Base Station Operation and User Association Mechanisms For Energy-
Delay Tradeoffs in Green Cellular Networks
by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar Krishnamachari
Haluk Celebi/ hc2489
![Page 2: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/2.jpg)
Outline
• Motivation• Problems to be solved• System model• Solution approaches and algorithms
![Page 3: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/3.jpg)
Main Motivation
• BSs are large underutilized: Traffic is below 10% of peak 45% of the time.
• UMTS BS consumes 800-1500W, and radio 30-40W. Thus, not only turning off the transceivers, we need to turn off BS completely.
![Page 4: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/4.jpg)
Problems to be solved
1. User association: When the set of active BS changes, MT needs to be associated with a new BS
2. Energy efficient BS operation: finding optimal set of active BS
- Paper gives a distributed algorithm to solve 1st problem optimally. For 2nd problem, it offers several greedy algorithms.
![Page 5: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/5.jpg)
System Model and Problem Formulation
( )x• arrival rateTraffic load density
Set of active BS
Transmission rate of user i located at x
Fraction of time required to deliver traffic load from BS i to location x
![Page 6: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/6.jpg)
Feasible solution to the problem: utilizations of BSs
Note that in optimal case p(x) is either 1 or 0
![Page 7: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/7.jpg)
Cost function
•n is the parameter that determines between the flow level performance and the energy level consumption
Flow level performance
![Page 8: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/8.jpg)
is a parameter specifying the degree of load balancing
Each MT prefers a BS that gives the highest rate
Minimizing number of flows, thus delay in M/M/1 queue
Thus as α increases, cost function places more importance on traffic load instead of transmission rate
![Page 9: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/9.jpg)
Cost function of Energy
Portion of fixed power consumption.
Energy that is spend only depends on the radio.
In other case, when q =1, regardless of the utilization amount of energy spend is Pi. That`s where turning BS off becomes more important
We assume femto cells are more energy proportional (smaller q values) macro cells.
![Page 10: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/10.jpg)
Solution approach to the problem
•Solving two cost functions together is hard.•We assume that flow arrival, and departure process is much faster than the period of determining active and passive BSs•Decompose problem into two sub-problems• Solve user association problem. For given active BS
set find which BS each MT should connect to• BS operation problem
![Page 11: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/11.jpg)
Connection policy
It`s proved in the paper that with this policy, each MT is able to choose optimal BS
![Page 12: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/12.jpg)
Energy Efficient BS operation
![Page 13: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/13.jpg)
![Page 14: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/14.jpg)
![Page 15: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/15.jpg)
![Page 16: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/16.jpg)
![Page 17: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/17.jpg)
![Page 18: Base Station Operation and User Association Mechanisms For Energy- Delay Tradeoffs in Green Cellular Networks by Kyuho Son, Hongseok Kim, Yung Yi, Bhaskar](https://reader030.vdocuments.net/reader030/viewer/2022032516/56649c725503460f94924845/html5/thumbnails/18.jpg)