batch flow process

Upload: mayank-soni

Post on 06-Apr-2018

241 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 Batch Flow Process

    1/32

    BATCH FLOW PROCESSBATCH FLOW PROCESS

    Course InstructorCourse Instructor

    Dr. N. SambandamDr. N. Sambandam

    ______________________________________________________________________________________________

    NATIONAL INSTITUTE OF INDUSTRIAL ENGINEERINGNATIONAL INSTITUTE OF INDUSTRIAL ENGINEERING

    ViharVihar Lake, Mumbai 400 087.Lake, Mumbai 400 087.

  • 8/3/2019 Batch Flow Process

    2/32

    PRODUCTS AND VOLUMEPRODUCTS AND VOLUME

    Produce low volumes of variety of differentproducts.

    Investment in specialized machines andtools is justified.Orders: one time for small qty. and repeat fromtime to time.

    ExamplesExamples: Home heating systems, Tanks formilitary, Ice cream, Forest harvest equipments,Suit coat, sport coat, Kitchen & dinning room

    furniture,Pharmaceutical products.

  • 8/3/2019 Batch Flow Process

    3/32

    LAYOUT AND MATERIAL FLOWLAYOUT AND MATERIAL FLOW

    Cellular layout/Functional layout.Employees work in more than one department and are skilled

    on many equipments.Equipment and tooling are special purpose a (lower overhead).Material flow through the shop do not differ for each job.Work-in-process inventory is low.Delivery times are not long.

    Setup time is low.Batch (or lot) size decides the workload in the shop.Scheduling is important but is simpler than job shop.

  • 8/3/2019 Batch Flow Process

    4/32

    Materialsordering

    Spreading

    Reproducingthe marker

    CuttingFitting andSoabaring

    Fitting

    Fitting

    Materialsreceipts

    Majormatching

    Subassembly

    Subassembly

    Othersubassembly

    Majormatching

    Finalassembly

    Pressingand

    inspection

    sleeves

    fronts

    backs

    collars

    Welts, etc

    To coatshop

    To skirtshop

    CoatShop

    Serging

    Outside pleating

    RemainingSkirt operations

    Pressing andinspection

    Warehouse matchingOf coat and skirt

    Skirtshop

    Todistributor

    Figure: a Simplified process flow diagram

  • 8/3/2019 Batch Flow Process

    5/32

    Operations flow chartOperations flow chart

    Shoulderjoint

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    6/32

    Operations descriptionOperations description

    Work station #4 , operation: TrimmingWork station #4 , operation: Trimming

    A set of collar parts is taken from stand and put onA set of collar parts is taken from stand and put onthe LHS area of the work stationthe LHS area of the work station

    A collar neck band part is taken by left handA collar neck band part is taken by left hand The part is put under the presser foot of trimmingThe part is put under the presser foot of trimming

    m/c by using both hands.m/c by using both hands.

    The part is trimmed by machine by pivoting itThe part is trimmed by machine by pivoting it

    wherever necessarywherever necessary The trimmed part is put on legs by right handThe trimmed part is put on legs by right hand

    A batch of trimmed parts is taken from legs and putA batch of trimmed parts is taken from legs and puton the standon the stand

  • 8/3/2019 Batch Flow Process

    7/32

    Determination ofDetermination of smvsmv &&

    ThroughputThroughput TotalTotal smvsmv= sum of all ten readings(seconds)/60= sum of all ten readings(seconds)/60

    AverageAverage smvsmv= Total= Total smvsmv/10/10

    Std time =Std time = AvgAvg time(time(avgavg smvsmv)*allowance)*allowance

    Allowance = 15% (for machine operation)Allowance = 15% (for machine operation)= 12%(for manual operation)= 12%(for manual operation)

    Capacity per hour(Throughput)= 60/std timeCapacity per hour(Throughput)= 60/std time

  • 8/3/2019 Batch Flow Process

    8/32

    Path lengthPath lengthpath: collar to end line(length= 10.53 m)path: collar to end line(length= 10.53 m)

    Shoulderjoint

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    9/32

    Path : collar band to end line checkingPath : collar band to end line checkinglength= 9.05 minuteslength= 9.05 minutes

    Shoulderjoint

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    10/32

    Path: front right to end line checkingPath: front right to end line checkingpath length= 9.62 minutespath length= 9.62 minutes

    Shoulderjoint

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    11/32

    Path: front right to end line checkingPath: front right to end line checkingpath length= 9.56 minutespath length= 9.56 minutes

    Shoulderjoint

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    12/32

    Path: pocket to end line checkingPath: pocket to end line checkingpath length= 10.37 minutespath length= 10.37 minutes

