222.43 50 1172.43 Tender to be called after model code of conduct is over

3 Construction of 50 bedded Hospital at Bawani

Khera with additional ward of 20 bedded in

Bhiwani Distt.

No. 20/93/2013-5 HB III

8.07.2013

102.27 0 102.27 Approval to finance department awaited Tender to be called after model code of conduct is over

4 Construction of SHC, Gangicha Jaat Distt.

Rewari

No. 20/134/2013-5 HB

09.09.2013

24.22 0 24.22 Work started

5 Construction of SHC Luhari, Ukhal Chana,

Kutani, Ahri and Salodha Distt. Jhajjar

No. 20/158/2013-5HB III

Dated 07.10.2013

185.52 12.37 173.15 Tender invited

6 Construction of PHC with residential

accomodation at Village Bahrana District Jhajjar

No. 20/167/2013-5 HB III

07.10.2013

380.7 146.72 233.98 Work started

7 Construction of SHC Jhatti Pur, Atolapur,

Karhans, Jorasi Sarf Khas Distt. Panipat

No. 20/125/2013-5HB III

12.08.2013

128 0 128 Tender approved

8 Constn. of Community Health Centre along with

Residential accommodation in village Naraina in

Panipat distt

ACS No. 20/206/2013

04-March-2014

695.19 0 695.19 Detailed estimate and DNIT under process Tender to be called after model code of conduct is over

9 Constuction of CHC Bapoli at Panipat D.G.H.S. No. 20/200/2012

19.-Dec-2012

690.85 0 690.85 Tender received to be approved after

model code of conduct is over

10 Construction of PHC at Dhotter (Sirsa) No. 20/111/2013-5 HB III

11.09.2013

339.22 0 339.22 Tender received on 04.12.2013 and under

process in circle office

11 Construction of PHC at Jui Kalan (Bhiwani) No. 20/131/2013-5HB III

29.08.2013

375.4 0 375.4 Approval of finance department awaited Tender to be called after model code of conduct is over

12 Construction of PHC and Residential Building,

Khairati Khaira (Fatehabad)

No. 20/92/2013- 5 HB III

16.08.2013

207.27 0 207.27 Tender received on 18.11.2013 and under

process in Head office

Tender received to be approved after model code of

conduct is over

13 Construction of CHC Jhansa with residential

accomodation at Jhansa in district Kurukshetra

No. 20/99/2013-5 HB III

08.07.2013

690.85 0.01 690.84 Work at DPC level

14 Construction of SHC Raiya (Jhajjar) No. 20/98/2013-5 HB II

08.07.2013

27.7 0 27.7 Work in progress

15 Construction of PHC Talu (Bhiwani) with

residential accomodation

No. 20/95/2013-5 HB III

24.06.2013

354.98 0 354.98 Tender approved

16 Up gradation of CHD into 50 bedded hospital at

Assandh in Karnal

PS HD No. 20/85/13 5 HB III

08.10.2013

77.8 0 77.8 DNIT/Detailed estimate under process Tender received to be approved after model code of

conduct is over

17 Up gradation of CHD into 50 bedded hospital at

Nilokheri in Karnal District

No. 20/83/2013-5 HB III

18.06.2013

73.99 0.12 73.87 DNIT under process Tender received to be approved after model code of

conduct is over

18 Construction of Primary Health Centre Nindana

Tigari Distt. Rohtak

No. 20/7/2014- 5HB III

17.01.2014

360 0 360 Tender received to be approved after

model code of conduct is over

19 Construction of Sub Health Centre Kultana

Distt. Rohtak

No. 20/7/2014- 5 HB II

17.01.2014

35 0 35 DNIT under approval

20 Construction of Primary Health Centre Jahajgarh

Disstt. Jhajjar with residendial accomodation

No. 20/7/2014- 5 HB II

17.01.2014

321.64 0 321.64 Tender approved

21 Construction of Primary Health Centre Ismila

Distt. Rohtak

No. 20/7/2014- 5 HB II

17.01.2014

360 0 360 Tender received to be approved after

model code of conduct is over

TOTAL 5430.6 159.22 5271.38

Sr. No. Name of work No. & date of Approval Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs + new

works

Status of work Remarks

1 Construction of residential quarter in the campus

of Tehsil building at Gharaunda in Karnal Distt.

FC & PS No. 348

11-Jan-2012

148.06 0.09 147.97 Work recently allotted to the agency

2 Construction of residential houses for Distt.

Administration Revenue officers in the campus

os (Residential colony) Mini Secretariat at

Panipat

EIC No. 482/WI

12-Jan-2012

406.02 226.98 179.04 Plastering and flooring work in progress in

DC, SDM, CTM Residence and 4 Nos.

1900 sft residence slab laid of 1st floor, 1

no houses columns of 1st storey completed

upto roof level and work in ADC house

upto plinth beam

3 Construction of house (24 Nos. 450 sft, 36 Nos.

650 sft, 36 Nos, 800 sft & 20 Nos. 1300 sft area)

in officers colony, Sector-15 A, Faridabad

30-R-6-2012/1753

10-Feb-2012

2256.78 9.34 2247.44 Work administratively approved but not

tendered yet. Detailed estimate and DNIT

received back from Head office with the

remarks that the same may be sent to next

financial year due to paucity of funds

4 Construction of House (2 Nos. 2800 sft area) in

officers colony, Sector 15-A Faridabad

887-R-6-2012/5296

31-May-2012

137.23 63.51 73.72 Structure completed including internal

plastering and external plastering is in

progress. Overall 55% work completed

5 Construction of (130 Nos.) Residential House

for revenue staff in Mini Sectt. At Sirsa Distt.

330-R-6-2013/2655

4-Mar-2013

2461.17 5.32 2455.85 Detailed esimate and DNIT submitted to

Head office vide Hisar No. 2267 dated

3.9.13

TOTAL 5409.26 305.24 5104.02

Sr. No.

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs

Status of work

Remarks

Bank of sanctions as on 01.04.14 under head 4216- C.O. on Housing-(Plan) District Administration-Major Works

Bank of sanctions as on 01.04.2014 for Housing-Administration of Justice Works under head 4216-C.O. (Major Works)

1 Construction of 1 no. JMIC houses for CJM in

the Judicial Complex at Pehowa in Distt.

Kurukshetra

Addl. Ch. Secy. 6/42/11-5

21-Dec-2012

61.83 34.34 27.49 Structural work completed. Finishing are

in progress

2 Constn. Of 9 nos. Houses (6 nos. JMIC/CJM &3

nos. ADJ houses) in D.C. Colony, Kurukshetra

FC&PS 6/47/2008-5JJ-II

21-Nov-2011

569.73 390.37 179.36 6 Nos. JMIC houses structure work

completed upto plastering stage and

marble stone flooring and heat resistance

tile terracing is in progress and 3 Nos.

ADJ houses structure work completed and

marble stone flooring is in progress.

3 Construction of Judicial Houses in Sector -15A,

Faridabad

6/1/2009-5JJ-II

18-Jun-2012

761.61 379.37 382.24 Work in physical progress. (i) Work of 3

Nos. ADJ Houses completed upto 1st floor

roof level. (ii) Work of 5 Nos. JMIC

houses completed upto 1st floor roof level

and 5 Nos. JMIC houses completed upto

Ground floor roof level and plastering is in

progress.

4 Construction of Judicial officers Residence in

SDO(civil) cum Judicial Complex at Ratia

F.C. 6/55/2008-5jj(ii)

8-Dec-2008

54.58 64.98 0.00 Work in progress

5 Construction of Judicial officers residence in the

campus of SDO Civil-Cum Judicial at Tohana in

Fatehabad Distt.

FC&PS No. 6/14/2012

22-Feb-2012

106.09 150.81 0.00 Structure completed. Work in progress

6 Construction of 3 Nos. 1900 sft houses in

Judicial Complex at Hansi.

FC&PS No. 6/75/2011

9-Dec-2011

167.10 161.01 6.09 Work completed.

7 Constn. of Judicial Houses at Ellenabad in Sirsa

Distt.

