bay medical center cooley bldg....
TRANSCRIPT
CONSULTANTS:MECHANICAL:
CODES:
PLUMBING:
ELECTRICAL:
BUILDING DATA:GROUP "B" = BUSINESS OCCUPANCY
TYPE "2B" UNPROTECTED SPRINKLERED
TLC Engineering Solutions1650 Prudential DriveSuite 200Jacksonville, FL. 32207PH: 904-306-9111
TLC Engineering Solutions1650 Prudential DriveSuite 200Jacksonville, FL. 32207PH: 904-306-9111
TLC Engineering Solutions1650 Prudential DriveSuite 200Jacksonville, FL. 32207PH: 904-306-9111
11,834 SQ. FT. (1ST FLOOR)
13,004 SQ. FT. (2ND FLOOR)
12,833 SQ. FT. (3RD FLOOR)
TOTAL: 30,172 SQ. FT.
FLORIDA EXISTING BUILDING CODE 6TH EDITIONFBC TEST PROTOCOLS FOR HIGH VELOCITY HURRICANE ZONESFLORIDA FIRE PREVENTION CODE 6TH EDITION
FLORIDA BUILDING CODE 6TH EDITION (2017) - BUILDINGFLORIDA BUILDING CODE 6TH EDITION (2017) - ACCESSIBILITYFLORIDA BUILDING CODE 6TH EDITION (2017) - TEST PROTOCOLSFLORIDA BUILDING CODE 6TH EDITION (2017) - MECHANICALFLORIDA BUILDING CODE 6TH EDITION (2017) - PLUMBINGFLORIDA BUILDING CODE 6TH EDITION (2017) - FUEL GAS
UL STANDARD 181 (2005)ASTM E 96 (2013)ASCE 7 (2010) - WITH ERRATA DATED JANUARY 11, 20112012 EDITION OF THE NFPA 101 LIFE SAFETY CODE
PRODUCT APPROVAL DATACATEGORY/SUB CATEGORY APPROVAL NUMBER
CONTRACTOR SHALL MAINTAIN ONSITE THE FOLLOWING1. COPY OF THE PRODUCT APPROVAL, INCLUDING PERFORMANCE CHARACTERISTICS WHICH THE PRODUCT WAS TESTED AND CERTIFIED TO COMPLY WITH.2. COPY OF APPLICAPLE MAUNUFACTURER'S INSTALLATION INSTRUCTIONS.PRODUCT SUBSTITUTION SHALL BE MADE SUBJECT TO FULL COMPLIANCE WITH THE CRITERIA NOTED HEREON, AND SUCH SUBSTITUTION SHALL BE SUBJECT TO PRIOR APPROVAL BY THE DESIGN PROFESSIONAL AND THE LOCAL BUILDING AUTHORITY HAVING JURISDICTION.
ROOF SYSTEM FLORIDA PRODUCT APPROVAL # 20324.1
EXTERIOR INSULATION & FINISH SYSTEM FLORIDA PRODUCT APPROVAL # 13447
MANUFACTURER
TREMCO
DRYVIT
SCOPE OF WORK
GYP. WALL BOARD REPAIR AND REPLACEMENT& INSULATION REPLACEMENT
FLOORING TO BE REMOVED AND REPLACED
CEILING GRID AND TILES TO BE REMOVED AND REPLACED
BUILT UP ROOF TO BE REMOVED AND REPLACED
DAMAGE TO EIFS TO BE REPAIRED
EIFS SURFACE TO BE COATED
WINDOWS TO BE REINSTALLED WHERE MISSING
DOORS TO BE REMOVED AND REPLACED
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
39:0
0A
M
TITL
ESH
EET
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
T1A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
BAY MEDICAL CENTER COOLEYBLDG. RESTORATION
615 N. BONITA AVENUE PANAMA CITY, FL 32401
SITE
CONTRACTOR SHALL MAINTAIN ON SITE THE FOLLOWING:1. COPY OF THE PRODUCT APPROVAL, INCLUDING PERFORMANCE CHARACTERISTICS WHICH THE PRODUCT WAS TESTED AND CERTIFIED TO COMPLY WITH2. COPY OF APPLICABLE MANUFACTURER'S INSTALLATION INSTRUCTIONS
PRODUCT SUBSTITUTION SHALL BE MADE SUBJECT TO FULL COMPLIANCE WITH THE CRITERIA NOTED HEREIN, AND SUCH SUBSTITUTION SHALL BE SUBJECTTO PRIOR APPROVAL BY THE DESIGN PROFESSIONAL AND THE LOCAL BUILDING AUTHORITY HAVING JURISDICTION
For THE BOARD OF TRUSTEES OF BAY MEDICAL CENTER, A SPECIAL DISTRICT VOLUME NUMBER 1
GOODWYN MILLS & CAWOOD, INC ARCHITECTURE, INTERIORS, CIVIL, LANDSCAPE
BAY MEDICAL CENTER COOLEY BLDG. RESTORATION
FOR THE BOARD OF TRUSTEES OF BAY MEDICAL CENTER,A SPECIAL DISTRICT
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:4
5A
M
IND
EXO
FD
RAW
ING
S
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
G1.0
1A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
INDEX OF DRAWINGS
SHEET NAME REVISION DATE
INDEX OF DRAWINGS
SHEET NAME REVISION DATE
INDEX OF DRAWINGS
SHEET NAME REVISION DATET1 TITLE SHEET
G1.01 INDEX OF DRAWINGSG1.03 GENERAL INFORMATION & MOCK UP WALLG1.11 ACCESSIBLILITY INFORMATIONG1.31 FIRESTOPPING - THRU-PENETRATION
SYSTEMSLS101 FIRST FLOOR LIFE SAFETY PLAND100 1ST FLOOR DEMOLITION PLAN
D100A FIRST FLOOR CEILING DEMOLITION PLAND101 2ND FLOOR DEMOLITION PLAN
D101A SECOND FLOOR CEILING DEMOLITION PLAND102 3RD FLOOR DEMOLITION PLAN
D102A THIRD FLOOR CEILING DEMOLITION PLAND103 PENTHOUSE DEMOLITION PLAND104 ROOF DEMO PLAND105 PENTHOUSE ROOF DEMO PLANA101 1ST FLOOR FLOOR FINISH PLANA102 2ND FLOOR FLOOR FINISH PLANA103 3RD FLOOR FLOOR FINISH PLANA201 FIRST FLOOR NEW WORK PLANA202 SECOND FLOOR NEW WORK PLANA203 THIRD FLOOR NEW WORK PLANA204 PENTHOUSE NEW WORK PLANA301 FIRST FLOOR NEW WORK CEILING PLANA302 SECOND FLOOR NEW WORK CEILING PLANA303 THIRD FLOOR NEW WORK CEILING PLAN
A400A EIFS REPAIRA400B EIFS REPAIR DETAILS & GENERAL NOTESA401 FIRST FLOOR EIFS REPAIR PLANA402 SECOND FLOOR EIFS REPAIR PLANA403 THIRD FLOOR EIFS REPAIR PLANA404 PENTHOUSE EIFS REPAIR PLANA405 ROOF NEW WORK PLANA406 PENTHOUSE NEW WORK PLAN AND DETAILSA407 EXTERIOR ELEVATIONSA408 EXTERIOR ELEVATIONSA500 DOOR SCHEDULE AND DETAILSA501 SECTIONS & DETAILSA600 FIRST FLOOR FINISH SCHEDULEA601 SECOND FLOOR FINISH SCHEDULEA602 THIRD FLOOR FINISH SCHEDULE
FP001 FIRE PROTECTION SYMBOLS, LEGEND,NOTES, AND INDEX
FP101 FIRST FLOOR PLAN FIRE PROTECTIONFP102 SECOND FLOOR PLAN FIRE PROTECTIONFP103 THIRD FLOOR PLAN FIRE PROTECTIONP001 PLUMBING SYMBOLS, LEGEND, NOTES, AND
INDEXP101 FIRST FLOOR PLAN PLUMBINGP102 SECOND FLOOR PLAN PLUMBINGP103 THIRD FLOOR PLAN PLUMBINGM001 MECHANICAL LEGEND, NOTES, & SHEET
INDEXM002 MECHANICAL SCHEDULES AND DETAILSM101 FIRST FLOOR PLAN DUCTWORKM102 SECOND FLOOR PLAN DUCTWORKM103 THIRD FLOOR PLAN DUCTWORKM104 ROOF & PENTHOUSE PLAN DUCTWORKM201 FIRST FLOOR PLAN PIPINGM202 SECOND FLOOR PLAN PIPINGM203 THIRD FLOOR PLAN PIPINGM204 ROOF & PENTHOUSE PLAN PIPINGM301 MECHANICAL ENLARGED LAUNDRY PLANM401 MECHANICAL SPECIFICATIONSE001 ELECTRICAL LEGEND AND DRAWING INDEXE002 ELECTRICAL SPECIFICATIONS AND NOTESE003 EXISTING ONE LINE DIAGRAME004 FIRE ALARM RISER, VOICE/DATA RISERE101 FIRST FLOOR PLAN LIGHTINGE102 SECOND FLOOR PLAN LIGHTINGE103 THIRD FLOOR PLAN LIGHTINGE104 ROOF & PENTHOUSE PLAN LIGHTINGE201 1ST FLOOR PLAN POWER AND SYSTEMSE202 SECOND FLOOR PLAN POWER AND SYSTEMSE203 THIRD FLOOR PLAN POWER AND SYSTEMSE204 ROOF AND PENTHOUSE PLAN POWER AND
SYSTEMS72
B/BBCBDBLDGBLKGBMBOTBRGBSMTBURBOWB/W
CABCBC/CCDCFCFCI
CICIPCJCLGCLOCLRCMPCMUCOCOLCONCCONNCONSTCONTCOORDCPTCSMUCTCW
DDBLDEMDETDHDIADIAGDIMDLDSDWGDF
FACE OFFACE OF BRICK
FACE OF CONCRETEFACE OF FINISH
FACE OF MASONRYFACE OF STUD
FRAME (ED), (ING)FIRE RETARDANT TREATED
FOOT/FEETFOOTING
GAUGEGALVANIZED
GRAB BARGALVANIZED HOLLOW METAL
GALVANIZED IRONGYPSUM WALL BOARD
GYPSUM
HEIGHTHANDICAP
HOLLOW METALHIGHEST OPERABLE DEVICE
HORIZONTALHIGH POINT/HORSE POWER
HOLLOW STRUCTURAL STEELHEIGHT
HEATING / VENTILATION / AIRCONDITIONING
HARDWARE
IDIEIJININSUL
JANJGJT
NOT IN CONTRACTNUMBERNOMINAL
NOT TO SCALE
OVERHEADON CENTER (S)OCCUPANT (S)
OUTSIDE DIAMETEROWNER FURNISHED,
CONTRACTOR INSTALLEDOPPOSITE HAND
OPENINGOPPOSITE
PRECAST JOINTPROPERTY LINE, PLATE
PLASTIC LAMINATEPAINT (ED)
PREFABRICATEDPREFINISHED
PREMANUFACTUREDPOUNDS PER SQUARE FOOTPOUNDS PER SQUARE INCH
POINT / PRESSURE TREATED / POINT OFTANGENCY
POLYVINYL CHLORIDEPAVEMENTPLYWOOD
QUARRY TILE
FBOFDFECFFEFFWFHCF/FFLFLGFND
WWBWCWDWHWINWPWTW/WWWFW/W/O
TELETERMT>HTHKTOTOCTOGBTOFTOJTOSTOWTYPTZ
UNO
VBVCTVERTVWC
REQUIREDRETAINING
REVISION (S), REVISEDRIGHT HAND
RECESSED JOINTROOM
ROUGH OPENINGRIGHT OF WAY
ROOF TOP UNIT
SEALED CONCRETESCHEDULED
STORM DRAINSECTION
STOREFRONTSIMILAR
SPECIFICATION (S)SQUARE
SOLID SURFACESTAINLESS STEEL
STANDARDSTEEL
STORAGESTRUCTURAL
SQUARE YARD
BACK -TO -BACKBASE OF CURB
BOARDBUILDING
BLOCKINGBENCHMARK
BOTTOMBEARING
BASEMENTBUILT -UP ROOF
BOTTOM OF WALLBETWEEN
ACCACIACTADDAFFALTALUMAPPROXARCHADJ
ACCESSIBLEAMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILEADDENDUM
ABOVE FINISH FLOORALTERNATEALUMINUM
APPROXIMATEARCHITECT (URAL)
ADJACENT
CABINETCATCH BASIN
CENTER TO CENTERCORE DECK
CUBIC FOOTCONTRACTOR FURNISHED, CONTRACTOR
INSTALLEDCAST IRON
CAST IRON PIPECONSTRUCTION OR CONTROL JOINT
CEILINGCLOSET
CLEAR (ANCE)CORRUGATED METAL PIPE
CONCRETE MASONRY UNITCLEAN OUT
COLUMNCONCRETE
CONNECTIONCONSTRUCTION
CONTINUOUS OR CONTINUECOORDINATECARPET (ED)
CALCIUM SILICATE MASONRY UNITCERAMIC TILE
CURTAIN WALL
DRYERDOUBLE
DEMOLISH OR DEMOLITIONDETAIL
DOUBLE HUNGDIAMETERDIAGONAL
DIMENSIONDEAD LOAD
DOWNSPOUTDRAWING
DRINKING FOUNTAIN
FURNISHED BY OTHERSFLOOR DRAIN
FIRE EXTINGUISHER & CABINETFINISH FLOOR ELEVATION
FINISH FACE OF WALLFIRE HOSE & CABINET
FACE TO FACEFLOOR
FLANGEFOUNDATION
FOFOBFOCFOFFOMFOSFRFRTFTFTG
GAGALVGBGHMGIGWBGYP
HHCHMHODHORIZHPHSSHTHVAC
HW
INSIDE DIAMETERINVERT ELEVATION
ISOLATION JOINTINCH / INCHES
INSULATION
JANITOR'S CLOSETJOIST GIRDER
JOINT
NICNONOMNTS
O/HOCOCCODOFCI
OHOPGOPP
PJPLPLAMPNTPREFABPREFINPREMANUFPSFPSIPT
PVCPVMTPWD
QT
REQ'DRETREVRHRJRMROROWRTU
SCSCHEDSDSECTSFSIMSPECSQSSSSTSTDSTLSTORSTRUCTSY
TELEPHONETERMINATION
TONGUE AND GROOVETHICK (NESS)THICK (NESS)
TOP OFTOP OF CURB
TOP OF GRAB BARTOP OF FOOTING
TOP OF JOISTTOP OF SLAB / TOP OF STEEL
TOP OF WALLTYPICAL
TERRAZZO
UNLESS NOTED OTHERWISE
VINYL BASEVINYL COMPOSITION TILE
VERTICALVINYL WALL COVERING
WASHER / WIDTH / WIDE FLANGEWOOD BASE
WATER CLOSETWOOD
WATER HEATERWINDOW
WORK POINT / WATERPROOFINGWEIGHT
WALL TO WALLWELDED WIRE FABRIC
WITHWITHOUT
MATERIALMAXIMUM
MISCELLANEOUS CHANNELMECHANICAL
MEZZANINEMANUFACTURE (R)
MANHOLEMINIMUM
MASONRY OPENINGMULLION
MATLMAXMCMECHMEZZMANUFMHMINMOMULL
LAMINATE (D)LINEAR FOOT
LENGTH, ANGLELABORATORY
LAVATORYLEFT HANDLIVE LOAD
LONG LEG HORIZONTALLONG LEG VERTICAL
LOW POINTLIGHT GAUGE
LIGHTLUXURY VINYL TILE
LAMLFLLABLAVLHLLLLHLLVLPLT GALTLVT
KKIPKJKSI
THOUSAND1000 #
KEY JOINT1000 # PER SQ IN
RETURN AIRRADIUS
RUBBER BASEREFLECTED CEILING PLAN
ROOF DRAINREINFORCEMENT BAR
REFRIGERATOR / REFERENCEREINFORCE (D), (ING)
RARADRBRCPRDREBARREFREINF
EAEFEIFSEJELEVELECENGREOPEOSEQEWEWCEXHEXISTEXPEXPNEXT
EACHEACH FACE
EXTERIOR INSULATION FINISH SYSTEMEXPANSION JOINT
ELEVATION / ELEVATORELECTRIC (ALL)
ENGINEEREDGE OF PAVEMENT
EDGE OF SLABEQUAL
EACH WAYELECTRIC WATER COOLER
EXHAUSTEXISTINGEXPOSED
EXPANSIONEXTERIOR
ROOM REFERENCE SYMBOL
2
COLUMN LINES:CONSECUTIVE NUMBERS ARE USED FOR
COLUMN LINES RUNNING NORTH & SOUTH
677.52 ELEVATION MARK SYMBOL:677.52 - ELEVATION (FT)
W1
0G
L1
ROOM NAME101
101
A
1
DOOR SYMBOL:DOOR NUMBER 101
WINDOW SYMBOL:WINDOW TYPE A
LOUVER SYMBOL:LOUVER TYPE L1
WALL SYMBOL:WALL TYPE 0G
REVISION SYMBOL:USED TO INDICATE SCOPE OF CURRENT
REVISION
A1.013
TRUENORTH
1
A1.01
INTERIOR ELEVATION SYMBOL:INTERIOR ELEVATION 3
ON SHEET A101
NORTH ARROW:ARCHITECTURAL ORIENTATION
FF&E:BY OTHERS
EXTERIOR ELEVATION SYMBOL:ELEVATION 1 ON SHEET A101
PLANNORTH
TA01
A
A1.01
A1.01
SPECIALTY EQUIPMENT TAG:SEE SPECIALTY EQUIPMENT SCHEDULE
PLAN KEYNOTE TAG:NOTE NUMBER A
SEE PLAN KEYNOTE SCHEDULE
BUILDING SECTION SYMBOL:SECTION 1 ON SHEET A101
WALL SECTION SYMBOL:SECTION 1 ON SHEET A101
ENLARGED DETAIL SYMBOL:DETAIL 1 ON SHEET A101
A1.01
#HEIGHT #
WIDTH #
DEPTH #
CDS#
CASEWORK TAG
1
1
1A CONSECUTIVE LETTERS ARE USED FORCOLUMN LINES RUNNING EAST & WEST
FACE OF MASONRY OR FACEOF GIRDER
2CIVIL ORIENTATION
DOOR TYPE A(SEE DOOR SCHEDULE AND
FLOOR PLANS)
(SEE EXTERIOR ELEVATIONSAND WINDOW SCHEDULE)
(SEE LOUVER SCHEDULE)
(SEE PARTITION LEGEND)
GENERAL DEMOLITION NOTES:
3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .
4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBING, & CEILING PLANDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.
5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.
1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.
2. CONTRACTOR SHALL INITIATE AND SET UP A PRE -DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.
6. REMOVE EXISTING PARTITIONS AS SHOWN. EXISTING PARTITIONS ARE METALSTUDS WITH GYPSUM BOARD.SHORING IS THE CONTRACTOR'S RESPONSIBILITY (SEE NOTE 2) WHENCUTTING FREE THE EXISTING FRAMING AND WALLS.7. REMOVE ALL EXISTING CEILINGS, GRIDS, AND SUSPENSION SYSTEMS FROMAREA OF RENOVATION AS INDICATED
8. REMOVE EXISTING FLOORING AND/OR BASE AS INDICATED IN AREA OFRENOVATION.
9. REMOVE EXISTING CABINETS, COUNTERTOPS, SHELVING AND APPLIANCES AS SHOWN
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:4
7A
M
GEN
ERA
LIN
FORM
ATI
ON
&M
OC
KU
PW
ALL
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
G1.0
3A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
A B B R E V I A T I O N S
A N N O T A T I O N S Y M B O L S
T Y P I C A L R E A C H R A N G E S
WALL MOUNTED DEVICE WALL MOUNTEDDEVICE
COUNTER TOP
WALL MOUNTED DEVICE WALL MOUNTEDDEVICE
WALL MOUNTED DEVICE
FIXED OBJECT
WALL MOUNTED DEVICE
FIXED OBJECT
F.F.E.
COUNTER TOP
MIN
15".
HOD
48"M
AX
SEE
ELEV HO
D
48"M
AX
SEE
ELEV
HOD
44"M
AX
10" MAX
34"M
AX
34"M
AX
HOD
46"M
AX
HOD
48"M
AX
HOD
48"M
AXM
IN
15".
>20" - 25" MAX
MAX
20" 10" MAX >10" - 24" MAX
U N O B S T R U C T E D F O R W A R DR E A C H
O B S T R U C T E D H I G H F O R W A R D R E A C H U N O B S T R U C T E D S I D E R E A C H O B S T R U C T E D H I G H S I D E R E A C H
F.F.E. F.F.E.
36" MIN BAR
17" FFW
W A T E R C L O S E T
TOGB
35"A
FF
TOSE
AT18
"AFF
GB
42" MIN
54" MIN
12" MAX
±40
"AFF
MIN
1'-6
"FFW
±40"
12" MIN24" MIN
59" MIN CLRCLR FLOOR SPACE
60" MIN
CLR
9"M
IN
TOGB
35"A
FF
AFF
44"M
AX
PARTITION
PARTITION/ EDGE OFSINK
CLR
9"M
IN
CLR6" MIN
FFW
24" MIN
URINAL SCREEN(WHERE OCCURS)
FFW13 1/2" MIN
56"A
FFM
IN
17"
MAX
AFF
TOHO
D
44"M
AX
6" MIN CLR
15" MIN CLR
TO ANYOBSTRUCTION
48" MIN CLR
TOHO
D
U R I N A L
F.F.E.
01. TYPICAL HEIGHTS: MOUNTING HEIGHTS INDICATED HEREIN ARE TYPICALMOUNTING HEIGHTS FOR DEVICE INDICATED. MOUNTING HEIGHTS FORSUBMITTED PRODUCTS MAY VARY BY MANUFACTURER. THE GENERALCONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCYBETWEEN THE INDICATED MOUNTING HEIGHT AND THE MANUFACTURERSRECOMMENDED MOUNTING HEIGHT, PRIOR TO INSTALLATION OF THEDEVICE.
02. THE GENERAL CONTRACTOR SHALL REFER TO PLANS FOR LOCATIONS OFDEVICES SHOWN HEREIN.
03. ADA DEVICES: ALL DEVICES AND FIXTURES NOTED AS “ADA” OR“ACCESSIBLE” SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THEAMERICANS WITH DISABILITIES ACT AND APPLICABLE BUILDING CODES.
04. ELECTRICAL DEVICES: SEE ELECTRICAL DRAWINGS AND SPECIFICATIONSFOR REQUIRED MOUNTING HEIGHT OF ELECTRICAL DEVICES AND FIXTURES.WHERE CONFLICTS EXIST BETWEEN MOUNTING HEIGHTS INDICATED HEREINAND THE REQUIREMENTS OF THE ELECTRICAL ENGINEER, THE GENERALCONTRACTOR SHALL NOTIFY THE ARCHITECT PRIOR TO ROUGH-IN.
M O U N T I N G H E I G H T N O T E S
05. MECHANICAL/PLUMBING DEVICES: SEE MECHANICAL AND PLUMBINGDRAWINGS AND SPECIFICATIONS FOR REQUIRED MOUNTING HEIGHT OFMECHANICAL AND PLUMBING DEVICES AND FIXTURES. WHERE CONFLICTSEXIST BETWEEN MOUNTING HEIGHTS INDICATED HEREIN AND THEREQUIREMENTS OF THE MECHANICAL ENGINEER, THE GENERALCONTRACTOR SHALL NOTIFY THE ARCHITECT PRIOR TO ROUGH-IN.
06. INSTALL ADA / ANSI COMPLIANT UNDER LAVATORY GUARDS ON ALLEXPOSED SINK PIPING.
07. CONTRACTOR MUST MAINTAIN ON THE JOB SITE A COPY OF THE CURRENTADAAG STANDARDS AND THE IBC CHAPTER 11 ACCESSIBILITYREQUIREMENTS.
08. DIMENSIONAL DESIGNATIONS 0F +/- TO HAVE +/-1/2" TOLERANCE UNLESSOTHERWISE NOTED.
09. DESIGNATION FOR FINISHED FACE OF WALL (FFW) TO BE TAKEN FROMNEAREST CONTINUOUS SURFACE IN THE PLANE OF THE WALL [I.E. FACE OFFLOOR BASE IF FACE OF BASE EXTENDS BEYOND FACE OF WALL].
CONTROLSAREA
ENTRANCE SIDE
SEAT WALLBACK WALL
TOGB
35"A
FF5"
18"M
IN
ENTRANCE SIDE
AFF
1'-6
"
FOLDING SHOWERSEAT
3" MIN
AFF
1'-6
"48
"MAX
AFF
TOGB
35".
6"MAX 6" MAX
MAX
2'-3"
HEAD WALL
A C C E S S I B L E R O L L - I N S H O W E R ( W I T H F O L D I N G S E A T )
SHOWERCURTAIN ROD
80"M
IN
42"
TOWEL BAR AT ACCESSIBLELOCATIONS
MAX4"
F.F.E.
SEE ELEVATIONS FORSTANDARD BAR HEIGHT
MIN
1'-6
"
34"C
NTRT
P.
3'-6
"U.
N.O
.
48"M
AX
TOLE
NSO
FST
ROBE
80"M
IN.-
90"M
AX
CLEAR1'-6"MIN
9" MIN
CLEQEQ
CENTERED ON TACTILECHARACTERS
TOPU
LLLE
VER
±45
"AFF
CHAR
ACTE
RS
VERI
FYEX
ACT
MO
UNTI
NGHE
IGHT
IF CEILING DOES NOT PERMIT 80" VERIFYHEIGHT W / ARCH
LATCH SIDE OR NEARESTADJACENT WALL
F I R E A L A R M W / S T R O B E
*NOTE: ROTATE ELECTRICAL COVER PLATES HORIZONTAL IFCOUNTERTOP IS ABOVE 42" HIGH
60"T
OTO
P
E L E C T R I C A L D E V I C E SA D A I N T E R I O R S I G N A G E
F.F.E.
HEAD WALL
CONTROLSAREA MAY BE ONANY SHOWER WALL
ENTRANCESIDE
END WALLBACK WALL
TOGB
35"A
FF5" 18
"MIN
ENTRANCESIDE
48"M
AXAF
F
TOGB
35"A
FF
A C C E S S I B L E R O L L - I N S H O W E R ( W I T H O U T F O L D I N G S E A T )
SHOWERCURTAIN ROD
80"
MIN6"MAX
6" MAX
6"MAX
3'-6
"
TOWEL BAR AT ACCESSIBLELOCATIONS
6" MAXMAX4"
F.F.E.
SEE ELEVATIONS FORSTANDARD BAR HEIGHT
F.F.E.TOGB
35"
AFF
CONTROL END WALL
TOGB
35"
AFF
A C C E S S I B L E T U B ( W I T H R E M O V A B L E S E A T )
TOGB9"
TOGB
2'-1
1"AF
F
BACK WALL
REMOVABLE TUBSEAT,15 1/2" W
18"A
FF
SEAT
GB
24" MIN
18"M
INGB
5"
GB12" MIN12" FFW MAX
CONTROLSAREA
HEAD WALLCONTROLWALL
24" FFW MAX
GB
24" MAX
EDGE OFTUB EDGE OF
TUB
HEAD END WALL
3'-6
"
TOWEL BAR AT ACCESSIBLELOCATIONS
SHOWERCURTAIN ROD
80"
MIN
MAX4"
SEE ELEVATIONS FORSTANDARD BAR HEIGHT
CONTROL END WALL
TOGB
35"A
FF
GB
24" MIN
18"M
INGB
5"
CONTROLSAREA
EDGE OFTUB
TOGB9"
TOGB
35"A
FF
PERMANENT TUBSEAT, 16" MIN
12" FFW MAX
HEAD WALLCONTROLWALL 15" FFW MAX
GB
24" MAX
BACK WALL ACCESSIBLE TUB (WITHPERMANENT SEAT)
AFF
SEAT
1'-6
" 3'-6
"
TOWEL BAR AT ACCESSIBLELOCATIONS
SHOWERCURTAIN ROD
80"
MIN
MAX4"
A C C E S S I B L E T U B ( W I T H P E R M A N E N T S E A T )
F.F.E.
SEE ELEVATIONS FORSTANDARD BAR HEIGHT
CONTROLSAREA
ENTRANCESIDE
SEAT WALLBACK WALL
TOGB
35"A
FF5" 18
"MIN
ENTRANCESIDE
18"A
FF
FOLDINGSHOWER SEAT
3" MIN
18"A
FF48
"MAX
AFF
TOGB
35"A
FF
6" MAX 6" MAX
HEAD WALL
A C C E S S I B L E T R A N S F E R S H O W E R ( W I T H F O L D I N G S E A T )
SHOWERCURTAIN ROD
80"
MIN
3'-6
"
TOWEL BAR AT ACCESSIBLELOCATIONS
GB EXTENT1'-6 1/4"
MAX4"
F.F.E.
SEE ELEVATIONS FORSTANDARD BAR HEIGHT
T O I L E T A C C E S S O R Y T Y P E
D R A W I N G D E S I G N A T I O N
PAPER TOWELDISPENSER
TOILET TISSUEHOLDER
TOILET TISSUEDISPENSER
WASTERECEPTACLE
SURFACEMOUNTED
WASTERECEPTACLE
RECESSED
CL
TA03
TA04
TA05
TA06
TA07
TA08
TA01
TA40
CL
CL
48"M
AX
TA02 TA10
TA11
TA09
48"M
AX
48"M
AX
48"M
AX
WASTERECEPTACLE
TA12
TA13
TA14
48"M
AX
SOAP DISPENSER
RECESSED
TA15
TA16
15"M
IN
1-1/
2"M
IN
GRAB
BAR
BOGB
WC8" FO
CL
WC8" FO
AFF
48"M
AXTO
GB12
"MIN
15"M
IN
GRAB
BAR
BOGB
1-1/
2"M
IN
48"M
AXAF
FTO
BOTT
OM
OF
SPO
OL
WC8" FO
12"M
INTO
GBWC
8" FO HEIG
HTO
FO
PERA
BLE
DEVI
CE
HEIG
HTO
FO
PERA
BLE
DEVI
CE
HEIG
HTO
FO
PERA
BLE
DEVI
CE
HEIG
HTO
FO
PERA
BLE
DEVI
CE
HEIG
HTO
FO
PERA
BLE
DEVI
CE
VERIFY EXACT MOUNTING HEIGHT OF SUBMITTED DEVICEWITH ARCHITECT
T Y P I C A L A C C E S S I B L E M O U N T I N G H E I G H T S
REFER TO PLAN & SPEC FORLENGTH AND CONFIGURATION
SAFETY GRAB BAR
48"M
AX
TA55
BABY CHANGING STATION
BOTT
OM
OF
REFL
ECTI
VESU
RFAC
E
MIRROR ATACCESSIBLECONDITIONS
40"M
AX
TA23
TA24
TA25
48"M
AX
TA30
TOILET SEAT COVERDISPENSER
48"M
AX
ROBE/COAT HOOK AT ACCESSIBLELOCATIONS (SEE ELEVATIONS FOR
STANDARD HOOK HT)
TA26
48"M
AX
40"M
IN
TA44
TOILETRY SHELF
5'-6
"
TA60
MOP AND BROOMHOLDER
TA20
TA21
TA22
HEIG
HTO
FO
PERA
BLE
DEVI
CE
HEIG
HTO
FO
PERA
BLE
DEVI
CE
HEIG
HTO
FO
PERA
BLE
DEVI
CE
HEIG
HTO
FO
PERA
BLE
DEVI
CE
HEIG
HTO
FO
PERA
BLE
DEVI
CE
48"M
AX
FIREEXTINGUISHER
FIRE EXTINGUISHERCABINET
FE FEC
18"
36"
42"
FINISH FLOOR
FINISH FLOOR
E.W.C.(ACCESSIBLE)
TOSP
OUT
36"M
AX
E.W.C.(STANDARD)
TOSP
OUT
38"-
43"
27"M
IN
48"M
AX
HEIG
HTO
FO
PERA
BLE
DEVI
CE
HAND DRYER
TA50
48"M
AX
T O I L E T A C C E S S O R Y T Y P E
D R A W I N G D E S I G N A T I O N
A B B R E V I A T I O N S A N D A C R O N Y M S
AFF . . . . . . . . . . . . . . . . . . . . . . . ABOVE FINISHED FLOOR
BOGB . . . . . . . . . . . . . . . . . . . . . . BOTTOM OF GRAB BAR
FFE . . . . . . . . . . . . . . . . . . . . . . FINISHED FLOOR ELEVATION
FFW . . . . . . . . . . . . . . . . . . . . . . . . .FINISH FACE OF WALL
GB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GRAB BAR
HOD . . . . . . . . . . . . . . . . . . . . . HIGHEST OPERABLE DEVICE
MAX . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MAXIMUM
MIN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MINIMUM
TOGB . . . . . . . . . . . . . . . . . . . . . . . . . TOP OF GRAB BAR
WC . . . . . . . . . . . . . . . . . . . . . . . . . . . WATER CLOSET
W/ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WITH
W/O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHOUT
MIN
1'-3" COUNTERWHEREOCCURS
OFFSET WASTE
ACCESSIBLE SINKBOWL 6 -1/2" DEEP
INSULATEEXPOSED PIPING
MAX
34"A
FFKN
EECL
R
27"M
INTO
ECL
R9"
MIN
FFW17" MIN
8"MIN CLR11"MIN CLR
TOE CLR6"MIN
L A V A T O R Y O R V A N I T Y S I N K
F.F.E.
