Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

Upload: josue-liggins

Post on 16-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

Barnstable Public SchoolsIntegrated Preschool Presentation

Town Council MeetingNovember 20, 2014

Phases II and III

Page 2: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

Phase II and III Acceleration

Remove:2 Remaining Portable Trailers at Barnstable West Barnstable Elementary School

3 Remaining Portable Trailers at Hyannis West Elementary School

Page 3: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

Phase II and III Acceleration (cont.)

Project Design CostsAppropriation Order of $172,000 for Construction Modular Classrooms at BWB and Hyannis West Elementary Schools

Page 4: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

Rationale

Between 1979 and 1992:• Barnstable installed 19 portable

temporary classrooms as student enrollment increased during this period of time.

• This was a temporary measure until a more permanent solution could be determined.

Page 5: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

Current Status

Only 6 portable trailers remain• Five of the six trailers are used as educational

spaces• One trailer houses the administrative office for

the Early Learning Center

Page 6: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

Current Use of Trailers for Educational Instructional Spaces

West Barnstable (BWB) – identified as a long-term school facility (TAMS Report 2003) as it is the only north side school in Barnstable.– Two trailers are used for special education,

art, music and technology. – School library is located on stage in cafeteria.– Current and future needs require the existing

2 trailers be demolished and replaced with permanent modular classrooms of 3,920 sq. ft.

Page 7: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

7

Page 8: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III
Page 9: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III
Page 10: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III
Page 11: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III
Page 12: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

Current Use of Trailers for Educational Instructional Spaces (cont.)

Hyannis West Elementary School houses 3 trailers installed in 1992 totaling 3,456 sq. ft.• School programs are housed in areas not intended for academic use:

– Reading support is held in a former locker room and on the cafeteria stage

– Small group math instruction is held in a locker room– Occupational therapy, physical therapy and Gateway instruction are

in outdated temporary buildings – Space Assessment (TBA Architects, 2013) identifies Hyannis West

Elementary school as having only 89% of the required space needed to educate a population of 340

– Current and future needs require the existing temporary space be replaced with permanent modular classrooms totaling 5,040 sq. ft.

Page 13: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

13

Page 14: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

14

Page 15: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III
Page 16: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

16

Page 17: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

17

Page 18: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

Impact of Removal of Trailers without Replacing Space

BWB Principal Mr. Frank Gigliotti

Hyannis West Principal Mrs. Kathi Amato

Page 19: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

Hyannis West Growth

Page 20: Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III

Preliminary Review of Space Requirements and Fiscal Impact

Appropriation Order Request of $172,000 for:–Design costs to replace 5 trailers over two

elementary school campuses totaling 8960 sq.ft.– Funding would be provided from the School

Department’s allocation of General Fund reserves, which has an available balance of $4.7 million