No. 6/89/2011-5JJ-II

6-Jan-2012

113.07 119.06 0.00 90% work completed-Work is in progress

8 Construction of proposed house type 1900 sft.

covered area for Civil Judge Senior and Junior

Division at Safidon in Jind Distt.

FC&PS No. 6/18/2012-5JJ-II

22-Feb-2012

142.00 121.70 20.30 Plaster work completed. Floor finishing

in progress

9 Construction of 2 Nos. A.D.J. Residential

Houses and 4 Nos. Civil Judge (Jr. Divin.) in

Civil Station area at Jind in Jind Distt.

A.C.S. No 6/40/2012-5JJ

19-Jun-2012

480.28 324.05 156.23 Joinery flooring and finishing is in

progress

10 Constn. of 1900 sft. area Judicial Residential

House(CJM/Senior Divn. Judge) in SDO(Civil)

Complex at Narwana

6/27/2008-5JJ-II

13-Dec-2011

127.39 91.15 36.34 Physically completed.

12 Construction of Residence of District and

Sessions Judge at Bhiwani

FC&PS 6/63/09-5JJ-II

4-Jun-2010

79.32 99.37 0.00 Building completed. Finishing work in

progress

13 Construction of 3 Nos. residence for Addl. Distt.

& Session Judge and 3 Nos. for Chief Judicial

Magistrate at Bhiwani

6/63/2009-5JJ-II

9-Nov-2011

415.34 445.36 0.00 90% work completed. Further work in

progress

14 Construction of 7 Nos. House for Judicial

Officers, ADJs (3 Nos.) CJM (1 No.) and 3 Nos.

for Civil Judge Junior Division in Mini Sectt. at

Narnaul in Mohindergarh Distt.

6/13/2013-5JJ-II

15-Mar-2013

432.58 0.46 432.12 Tender not yet approved due to code of

conduct

15 Construction of 5 Nos. House for Judicial

Officers (1) No. for Civil Judge (Sr. Division)

and 4 Nos. for Civil Judge (Jr. Division) in

Judicial Complex at Mohindergarh in

Mohindergarh District.

6/10/2013-5JJ-II

18-Mar-2013

296.36 0.46 295.90 Tender not yet approved due to code of

conduct

17 Constn. of 1 No. for Civil Judge (Senior

Division) & 2 Nos. houses (Junior division)

1900 sft area house at Gohana in Sonepat Distt.

No. 6/35/2012-5jj-II

13-Jun-2012

189.75 159.96 29.79 95% work completed and balance work is

in progress

18 Constn. of 1 No. for Civil Judge (Senior

Division) & 2 Nos. houses (Junior division)

1900 sft area house at Ganaur in Sonepat Distt.

NO. 6/392012-5JJ-II

19-Jun-2012

129.00 30.61 98.39 15% work completed and balance work is

in progress

19 Constn. of 10 Nos. Residential houses for

judicial officers or various categories in Mini

Sectt at Sonepat

No. 6/36/2012-5JJ-II 791.25 318.76 472.49 80% work completed and balance work is

in progress

21 Const. of Houses for C.J.M. Division Judge at

Kosli in Rewari Distt

6/11/2013-5JJ-11

15-Mar-2013

138.68 0.00 138.68 Tender received from head office for

extending the validity

22 Const. of ADJ 4 No., SDJ 2 No. and CJM 2 No.

Judicial houses at Rewari in Rewari Distt.

6/12/2013-5JJ-11

15-Mar-2013

610.30 2.51 607.79 Work allotted recently. Some

modification in site desired by District and

session judge/DC rewari

23 Const. of 14 Nos. houses for Judicial officers, 2

Nos. for ADJs, 2 for CJSD, 1 No. for CJM, 9 for

CJJD at Hisar

6/24/2013-5JJ

15-Mar-2013

838.21 133.97 704.24 Work in progress

24 Const. of 6 No. houses having 1900 sft. Area of

each house for CJM and Senior division judge at

yamuna nagar

C.Sec.Govt.Hr.6/73/2013

24-Jun-2013

418.41 0.01 418.40 Tender received back due to non approval

25

Const. of residential houses of various categoreis

for the judicial officers in the campus of

(Residendial Colony) Mini Sectt. Panipat

T/S vide EIC No. 8041

9-Nov-2011

1465.34 1314.12 151.22 Work completed except misc. work

internal public health EI joinery and road

junction

26 Construction of Senior Judge Residence (CJM)

1900 sft area House in the campus of Judicial

Complex at Assandh District Karnal

A/A C.S. No. 6/59/12-5

19-June-2012

48.06 41.24 6.82 Work is in progress

27 Const. of 1 Nos. CJM House and 4 Noss. JMIC

Houses in Sector-13, Part-B at Bahadurgarh in

Jhajjar Distt.

6/82/2013-5-JJ-II.

8-Jul-2013

387.89 0.97 386.92 Tender received and pending due to

shortage of funds

28 Rough cost estimate for construction of Judicial

Residences at Sector 12-A Panchkula

6/46/2012-5JJ-II

29.08.2013

1736.34 0.00 1736.34 Work yet not started. Str. Design under

preparation

29 construction of 1990 sft area judicial residential

house in SDO complex at Guhla in district

kaithal

6/74/2013-5JJ-II

21.10.2013

63.88 0.00 63.88 D/E and DNIT sent to Head office

30 Renovation of entrance gate and construction of

check post in New Sessions House at Ambala

City

6/21/2014-5JJ-II

03.04.2014

3.82 0.00 3.82

TOTAL 10628.21 4384.64 6354.85

Sr. No.

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs

Status of work

Remarks

1 Construction of Superintending Engineer

Residence in PWD B& R colony at Kaithal

4/11/2009-1B&R (w) 46.57 29.91 Floor work in progress

2 Costruction of PWD (B&R) Colony at Kaithal 4/11/2009-1 B&R (W) 761.84 0.05 761.79 Work allotted

TOTAL 808.41 0.05 791.7

Sr. No.

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs

Status of work

Remarks

1 Administrative approval for the construction of

Govt. Industrial Training Institute Mustafabad

Distt Yamuna nagar

Bhawan/ITI/Mustafabad/824

24.07.2013

805.13 0.55 804.58 Project not taken up due to non

availability of funds

2 Construction of new building of ITI Bharapur

(Naraingargh) in Ambala Distt.

Bhawan/ITI

11-Dec-2008

997.55 135.92 861.63 Work shop block excavation in foundation

is in progress

3 Construction of Industrial training Institute at

village Jaisinghpura in Distt. Karnal

A/A IT Deptt. No. 86

24-Jan-2013

428.56 0.28 428.28 Project not taken up due to non

availability of funds

4 Construction of building of ITI at Madina in

Rohtak Distt.

Bhawan/ITI/Madina/466

29-Mar-2012

764.09 509.17 254.92 Work in physical progress. RCC of

column upto roof level completed and

shuttering is in progress.

5 Construction of Admn. & Workshop Block in

ITI at village Kansala in Rohtak District

B/ITI/Kansala654-57-B

6-May-2010

677.17 260.56 416.61 Work in physical progress. Admn block

slab completed. Front and back boundary

wall completed and plaster of Admn block

completed. Slab of G.F. laid for workshop

block. Parking of admn block completed.

Shuttering of F.F. two span is in progress.

6 Construction of Admn. & Workshop Block in

ITI at Hassangarh in Rohtak District

B/ITI/Hassangarh/2013

2-Feb-2011

560.00 75.01 484.99 Work administratively approved. Work is

in progress. Slab GF and FF of workshop

block completed and admn block slab

completed. The brick work of GF is in

progress.

7 Construction of I.T.I at Fatehpur Billoch

Faridabad

NewITI/F.P. Billoach

10-Jun-2007

493.26 392.39 100.87 Work in physical progress. Work is in

progress on risk and ost of M/s Deep

Builders

Bank of sanctions as on 01.04.2014 for Housing Works under head 4216-C.O. Public works (Major Works)

Bank of sanctions as on 01.04.14 for ITI works under head 4250- C.O. creation of infrasturcuture for Development of Industrial Training (Major Works)

8 Construction of ITI at Uncha Majra in Gurgaon

Distt.