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:5
0A
M
AC
CES
SIBL
ILIT
YIN
FORM
ATI
ON
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
G1.1
1A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
T Y P I C A L T O I L E T L A Y O U T S
NOTES:1. LOCATE FLUSH ACTIVATION ON WIDE SIDE AT ALL TOILETS - LOCATE FLUSH VALVE BENEATH ADJACENT GRAB BARS.2. SANITARY NAPKIN DISPENSERS TO BE LOCATED AT ALL FEMALE, UNISEX, & FAMILY TOILETS
T Y P I C A L A C C E S S I B L E P L U M B I N G D E T A I L S - E L E V A T I O N SEE G1.12 FOR PLAN DETAILS
GYPSUM BOARD AND METALSTUD PARTITION
STEEL SLEEVE
MINERAL FIBER PACKING
METAL PIPE OR CONDUIT (MAX 12"STEEL, 6" COPPER PIPE OR 4"CONDUIT)
GLASS FIBER PIPE INSULATION
INTUMESCENT FIRESTOP SEALANT
I N S U L A T E D M E T A L P I P E T H R U G Y P S U MP A R T I T I O N
C A B L E T R A Y T H R U G Y P S UM P A R T I T I O N
I N S U L A T E D M E T A L P I P E T H R U C M U/ C O N C W A L L O R F L O O R
I N S U L A T E D H V A C D U C T T H R U C M U/ C O N C W A L L O R F L O O R
I N S U L A T E D M E T A L P I P E T H R U CO N C , O R C O N C O N M E T A L D E C K
S I N G L E U N I N S U L A T E D M E T A L P I P E T H R UC O N C O V E R M E T A L F L O O R
U N I N S U L A T E D H V A C D U C T T H R UC O N C F L O O R / W A L L O R C M U W A L L
S I N G L E U N I N S U L A T E D M E T A L P I P E T H R UC O N C F L O O R / W A L L O R C M U W A L L
I N S U L A T E D H V A C D U C T T H R UG Y P S U M B O A R D P A R T I T I O N
S I N G L E U N I N S U L A T E D M E T A L P I P ET H R U G Y P S U M B O A R D P A R T I T I O N
S I N G L E N O N M E T A L L I C M E T A L P I P ET H R U G Y P S U M B O A R D P A R T I T I O N
S I N G L E O R B U N D L E D C A B L E T H R UG Y P S U M B O A R D P A R T I T I O N
M E M B R A N E P E N E T R A T I O N S T H R UG Y P S U M B O A R D P A R T I T I O N
M U L T I P L E P E N E T R A T I O N S T H R UG Y P S U M B O A R D P A R T I T I O N
M U L T I P L E P E N E T R A T I O N S T H R UG Y P S U M B O A R D P A R T I T I O N
U N I N S U L A T E D H V A C D U C TT H R U G Y P S U M B O A R D P A R T I T I O N
S I N G L E N O N M E T A L L I C P I P E T H R UC O N C F L O O R / W A L L O R C M U W A L L
[NOT USED]
S I N G L E N O N M E T A L L I C P I P E T H R UC O N C R E T E O V E R M E T A L F L O O R
S I N G L E O R B U N D L E D C A B L E T H R UC O N C O V E R M E T A L F L O O R
B U S W A Y T H R U C O N C F L O O R / W A L L O R C M U WA L L
B U N D L E D C A B L E T H R UC O N C F L O O R / W A L L O R C M U W A L L
C A B L E T R A Y T H R UC O N C F L O O R / W A L L O R C M U W A L L
M U L T I P L E P E N E T R A T I O N S T H R UC O N C F L O O R / W A L L O R C M U W A L L
GYPSUM BOARD AND METAL STUDPARTITION
STUD FRAMED OPENING
INTUMESCENT BLOCKS OR PILLOWS
CABLE TRAY
INTUMESCENT FIRESTOP SEALANT
INTUMESCENT BLOCKS OR PILLOWS
CONCRETE FLOOR, OR CMU ORCONCRETE WALL
STEEL SLEEVE
MINERAL FIBER PACKING
METAL PIPE OR CONDUIT (MAX 12"STEEL, 6" COPPER PIPE OR 4" CONDUIT)
GLASS FIBER PIPE INSULATION
INTUMESCENT SEALANT IN ANNULARSPACE
NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS
CONCRETE FLOOR, OR CMU ORCONCRETE WALL
MINERAL FIBER PACKING
GLASS FIBER PIPE INSULATION
INTUMESCENT SEALANT FIRESTOP
NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS
HVAC DUCT WITHOUT DAMPER (MAX 30" X30")
METAL ANGLE FRAME SCREWED TO DUCT
METAL PIPE OR CONDUIT
INTUMESCENT-LINED CAST-INFIRESTOP DEVICE
CONCRETE OR CONCRETE OVERMETAL DECK
PIPE INSULATION
METAL PIPE OR CONDUIT (MAX 12"STEEL, 6" COPPER PIPE OR 4"CONDUIT)
INTUMESCENT FIRESTOP SEALANT
GYPSUM BOARD AND METALSTUD PARTITION
STEEL SLEEVE
MINERAL FIBER PACKINGCONCRETE FLOOR, OR CMU ORCONCRETE WALL
STEEL SLEEVE
MINERAL FIBER PACKING
METAL PIPE OR CONDUIT (MAX 6"DIA)
INTUMESCENT SEALER INANNULAR SPACE
NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS
CONCRETE FLOOR, OR CMU ORCONCRETE WALL
MINERAL FIBER PACKING
INTUMESCENT FIRESTOP SEALANT
NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS
HVAC DUCT WITHOUT DAMPER (MAX30" X 30")
METAL ANGLE FRAME SCREWED TODUCT
METAL PIPE OR CONDUIT
INTUMESCENT-LINED CAST-INFIRESTOP DEVICE
CONCRETE OR CONCRETE OVERMETAL DECK
PIPE OR CONDUIT (MAX 6" PVC, ABS,FRPP, OR CPVC)
INTUMESCENT FIRESTOP SEALANT INANNULAR SPACE
GYPSUM BOARD AND METAL STUDPARTITION
INTUMESCENT-LINED METALCOLLAR
MINERAL FIBER INSULATION
INTUMESCENT FIRESTOP SEALANT
GYPSUM BOARD AND METAL STUDPARTITION
STUD-FRAMED OPENING
MINERAL FIBER PACKING
SQUARE HVAC DUCT
INTUMESCENT FIRESTOP SEALANT
GYPSUM BOARD AND METAL STUDPARTITION
STUD-FRAMED OPENING
MINERAL FIBER PACKING
SQUARE HVAC DUCT
CONCRETE FLOOR, OR CMU ORCONCRETE WALL
INTUMESCENT LINED METALCOLLAR
NON-METALLIC PIPE OR CONDUIT(MAX 6" DIA)
INTUMESCENT FIRESTOP SEALANT INANNULAR SPACE
NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS
PLASTIC PIPE OR CONDUIT
INTUMESCENT-LINED CAST-INFIRESTOP DEVICE
CONCRETE OR CONCRETE OVERMETAL DECK
CONCRETE FLOOR, OR CMU ORCONCRETE WALL
INTUMESCENT SEALANT AT POINT OFCONTACT
BUNDLED CABLE
MINERAL FIBER PACKING
NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS
INTUMESCENT FIRESTOP SEALANT INANNULAR SPACE
STEEL SLEEVE
CONCRETE FLOOR, OR CMU ORCONCRETE WALL
MINERAL FIBER PACKING
ELECTRICAL BUSWAY
NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS
INTUMESCENT FIRESTOPSEALANT
SINGLE OR BUNDLED CABLE
INTUMESCENT-LINED CAST-INFIRESTOP DEVICE
CONCRETE OR CONCRETE OVERMETAL DECK
GYPSUM BOARD AND METAL STUDPARTITION
INTUMESCENT FIRESTOP SEALANT
BUNDLED CABLE (MAX 30% CROSSSECTION OF SLEEVE)
MINERAL FIBER PACKING
STEEL SLEEVE
GYPSUM BOARD AND METAL STUDPARTITION
INTUMESCENT FIRESTOP SEALANT TOOLED FLUSH WITHBOTH SIDES OF WALL
METAL PIPE OR CONDUIT
SINGLE OR BUNDLED CABLE(2" MIN BETWEEN PENETRANTS)
MINERAL FIBER PACKING
STEEL SLEEVE OR COLLAR
CONCRETE FLOOR, OR CMU ORCONCRETE WALL
INTUMESCENT WRAP STRIP
CABLE TRAY
INTUMESCENT SHEET
INTUMESCENT FIRESTOP SEALANT
CONCRETE FLOOR, OR CMU ORCONCRETE WALL
MINERAL FIBER PACKING
SINGLE OR BUNDLED CABLE
INTUMESCENT FIRESTOP SEALANT
METAL PIPE OR CONDUIT
ABC
W-L-5040W-L-5029W-L-5014
W-L-4037W-L-4011W-L-4008
C-AJ-5024C-AJ-5096C-AJ-5087
C-AJ-7115WL-7059C-AJ-7143
F-A-5029F-A-5015F-A-5041
W-L-2073W-L-2078W-L-2029
W-J-7169W-L-7040W-L-7056
C-AJ-2005C-AJ-2109C-AJ-2038
F-A-2097F-A-2054F-A-2192
W-L-1001W-L-1054W-L-1088
W-L-7195W-L-7059W-L-7178
C-AJ-1044C-AJ-1226C-AJ-1080
C-AJ-7016WL-7109C-AJ-7027
F-A-1067F-A-1017F-A-1110
W-L-3031W-L-3065W-L-3133
W-L-1389W-L-1228W-L-1168
C-AJ-3021C-AJ-3095C-AJ-3043
C-AJ-6002C-AJ-6017C-AJ-6008
F-A-3017F-A-3007F-A-3055
W-L-1410W-L-1353--------
W-L-8010W-L-8079W-L-8026
C-AJ-4003C-AJ-4035C-AJ-4022
C-AJ-8003C-AJ-8143C-AJ-8053
1. THE ILLUSTRATIONS ON THIS DRAWING REPRESENT FREQUENTLY ENCOUNTERED FIRESTOPPING PENETRATION CONDITIONS THROUGH FIRE- RATED FLOOR AND WALL ASSEMBLIES.
2. THE NUMBERS SHOWN BELOW ARE MANUFACTURERS' UL-TEST NUMBERS FOR EACH CONDITION.
3. THE KEY TO MANUFACTURERS (A, B, OR C) IS AS INDICATED BELOW.
G E N E R A L T H R U - P E N E T R A T I O NN O T E S
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
P R O D U C T / M A N U F A C T U R E R L E G E N D
MIN. 1/2" BEAD FIRESTOP SEALANT AT ALL POINTCONTACT LOCATIONS
INTUMESCENT FIRESTOP SEALANT IN ANNULARSPACE TOOLED FLUSH WITH BOTH SIDES OF WALL
MULTIPLE METAL PIPES OR CONDUITS INSTALLED IN ASINGLE LAYER ARRAY
GYPSUM BOARD AND METALSTUD PARTITION
MIN. 1/2" BEAD FIRESTOP SEALANT AT ALL POINTCONTACT LOCATIONS
INTUMESCENT FIRESTOP SEALANT INANNULAR SPACE TOOLED FLUSHWITH BOTH SIDES OF WALL
GYPSUM BOARD AND METALSTUD PARTITION
SINGLE METAL PIPE OR CONDUITTHRU A SINGLE MEMBRANE LAYER
------------------------
ABC
ABC
3MHILTISTI
[NOT USED]
KEY TO MANUFACTURERS------------------------
ABC
1. GENERALA. ALL THROUGH-PENETRATION FIRESTOP WORK SHALL COMPLY WITH THE REQUIREMENTS OFSECTION 078413 – PENETRATION FIRESTOP SYSTEMS .B. THE DETAILS SHOWN HEREIN ILLUSTRATE FREQUENTLY ENCOUNTERED THROUGH-PENETRATIONFIRESTOP CONDITIONS. THEY ARE GENERIC REPRESENTATIONS OF SYSTEMS AVAILABLE FROMSEVERALMANUFACTURERS.C. SELECTION OF APPROPRIATE SYSTEMS SHALL BE THE RESPONSIBILITY OF THE FIRESTOPCONTRACTOR, AND MUST BE SUBMITTED FOR ARCHITECT’S APPROVAL. EACH SELECTION SHALLBE APPROPRIATE FOR THE PENETRATING ITEM AND SUBSTRATE, AND SHALL COMPLY WITH THESPECIFIC REQUIREMENTS OF A UL LISTED SYSTEM DESIGN.D. WHERE NO APPLICABLE UL DESIGN IS AVAILABLE FOR A PARTICULAR FIRESTOP CONFIGURATION,SUBMIT AN ENGINEERING JUDGMENT (EJ), OR EQUIVALENT FIRE RESISTANCE RATED ASSEMBLY(EFRRA), PREPARED BY THE FIRESTOP MANUFACTURER.
2. APPLICABILITYA. PROVIDE THROUGH-PENETRATION FIRESTOP SYSTEMS FOR ALL PENETRATIONS (INCLUDINGSINGLE-SIDED MEMBRANE PENETRATIONS) OF FIRE RESISTANCE RATED CONSTRUCTION, WHETHEROR NOT SPECIFICALLY DETAILED ON THE DRAWINGS (APPLICABLE TO BOTH EMPTY OPENINGS ANDOPENINGS CONTAINING PENETRATING ITEMS).B. ALL PIPING AND DUCTWORK SUBJECT TO MOVEMENT SHALL BE FIRESTOPPED WITH FLEXIBLEFIRE RATED SEALANT.C. TO EXTENT THAT APPROPRIATE UL DESIGNS ARE AVAILABLE FOR SUBSTRATE REQUIRED, USETHE FOLLOWING APPROACH TO SELECTION OF SYSTEMS:
1. FOR SIMPLE PENETRATIONS: ONE-PART FIRESTOP SEALANT2. FOR COMPLEX PENETRATIONS: FOAMED-IN-PLACE FIRESTOP SEALANT3. FOR INSULATED METAL PIPE: INTUMESCENT WRAP STRIP AND ONE-PART
FIRESTOP SEALANT.4. FOR DUCTS OR VENTS:5. FOR CABLE TRAYS OR RACEWAYS:
3. SLEEVINGA. THE FOLLOWING PENETRATIONS MUST BE SLEEVED:
1. SINGLE ROUND PENETRATIONS IN RATED CMU WALLS2. INSULATED PIPE PENETRATIONS IN RATED GYPSUM BOARD WALLS3. BUNDLED CABLE PENETRATIONS IN RATED GYPSUM BOARD WALLS4. ALL PENETRATIONS IN ELEVATED CONCRETE SLABS.
B. ALL SLEEVES SHALL BE METAL. PLASTIC IS NOT PERMITTED. THE JUNCTURE OF STEEL SLEEVESAND WALL SHALL BE SEALED WITH FLEXIBLE FIRE RATED SEALANT.
4. QUALITY ASSURANCEA. COMPLY WITH “INSTALLER QUALIFICATIONS” AND “ON-SITE RESPONSIBLE PARTY” PROVISIONSOF SPECIFICATION SECTION 078413 – THROUGH-PENETRATION FIRESTOP SYSTEMS.B. OBTAIN THROUGH-PENETRATION FIRESTOP SYSTEMS THROUGH ONE SOURCE FROM A SINGLEMANUFACTURER.C. COMMENCE FIRESTOPPING WORK ONLY AFTER SUBMITTALS (INCLUDING MOCKUPS WHEREAPPLICABLE) ARE APPROVED, AND PRE-INSTALLATION CONFERENCE IS SUCCESSFULLYCONCLUDED.
