REASONS FOR CRYOGENIC TANKINSPECTIONS
INTEREST IN INNOVATION/ REFURBISH-
MENT
RISK OF POTENTIAL
LOSS OF PRODUCTION
TERMINAL LIFETIME
ASSESSMENT
YOU DETECT POTENTIAL RISKS OR IRREGULARITIES WITHIN YOUR
TANK
THE DESIGNED LIFETIME OF YOUR TANK IS COMING TO AN
END
YOU WOULD LIKE TO REFURBISH YOUR TANK OR UPDATE TO THE
NEWEST STATE OF THE ART TECHNOLOGY, CHANGE OF LOCAL
REGULATIONS
www.tge-gas.comPage 4
REASONS FOR CRYOGENIC STORAGE TANK INSPECTIONSWE CAN HELP YOU:
TO ENSURE THE SAFETY OF YOUR ASSETS AND YOUR EMPLOYEES ON SITE;
TO EXTEND THE LIFETIME OF YOUR TANK;
TO KEEP TRACK OF THE LATEST INNOVATIONS AND TO UPDATE YOUR TANK TO THE NEWEST TECHNICAL STANDARDS;
TO SAVE MONEY WITH PRECISE CAPACITY / ACCURATE TANK CALIBRATION;
TO COMPLY TO CHANGES OF LOCAL REGULATIONS;
TO IDENTIFY ROOT CAUSE AND SOLVE PROBLEMS;
TO CONTINUE TO BE A RELIABLE AND PROFESSIONAL PARTNER IN THE OIL & GAS INDUSTRY.
www.tge-gas.comPage 5
THE RIGHT PARTNERLEADING ENGINEERING COMPANY FOR PROJECTS FOR THE STORAGE AND HANDLING OF LIQUEFIED PETROCHEMICAL GASES:
• WITH MORE THAN 35 YEARS BUSINESS EXPERIENCE; FROM THE INITIAL CONCEPT / FEASIBILITY STUDY TO THE TURN-KEY LUMP-SUM EXECUTION OF COMPLETE PROJECTS AS MAIN CONTRACTOR;
• REALIZING INSPECTIONS, REDESIGNS / EVALUATIONS OF STORAGE TANKS & PROCESS FACILITIES PLUS LEAD AND / OR SUPPORT OF ANY COMMISSIONING ACTIVITIES, WITH OUR OWN EXPERIENCED INSPECTION TEAM, QUALIFIED TO API 653, EEMUA 159;
• OPERATING WORLDWIDE WITH MAIN OFFICES LOCATED IN EUROPE AND ASIA, EMBEDDED WITHIN A LARGE INDUSTRIAL GROUP WITH STRONG PARTNERS AND SHAREHOLDERS.
www.tge-gas.comPage 6
THE RIGHT PARTNER
SPECIALIZED
TRUSTFUL
EXPERIENCED
REPUTABLE
RELIABLE
CONFIDENTIAL
PROFESSIONAL
www.tge-gas.comPage 7
EVALUATION PROCEDURE• OPTIONAL:
OUT-OF-SERVICE INSPECTION
• SITE SURVEY/ FEASIBILITY STUDY
PROPOSAL OF TAILOR MADE INSPECTION SOLUTION
PERFORMANCE OF TANK INSPECTION
LIFETIME ASSESSMENT
FINAL REPORT & PROPOSAL OF
POTENTIAL FOLLOW-UP-SOLUTIONS
www.tge-gas.comPage 8
EVALUATION PROCEDUREIN-SERVICE INSPECTION FOR CRYOGENIC TANKS
PRE-INSPECTION: • Review of existing Engineering and Construction Documents• Site Visit• Issue of detailed inspection procedures and schedule
INSPECTION: • Storage Tank• Steel Structures• Piping & Supports• Painting / Coating Condition• Crane / Hoist• Safety Installation• Instrumentation• Electrical Installations• Equipment• External Insulation Piping and Tank
FINAL REPORT • Post inspection meeting• Listing of results• Assessment of specific findings• Evaluation of need of further inspections or calculations• Recommendations for preventative maintenance• General maintenance consultancy• Evaluation of potential repair work or modification
www.tge-gas.comPage 9
EVALUATION PROCEDUREOUT-OF-SERVICE INSPECTION FOR CRYOGENIC TANKS
DECOMMISSIONING: • Liquid Removal• Remaining Liquid Vaporization and Tank Warming up• Purge• Gassing-up • Decommissioning of pipework• Where necessary removal of Insulation to gain access
INNER TANK ACCESS • Safety Precautions• Preparation Works for Inspection
TANK INSPECTION • Inner Tank – Inside and Outside Face• Outer Tank – Inner Face• Inner Tank Equipment: Pumps / Instruments• Insulation, Nozzles, Instruments, Structural members, Liners
PRE-COMMISSIONING • Checks and tests after inspection completion• Commissioning of utility systems• Check of Safety Systems• Test of equipment loop-check and interlocks• Inerting with Nitrogen
COMMISSIONING • Gassing-up• Cool down of the storage tank• First liquid filling• Functional tests
www.tge-gas.comPage 10
YOUR ADDED VALUEAN EXTENDED LIFE TIME OF YOUR TERMINAL!
UPDATE TO INNOVATIVE AND NEWEST STANDARDS!
PRESERVATION OF YOUR ASSETS & INVESTMENT!
SAFETY FOR THE ENVIRONMENT AND YOUR EMPLOYEES!
STATE-OF-THE-ART!
www.tge-gas.comPage 11
THANK YOU FOR YOUR ATTENTION!Das Bild kann nicht angezeigt werden.
Vielen Dank cпaсибо большое
Obrigado
www.tge-gas.comPage 12
TGE Gas Engineering GmbHMildred-Scheel-Str. 153175 BonnGermany
+49 228 60448 821+49 228 60448 893
CONTACTDas Bild kann nicht angezeigt werden.
www.tge-gas.comPage 13
China
Shanghai CIMC TGE Gas Engineering Co., LtdNew Shanghai International TowerUnit A, 30th Floor – 360 Pu Dong Nan Road200120 ShanghaiP. R. CHINA+ 86 21 6418 3069+ 86 21 6418 [email protected]
India
TGE Gas Engineering PVT Ltd.German Centre for Industry and TradeOffice No. 22, 12th FloorBuilding No. 9 Tower BDLF Cyber City Phase IIIGurgaon 122002INDIA+ 91 124 4249080 83+ 91 124 [email protected]
Russia
OOO TGE Gas Engineering RUSPulkovskoe shosse 28 (Building A), Room 701196158 Saint PetersburgRUSSIA+7 981 [email protected]
United Kingdom
TGE Gas Engineering GmbHSuite 2a, Manchester International Office CentreStyal Road, Manchester M22 5WB UNITED KINGDOM+ 44 161 2040 000+ 44 161 2040 [email protected]
Technodyne International LtdBlack Horse House8-10 Leigh Road, EastleighHampshire SO50 9FHUNITED KINGDOM+ 44 2380 629929+ 44 2380 [email protected]
Taiwan
TGE Gas Engineering GmbH5F-1, No. 81, Chengde Road Section 4111 – TaipeiTAIWAN+ 886 2 2885 7885+ 886 2 2885 [email protected]
TGE WORLDWIDE - CONTACTS