FC &PS No. T-9

4-May-2010

1033.53 143.66 889.87 Work is in progress. 95% boundary wall

completed. 50% RCC slab of ground

floor of work shop laid. RCC column

work of rest portion up to roof level

completed. Foundation work of

administrative block is in progress.

Overall 25% work completed.

9 Construction of I.T.I. at village Pali in District

Faridabad (Administration Block, One

Workshop, Boundary wall & road parking etc.)

ITI/Pali/Expansion/365

6-Jan-2012

502.45 7.21 495.24 Tender case received back from head

office with the remarks to submit the same

after receipt of approval from client

department as per FD instructions issued

vide letter No. 5/6/5005-5 dated

14.10.2013

10 Administrative approval for the construction of

Govt. Industrial Training Institute Moujabad,

Distt Gurgaon

Bhawan/ITI/Moujabad/454

15.04.2013

424.36 0.28 424.08 Detailed estimate and DNIT received back

from Head office due to shortage of funds

11 Construction of ITI at Kushak in Palwal Distt. FC & PS IT & VE No. Nil

21-Jun-2007

532.02 597.31 0.00 98% admn and work shop block and 95%

boundary wall completed and further work

is in progress

12 Construction in ITI Bhirdana in Fatehabad Bhawan/ITI/Bhirdana

5-03-2013

457.88 186.48 271.40 Ground floor slab laid.

13 Constn. of I.T.I. at Majra Piau (Narnaund) F.C. No. 1680

6-Oct-2011

504.60 511.65 0.00 Work completed.

14 Construction of New Govt. ITI Rania Distt Sirsa Bhawan/ITI/Rania/946

29.08.2013

732.26 0.42 731.84 Tender received unapproved due to non

availability of funds

15 Construction of I.T.I. Pinjupura (Kalayat) In

Kaithal Distt.

FCPS No. Bhawan/ITI/505

20-Sep-2011

738.71 512.72 225.99 Finishing work is in progress

16 Construction of ITI Bir Bangra at Rajound Distt.

Kaithal

PS to Govt. No. 4390

25-Oct-2012

644.98 240.82 404.16 Administrative block. Single storey, work

shop double storey. Administration block

slab laid and brick work completed and

momty roof slab laid. Work shop ground

floor slab laid and 2nd storey 75% roof

slab laid and B/W completed.

17 Administrative approval for the construction of

ITI Pabnawa Distt. Kaithal Bhawan/ITI/Pabnawa/637

26.06.2013

551.43 9.98 542.45 Approval received from financial

department and tender case sent to circle

office.

18 Construction of Ch. Surender Singh Memorial

I.T.I. Building at Tosham in Bhiwani District

(Workshop block only)

FC/New/ITI/Tosham/1106

1-Jul-2011

502.27 359.62 142.65 Work in progress. G floor and 1st floor

completed. Finishing in progress. Clause

II imposed vide No. 1758 dated 19.8.10

19 Constn. of Hospitality wing in at Siwani Khera

(Siwani) district Bhiwnai

Bhawan/ITI/Khera/547

24-Jan-2013

683.65 2.92 680.73 Project not taken up due to non

availability of funds and guidelines of

finance department

20 Administrative approval for the construction of

Govt. Industrial Training Institute Jamalapur

Distt Bhiwani

Bhawan/ITI/Jamalpur/748

17.07.2013

300.00 0.00 300.00 Project not taken up due to non

availability of funds and guidelines of

finance department

21 Construction of building of new I.T.I. at

Malrabas District Mohindergarh

Bhawan/ITI/Khera/457

13-Jul-2007

525.00 153.70 371.30 Work in progress departmentally. 100%

slab of Admn block laid. Plastering is in

progress

22 Construction of I.T.I. Assaudha in Jhajjar

District.

B/ITIAssaudah/1953

12-Oct-2011

281.60 267.32 14.28 Physically completed.

23 Construction of ITI Building at Bhaproda in

Jhajjar District

F.C. No. Bhaproad 5201

12-Aug-2009

658.60 487.93 170.67 Work in progress 95% work done. Work

for internal road/parking physically

completed

24 Construction of ITI at Dubaldhan in Jhajjar

District

PS Govt Hry No. 4577

24-Dec-2012

424.37 284.53 139.84 Work is in progress. Overall 25% work

completed.

25 Construction of ITI at village Pahadipur in

Jhajjar District

FC & PC No. 41-44

10-Jan-2013

578.00 238.72 339.28 Work is in progress. Overall 15% work

completed.

26 Construction of Administration Block &

Workshop Block in ITI at village Khudan in

Jhajjar District

FC&PC No. 58

2-Feb-2013

659.60 309.36 350.24 Work is in progress. Overall 15% work

completed.

27 Construction of Pandit Jage Ram Govt. ITI

Jahangirpur in Distt. Jhajjar

Bhawan/ITI/Jahangirpur

25-01-2013

416.72 160.55 256.17 Work is in progress

28 Expansion of Building of ITI, Kund Manethi in

Distt. Rewari

IT/KundManethi/1294-B-I

14-Dec-2009

768.08 572.86 195.22 Work physically completed.

29 Construction of New building of Rao Abhay

Singh Govt ITI, Saharanwas in Rewari Distt

PS Endst No: Bhawan/2172

9-Aug-2012

473.20 172.22 300.98 Ground floor roof slab and brick work

complated and first floor slab is in

progress

30 Administrative approval for construction of

Govt. Industrial Training Institute Kharkhara

Distt Rewari

Bhawan/ITI/Kharkhara/885

08.08.2013

500.00 0.00 500.00 A/A received on normative basis.

Detailed Drawings are awaited from Chief

Architect, Haryana. RCE is under

preparation

31 Construction of building of new I.T.I. at Rajlu

Garhi in Sonepat Distt

No. KC/Bhawan/ITI

14-Jan-2009

386.41 229.88 156.53 Action under clause II taken vide T.O. No.

5825 dated 19.7.2010. 1st storey and 2nd

storey slab completed. 3rd storey in

progress. D/E submitted by 31.1.2011

32 Admnistrative approval for construction of

special repair and new construction Raising of

boundary wall and earthwork filling in open

yard at Govt. ITI Julana in Jind

Bhawan/ITI/Julana/952

29.08.2013

18.35 0.00 18.35 Tender process of allotment

33 Administrative approval for the construction of

Pgd. Electrical Sub station in Govt. Industrial

Training Institute Behal Distt. Bhiwani

Bhawan/ITI/Behal/874

03.06.2013

21.55 0.00 21.55 Not taken up due to shortage of funds.

TOTAL 18045.38 6824.02 11294.70

Sr. No.

Name of work

No. & date of Approval Amount of A/A

Rs. Lacs

Expenditure up to

3/2014Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs

Status of work

Remarks

1 Construction of 1st storey at Tehsil Building at

Bilaspur in Yamuna Nagar Distt.

190-R-6-2012

24-Feb-12

85 47.17 Work is in progress

2 Construction of Administrative office Building

Phase-II, with Multi Level Parking in Mini

Sectt. Complex Sector-1, Panchkula

2427-R-62011/1711

9-Feb-2012

3470.59 3470.59 R/C/E for Rs. 3470.59 Lacs stand

submitted for A/A but F.C& Revenue

disaster Management

3 Construction of Mini Sectt. (SDO) (Civil)

Complex at Samalkha in Panipat

F.C. & P.S. no. 7202

24-Aug-2009

847.4 481.44 Work in physical progress. i) 90% Kotah

stone work completed and further in

progress.ii) The terrazzo flooring in

ground & 1st/2nd floor floor in

progress.iii) Tile terracing is in progress.

4 (i) Construction of Internal Road (Rigid

Pavement) in Judicial complex at Rohtak. (ii)

Dismantling/ providing the existing chambers at

Rohtak

6/06/2009-5JJ-II

23-Nov-2011

290.54 93.84 Work in physical progress. CC Pavement

completed except pavement in between

Judicial complex and Litigant hall. (ii)

Work completed and inaugurated by

Hon’ble Chief Minister, Haryana on

14/07/2012

5 Construction of Surface Car Parking in Mini

Sectt. at Rohtak

275-R-6-2012/2006

21-Feb-2012

89.41 60.19 Work in physical progress. Work of

boundary wall completed & laying of

stone metalled (G-II) in parking

completed. Laying of interlocking paver

block is in progress.