5. INSTALLATION - GENERALA. COMPLY WITH UL SYSTEM REQUIREMENTS AND FIRESTOPPING MANUFACTURERS’ PRINTEDINSTALLATION INSTRUCTIONS.B. INSTALL FORMING /DAMMING /BACKING MATERIALS AND OTHER ACCESSORIES OF TYPESREQUIRED TO SUPPORT FILL MATERIALS DURING THEIR APPLICATION AND IN THE POSITION NEEDEDTO PRODUCE CROSS-SECTIONAL SHAPES AND DEPTHS REQUIRED TO ACHIEVE FIRE RATINGSINDICATED.C. INSTALL FILL MATERIALS BY PROVEN TECHNIQUES TO PRODUCE THE FOLLOWING RESULTS:
1. FILL VOIDS AND CAVITIES FORMED BY OPENINGS, FORMING MATERIALS, ACCESSORIES, AND PENETRATING ITEMS AS REQUIRED TO ACHIEVE FIRE-RESISTANCE RATINGS INDICATED,
2. APPLY MATERIALS SO THEY CONTACT AND ADHERE TO SUBSTRATES FORMED BY OPENINGS AND PENETRATING ITEMS,D. FOR FILL MATERIALS THAT WILL REMAIN EXPOSED AFTER COMPLETING WORK, FINISH TOPRODUCE SMOOTH UNIFORM SURFACES THAT ARE FLUSH WITH ADJOINING FINISHES.E. REMOVE COMBUSTIBLE FORMING MATERIALS, AND OTHER ACCESSORIES, THAT ARE NOTINDICATED AS PERMANENT COMPONENTS OF FIRESTOP SYSTEMS. REMOVE EXCESS SEALANTFROM ADJOINING SURFACES.F. IDENTIFY THROUGH PENETRATION FIRESTOP SYSTEMS WITH PERMANENTLYATTACHED,PREPRINTED METAL OR PLASTIC LABELS, AS SPECIFIED.G. INSPECT FILL MATERIALS AFTER 48 HOURS FOR COMPLETE ADHESION AND SEAL INACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS. CORRECT DEFICIENCIES AND RE-INSPECT
F I R E S T O P P I N G - T H R U - P E N E T R A T I O N S Y S T E M S
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:5
2A
M
FIRE
STO
PPIN
G-
THRU
-PEN
ETRA
TIO
NSY
STEM
S
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
G1.3
1A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
S
S
S
S
FE
F
F
F
F
F
S
FE
F
S
F
F
FEF
F
F
F
F
F
F
F
55'-0"
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FIRE RATED WALL ( 1 HR.)
MAXIMUM PATH OF TRAVEL
FIRE EXTINGUISHER DISTANCE
EGRESS WIDTH PROVIDED (IN.)
LIFE SAFETY SYMBOLS LEGEND
FIRE RATED DOOR (IN MINUTES)
FIRE ALARM PULL STATION
FIRE ALARM HORN & STROBE
FIRE ALARM STROBE
EXIT LIGHT
EMERGENCY LIGHTS
EMERGENCY CAN LIGHT
FE
FEC
PRIMARY EXIT
AUTOMATIC SMOKE DETECTOR
EXIT SIGN
F
S
F
20
XX
FIRE RATED WALL ( 2 HR.)
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:5
9A
M
FIRS
TFL
OO
RLI
FESA
FETY
PLA
N
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
LS10
1A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 FIRST FLOOR LIFESAFETY PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
1
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
50
'-0
"
3
3 3
3
3
REMOVECHAIN LINKFENCE
3
3
3
3
3
3
3
3
33
REMOVE SINKCOORD. WITHPLUMBING
3
3
3
3
3
3 3
3
33
GENERAL DEMOLITION NOTES:
3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .
4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBING, & CEILING PLANDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.
5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.
1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.
2. CONTRACTOR SHALL INITIATE AND SET UP A PRE -DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.
6. REMOVE EXISTING PARTITIONS AS SHOWN. EXISTING PARTITIONS ARE METALSTUDS WITH GYPSUM BOARD.SHORING IS THE CONTRACTOR'S RESPONSIBILITY (SEE NOTE 2) WHENCUTTING FREE THE EXISTING FRAMING AND WALLS.7. REMOVE ALL EXISTING CEILINGS, GRIDS, AND SUSPENSION SYSTEMS FROMAREA OF RENOVATION AS INDICATED
8. REMOVE EXISTING FLOORING AND/OR BASE AS INDICATED IN AREA OFRENOVATION.
9. REMOVE EXISTING CABINETS, COUNTERTOPS, SHELVING AND APPLIANCES AS SHOWN
= EXISTING WALLS, CASEWORK, & FLOORING TO REMAIN
= EXISTING WALLS / DOORS TO BE REMOVED
= EXISTING CASEWORK TO BE REMOVED
= EXISTING DOORS TO REMAIN
= EXISTING DOORS & FRAMES TO BE REMOVED
= EXISTING FLOORING TO BE REMOVED
= GYP BOARD & INSULATION TO BE REMOVED FROM FLOOR TO CEILING
= REMOVE GYP. BOARD 1'-0" A.F.F. (FLOOD CUT)
= BORDER WALL COVERING TO BE REMOVED1
2
3
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:19
AM
1ST
FLO
OR
DEM
OLI
TIO
NPL
AN
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
D10
0A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 FIRST FLOOR DEMO PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
ELEVATORLOBBY
S101
CORRIDOR
S102
JANCLOSET
S103
ELEVATOREQUIPMENT
S105
TELEPHONE
S106
MEN'SRESTROOM
S108
EMPLOYEELOUNGE
S109
WOMEN'SRESTROOM
S116
PATIENTACCOUNT
DEPT.
S117
MEN'SRESTROOM
S118
WOMEN'SRESTROOM
S119
ELECTRICALROOM
S120
STAIR #1
S107OFFICE
S128
COPYROOM
S129
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
EXISTING CEILING GRID & TILESTO BE REMOVED
EXISTING CEILING GRID ONLYTO BE REMOVED
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:2
3A
M
FIRS
TFL
OO
RC
EILI
NG
DEM
OLI
TIO
NPL
AN
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
D10
0AA
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 FIRST FLOOR CEILING DEMO PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
VESTIBULE
S200
CORRIDOR
S201
STORAGE
S202
COMM
S203
PHYSICIANPRACTICEOFFICE
S204
ELECTRICALROOM
S205
WAITINGAREA
S206
EMPLOYEEOF
CHOICECOORD.
S207
PHOTO
S208
BREAKROOM
S209
TESTINGROOM 1
S210
CORRIDOR
S211
TESTINGROOM 2
S212
EMERALDHEALTH
S213
CORRIDOR
S214
STORAGE
S215
CONFERENCEROOM
S216
OFFICE
S217
EMPLOYEEHEALTHNURSE
S218A
VENDING
S219
RESTROOM
S220
HEALTHCOORD.
S222
RECRUITER1
S224
MANAGEDCARE
S225
OFFICE
S226
RECRUITER2
S228
OFFICE
S227A
CONF.ROOM
PATIENTBILLING
S229
CORRIDOR
S230
MANAGER
S232
STORAGE
S233
CLERICALWORKROOM
S234
STAIRS
S235
BENIFITSSPECIALIST
S236
HRSPECIALIST
S238
ALCOVE
S237
JANITORCLOSET
S239
RECORDSSTORAGE
S240
WOMEN'SRESTROOM
S241
SUPPORTCLERK
S242
MEN'SRESTROOM
S243
STORAGE
S244
ACCOUNTSRECEIVABLE
S245
SECRETARY
S246
INSURANCEWORKROOM
S247
VPCORPORATESERVICES
S248
BILLINGINS.
WORKROOM
S249
SUPERVISOR
S251
RISKMGR.CCO
S252
BREAKROOM
S253
OFFICE
S254
PRINTERROOM
S255
BILLERS /COLLECTORS
S257
CONFERENCEROOM
S259
DEPARTMENTSUPERVISOR
S261
CLERICALWORKROOM
S263
STAIRS
S262
COLLECTIONSOFFICE
S270
CASHIER'SOFFICE
S271
STORAGE
S272
SUPERVISOROFFICE
S273
MAILSORTROOM
S274
ALCOVE
S275
1
1
11
1
1
1 1
1
1
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
142' - 10 1/4"
62
'-8
"5
0'-
2"
11
2'-
10
"
1
1
GENERAL DEMOLITION NOTES:
3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .
4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBING, & CEILING PLANDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.
5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.
1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.
2. CONTRACTOR SHALL INITIATE AND SET UP A PRE -DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.
6. REMOVE EXISTING PARTITIONS AS SHOWN. EXISTING PARTITIONS ARE METALSTUDS WITH GYPSUM BOARD.SHORING IS THE CONTRACTOR'S RESPONSIBILITY (SEE NOTE 2) WHENCUTTING FREE THE EXISTING FRAMING AND WALLS.7. REMOVE ALL EXISTING CEILINGS, GRIDS, AND SUSPENSION SYSTEMS FROMAREA OF RENOVATION AS INDICATED
8. REMOVE EXISTING FLOORING AND/OR BASE AS INDICATED IN AREA OFRENOVATION.
9. REMOVE EXISTING CABINETS, COUNTERTOPS, SHELVING AND APPLIANCES AS SHOWN
= EXISTING WALLS, CASEWORK, & FLOORING TO REMAIN
= EXISTING WALLS / DOORS TO BE REMOVED
= EXISTING CASEWORK TO BE REMOVED
= EXISTING DOORS TO REMAIN
= EXISTING DOORS & FRAMES TO BE REMOVED
= EXISTING FLOORING TO BE REMOVED
= GYP BOARD & INSULATION TO BE REMOVED FROM FLOOR TO CEILING
= REMOVE GYP. BOARD 1'-0" A.F.F. (FLOOD CUT)
= BORDER WALL COVERING TO BE REMOVED1
2
3
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:2
9A
M
2ND
FLO
OR
DEM
OLI
TIO
NPL
AN
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
D10
1A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 SECOND FLOOR DEMO PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
142' - 10 1/4"
62
'-8
"5
0'-
2"
11
2'-
10
"
EXISTING CEILING GRID & TILESTO BE REMOVED
EXISTING CEILING GRID ONLYTO BE REMOVED
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:3
4A
M
SEC
ON
DFL
OO
RC
EILI
NG
DEM
OLI
TIO
NPL
AN
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
D10
1AA
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 SECOND FLOOR CEILING DEMO PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
ELEVATORLOBBY
S300
CORRIDOR
S301
CONFERENCEROOM
S302
COMM
S303
STORAGE
S304
VESTIBULE
S304A
RESTROOM
S306CEO
S308
ELECTRICAL
S305
REVENUECYCLE
COORD.
S307
CORRIDOR
S309
OFFICE
S310
BREAKROOM
S311
VP'SSECRETARY
S312
VESTIBULE
S313
VICEPRESIDENT
1
S314
PAYROLLWORKROOM
S315
WAITINGROOM
S316
FINACIALACCOUNT
SUPERVISOR
S317
VP'SSECRETARY
S318
ACCOUNTINGWORKROOM
S319
VICEPRESIDENT
2
S320
VP'SSECRETARY
S322
WORKROOM
S324
VICEPRESIDENT
3
S328
FINANCIALACCOUNTMANAGER
S329
FINANCIALACCOUNT
WORKROOM
S331
LIBRARY
S332
STAIR #1
S333
WOMEN'SRESTROOM
S335
STAIR #2
S336
JANITOR'SCLOSET
S337
VICEPRESIDENT
4
S336A
MEN'SRESTROOM
S339
CONFERENCEROOM
S340
PROCESSENGINEER
S342
VP'SSECRETARY
S344
VICEPRESEIDENT
5
S346
FINANCIALSTORAGE
S348WORKROOM
S350
COMPTROLLER
S352
MANAGERIALACCOUNT
WORKROOM
S354
AUDITOR
S362
MGRACCOUNT
SUPERVISOR
S364
PRODUCTION
S341
BREAKROOM
S367
SUPERVISOR
S370
STORAGE
S369
SCHEDULERS
S368
1
1
1
1
1
11
1
1
1
1
11
1
1
1
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
142' - 10 1/4"
62
'-8
"5
0'-
2"
11
2'-
10
"
GENERAL DEMOLITION NOTES:
3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .
4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBING, & CEILING PLANDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.
5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.
1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.
2. CONTRACTOR SHALL INITIATE AND SET UP A PRE -DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.
6. REMOVE EXISTING PARTITIONS AS SHOWN. EXISTING PARTITIONS ARE METALSTUDS WITH GYPSUM BOARD.SHORING IS THE CONTRACTOR'S RESPONSIBILITY (SEE NOTE 2) WHENCUTTING FREE THE EXISTING FRAMING AND WALLS.7. REMOVE ALL EXISTING CEILINGS, GRIDS, AND SUSPENSION SYSTEMS FROMAREA OF RENOVATION AS INDICATED
8. REMOVE EXISTING FLOORING AND/OR BASE AS INDICATED IN AREA OFRENOVATION.
9. REMOVE EXISTING CABINETS, COUNTERTOPS, SHELVING AND APPLIANCES AS SHOWN
= EXISTING WALLS, CASEWORK, & FLOORING TO REMAIN
= EXISTING WALLS / DOORS TO BE REMOVED
= EXISTING CASEWORK TO BE REMOVED
= EXISTING DOORS TO REMAIN
= EXISTING DOORS & FRAMES TO BE REMOVED
= EXISTING FLOORING TO BE REMOVED
= GYP BOARD & INSULATION TO BE REMOVED FROM FLOOR TO CEILING
= REMOVE GYP. BOARD 1'-0" A.F.F. (FLOOD CUT)
= BORDER WALL COVERING TO BE REMOVED1
2
3
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:4
1AM
3RD
FLO
OR
DEM
OLI
TIO
NPL
AN
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
D10
2A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 THIRD FLOOR DEMO PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
142' - 10 1/4"
62
'-8
"5
0'-
2"
11
2'-
10
"
EXISTING CEILING GRID & TILESTO BE REMOVED
EXISTING CEILING GRID ONLYTO BE REMOVED
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:4
3A
M
THIR
DFL
OO
RC
EILI
NG
DEM
OLI
TIO
NPL
AN
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
D10
2AA
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 THIRD FLOOR CEILING DEMO PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
REMOVE EXISTINGDOORS AND FRAMES
GENERAL DEMOLITION NOTES:
3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .
4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBING, & CEILING PLANDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.
5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.
1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.
2. CONTRACTOR SHALL INITIATE AND SET UP A PRE -DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.
6. REMOVE EXISTING PARTITIONS AS SHOWN. EXISTING PARTITIONS ARE METALSTUDS WITH GYPSUM BOARD.SHORING IS THE CONTRACTOR'S RESPONSIBILITY (SEE NOTE 2) WHENCUTTING FREE THE EXISTING FRAMING AND WALLS.7. REMOVE ALL EXISTING CEILINGS, GRIDS, AND SUSPENSION SYSTEMS FROMAREA OF RENOVATION AS INDICATED
8. REMOVE EXISTING FLOORING AND/OR BASE AS INDICATED IN AREA OFRENOVATION.
9. REMOVE EXISTING CABINETS, COUNTERTOPS, SHELVING AND APPLIANCES AS SHOWN
= EXISTING WALLS, CASEWORK, & FLOORING TO REMAIN
= EXISTING WALLS / DOORS TO BE REMOVED
= EXISTING CASEWORK TO BE REMOVED
= EXISTING DOORS TO REMAIN
= EXISTING DOORS & FRAMES TO BE REMOVED
= EXISTING FLOORING TO BE REMOVED
= GYP BOARD & INSULATION TO BE REMOVED FROM FLOOR TO CEILING
= REMOVE GYP. BOARD 1'-0" A.F.F. (FLOOD CUT)
= BORDER WALL COVERING TO BE REMOVED1
2
3
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:4
4A
M
PEN
THO
USE
DEM
OLI
TIO
NPL
AN
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
D10
3A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 PENTHOUSE ROOF DEMO PLAN
STAIRS#2
S401
PENTHOUSE
S402
RDRD
OF
RDOF
RD
RD
RDRDRDOF
RDOF
RDOF
2A406
3A406
4A406
2A406
2A406
2A406
2A406
2A406
2A406
2A406
3A406
3A406
REMOVE EXISTING DOORS AND FRAMES
GENERAL DEMOLITION NOTES:
3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .
4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBINGDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.
5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.
1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.
