PROJECT OVERVIEW JUNE 2020 BARWON HEADS ROAD DUPLICATION We’re upgrading Barwon Heads Road to make your journey safer and more predictable. Project benefits Once complete, the duplication will improve traffic flow in the area, and make your journey safer and more predictable. Project overview The Barwon Heads Road duplication project extends four kilometres from Settlement Road to Reserve Road. As part of this upgrade, we will: duplicate four kilometres of Barwon Heads Road between Settlement Road and Reserve Road build a bridge over the railway line at Marshall, removing the level crossing upgrade intersections install new street lighting, road signage, drainage and landscaping. Four kilometres of construction Capacity to cater for 33,000 daily journey's by 2031 Improving access to active and public transport modes Improving safety and reducing the severity and incidence of crashes Authorised by the Victorian Government, 1 Treasury Place, Melbourne SIGN UP FOR PROJECT UPDATES roadprojects.vic.gov.au Image above: The Barwon Heads Road and Horseshoe Bend Road Intersection

Upload: others

Post on 30-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BARWON HEADS ROAD DUPLICATION PROJECT OVERVIEW › hdp.au.prod.app... · 2020-06-25 · PROJECT OVERVIEW JUNE 2020 BARWON HEADS ROAD DUPLICATION We’re upgrading Barwon Heads Road

PROJECT OVERVIEW

JUNE 2020

BARWON HEADS ROAD DUPLICATION

We’re upgrading Barwon Heads Road to make your journey safer and more predictable.

Project benefits

Once complete, the duplication will improve traffic flow in the area, and make your journey safer and more predictable.

Project overview

The Barwon Heads Road duplication project extends four kilometres from Settlement Road to Reserve Road.

As part of this upgrade, we will:

• duplicate four kilometres of Barwon Heads Road between Settlement Road and Reserve Road

• build a bridge over the railway line at Marshall, removing the level crossing

• upgrade intersections

• install new street lighting, road signage, drainage and landscaping.

Four kilometres of construction

Capacity to cater for 33,000 daily journey's by 2031

Improving access to active and public transport modes

Improving safety and reducing the severity and incidence of crashes

Authorised by the Victorian Government, 1 Treasury Place, Melbourne

SIGN UP FOR PROJECT UPDATES roadprojects.vic.gov.au

Image above: The Barwon Heads Road and Horseshoe Bend Road Intersection

Page 2: BARWON HEADS ROAD DUPLICATION PROJECT OVERVIEW › hdp.au.prod.app... · 2020-06-25 · PROJECT OVERVIEW JUNE 2020 BARWON HEADS ROAD DUPLICATION We’re upgrading Barwon Heads Road

Contact [email protected]

1800 105 105

Major Road Projects Victoria GPO Box 4509, Melbourne VIC 3001

Please contact us if you would like this information in an accessible format

If you need assistance because of a hearing or speech impairment, please visit relayservice.gov.au

For languages other than English, please call 9209 0147

Follow us on social media

@roadprojectsvic

1525

South BarwonReserve

Jerringot Wetlands

Barwon River

Mar

shal

lTr

ain

Stat

ion

Wau

rn P

onds

Tra

il

Fellmongers Road

Leather Street

Tannery Road

Breakwater RoadGundog Lane

Set

tlem

ent R

oad

Crows Road

Winter Street

Grove Road

Woolscour Lane

Marshalltown Road

Reserve Road

Tann

er S

tree

t

Tuck

er S

tree

t

Spa

rrow

vale

Roa

d

Dre

ws

Roa

d

Hor

sesh

oe B

end

Roa

d

Barwon H

eads Road

Stat

ion

Road

Bar

war

re R

oad

Barwon H

eads Road

BREAKWATER

GROVEDALE

CHARLEMONT

BELMONT SOUTH GEELONG

MARSHALL

To Geelong

To Barwon Heads

Bridge over railway crossing

Duplicate from two to four lanes

New bridge over railway

Rail line

Existing pathway

New shared user pathway

Level crossing removal

Not to scale

Train station

Upgraded intersection

No through road