6 Construction of proposed Judicial Block (Phase -

II) on existing Litigant Hall in Mini Sectt. at

Rohtak

6/35/2012-5 JJ-II

18-Jun-2012

877.31 877.31 Work administratively approved. Tender

re-invited on dated 11/03/2013

7 Construction of additional Judicial Complex at

Faridabad

6/8/2006-5JJ-II

24-Jan-2013

3262.08 3233.71 Work in physical progress. Excavation for

basement is in progress

8 Construction of Labour courts in Mini

Secretariat at Gurgaon

A/A No.456-R-2011/1972

17-Feb-2011

1246 486.44 The structure work completed , Finishing

work is in progress . Remaining 50% A/A

of Rs. 62300000/-

9 Construction of Judcial Block in the compus of

SDO (Civil Complex) at Hathin in Palwal Distt.

FC/PS No.6/7/2012-5 JJ-II

19-Jun-2012

792.42 740.88 Work is in progress

10 Construction of Judician block including

Malkhana in Mini Sectt. At Palwal in Palwal

District

FS/PS 6/32/2004-5 JJ(II)

26-Nov-2009

2560 2560 Work completed except officers lift

11 Construction of Roads & Parking in Mini Sectt.

Complex (Excluding Residential Area) at Palwal

in Palwal District A/A received from FC&PS to

Govt. Hr. Revenue and Disaster Manaement

Deptt.

FS/PS 6/32/2004-5 JJ(II)

26-Nov-2009

486.69 486.69 Work is in Progress

Bank of sanctions as on 1.4.14 for Judiciary works under head 4059-C.O. Capital outlay on public works

12 Construction of Securit Guard Room, Check

post & high security boundary wall around

judicial court complex Mini Sectt. at Sirsa in

Sirsa Distt

1

29-Dec-2011

134.67 63.69 Work in progress

13 Construction of Check Post, Gurard Room, High

Security Boundary Wall, Judicial Malkhana and

Additional Building in Judicial Complex at

Hisar

FCNo.6/92/2011-5JJ-II

6-Jan-2012

716.71 601.05 Work is in progress

14 Constructing Additional work in the Campus of

Mini Sectt. at Bhiwani in Bhiwani Distt

No.2538-P-B-11/11904

3-Nov-2011

114.74 Work in progress

15 Construction of SDO(Civil) Complex

(Administrative-cum-Judicial Complex) at

Tosham in Bhiwani Distt.

No.597-R-6-2012/3083

14-Mar-2012

978.13 978.1 Tender approved. Letter to proceed to be

issued.

16 Construction of SDO (Civil) Complex

(Administrative Block) in the Campus of Mini

Sectt. Charkhi Dadri in Bhiwani Distt.

631-R-6-2012/3170

16-Mar-2012

1055 1052.75 Tender received on 13.03.2013 and under

process

17 Construction of Additional Litigant Hall & Bar

Complex in Mini Secretariate at Narnaul in

Mohindergarh District.

6/33/2012-5-JJ (II)

4-July-2012

317.35 0 317.35 Tender re-invited which will be opened on

10.04.2013

18 Supply & installation of Lifts in Jdicial complex

in Mini Sectt. Palwal FS/PS 6/32/2004-5 JJ(II)

26-Nov-2009

2560 0 2560 Part of main A&A) Material of 4 Nos lifts

received at site and further installation

work in progress.

19 Pdg. 4 Nos passenger elevators in Admn. block

in Mini Sectt. campus at Palwal.

F C No. 7018

18-Aug-2009

2432 0 2432 Part of main A&A

20 Pdg. 5 Nos. passenger elevators in Judicial

complex at Nuh in Mewat Distt

F C No. 6/50/2005-5JJ(II)

20-Aug-2009

3137.45 0 3137.45 Part of main A&A

21 Pdg. 4 Nos passenger elevators in Admn. block

in Mini Sectt. Nuh

F C No. 7127

21-Aug-2009

2654.65 0 2654.65 Part of main A&A

22 Construction Judicial Courts Complex at

Mohindergarh (Pdg. CC TV system)

FC &PS 6/22/03/-5JJ(II)

11-Oct-2007

392.86 368.18 Work in Physical progress, Only two Nos.

Cameras are to be installed (Estimate Rs.

947000/- )(Part of main A/A Rs. 392.86

Lacs)

23 Construction of 8 Nos. Court Building in Mini

Sectt. At Bhiwani (Pdg. Electrical Installation)

FC&PS A&J 6/56/2003-05

11-Oct-2007

581.92 545.07 Work in progress, Near Completion (part

of Main A/A Rs. 581.92) (Estimate Rs.

231000/- Only)

24 Construction of Judicial Block including

Malkhana in Mini Sectt. Complex at Nuh in

Mewat Distt.

FC&PS No.6/50//JJ (II)

20-Aug-2009

2560.95 2198.86 82% work phy. comp. RCC Slab and brick

work comp. of all floors. Flooring and

Plastering 80% complete and finishing

work is in progress. L.D. imposed

25 Construction of Residential Houses for Judicial

Officers and Officials in Mini Sectt. Complex at

Nuh in Mewat District

No.597-R-6-2012/3083

11-Dec-2012

737.7 737.7 Tender approved. Letter to proceed to be

issued.

26 Construction of Roads & Parking, Campus

Boundary wall, High Security Boundary Wall,

Earth filling, Land Scaping and Estate PH & EI

Services in Mini Sectt. Complex at Nuh in

Mewat Distt.

FC&PS No.6/50/2005-5JJ

20-Aug-2009

576.5 230.59 1. Constn. of 80% comp. all over campus

& 40% Grills has been fixed. Action

under clause-II

2.Road & Parking work 50% Comp.

27 Rough cost estimate for furniture in Judicial

Court Complex at Mini Sectt. at Nuh in Mewat

District.

Add. C.S No.6/14/2013-5JJ

19-Feb-2013

98.54 98.54 D/E resent to S.E.

28 Construction of Judicial Block in the campus of

SDO Civil Complex at Gohana in Sonepat Distt.

F.C.No.6/11/2012-5JJ-II

8-Feb-2012

765 375.36 Work in progress

29 Construction of Judicial Block in the campus of

SDO Civil Complex at Ganaur in Sonepat Distt.

F.C.No.9082-89/WI

5-Dec-2011

765 606.38 Work in progress

30 Construction of additional Eight Court building

in Mini Secretariat at Sonepat Distt.

No.6/48/2012-5JJ-II

4-July-2012

1175 1174.36 Tender under process

TOTAL 35761.61 32670.34

Sr. No. Name of the work A/A Amount (Rs. in Lacs) No. and date Division

1 Administrative approval of SC/ST wing at

G.I.T.I, Ambala350

Bhawan/ITI/SC/

ST/Common/10

15

30.08.2013

Ambala

2

Administrative approval of SC/ST wing at

G.I.T.I, Bhiwani350

Bhawan/ITI/SC/

ST/Common/10

25

30.08.2013

Bhiwani

3

Administrative approval of SC/ST wing at

G.I.T.I, Faridabad350

Bhawan/ITI/SC/

ST/Common/10

31

30.08.2013

Gurgaon

4

Administrative approval of SC/ST wing at

G.I.T.I, Gurgaon350

Bhawan/ITI/SC/

ST/Common/10

37

30.08.2013

Gurgaon

5

Administrative approval of SC/ST wing at

G.I.T.I, Mojabad in Distt Gurgaon350

Bhawan/ITI/SC/

ST/Common/10

43

30.08.2013

Gurgaon

6

Administrative approval of SC/ST wing at

G.I.T.I, Hisar350

Bhawan/ITI/SC/

ST/Common/10

49

30.08.2013

Hisar

List of works recently sanctioned under head P-01-08-4250-51-789-98-51-N-V-Training Building for Schedule Castes Wings-16 Major Works