2. CONTRACTOR SHALL INITIATE AND SET UP A PRE-DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.
= EXISTING DOORS AND FRAMES TO BE REMOVED
= EXISTING ROOFING TO BE REMOVED
1) REMOVE ALL ROOFING DOWN TO EXPOSED LWIC2) ADHERE 1 PLY SELF ADHERED VAPOR BARRIER3) MECHANICALLY ATTACH BASE LAYER POLYISCOCYANURATE THROUGH LWIC INTO STEEL DECK4) ADHERE 2ND LAYER OF ISO W/ LOW RISE FOAM5) ADHERE 1/4" SECUROCK USING LOW RISE FOAM6) ADHERE 1 PLY BASE PLY IN COLD ADHESIVE7) INSTALL LIQUID APPLIED BASE COAT AND FIBERGLASS8) INSTALL LIQUID APPLIED TOP COAT
ROOF REPLACEMENT NOTES
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
45:14
AM
ROO
FD
EMO
PLA
N
GM
C#
apen
1900
48
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
D10
4A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RES
ORA
TIO
NBI
D
1/8" = 1'-0"1 ROOF DEMO PLAN
GENERAL DEMOLITION NOTES:
3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .
4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBINGDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.
5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.
1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.
2. CONTRACTOR SHALL INITIATE AND SET UP A PRE-DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.
= EXISTING DOORS AND FRAMES TO BE REMOVED
= EXISTING ROOFING TO BE REMOVED
1) REMOVE ALL ROOFING DOWN TO EXPOSED LWIC2) ADHERE 1 PLY SELF ADHERED VAPOR BARRIER3) MECHANICALLY ATTACH BASE LAYER POLYISCOCYANURATE THROUGH LWIC INTO STEEL DECK4) ADHERE 2ND LAYER OF ISO W/ LOW RISE FOAM5) ADHERE 1/4" SECUROCK USING LOW RISE FOAM6) ADHERE 1 PLY BASE PLY IN COLD ADHESIVE7) INSTALL LIQUID APPLIED BASE COAT AND FIBERGLASS8) INSTALL LIQUID APPLIED TOP COAT
ROOF REPLACEMENT NOTES
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
45:14
AM
PEN
THO
USE
ROO
FD
EMO
PLA
N
GM
C#
apen
1900
48
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
D10
5A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RES
ORA
TIO
NBI
D
1/8" = 1'-0"1 PENTHOUSE ROOF DEMO PLAN
CUT AROUND THEDAMAGED AREA WITH ARAZOR KNIFE CUTTINGTHROUGH ALL LAYERS, TOTHE SUBSTRATE. MAKESURE THE PATCH AREA ISLARGE ENOUGH TO EASILYWORK WITHIN, EVEN IF THEDAMAGED AREA IS SMALL.
CAREFULLY REMOVE THEFINISH, REINFORCINGMESH, AND BASE COAT.
IDENTIFY DAMAGED AREA TOBE REPAIRED
REMOVE THE DAMAGEDEPS INSULATION BOARDDOWN TO THESHEATHING. REPAIR ORREPLACE ANY DAMAGEDSHEATHING. ENSURETHAT ALL EPS INSULATIONBOARD REMAINS ARECOMPLETELY REMOVED.
MARK A SQUARE AREA AROUNDREMOVED MATERIAL 3-4INCHES
WITH A SMALL GRINDER,CAREFULLY REMOVE THEFINISH APPROXIMATELY 3-4INCHES AROUND THE REPAIRAREA.
SEPARATE BASE COAT &MESH FROM INSULATIONWITH A FLAT KNIFE
REMOVE TOP AND BASE COATS ONCE FINISH HAS BEENREMOVED FROM AROUND THEDAMAGED AREA, BRUSH ORBLOW AWAY ANY REMAININGEPS INSULATION BEADS ANDDUST FROM THE GRINDING.
CUT THE EPS INSULATIONBOARD SO THAT IT WILL FITSNUGLY INTO THE OPENING.APPLY ADHESIVE TO THE EPSINSULATION BOARD ANDTHEN PLACE THE EPSINSULATION BOARD INTO THEOPENING, ENSURING A GOODADHESIVE BOND ISACHIEVED.
AFTER THE ADHESIVE HASDRIED, RASP THE EPSINSULATION BOARD DOWNTO THE LEVEL OF THEGROUND DOWN AREA.MIX BASE COAT
MASK OFF THE FINISHAROUND THE GROUNDDOWN AREA. THE EXPOSEDGROUND OFF AREA MUSTBE APPROXIMATELY 3-INCHES AROUND THEREPAIR TO ENSUREENOUGH ROOM FOR THEREINFORCING MESH TOPROPERLY OVERLAP.
APPLY THE MIXED BASECOAT TO THE REPAIRAND THEN PLACE THEPRE-CUT REINFORCINGMESH INTO THE BASECOAT.
EMBED THE REINFORCINGMESH WITH A TROWEL ORMARGIN TROWEL, TO ASMOOTH FLAT UNIFORMTHICKNESS TO THEGROUND OFF AREA ONLY.DO NOT BUILD UP THEAREA, TROWEL THE BASECOAT TIGHT, BUT THICKENOUGH TO ENCAPSULATETHE REINFORCING MESH.
MASK WITH PLASTIC AROUNDTAPED AREA
TROWEL FINISH ONTO THEPREPARED AREA USING ASTAINLESS STEEL TROWEL.
REMOVE THE TAPE BEFORETHE FINISH DRIES. TOUCHUP THE EDGES WITH ASMALL PAINT BRUSH BYLIGHTLY DABBING AROUNDTHE EDGE. THIS HELPS TOSOFTEN AND BLEND IN THEEDGE AROUND THE PATCH.
IF NECESSARY, LIGHTLYFLOAT THE FINISH AGAIN.MAKE SURE THERE IS NOEXCESS MATERIAL ON THEBACK OF THE FLOAT PRIORTO RE-FLOATING THE AREA.
COLOR COAT MAY BEREQUIRED IF THE FINISHCOLOR OF THE PATCH IS NOTACCEPTABLE.
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
44:4
7A
M
EIFS
REPA
IR
GM
C#
apen
1900
48
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A40
0AA
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RES
ORA
TIO
NBI
D
3/32" = 1'-0"1 EIFS REPAIR
FACE SEALREAR SEAL
VENT
A-A
A
A
EXISTINGEPS INSULATION BOARDEXISTINGREINFORCING MESHEMBEDDED IN BASECOAT
EXISTING FINISH COAT
EXISTING FRAMING & EIFS WITHEXISTING REVEAL
PRIMER ON SURFACESTO RECEIVE SEALANT
NEW REINFORCINGMESHEMBEDDED IN BASECOAT
NEW FINISH COAT
NEW BACKER ROD& SEALANT
NEW REINFORCINGMESHEMBEDDED IN BASECOAT
NEW FINISH COAT
NEW REINFORCINGMESHEMBEDDED IN BASECOAT
NEW FINISH COAT
GENERAL LIGHT CLEANING
TO REMOVE ORDINARY DIRT AND ENVIRONMENTAL CONTAMINANTS, FINISH MAY BE CLEANED WITH A MILD DETERGENT SOLUTION OR COMMERCIAL GRADECLEANER. PREPARE THE SURFACE FOR CLEANING BY THOROUGHLY RINSING THE WALL WITH CLEAN WATER TO REMOVE SURFACE PARTICLES. APPLY THECLEANING SOLUTION TO THE ENTIRE AREA USING A SOFT BRISTLE BRUSH. DO NOT ALLOW THE CLEANING SOLUTION TO DRY ON THE WALL. RINSE THE WALLTHOROUGHLY WITH CLEAN WATER TO REMOVE ALL TRACES OF LOOSENED DIRT AND CLEANING SOLUTION.
POWER WASHING
IF POWER WASHING IS NECESSARY OR DESIRED, A LOW PRESSURE 92068-3447 kPa/300-500 PSI) POWER WASH USING COLD WATER IS RECOMMENDED.FREQUENT POWER WASHING OR THE USE OF HOT WATER SHOULD BE AVOIDED, SINCE IT MAY RESULT IN PREMATURE DETERIORATION OF THE FINISH.
MOLD AND MILDEW REMOVAL
MOLD AND MILDEW ARE LIVING ORGANISMS, CONSISTING OF A ROOT SYSTEM AND A BLOOM, WHICH MUST BE COMPLETELY REMOVED OR KILLED TO STOPGROWTH. TO KILL THE ROOTS AND REMOVE THE BLOOM, USE A FUNGUS, MILDEW, MOLD AND ALGAE REMOVER IN CONJUNCTION WITH LOW-PRESSUREPOWER WASHING. COLD WATER POWER WASHING ALONE WILL REMOVE THE BLOOM BUT MAY ACTUALLY DRIVE THE ROOTS DEEPER INTO THE FINISH ANDCREATE A STRONGER, HEALTHIER GROWTH. AVOID PHOSPHATE-BASED CLEANERS SUCH AS tsp ( TRISODIUM PHOSPHATE) WHEN CLEANING MOLD ANDMILDEW. ALTHOUGH TSP AND OTHER PHOSPHATE BASED CLEANERS MAY BE USEFUL FOR REMOVING DIRT, MOLD AND MILDEW THRIVE ON THE PHOSPHATES.
TREAT STAINS WHICH MAY REMAIN AFTER MOLD AND MILDEW REMOVAL, APPLY A SOLUTION OF 1 PART HOUSEHOLD BLEACH AND 20 PARTS CLEAN WATERTO THE WALL WITH A SOFT BRISTLE BRUSH. THE CONCENTRATION MAY BE INCREASED IF A STRONGER SOLUTION IS REQUIRED. RINSE THE WALLTHOROUGHLY WITH CLEAN WATER TO REMOVE ALL TRACES OF BLEACH SOLUTION.
PUNCTURE REPAIR
1. CUT AROUND THE DAMAGED AREA WITH A RAZOR KNIFE CUTTING THROUGH ALL LAYERS, TO THE SUBSTRATE. MAKE SURE THE PATCH AREA IS LARGEENOUGH TO EASILY WORK WITHIN, EVEN IF THE DAMAGED AREA IS SMALL.
2. CAREFULLY REMOVE THE FINISH, REINFORCING MESH, AND BASE COAT.
3. REMOVE THE DAMAGED EPS INSULATION BOARD DOWN TO THE SHEATHING. REPAIR OR REPLACE ANY DAMAGED SHEATHING. ENSURE THAT ALL EPSINSULATION BOARD REMAINS ARE COMPLETELY REMOVED.
4. WITH A SMALL GRINDER, CAREFULLY REMOVE THE FINISH APPROXIMATELY 3-4 INCHES AROUND THE REPAIR AREA. DO NOT GRIND INTO THE REINFORCINGMESH AND BASE COAT.
5. ONCE FINNISH HAS BEEN REMOVED FROM AROUND THE DAMAGED AREA, BRUSH OR BLOW AWAY ANY REMAINING EPS INSULATION BEADS AND DUST FROMTHE GRINDING.
6. CUT THE EPS INSULATION BOARD SO THAT IT WILL FIT SNUGLY INTO THE OPENING. APPLY ADHESIVE TO THE EPS INSULATION BOARD AND THEN PLACE THEEPS INSULATION BOARD INTO THE OPENING, ENSURING A GOOD ADHESIVE BOND IS ACHIEVED.
7. AFTER THE ADHESIVE HAS DRIED, RASP THE EPS INSULATION BOARD DOWN TO THE LEVEL OF THE GROUND DOWN AREA.
8. MASK OFF THE FINISH AROUND THE GROUND DOWN AREA. THE EXPOSED GROUND OFF AREA MUST BE APPROXIMATELY 3-INCHES AROUND THE REPAIR TOENSURE ENOUGH ROOM FOR THE REINFORCING MESH TO PROPERLY OVERLAP.
9. APPLY THE MIXED BASE COAT TO THE REPAIR AND THEN PLACE THE PRE-CUT REINFORCING MESH INTO THE BASE COAT.
10. EMBED THE REINFORCING MESH WITH A TROWEL OR MARGIN TROWEL, TO A SMOOTH FLAT UNIFORM THICKNESS TO THE GROUND OFF AREA ONLY. DONOT BUILD UP THE AREA, TROWEL THE BASE COAT TIGHT, BUT THICK ENOUGH TO ENCAPSULATE THE REINFORCING MESH.
11. ALLOW TIME TO DRY. SCRAPE AWAY TROWEL MARKS BEFORE APPLYING FINISH.
12. TROWEL FINISH ONTO THE PREPARED AREA USING A STAINLESS STEEL TROWEL.
13. REMOVE THE TAPE BEFORE THE FINISH DRIES. TOUCH UP THE EDGES WITH A SMALL PAINT BRUSH BY LIGHTLY DABBING AROUND THE EDGE. THIS HELPSTO SOFTEN AND BLEND IN THE EDGE AROUND THE PATCH.
14. IF NECESSARY, LIGHTLY FLOAT THE FINISH AGAIN. MAKE SURE THERE IS NO EXCESS MATERIAL ON THE BACK OF THE FLOAT PRIOR TO RE-FLOATING THEAREA.
15. COLOR COAT MAY BE REQUIRED IF THE FINISH COLOR OF THE PATCH IS NOT ACCEPTABLE.
CORNER REPAIR:
1. MATERIALS MUST BE REMOVED FROM BOTH SIDES OF THE CORNER.
2. FOLLOW STEPS 1-14 OF BASIC REPAIR PROCEDURE.
3. MAKE SURE TO USE A DOUBLE LAYER OF REINFORCING MESH IN STEP 10 TO ENSURE PROPER CORNER REINFORCING.
TEXTURE FINISH REPAIR:
1. GRIND DOWN THE FINISH JUST UNTIL THE BASE COAT SHOWS, APPROXIMATELY 1-INCH AROUND THE DAMAGED AREA.
2. MASK OFF THE FINISH AROUND THE GROUND DOWN AREA.
3. TROWEL THE PROPERLY COLOR MATCHED FINISH ONTO THE PREPARED AREA USING A STAINLESS STEEL TROWEL.
4. REMOVE THE TAPE BEFORE THE FINISH DRIES. TOUCH UP THE EDGES WITH A SMALL PAINT BRUSH BY LIGHTLY DABBING AROUND THE EDGE. THIS HELPSTO SOFTEN AND BLEND IN THE EDGE AROUND THE NEW FINISH.
RE-TEXTURING ENTIRE WALL:
1. THOROUGHLY CLEAN THE WALL SURFACE ACCORDING THE CLEANING PROCEDURE LISTED AT BEGINNING OF THIS DOCUMENT. THE AREA TO BE FINISHEDMUST BE SOUND AND FREE OF DEFECTS SUCH AS PEELING, CRACKING, DELAMINATING, AND BLISTERING.
2. LEVEL THE SURFACE WITH BASE COAT IN ORDER TO ACHIEVE A SMOOTH LEVEL SURFACE. ALLOW THE BASE COAT TO THOROUGHLY DRY BEFOREAPPLYING THE FINISH COAT.
3. TINTED PRIMER MAY BE USED TO HELP ALLEVIATE SHADOWING OF THE FINISH.
4. APPLY NEW FINISH WITH DESIRED TEXTURE AND COLOR
GENERAL NOTES:
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
44:4
8A
M
EIFS
REPA
IRD
ETA
ILS
&G
ENER
AL
NO
TES
GM
C#
apen
1900
48
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A40
0BA
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RES
ORA
TIO
NBI
D
3" = 1'-0"1 EIFS REPAIR DETAILS
*ALTERNATE BID ITEM*
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
OFFICE
S134
OFFICE
S133
OFFICE
S132
OFFICE
S130
CONF.
S129
WOMEN'SRESTROOM
S119
WOMEN'SRESTROOM
S116
ELECTRICALROOM
S120
TELEPHONEROOM
S106
CORRIDOR
S102JANITOR
S103
MEN'SRESTROOM
S108
ENVIRONMENTALSERVICES
S109
STORAGE
S110
STORAGE
S113STORAGE
S131
OFFICE
S114
MECHANICALROOM
S115
STAIRS#1
S107
ELEVATORLOBBY
S101
ELEVATOREQUIPMENT
ROOM
S105
ENGINEERINGFACILITIES
S117
MATERIALSMANAGEMENT
S121
CLEANCART
STORAGE
S125
OFFICE
S124
OFFICE
S126
STORAGE
S127
ENVIRONMENTALSERVICES
S112
ELEVATOR
S128
STAIRS#2
S122
MEN'SRESTROOM
S118
DRAIN COVER TO REMAIN
MATERIALSMANAGEMENT
S123
= EXISTING TILE FLOOR TO REMAIN
= NEW LVT FLOORING
= SEALED CONCRETE
NOTES:
• REPAIR AND PAINT ALL GYP BOARD• REPLACE ALL RUBBER BASE• PRIME EXISTING SLABS PRIOR TO LVT INSTALLATION
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
37:3
3A
M
1ST
FLO
OR
FLO
OR
FIN
ISH
PLA
N
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A10
1A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 FIRST FLOOR FLOOR FINISH PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
VESTIBULE
S200
CORRIDOR
S201
STORAGE
S202
COMM
S203
PHYSICIANPRACTICEOFFICE
S204
ELECTRICALROOM
S205
WAITINGAREA
S206
EMPLOYEEOF
CHOICECOORD.
