barriers to accelerating delivery christine whitehead lse new ideas for housing: tools for...

13
Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday November 11 th

Upload: jesse-shaw

Post on 17-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday

Barriers to Accelerating Delivery

Christine WhiteheadLSE

New Ideas for Housing: Tools for accelerating delivery

New London ArchitectureLondon

Wednesday November 11th

Page 2: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday

Housing Requirements in London

• Latest projections suggest 222,000 per annum required in England starting in 2011 through to 2031;

• The number of households in London is projected to increase by one third; • This implies that 25% of required homes need to be in London – i.e. 55,000

units a year• Currently building under 20,000 in 2014/15, although starts rising.

Page 3: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday

Housing supply(Source: GLA)

Page 4: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday
Page 5: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday

What are the Barriers (i) • Everyone says land with planning permission;• However, there are large numbers of

outstanding planning permissions – so story not so straightforward;

• Other reasons include • Land ownership – developers v rest?• Size of sites – large sites delivering much less;• Viability;• Managed output rates to maximise profits.

Page 6: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday

Housing pipeline, approvals and completions in London 2004-2013

Page 7: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday

What are the Barriers (ii) • Structure of the construction industry;• Traditionally three types of construction firm:

Large developers, SME builders; and contractors;

• Now dominated by large developers whose appetite is probably little more than 150,000 nationally;

• Need new entry/ different approaches.

Page 8: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday

What are the Barriers (iii)

• Shorter term: materials and skills shortages because of financial crisis;

• Longer term: inadequate training, few innovations; poor productivity; inflexibility on planning and building regulations;

• Most fundamental: macro economic volatility which generates asymmetric response and loss of output.

Page 9: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday

What are the Barriers (iv)

• Consumer finance: higher deposits; tougher financial regulations; lack of institutional finance;

• Affordability - is there effective demand?• Development finance:

– Short(er) term - post crisis closure of bank lending and need to offset by pre-sales;

– Longer term – risks associated with gaining planning permission and infrastructure which generate very high borrowing costs in early stages of development.

Page 10: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday

What are the Barriers (v)

Back to land into the longer term• Emphasis on brownfield;• Emphasis on London; • When we build infrastructure do not then

effectively enable more effective use of surrounding land;

• The Green Belt?

Page 11: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday

London Green Belt

Page 12: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday

Findings from our last project: topics to address before the Mayoral election

• The uncertainties introduced by the planning negotiation process—especially viability and s106;

• The near disappearance of small and medium-sized builders from the London market;

• The potential role of Housing Zones;• Whether the Mayor has the right powers in connection with

new development;• How the GLA and local authorities could contribute to

funding;• The case for a crisis package.

Page 13: Barriers to Accelerating Delivery Christine Whitehead LSE New Ideas for Housing: Tools for accelerating delivery New London Architecture London Wednesday

Our new report

Housing in London: Addressing the Supply Crisishttp://www.lse.ac.uk/

geographyAndEnvironment/research/london/docs/LSE-Report-Final-Version-Web-Authored.pdf

Many Thanks to GLA for data

[email protected]