7

Administrative approval of SC/ST wing at

G.I.T.I, Barwala in Distt Hisar350

Bhawan/ITI/SC/

ST/Common/10

55

30.08.2013

Hisar

8

Administrative approval of SC/ST wing at

G.I.T.I, Piau Majra in Distt Hisar350

Bhawan/ITI/SC/

ST/Common/10

61

30.08.2013

Hisar, Hansi

9

Administrative approval of SC/ST wing at

G.I.T.I, Nalwa in Distt. Hisar350

Bhawan/ITI/SC/

ST/Common/11

39

30.08.2013

Hisar, Hansi

10

Administrative approval of SC/ST wing at

G.I.T.I, Julana in Distt. Jind350

Bhawan/ITI/SC/

ST/Common/10

85

30.08.2013

Jind

11

Administrative approval of SC/ST wing at

G.I.T.I, Jind in Distt Jind350

Bhawan/ITI/SC/

ST/Common/10

79

30.08.2013

Jind

12

Administrative approval of SC/ST wing at

G.I.T.I, Gulha-Cheeka in Distt. Kaithal350

Bhawan/ITI/SC/

ST/Common/11

03

30.08.2013

Kaithal

13

Administrative approval of SC/ST wing at

G.I.T.I, Karnal in Distt. Karnal350

Bhawan/ITI/SC/

ST/Common/10

91

30.08.2013

Karnal

14

Administrative approval of SC/ST wing at

G.I.T.I, Sujapur in Distt. Mohindargarh350

Bhawan/ITI/SC/

ST/Common/11

09

30.08.2013

Narnaul

15

Administrative approval of SC/ST wing at

G.I.T.I, Kalayat in Distt. Kaithal350

Bhawan/ITI/SC/

ST/Common/

1097

30.08.2013

Narwana

16

Administrative approval of SC/ST wing at

G.I.T.I, Palwal350

Bhawan/ITI/SC/

ST/Common/11

15

30.08.2013

Palwal

17

Administrative approval of SC/ST wing at

G.I.T.I, Naultha in Distt. Panipat350

Bhawan/ITI/SC/

ST/Common/11

27

30.08.2013

Panipat

18

Administrative approval of SC/ST wing at

G.I.T.I, Tankri in Distt Rewari350

Bhawan/ITI/SC/

ST/Common/11

33

30.8.2013

Rewari

19

Administrative approval of SC/ST wing at

G.I.T.I, Sirsa 350

Bhawan/ITI/SC/

ST/Common/10

73

30.08.2013

Sirsa

20

Administrative approval of SC/ST wing at

G.I.T.I, Mundlana in Distt Sonepat350

Bhawan/ITI/SC/

ST/Common/11

21

30.08.2013

Sonepat

21

Administrative approval of SC/ST wing at

G.I.T.I, Sonepat 350

Bhawan/ITI/SC/

ST/Common/10

67

30.08.2013

Sonepat

22 Administrative approval of SC/ST wing at

Yamuna nagar350

Yamuna nagar

23 Administrative approval of SC/ST wing at

Sujapur Mohindegarh 350

Mohindergarh

TOTAL 8050

NOTE:- The architectural drawing of some of the above works have been received recently.None of the above works has been tendered so far. The standard structural is being prepared by the consultant.

Sr. No. Name of Work No. and dated of Approval Amount of A/A

Rs. Lacs

Expenditure upto

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14 Rs. Lacs

+ new works

Status of work

1 Construction of Judicial Block in the campus of

SDO Civil Complex at Tohana in Fatehabad

Distt.

6/24/2012-5JJ-II

12.03.2012

765.00 576.88 188.12 Work completed

2 Construction of Check post, guard room, high

security boundary wall, judicial malkhana and

additional building in judicial complex at Hisar

FC No. 6/92/2011-5JJ-II

6-Jan-2012

716.71 427.85 288.86 Work is in progress

3 Construction of 4 Nos. Additional court building

in Mini Sectt. Complex at Jind

ACS No. 6/21/2013-5JJ-11

2-Apr-2013

592.30 2.03 590.27 Foundation work completed, roof slab of

GF in progress

4 Construction of Additional court room in

Judicial complex at Narnaul in Mohindergarh

distt.

6/27/2013-5JJ-II

2-Apr-2013

456.00 0.00 456.00 Tender not yet approved due to code of

conduct

5 Construction of Judicial complex at Sector-12,

Bahadurgarh in Jhajjar

6/08/2012-5JJ-II

15-Mar-2013

1713.82 12.01 1701.81 Tender received on 01.10.2013 & sent to

head office for approval

6 Construction of Judicial Block in the campus of

SDO civil Complex at Gohana at Sonepat Distt.

6/11/2012-5-JJ-II

08.02.2012

765.00 23.39 741.61 Work in progress wiring being done

7 Construction of additional eight court building

in Mini Sectt. At Sonepat Distt.

6/48/2012-5-JJ-II

04-07-2012

1175.00 215.15 959.85 35% work completed and balance work is

in progress

8 Providing Fire alarm system in judicial complex

at Narnaul in Distt. Mohindergarh

6/69/2013-5JJ-II

31.05.2013

15.33 15.33 Tender to be received on 15.11.2013

9 Providing furniture in Judicial Court Complex at

Mini Sectt. At Nuh in Mewat Distt.

6/14/2013-5JJ-II 19.02.2013 98.54 98.54 Work in progress

10 Construction of additional Judicial Complex at

Faridabad

6/8/2006-5JJ-II

24-Jan-2013

3262.08 637.11 2624.97 Work in physical progress. 100%

basement roof slab casted and 80% ground

floor slab completed and 40% first floor

slab completed. Overall 28% work

completed

11 Construction of Judicial complex at Gurgaon 6/13/2012- 5JJ-II 11331.00 0.60 11330.40 Structural design in process

12 Additional alteration in Judicial Complex at

Mohindergarh

6/43/2013- 5JJ- II

11.04.2013

7.05 4.61 2.44 Physically completed

13 Providing furniture in Judicial complex at Nuh

in Mewat district

6/14/2013/5JJ-II

19.02.2013

98.54 98.54

14 Providing and installing 1 No. tubewell and

laying of connecting pipeline to provide driking

water supply facilities in judicial complex at

mini sectt narnaul

6/07/2014-5JJ-II

03.04.2014

10.05 10.05

15 Providing addition and alteration in judicial

complex at Narnaul in Mohindergarh district

6/22/2014-5JJ-II 6.54 6.54

List of Works under head 4059 Administration of Justice 75:25 scheme (part 2)

16 Construction of Judicial Malkhana in Mini Sectt

Yamuna nagar

6/19/2013-5JJ-II 51.63 51.63

17 Construction of 10 Nos. Additional court room

at Kurukhetra

6/106/2013-5JJ-II

16.04.2014

1772.63 0.00 1772.63

18 Work providing computer points in various

rooms in Judicial Complex at Ambala City

6/19/2014-5JJ-II

03.04.2014

1.93 0.00 1.93

19 Construction of 8Nos.court building in Mini

Sectt. at Bhiwani

6/18/2014-5JJ-II

03.04.2014

3.945 0.00 3.945

20 Providing false ceiling in the various judges

chamber of judicial complex karnal

6/24/2014-5JJ-II

03.04.2014

5.06 0.00 5.06

TOTAL 22848.16 1899.63 20948.53

Sr. No. Name of Work No. and dated of Approval Amount of A/A

Rs. Lacs

Expenditure upto

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14 Rs. Lacs

+ new works

Status of work Remarks

1 Construction of Judicial Block in the campus of

SDO Civil Complex at Tohana in Fatehabad

Distt.

6/24/2012-5JJ-II

12.03.2012

765.00 378.5 Finishing in progress

2 Construction of Check post, guard room, high

security boundary wall, judicial malkhana and

additional building in judicial complex at Hisar

FC No. 6/92/2011-5JJ-II

6-Jan-2012

716.71 572.93 Work in progress

3 Construction of 4 Nos. Additional court building

in Mini Sectt. Complex at Jind

ACS No. 6/21/2013-5JJ-11

2-Apr-2013

592.30 592.30 Work recently allotted

4 Construction of Additional court room in

Judicial complex at Narnaul in Mohindergarh

distt.

6/27/2013-5JJ-II

2-Apr-2013

456.00 456.00 Tender re-invited and to be opened on

06.11.2013

5 Construction of Judicial complext at Sector-12,

Bahadurgarh in Jhajjar

6/08/2012-5JJ-II

15-Mar-2013

1713.82 1713.82 Tender received and under approval

6 Construction of Judicial Block in the campus of

SDO civil Complex at Gohana at Sonepat Distt.

6/11/2012-5-JJ-II

08.02.2012

765 375.36 Work in progress

7 Construction of additional eight court building

in Mini Sectt. At Sonepat Distt.

6/48/2012-5-JJ-II

04-07-2012

1175 1174.13 Work is in progress

8 Providing Fire alarm system in judicial complex

at Narnaul in Distt. Mohindergarh

6/69/2013-5JJ-II

31.05.2013

15.33 15.33 Tender to be received on 15.11.2013

9 Providing furniture in Judicial Court Complex at

Mini Sectt. At Nuh in Mewat Distt.

6/14/2013-5JJ-II 19.02.2013 98.54 98.54 Work in progress

10 Construction of additional Judicial Complex at

Faridabad

6/8/2006-5JJ-II

24-Jan-2013

3262.08 3233.45 Work in physical process. Concreting of

foundation beams and slab is in progress

and shuttering of basement roof slab is in

progress.

List of Works under head 4059 Administration of Justice 75:25 scheme (part 2)

Sr. No. Name of work No. & date of Approval Amount of A/A Expendiure up to

3/2014

Balance

sanction as on

1.4.2014 + new

works

Status of work Remarks

1 Construction of Govt. Polytechnic at Meham in

Rohtak Distt.

35/62/09-2T.E.

18-Aug-2009

800.00 685.08 114.92 Work in physically progress. (i) Work

completed. (ii) Plastering, tile terracing,

flooring completed. Grill in window,

plinth protection, finishing & P.H. work

fitting is in progress. (iii) Work

completed.

2 Construction of Administrative cum Academic

Block (Block A) and Workshop Block (Block C)

at Govt. Polytechnic, Shergarh Distt. Kaithal

FCPS no. 35/38/2012-TE

26-Apr-2012

1550.00 674.54 875.46 Block A&C Parking, Grinding of floor,

wall putty in progress. Block B&D

Ground floor slab laid.

3 Construction of Academic block of Government

Polytechnic Bhiwani in Bhiwani District.

35/45/2008-2TE

7-Jul-2008

1,525.00 600.22 924.78 Finishing work in progress. Building

partly handed over to the client deptt

4 Rough Cost Estimate execution of civil works at

Govt. Polytechnic Jhajjar.

31/01/2013-TE

2-Jan-2013

23.13 23.13 Wok in physical progress. Admin. Block-

Completed , Boys Hostel- Completed.

Girls Hostel- Completed, Residences -

75% work completed and finshing is in

progress. Statue work completed. not in mis list

5 Construction work of Govt. Polytechnic, at

village Mandkola, Distt. Palwal.

35/26/2013-4TE

12-April-2013

1,554.13 4.66 1549.47 Estimate and DNIT is under process

6 Construction work of Govt. Polytechnic, at

village Indri, Distt. Mewat.

35/25/2013- 4TE

12-April-2013

1,554.13 210.88 1343.25 Found work comp. upto plinth beam in all

blocks. A block slab G.F. casted and

shuttering in progress. Block D, casting

of column in progress and B/wall 90%

completed

7 Const. of Govt. Polytechnic at village Malab

District Mewat

1554.13 3.48 1574.65 Work of foundation and B/wall in progress

Total 8,560.52 2178.86 6405.66

Sr. No.

Name of Work

No. and date of Approval Amount of A/A Expenditure up to

03/2014

Balance

sanction as on

1.4.2014

Status of work

Remarks

1 Const. of Govt. Polytechnic Jatal in Distt

Panipat

P.S. No. 35/3/2010-2TE

16-Apr-2013

1,554.13 0.00 1554.13 Tender to be received on 30.08.2013

2 Const. of Administrative cum Academic Block

at Government Polytechnic at village Neemka in

Faridabad District

35/5/2013-2TE 1,500.00 1475 Work in tender allocation formalities.

Tender on 24.08.2013 and under process

Bank of Sanction as on 01.04.2014 for Education, Sports, Art & Culture (Plan), under Head 4202-C.O. (Polytechnic)

3 Const. of Polytechnic at Lisana in Rewari Distt No. 35/33/2006-2TE

19-May-2008

2,516.46 985.82 Main building completed & Handed over.

Boundary wall in progress

4 Choudhary Ranbir Singh Hooda Govt. Institute

of Irrigation and Power Engineering

Hathinikund Distt Yamuna nagar

35/33/2010-2D

Dated 12.04.2013

1554.13 0 1554.13 DE/DNIT under submission by SE

Chandigarh. Tenders will be called by

20.07.2013

5 Govt. Polytechnic, Dhangar Distt. Fatehabad 35/33/2010-2TE

Dated 16.04.2013

1554.13 0 1554.13 Tender invited and to be received on

12.08.2013

TOTAL 8,678.85 0.00 7123.21

Sr. No.

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction Rs.

Lacs 01.04.14

Status of work

Remarks

1 Construction of New SDE PWD B&R office at

Pehowa in Distt. Kurukshetra.

FC & PS No. 1/14/2011-1(W)

14-May-2012

58.56 58.56 Roof slab completed

2 Administrative approval for construction of New

PWD Rest House at village Sirsagarh, Near

Dosarka Mullana in Ambala Distt.

1/29/2010-1 B&R (W) 173.52 128.30 Foundation completed

3 Construction of PWD Rest House at

Chhachhrauli in Yamuna Nagar District

EIC, Hr. no. 4257-62

16-Jun-2011

135.62 135.62 Work completed.

4 Constructing of New Rest House at Fatehabad in

Fatehabad Distt.

FC&PS No. 1/22/2011

6-Mar-2012

179.52 179.52 Structure completed. Flooring in progress

5 Constn. of PWD Rest House at Narwana in Jind

Distt.

FC No. 1/1/2011-1B&R(W)

6-Sep-2011

146.00 146 Finishing work is in progress.

6 Construction of New Block No. II in PWD Rest

House at Kaithal.

FCPS No. 1/2/2009-1B&R(w)

22-Feb-2012

175.30 175.3 Structure completed. Plaster in progress

7 Construciton of Nirman Sadan PWD B&R

Office Complex at Kaithal.

1/2/2009-1B&R(w)

29-Nov-2012

995.75 995.75 Basement partly completed

8 Construction of New PWD Rest House at Pundri

in Distt. Kaithal.

FC&PS No.1/4/2012-1B&R

7-May-2012

200.73 200.73 Ground floor slab laid.

9 Construction of PWD B&R Rest House at

Jhajjar

No.1/9/2010-1B&R (W)

4-May-2012

204.00 204 Work is in progress. Over all 30% work

completed

10 Construction of PWD Rest House with 2 Nos.

440 Sft houses and SDO Office at Beri in Jhajjar

District

No.1/37/2010-1B&R(W)

19-Mar-2013

569.51 569.51 Detailed estimate/DNIT stands submitted

to head office

11 Construction of Nirman Sadan at Rohtak NO. 1/2/2011-1 B&R(W) 1779.8 1779.8 Work just started

12 PWD Rest house at Rai in Sonepat Distt 1099.13 1099.13 Foundation in progress

Total 5717.44 5672.22

Bank of sanctions as on 01.04.14 under head 4059- C.O. Public Works (Major Works)-Allotted works

Bank of sanctions as on 29.04.14 under head 4059- C.O. Public Works (Major Works)

Sr. No.

Name of work No. & date of Approval

Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction Rs.

Lacs 01.04.14

Status of work

Remarks

1 Construction of New SDE PWD B&R office at

Pehowa in Distt. Kurukshetra.