S207
PHOTO
S208
BREAKROOM
S209
TESTINGROOM 1
S210
CORRIDOR
S211
TESTINGROOM 2
S212
EMERALDHEALTH
S213
CORRIDOR
S214
STORAGE
S215
CONFERENCEROOM
S216
OFFICE
S217
EMPLOYEEHEALTHNURSE
S218A
VENDING
S219
RESTROOM
S220
HEALTHCOORD.
S222
RECRUITER1
S224
MANAGEDCARE
S225
OFFICE
S226
RECRUITER2
S228
OFFICE
S227A
CONF.ROOM
PATIENTBILLING
S229
CORRIDOR
S230
MANAGER
S232
STORAGE
S233
CLERICALWORKROOM
S234
STAIRS
S235
BENIFITSSPECIALIST
S236
HRSPECIALIST
S238
ALCOVE
S237
JANITORCLOSET
S239
RECORDSSTORAGE
S240
WOMEN'SRESTROOM
S241
SUPPORTCLERK
S242
MEN'SRESTROOM
S243
STORAGE
S244
ACCOUNTSRECEIVABLE
S245
SECRETARY
S246
INSURANCEWORKROOM
S247
VPCORPORATESERVICES
S248
BILLINGINS.
WORKROOM
S249
SUPERVISOR
S251
RISKMGR.CCO
S252
BREAKROOM
S253
OFFICE
S254
PRINTERROOM
S255
BILLERS /COLLECTORS
S257CONFERENCE
ROOM
S259
DEPARTMENTSUPERVISOR
S261
CLERICALWORKROOM
S263
STAIRS
S262
COLLECTIONSOFFICE
S270
CASHIER'SOFFICE
S271
STORAGE
S272
SUPERVISOROFFICE
S273
MAILSORTROOM
S274
ALCOVE
S275
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
142' - 10 1/4"
62
'-8
"5
0'-
2"
11
2'-
10
"
NOTES:
• REPAIR AND PAINT ALL GYP BOARD• REPLACE ALL RUBBER BASE• PRIME EXISTING SLABS PRIOR TO LVT INSTALLATION
= EXISTING TILE FLOOR TO REMAIN
= NEW LVT FLOORING
= SEALED CONCRETE
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
37:3
9A
M
2ND
FLO
OR
FLO
OR
FIN
ISH
PLA
N
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A10
2A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 SECOND FLOOR FLOOR FINISH PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
ELEVATORLOBBY
S300
CORRIDOR
S301
CONFERENCEROOM
S302
COMM
S303
STORAGE
S304
VESTIBULE
S304A
RESTROOM
S306 CEO
S308
ELECTRICAL
S305
REVENUECYCLE
COORD.
S307
CORRIDOR
S309
OFFICE
S310
BREAKROOM
S311
VP'SSECRETARY
S312
VESTIBULE
S313
VICEPRESIDENT
1
S314
PAYROLLWORKROOM
S315
WAITINGROOM
S316
FINACIALACCOUNT
SUPERVISOR
S317
VP'SSECRETARY
S318
ACCOUNTINGWORKROOM
S319
VICEPRESIDENT
2
S320
VP'SSECRETARY
S322
WORKROOM
S324
VICEPRESIDENT
3
S328
FINANCIALACCOUNTMANAGER
S329
FINANCIALACCOUNT
WORKROOM
S331
LIBRARY
S332
STAIR #1
S333
WOMEN'SRESTROOM
S335
STAIR #2
S336
JANITOR'SCLOSET
S337
VICEPRESIDENT
4
S336A
MEN'SRESTROOM
S339
CONFERENCEROOM
S340
PROCESSENGINEER
S342
VP'SSECRETARY
S344
VICEPRESEIDENT
5
S346
FINANCIALSTORAGE
S348
WORKROOM
S350
COMPTROLLER
S352
MANAGERIALACCOUNT
WORKROOM
S354
AUDITOR
S362
MGRACCOUNT
SUPERVISOR
S364
PRODUCTION
S341
BREAKROOM
S367
SUPERVISOR
S370
STORAGE
S369
SCHEDULERS
S368
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
142' - 10 1/4"
62
'-8
"5
0'-
2"
11
2'-
10
"
NOTES:
• REPAIR AND PAINT ALL GYP BOARD• REPLACE ALL RUBBER BASE• PRIME EXISTING SLABS PRIOR TO LVT INSTALLATION
= EXISTING TILE FLOOR TO REMAIN
= NEW LVT FLOORING
= SEALED CONCRETE
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
37:4
6A
M
3RD
FLO
OR
FLO
OR
FIN
ISH
PLA
N
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A10
3A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 THIRD FLOOR FLOOR FINISH PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
8'-
10
"6
'-0
"1
0'-
10
"1
1'-
43
/4"
12
'-1
11
/4"
OFFICE
S134
OFFICE
S133
OFFICE
S132
OFFICE
S130
CONF.
S129
S129
S132
S133
S134
A
A
A
A
A
A
A
A
19
'-4
1/2
"
SEE DETAIL 3/A501FOR NEW WALL @MULLION LINE TYP.
1
A501TYP.
WOMEN'SRESTROOM
S119
WOMEN'SRESTROOM
S116
ELECTRICALROOM
S120
TELEPHONEROOM
S106
CORRIDOR
S102JANITOR
S103
MEN'SRESTROOM
S108
ENVIRONMENTALSERVICES
S109
STORAGE
S110
STORAGE
S113
STORAGE
S131
OFFICE
S114
MECHANICALROOM
S115
STAIRS#1
S107
ELEVATORLOBBY
S101
ELEVATOREQUIPMENT
ROOM
S105
ENGINEERINGFACILITIES
S117
MATERIALSMANAGEMENT
S121
CLEANCART
STORAGE
S125
OFFICE
S124
OFFICE
S126
STORAGE
S127
MATERIALSMANAGEMENT
S123
ENVIRONMENTALSERVICES
S112
ELEVATOR
S128
STAIRS#2
S122
MEN'SRESTROOM
S118
S109
= NEW FULL HEIGHT GYP. BOARD & INSULATION TO 1'-0" ABOVE CEILING GRID
NEW WORK LEGEND
= NEW WALL
= NEW GYP. BOARD 1'-0" HIGH @ FLOOD CUT
= NEW GYP. BOARD 4'-0" HIGH UNDER GLAZING
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
37:5
0A
M
FIRS
TFL
OO
RN
EWW
ORK
PLA
N
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A20
1A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 FIRST FLOOR NEW WORK PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
VESTIBULE
S200
CORRIDOR
S201
STORAGE
S202
COMM
S203
PHYSICIANPRACTICEOFFICE
S204
ELECTRICALROOM
S205
WAITINGAREA
S206
EMPLOYEEOF
CHOICECOORD.
S207
PHOTO
S208
BREAKROOM
S209
TESTINGROOM 1
S210
CORRIDOR
S211
TESTINGROOM 2
S212
EMERALDHEALTH
S213
CORRIDOR
S214
STORAGE
S215
CONFERENCEROOM
S216
OFFICE
S217
EMPLOYEEHEALTHNURSE
S218A
VENDING
S219
RESTROOM
S220
HEALTHCOORD.
S222
RECRUITER1
S224
MANAGEDCARE
S225
OFFICE
S226
RECRUITER2
S228
OFFICE
S227A
CONF.ROOM
PATIENTBILLING
S229
CORRIDOR
S230
MANAGER
S232
STORAGE
S233
CLERICALWORKROOM
S234
STAIRS
S235
BENIFITSSPECIALIST
S236
HRSPECIALIST
S238
ALCOVE
S237
JANITORCLOSET
S239
RECORDSSTORAGE
S240
WOMEN'SRESTROOM
S241
SUPPORTCLERK
S242
MEN'SRESTROOM
S243
STORAGE
S244
ACCOUNTSRECEIVABLE
S245
SECRETARY
S246
INSURANCEWORKROOM
S247
VPCORPORATESERVICES
S248
BILLINGINS.
WORKROOM
S249
SUPERVISOR
S251
RISKMGR.CCO
S252
BREAKROOM
S253
OFFICE
S254
PRINTERROOM
S255
BILLERS /COLLECTORS
S257
CONFERENCEROOM
S259
DEPARTMENTSUPERVISOR
S261
CLERICALWORKROOM
S263
STAIRS
S262
COLLECTIONSOFFICE
S270
CASHIER'SOFFICE
S271
STORAGE
S272
SUPERVISOROFFICE
S273
MAILSORTROOM
S274
ALCOVE
S275
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
142' - 10 1/4"
62
'-8
"5
0'-
2"
11
2'-
10
"
= NEW FULL HEIGHT GYP. BOARD & INSULATION TO 1'-0" ABOVE CEILING GRID
NEW WORK LEGEND
= NEW WALL
= NEW GYP. BOARD 1'-0" HIGH @ FLOOD CUT
= NEW GYP. BOARD 4'-0" HIGH UNDER GLAZING
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
37:5
5A
M
SEC
ON
DFL
OO
RN
EWW
ORK
PLA
N
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A20
2A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 SECOND FLOOR NEW WORK PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
142' - 10 1/4"
62
'-8
"5
0'-
2"
11
2'-
10
"
S369
S368
S367
S370
S336S300
S304
S302
S316A
S302B
S306
S304A
S308
S302A
S314
S320
S328
S336A
S346
S352S350
S362
S364S354S319
S348
S313
S313AS309
S340 S342
S332
S324
S316S303
S305
S307
S311
S317
S315
S331S329
S339
S337
S335
S301
ELEVATORLOBBY
S300
CORRIDOR
S301
CONFERENCEROOM
S302
COMM
S303
STORAGE
S304
VESTIBULE
S304A
RESTROOM
S306 CEO
S308
ELECTRICAL
S305
REVENUECYCLE
COORD.
S307
CORRIDOR
S309
OFFICE
S310
BREAKROOM
S311
VP'SSECRETARY
S312
VESTIBULE
S313
VICEPRESIDENT
1
S314
PAYROLLWORKROOM
S315
WAITINGROOM
S316
FINACIALACCOUNT
SUPERVISOR
S317
VP'SSECRETARY
S318
ACCOUNTINGWORKROOM
S319
VICEPRESIDENT
2
S320
VP'SSECRETARY
S322
WORKROOM
S324
VICEPRESIDENT
3
S328
FINANCIALACCOUNTMANAGER
S329
FINANCIALACCOUNT
WORKROOM
S331
LIBRARY
S332
STAIR #1
S333
WOMEN'SRESTROOM
S335
STAIR #2
S336
JANITOR'SCLOSET
S337
VICEPRESIDENT
4
S336A
MEN'SRESTROOM
S339
CONFERENCEROOM
S340
PROCESSENGINEER
S342
VP'SSECRETARY
S344
VICEPRESEIDENT
5
S346
FINANCIALSTORAGE
S348WORKROOM
S350
COMPTROLLER
S352
MANAGERIALACCOUNT
WORKROOM
S354
AUDITOR
S362
MGRACCOUNT
SUPERVISOR
S364
PRODUCTION
S341
BREAKROOM
S367
SUPERVISOR
S370
STORAGE
S369
SCHEDULERS
S368
S135
OFFICE
S373
OFFICE
S372
OFFICE
S371
S373S372S371 S372
S302C
= NEW FULL HEIGHT GYP. BOARD & INSULATION TO 1'-0" ABOVE CEILING GRID
NEW WORK LEGEND
= NEW WALL
= NEW GYP. BOARD 1'-0" HIGH @ FLOOD CUT
= NEW GYP. BOARD 4'-0" HIGH UNDER GLAZING
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
37:5
9A
M
THIR
DFL
OO
RN
EWW
ORK
PLA
N
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A20
3A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 THIRD FLOOR NEW WORK PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
629P01 P02
P03
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:0
0A
M
PEN
THO
USE
NEW
WO
RKPL
AN
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A20
4A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 ROOF PLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
8' - 0"
8' - 0"
8' - 0"8' - 0"
8' - 0"
8' - 0"
9' - 0"
9' - 0"
8' - 0"8' - 0"
9' - 0"
8' - 0"
9' - 0"
8' - 0"
8' - 0"8' - 0"
11' - 0"
8' - 0" 9' - 6"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
10' - 0"
OFFICE
S134
OFFICE
S133
OFFICE
S132
OFFICE
S130
CONF.
S129
WOMEN'SRESTROOM
S119
WOMEN'SRESTROOM
S116
ELECTRICALROOM
S120
TELEPHONEROOM
S106
CORRIDOR
S102JANITOR
S103
MEN'SRESTROOM
S108
ENVIRONMENTALSERVICES
S109
STORAGE
S110
STORAGE
S113STORAGE
S131
OFFICE
S114
MECHANICALROOM
S115
STAIRS#1
S107
ELEVATORLOBBY
S101
ELEVATOREQUIPMENT
ROOM
S105
ENGINEERINGFACILITIES
S117
MATERIALSMANAGEMENT
S121
CLEANCART
STORAGE
S125
OFFICE
S124
OFFICE
S126
STORAGE
S127
MATERIALSMANAGEMENT
S123
ENVIRONMENTALSERVICES
S112
ELEVATOR
S128
STAIRS#2
S122
MEN'SRESTROOM
S118
NEW ACOUSTICALCEILING GRID ANDTILE
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:0
2A
M
FIRS
TFL
OO
RN
EWW
ORK
CEI
LIN
GPL
AN
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A30
1A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1 FIRST FLOOR NEW WORK CEILING PLAN
LINE OF CEILING ELEVATION CHANGE
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
142' - 10 1/4"
62
'-8
"5
0'-
2"
11
2'-
10
"
8' - 0"8' - 0"
8' - 0"
8' - 0"
8' - 0"8' - 0"
8' - 0"
9' - 0" 9' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0" 8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
NEW ACOUSTICALCEILING GRID ANDTILE
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:0
5A
M
SEC
ON
DFL
OO
RN
EWW
ORK
CEI
LIN
GPL
AN
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A30
2A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1SECOND FLOOR NEW WORK CEILINGPLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
59' - 10" 83' - 0"
142' - 10"
25
'-0
"2
5'-
0"
30
'-0
"3
0'-
0"
11
3'-
93
/4"
142' - 10 1/4"
62
'-8
"5
0'-
2"
11
2'-
10
"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0" 8' - 0"
8' - 0"
8' - 0"8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
NEW ACOUSTICALCEILING GRID ANDTILE
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:0
7A
M
THIR
DFL
OO
RN
EWW
ORK
CEI
LIN
GPL
AN
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A30
3A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1/8" = 1'-0"1THIRD FLOOR NEW WORK CEILINGPLAN
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
ELEVATORLOBBY
S101
CORRIDOR
S102JAN
CLOSET
S103
ELEVATOREQUIPMENT
S105
TELEPHONE
S106
MEN'SRESTROOM
S108
EMPLOYEELOUNGE
S109
WOMEN'SRESTROOM
S116
PATIENTACCOUNT
DEPT.
S117
MEN'SRESTROOM
S118
WOMEN'SRESTROOM
S119
ELECTRICALROOM
S120
STAIR #1
S107OFFICE
S128
COPYROOM
S129
113'
-2"
59' - 10" 19' - 4" 23' - 4" 40' - 4"
50'-
0"62
'-10
"
REPAIR LEGEND
*ALTERNATE*REFINISH EXISTING EIFSFINISH WITH NEW BASE COAT,MESH, AND FINISH COAT
SEE COVER SHEET FOR EIFS REPAIR GENERAL NOTES
REPAIR EXISTING DAMAGE &COAT SURFACE WITHELASTOMERIC COATING
3"MIN. MARGIN
REMOVE AND REPLACEFINISH / FOAM @ DAMAGEDAREA
A
A
REMOVE MESH, BASE, AND FINISHCOATS MINIMUM 3" AROUNDDAMAGED AREA. REPLACEMESH, BASE, AND FINISH COATSFLUSH TO EXISTING EIFS.
MIN
.