    Shoulderjoint

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    13/32

    Path: back to end line checkingPath: back to end line checkingpath length= 9.764 minutespath length= 9.764 minutes

    Shoulderjoint

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    14/32

    Path: sleeve placket to end linePath: sleeve placket to end linecheckingchecking

    path length= 8.68 minutespath length= 8.68 minutesCollar trim Collar run Collar trim Collar turn Collar

    edge levelCollar iron Collar top

    Band hem Band set Band set

    top

    Collar

    inspection

    Plackettrim

    Frontplacket

    Frontbutton hole

    Pocketattach

    Pocketiron

    Pocketiron & trim

    Pockethem

    Main labelattach Small labelattach Yokeattach Yoke iron& trim

    Shoulderjoint

    Sleeveplacket

    SleeveBartac

    Sleeve boxSleeve

    button hole

    Cuff hem Cuff runCuff turn& edge

    Cuff top

    Collar attach

    Collar finishing

    Sleeve attach

    Sleeve top

    Side seam

    Cuff matchingand marking

    Checking &trimming

    Frontbuttonattach

    Buttonmarking

    Collar &cuff button

    holeBottom

    hemCuff attach

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    15/32

    Path: cuff to end line checkingPath: cuff to end line checkingpath length= 6.113 minutespath length= 6.113 minutes

    Collar trim Collar run Collar trim Collar turn Collaredge level

    Collar iron Collar top

    Band hem Band set Band set

    top

    Collar

    inspection

    Plackettrim

    Frontplacket

    Frontbutton hole

    Pocketattach

    Pocketiron

    Pocketiron & trim

    Pockethem

    Main labelattach Small labelattach Yokeattach Yoke iron& trim

    Shoulderjoint

    Sleeveplacket

    SleeveBartac

    Sleeve boxSleeve

    button hole

    Cuff hem Cuff runCuff turn& edge

    Cuff top

    Collar attach

    Collar finishing

    Sleeve attach

    Sleeve top

    Side seam

    Cuff matchingand marking

    Checking &trimming

    Frontbuttonattach

    Buttonmarking

    Collar &cuff button

    holeBottom

    hemCuff attach

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    16/32

    Critical pathCritical path

    The path having maximum time lengthThe path having maximum time length

    i.e. if all the parts of the shirt are put into the line fori.e. if all the parts of the shirt are put into the line fortheir respective operations at the same time thentheir respective operations at the same time thenthe part which is coming through the path which isthe part which is coming through the path which istaking maximum time will decide the throughputtaking maximum time will decide the throughputtime of the line , this path is called as critical pathtime of the line , this path is called as critical path

    So here critical path: the path coming from collar toSo here critical path: the path coming from collar toend line checkingend line checking

    Critical path length= 10.53 minutesCritical path length= 10.53 minutes

  • 8/3/2019 Batch Flow Process

    17/32

    Critical pathCritical pathcritical path length=10.53 minutescritical path length=10.53 minutes

    Collar trim Collar run Collar trim Collar turn Collaredge level

    Collar iron Collar top

    Band hem Band set Band set

    top

    Collar

    inspection

    Plackettrim

    Frontplacket

    Frontbutton hole

    Pocketattach

    Pocketiron

    Pocketiron & trim

    Pockethem

    Main labelattach Small labelattach Yokeattach Yoke iron& trim

    Shoulderjoint

    Sleeveplacket

    SleeveBartac

    Sleeve boxSleeve

    button hole

    Cuff hem Cuff runCuff turn& edge

    Cuff top

    Collar attach

    Collar finishing

    Sleeve attach

    Sleeve top

    Side seam

    Cuff matchingand marking

    Checking &trimming

    Frontbuttonattach

    Buttonmarking

    Collar &cuff button

    holeBottom

    hemCuff attach

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    18/32

    Work balancing among workWork balancing among workstations to achieve the requiredstations to achieve the required

    targettarget Search for the bottleneck operationsSearch for the bottleneck operations

    Bottleneck decides the capacity of theBottleneck decides the capacity of thelineline

    E.g. what is the capacity of this line?E.g. what is the capacity of this line?

    Op1(100) Op2(90) Op3(115) Op4(120)

  • 8/3/2019 Batch Flow Process

    19/32

    Work balancing.Work balancing. continuedcontinued

    Operation with least capacity isOperation with least capacity is

    sleeve placketsleeve placket

    SMV=1.18 minutesSMV=1.18 minutesCapacity = 44 units per hourCapacity = 44 units per hour

    But it will not be considered asBut it will not be considered asbottleneck because it does not lie onbottleneck because it does not lie onthe critical paththe critical path

  • 8/3/2019 Batch Flow Process

    20/32

    Critical pathCritical pathcritical path length=10.53 minutescritical path length=10.53 minutes

    Collar trim Collar run Collar trim Collar turn Collaredge level

    Collar iron Collar top

    Band hem Band set Band set

    top

    Collarinspection

    Plackettrim

    Frontplacket

    Frontbutton hole

    Pocketattach

    Pocketiron

    Pocketiron & trim

    Pockethem

    Main labelattach Small labelattach Yokeattach Yoke iron& trim

    Shoulderjoint

    Sleeveplacket

    SleeveBartac

    Sleeve boxSleeve

    button hole

    Cuff hem Cuff runCuff turn& edge

    Cuff top

    Collar attach

    Collar finishing

    Sleeve attach

    Sleeve top

    Side seam

    Cuff matchingand marking

    Checking &trimming

    Frontbuttonattach

    Buttonmarking

    Collar &cuff button

    holeBottomhem

    Cuff attach

    Path from sleeve

    placket have thelead of 1.84 mover the critical

    pathLeast

    capacitySMV=1.1

    8 m &capacity

    =44 u ph

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    21/32

    Work balancing Work balancing Next operation having the least capacityNext operation having the least capacity

    Cuff attachCuff attach

    SMV = 1.145 minutesSMV = 1.145 minutes

    Capacity = 45 units per hourCapacity = 45 units per hour

    It lies on the critical pathIt lies on the critical path

    So considered as bottleneck operationSo considered as bottleneck operation

    So affects the line capacity, because changes in theSo affects the line capacity, because changes in thesmvsmv value of this operation will have effect onvalue of this operation will have effect on

    critical path lengthcritical path length

  • 8/3/2019 Batch Flow Process

    22/32

    Work balancing..Work balancing..Ways to improve bottleneckWays to improve bottleneck

    capacitycapacity

    a.a. Put an extra work stationPut an extra work station

    it will causeit will cause smvsmv to be half andto be half anddouble the capacitydouble the capacity

    b.b. Distribute the excess work to theDistribute the excess work to theother work stations(it is being appliedother work stations(it is being appliedcurrently)currently)

  • 8/3/2019 Batch Flow Process

    23/32

    Distributing the excess work toDistributing the excess work to

    other work stations in the lineother work stations in the line Required capacity = 69 units per hourRequired capacity = 69 units per hour

    Current production = 45 units per hourCurrent production = 45 units per hour

    Work remained= 69Work remained= 69--45= 24 units per hour45= 24 units per hour extra time required= 24*1.145*1.15=extra time required= 24*1.145*1.15=

    31.6 minutes = 31 minutes 36 seconds31.6 minutes = 31 minutes 36 seconds

    Looking at the operation flow chart for the workLooking at the operation flow chart for the workstation having operation running at over capacitystation having operation running at over capacity

    Band hem is that operationBand hem is that operation

    capacity= 315 units per hourcapacity= 315 units per hour

  • 8/3/2019 Batch Flow Process

    24/32

    Distribution of work .Distribution of work .

    Band hemBand hem Minimum required units to be produced= 85 unitsMinimum required units to be produced= 85 units

    per hourper hour

    time required to do band hem operation on 85time required to do band hem operation on 85units= (1/315)*85= 0.27 hours = 16.19 minutesunits= (1/315)*85= 0.27 hours = 16.19 minutes= 16 minutes 11.4 seconds= 16 minutes 11.4 secondsextra time available = 43 minutes 48.6 secondsextra time available = 43 minutes 48.6 seconds

    For cuff attach we require 31 minutes 36 secondsFor cuff attach we require 31 minutes 36 secondsSo we can accommodate it hereSo we can accommodate it here

    still time available = 12 minutes 12.5 secondsstill time available = 12 minutes 12.5 seconds

  • 8/3/2019 Batch Flow Process

    25/32

    Search for next bottleneckSearch for next bottleneck

    Cuff run is the next operation having least capacityCuff run is the next operation having least capacity

    But it cant be said as a bottleneck operationBut it cant be said as a bottleneck operationbecause it doesnt lie on the critical pathbecause it doesnt lie on the critical path

    The sub path is having lead of 4.412 minutes overThe sub path is having lead of 4.412 minutes overits counter path on the junction operationits counter path on the junction operation

    So the delay caused by the cuff run operation willSo the delay caused by the cuff run operation willbe compensated by the lead timebe compensated by the lead time

  • 8/3/2019 Batch Flow Process

    26/32

    Operation = cuff runOperation = cuff run

    Collar trim Collar run Collar trim Collar turn Collaredge level

    Collar iron Collar top

    Band hem Band set Band set

    top

    Collarinspection

    Plackettrim

    Frontplacket

    Frontbutton hole

    Pocketattach

    Pocketiron

    Pocketiron & trim

    Pockethem

    Main labelattach Small labelattach Yokeattach Yoke iron& trim

    Shoulderjoint

    Sleeveplacket

    SleeveBartac

    Sleeve boxSleeve

    button hole

    Cuff hem Cuff runCuff turn& edge

    Cuff top

    Collar attach

    Collar finishing

    Sleeve attach

    Sleeve top

    Side seam

    Cuff matchingand marking

    Checking &trimming

    Front

    buttonattach

    Buttonmarking

    Collar &

    cuff buttonhole

    Bottomhem Cuff attach

    Leastcapacity

    = 51uphsmv=1.0

    1 mSub path viacuff run is

    having leadtime = 4.412m over its

    counter path

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    27/32

    Search for the nextSearch for the nextbottleneckbottleneck

    Sleeve topSleeve top Capacity=58 units per hourCapacity=58 units per hour

    SMV= 0.88 minutesSMV= 0.88 minutes

    Extra units to beExtra units to be operationalisedoperationalised = 11 units per hour= 11 units per hour

    Time required to do sleeve top operation on 11 units =Time required to do sleeve top operation on 11 units =11*0.88*1.15 = 11 minutes 8 seconds11*0.88*1.15 = 11 minutes 8 seconds

    3 options3 options

    We can accommodate it on the work station at whichWe can accommodate it on the work station at which

    band hem is being doneband hem is being done Put an extra work stationPut an extra work station

    Search for another work station which is running onSearch for another work station which is running onover capacityover capacity

  • 8/3/2019 Batch Flow Process

    28/32

    Search for the work stationSearch for the work station

    running at over capacityrunning at over capacity Main label attachmentMain label attachment

    Capacity = 206 units per hourCapacity = 206 units per hour

    SMV= 0.26 minutesSMV= 0.26 minutes Required capacity = 142 units per hourRequired capacity = 142 units per hour

    Time require for 142 unit = 142*1.15*0.26= 41Time require for 142 unit = 142*1.15*0.26= 41minutes 38.4 secondsminutes 38.4 seconds

    Extra time available= 19 minutes 21.6 secondsExtra time available= 19 minutes 21.6 seconds So we can accommodate the 11 units per hour forSo we can accommodate the 11 units per hour for

    the sleeve top operationthe sleeve top operation

    Still the time available = 8 minutes 13 secondsStill the time available = 8 minutes 13 seconds

  • 8/3/2019 Batch Flow Process

    29/32

    Improvement in the lineImprovement in the linecapacitycapacity

    Current capacity = 550 units per shiftCurrent capacity = 550 units per shift

    Projected improvement=10% or 56 unitsProjected improvement=10% or 56 units

    per shiftper shift New projected capacity = 606 units perNew projected capacity = 606 units per

    shiftshift

    Per hour capacity = 76 unitsPer hour capacity = 76 units

    So the bottleneck operation will be theSo the bottleneck operation will be theoperation running on the capacity less thanoperation running on the capacity less than

    76 units per hour76 units per hour

  • 8/3/2019 Batch Flow Process

    30/32

    Critical path length= 10.017Critical path length= 10.017minutesminutes

    Collar trim Collar run Collar trim Collar turn Collaredge level

    Collar iron Collar top

    Band hem Band set Band set

    top

    Collarinspection

    Plackettrim

    Frontplacket

    Frontbutton hole

    Pocketattach

    Pocketiron

    Pocketiron & trim

    Pockethem

    Main labelattach Small labelattach Yokeattach Yoke iron& trim

    Shoulderjoint

    Sleeveplacket

    SleeveBartac

    Sleeve boxSleeve

    button hole

    Cuff hem Cuff runCuff turn& edge

    Cuff top

    Collar attach

    Collar finishing

    Sleeve attach

    Sleeve top

    Side seam

    Cuff matchingand marking

    Checking &trimming

    Front

    buttonattach

    Buttonmarking

    Collar &

    cuff buttonhole

    Bottomhem Cuff attach

    Frontpairing

    Buttonplacket

  • 8/3/2019 Batch Flow Process

    31/32

    Operations with capacity

  • 8/3/2019 Batch Flow Process

    32/32