FC & PS No. 1/14/2011-1(W)

14-May-2012

58.56 28.62 29.94 Structural work completed. Finishing

work such as plastering and flooring are in

progress

2 Administrative approval for construction of New

PWD Rest House at village Sirsagarh, Near

Dosarka Mullana in Ambala Distt.

1/29/2010-1 B&R (W) 173.52 89.76 83.76 Work in progress

3 Construction of PWD Rest House at

Chhachhrauli in Yamuna Nagar District

EIC, Hr. no. 4257-62

16-Jun-2011

135.62 145.01 0.00 Work completed

4 Construction of 1st floor & 2nd floor of existing

Rest House in Sector -16A, Faridabad

4/23/2006-1B&R(W)

28-Dec-2011

259.80 0.78 259.02 Work in tender/allocation formalities.

Tender received on dated 20.12.2013 and

under process

5 Constructing of New Rest House at Fatehabad in

Fatehabad Distt.

FC&PS No. 1/22/2011

6-Mar-2012

179.52 110.96 68.56 Finishing work is in progress.

6 Constn. of PWD Rest House at Narwana in Jind

Distt.

FC No. 1/1/2011-1B&R(W)

6-Sep-2011

146.00 86.82 59.18 Physically completed

7 Constn. of PWD Rest House at Uchana in Jind

Distt.

14/02/2008-1B&R(w)

31-Oct-2011

116.50 0.27 116.23 The case of land acquisition has been

admitted on 8.11.12 in Hon'ble Pb. & Hry.

High Court titled as Baljeet Singh V/s

State case No.CWP 3380 of 2012. Next

date 26.5.14

8 Land Acquisition for construction of rest house

(B&R) at Uchana (Jind)

ACS no. 14/02/2008-1 B&R W

31-Oct-2012

62.93 0.00 62.93 Award awaited

9 Construction of New Block No. II in PWD Rest

House at Kaithal.

FCPS No. 1/2/2009-1B&R(w)

22-Feb-2012

175.30 89.04 86.26 Structure work completed. Floor tile work

in progress.

10 Construciton of Nirman Sadan PWD B&R

Office Complex at Kaithal.

1/2/2009-1B&R(w)

29-Nov-2012

995.75 179.12 816.63 Basement, ground floor and first floor slab

laid

11 Construction of New PWD Rest House at Pundri

in Distt. Kaithal.

FC&PS No.1/4/2012-1B&R

7-May-2012

200.73 96.22 104.51 Doubly storey building. Main rest house

ground floor slab laid. First floor slab

laid. Boundary wall completed, flooring

in progress

12 Construction of new PWD Rest House at

Charkhi Dadri in Bhiwani Distt.

1/39/2010-1B&R(W)

27-Aug-2012

182.53 3.83 178.70 Detailed estimate & DNIT sent to Head

office. Tender will be called after

approval of DNIT

13 Construction of PWD B&R Rest House at

Jhajjar

No.1/9/2010-1B&R (W)

4-May-2012

204.00 177.60 26.4 100 % work completed.

14 Construction of PWD Rest House with 2 Nos.

440 Sft houses and SDO Office at Beri in Jhajjar

District

No.1/37/2010-1B&R(W)

19-Mar-2013

569.51 173.62 395.89 Work in progress

15 Construction of Nirman Sadan at Rohtak NO. 1/2/2011-1 B&R(W) 1779.8 4.53 1775.27 Work administratively approved. Work

started excavation completed. Footing is

in progress.

16 Construction of New PWD Rest House Gurgaon NO. 1/20/2012-1B&R(W) 737.19 0.00 737.19 Site not finalized yet

17 PWD Rest house at Bahadurgarh 1/6/2010-1B&R(W)

04.06.2013

489.02 0.02 489.00 Tender received and sent to head office for

approval

18 PWD Rest house at Rai in Sonepat Distt Sanction received in UO form 1099.13 79.80 1019.33 Work is in progress

19 Construction of New Rest House at Hodal in

Palwal Distt.

1/18/11-1B&R (W) 185.55 0.00 185.55 Detailed estimate/DNIT under preparation

20 Construction of Memorial of Sardar Partap

Singh at Village Rasoi in Sonepat Distt.

1/13/2013-1 B&R (W) 415.51 0.69 414.82 Tender to be received on 16.1.14

21 Re-construction of PWD Rest House (Ekant

Bhawan) at Mussorie

1/2/2013-1 B&R (W) 662.51 0.00 662.51 Fresh approval

Total 8828.98 1266.69 7571.68

Sr. No. Name of work No. & date of Approval Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs

Status of work

1 Const. of office building of Haryana state Legal

services Authority in Sector-14 Panchkula

20/8/2005-4JJ-I

21-Jan-2013

756.15 106.24 649.91 Work in progress.

2 Construction of proposed Judicial Block (Phase -

II) on existing Litigant Hall in Mini Sectt. at

Rohtak

6/35/2012-5 JJ-II

18-Jun-2012

877.31 103.95 773.36 Slab of FF, S.F. completed and 50% slab

of T.F. laid and mumty of 50% is in

progress. Building of steel bars and T.F.

is in progress. Overall 70%work

completed.

3 Construction of Judicial Block in the compus of

SDO (Civil Complex) at Hathin in Palwal

FC/PS No. 6/7/2012-5 JJ-II

19-Jun-2012

792.42 236.30 556.12 Work is in progress.

4 Construction of Security Guard Room, Check

post & high security boundary wall around

judicial court complex Mini Sectt. at Sirsa in

Sirsa Distt

1

29-Dec-2011

134.60 102.89 31.71 Work physically & financially completed

5 Construction of Judicial Block in the campus of

SDO Civil Complex at Ganaur in Sonepat Distt.

F.C. NO. 9082-89/WI

5-Dec-2011

765.00 317.48 447.52 65% work completed and balance work in

progress

6 Construction of Property Room of Judicial

Complex & Police Malkhana in Campus of Mini

Sectt Sirsa

6/110/2012-S JJ-II

26-Oct-2012

67.84 67.68

7 Constructing Additional work in the Campus of

Mini Sectt. at Bhiwani in Bhiwani Distt.

No. 2538-P-B-11/11904

3-Nov-2011

114.74 113.9 Work in progress

8 Construction of Additional Litigant Hall & Bar

complext in Mini Sectt. At Narnaul in

Mohindergarh District

6/33/2012-5-JJ (II)

4-Jul-2012

317.35 78.12 239.23 50% roof slab laid and further work in

progress

9 Const. of Bridge connecting lawyers chambers

and litigant shed in mini sectt. at Karnal

Add. C.S.No. 6/21/ 5JJ II

7-Aug-2013

75.73 1.38 74.35 Excavation of footing and column in

progress 06.02.2014

Bank of sanctions as on 01.04.14 for Administration of Justice under head 4059- C.O. Public Works (Major Works)

10 Supply of furniture for two subordiate courts at

new Judicial Complex, Tohana, District

Fatehabad

6/112/2013-5 JJ-II

01.01.2014

11.40 0.00 11.40 Work completed

11 Estimate for Providing Estate PHA Services in

Mini Sectt. (SDO Civil) at Meham Distt,Rohtak

2664-R-6-2013/20989

30.12.2013

51.32 51.32

12 Renovation of office of Advocte General,

Haryana Chandigarh (Level I & II)

2/27/2013- 5 JJ (I)

22.08.2013

50.52 50.52

13 Renovation of office of Advocte General,

Haryana Chandigarh

2/13/2013-5 JJ (I)

03.01.2014

11.33 11.33

14 Connectivity of electricity pertaining to the Civil

Court Safidon with hotline

6/105/2013-5JJ-II

20.11.2013

12.19 0.00 12.19 Work is in progress.

15 Construction of structure for temporary chamber

for the lawyers in New Judicial Complex,

Palwal

6/102/2013- 5 JJ-II

12.11.2013

21.08 21.08

16 Approval for laying of Local area network in the

subordiated courts located in the states of

haryana

6/18/2013-5 JJ- II

12.11.2013

537.00 341.00 196.00 Part payment made

17 Providing addition and alteration in Judicial

Complex at Narnaul (Mohindegarh)

6/70/2013/5JJ- II

26.06.2013

6.33 0.00 6.33 Physically completed.

18 Installation of Grills on the walls of Bar

Room/Complex at Safidon in Jind district

6/88/2013/5JJ-II

13.09.2013

2.70 0.05 2.65 Work is in progress.

19 Connnectivity passage on 2nd floor and district

courts Ambala

6/151/12

dated 26.11.2012

20.17 23.38 0.00 Work physically completed but financial liabilities pending

TOTAL 4625.18 1310.79 3316.6

Sr. No. Name of work No. & date of Approval Amount of A/A

Rs. Lacs

Expenditure up to

3/2014

Rs. Lacs

Balance

sanction as on

1.4.14

Rs. Lacs + new

works

Status of work Remarks

1 Construction of Sub Tehsil Building at Village

Mullana in Ambala District

CS No. 3136 r 6 2012 168

3-Jan-2013

139.64 66.57 73.07 Work in progress.

2 Const. of Tehsil Bldg. at Raipur Rani Distt FC&PS Memo No. 319-F-6-

2013/2651

4-Mar-2013

272.00 0.00 272.00 Work yet not started

3 Constructing of Internal road/Parking in S.D.O.

(Civil) Block at Samalkha in distt. Panipat

FC & PS No. 2367R-6-09-7209

24 -Aug-2009

98.07 78.39 19.68 Worky physically completed but financial

liabilities pending

4 Const. of EVM Warehouse in the campus of

Mini Sectt. Complex at Panipat

ACS & FCR No. 1155-R-

6/7807

18-Jun-2013

103.70 0.00 103.70 The revised drawing submittred by Chief

architect office to financial commissioner.

Revenue for approval. Still awaited.

Bank of sanctions as on 01.04.14 for District Administration under head 4059- C.O. Public Works (Major Works)

5 Construction of Mini Secretariat at Meham in

Rohtak District

FC&PS No.2655-R-6-10/9831

30-Sep-2010

815.00 607.16 207.84 Work administratively approved. Work

completed except finishing and parking

area. Finishing is in progress.

6 Construction of Surface Car Parking in Mini

Sectt. at Rohtak.

275-R-6-2012/2006

21-Feb-2012

89.41 Work completed.

7 Construction of Tehsil building at Farrukh

Nagar Distt. Gurgaon

No. 2828-R-6-2011/13396

28-Nov-2010

317.95 211.77 106.18 Overall 90% nwork completed.

8 Construction of SDO(Civil) Complex ( Admn.

Block) building at Pataudi in Gurgaon Distt.

T/S vide EIC No.22/WI

3-Jan-2012

531.39 417.80 113.59 Work is in Physical progress. RCC

structure completed. Plaster of ground

floor and first floor completed. Joinery

work of ground floor and floor is in

progress. Flooring work is in progress.

9 Construction of Mini Sectt. (S.D.O.) Civil

Complex (Admn. Block) at Hathin in Palwal

Distt

FC&PS No 721-R-6-11/3198

24-Mar-2011

899.60 655.09 244.51 Physically completed and hander over to

client department on 05.03.2014

10 Construction of SDO Civil Complex (Admn.

Block) at Tohana in Fatehabad Distt.

FC&PS No. 2537-R-6

9-Nov-2011

914.00 710.38 203.62 Work completed.

11 Construction of ware house for EVM Machine in

Mini Secretariat at Fatehabad

1090-R0602012/7214

3-Jun-2013

150.30 1.23 149.07 D/E submitted

12 Rough cost estimate for construction of Record

room of SDM office in DAC building Hisar

Endst. 696-R-6-2012/356

26.03.2012

71.25 0.00 71.25

13 Construction of Tehsil Building at Uklana Distt

Hisar.

FC &PS memo No. 57-R-6-

2013/1241

30-Jan-2013

420.53 0.60 419.93 Work allotted but it will be started after

mode of conduct

14 Construction of Tehsil Office cum Revenue

record room in Tehsil Julana Distt. Jind

FC&PS No191-R-6-2012/2186

24-Feb-2012

381.60 250.94 130.66 100% B/wall completed and 2nd floor

roof slab laid further work is in progress.

15 Extension/Expansion of New Mini Sectt. at Jind

in Jind Distt.

ACSP No.3292-R-6/2012/172

3-Jan-2013

1,050.75 1.64 1049.11 Tender under approval in Head office

16 Constructing Additional work in the Campus of

Mini Sectt. at Bhiwani in Bhiwani Distt.

No.2538-P-B-11/11904

3-Nov-2011

114.74 74.63 40.11 90% work completed. Further work is in

progress

17 Construction of 2nd Floor on SDO (Civil) &

Tehsil Complex at Charkhi Dadri in Distt.

Bhiwani

FC&PS No.2844-R/13400

28-Nov-2011

98.27 51.97 46.30 Worky physically completed.

18 Construction of SDO (Civil) Complex

(Administrative Block) in the Campus of Mini

Sectt. Charkhi Dadri in Bhiwani Distt.

631-R-6-2012/3170

16-Mar-2012

1,055.00 555.91 499.09 703/703 piles & 175/175 piers cap casted.

Further work is in progress.

19 Construction of SDO Civil complex (Admin

Block) building at Sector 12 Bahadurgarh

Jhajjar Distt.

FC &PS memo No. 3247-R-6-

2012/312

31-Jan-2013

1288.83 328.16 960.67 Slab of ground floor laid. RCC work in

first storey is in progree

20 Construction of Tehsil Building at Beri in

Jhajjar District.

FC&PS No. 1372

13-Feb-2009

177.50 0.18 177.32 Work not yet started. Decision is pending

with LA with distt admn.

21 Construction of ware house for EVM Machine in

Mini Secretariat at Jhajjar

No.3154-R-6-2012/1246

30-Jan-2013

88.95 89.62 0.00 Work is in progress. Overall 20% work

completed.

22 Construction of Administration Block in SDC

(C) Complex at Beri in Jhajjar District

No.105-R-6-2012/1768

12-Feb-2013

1,525.85 159.46 1366.39 Tender case stands submitted to head

office vide SE(J) letter No. 1729 dated

12.09.13

23 Constn. of mini Sectt. Admn. Block at Sonipat R/A F.C. No. 12046

4-Nov-2010

1,329.80 1,182.78 147.02 Structure completed. Flooring and

plastering in progress.

24 Construction of SDO Civil complex (Admn

Block) at Ganaur in Sonepat Distt.

F.C. memo No. 13184

22-Nov-2011

898.77 201.02 697.75 40% work completed and balance work in

progress.

25 Construction of SDO Civil complex at Gohana

in Sonepat Distt

F.C. memo No. 12504

16-Nov-2010

692.25 702.51 0.00 Work physically completed.

26 Construction extention of litigant hall at Distt.

Administrative complex in Mini. Sectt. Sonepat

FC.No. 11460

18-Oct-2011

139.70 95.29 44.41 Physically completed.

27 Providing & fixing aluminium partition all

doors, high mast lighting audio & conference

system AC, RO & invertor in Admn Block in

Mini Sectt. at Sonepat

F.C. No.1969-R-6-12/12704

15-Oct-2012

258.88 112.59 146.29 Physically completed.

28 Construction of ware house for EVM Machine in

Mini Secretariat at Sonepat

No. 594-R-6-2013/4646

10-Apr-2013

219.88 0.00 219.88 DNIT and detailed estimate are under

preparation.

29 Replacement of lift no. 3 in New Sectt. Bldg.,

Haryana Sec-17, Chandigarh

740-CT-N-2012/3625

27-Mar-2012

76.08 76.08 Work in progress.

not in mis list

30 Construction of Administrative office building

phase II with multi level parking in the campus

of mini sectt sector 1 panchkula

2665-R-6-2013/20994

30.12.2013

4162.05 0.00 4162.05 Work yet not started. Str. Design under

preparation

31 Estimate for providing Estate Water Supply,

Sewerage, and Fire Fighting arrangement in

Administration Block (Phase-II) in the campus

of Mini Sectt. Fatehabad District

2565-R-6-2013/20547

18.12.2013

37.93 37.93

not in mis list

TOTAL 18419.67 6555.69 11785.5