3"
NEW FINISH COATNEW BASE COAT
NEW FOAM
FASTEN FOAM TO SHEATHINGPER MANUFACTURER
NEW MESH
EXISTING EIFS SYSTEM
NEW FINISH COAT
NEW BASE COAT
NEW MESH
EXISTING EIFS SYSTEM
*ALTERNATE BID ITEM*
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
44:5
1AM
1ST
FLO
OR
EIFS
REPA
IRPL
AN
GM
C#
apen
1900
48
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A40
1A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RES
ORA
TIO
NBI
D
1/8" = 1'-0"1 FIRST FLOOR EIFS REPAIR PLAN
1/2" = 1'-0"EIFS DAMAGE REPAIR DETAIL
1/2" = 1'-0"NEW EIFS DETAIL
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
VESTIBULE
S200
CORRIDOR
S201
STORAGE
S202
COMM
S203
PHYSICIANPRACTICE
OFFICE
S204
ELECTRICALROOM
S205
WAITINGAREA
S206
EMPLOYEEOF
CHOICECOORD.
S207
PHOTO
S208
BREAKROOM
S209
TESTINGROOM 1
S210
CORRIDOR
S211
TESTINGROOM 2
S212
EMERALDHEALTH
S213
CORRIDOR
S214
STORAGE
S215
CONFERENCEROOM
S216
OFFICE
S217
EMPLOYEEHEALTHNURSE
S218A
VENDING
S219
RESTROOM
S220
HEALTHCOORD.
S222
RECRUITER1
S224
MANAGEDCARE
S225
OFFICE
S226
RECRUITER2
S228
OFFICE
S227A
CONF.ROOM
PATIENTBILLING
S229
CORRIDOR
S230MANAGER
S232
STORAGE
S233
CLERICALWORKROOM
S234
STAIRS
S235
BENIFITSSPECIALIST
S236
HRSPECIALIST
S238
ALCOVE
S237
JANITORCLOSET
S239
RECORDSSTORAGE
S240
WOMEN'SRESTROOM
S241
SUPPORTCLERK
S242
MEN'SRESTROOM
S243
STORAGE
S244
ACCOUNTSRECEIVABLE
S245
SECRETARY
S246
INSURANCEWORKROOM
S247
VPCORPORATE
SERVICES
S248
BILLINGINS.
WORKROOM
S249
SUPERVISOR
S251
RISKMGR.CCO
S252
BREAKROOM
S253
OFFICE
S254
PRINTERROOM
S255
BILLERS/
COLLECTORS
S257CONFERENCE
ROOM
S259
DEPARTMENTSUPERVISOR
S261
CLERICALWORKROOM
S263
STAIRS
S262
COLLECTIONSOFFICE
S270
CASHIER'SOFFICE
S271
STORAGE
S272
SUPERVISOROFFICE
S273
MAILSORTROOM
S274
ALCOVE
S275
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
59' - 10" 83' - 0"
142' - 10"
25'-
0"25
'-0"
30'-
0"30
'-0"
113'
-97/
8"
142' - 10 1/8"
62'-
8"50
'-2"
112'
-10"
REPAIR LEGEND
*ALTERNATE*REFINISH EXISTING EIFSFINISH WITH NEW BASE COAT,MESH, AND FINISH COAT
SEE COVER SHEET FOR EIFS REPAIR GENERAL NOTES
REPAIR EXISTING DAMAGE &COAT SURFACE WITHELASTOMERIC COATING
NEW FINISH COAT
NEW BASE COAT
NEW MESH
EXISTING EIFS SYSTEM
*ALTERNATE BID ITEM*
3"MIN. MARGIN
REMOVE AND REPLACEFINISH / FOAM @ DAMAGEDAREA
A
A
REMOVE MESH, BASE, AND FINISHCOATS MINIMUM 3" AROUNDDAMAGED AREA. REPLACEMESH, BASE, AND FINISH COATSFLUSH TO EXISTING EIFS.
MIN
.
3"
NEW FINISH COATNEW BASE COAT
NEW FOAM
FASTEN FOAM TO SHEATHINGPER MANUFACTURER
NEW MESH
EXISTING EIFS SYSTEM
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
44:5
4A
M
2ND
FLO
OR
EIFS
REPA
IRPL
AN
GM
C#
apen
1900
48
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A40
2A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RES
ORA
TIO
NBI
D
1/8" = 1'-0"1 SECOND FLOOR EIFS REPAIR PLAN
1/2" = 1'-0"NEW EIFS DETAIL
1/2" = 1'-0"EIFS DAMAGE REPAIR DETAIL
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
ELEVATORLOBBY
S300
CORRIDOR
S301
CONFERENCEROOM
S302
COMM
S303
STORAGE
S304
VESTIBULE
S304A
RESTROOM
S306 CEO
S308
ELECTRICAL
S305
REVENUECYCLE
COORD.
S307
CORRIDOR
S309
OFFICE
S310
BREAKROOM
S311
VP'SSECRETARY
S312
VESTIBULE
S313
VICEPRESIDENT
1
S314
PAYROLLWORKROOM
S315
WAITINGROOM
S316
FINACIALACCOUNT
SUPERVISOR
S317
VP'SSECRETARY
S318
ACCOUNTINGWORKROOM
S319
VICEPRESIDENT
2
S320
VP'SSECRETARY
S322
WORKROOM
S324
VICEPRESIDENT
3
S328
FINANCIALACCOUNTMANAGER
S329
FINANCIALACCOUNT
WORKROOM
S331
LIBRARY
S332
STAIR #1
S333
WOMEN'SRESTROOM
S335
STAIR #2
S336
JANITOR'SCLOSET
S337
VICEPRESIDENT
4
S336A
MEN'SRESTROOM
S339
CONFERENCEROOM
S340
PROCESSENGINEER
S342
VP'SSECRETARY
S344
VICEPRESEIDENT
5
S346
FINANCIALSTORAGE
S348WORKROOM
S350
COMPTROLLER
S352
MANAGERIALACCOUNT
WORKROOM
S354AUDITOR
S362
MGRACCOUNT
SUPERVISOR
S364
PRODUCTION
S341
BREAKROOM
S367
SUPERVISOR
S370
STORAGE
S369
SCHEDULERS
S368
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
59' - 10" 83' - 0"
142' - 10"
25'-
0"25
'-0"
30'-
0"30
'-0"
113'
-97/
8"
142' - 10 1/8"
62'-
8"50
'-2"
112'
-10"
REPAIR LEGEND
*ALTERNATE*REFINISH EXISTING EIFSFINISH WITH NEW BASE COAT,MESH, AND FINISH COAT
SEE COVER SHEET FOR EIFS REPAIR GENERAL NOTES
REPAIR EXISTING DAMAGE &COAT SURFACE WITHELASTOMERIC COATING
NEW FINISH COAT
NEW BASE COAT
NEW MESH
EXISTING EIFS SYSTEM
*ALTERNATE BID ITEM*
3"MIN. MARGIN
REMOVE AND REPLACEFINISH / FOAM @ DAMAGEDAREA
A
A
REMOVE MESH, BASE, AND FINISHCOATS MINIMUM 3" AROUNDDAMAGED AREA. REPLACEMESH, BASE, AND FINISH COATSFLUSH TO EXISTING EIFS.
MIN
.
3"
NEW FINISH COATNEW BASE COAT
NEW FOAM
FASTEN FOAM TO SHEATHINGPER MANUFACTURER
NEW MESH
EXISTING EIFS SYSTEM
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
44:5
7A
M
3RD
FLO
OR
EIFS
REPA
IRPL
AN
GM
C#
apen
1900
48
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A40
3A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RES
ORA
TIO
NBI
D
1/8" = 1'-0"1 THIRD FLOOR EIFS REPAIR PLAN
1/2" = 1'-0"NEW EIFS DETAIL
1/2" = 1'-0"EIFS DAMAGE REPAIR DETAIL
1 1
2 2
3 3
4 4
5 5
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
12'-
0"51
'-7
7/8"
42' - 0 1/8"
REPAIR LEGEND
*ALTERNATE*REFINISH EXISTING EIFSFINISH WITH NEW BASE COAT,MESH, AND FINISH COAT
SEE COVER SHEET FOR EIFS REPAIR GENERAL NOTES
REPAIR EXISTING DAMAGE &COAT SURFACE WITHELASTOMERIC COATING
3"MIN. MARGIN
REMOVE AND REPLACEFINISH / FOAM @ DAMAGEDAREA
A
A
REMOVE MESH, BASE, AND FINISHCOATS MINIMUM 3" AROUNDDAMAGED AREA. REPLACEMESH, BASE, AND FINISH COATSFLUSH TO EXISTING EIFS.
MIN
.
3"
NEW FINISH COATNEW BASE COAT
NEW FOAM
FASTEN FOAM TO SHEATHINGPER MANUFACTURER
NEW MESH
EXISTING EIFS SYSTEM
NEW FINISH COAT
NEW BASE COAT
NEW MESH
EXISTING EIFS SYSTEM
*ALTERNATE BID ITEM*
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
44:5
8A
M
PEN
THO
USE
EIFS
REPA
IRPL
AN
GM
C#
apen
1900
48
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A40
4A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RES
ORA
TIO
NBI
D
1/8" = 1'-0"1 PENTHOUSE EIFS REPAIR ROOF PLAN
1/2" = 1'-0"EIFS DAMAGE REPAIR DETAIL
1/2" = 1'-0"NEW EIFS DETAIL
STAIRS#2
S401
PENTHOUSE
S402
RDRD
OF
RDOF
RD
RD
RDRDRDOF
RDOF
RDOF
2A406
3A406
4A406
3A406
3A406
2A406
2A406
2A406
2A406
2A406
2A406
2A406
P01 P02
P03
62'-
8"50
'-2"
8'-0
7/8"
120'
-10
7/8"
59' - 10" 19' - 4" 23' - 4" 40' - 4"
142' - 10"
NEW ROOF
NEW ROOF
TYP. 8'-0" X 8'-0"TAPERED INSULATION@ EACH ROOF DRAIN
NEW PARAPET CAPFLASHING TYP.
= NEW ROOF
1) REMOVE ALL ROOFING DOWN TO EXPOSED LWIC2) ADHERE 1 PLY SELF ADHERED VAPOR BARRIER3) MECHANICALLY ATTACH BASE LAYER POLYISCOCYANURATE THROUGH LWIC INTO STEEL DECK4) ADHERE 2ND LAYER OF ISO W/ LOW RISE FOAM5) ADHERE 1/4" SECUROCK USING LOW RISE FOAM6) ADHERE 1 PLY BASE PLY IN COLD ADHESIVE7) INSTALL LIQUID APPLIED BASE COAT AND FIBERGLASS8) INSTALL LIQUID APPLIED TOP COAT
ROOF REPLACEMENT NOTES
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
44:5
9A
M
ROO
FN
EWW
ORK
PLA
N
GM
C#
apen
1900
48
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A40
5A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RES
ORA
TIO
NBI
D
1/8" = 1'-0"1 ROOF NEW WORK PLAN
2A406
2A406
2A406
2A406
RD
RD
63'-
77/
8"42' - 0 1/8"
TYP. 8'-0" X 8'-0"TAPERED INSULATION@ EACH ROOF DRAIN
NEW PARAPET CAPFLASHING TYP.
EXISTING EXTERIORWALL SYSTEM TO REMAIN
REMOVE EXISTING TEMPORARY ICE AND WATER SHIELDMEMBRANE TO EXPOSE ORIGINAL CONSTRUCTION. REMOVEEXISTING GRANULAR SURFACED ROOF SYSTEM VERTICALWALL FLASHINGS AS REQUIRED TO EXPOSE EXISTING SUBSTRATE.REMOVE EXISTING ALUMINUM
COPING, ANCHOR, & SPLICE PLATE
CONTRACTOR TO DETERMINE IFP.T. WOOD NAILER IS INSUFFICIENT CONDITION TOCONTINUE TO PERFORM.IF NAILER IS NOT STRUCTURALYSOUND, REMOVE AND REPLACE.
CONTRACTOR TO DETERMINE IFSHEATHING (GYP. SHEATHING / PLYWOOD) IS INSUFFICIENT CONDITION TOCONTINUE TO PERFORM.IF SUBSTRATE IS NOT STRUCTURALYSOUND, REMOVE AND REPLACE.
REMOVE AND REPLACEEXISTING CANT STRIP
EXISTING STRUCTURE, INSULATION& LIGHTWEIGHT CONCRETE TOREMAIN
NEW METALCOPING, ANCHOR, & SPLICE PLATE
NEW CANT STRIP
NEW MEMBRANE ROOF PER MANUFACTURER
CLEAN EXISTING SUBSTRATE AND INSTALLNEW COVER BOARD OVER EXISTING, ANCHORTHRU EXISTING SUBSTRATE TO EXISTING FRAMINGWITH APPROVED DEPTH SCREW ANCHORS
REMOVE EXISTING GRANULAR SURFACED ROOF SYSTEMTO EXPOSED EXISTING LIGHTWEIGHT CONCRETE ROOF DECK
DEMO NEW WORK
NEW FLASHING
NEW CANT STRIP
NEW MEMBRANE ROOFSYSTEM PER MANUFACTURER
REMOVE EXISTING GRANULAR SURFACEDROOF SYSTEM / FLASHING TO EXPOSED EXISTINGLIGHTWEIGHT CONCRETE ROOF DECK
DEMO NEW WORK
NEW FLASHING
NEW CANT STRIP
NEW MEMBRANE ROOFSYSTEM PER MANUFACTURER
REMOVE EXISTING GRANULAR SURFACEDROOF SYSTEM / FLASHING TO EXPOSED EXISTINGLIGHTWEIGHT CONCRETE ROOF DECK
DEMO NEW WORK
SEALANT
EXISTING DRAIN
EXISTING LIGHTWEIGHTCONCRETE
RETRO-DRAIN
NEW MEMBRANEROOF MATERIAL
EPDM FLASHING
LAP SEALANT
TAPERED INSULATION
= NEW ROOF
1) REMOVE ALL ROOFING DOWN TO EXPOSED LWIC2) ADHERE 1 PLY SELF ADHERED VAPOR BARRIER3) MECHANICALLY ATTACH BASE LAYER POLYISCOCYANURATE THROUGH LWIC INTO STEEL DECK4) ADHERE 2ND LAYER OF ISO W/ LOW RISE FOAM5) ADHERE 1/4" SECUROCK USING LOW RISE FOAM6) ADHERE 1 PLY BASE PLY IN COLD ADHESIVE7) INSTALL LIQUID APPLIED BASE COAT AND FIBERGLASS8) INSTALL LIQUID APPLIED TOP COAT
ROOF REPLACEMENT NOTES
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
45:0
0A
M
PEN
THO
USE
ROO
FN
EWW
ORK
PLA
N&
DET
AIL
S
GM
C#
apen
1900
48
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A40
6A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RES
ORA
TIO
NBI
D
1/8" = 1'-0"1 PENTHOUSE NEW WORK ROOF PLAN
1 1/2" = 1'-0"2 ROOF EDGE @ PARAPET
1 1/2" = 1'-0"3 ROOF WALL TRANSITION @ EIFS
1 1/2" = 1'-0"4 ROOF WALL TRANSITION @ BRICK
1 1/2" = 1'-0"5 ROOF DRAIN DETAIL
FIRST FLOOR0"
SECOND FLOOR10' - 0"
PENTHOUSEROOF40' - 0"
10'-
0"10
'-0"
10'-
0"10
'-0"
2'-0
"
THIRD FLOOR20' - 0"
ROOF PLAN30' - 0"
ABCDEFGH
EXISTINGBRICK
EIFS
CONTROL JOINTS TYPICAL
10'-
0"10
'-0"
10'-
0"2'
-0"
8'-0
"2'
-0"
1' - 6 1/8" 20' - 0" 19' - 1 3/4" 10 1/4" 20' - 0" 20' - 0" 1' - 6" 18' - 6" 20' - 0" 20' - 0" 1' - 4"
142' - 10 1/8"
NEW PARAPET CAP FLASHING
FIRST FLOOR0"
SECOND FLOOR10' - 0"
PENTHOUSEROOF40' - 0"
THIRD FLOOR20' - 0"
ROOF PLAN30' - 0"
1 2 3 4 5
CONTROL JOINTS TYP.
EIFS
EXISTINGBRICK
EXISTINGBRICK
2'-0
"10
'-0"
10'-
0"10
'-0"
10'-
0"
2' - 4 1/8"2' - 3 7/8" 30' - 0" 30' - 0" 1' - 4" 23' - 8" 25' - 0" 9' - 6 7/8"
124' - 2 7/8"
DOORS TO BE REPLACED
NEW PARAPET CAP FLASHING
NOTE:FIELD VERIFY LOCATIONSOF CONTROL JOINTS AND REVEALSMATCH EXISTING W/ *ALTERNATEBID*
FINISH LEGEND
EXISTING EIFS TO BEREPAIRED AND COATED
EXISTING BRICKTO REMAIN
WINDOW REPLACEMENT LEGEND
REINSTALL WINDOWSPREVIOUSLY REMOVEDSTORED W/ FACILITIES
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
45:0
6A
M
EXTE
RIO
REL
EVA
TIO
NS
GM
C#
apen
1900
48
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A40
7A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RES
ORA
TIO
NBI
D
1/8" = 1'-0"1 North
1/8" = 1'-0"2 East
FIRST FLOOR0"
SECOND FLOOR10' - 0"
PENTHOUSEROOF40' - 0"
THIRD FLOOR20' - 0"
ROOF PLAN30' - 0"
A B C D E F G H
CONTROL JOINTS TYP.
EXISTINGBRICK
EIFS
EIFS
2'-0
"10
'-0"
10'-
0"10
'-0"
10'-
0"
1' - 6 1/8"20' - 0"19' - 1 3/4"10 1/4"20' - 0"20' - 0"1' - 6"18' - 6"20' - 0"20' - 0"1' - 4"
142' - 10 1/8"
NEW PARAPET CAP FLASHING
FIRST FLOOR0"
SECOND FLOOR10' - 0"
PENTHOUSEROOF40' - 0"
THIRD FLOOR20' - 0"
ROOF PLAN30' - 0"
12345
EIFSEXISTINGBRICK
CONTROL JOINTS TYP.
2'-0
"8'
-0"
2'-0
"10
'-0"
10'-
0"10
'-0"
9' - 6 7/8" 25' - 0" 23' - 8" 1' - 4" 30' - 0" 30' - 0" 2' - 4"2' - 4"
124' - 2 7/8"
DOOR TO BE REPLACED NEW PARAPET CAP FLASHING
FINISH LEGEND
EXISTING EIFS TO BEREPAIRED AND COATED
EXISTING BRICKTO REMAIN
NOTE:FIELD VERIFY LOCATIONSOF CONTROL JOINTS AND REVEALSMATCH EXISTING W/ *ALTERNATEBID*
WINDOW REPLACEMENT LEGEND
REINSTALL WINDOWSPREVIOUSLY REMOVEDSTORED W/ FACILITIES
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
45:13
AM
EXTE
RIO
REL
EVA
TIO
NS
GM
C#
apen
1900
48
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A40
8A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RES
ORA
TIO
NBI
D
1/8" = 1'-0"1 South
1/8" = 1'-0"2 West
TYPICAL INTERIORPARTITION - SEEDETAILS
FULL BATT INSULATION
WRAP-AROUNDHOLLOW METAL FRAMEWITH 2" HEAD,(KNOCKDOWN) (TYPICAL)
DOOR. SEE SCHEDULE
3 5/8" METAL STUDS
5/8" GYP BOARD
CAULK
2"
DOOR. SEE SCHEDULE
INTERIOR WALLSTEEL STUD ANCHORS
TYPICAL INTERIORPARTITION - SEE DETAILS
CAULKFULL BATT INSULATION
WRAP-AROUNDHOLLOW METAL FRAMEWITH 2" HEAD,(KNOCKDOWN) (TYPICAL)
2"
DOOR - SEE SCHEDULE
HOLLOW METAL FRAME
PROVIDE TRANSITION STRIPBETWEEN DIFFERENTFLOOR FINISHES
FLOOR, SEE SCHEDULE
AEXTERIOR INSULATED & IMPACTRATED HOLLOW METAL DOORW/ HOLLOW METAL FRAME
7'-
0"
6' - 0"
BINTERIOR SINGLE WOOD PANELDOOR USE EXISTING FRAMES
7'-
0"
3' - 0"
CINTERIOR SINGLE WOOD PANEL W/LITE DOOR USE EXISTING FRAMES
7'-
0"
3' - 0"
D
7'-
0"
3' - 0"
E
7'-
0"
3' - 0"
6"
2'-
9"
3"
6"
2'-
9"
6"
6"6"
2'-
9"
INTERIOR SINGLE WOOD PANEL W/LITE DOOR USE EXISTING FRAMES
INTERIOR SINGLE WOOD PANEL W/LITE DOOR USE EXISTING FRAMES
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:0
9A
M
DO
OR
SCH
EDU
LEA
ND
DET
AIL
S
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A50
0A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
3" = 1'-0"1 HOLLOW METAL DOOR HEAD 3" = 1'-0"2 HOLLOW METAL DOOR JAMB
3" = 1'-0"3 HOLLOW METAL DOOR SILL
NUMBER ROOM
DOORSIZE
WIDTH
DOOR SIZE DOOR DESCRIPTION FRAME DESCRIPTION
Fire Rated HEAD JAMB SILL NU
MBE
RED
NO
TES
H THKDOORTYPE MAT'L FRAME TYPE MAT'L
P01 PENTHOUSE 7' - 0" 6' - 0" 1 3/4" A METAL HOLLOW METAL HOLLOW METAL 45 MIN. 1/A500 2/A500 3/A500P02 PENTHOUSE 7' - 0" 6' - 0" 1 3/4" A METAL HOLLOW METAL HOLLOW METAL 45 MIN. 1/A500 2/A500 3/A500P03 PENTHOUSE 7' - 0" 6' - 0" 1 3/4" A METAL HOLLOW METAL HOLLOW METAL 45 MIN. 1/A500 2/A500 3/A500
S109 ENVIRONMENTAL SERVICES 7' - 0" 6' - 0" 1 3/4" A METAL HOLLOW METAL HOLLOW METAL 1/A500 2/A500 3/A500S129 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS132 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS133 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS134 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS135 WORKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS300 ELEVATOR LOBBY 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS301 CORRIDOR 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS302 CONFERENCE ROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METAL
S302A CONFERENCE ROOM 7' - 0" 3' - 0" 1 3/4" D WOOD EXISTING HOLLOW METALS302B CONFERENCE ROOM 7' - 0" 3' - 0" 1 3/4" E WOOD EXISTING HOLLOW METALS302C CONFERENCE ROOM 7' - 0" 3' - 0" 1 3/4" C WOOD EXISTING HOLLOW METALS303 COMM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS304 STORAGE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METAL
S304A CEO 7' - 0" 3' - 0" 1 3/4" C WOOD EXISTING HOLLOW METALS305 ELECTRICAL 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS306 RESTROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS307 REVENUE CYCLE COORD. 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS308 CEO 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS309 CORRIDOR 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS311 BREAK ROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS313 VESTIBULE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METAL
S313A VESTIBULE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS314 VICE PRESIDENT 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS315 PAYROLL WORKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS316 WAITING ROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METAL
S316A WAITING ROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS317 FINACIAL ACCOUNT SUPERVISOR 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS319 ACCOUNTING WORKROOM 7' - 0" 3' - 0" 1 3/4" C WOOD EXISTING HOLLOW METALS320 VICE PRESIDENT 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS324 WORKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS328 VICE PRESIDENT 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS329 FINACIAL ACCOUNT MANAGER 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS331 FINACIAL ACCOUNT WORKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS332 LIBRARY 7' - 0" 3' - 0" 1 3/4" C WOOD EXISTING HOLLOW METALS335 WOMEN'S RESTROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS336 STAIR #2 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METAL
S336A VICE PRESIDENT 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS337 JANITORS CLOSET 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS339 MEN'S RESTROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS340 CONFERENCE ROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS342 PROCESS ENGINEER 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS346 VICE PRESIDENT 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS348 FINACIAL STORAGE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS350 WORKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS352 COMPTROLLER 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS354 MANAGERIAL ACCOUNT WORKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS362 AUDITOR 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS364 MGR ACCOUNT SUPERVISOR 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS367 BREAKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS368 SCHEDULERS 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS369 STORAGE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS370 SUPERVISOR 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS371 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS372 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS373 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METAL
1/2" = 1'-0"DOOR TYPES
3 5/8" METAL STUDS@ 16" O.C. MAX.MIN. 20GA.
5/8" GYP. BOARDEACH SIDE
SOUND ATTENUATED BATT.INSULATION
3 1/2" RESILIENT BASE
ACOUSTICAL TILE CEILING9'-0" A.F.F.
BRACE TOP OF WALL TO STRUCTURE AS REQUIRED
CONT. STUD TRACK SETIN ACOUSTICAL SEALANT TYP.
U-ANCHOR. SHOPWELDTO FRAME
GROUT FILLFRAME(HEAD &JAMBS)
METAL STUDS2" 5 1/2"
NEOPRENE ORFLEXIBLE SEALANTBETWEEN MULLIONAND BREAK METAL
EXISTINGSTOREFRONT
BENT ALUMINUM BREAKMETAL TO MATCHSTOREFRONT SYSTEM
5/8" GYP BOARD
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:10
AM
SEC
TIO
NS
&D
ETA
ILS
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A50
1A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
1 1/2" = 1'-0"1 WALL TYPE "A" 3" = 1'-0"2 TYPICAL STUD ANCHOR
1 1/2" = 1'-0"3 NEW WALL OFF MULLION LINE
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:11
AM
FIRS
TFL
OO
RFI
NIS
HSC
HED
ULE
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A60
0A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
FIRST FLOOR ROOM FINISH SCHEDULE
NUMBER Name CommentsCeilingMaterial
CeilingHeight Floor Finish
BaseFinish
North WallMaterial
North WallFinish
East WallMaterial
East WallFinish
South WallMaterial
South WallFinish
West WallMaterial
West WallFinish
S101 ELEVATOR LOBBY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS102 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS103 JANITOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS105 ELEVATOR EQUIPMENT ROOM EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS106 TELEPHONE ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS107 STAIRS #1 EXPOSED EXPOSED CONCRETE RUBBER CMU PAINT CMU PAINT CMU PAINT CMU PAINTS108 MEN'S RESTROOM ACT 8'-0" EXISTING EXISTING GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS109 ENVIRONMENTAL SERVICES ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS110 STORAGE ACT 11'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS112 ENVIRONMENTAL SERVICES ACT 11'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS113 STORAGE ACT 11'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS114 OFFICE ACT 11'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS115 MECHANICAL ROOM EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS116 WOMEN'S RESTROOM ACT 8'-0" EXISTING EXISTING GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS117 ENGINEERING FACILITIES ACT 8'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS118 MEN'S RESTROOM ACT 8'-0" EXISTING EXISTING GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS119 WOMEN'S RESTROOM ACT 8'-0" EXISTING EXISTING GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS120 ELECTRICAL ROOM EXPOSED 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS121 MATERIALS MANAGEMENT ACT 8'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS122 STAIRS #2 EXPOSED EXPOSED CONCRETE RUBBER CMU PAINT CMU PAINT CMU PAINT CMU PAINTS123 MATERIALS MANAGEMENT ACT 14'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS124 OFFICE ACT 14'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS125 CLEAN CART STORAGE ACT 14'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS126 OFFICE ACT 14'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS127 STORAGE ACT 14'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS128 ELEVATOR ACT EXPOSED LVT N/A GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS129 CONF. ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS130 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS131 STORAGE ACT 14'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS132 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS133 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS134 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT
SEE SHEET A501 FOR EXTENT OF GYP. BOARD
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:12
AM
SEC
ON
DFL
OO
RFI
NIS
HSC
HED
ULE
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A60
1A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
SECOND FLOOR ROOM FINISH SCHEDULE
Number Name Comments Ceiling Material Ceiling Height Floor Finish Base FinishNorth WallMaterial
North WallFinish
East WallMaterial
East WallFinish
South WallMaterial
South WallFinish
West WallMaterial
West WallFinish
S200 VESTIBULE ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS201 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS202 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS203 COMM EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS204 PHYSICIAN PRACTICE OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS205 ELECTRICAL ROOM EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS206 WAITING AREA ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS207 EMPLOYEE OF CHOICE COORD. ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS208 PHOTO ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS209 BREAK ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS210 TESTING ROOM 1 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS211 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS212 TESTING ROOM 2 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS213 EMERALD HEALTH ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS214 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS215 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS216 CONFERENCE ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS217 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS218A EMPLOYEE HEALTH NURSE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS219 VENDING ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS220 RESTROOM ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS222 HEALTH COORD. ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS224 RECRUITER 1 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS225 MANAGED CARE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS226 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS227A OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS228 RECRUITER 2 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS229 CONF. ROOM PATIENT BILLING ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS230 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS232 MANAGER ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS233 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS234 CLERICAL WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS235 STAIRS EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT CMU PAINT CMU PAINT CMU PAINTS236 BENIFITS SPECIALIST ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS237 ALCOVE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS238 HR SPECIALIST ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS239 JANITOR CLOSET ACT 8'-0" CPT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS240 RECORDS STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS241 WOMEN'S RESTROOM ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS242 SUPPORT CLERK ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS243 MEN'S RESTROOM ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS244 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS245 ACCOUNTS RECEIVABLE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS246 SECRETARY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS247 INSURANCE WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS248 VP CORPORATE SERVICES ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS249 BILLING INS. WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS251 SUPERVISOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS252 RISK MGR. CCO ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS253 BREAKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS254 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS255 PRINTER ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS257 BILLERS / COLLECTORS ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS259 CONFERENCE ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS261 DEPARTMENT SUPERVISOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS262 STAIRS EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT CMU PAINT CMU PAINT CMU PAINTS263 CLERICAL WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS270 COLLECTIONS OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS271 CASHIER'S OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS272 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS273 SUPERVISOR OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS274 MAIL SORT ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS275 ALCOVE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT
Pens
acol
a,FL
3250
2
F85
0.43
3.05
08G
MC
NE
TW
OR
K.C
OM
T85
0.43
2.07
06
720
Bay
front
Par
kway
,Sui
te20
0
DRA
WN
BY:
ISSU
E
CH
ECK
EDBY
:
DA
TE
10/1
8/20
196 :
38:13
AM
THIR
DFL
OO
RFI
NIS
HSC
HED
ULE
GM
C#
APE
N19
0048
615
N.B
ON
ITA
AV
ENU
EPA
NA
MA
CIT
Y,F
L32
401
A60
2A
utho
r
10-1
5-20
19BA
YM
EDIC
AL
CEN
TER
CO
OLE
YBL
DG
.RE
STO
RATI
ON
BID
THIRD FLOOR ROOM FINISH SCHEDULE
Number Name Comments Ceiling MaterialCeilingHeight Floor Finish Base Finish
North WallMaterial
North WallFinish
East WallMaterial
East WallFinish
South WallMaterial
South WallFinish
West WallMaterial
West WallFinish
S300 ELEVATOR LOBBY ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS301 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS302 CONFERENCE ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS303 COMM EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS304 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS304A VESTIBULE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS305 ELECTRICAL EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS306 RESTROOM ACT 8'-0" CPT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS307 REVENUE CYCLE COORD. ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS308 CEO ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS309 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS310 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS311 BREAK ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS312 VP'S SECRETARY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS313 VESTIBULE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS314 VICE PRESIDENT 1 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS315 PAYROLL WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS316 WAITING ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS317 FINACIAL ACCOUNT SUPERVISOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS318 VP'S SECRETARY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS319 ACCOUNTING WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS320 VICE PRESIDENT 2 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS322 VP'S SECRETARY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS324 WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS328 VICE PRESIDENT 3 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS329 FINANCIAL ACCOUNT MANAGER ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS331 FINANCIAL ACCOUNT WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS332 LIBRARY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS333 STAIR #1 EXPOSED EXPOSED CONCRETE RUBBER CMU PAINT CMU PAINT CMU PAINT CMU PAINTS335 WOMEN'S RESTROOM ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS336 STAIR #2 EXPOSED EXPOSED CONCRETE RUBBER CMU PAINT CMU PAINT CMU PAINT CMU PAINTS336A VICE PRESIDENT 4 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS337 JANITOR'S CLOSET ACT 8'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS339 MEN'S RESTROOM ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS340 CONFERENCE ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS341 PRODUCTION ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS342 PROCESS ENGINEER ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS344 VP'S SECRETARY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS346 VICE PRESEIDENT 5 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS348 FINANCIAL STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS350 WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS352 COMPTROLLER ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS354 MANAGERIAL ACCOUNT WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS362 AUDITOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS364 MGR ACCOUNT SUPERVISOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS367 BREAKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS368 SCHEDULERS ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS369 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS370 SUPERVISOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT