bay transit transit development plan: fiscal years … · bay transit transit development plan:...

104
B B A A Y Y T T R R A A N N S S I I T T T T R R A A N N S S I I T T D D E E V V E E L L O O P P M M E E N N T T P P L L A A N N : : F F I I S S C C A A L L Y Y E E A A R R S S 2 2 0 0 1 1 0 0 2 2 0 0 1 1 5 5 Prepared for: Prepared by: Under contract to: October 2009

Upload: others

Post on 25-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

 

BBAAYY TTRRAANNSSIITT

TTRRAANNSSIITT DDEEVVEELLOOPPMMEENNTT PPLLAANN::

FFIISSCCAALL YYEEAARRSS 22001100 –– 22001155

Prepared for:

Prepared by:

Under contract to:

 

 

 

October 2009

Page 2: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  i  October 2009 Transit Development Plan:  FY 10‐15 

TTaabbllee  ooff  CCoonntteennttss  

11..00 OOvveerrvviieeww  ooff  BBaayy  TTrraannssiitt     

1.1 History ............................................................................................................ 1‐1 

1.2 Governance .................................................................................................... 1‐2 

1.3 Organizational Structure ................................................................................ 1‐4 

1.4 Transit Services Provided and Areas Served .................................................. 1‐6 

1.5 Fare Structure ................................................................................................ 1‐7 

1.6 Fleet ............................................................................................................... 1‐7 

1.7 Existing Facilities ............................................................................................ 1‐7 

1.8 Transit Security Program ............................................................................... 1‐8 

1.9 Public Outreach .............................................................................................. 1‐8 

 

22..00 GGooaallss,,  OObbjjeeccttiivveess,,  aanndd  SSttaannddaarrddss  

2.1 Goals and Objectives ...................................................................................... 2‐1 

2.2 Service Performance Standards ..................................................................... 2‐5 

 

33..00 SSeerrvviiccee  aanndd  SSyysstteemm  EEvvaalluuaattiioonn  

3.1 Historical and Existing Service Perspective .................................................... 3‐1 

3.2 Peer System Review ....................................................................................... 3‐4 

3.3 Public On‐Board Passenger Survey ................................................................ 3‐6 

3.4 Level of Support for Transit ........................................................................... 3‐9 

3.5 Focus Groups and General Community Input ............................................. 3‐10 

3.6 Recent Changes in Patronage, Operating Costs, and Operating Revenue .. 3‐11 

3.7 Deviations from Service Standards and Potential Remedies ...................... 3‐14 

3.8 Potential Solutions to Gaps or Service Deficiencies .................................... 3‐17 

3.9 Potential Remedies for Equipment and Facility Deficiencies ...................... 3‐17 

3.10 Title VI Report and FTA Quadrennial Review .............................................. 3‐18 

 

44..00 SSeerrvviiccee  EExxppaannssiioonn  PPrroojjeecctt  DDeessccrriippttiioonnss  

4.1 Demographic Analysis of Anticipated Population  

  and Employment Changes ............................................................................. 4‐1 

4.2 Potential Service Expansion and Facility Needs ............................................ 4‐6 

Page 3: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  ii  October 2009 Transit Development Plan:  FY 10‐15 

4.3 Estimates of Capital and Operating Costs for Identified Improvements ..... 4‐14 

 

55..00 SSeerrvviiccee  aanndd  FFaacciilliittyy  RReeccoommmmeennddaattiioonnss  

5.1 Service Recommendations ............................................................................ 5‐1 

5.2 Facility Recommendations ............................................................................. 5‐2 

5.3 Other Recommendations ............................................................................... 5‐4 

 

66..00 CCaappiittaall  IImmpprroovveemmeenntt  PPrrooggrraamm  

6.1 Vehicle Replacement Program ...................................................................... 6‐1 

6.2 Facility Improvement Program ...................................................................... 6‐1 

 

77..00 FFiinnaanncciiaall  PPllaann     

7.1 Operation and Maintenance Costs and Funding Sources ............................. 7‐1 

7.2 Bus Purchase Costs and Funding Sources ...................................................... 7‐5 

7.3 Facility Improvement Costs and Funding Sources ......................................... 7‐6 

 

88..00 TTDDPP  MMoonniittoorriinngg  aanndd  EEvvaalluuaattiioonn  

8.1 Coordination with Other Plans and Programs ............................................... 8‐1 

8.2 Service Performance Monitoring ................................................................... 8‐2 

8.3 Annual TDP Monitoring ................................................................................. 8‐2 

 

AAppppeennddiicceess  

A. FTA Triennial Review Report* 

B. Title VI Report* 

C. Fleet Inventory from DRPT’s On‐Line Grant Application System (OLGA) 

D. Operating and Capital Expenses and Revenues – A 3‐Year Retrospective 

E. Transit Rider On‐Board Survey Results 

F. Stakeholder’s Meeting Minutes:  March 12, 2009 

 

*Currently defined as a service that is provided in a rural portion of the Commonwealth, Bay Transit is not required to  prepare  and  submit  its  own  separate  Title  VI  report  or  the  associated  FTA  Quadrennial  Review;  therefore, Appendix A and Appendix B are not included as part of this document. 

Page 4: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  iii  October 2009 Transit Development Plan:  FY 10‐15 

LLiisstt  ooff  TTaabblleess  

Table 1‐1.  Bay Transit Fare Structure   Table 3‐1.    Operating Statistics for Bay Transit, FY2006‐FY2008 Table 3‐2.    Peer Group Comparison Summary Table 3‐3.     Bay Transit System Revenues and Operating Assistance FY2006‐FY2008 Table 3‐4.  Allocation of Net Operating Assistance FY2006‐ FY2008 Table 4‐1.    Present Day Population and Employment Summary Table 4‐2.    Future Year Bay Transit Service Area Population Estimates (All Ages) Table 4‐3.    Future Year Bay Transit Service Area Population Estimates of Elderly Persons 

(65 or Older) Table 4‐4.    Bay Transit Fleet Replacement Program, FY2009‐FY2015 Table 4‐5.     Estimated Cost of Base Fleet Vehicle Replacement Program, FY2009‐FY2015 Table 4‐6.    Operating Statistics of Bay Transit, FY2008‐FY2015 Table 4‐7.    System Revenues and Operating Assistance of Bay Transit, FY2008‐FY2015 Table 4‐8.    Estimated Annual Operating Miles of Proposed Fixed Routes Table 4‐9.    Estimated Cost per Revenue Mile of Proposed Fixed Routes Table 4‐10.    Estimated Annual Operating Miles of Proposed Fixed Routes Table 4‐11.    Capital Cost of Proposed Fixed‐Route Service Expansions Table 4‐12.    Total Annual Cost of Proposed Fixed‐Route Service Expansions Table 4‐13.    Cost Estimate for Computerized Scheduling and Dispatching System  Table 4‐14.    Annual Passenger Estimation for Bay Transit Table 7‐1.    TDP Financial Plan for Funding Annual O&M Costs Table 7‐2.   TDP Financial Plan for Funding Bus Purchases Table 7‐3.    TDP Financial Plan for Funding Facility Improvements  

              

  

Page 5: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  iv  October 2009 Transit Development Plan:  FY 10‐15 

LLiisstt  ooff  FFiigguurreess  

Figure 1‐1.   Counties Served by Bay Transit Figure 1‐2.    Bay Transit Organizational Chart Figure 3‐1.    Annual Passengers, FY 2006‐FY 2008 Figure 3‐2.    Annual Operating Costs, FY 2006‐FY 2008 Figure 3‐3.    Cost Per Passenger, FY 2006‐FY 2008 Figure 3‐4.   Peer Comparison Figure 3‐5.   Bay Transit System Revenues and Operating Assistance FY2006‐FY2008 Figure 3‐6.    Allocation of Net Operating Assistance FY2006 – FY2008 Figure 4‐1.    Projected Population (All Bay Transit Service Jurisdictions) Figure 4‐2.   Proposed Fixed‐Route Services Figure 4‐3.  Northern Neck Proposed Fixed Transit Routes         

Page 6: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  1‐1            October 2009 Transit Development Plan:  FY 10‐15 

11..00  OOVVEERRVVIIEEWW  OOFF  BBAAYY  TTRRAANNSSIITT  

 

11..11 HHiissttoorryy  

Bay Transit began its operations in 1996 in Gloucester County, in the coastal area directly east of Richmond, Virginia.  

From  its  beginning,  Bay  Transit  has  been  an  operating  division  of  Bay  Aging,  a multi‐county Area Agency on Aging.   Bay Aging  initiated  the  transit  service with one bus and provided only two days of demand‐responsive, door‐to‐door type service per week, with a focus on the provision of basic transportation services to residents of Gloucester County.   

Service soon grew to a fleet of two buses in 1998, and it has continued to steadily expand over the years.   Through the use of a rural public transportation demonstration  funding grant  from  the  Virginia  Department  of  Rail  and  Public  Transportation  (DRPT),  which required a five percent local government match, service was expanded first into Lancaster County and then in December 1999 into Essex County. 

Bay Transit’s new transit service enjoyed interest and support from the public.  Citizens of the  local  governments  asked  County  supervisors  to  request  transit  service  from  Bay Transit.   Bay Transit would  typically provide service on a demonstration basis, and  then would  continue  to  operate  these  services  with  the  use  of  federal,  state,  and  local government  financial  support  to  supplement  passenger  fares.    Currently,  local government financial support represents 25 to 30 percent of annual operating expenses. 

With  the  good  reputation  for  quality  service  developed  during  the  initial  years  of  the operation, Bay Transit has continued to  look for ways to expand their services.    Initially, the individual counties imposed service restrictions that essentially created a group of ten separate small systems.   However,  inter‐county on‐demand service was soon  requested and service demands for the local community colleges increased in Gloucester County and Richmond County.  

Today,  Bay  Transit  operates  on‐demand  public  transportation  services  in  12  counties: Charles  City,  Essex,  Gloucester,  King  and  Queen,  King  William,  Lancaster,  Mathews, Middlesex, New Kent, Northumberland, Richmond, and Westmoreland.   Bay Transit also serves the towns of West Point and Colonial Beach and runs seasonal trolley service in the towns of Kilmarnock, Irvington, White Stone, Urbanna, and Colonial Beach. 

Based on 2000 Census data, the 12‐county area served by Bay Transit, shown in Figure 1‐1,  covers  approximately  2,700  square  miles  and  has  an  estimated  population  of approximately 150,000 people.   

Page 7: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  1‐2            October 2009 Transit Development Plan:  FY 10‐15 

 

Figure 1‐1.  Counties Served by Bay Transit 

From its initial fleet of just a few vehicles, Bay Transit has grown to now include in 2009 a fleet of 68 vehicles comprised of 12 to14 passenger handicapped accessible buses, vans, trolleys,  and  service  and  support  vehicles  that  serve  all  ages of passengers  and  all  trip purposes.1  The system carried over 156,000 passenger trips in 2008. 

Recently,  on  April  27,  2009,  Bay  Transit  broke  ground  for  a  new  operations  and maintenance  facility at 111 Commerce Parkway  in  the Commerce Park of Warsaw.   The almost 11,000 square foot facility will include an area for operations and dispatch, as well as a fleet maintenance shop.   

11..22 GGoovveerrnnaannccee  

The operation of Bay Transit is managed by Bay Aging, the regional Area Agency for Aging (AAA).   Bay Aging  is a nonprofit organization  that provides services  for older adults and persons with disabilities of all ages in the Middle Peninsula and Northern Neck regions of the Commonwealth.   

1 NOTE: Seven of the 12 to 14 passenger vehicles will be sold in the summer of 2009. 

Page 8: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  1‐3            October 2009 Transit Development Plan:  FY 10‐15 

The Bay Aging Board of Directors consists of one director from each of 10 counties and one member‐at‐large, as shown below.  

Bay Aging Board of Directors

2008 - 2009

Mr. Luther J. Derby, Jr.      Essex County P. O. Box 267                       Tappahannock, VA  22560  Mr. Joseph Curry        Lancaster County P. o. Box 737 Kilmarnock, VA  22482                                  Mr. Ed Clayton         Mathews County   1205 Aarons Beach Road Diggs, VA  23045                                   Mrs. Carolyn Gray, Secretary        Richmond County 3945 Folly Neck Road                        Warsaw, VA   22572   Dr. Elton Smith, Jr.                           King & Queen County P. O. Box 27                                Shacklefords, Virginia   23l56               Mr. Kenneth E. Smith, Treasurer      Gloucester County 7083 Tracey Court                           Gloucester, VA  23061  Mrs. Diana Pitts                               Middlesex County P. O. Box 191                               Urbanna, VA  23175                        Mr. Manuel Haynie, Vice Chairman    Northumberland County Bayside Realty                     P. O. Box 281                               Reedville, VA   22539  Ms. Sara Looney                              Westmoreland Co. 3 Marshall Avenue                           Colonial Beach, Va.  22443                   

Page 9: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  1‐4            October 2009 Transit Development Plan:  FY 10‐15 

Mr. Jim Mickens, Chairman         King William Co. 1809 Churchville Road                       West Point, VA  23181    Mr. James N. Carter, Jr.      At Large Board Member   P O. Box 300                   Irvington, VA 22480                    

11..33 OOrrggaanniizzaattiioonnaall  SSttrruuccttuurree  

Bay  Aging  supervises  the  operation  of  Bay  Transit.    A  senior manager  from  Bay  Aging serves  as  the  overall  Transit  Director, with  two  Division Managers  responsible  for  the management of the day‐to‐day operations of Bay Transit.  

There are five major operations/dispatch offices for Bay Transit.  These offices are located in Essex County, Gloucester County, Lancaster County,  the Town of Colonial Beach, and New Kent County.   Each office has a Regional Operations Supervisor who reports to the respective Division Manager. 

Currently, Bay Transit has a total of 90 employees.   Of this total, 16 are full‐time and 74 are part‐time employees.   The  latter group primarily represents the vehicle drivers.   The full‐time  staff  constitutes  the  management,  administration  operations,  scheduling personnel,  and  some  full‐time  drivers.    All  of  these  individuals  are  employees  of  Bay Aging. 

An organization chart for Bay Transit is shown in Figure 1‐2 below. 

Page 10: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  1‐5            October 2009 Transit Development Plan:  FY 10‐15 

  

Figure 1‐2.  Bay Transit Organizational Chart 

 

Page 11: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  1‐6            October 2009 Transit Development Plan:  FY 10‐15 

11..44 TTrraannssiitt  SSeerrvviicceess  PPrroovviiddeedd  aanndd  AArreeaass  SSeerrvveedd  

Areas  Served.    As  shown  in  Figure  1‐1  in  Section  1.1,  the  service  areas  include  the counties  of  Charles  City,  New  Kent,  Essex,  Gloucester,  King  and  Queen,  King William, Lancaster, Mathews, Middlesex, Northumberland, Richmond, and Westmoreland and the Towns of West Point and Colonial Beach.   

Transit  Services  Provided.    Bay  Transit  currently  provides  on‐demand  services  in  all counties within  the Middle  Peninsula  and Northern Neck  Planning District  Commission (PDC) regions from 6:00 AM to 6:00 PM, Monday through Friday.  Riders are requested to call Bay Transit at least 24 hours in advance of the scheduled appointment.  In 2008, Bay Transit provided over 156,000 passenger trips, with over half of these being work‐related trips.    It  is  estimated  that  the  average  one‐way  distance  of  the  typical  passenger  trip provided by Bay Transit  is between 9 and 12 miles.   Bay Transit buses offer  fixed‐route service in the towns of Colonial Beach and West Point.  Three trolleys provide fixed‐route service  in the towns of Kilmarnock, Irvington, White Stone, Colonial Beach, and Urbanna during the summer months and some fall and winter holiday weekends.  The availability of Federal Job Access and Reverse Commuting (JARC) program funding has been important in recent years for the operation of Bay Transit.  With this funding and the local government funding match, Bay Transit was able to operate late evening services (6 PM to 8 PM).  When the JARC funding ended, Bay Transit was forced to eliminate the late evening  services.    Previously  provided midday  services  also were  reduced.   Work  trip‐related transit services are now being primarily provided only during the AM and PM peak periods. 

Several years ago, Bay Transit developed an  initial plan for potential system growth, but recent  limitations  on  funding  provided  by  the  different  federal,  state,  and  local government agencies is the major constraint on the ability to expand the services beyond what  is presently being provided.   As described above, Bay Transit has had  to eliminate some previously operated services due to program  funding restraints.   While this action resulted  in some modest ridership declines, the high cost of gasoline  in 2008 resulted  in continuing  growth  in  transit  demands  and  ridership  has  been  returning  to  previously observed levels in recent months.    

In January, 2009, VDRPT announced an 8.469 percent decrease in the amount of formula assistance  that  would  be  provided  by  the  Commonwealth  in  Fiscal  Year  2009.  Subsequently,  in February, 2009, Bay Transit cut one hour of service per day on at  least one bus in each county. VDRPT has announced additional operating expense reductions of 10 percent for FY 2010.    Similarly, since DRPT recently changed their policy on state operating assistance support due  to  a  reduced  level  of  available  funding,  and  with  the  2008  federal  regulations restricting the provision of charter services by public transportation agencies, Bay Transit 

Page 12: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  1‐7            October 2009 Transit Development Plan:  FY 10‐15 

is no  longer able  to provide charter services  to  local charity or non‐profit events.   Local agencies  appreciated  this  service  and  several  complaints were  generated when  it was discontinued.    

11..55 FFaarree  SSttrruuccttuurree  

The Bay Transit fare structure for the demand–responsive services is shown in Table 1‐1.  The base boarding fare for most of the Bay Transit services is a flat‐fee of $1.00 per trip.  There is an additional $1.00 fee charged when a rider transfers from one bus to another.  Only one  county  (Lancaster County)  is  charging  a base boarding  fare of $2.00 per  trip.  Trolley fares are $.25 per ride per person.  

Bay Transit accepts cash fares on an exact fare basis and does not have a dedicated fare box in their vehicles.  Another payment method that is used by Bay Transit is a booklet of ten tickets sold at a discounted price of $8.00 per booklet.   

Table 1‐1.  Bay Transit Fare Structure 

Base Fare – all areas except Lancaster County  $1.00/trip 

Base Fare – Lancaster County  $2.00/trip 

Additional fare for transfer  $1.00 

Booklet of 10 tickets – discounted fare  $8.00 

Local businesses and  the  community  colleges do not  contribute  funding  to Bay Transit, and little or no funding resources have been provided from commercial revenues.   

11..66 FFlleeeett  

Bay Transit’s major services are provided in the form of demand‐response services.  Based on the vehicle data available from DRPT, Bay Transit presently has a total inventory of 68 vehicles  located  in  the  facilities of  the different  counties.   Thirty‐three  (33) of  these 68 vehicles  have  diesel  engines,  while  the  other  35  vehicles  use  gasoline  engines.    The passenger  fleet  primarily  consists  of  12  to  14  passenger  handicapped  accessible  vans.  Appendix C at  the end of  this  report details  the Bay Transit’s  fleet  inventory,  including vehicle  identification  number,  make,  model,  year,  seated  capacity,  engine  type, wheelchair accessibility, and service type. 

11..77 EExxiissttiinngg  FFaacciilliittiieess  

The  service  area  of  Bay  Transit  covers  the  counties  of  Charles  City,  New  Kent,  Essex, Gloucester,  King  and  Queen,  King  William,  Lancaster,  Mathews,  Middlesex, 

Page 13: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  1‐8            October 2009 Transit Development Plan:  FY 10‐15 

Northumberland,  Richmond,  and  Westmoreland  and  the  Towns  of  West  Point  and Colonial  Beach.    Since  this  area  is  large,  Bay  Transit  has  several  facilities  to  store  and maintain  their  vehicles.    Currently,  Bay  Transit  has  a  central  administrative  office  in Urbanna  in  the  same  complex  that  houses  the  Bay  Aging main  offices.    In  addition, operations  facilities  are  located  in  Essex  County, Gloucester  County,  Lancaster  County, New Kent County, and the Town of Colonial Beach.     

Recently,  on  April  27,  2009,  Bay  Transit  broke  ground  for  a  new  operations  and maintenance  facility at 111 Commerce Parkway  in  the Commerce Park of Warsaw.   The almost 11,000 square foot facility will include an area for operations and dispatch, as well as a fleet maintenance shop with two vehicle bays with  lifts.   The facility  is scheduled to be open in the summer of 2010.   

11..88 TTrraannssiitt  SSeeccuurriittyy  PPrrooggrraamm  

Currently, Bay Transit does not have GPS devices, on‐vehicle cameras, or alarm  sensors installed  in  their  vehicles.    All  vehicles  have  two‐way  radios  on  board  to  allow communication with each of the operations facilities.   

11..99 PPuubblliicc  OOuuttrreeaacchh  

The service area of Bay Transit is rural and a majority of the local residents are considered to be low‐income.  While Bay Transit provides public transportation for “all people, of all ages,  for  all  reasons”,  most  of  Bay  Transit’s  services  currently  are  perceived  to  be primarily for the elderly in the region.  

While some limited surveys of passengers have been conducted in past years, these have focused more on  the ridership  in one or a small group of counties.   Bay Transit has not conducted any system‐wide surveys or surveys of non‐riders. 

Page 14: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  2‐1             October 2009 Transit Development Plan:  FY 10‐15 

22..00    GGOOAALLSS,,  OOBBJJEECCTTIIVVEESS,,  AANNDD  SSTTAANNDDAARRDDSS   Bay Transit is a service of Bay Aging.  Bay Aging is a non‐profit, 501(c) (3) Area Agency for Aging that has been serving the residents of the Middle Peninsula and Northern Neck regions of the Commonwealth since 1978.  

While the focus of the parent agency, Bay Aging,  is on the provision of programs and services for older adults and persons with disabilities of all ages, the stated vision of Bay Transit is: 

“Public Transportation Service for ALL People, of ALL Ages, for ALL Reasons!”2 

 This mission statement of Bay Transit is: 

We believe that every citizen must be assured accessible and safe transportation to the local destination of their choice without regard for disability, age, or economic status. 

 

In support of its defined mission, Bay Transit is enhancing its generalized operating policies and procedures that will be reviewed and acknowledged by each of the system’s employees.   

22..11 GGooaallss  aanndd  OObbjjeeccttiivveess  

As a non‐profit community transit service for a 12‐county region, Bay Transit provides primarily 24‐hour advance reservation, on‐demand, curb‐to‐curb transit service.   Seasonal trolley fixed‐route services are provided in Urbanna, Kilmarnock, and Colonial Beach.    

As part of this TDP work effort, specific goals, objectives, and standards have been defined to guide Bay Transit operations and activities over the TDP time period.   Goals center on specific themes.   Objectives have been defined within each goal.   Future updates of  the  Long‐Range Rural Transportation Plans  for  the Middle Peninsula PDC and  the Northern Neck PDC  regions and specific town and county Comprehensive Plans should take  into consideration these goals and objectives.     

GOAL 1:   Provide reliable demand‐responsive service, and modified fixed‐route service, that meets the transportation needs for all residents of the Bay Transit service area. 

 Objective  1.1:    Provide  transit  service  connections  between  residential  areas  and commercial areas with jobs, education, shopping, and medical services. 

This objective is to be accomplished through the following minimum activities: 

2 http://www.baytransit.org/  

Page 15: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  2‐2             October 2009 Transit Development Plan:  FY 10‐15 

Document and record customer service requests. 

Coordinate  regularly  with  the  Towns  and  Counties  and  to  identify  planned  new developments that might warrant transit service. 

Survey riders at least once every five years to determine rider service needs. 

Objective  1.2:    Provide  easily  identifiable  stop  locations  along  routes  and  passenger shelters, if warranted.  

This objective is to be accomplished through the following minimum activities: 

Establish  safe  bus  stop  locations  when  modifying  an  existing  alignment  or implementing new service. 

Work with Town and County Public Works Department and Virginia Department of Transportation (VDOT) staff in developing stops with high ridership demands. 

Monitor  ridership  activity  at  high  demand  stops  to  determine  if/when  passenger waiting shelters are needed. 

 

GOAL 2:  Market existing transit services. 

Objective 2.1: Actively market transit services as a viable travel option within the entire Bay Transit service area.  

This objective is to be accomplished through the following minimum activities: 

Maintain “Bay Transit System, Route, and Schedule Guide”  for users of  the  transit system. 

Continue to update transit  information on the Bay Transit and Bay Aging web sites and establish  links to those web sites maintained by the towns, counties, and PDCs within the service area. 

Participate in community events to promote public transportation. 

Maintain  a mailing  list of organizations  and  social  service  agencies  that  represent markets  that  are  likely  to  ride  transit  and  provide  service  information  to  those organizations and agencies. 

Objective 2.2: Explore potential demand to expand hours of operation and/or cost‐effective transit service to areas outside of the current 12‐county Bay Transit service area.   

This objective is to be accomplished through the following minimum activities: 

Initiate exploration meetings with Town, County, and PDC staff and local officials to determine potential transit service needs.   

Page 16: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  2‐3             October 2009 Transit Development Plan:  FY 10‐15 

Such meetings should take place no less frequently than once a year. 

GOAL  3:    Deliver modified  fixed‐route  and  demand‐responsive  services  in  a  cost‐effective manner. 

Objective  3.1:  Maintain  a  system‐wide  farebox  recovery  ratio  (farebox  revenues/total operating expenses) that meets or exceeds standards identified in Section 2.2 of this TDP.   

This objective is to be accomplished through the following minimum activities: 

Record and monitor trends in passenger trips by route and county service area. 

Record and monitor monthly transit operations expenses and farebox revenues. 

Objective  3.2:  Hold  administrative  costs  to  approximately  20  percent  of  total  operating budget. 

This objective is to be accomplished through the following minimum activities: 

Continue  to  record and monitor monthly  transit operations expenses and  farebox revenues. 

Objective 3.3: Achieve system‐wide demand‐responsive and modified fixed‐route ridership levels that meet or exceed standards identified in Section 2.2 of this TDP.   

This objective is to be accomplished through the following minimum activities: 

Maintain  and  monitor  monthly  ridership  reports  for  all  demand‐responsive  and fixed‐route services, with ridership reported on a county‐level basis for all demand‐responsive operations and on a route‐segment basis for all fixed‐route services.    

Implement  corrective measures  if  ridership  falls  below  established  standards  for specific county operations or town‐level fixed‐route services for more than two (2) months  in a  row.   Such corrective measures may  include: modifications  to vehicle dispatching  and  scheduling  procedures  for  demand‐responsive  operations,  route alignment  for  fixed‐route  services,  service  frequency,  and  span  of  service  and/or fare adjustments. 

 

GOAL 4:  Deliver modified fixed‐route and demand‐responsive services in a safe manner.   

Objective 4.1:  Ensure that transit service operators maintain an accident rate less than the standard identified in Section 2.2 of this TDP.   

This objective is to be accomplished through the following minimum activities: 

Page 17: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  2‐4             October 2009 Transit Development Plan:  FY 10‐15 

Maintain a training program for new employees. 

Review  Operating  Policies  and  Procedures  at  least  once  a  year  and  update  as necessary.   

Review  those policies and procedures as part of all  training efforts with new staff.  Also review with existing staff at least once every two years.   

Objective  4.2:    Ensure  that  an  adequate  fleet  of  vehicles  is  maintained  for  demand‐responsive services. 

This objective is to be accomplished through the following minimum activities: 

Identify the need for replacement vehicles based on  industry standards for defined useful  life of vehicles.   For most buses operated by Bay Transit, the defined useful life is four years or 100,000 revenue miles of service. 

Maintain a spare ratio of at least 10 percent of total number of vehicles at all times for  each  of  the  three  principal multi‐county  sub  regions  (Northern  Neck, Middle Peninsula, and Charles City/New Kent Counties) for demand‐responsive services.  

 

GOAL 5: Provide transit services that are accessible to citizens. 

Objective 5.1: Provide transit services that are accessible to all population groups within the 12‐county Bay Transit service area.  

This objective is to be accomplished through the following minimum activities: 

Comply  with  the  applicable  requirements  of  the  Americans  with  Disabilities  Act (ADA). 

Provide  the  ADA‐eligible  population with  door‐to‐door  paratransit  service  that  is comparable  to  service  provided  by  the  fixed‐route  system  in  those  towns where fixed routes are being operated. 

 

 

 

 

 

Page 18: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  2‐5             October 2009 Transit Development Plan:  FY 10‐15 

22..22 SSeerrvviiccee  PPeerrffoorrmmaannccee  SSttaannddaarrddss  

This  TDP  work  effort  has  identified  the  following  service  standards  to  be monitored  on  a monthly basis by Bay Transit administrative staff. 

Ridership Service Productivity Measures 

The  following system‐wide service standards are proposed based on a review of ridership characteristics over the past several months: 

Modified  Fixed‐Route  Standard  –  Monthly  system‐wide  fixed‐route  ridership  should maintain levels equivalent to 1.40 passenger trips per revenue hour. 

Demand‐Response Standard – Monthly demand‐response service should maintain ridership levels equivalent to 2.0 passenger trips per revenue‐hour with average one‐way ride times not exceeding 50 minutes.   Monthly demand‐response  service  should maintain  ridership levels equivalent to 1.5 passenger trips per revenue‐hour with average one‐way ride times exceeding 50 minutes.   

Corrective measures should be  investigated  if ridership on Bay Transit’s services fall below the levels identified above for a period of three (3) consecutive months. 

Cost‐Effectiveness Measures  

Fixed‐Route  Standard  ‐  Bay  Transit’s  farebox  recovery  ratio  (farebox  revenues  as  a percentage of operating expenses)  for  fixed‐route  services  shall  remain  at  approximately 2.0 percent.   Corrective measures should be  investigated  if the farebox recovery ratio falls below this standard for three (3) consecutive months. 

Demand‐Response  Standard  –  Bay  Transit’s  farebox  recovery  ratio  for  demand‐response service should remain within the range of 5.0 to 8.0 percent.   Corrective measures should be investigated if these thresholds are not met for three (3) consecutive months. 

Vehicle Maintenance Performance Measures 

The  following  two  standards  shall  be  monitored  with  regards  to  vehicle  maintenance performance: 

Bus Preventive Maintenance Inspections – Preventive maintenance shall be conducted on all vehicles in the transit fleet per the vehicle manufacturer recommendations. 

Revenue Vehicle  Failures – Bay Transit  should maintain a  standard of no more  than 0.15 revenue vehicle failures per 1,000 revenue bus‐miles of service.                                            

Page 19: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐1             October 2009 Transit Development Plan:  FY 10‐15 

33..00    SSEERRVVIICCEE  AANNDD  SSYYSSTTEEMM  EEVVAALLUUAATTIIOONN   The purpose of  this chapter  is  to describe  the  recent performance of  the Bay Transit  system relative to generally accepted performance standards for the demand‐responsive transit mode associated with  this  system.    This  assessment  describes  the manner  in which  Bay  Transit  is providing public  transportation  services  to  the  residents of  the  12‐county  region  in which  it operates.  Each of the following sections discusses one facet of this evaluation process. 

33..11 HHiissttoorriiccaall  aanndd  EExxiissttiinngg  SSeerrvviiccee  PPeerrssppeeccttiivvee  

Bay Transit is one of the newer public transportation systems in the Commonwealth of Virginia.  From the  initiation of service  in Gloucester County  in 1996, the system has expanded to now offer services across a total of 12 counties.   

As  the  system has  continued  to  grow  and expand,  changes have been  regularly observed  in virtually all relevant comparative factors, from the number of revenue‐miles and revenue‐hours operated  each  year  to  the  total  system  operating  costs  and  the  number  of  passengers transported.  With many of the service changes having been observed over just the past several years, it is difficult to apply a traditional five‐year service history to the system.   

The most  comprehensive  assembly  of  statewide  system  performance  data  for  public  transit systems  in  Virginia  was  published  in  2007.3    Although  the  title  of  this  statewide  transit performance  report  indicates  that  it  presents  data  for  the  period  FY  2002  –  FY  2006,  this information  is typically only provided  for the  larger and better established urban bus and rail systems in the Commonwealth.   

In the case of Bay Transit, and virtually all of the other small municipal and rural public transit systems in the state, only data for FY 2006 is provided in this report.  As a result, the historical evaluation of Bay Transit operations associated with this TDP has only been able to consider the three‐year  period  from  FY  2006  through  FY  2008.    Table  3‐1  and  the  subsequent  charts illustrate several operating statistics in each of these three years.   

3 Virginia  Transit  Performance  Report  (FY2002‐FY2006); Virginia Department  of  Rail  and  Public  Transportation; Richmond, Virginia; 2007. 

Page 20: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

As showpersons higher atyears rep

Much of in the amin FY 20061,822 re

FY 2

FY 2

FY 2

t velopment Pla

Tabl

Oper

Annual Pa

Annual Op

Annual Re

Annual Re

Passenger

Passenger

Cost per P

Cost per R

Cost per R

Source: Bay 

n  in  the Figin FY 2006 tt 157,190 pepresents an 

this reportemount of tra06  to 1.66 mevenue hour

130,000

2006

2007

2008

n:  FY 10‐15 

le 3‐1.  Oper

rating Statis

ssengers 

perating Cost

venue Miles

venue Hour

s per Reven

s per Reven

assenger 

Revenue Mile

Revenue Hou

Transit  

Figure 3‐

ure 3‐1 aboto 156,067 ersons.  This 11 percent i

ed ridership nsit service million  revers in FY 2006

135,000

rating Statis

stics 

ts  $

ue Mile 

ue Hour 

ur 

‐1.  Annual P

ove,  the numin FY 2008,net increasencrease ove

increase appbeing provinue miles  in6 to 75,045 r

140,000

140

3‐2

stics for Bay 

FY 2006 

140,632 

$  1,779,269

1,214,502

61,822 

0.12 

2.27 

$12.65 

$1.47 

$28.78 

Passengers, 

mber of annwith the ane in ridershiper this time p

pears to be aded by Bay n FY 2008  (revenue hou

145,000

0,632

Transit, FY2

FY 200

157,19

9 $  2,146,3

1,510,29

70,876

0.10

2.22

$13.65

$1.42

$30.28

FY 2006‐FY 

nual passengnnual ridershp of 15,435 pperiod.   

attributableTransit, froman  increaseurs in FY 200

150,000 1

2006‐FY2008

7  FY 2

0  156

390 $  2,45

93  1,664

6  75,

0.

2.

5  $15

  $1

8  $32

2008 

gers  increasehip  in FY 20persons ove

 to the contm 1.21 millio of 37.2 pe09 (a 21.4 pe

155,000 1

1

156

           October

2008 

,067 

59,305 

4,376 

045 

09 

08 

5.76 

.48 

2.77 

ed  from 140007 being slier a period o

inuing expanon revenue rcent), and ercent increa

160,000

157,190

6,067

r 2009 

0,632 ightly f two 

nsion miles from ase).   

Page 21: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

As wouldannual syincrease,

When  thconclusioobservedthis onlyvalue, th

Similarly,per passepercent. operating

FY 2

FY 2

FY 2

t velopment Pla

d  be  expectystem opera, from $1.78

hese  total  aons can be dd  in FY 2006y  representse factor is st

, as shown aenger in FY 2 Much of thg  costs,  wit

$0 

2006

2007

2008

FY 200

FY 200

FY 200

n:  FY 10‐15 

Figure 3‐2. 

ted with  incating costs, 8 million in FY

nnual  valuedrawn.  For e6 declined to  an 8.4 pertill in an acce

Figure 3‐

above in Fig2006 to $15.his  increase th  much  of

$500,000

$0.00 

06

07

08

 Annual Op

creases  of  tshown  in  thY 2006 to $2

es  are  expreexample, theo a value of rcent declineeptable rang

‐3.  Cost Per 

ure 3‐3, the.76 per passappears to f  the  increa

0  $1,000,0

$5.00 

3‐3

erating Cost

his magnituhe Figure 3‐2.46 million 

essed  in  terme average pa2.08 passene  in  this proge. 

Passenger, 

e average cosenger in FYbe attributaase  due  to 

000  $1,500

$10.00 

ts, FY 2006‐F

ude  in  the  a‐2 above, alin FY 2008 (a

ms  of  unit  fassengers pengers per reoductivity  fa

FY 2006‐FY 

ost per passe2008, or a cable to the oboth  signif

,000  $2,00

$1,7

$15.00 

$12.65 

$13.65 

$1

FY 2008

amount  of  sso experienan increase 

factors,  somer revenue hevenue houractor.    Even

2008 

enger increahange of apobserved  inficantly  mor

0,000  $2,5

779,269 

$2,146

$20.00 

5.76 

           October

service  provnced a signifof 38.2 perc

mewhat  diffeour value ofr  in FY 2008n  at  this  low

ased from $1proximatelycrease  in syre  service  b

00,000 

6,390 

$2,459,30

r 2009 

vided, ficant cent).   

erent f 2.27 .   Yet wered 

12.65 y 24.6 ystem being 

05 

Page 22: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐4             October 2009 Transit Development Plan:  FY 10‐15 

provided  and  the  higher  fuel  costs  experienced  during  FY  2008  for  the  gasoline  and  diesel‐powered vehicle fleet operated by Bay Transit.    All  of  these  cost  and  ridership  response  factors  will  need  to  be  regularly  monitored  and reported  by  the  system’s management  in  order  to  identify  trends  of  both  a  positive  and  a negative nature. 

33..22 PPeeeerr  SSyysstteemm  RReevviieeww    

A peer  system  review compares  system characteristics and performance  for Bay Transit with those of other systems of similar size and operational characteristics.  While comparing Virginia systems to those in other states is certainly appropriate, in the case of rural demand‐response systems,  there  are  advantages  to  keeping  the  comparison  limited  to  other Virginia  systems.  This  is due  to  the  fact  that  state  funding  rules  and procedures  and  the  relationship of  rural public systems to various human services agencies can differ greatly from state to state.  Thus, the systems considered for inclusion in this peer system review were limited to systems within Virginia. 

A number of criteria were used to select the systems to be  included  in the comparison.   Only rural  systems operating exclusively or primarily demand‐responsive  service were  considered, due  to  the  relatively  unique  operating  environments  and  characteristics  of  these  systems.  Another of the criteria was that the systems all be multi‐county operations.  This is also due to the operating environments of these systems as well as the general trip characteristics of these types of systems.  Other criteria used in the selection of the peer systems included service area population, system size, and the number of annual passenger trips served. 

Based on these criteria, three systems were selected  for  inclusion  in the peer system review.  These systems  include Mountain Empire Transit (MEOC), 4‐County Transit, and JAUNT.   These systems are all multi‐county rural systems providing primarily or exclusively demand‐responsive service.    Table  3‐2  and  Figure  3‐4  summarize  the  general  system  characteristics  and  key performance  indicators  for  the  three  selected  systems  and  Bay  Transit  for  FY  2008.    The average values for the peer systems are also included in the table.   

Bay Transit’s service area population  is very close  to  the average  for  the  three peer systems.   The average for the peer systems for both of these measures is higher than it otherwise would be due to the size of the JAUNT system.  This is impacted by the fact that JAUNT’s service area includes a small urban area rather than strictly a rural area. 

Bay Transit’s annual vehicle revenue miles and vehicle revenue hours are both higher than the average for the three peer systems, with the total number of vehicle miles being considerably higher.   This  is due  to  the  fact  that  the geographical  size of Bay’s  service area  is quite  large, resulting  in  relatively  longer  trips  and  higher miles  per  hour  than  that  of  any  of  the  peer systems. 

Page 23: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐5             October 2009 Transit Development Plan:  FY 10‐15 

The annual number of unlinked passenger trips for Bay Transit is more than ten percent lower than the peer system average for both JAUNT and 4‐County Transit, but higher than the total number of trips for MEOC.   Bay Transit’s rate of passengers per revenue mile  is the  lowest of the four systems.  This also is most likely due to the size of the service area and the fact that the average passenger trip is quite likely longer than those of the other systems.   By contrast, while Bay Transit’s rate of passengers per revenue hour is also lower than the peer system average, it is not the lowest of the four systems. 

As shown in Table 3‐2 and in Figure 3‐4, the overall average unit operating cost for Bay Transit is quite  comparable  to  the  values of  the peer  systems.   While Bay  Transit’s  cost per  trip of $15.76 is above the average for the three peer systems, this is due to the extremely low value reported for 4‐County Transit.  Bay’s cost per trip is actually lower than that for the other two peer systems and certainly appears to be in line with other systems within Virginia. 

Table 3‐2. Peer Group Comparison Summary 

 Characteristics and 

Performance Indicators 

MEOC  4‐County Transit 

JAUNT Peer 

Systems Average 

Bay Transit 

 

Service Area Population 

91,019  114,940 200,000 135,320  130,000

Total System Operating Cost 

$1,354,143  $1,629,633 $4,566,275 2,516,684  $2,459,305

Total Vehicle Revenue Miles 

647,584  1,154,672 1,750,276 1,184,177  1,664,376

Total Vehicle Revenue Hours 

53,059  56,874 83,564 64,499  75,045

Total Unlinked Passenger Trips 

75,641  184,140 270,875 176,885  156,067

Passengers per Revenue Mile 

0.12  0.16 0.15 0.15  0.09

Passengers per Revenue Hour 

1.43  3.24 3.24 2.74  2.08

Cost per Trip  $17.90  $8.85 $16.86 $14.23  $15.76

Cost per Vehicle Revenue Mile 

$2.09  $1.41 $2.61 $2.13  $1.48

Cost per Vehicle Revenue Hour 

$25.52  $28.65 $54.64 $39.02  $32.77

  

Page 24: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐6             October 2009 Transit Development Plan:  FY 10‐15 

Figure 3‐4.  Peer Comparison 

Bay Transit’s cost per vehicle  revenue mile of $1.48  is more  than 30 percent below  the peer system average of $2.13 per vehicle revenue mile, and it is lower than two of the three systems.  Similarly, Bay  Transit’s  cost per  vehicle  revenue hour of  $32.77  is  approximately  16 percent lower than the peer system average of $39.02 per vehicle revenue hour.   

Overall, while Bay Transit’s productivity values are lower than those of its peers, this is primarily due  to  the nature of  the  system’s  service area and  the  relatively  long passenger  trips  that  it provides.  The unit cost figures for Bay Transit are certainly in line with those of its peer systems indicating a reasonable level of system efficiency.  

33..33 PPuubblliicc  OOnn‐‐BBooaarrdd  PPaasssseennggeerr  SSuurrvveeyy  

Appendix E at the end of this report presents a technical memorandum with detailed findings from the on‐board transit rider survey.   

Using these survey results, the typical Bay Transit rider can be characterized as follows: 

Passenger Demographics:   

Gender:  The majority of the passengers are female. 

Age:   The  findings suggest that Bay Transit  is providing basic mobility services to a 

broad  cross‐section  of  the  service  area  population  and  is  not,  as  some  might 

perceive it to be, a system transporting only elderly residents. 

Race:    African‐American  and  Caucasian  are  the  top  two  races  using  Bay  Transit 

service, representing over 90 percent of ridership. 

$0.00 

$10.00 

$20.00 

$30.00 

$40.00 

$50.00 

$60.00 

Cost per Trip Cost per Vehicle Revenue Mile

Cost per Vehicle Revenue Hour

MEOC  4‐County Transit JAUNT Peer Systems Average Bay Transit

Page 25: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐7             October 2009 Transit Development Plan:  FY 10‐15 

Education  Level:   Approximately 80 percent of  the passengers  indicated  that  they 

either possessed a high school degree (48 percent) or had not graduated from high 

school (32 percent). 

Annual Household  Income:    Persons with  low  income  are  the major  users  of  Bay 

Transit. 

Frequency of Ridership:   A high  level of  repeat  ridership  further  indicates  that Bay 

Transit  is  providing  an  essential  mobility  service  to  a  broad  cross‐section  of  its 

passengers. 

Passenger Trip Characteristics: 

Trip Origin/Destination:  The vast majority (84.7 percent) of the passengers started their 

trips from their home.   The results demonstrate that the current ridership  is using the 

Bay  Transit  system  for  basic  mobility  purposes  between  their  homes  and  their 

workplace or other important destinations.   

Reason for Riding Bay Transit:  The responses indicate that the current ridership can be 

classified as “transit captives”; that is, they have few if any other travel options available 

and if the current transit service was not provided, the subject trip would probably not 

be made.  

 

Service Ratings:   

The service factors presented for rating were as follows: 

Reservation procedures 

Bus on‐time performance 

Hours of bus service  

Cost of bus fare 

Sense of security on the buses 

Cleanliness of buses 

Courtesy/friendliness of bus drivers  

Overall service rating 

 

For each of these eight evaluation measurements, those that responded to the survey provided combined  ratings of “Very Good” or “Good”  in  the  range of approximately 80‐95 percent  for almost  every  measurement.    The  findings  represent  a  very  positive  reaction  from  the passengers  of  Bay  Transit.    They  also  indicate  that  the  current  users  are  satisfied with  the overall services provided by Bay Transit.  

   

Page 26: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐9             October 2009 Transit Development Plan:  FY 10‐15 

Future Service Needs:   

More  than  half  of  respondents  viewed  the  following  suggested  areas  of  potential  service improvement as being “Very Important” or “Somewhat Important” 

Less advance time to schedule trip 

Expand hours / days of service  

33..44 LLeevveell  ooff  SSuuppppoorrtt  ffoorr  TTrraannssiitt  

Bay  Transit  has  received  a  positive  reaction  from  the  people  of  the  region  and  residents regularly express  the opinion  that  it  is a good  service  for  the community.   When Bay Transit initiated their services, not all counties in the Middle Peninsula and Northern Neck PDC regions were covered.   Citizens of  the  local governments asked County supervisors  to  request  transit service  from  Bay  Transit,  and  this  service  would  typically  be  provided  initially  on  a demonstration basis for some period of time.  If determined to be successful, the service would continue with the use of federal, state, and  local government financial support to supplement passenger fares.  The system has been successful, as Bay Transit now provides service to a 12‐county area.  

The  change  in  transit  service  demand  appears  to  be  generally  keeping  pace with  observed population  growth  in  the  region.   Bay  Transit developed  an  initial  plan  for  potential  system growth,  but  recent  limitations  on  funding  provided  by  the  different  federal,  state,  and  local government agencies is the major constraint on the ability to expand the services beyond what is presently being provided.  

A  stakeholder’s meeting  was  conducted  on March  12,  2009  (meeting minutes  included  in Appendix F).  At this meeting, the following comments were offered by the attendees regarding the current Bay Transit service: 

A representative of DRPT indicated that funding was an issue for each transit system in Virginia.   However, DRPT had matched the maximized funding available for Bay Transit for the last couple of years.  

A  representative  of  the  Town  of  Colonial  Beach mentioned  that  there were  certain demands  for  transit  services  from Colonial Beach  to  the  community of Montross, but apparently the services cannot be provided by Bay Transit due to funding limitations. 

Westmoreland County, the second biggest county  in Northern Neck, currently has only one Bay Transit vehicle for transit services. 

Colonial Beach has their own buses running transit services, with the representative of Colonial Beach expressing  the willingness  that  they would  like  to  cooperate with Bay Transit to develop a plan to provide more transit services between the jurisdictions.   

Page 27: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐10             October 2009 Transit Development Plan:  FY 10‐15 

Some private business owners have expressed a willingness to substitute the operating cost for Bay Transit fixed‐route services if the route can serve their locations. 

One representative suggested that Bay Transit should obtain the opinions of people who currently  do  not  use  the  transit  services  to  help  determine  their willingness  to  use transit services if the transit system fits their needs. 

Representatives at  this  stakeholder’s meeting expressed  the  following  suggestions  for Bay Transit’s consideration: 

o Request Stimulus Funding to purchase additional vehicles  o Keep the fare at its current level o Consider the potential for commuter rail service to Richmond in the long term future  o Work with Westmoreland County to provide more buses o Support for drivers to have more training o Expand services to the areas that attract tourists o Build walking and biking trails to connect major attractions o Reroute Bay Transit services to cover more areas 

One  representative  suggested  that  DRPT  should  encourage  carpool,  vanpool,  and  other transportation programs to increase use of the public transit systems. 

In  general,  there  appears  to be  a  good  level of  local  government  support  for  the  continued operation of Bay Transit, but the finances of all the local governments are being strained at the present time.  As a result, the potential for significant increases in local operating assistance is viewed as being unlikely over the next few years.   

33..55 FFooccuuss  GGrroouuppss  aanndd  GGeenneerraall  CCoommmmuunniittyy  IInnppuutt  

DRPT  recently  changed  their  previous  policy  on  state  operating  assistance  support  due  to  a reduced level of available funding.  Combined with the effects of new federal regulations issued by FTA restricting the provision of local charter type services by public transportation agencies, Bay  Transit  is no  longer  able  to provide  transit  services  to  local  charity organizations or  the sponsors of local non‐profit events.  

This change has generated a number of complaints  from many  local agencies with respect to the  challenges  it  presents  to  increasing  community  involvement with  such  activities.    These local community groups and private citizens are supportive of providing additional public transit services in the region, but they are unable to generate local government support for increased public funding.   

During the course of the TDP development process, Bay Transit agency staff and the consulting team received a number of suggestions from the representatives of the counties that currently have Bay Transit services.   Most of  those  that offered  these suggestions are not users of  the system.   What  they  suggested  as  potential  service  improvements  included  better  on‐time 

Page 28: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐11             October 2009 Transit Development Plan:  FY 10‐15 

performance and an expanded service frequency (longer hours of operation during the day as opposed to initiation of service on weekends). 

33..66 RReecceenntt  CChhaannggeess  iinn  PPaattrroonnaaggee,,  OOppeerraattiinngg  CCoossttss,,  aanndd  OOppeerraattiinngg  RReevveennuuee  

Over  the past  three  years,  the number of  annual passengers  transported by Bay Transit has increased from 140,632 persons in FY 2006 to 156,067 in FY 2008, with the annual ridership in FY  2007  being  slightly  higher  at  157,190  persons.    This  net  increase  in  annual  ridership  of 15,435 persons over a period of  two years  represents an 11 percent  increase over  this  time period.   Much of this reported ridership  increase appears to be attributable to the continuing expansion in transit service; from 1.21 million revenue miles in FY 2006 to 1.66 million revenue miles in FY 2008 (an increase of 37.2 percent in revenue miles), and from 61,822 revenue hours in  FY  2006  to  75,045  revenue  hours  in  FY  2008  (a  21.4  percent  increase  in  annual  revenue hours).   

As would be expected with  increases  in  services of  this magnitude, annual  system operating costs have also experienced a significant increase, from $1.78 million in FY 2006 to $2.46 million in FY 2008 (an increase of 38.2 percent).   

When  these  total  annual  values  are  expressed  in  terms  of  unit  factors,  somewhat  different conclusions can be drawn.  For example, the average passengers per revenue hour value of 2.27 observed  in FY 2006 declined to a value of 2.08 passengers per revenue hour  in FY 2008.   Yet this  change  only  represents  an  8.4  percent  decline  in  this  productivity  factor.    Even  at  this lowered value, the factor  is still  in an acceptable range when compared to the average of the three peer transit systems (see Section 3.2). 

Similarly,  the average cost per passenger  increased  from $12.65 per passenger  in FY 2006  to $15.76 per passenger  in  FY 2008, or  a  change of  approximately 24.6 percent.   Much of  this increase appears  to be attributable  to  the observed  increase  in  system operating costs, with much of the increase due to both significantly more service being provided and the higher fuel costs experienced during FY 2008  for  the predominantly diesel and gasoline powered vehicle fleet operated by Bay Transit.   

All of these cost and ridership response factors need to be regularly monitored and reported by the system’s management in order to identify trends of both a positive and a negative nature. 

Table 3‐3 and Figure 3‐5 present a summary of the Bay Transit system’s annual revenues and operating assistance  for Fiscal Years 2006  to 2008.   As shown  in  the  table, system passenger revenues experienced consistent growth over this period, from $94,779 in FY 2006 to $119,602 in  FY  2008.    This  represents  an  increase  of  approximately  26.2 percent  over  the  two  year period, a rate of increase higher than the 11 percent increase in annual passengers reported in Table 3‐1.  The average revenue per passenger of $0.67 in FY 2006 increased to a value of $0.77 per passenger in FY 2008.  Contract revenues were $164,022 in FY 2006 and decreased slightly to $156,937 in FY 2008. 

Page 29: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

$50

$1,00

$1,50

$2,00

$2,50

$3,00

Oth

Loc

t velopment Pla

Table 

Sysand Op

Passenger Fa

Contract Rev

Local Operat

State Operat

Federal Ope

Other Match

Totals 

Source: Bay T

Figure 

$0 

00,000 

00,000 

00,000 

00,000 

00,000 

00,000 

her Match

cal Operating 

n:  FY 10‐15 

3‐3.  Bay Tra

stem Revenueperating Assis

ares 

venues 

ting Assistanc

ting Assistanc

rating Assista

Transit 

3‐5.  Bay Tr

FY 2006

$32,6$94,7$164,

$416,

$445,

$693,

Assistance

ansit SystemFY2

es  stance 

ce 

ce 

ance 

ransit SystemFY2

6

612 779 ,022 

,591 

,718 

,318 

Passenge

State Op

3‐12

m Revenues 006‐FY2008

FY2006 

$  94,779

$  164,022

$  416,591

$  445,718

$  693,318

$ 32,612

$ 1,847,040

 m Revenues006‐FY2008

FY 2007

$101,64$158,78

$619,93

$385,31

$949,75

er Fares

erating Assist

and Operat8 

FY200

$   101,

2  $    158,

1  $   619,

8  $   385,

8  $   949,

 

0  $  2,215

 and Operat8 

40 81 

33 

18 

59 

Co

tance Fe

ing Assistan

07  FY

640  $   1

,781  $   1

933  $   6

318  $   3

759  $  1,0

$ 12

,431  $  2,5

ting Assistan

FY 2008

$120,391$119,602$156,937

$679,436

$357,891

$1,095,59

ontract Reven

ederal Operat

           October

nce  

Y2008 

119,602 

156,937 

679,436 

357,891 

095,597 

20,391 

529,854 

nce 

1 2 7 

nues

ting Assistanc

r 2009 

ce

Page 30: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐13             October 2009 Transit Development Plan:  FY 10‐15 

 As noted earlier in this chapter, total system operating costs have steadily increased in recent years.    The  total  annual  system operating  costs  (defined here  as passenger  fares  +  contract revenues + operating assistance) are reported to have increased from $1,847,040 in FY 2006 to $2,529,854 in FY 2008.  This represents an increase of approximately 37 percent.  With system revenue miles of service increasing from 1.21 million miles in FY 2006 to 1.66 million miles in FY 2008, the observed increase in total system operating costs appears to be reasonable. 

Total  reported  revenues  (passenger  fares  +  contract  revenues)  in  FY  2006  of  $258,801 represented approximately 14.0 percent of the total reported operating cost of $1,847,040.  In FY 2008,  the  total reported revenues of $276,539 represented approximately 10.9 percent of the  total  reported operating  costs  in  that  fiscal year.   Passenger  fares alone  represented 5.1 percent of  total  reported operating costs  in FY 2006, 4.6 percent of  total  reported operating costs in FY 2007, and 4.7 percent of total reported operating costs in FY 2008.  As shown in the chart,  in  all  three  years, most  of  Bay  Transit’s  income  is  from  federal  and  local  operating assistance. 

As  shown  in  Table  3‐4  and  Figure  3‐6,  the  share  of  operating  assistance  provided  by  local governments,  the  Commonwealth  of  Virginia,  and  the  Federal  government  have  fluctuated somewhat from year to year.  The Federal Transit Administration’s share of total net operating costs has ranged from 41 percent in FY 2006, 46 percent in FY 2007, and 47 percent in FY 2008. 

Table 3‐4.  Allocation of Net Operating Assistance FY2006‐FY2008 

Funding Source  FY2006  FY2007  FY2008 

Local Governments  25% 30% 29% 

State Government  26% 19% 15% 

Federal Government  41% 46% 47% 

Contract Revenues  10% 8% 7% 

Other  2% 5% 

Totals  104% 103% 103% 

  Source: Bay Transit        

Page 31: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

State  opTransporpercent ifunding operating

33..77

As  a  demlarge  anddifferentthe Bay Tdevelope(FTA) or Board.  Oin an  indservice st

In  May TransporconjunctGuideline

1. PM

4 Maryland

1

1

O

t velopment Pla

Figure 

perating  asrtation has fin FY 2007 ahas  fluctuag costs in FY

DDeevviiaattiioonn

mand‐respod  generally t service staTransit systeed at a natioby  the Tran

Others have dividual  stattandards for

2002,  thertation  pubion  with  thes were defi

rovide  techMaryland. 

d Transit Guide

0%

20%

40%

60%

80%

100%

120%

Other Contr

n:  FY 10‐15 

3‐6.  Allocat

ssistance  fufluctuated band 15 perceated  to  covY 2006 to 38 

nnss  ffrroomm  SSeerr

nsive  publiclow‐densityndards and em.   Some oonal level thrnsit Cooperabeen develoe.   At  the pr application

e  Marylandblished  a  rhe  Marylandned as havin

hnical  guida

elines, Marylan

FY2006

2%10%

25%

26%

41%

ract Revenue

tion of Net O

unding  provetween 26 pent in FY 200ver  the  rempercent in F

rrvviiccee  SSttaanndd

c  transportay  rural  portioperating gof these serrough reseaative Researoped with a present  timen to rural sys

  Transit  Aeport  titledd  Compreheng four prim

ance  to  tra

nd Transit Adm

s Local Go

3‐14

Operating A

vided  by  tpercent of t08.  Local gomaining  diffeFY 2007 and 

ddaarrddss  aanndd

ation  prograon  of  the Cguidelines  thrvice standarch sponsorerch Programfocus on rure, DRPT hasstems such a

Administratiod  “Marylanensive  Transmary objectiv

ansit  agenc

ministration, Ba

FY2007

8%

30%

19%

46%

vernments

ssistance FY

the  Departotal net opeovernment, erence,  fromto 41 perce

PPootteennttiiaall

am  whose  sCommonweahat can be ards and opeed by the Fe  (TCRP) of  tral public tra not develoas Bay Transi

on  of  the d  Transit sit  Plan  (Mves or purpo

ies  and  tra

ltimore, Maryl

FY

State Gover

Y2006 – FY20

tment  of  Rerating cost contract revm  37  percent in FY 200

RReemmeeddiieess

service  areaalth,  there  aapplied  to  terating guideederal Transthe Transpoansit serviceoped a  set oit.   

Maryland Guidelines.”CTP),  the  Mses4: 

ansit  provid

land; May 200

Y2008

5%7%

29%

15%

47%

rnment Fed

           October

008 

Rail  and  Pin FY 2006 tvenue, and oent  of  tota8.   

ss  

  encompassare  a  numbhe operatioelines have it Administrortation Reses being operof general  tr

Departmen”    PrepareMaryland  Tr

ders  throug

2, Page 2. 

deral Governm

r 2009 

Public to 19 other l  net 

ses  a ber  of ns of been ration earch rated ransit 

nt  of ed  in ransit 

ghout 

ment

Page 32: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐15             October 2009 Transit Development Plan:  FY 10‐15 

2. Create consistency in transit service and infrastructure throughout Maryland. 

3. Establish measurable guidelines for transit. 

4. Provide a basis for securing funding for transit improvements. 

The Maryland Transit Guidelines encompassed all of the transit modes operating  in the state, from large urban fixed‐guideway systems to small urban area bus and rural demand‐responsive services.   For  the purposes of  the Bay Transit TDP,  the  following Maryland service guidelines developed  for application  to  rural, general public, demand‐responsive  transit  services will be applied: 

Reservations 

Span of Service 

System Access and Availability 

Directness 

Dependability 

Rider Compliance and No Show Policy 

Financial 

Productivity 

The application of each of these guidelines to the current operations of Bay Transit is discussed below. 

Reservations.  This  criterion  delineates  both  the minimum  and maximum  amount  of  time  in advance of  requested  service  that  a  rider  is  required  to place  a  reservation with  the  transit system  operator.    The MTA minimum  reservation  period  for  non‐ADA  service  such  as  that operated by Bay Transit is “noon on the prior day” and the maximum reservation period is two weeks.  Bay Transit requires a 24‐hour advance notice for individual trips and allows for regular trips  to be prescheduled several weeks  in advance.   The current service satisfies  this service guideline. 

Span  of  Service.  The MTA  guidelines  define  “span  of  service”  as  the  duration  of  time when service  is “made available” and  is measured from the earliest to the  latest pick‐up times.   For rural, non‐ADA services, the MTA guidelines define span of service as from 7:00 AM to 6:00 PM on weekdays.   Bay  Transit  currently operates Monday  through  Friday between  the hours of 6:00 AM and 6:00 PM.  The current service satisfies this service guideline. 

Loading Guideline. The MTA service guidelines  indicate that no standees are permitted at any time on demand‐responsive vehicles  throughout  the State of Maryland.   Bay Transit satisfies this guideline by  requiring all passengers  to wear seatbelts at all  times on  the vehicles and never allowing standees on any trip. 

Page 33: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐16             October 2009 Transit Development Plan:  FY 10‐15 

System Access and Availability.  The MTA guidelines define the minimum “access” for demand‐responsive service to be the provision of “curb‐to‐curb” transportation.  This guideline is being satisfied  by  Bay  Transit.    The MTA  guideline  for  “availability”  defined  compliance  as  service being  provided  for  any  trip  purpose  on  a  space/time  available  basis  within  the  agency’s operating  service  area.   Bay  Transit  is  in  full  compliance with  this  guideline  across  the  12‐county area that it serves. 

Directness.    The MTA  guidelines  recommend  that  a  demand‐responsive  trip  should  take  no more  than  an  hour  (60 minutes)  for  a  driving  distance  of  up  to  20 miles  and  discourage transfers on demand‐response systems.  Bay Transit does not schedule passenger transfers for those trips that have both their origin and their destination within a single county service area.  Transfers  are  limited  to  those  trips  that  require  a  passenger  to  use  separate  vehicles when traveling from one county to another.  Given the large geographic size of the 12‐county region served by Bay Transit, non‐adherence to this MTA guideline is deemed to be reasonable and acceptable.    Based  on  a  review  of  a  small  random  sample  of  driver  logs  and  reservation sheets, the maximum trip time guideline is being satisfied.  Dependability.  The MTA guideline for dependability measures whether the service is operated as scheduled and whether the service picks up all passengers who have made reservations.  The MTA service guidelines involve two criteria: schedule adherence and trip fulfillment.  The MTA schedule adherence criteria define “on‐time” as being 15 minutes early to 15 minutes  late for pick‐ups,  and up  to 15 minutes  late  for drop‐offs.    The  associated  “on‐time” percentage  for pick‐ups  and  drop‐offs  is  90  percent.    Bay  Transit  currently  operates  a manual  dispatching system with modest levels of computer assistance.  Driver assignment sheets define the time of all scheduled pick‐ups over  the course of  the service day and drivers  record  the actual  times that pick‐ups and drop‐offs  take place  for each  trip.   Based on a  review of a  small  random sample of driver logs and reservation sheets, the schedule adherence guidelines appear to be satisfied.  Similarly, the trip fulfillment criterion is being satisfied by all scheduled trips being served. 

Rider Compliance and No Show Policy.  All demand‐responsive transit system operators should strive to provide all eligible patrons with no turn downs.  To accomplish this objective, persons that are consistent “no shows” must be denied service so that other riders can use the available system  capacity.    Since  its  earliest  days  of  operation,  Bay  Transit  has  implemented  and maintained a consistent set of policies related to rider compliance and “no shows”.  Records are maintained of  those persons who make  a  reservation but  are not  available  to be picked up within  the  designated  time  period  or  who  cancel  a  reservation  on  short  notice.    Written notification  is  provided  to  these  individuals  of  the  potential  for  suspension  of  service  if  the situation continues.  Suspension of service has been applied where necessary and appropriate. It appears that this service criterion is being satisfied. 

Financial.  The cost of operating a demand‐response transit system can be measured by several basic financial factors.  The most commonly used factors are the average system‐wide cost per passenger and the average system‐wide cost per vehicle hour of service provided.  As described 

Page 34: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐17             October 2009 Transit Development Plan:  FY 10‐15 

earlier in this chapter, Bay Transit appears to be operating a very efficient and cost effective service.  The current average cost per passenger during FY 2008 was $15.76, and Bay Transit’s average  cost  per  vehicle  hour  of  service  provided  was  $32.77  during  FY  2008,  a  value approximately 16 percent  lower than the average experienced by the other three peer transit systems.   

Productivity.  The  most  useful  measure  of  a  demand‐response  system’s  productivity  is passengers  per  revenue  hour  because  it  provides  the  operating  agency  with  a method  to measure  service without  focusing  on  operating  costs.    As  noted  earlier  in  this  chapter,  Bay Transit’s system‐wide passenger per revenue hour factor during FY 2008 was 2.08, as compared to  the  average  value  for  this  factor  experienced  by  the  three  peer  transit  systems  of  2.74.  Given the fact that most of the peer systems provide service to much smaller geographic areas, typically only a  single county as opposed  to  the 12‐county  region  served by Bay Transit,  this finding  is  not  unexpected.    Comparing  this  operating  statistic  for  Bay  Transit  to  the  same measure for its most comparable peer system, MEOC Transit, results in a much more favorable finding.   While Bay Transit  carried 2.08 passengers per  revenue hour during  FY 2008, MEOC Transit  carried 1.43 passengers per  revenue hour.    It would  thus appear  that Bay Transit  is providing service in a very cost‐effective manner.

33..88 PPootteennttiiaall  SSoolluuttiioonnss  ttoo  GGaappss  oorr  SSeerrvviiccee  DDeeffiicciieenncciieess  

Bay  Transit’s  services  are essentially  all demand‐response  in nature.    Year‐round  fixed‐route services are offered weekdays in the Towns of Colonial Beach and West Point.  Three seasonal trolleys run seasonal weekend fixed routes  in the towns of Colonial Beach, Kilmarnock, White Stone, Irvington, and Urbanna.    As described above, the system appears to be providing these services in an efficient and cost‐effective manner.   As evidenced by  the  results of  the on‐board  ridership  survey,  the  current passengers appear to be pleased and supportive of the transit services that are being provided.  

With that said, the service factor of “On‐time Performance” may be the single most important factor  that  the  current  riders believe  is  in need of  improvement.    This  factor has  also been noted  by  the  Bay  Transit  management,  who  recently  initiated  a  needs  assessment  for paratransit services scheduling software.   The primary purpose of this project  is to assess the current primarily manual scheduling practices of Bay Transit and to recommend scheduling and dispatching software  that can be employed  to  increase operational efficiencies and ridership.  This needs assessment project began in May 2009 and is planned to be completed by the end of 2009.    

33..99 PPootteennttiiaall  RReemmeeddiieess  ffoorr  EEqquuiippmmeenntt  aanndd  FFaacciilliittyy  DDeeffiicciieenncciieess  

Since  the  initiation of  service  in 1996, Bay Transit has been  successful  in both  acquiring  the vehicles required to operate  its service on a regular basis and  in obtaining  federal, state, and local government operating assistance.  However, they have been constrained by limitations on 

Page 35: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  3‐18             October 2009 Transit Development Plan:  FY 10‐15 

obtaining  appropriate  administrative  and  maintenance  facilities.    The  Bay  Transit  senior management and administrative staff currently share space with their co‐workers of Bay Aging at the latter’s main offices in Urbanna, Middlesex County.  Actual operations and maintenance functions are distributed across a number of  locations on both the Northern Neck and Middle Peninsula portions of the 12‐county service area.  Area operations managers typically work out of the Bay Aging offices in their particular area, with vehicle maintenance services provided by private contractors.    Recognizing the need to address this issue, Bay Transit has been working closely with DRPT and its local government partners over the past several years on the planning and design of its first new dedicated operations and maintenance  facility.   This work culminated on April 27, 2009 with  groundbreaking  ceremonies  in  the  Commerce  Park  of Warsaw,  Virginia  for  an  11,000 square foot transit facility that will include space for operations and dispatch functions as well as a fleet maintenance shop consisting of two vehicle bays with lifts.  The combined design and construction cost  for the Bay Transit operations and maintenance  facility  is $2,720,327.5   The construction of this new facility is anticipated to be completed by Spring 2010, with operations out of  the  center beginning  in Summer 2010.   The Warsaw  center will  serve as  the dispatch location for all twelve (12) counties.   Bay Transit is also beginning to plan for the development of a Middle Peninsula administration and maintenance facility to accommodate its needs in the central and southern portions of the Middle Peninsula and  those  in New Kent and Charles City Counties.   The specific  location  for this facility has not yet been identified.  The current thinking of Bay Transit management is that this facility should be in operation within the next five to seven years, or within the time‐frame associated with this initial Transit Development Plan. 

33..1100 TTiittllee  VVII  RReeppoorrtt  aanndd  FFTTAA  QQuuaaddrreennnniiaall  RReevviieeww  

As  a  designated  subrecipient  of  FTA  capital  and  operating  assistance  funding  through  the Virginia Department of Rail and Public Transportation (DRPT) whose services are provided in a rural portion of the Commonwealth, Bay Transit is not required to prepare and submit its own separate Title VI report or the associated FTA Quadrennial Review.  However, Bay Transit is still required  to  follow  the  Title  VI  and  Title VI‐dependent  guidelines  for  Federal  Transit Administration  recipients  as  described  in  FTA  Circular  C  4702.1A.    Thus,  for  example,  the appropriate  provisions  of  the NEPA  process were  followed  in  connection with  the  planning, design,  and  construction  of  the  new  Warsaw  transit  operations  and  maintenance  center.  Similarly, all official publications issued by Bay Transit include appropriate language concerning non‐discrimination.   

5 Bay Transit has Groundbreaking Ceremony for Warsaw Transit Facility; http://www.drpt.viginia.gov/nnews/details.aspx?id=379.  

Page 36: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐1  October 2009 Transit Development Plan:  FY 10‐15

44..00    SSEERRVVIICCEE  EEXXPPAANNSSIIOONN  PPRROOJJEECCTT  DDEESSCCRRIIPPTTIIOONNSS    This chapter presents a description of potential service and facility improvement needs over the multi‐year duration of the transit plan.   This discussion should be viewed not as a “wish  list”, but  rather  as  documentation  of  those  reasonable  potential  actions  to  improve  the  existing transit  system  over  the  next  five  to  seven  years.    The  contents  of  this  chapter  include  the following elements: 

Demographic analysis that identifies anticipated changes in population and employment within the service area. 

A description of potential needs based on  the work undertaken  to date  in connection with the TDP development.  This work reflects inputs from the transit agency staff, other regional  stakeholders,  and  the  technical  analysis  undertaken  by  the members  of  the consultant team.  

Preliminary  capital  and  operating  cost  estimates  associated with  each  of  the  various identified  potential  needs  and  a  discussion  of  potential  policy,  funding,  or  operating issues associated with the defined needs.   This data will  include estimates of potential ridership response to the various service improvements.   

Each of these topics is discussed in more detail below. 

44..11 DDeemmooggrraapphhiicc   AAnnaallyyssiiss   ooff   AAnnttiicciippaatteedd   PPooppuullaattiioonn   aanndd   EEmmppllooyymmeenntt  

CChhaannggeess  

The  Bay  Transit  service  area  encompasses  a  12‐county  region  in  the  eastern  part  of  the Commonwealth of Virginia  that  is predominantly  rural  in character.   With  the exception of a number of small urban centers that house concentrations of population and employment, most of the land area is primarily agricultural, forest, or wetlands.  

As shown on Table 4‐1, the estimated present day population of the Bay Transit service area (based on 2008 data) is approximately 168,300 persons, spread across a total land area for the 12 counties of approximately 2,664 square miles.   The resulting average population density  is approximately 63.2 persons per square mile.  

The  more  densely‐populated  portion  of  the  region  is  composed  of  the  six  counties  that constitute the Middle Peninsula PDC.  These six counties contain approximately 92,240 persons, or approximately 55 percent of the total service area population.   

The  four  counties  that  comprise  the Northern Neck  PDC  area  contain  approximately  50,987 persons, or approximately 30 percent of the regional total, with the two counties (Charles City County  and New  Kent  County) within  the  Richmond  Regional  PDC  containing  the  remaining 25,037 persons, or approximately 15 percent of the regional total.   

Page 37: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐2  October 2009 Transit Development Plan:  FY 10‐15

Between  2000  and  2008,  the  Richmond  Region  population  grew  the  most  (22.8  percent), followed  by  the Middle  Peninsula  (10.2  percent).    The  Northern  Neck  grew  very  little  (3.3 percent). 

Recent  estimates  assembled  by  the  Virginia  Employment  Commission  show  that  the  total employment within these twelve counties is approximately 80,500 jobs.  As shown in Table 4‐1, this  estimate  includes  approximately  45,200  jobs  in  the  six Middle  Peninsula  PDC  counties, approximately 22,800  jobs  in the four Northern Neck PDC counties, and the remaining 12,400 jobs in Charles City and New Kent Counties.   

Table 4‐1.  Present Day Population and Employment Summary 

PDC and Counties Population 

Percent Change in Pop‐ulation

County Area (Sq. Miles) 

Population Density 

(Persons/Sq.Mi.) 2009 

Employment

2000  2008  2000  2008 

PDC 18 ‐Middle Peninsula                

Essex County  9,989  11,091 11.0% 276.4 36.1 40.1  5,382

Gloucester County  34,780  38,656 11.1% 253.3 137.3 152.6  19,702

King and Queen County  6,630  6,830 3.0% 324.4 20.4 21.1  3,110

King William County  13,146  16,040 22.0% 285.2 46.1 56.2  7,965

Mathews County  9,207  9,038 ‐1.8% 103.1 89.3 87.7  4,242

Middlesex County  9,932  10,585 6.6% 142.3 69.8 74.4  4,841

Total PDC 18  83,684  92,240 10.2% 1384.7 60.4 66.6  45,242

PDC 17 ‐ Northern Neck       

Lancaster County  11,567  11,466 ‐0.9% 150.0 77.1 76.4  5,153

Northumberland County 

12,259  12,915 5.4% 216.4 56.6 59.7  5,468

Richmond County  8,809  9,144 3.8% 206.1 42.7 44.4  3,877

Westmoreland County  16,718  17,462 4.5% 277.7 60.2 62.9  8,338

Total PDC 17  49,353  50,987 3.3% 850.2 58.0 60.0  22,836

PDC 15 ‐ Richmond Region     

Charles City County  6,926  7,212 4.1% 204.0 34.0 35.4  3,541

New Kent County  13,462  17,825 32.4% 225.0 59.8 79.2  8,861

Total PDC 15 (partial)  20,388  25,037 22.8% 429.0 47.5 58.4  12,402

Service Area Total  153,425  168,264 9.7% 2663.9 57.6 63.2  80,480

Sources:  2000 Population and County Area ‐ 2000 Census  2008 Population Estimates ‐  http://quickfacts.census.gov/qfd/states/51/51036.html  2009 Employment Data (Average: January – June 2009) ‐ Virginia Employment Commission  

Future year forecasts of population for each of the 12 counties  in the Bay Transit service area for the years 2010, 2020, and 2030 were obtained from the Virginia Employment Commission.  

Page 38: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐3  October 2009 Transit Development Plan:  FY 10‐15

Employment  projections  for  these  rural  counties  were  not  available  from  the  Virginia Employment Commission. 

For the purposes of the Bay Transit TDP, a future plan horizon year of 2015 has been identified, six years from the current base transit operations year of 2009.  Table 4‐2 presents estimates of future population for the years 2010, 2015, 2020, and 2030 for each of the Bay Transit service area counties.  The 2015 estimates were interpolated from the 2010 and 2020 estimates.  

Page 39: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐4  October 2009 Transit Development Plan:  FY 10‐15

Table 4‐2.  Future Year Bay Transit Service Area Population Estimates (All Ages) 

PDC and Counties  2010  2015  2020  2030 

Change: 2010‐2015 

Number  Percent 

PDC 18 ‐ Middle Peninsula               

Essex County  10,969 11,465 11,960 12,974 496  4.5%

Gloucester County  40,474 43,244 46,013 51,824 2,770  6.8%

King and Queen County  6,891 7,039 7,187 7,564 148  2.1%

King William County  16,187 17,653 19,119 22,227 1,466  9.1%

Mathews County  9,097 9,087 9,077 9,068 ‐10  ‐0.1%

Middlesex County  11,012 11,534 12,055 13,181 522  4.7%

Total PDC 18  94,630 100,021 105,411 116,838 5,391  5.7%

PDC 17 ‐ Northern Neck               

Lancaster County  11,485 11,481 11,477 11,478 ‐4  0.0%

Northumberland County  13,420 14,004 14,587 15,821 584  4.3%

Richmond County  8,333 9,117 9,900 10,512 784  9.4%

Westmoreland County  17,483 17,910 18,336 19,261 427  2.4%

Total PDC 17  50,721 52,511 54,300 57,072 1,790  3.5%

PDC 15 ‐ Richmond Region PDC      

     

Charles City County  7,431 7,682 7,932 8,749 251  3.4%

New Kent County  18,681 21,176 23,671 29,496 2,495  13.4%

Total PDC 15 (partial)  26,112 28,858 31,603 38,245 2,746  10.5%

Service Area Total  171,463 181,389 191,314 212,155 9,926  5.8%

Source: 2000 Census and Virginia Employment Commission Community Profiles for each county.

As  Table  4‐2  shows,  almost  all  of  the  Bay  Transit  service  area  counties  are  projected  to experience  increases  in population  from 2010  to 2015.   Only Mathews County and Lancaster County are projected to experience very small decreases in population.  In these two counties, the anticipated percentage change resulting from these decreases  is expected to be  less than 0.1 percent, which can be considered as no change in the total population.  For the overall Bay Transit service area, the total estimated population  increase  is projected to be 9,926 persons from 2010  to 2015, or a percentage  change over  this period of 5.8 percent.   On an average annual basis, this equates to approximately 1.1 percent per year. 

Table 4‐3 illustrates the current and projected future service area population of persons age 65 or older.       

Page 40: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐5  October 2009 Transit Development Plan:  FY 10‐15

Table 4‐3.  Future Year Bay Transit Service Area Population Estimates of Elderly Persons (65 or Older) 

PDC and Counties  2010  2015  2020 Change, 2010‐2015 

Number  Percent 

PDC 18 ‐ Middle Peninsula             

Essex County  1,914 2,143 2,372 229  12.0%

Gloucester County  5,676 7,016 8,356 1,340  23.6%

King and Queen County  1,265 1,385 1,505 120  9.5%

King William County  2,118 2,647 3,175 529  25.0%

Mathews County  2,198 2,253 2,307 55  2.5%

Middlesex County  2,706 2,933 3,160 227  8.4%

Total PDC 18 15,877 18,376 20,875 2,499  15.7%

PDC 17 ‐ Northern Neck      

Lancaster County  3,122 3,019 2,916 ‐103  ‐3.3%

Northumberland County  3,944 4,050 4,156 106  2.7%

Richmond County  1,688 1,767 1,846 79  4.7%

Westmoreland County  3,422 3,616 3,809 194  5.7%

Total PDC 17 12,176 12,452 12,727 276  2.3%

PDC 15 ‐ Richmond Region PDC      

Charles City County  1,193 1,453 1,712 260  21.8%

New Kent County  2,297 3,401 4,504 1,104  48.0%

Total PDC 15 (partial) 3,490 4,853 6,216 1,363  39.1%

Service Area Total 31,543 35,681 39,818 4,138  13.1%

Source: 2000 Census and Virginia Employment Commission Community Profiles for each county.

 As  shown  on  Table  4‐3,  the  population  of  elderly  persons  age  65  or  older  is  projected  to increase  from 2010  to 2015  for all  counties  in  the Bay Transit  service area except  Lancaster County.  Lancaster County is projected to experience a decrease of approximately 103 persons age 65 or older between 2010 and 2015.   This value represents a 3.3 percent decrease  in the elderly population of this county.  For the overall Bay Transit service area, the total number of elderly  persons  is  projected  to  increase  from  approximately  31,543  persons  in  2010  to approximately 35,681 persons in 2015.  This change in the number of elderly residents of 4,138 persons from 2010 to 2015 represents a percentage change of approximately 13.1 percent, or approximately 2.5 percent per year.  Figure 4‐1 below presents the existing population and the projected total and elderly populations for the Bay Transit service area jurisdictions in the years 2010, 2015, and 2020, compared to the 2008 base year.  The elderly population (65+) for 2008 was  not  readily  available,  but  it  can  be  assumed  that  it  is  a  similar  portion  of  the  total population as 2010. 

Page 41: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

44..22 PP

As descriand expain Gloucecounty re

The  fundsystem. replacemthe desigsystems Bay Trantotal coststate  or approxim

In  recentaverage using  Fedtypical ve

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

t velopment Pla

Figure 4

PPootteennttiiaall  SSe

ibed in previanding systeester Countegion.  

damental  qu One  of  the

ment and  flegnation  in Ain Virginia  t

nsit was ident of $395,90local  matc

mately $56,5

t  years,  Bayof seven or deral Recovehicle acqui

0

00

00

00

00

00

00

00

00

00

00

2

n:  FY 10‐15

4‐1.  Projecte

eerrvviiccee  EExxpp

ious sectionm for over aty,  the  syste

uestion  nowe  basic  facileet expansioApril 2009 ofto  receive Fntified as the00.  This allocching  funds500.   

y  Transit  haeight vehic

very Act  stimsition / repl

2008

168,264

Elderly Po

ed Populatio

ppaannssiioonn  aann

s of this TDPa decade.  Siem has  grow

w  facing  the lity  needs  ison program.f Bay TransitFederal Recoe recipient ocation will ta  required. 

s  typically  ales each yeamulus  fundinacement cy

2010

31,54

171,

opulation (65+

4‐6

on (All Bay T

dd  FFaacciilliittyy  NN

P document,nce the initiwn  to  a  flee

agency  is  hs  the  contin   This activit as one of overy Act  stof seven repake the form  The  avera

acquired  fivear.   The sevng  thus  repcle.  Assumi

2

3

,463

+) Total

Transit Servi

NNeeeeddss  

, Bay Transitation of servet of 68  veh

how  best  tonuation  of  tity  continuethe rural animulus  fundplacement pm of 100 percage  cost  of

e  to  ten  veven vehicles resents  the ing that this

015

35,681

181,389

l Population (

ce Jurisdicti

t has been a vice in 1996 hicles operat

o  improve  uthe  historicaes  today, mond small urbding.   Througassenger tracent Federaf  each  of  t

hicles  in  anto be obtaisystem’s  re

s typical veh

2020

39,818

191,

(All Ages)

October

ions)

steadily growith one veting across  a

upon  the  cual  transit  veost  recently ban public trgh  this progansport vansl funding withese  vehicl

y  given  yeaned during ecently obseicle replace

8

,314

r 2009 

owing ehicle a 12‐

rrent ehicle with ransit gram, s at a th no es  is 

ar,  an 2009 erved ment 

Page 42: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐7  October 2009 Transit Development Plan:  FY 10‐15

cycle is continued over the next several years, Table 4‐4 illustrates the total passenger fleet size and the anticipated average vehicle age between 2009 and the TDP horizon year of 2015.  

Table 4‐4.  Bay Transit Fleet Replacement Program, FY2009‐FY2015 

Passenger Vehicle Fleet  Calendar Year 2008 ‐ 2015 

Model Year No. of Vehicles 

2008  2009  2010  2011  2012  2013  2014  2015 

1988  1  1               

1999                   

1990  1  1               

1991  1  1               

1992  1  1               

1993                   

1994  1  1               

1995  1  1               

1996                   

1997                   

1998  1  1               

1999  2  2               

2000  1  1               

2001  2  2  2             

2002  6  6  6             

2003  7  7  7  7           

2004                   

2005  7  7  7  7  7         

2006  10  10  10  10  10  10  5     

2007  5  5  5  5  5  5  5  5   

2008  10  10  10  10  10  10  10  10  10 

2009  ‐    7  7  7  7  7  7  7 

2010  ‐      7  7  7  7  7  7 

2011  ‐        7  7  7  7  7 

2012  ‐          7  7  7  7 

2013  ‐            7  7  7 

2014  ‐              7  7 

2015  ‐                7 

Total Vehicles  57  57  54  53  53  53  55  57  59 

Average Age  5.6  4.3  4.1  4.1  4.2  4.4  4.5  4.7 

Assumptions:  Current fleet size remains relatively constant; 7 vehicles to be acquired each year starting 2009. 

Page 43: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐8  October 2009 Transit Development Plan:  FY 10‐15

Applying the average vehicle acquisition cost of $56,500 in the current year (2009) and applying an average annual  inflation  rate of 2.0 percent over  the period of 2010  to 2015,  the  typical average annual cost associated with the acquisition of several replacement vehicles each year over this period is shown in Table 4‐5. 

Table 4‐5. Estimated Cost of Base Fleet Vehicle Replacement Program, FY2009‐FY2015 

Model Year 

Avg. Vehicle Cost 

2008  2009  2010  2011  2012  2013  2014  2015  Total Cost

2009  $56,500   $ ‐  $ ‐  $ ‐  $ ‐  $ ‐  $ ‐  $ ‐  $ ‐  $ ‐ 

2010  $57,600   $ ‐  $ ‐  $403,200  $ ‐  $ ‐  $ ‐  $ ‐  $ ‐  $403,200 

2011  $58,800   $ ‐  $ ‐  $ ‐  $411,600  $ ‐  $ ‐  $ ‐  $ ‐  $411,600 

2012  $60,000   $ ‐  $ ‐  $ ‐  $ ‐  $420,000  $ ‐  $ ‐  $ ‐  $420,000 

2013  $61,200   $ ‐  $ ‐  $  ‐  $ ‐  $ ‐  $428,400  $ ‐  $ ‐  $428,400 

2014  $62,400   $ ‐  $ ‐  $ ‐  $ ‐  $ ‐  $  ‐  $436,800   $ ‐  $436,800 

2015  $63,600   $ ‐  $  ‐  $ ‐  $ ‐  $ ‐  $ ‐  $ ‐  $445,200   $445,200 

  Totals  $ ‐  $  ‐  $415,100  $436,100  $457,800  $480,900  $504,700   $529,900   $2,545,200 

Note: Average Vehicle Cost each year assumes 2.0 percent inflation rate. 

As  illustrated  in  Table  4‐5,  the  average  vehicle  cost  today  of  $56,500  could  increase  to approximately  $63,600  by  the  year  2015  assuming  an  average  annual  inflation  rate  of  2.0 percent, and with the average vehicle cost rounded to the nearest $100.   The total estimated cost of  acquiring  seven  vehicles each  year  for  a period of  six  years would be  approximately $2,545,200. 

Table  4‐6  and  Table  4‐7,  respectively,  illustrate  the  anticipated  operating  statistics  and operating assistance funding levels associated with the continuing operation of the Bay Transit system at present day service levels.  These tables assume that the currently observed vehicle miles and hours of service would remain basically unchanged over the next several years, with the anticipated  increase  in service area population defining  the magnitude of  the anticipated passenger  growth.    The  latest  available  budget  information  for  Bay  Transit  is  FY  2010. Therefore,  operating  expenses  are  assumed  to  experience  an  average  annual  increase  of approximately 2.0 percent starting from FY 2011 to FY 2015. 

 

Page 44: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐9  October 2009 Transit Development Plan:  FY 10‐15

Table 4‐6. Operating Statistics of Bay Transit, FY2008‐FY2015 

Operating Statistics  FY2008  FY2009  FY2010  FY2011  FY2012  FY2013  FY2014  FY2015 

Annual Passengers 

156,067          157,784          159,519          161,274          163,048          164,842          166,655          168,488 

Annual Operating Costs 

 $ 2,459,305   $ 2,420,176   $ 2,582,544   $ 2,634,195   $ 2,686,879   $ 2,740,616   $ 2,795,429   $ 2,851,337 

Annual Revenue Miles 

1,664,376  1,664,456  1,664,456 1,664,456 1,664,456 1,664,456  1,664,456 1,664,456

Annual Revenue Hours 

75,045  75,175  75,175 75,175 75,175 75,175  75,175 75,175

Passengers per Revenue Mile 

0.094  0.095  0.096 0.097 0.098 0.099  0.100 0.101

Passengers per Revenue Hour 

2.08  2.10  2.12 2.15 2.17 2.19  2.22 2.24

Cost per Passenger 

$15.76  $15.34  $16.19 $16.33 $16.48 $16.63  $16.77 $16.92

Cost per Revenue Mile 

$1.48  $1.45  $1.55 $1.58 $1.61 $1.65  $1.68 $1.71

Cost per Revenue Hour 

$32.77  $32.19  $34.35 $35.04 $35.74 $36.46  $37.19 $37.93

1. The percentage of Annual Passenger increase is assumed to be 1.1% based on the regional population increase, beginning in FY 2009.   2. FY2010 Operating Cost obtained from DRPT FY2010 district budget data.  Beginning in FY2011, the Annual Operating Cost calculated assuming a 2.0%/year inflation rate. 

3.  Annual Revenue Miles assumed to be constant through the life of the TDP period.   4.  Annual Revenue Hours for FY 2009 provided by Bay Transit and assumed to be constant through the life of the TDP period. 5. FY2010 Passenger Fare and Contract Revenue Total obtained from DRPT FY2010 district budget data and assumed to be constant through the life of the TDP period. 6. Federal Operating Assistance reflects estimated FTA Section 5311 and FTA 5316 funds; assumed to remain flat at FY2010 levels. 

7. FY2010 State Operating Assistance obtained from DRPT FY2010 district budget data.  The increase in State Operating Assistance, as per DRPT, is assumed to be 1.77% in FY2011, 2.90% in FY2011‐FY2012, 3.50% in FY2012‐FY2013, 3.16% in FY2013‐FY2014, and 3.16% in FY2014‐FY2015. 

8.  Net Operating Cost calculated as Total Cost less Passenger Fares and Contract Revenues. 

              

Page 45: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐10  October 2009 Transit Development Plan:  FY 10‐15

Table 4‐7.  System Revenues and Operating Assistance of Bay Transit, 2008‐2015                           

System Revenues 

and Operating Assistance 

FY2008  FY2009  FY2010  FY2011  FY2012  FY2013  FY2014  FY2015 

Passenger Fares 

   $119,602  

   $120,000    $  121,234   $  122,568  $ 123,917  $  125,280 

 $ 126,658 $  128,051 

Contract Revenues 

   $156,937  

   $157,000   $ 25,000      $ 25,000     $ 25,000    $ 25,000 

     $ 25,000     $ 25,000 

Local Operating Assistance 

   $679,436  

   $621,219  

   $757,793 

   $799,821 

  $837,315 

   $872,444  

   $909,785       $947,704 

State Operating Assistance 

   $357,891       $411,839  

   $469,501 

   $477,811 

  $491,668 

   $508,876  

   $524,957     $541,545 

Federal Operating Assistance 

  $1,095,597  

  $1,071,118  

  $1,208,972 

  $1,209,000 

  $1,209,000 

  $1,209,000  

  $1,209,000   $ 1,209,000 

Other Match      $120,391  

   $39,000                    

Totals   

$2,529,854    

$2,420,176   $2,582,500  $2,634,200  $2,686,900   

$2,740,600   $2,795,400   $ 2,851,300 

                          

Net Operating 

Cost   

$2,253,315   

$2,143,176   $2,436,266   

$2,486,632   

$2,537,983  $2,590,320   

$2,643,742    $2,698,249 

1. The percentage of Annual Passenger increase is assumed to be 1.1% based on the regional population increase, beginning in FY 2009.   2. FY2010 Operating Cost obtained from DRPT FY2010 district budget data.  Beginning in FY2011, the Annual Operating Cost calculated assuming a 2.0%/year inflation rate. 

3.  Annual Revenue Miles assumed to be constant through the life of the TDP period.   4.  Annual Revenue Hours for FY 2009 provided by Bay Transit and assumed to be constant through the life of the TDP period. 5. FY2010 to FY2015 Passenger Fare and Contract Revenue Total estimate obtained from Diana Giles, CFO, Bay Transit. 6. Federal Operating Assistance reflects estimated FTA Section 5311 and FTA 5316 funds; assumed to remain flat at FY2010 levels. 

7. FY2010 State Operating Assistance obtained from DRPT FY2010 district budget data.  The increase in State Operating Assistance, as per DRPT, is assumed to be 1.77% in FY2011, 2.90% in FY2011‐FY2012, 3.50% in FY2012‐FY2013, 3.16% in FY2013‐FY2014, and 3.16% in FY2014‐FY2015. 

8.  Net Operating Cost calculated as Total Cost less Passenger Fares and Contract Revenues. 

 

   

Page 46: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐11  October 2009 Transit Development Plan:  FY 10‐15

Potential Service Expansions 

As described  in previous  sections  of  this  TDP  document,  currently Bay  Transit only provides demand‐response transit services.   However, the staff of Bay Transit and several stakeholders have identified the potential need in the region for the initiation of fixed‐route services.  Based on  the demand of  services,  three potential  fixed  routes have been  identified  in  this TDP,  as shown in Figure 4‐2 and described below:  

Proposed Fixed‐Route 1: Gloucester Point – Urbanna – Tappahannock:  This route starts from Gloucester and follows Rt. 17 to get to Urbanna and then to Tappahannock.   The one‐way distance of this route is approximate 62 miles and travel time is estimated at 1 ½ hours for a one‐way trip.  The following figure shows the proposed route. 

  Proposed Fixed‐Route 2: Colonial Beach – Montross – Warsaw – Tappahannock:   This 

route starts from Colonial Beach and follows Rt. 205 to Montross, then Rt. 3 to Warsaw, and  then  travels  to Tappahannock via Rt. 360.   The one‐way distance of  this  route  is approximately 40 miles, and travel time is estimated at 1 hour for a one‐way trip.  The following figure shows the proposed route.  

Proposed Fixed‐Route 3: Kilmarnock – Warsaw – Kilmarnock:  This route is a loop route. 

It starts from Kilmarnock to get to Warsaw via Rt. 3 and then follows Rt. 360 and Rt. 200 to return to Kilmarnock.  The loop distance of this route is approximately 70 miles, and travel  time  is estimated at 1 ½ hours  for a  typical one‐loop  trip.   The  following  figure shows the proposed route.  

The  routes  shown  in  Figure  4‐3  were  submitted  by  the  Northern  Neck  Planning  District Commission  as  their  suggestion  for potential new  fixed‐route  services.   Note  that  the  green route  in Figure 4‐3 matches the Proposed Fixed‐Route 2 and the red  loop route  in Figure 4‐3 matches Proposed Fixed‐Route 3.   The PDC  suggested  the  following  service details  for  these potential routes:      

1. The loop could be implemented in two or more phases.  The Colonial Beach‐to‐Warsaw segment  might  be  Phase  One  as  it  would  provide  service  between  two  regional employment  centers,  as  well  as  regularly  scheduled  transportation  to/from Rappahannock Community College. 

 2. The  ideal  fixed‐route schedule would be six or seven days a week, with buses running 

primarily from 6 AM to 9 AM and 4 PM to 7 PM on weekdays, and another schedule on weekends, depending on demand. 

Page 47: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐12  October 2009 Transit Development Plan:  FY 10‐15

Figure 4‐2. Proposed Fixed‐Route Services 

  

Two  additional  suggestions  for  expanded  service  were  presented  at  the  Final  Stakeholder Meeting on October 7, 2009.  This meeting was held  to discuss  the contents of  this TDP and review its final recommendations.  During the general question and answer period at the end of the meeting, the following two services were discussed and  it was agreed that they would be included in the TDP for reevaluation and consideration, if funding were to become available in the future:  

1. Commuter  service  from  New  Kent/Charles  City  to  Richmond  or  Williamsburg.   This 

service would be provided Monday through Friday, with one trip  in the morning and a 

return trip in the evening. 

2. The extension of existing demand‐response service to include later evening hours (after 

6:00 PM) and/or weekend service (primarily Saturday). 

 

Page 48: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐13  October 2009 Transit Development Plan:  FY 10‐15

 Figure 4‐3. Northern Neck Proposed Fixed Transit Routes 

   

Page 49: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐14  October 2009 Transit Development Plan:  FY 10‐15

Computerized Scheduling and Dispatching System  Another transit service  improvement that Bay Transit has proposed  is the planned acquisition of a computerized  scheduling and dispatching  system.   Bay Transit  is presently using manual methods to schedule and dispatch their vehicles.   

Based on their experiences with the manual method, they have found that it is not an efficient means  to operate  their  system.    Therefore, Bay  Transit  currently  is  in  the  early phases of  a process to acquire a computerized scheduling and dispatching system to operate their system.  A  needs  assessment  of  paratransit  services  scheduling  software  has  recently  been  initiated, with completion expected by the end of calendar year 2009.   The funding mechanism for the acquisition of the computerized scheduling and dispatching system has not yet been identified.   

Based upon  limited experience  in other communities,  it  is anticipated that  implementation of such  a  computerized  scheduling  and dispatching  system may be  able  to  achieve operational efficiencies.  Bay Transit suggests that the overall annual system ridership could experience an increase  of  approximately  10  percent  per  year  following  implementation  of  the  system (assumed as FY 2012). 

Administration and Maintenance Center 

Based on the transit demand growth in the Bay Transit service area, a new administration and maintenance  center  has  been  proposed  to  be  built  in  the Middle  Peninsula.    It  has  been assumed that this new  facility could be  funded and constructed within the  five to seven year TDP time‐frame.  The size of this proposed administration and maintenance center is assumed to  be  similar  to  that  of  the Warsaw  facility, which  broke  ground  on  April  27,  2009  and  is anticipated to be completed in 2010.    

44..33 EEssttiimmaatteess  ooff  CCaappiittaall  aanndd  OOppeerraattiinngg  CCoossttss  ffoorr  IIddeennttiiffiieedd  IImmpprroovveemmeennttss  

The  previous  section  identified  the  potential  improvement  needs  for  Bay  Transit.    In  this section, the capital and operating costs associated with these improvements are evaluated and estimated. 

1.   The cost of three fixed‐route services 

The cost of  the three new proposed routes  includes the capital cost and estimated operating cost.    The  capital  cost  for  the  new  fixed  routes  are  anticipated  to  include  the  cost  for  the required new vehicle purchase.  The operating cost includes all the expenses for the operation of the transit service.   For examples: the salaries of Bay Transit staff, motor fuels, motor tires and parts, etc.   

The latest available budget information from FY 2009 was used to estimate both future capital and operating cost.  All cost estimations are based on this current year budget information with 

Page 50: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐15  October 2009 Transit Development Plan:  FY 10‐15

the application of an assumed 2.0 percent annual  inflation  rate  for each of  the  future  years through the TDP horizon year of 2015.    

It is assumed that these new fixed routes will be implemented in FY 2012, and that the transit services will be operated 12 hours per day, 5 days per week.   The  total number of operating days for the transit service is assumed to be 250 days per year.  Two options are considered for each  route: one  vehicle  running  the  route or  two  vehicles  running  the  route.   Based on  the information associated with the Federal Recovery Act stimulus funding allocation to Bay Transit, the  anticipated  average  cost  of  each  of  these  additional  required  vehicles  is  approximately $56,500.   

The methodology to determine the operating cost of the  fixed‐route services  is based on the annual operating miles of  fixed routes and the cost per revenue mile.   The annual number of revenue miles associated with each of the three proposed routes is the product of the miles of each round trip on the route, the number of round trips assumed to be operated per day on each route, and the assumed number of service days per year.  

Table 4‐8 below summarizes the annual operating miles of the proposed fixed routes described in the previous section.  It should be noted that a 5 percent deadhead mileage factor has been added to the initially estimated annual revenue miles of service for each route to arrive at the estimated total annual operating miles for the route.         

Table 4‐8.  Estimated Annual Operating Miles of Proposed Fixed Routes 

Proposed Fixed Route  Option Annual Operating Miles of Proposed Fixed Routes 

FY2010 FY2011  FY2012  FY2013  FY2014  FY2015 

Route (1)  Gloucester Point – Urbanna – Tappahannock 

Option 1 – one vehicle 

0  0  130,200  130,200   130,200  130,200 

Option 2 – two vehicles 

0  0  260,400  260,400   260,400  260,400 

Route (2)  Colonial Beach – Montross – Warsaw – Tappahannock 

Option 1  0  0  126,000  126,000   126,000  126,000 

Option 2  0  0  252,000  252,000   252,000  252,000 

Route (3)  Kilmarnock – Warsaw – Kilmarnock 

Option 1  0  0  147,000  147,000   147,000  147,000 

Option 2  0  0  294,000  294,000   294,000  294,000 

Totals Option 1  0  0  403,200  403,200   403,200  403,200 

Option 2  0  0  806,400  806,400   806,400  806,400 

Note:  Total annual operating miles = total estimated revenue miles plus 5 percent deadhead mileage.  

Based on  the FY 2009 Bay Transit budget  information,  the average  cost per  revenue mile of operation  is $1.48 per mile.   By applying an annual  inflation rate of 2.0 percent,  the cost per revenue mile for each of the future years is summarized in Table 4‐9 below. 

Page 51: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐16  October 2009 Transit Development Plan:  FY 10‐15

Table 4‐9.  Estimated Cost per Revenue Mile of Proposed Fixed Routes 

      Cost per Revenue Mile 

Proposed Fixed Route     FY2010  FY2011 FY2012 FY2013 FY2014  FY2015 

Route (1) Gloucester Point – Urbanna                 – Tappahannock 

Option 1 

   $1.48 

  $1.51 

  $1.54 

   $1.57 

   $1.60  

   $1.63 

Option 2 

   $1.48 

   $1.51 

  $1.54 

   $1.57 

   $1.60  

   $1.63 

Route (2) Colonial Beach – Montross                 – Warsaw – Tappahannock 

Option 1 

   $1.48 

  $1.51 

  $1.54 

   $1.57 

   $1.60  

   $1.63 

Option 2 

   $1.48 

   $1.51 

   $1.54 

   $1.57 

   $1.60  

   $1.63 

Route (3) Kilmarnock – Warsaw                 – Kilmarnock 

Option 1 

   $1.48 

   $1.51 

  $1.54 

   $1.57 

   $1.60  

   $1.63 

Option 2 

   $1.48 

   $1.51 

   $1.54 

   $1.57 

   $1.60  

   $1.63 

Note: Present (FY2009) cost per revenue mile = 1.45 dollar/mile.  Assumed annual inflation rate is 2 percent. 

 

The  annual  operating  costs  for  the  proposed  fixed  routes  are  calculated  by multiplying  the estimated number of annual operating miles by the average cost per revenue mile.  Table 4‐10 summarizes the estimated annual operating costs for each of the proposed fixed‐route services.   

Table 4‐10.  Estimated Annual Operating Miles of Proposed Fixed Routes 

      Operating Cost 

Proposed Fixed Route     FY2010  FY2011 FY2012  FY2013  FY2014  FY2015 

Route (1) Gloucester Point – Urbanna                 – Tappahannock 

Option 1 

                $         ‐   

               $         ‐       $200,300 

  $204,400 

   $208,400  

  $212,600 

Option 2 

                $         ‐   

               $         ‐   

  $400,700 

  $408,700 

   $416,900  

  $425,200 

Route (2) Colonial Beach – Montross                 – Warsaw – Tappahannock 

Option 1 

                $         ‐   

               $         ‐   

  $193,900 

  $197,800 

   $201,700  

  $205,700 

Option 2 

                $         ‐   

               $         ‐   

  $387,800 

  $395,500 

   $403,400  

  $411,500 

Route (3) Kilmarnock – Warsaw                 – Kilmarnock 

Option 1 

                $         ‐   

               $         ‐   

  $226,200 

  $230,700 

   $235,300  

  $240,000 

Option 2 

                $         ‐   

               $         ‐   

  $452,400 

  $461,400 

   $470,700  

  $480,100 

Total 

Option 1 

                $         ‐   

               $         ‐       $620,400 

  632,900 

   $645,400  

  $658,300 

Option 2 

                $         ‐   

               $         ‐   

  $1,240,900 

  $1,265,600 

  $1,291,000  

  $1,316,800 

Page 52: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐17  October 2009 Transit Development Plan:  FY 10‐15

 

For these proposed fixed‐route services, the anticipated need for new vehicle purchases is the capital cost for the system.  It is assumed that the services will be operated in FY 2012 and that replacement vehicles will be purchased  in FY 2015 to conform to normal four‐year service  life per 100,000 miles of revenue service criteria.  Table 4‐11 below summarizes the capital cost of the proposed fixed‐route services. 

Table 4‐11.  Capital Cost of Proposed Fixed‐Route Service Expansions 

Proposed Fixed Route  Option Capital Costs 

FY2010 FY2011 FY2012  FY2013  FY2014  FY2015 

Route (1)  Gloucester Point – Urbanna – Tappahannock 

Option 1 – one vehicle 

 $     ‐      $     ‐      $       60,000   $           ‐   $           ‐   $       63,700  

Option 2 – two vehicles 

 $     ‐      $     ‐      $    120,000   $           ‐   $           ‐   $     127,300  

Route (2)  Colonial Beach – Montross – Warsaw – Tappahannock 

Option 1 – one vehicle 

 $     ‐      $     ‐      $       60,000   $           ‐   $           ‐   $       63,700  

Option 2 – two vehicles 

 $     ‐      $     ‐      $    120,000   $           ‐   $           ‐   $     127,300  

Route (3)  Kilmarnock – Warsaw – Kilmarnock 

Option 1 – one vehicle 

 $     ‐      $     ‐      $       60,000   $           ‐   $           ‐   $       63,700  

Option 2 – two vehicles 

 $     ‐      $     ‐      $    120,000   $           ‐   $           ‐   $     127,300  

Note:  Present (FY2009) vehicle purchase cost is $56,500 per vehicle.  Assumed annual inflation rate is 2 percent. 

 

The  combination  of  the  estimated  annual  operating  cost  and  the  capital  cost  in  the  year  in which  it  is expected  to occur  is  the  total estimated  cost of  the proposed  fixed‐route  service expansions.  These totals are summarized in Table 4‐12. 

 

 

 

Page 53: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐18  October 2009 Transit Development Plan:  FY 10‐15

Table 4‐12.  Total Annual Cost of Proposed Fixed‐Route Service Expansions 

Proposed Fixed Route 

      Total Cost 

      FY2010  FY2011  FY2012  FY2013  FY2014  FY2015 

Route (1) Gloucester Point – Urbanna                 – 

Tappahannock 

Option 1 

Operating  Cost 

                $          ‐   

                $          ‐     $200,300  $204,400  

  $208,400 

   $212,600 

Capital  Cost 

 $          ‐   

  $          ‐     $60,000 

                  $   ‐   

               $   ‐   

   $63,700 

Option 2 

Operating  Cost 

 $          ‐   

               $          ‐   

   $400,700 

   $408,700  

   $416,900 

  $425,200 

Capital  Cost 

 $          ‐   

               $          ‐        $120,000 

   $             ‐   

               $   ‐   

   $127,300 

Subtotal 

Option 1 Cost                 $          ‐   

 $          ‐    $260,300 

   $204,400  

   $208,400 

   $276,300 

Option 2 Cost                 $         ‐   

 $          ‐   

  $520,700    

$408,700     

$416,900    

$552,500 

Route (2) Colonial Beach – Montross                 – Warsaw – 

Tappahannock 

Option 1 

Operating  Cost 

 $         ‐    

                $          ‐    $193,900 

   $197,800  

   $201,700 

  $205,700 

Capital  Cost 

 $          ‐   

                $          ‐    $60,000 

                  $   ‐   

               $   ‐   

  $63,700 

Option 2 

Operating  Cost 

 $          ‐   

               $          ‐    $387,800 

   $395,500  

  $403,400 

   $ 411,500 

Capital  Cost 

 $          ‐   

                $          ‐   

   $120,000 

   $             ‐   

               $   ‐   

   $127,300 

Subtotal 

Option 1 Cost                 $          ‐   

 $         ‐     $253,900 

   $197,800  

   $201,700 

   $269,400 

Option 2 Cost                 $          ‐   

   $         ‐    

  $507,800 

   $395,500  

   $403,400 

   $538,800 

Route (3) Kilmarnock – Warsaw                 – Kilmarnock 

Option 1 

Operating  Cost 

                $          ‐   

                $         ‐       $226,200 

   $230,700  

  $235,300 

  $240,000 

Capital  Cost 

               $          ‐   

                $         ‐   

  $60,000 

                $   ‐   

   $             ‐   

  $63,700 

Option 2 

Operating  Cost 

               $          ‐   

                $         ‐   

  $452,400 

   $461,400  

   $470,700 

  $480,100 

Capital  Cost 

                $          ‐   

               $         ‐   

   $120,000 

                 $   ‐                   $    $127,300 

total 

Option 1 Cost                $          ‐   

                $         ‐   

   $286,200 

   $230,700  

   $235,300 

  $303,700 

Option 2 Cost                 $          ‐   

                $         ‐   

   $572,400 

   $461,400  

   $470,700 

  $607,400 

Grand Total 

Option 1 Cost                 $          ‐   

                $         ‐   

   $800,400 

   $632,900  

  $645,400 

  $849,400 

Option 2 Cost $          ‐     $         ‐   

  $1,600,900  $1,265,600   $1,291,000  $1,698,700 

Page 54: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐19  October 2009 Transit Development Plan:  FY 10‐15

2.  The cost of the planned computerized scheduling and dispatching system 

As  described  in  the  previous  section,  the  planned  computerized  scheduling  and  dispatching system is the system improvement Bay Transit is in the initial phases of acquisition.  Bay Transit initiated  a  contract  with  a  consulting  firm  to  research  the  appropriate  scheduling  and dispatching  software  for  Bay  Transit  in  April  2009.    It  is  assumed  that  this  system will  be acquired and first operated within the TDP’s six‐year time‐frame.   

A similar study was conducted by PBS&J in 2008 for Loudoun County, Virginia.  As the research results showed, there are different kinds of software that could be applied to a transit system such as Bay Transit.  The average cost of this type of software is approximately $350,000, with an annual licensing fee of approximately $2,000.  Assuming similar software is implemented for Bay Transit by FY 2012, Table 4‐13 below summarizes the cost estimation of the software. 

Table 4‐13.  Cost Estimate for Computerized Scheduling and Dispatching System 

   Total Cost 

   FY2010  FY2011  FY2012  FY2013  FY2014  FY2015 

Scheduling and  Dispatching System 

 $          ‐      $            ‐          $2,122          $2,165            $2,208           $ 2,252 

Capital Cost 

FY2010  FY2011  FY2012  FY2013  FY2014  FY2015 

 $         ‐        $364,140   $              ‐     $              ‐     $                ‐      $                ‐   

Total Cost 

FY2010  FY2011  FY2012  FY2013  FY2014  FY2015 

 $         ‐       $364,140   $2,122        $2,165  $ 2,208          $ 2,252 

Note:  Present (FY2009) system cost is $350,000 with annual licensing fee of $2,000.  Assumed annual inflation rate is 2  percent.  Costs  for  the  system will  be  finalized  in  a  subsequent  update  to  the  TDP  once  an  RFP  is  issued  and proposals are received. 

    

Due  to  the  improved  operational  efficiencies,  Bay  Transit  expects  that  their  annual  system ridership  will  increase  by  approximately  10  percent  in  the  year  following  the  software implementation  (FY 2012).   The estimated annual  ridership with and without  the dispatching system is summarized in Table 4‐14 below. 

Table 4‐14.  Annual Passenger Estimation for Bay Transit 

Passengers  FY2010  FY2011  FY2012  FY2013  FY2014  FY2015 

Annual Passengers w/o dispatching system* 

159,519 161,274 163,048 164,842 166,655  168,488 

Annual Passengers  w/dispatching system 

159,519 161,274 179,353 197,810 199,986  202,186 

* Note:    It  is assumed  that a 1.1 percent annual passenger  increase will occur on  the  current base system due to area growth.   Then with the software implementation, starting in FY 2012, an additional 10 percent ridership increase is expected.  

Page 55: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  4‐20  October 2009 Transit Development Plan:  FY 10‐15

3.  The cost of a new Administration and Maintenance Center  

The funding for this administration and maintenance facility has been previously identified as a Federal  earmark without  the  requirement  of  any  local matching  funds.    The  total  allocated budget for the center is $2,615,113 and it is expected that this new facility could be constructed at  the  end  of  the  TDP’s  six‐year  time‐frame  in  FY  2015.    Note  that  based  on  a  review  of preliminary feasibility studies, the cost of the facility is estimated to be slightly higher than this budgeted amount. 

 

Page 56: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  5‐1             October 2009 Transit Development Plan:  FY 10‐15

55..00    SSEERRVVIICCEE  AANNDD  FFAACCIILLIITTYY  RREECCOOMMMMEENNDDAATTIIOONNSS   This chapter  identifies service and facility needs that are recommended for  inclusion over the multi‐year duration of the transit plan.  A more comprehensive listing of potential services and facility  needs were  identified  in  the  prior  chapter  of  this  TDP.    Recommended  service  and facility  improvements  presented  in  this  chapter  are  based  on  the  anticipated  funding availability levels during the TDP time period.    

Where sufficient federal, state, and  local funding has been  identified for either the estimated capital  or  operating  costs  associated with  a  specific  recommendation,  the  activity  has  been categorized as achievable under the fiscally “constrained” transit development plan.   Where a substantial portion or the total required amount of estimated capital or operating costs  for a specific action cannot be easily  identified, the activity has been  identified as being  in need of additional  funding  and  has  been  considered  to  be  achievable  only  under  the  fiscally “unconstrained”  transit  development  plan.    This  designation  does  not mean  that  the  action cannot  be  accomplished  during  the  six‐year  TDP  cycle  ending  in  FY  2015,  but  rather  that additional sources of  federal, state, or  local  funding beyond those currently anticipated to be available  to  the Bay Transit  system will need  to be  identified  and  committed  to  the  specific project.

55..11 SSeerrvviiccee  RReeccoommmmeennddaattiioonnss  

Chapter 4 of this TDP identified the following potential service improvements for consideration over the TDP’s six‐year time period of FY 2010 to FY 2015 in addition to the continuation of the current Bay Transit level of operations:   

The initiation of fixed‐route services. 

o Proposed Fixed‐Route 1: Gloucester Point – Urbanna – Tappahannock 

o Proposed Fixed‐Route 2: Colonial Beach – Montross – Warsaw – Tappahannock 

o Proposed Fixed‐Route 3: Kilmarnock – Warsaw – Kilmarnock 

As was  noted  in  Chapter  4,  two  options were  proposed  for  each  route,  the  first  being  the operation of each of the three routes with a single bus, and the second being the use of two buses on each route to provide more reasonable headways on the order of once an hour.    It was assumed that both of the proposed routes could start operation in FY 2012 if the necessary capital and operating  funding  could be made available.   The estimated  annual  total  costs of these options were approximately $800,000 (Option 1) and $1.6 million (Option 2) in first year of operation (FY 2012).  

Taking  into  consideration  the  current Bay Transit  financial  condition  and  anticipated  funding levels  in  the near‐term  future,  it appears  to be unlikely  that Bay Transit would be  financially able to initiate the new fixed‐route services.   

Page 57: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  5‐2             October 2009 Transit Development Plan:  FY 10‐15

As  was  described  in  Chapter  3,  the  total  annual  revenues  (passenger  fares  and  contract revenues)  generated by Bay  Transit’s operations  in  FY  2008  represented  approximately  10.9 percent of  the  total annual operating costs.   The  remaining net operating costs were  funded during that year through a combination of local government (29 percent), state government (15 percent) and federal government (47 percent) funds.  

Because of  the recent economic downturn,  it  is expected that  the  local government  tax base will not be growing at a significant rate.  In addition, future federal and state funding levels are somewhat uncertain at  this point, with  the  level of state operating assistance support having recently experienced a reduction in funding.  

Therefore, it is recommended that Bay Transit’s top priority as defined in this TDP be a focus on maintaining the current demand‐response service  levels  in the near‐term.   The proposed initiation  of  three  new  fixed‐route  services  should  only  be  considered  an  element  of  the “unconstrained”  TDP  program  of  projects.    Should  additional  operating  assistance  funds become available from federal, state, or local sources, one or more of these three routes could be designated as an element of the “constrained” TDP program of projects.

55..22 FFaacciilliittyy  RReeccoommmmeennddaattiioonnss  

Chapter 4 of this TDP  identified several potential facility  improvements for consideration over the TDP’s six‐year time period.  The improvements are as follows:   

Existing operating vehicle acquisition /  replacement as vehicles  reach  the end of  their designated useful life 

Computerized Scheduling and Dispatching System 

Administration and Maintenance Center in the Middle Peninsula 

Existing operating vehicle acquisition / replacement 

The American Recovery and Reinvestment Act (ARRA) identified Bay Transit as one of the rural and  small  urban  public  transit  systems  in  Virginia  to  receive  Federal  Recovery  Act  stimulus funding.    Through  this  program,  Bay  Transit  was  identified  as  the  recipient  of  seven replacement passenger transport vans at a total cost of $395,900.  This allocation will take the form of 100 percent Federal funding with no state or local matching funds required.  

Therefore, it is expected that seven vehicles will be replaced for Bay Transit in FY 2009 using the ARRA  stimulus  funding.    In  addition, Bay  Transit has  typically  acquired  an  average of  7 or  8 vehicles each  year.   Assuming  that during  the TDP’s  six‐year  time period,  the  typical  vehicle replacement  schedule  is  continued,  then  from  FY  2009  to  FY  2015,  Bay  Transit  should  be expected  to be able  to acquire approximately  seven new/replacement vehicles each year, as shown  in Table 4‐4.   This historically observed vehicle replacement schedule  is thus viewed as an element of the “constrained” TDP program of projects.    

Page 58: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  5‐3             October 2009 Transit Development Plan:  FY 10‐15

Computerized Scheduling and Dispatching System 

As described in Chapter 4 of this TDP, Bay Transit currently is in the early phases of a process to acquire a computerized scheduling and dispatching system to  improve the operations of their system.    A  needs  assessment  of  paratransit  services  scheduling  software  has  recently  been initiated, with the completion of this activity expected by the end of calendar year 2009.   The funding mechanism for the acquisition of the computerized scheduling and dispatching system has not yet been  identified; however,  it  is assumed that this system will be acquired and first operated within the TDP’s six‐year time‐frame.   

Administration and Maintenance Center 

Construction of a new operations and maintenance facility for Bay Transit  in Warsaw, Virginia began on April 27, 2009, and  it  is anticipated to be completed  in 2010.   Based on  the  transit demand growth in the Bay Transit service area, an administration and maintenance center has been proposed to be built in the Middle Peninsula.  

The funding for this administration and maintenance facility has been previously identified as a Federal  earmark without  the  requirement  of  any  local matching  funds.    The  total  allocated budget  for  this  facility  is  $2,615,113,  and  it  is  expected  that  this  new  facility  could  be constructed  at  the  end  of  the  TDP’s  six‐year  time‐frame  in  FY  2015.   Note  that  based  on  a review of preliminary feasibility studies, the cost of the facility is estimated to be slightly higher than this budgeted amount. 

Since the funding for this facility has already been identified and approved, this project should be defined as an element of the “constrained” TDP list of projects for Bay Transit.  

Assuming the allocated capital funding from Federal and state governments and ARRA stimulus funding  are  all  available  for  Bay  Transit  in  the  TDP’s  six‐year  time‐frame,  the  facility improvements recommended for implementation for each year are as follows: 

FY2009     Seven replacement vehicles (ARRA stimulus funding)  FY2010    Seven replacement vehicles   FY2011    Seven replacement vehicles    Computerized Scheduling and Dispatching System  FY2012    Seven replacement vehicles   

   

Page 59: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  5‐4             October 2009 Transit Development Plan:  FY 10‐15

FY2013    Seven replacement vehicles   FY2014    Seven replacement vehicles    Construction of an Administration and Maintenance Center in the Middle Peninsula  FY2015    Seven replacement vehicles 

 

55..33 OOtthheerr  RReeccoommmmeennddaattiioonnss  

The comments received  from  the on‐board survey conducted  for Bay Transit  in February and March 2009 suggested that Bay Transit consider the extension of their service hours to include weekend service.  These riders currently have to seek a family member or friend’s assistance or use other options to travel on weekends.  This request may be a potential service improvement that  Bay  Transit  can  study  further  following  the  acquisition  and  implementation  of  the computerized scheduling and dispatching system.   No specific time‐frame has been  identified for this study effort, and no local government funding has been assumed in the TDP’s financial plan.   The  installation  of  surveillance  cameras  and GPS  devices  for  the  vehicles  of  Bay  Transit  are another  potential  improvement  that  Bay  Transit  could  consider.    Currently,  no  surveillance cameras or GPS devices are  installed  in  the buses.   However, based on Bay Transit’s  current request for a computerized scheduling and dispatching system, this type of equipment may be needed  for  the  implementation  of  all  aspects  of  the  dispatching  system.    With  the computerized  scheduling  and  dispatching  software  not  yet  acquired  or  implemented,  no specific time‐frame has been identified for the possible installation of the on‐board surveillance cameras and GPS devices, and no  funding  sources have been assumed  in  the TDP’s  financial plan.       

Page 60: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  6‐1             October 2009 Transit Development Plan:  FY 10‐15

66..00    CCAAPPIITTAALL  IIMMPPRROOVVEEMMEENNTT  PPRROOGGRRAAMM   This chapter describes those capital programs (vehicles, facilities, and equipment) required to carry out the operations and services set forth in the TDP service and facility recommendations that were presented in the prior chapter.    

66..11 VVeehhiiccllee  RReeppllaacceemmeenntt  PPrrooggrraamm  

As was noted in prior chapters of this TDP, Bay Transit presently has a total vehicle inventory of 68  vehicles  located  in  the  facilities  of  the  different  counties.    Thirty‐three  (33)  of  these  68 vehicles have diesel engines, with the other 35 vehicles using gasoline engines.  The passenger fleet primarily consists of 12 to 14 passenger handicapped accessible vans.  Model years range from 1988 through 2008.  

In  recent  years,  Bay  Transit  has  typically  acquired  five  to  ten  vehicles  in  any  given  year,  an average of seven or eight vehicles each year.   These represent both replacements for existing vehicles that have reached the end of their useful life and the acquisition of additional vehicles for  the provision of expanded services.   The seven vehicles  to be obtained during 2009 using Federal Recovery Act  stimulus  funding  thus  represent  the  system’s  recently observed  typical vehicle  acquisition  /  replacement  cycle.    This  allocation  will  take  the  form  of  100  percent Federal funding with no state or local matching funds required.  

Assuming  that  this  typical vehicle  replacement cycle  is continued over  the next several years through available funding from Federal, State, and Local governments, Table 4‐4 illustrates the total passenger  fleet size and the anticipated average vehicle age between 2008 and the TDP horizon year of 2015. 

66..22 FFaacciilliittyy  IImmpprroovveemmeenntt  PPrrooggrraamm  

Chapter 4 of  this TDP also  identified  two potential  facility  improvements  for Bay Transit over the  TDP’s  six‐year  time  period.    These  two  improvements  were  the  acquisition  of  a computerized scheduling and dispatching system and the construction of an administration and maintenance center.  

Bay Transit currently  is  in the early phases of a process to acquire a computerized scheduling and  dispatching  system  to  improve  the  operations  of  their  system.   A  needs  assessment  of paratransit services scheduling software has recently been initiated, with the completion of this activity expected by the end of calendar year 2009.  The funding mechanism for the acquisition of the computerized scheduling and dispatching system has not yet been identified; however, it is assumed that this system will be acquired and first operated within the TDP’s six‐year time‐frame.   

The  funding  for  the planning, design,  site acquisition, and  construction of  the administration and maintenance  facility  has  been  previously  identified  as  a  Federal  earmark  without  the 

Page 61: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  6‐2             October 2009 Transit Development Plan:  FY 10‐15

requirement  for  any  local  matching  funds.    Note  that  based  on  a  review  of  preliminary feasibility studies, the cost of the  facility  is estimated to be slightly higher than the budgeted amount.  It is expected that this new facility could be constructed near the end of the TDP’s six‐year time‐frame in FY 2015.    

Page 62: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  7‐1              October 2009 Transit Development Plan:  FY 10‐15

77..00    FFIINNAANNCCIIAALL  PPLLAANN   The  financial  plan  is  a  principal  product  of  the  TDP.    It  is  in  this  chapter  that  an  agency demonstrates  its  ability  to  provide  a  sustainable  level  of  transit  service  over  the  TDP  time period,  including  the  rehabilitation and  replacement of capital assets.   This chapter  identifies potential  funding  sources  for annual operating and maintenance costs,  funding  requirements and  sources  for  bus  purchases,  and  funding  requirements  and  sources  for  other  facility improvements.     

77..11 OOppeerraattiioonn  aanndd  MMaaiinntteennaannccee  CCoossttss  aanndd  FFuunnddiinngg  SSoouurrcceess  

Based  on  the  latest  budget  information  available  from  Bay  Transit,  the  system’s  operating budget was approximately $2.4 million  in FY 2009.   Funding sources  for the adopted FY 2009 operating budget were as follows: 

Federal Funds ‐ $1,071,118 (44%) 

State Funds ‐ $411,839 (17%) 

Local Government and Other Match Funds ‐ $660,210 (27%) 

Passenger Fares and Contract Revenues ‐ $277,000 (11%) 

This TDP’s financial plan begins with these costs and funding sources and those in the currently proposed FY 2010 system budget as  the “base year” values  for  the estimation of  future year operating costs and revenue streams.  

Annual operation and maintenance  (O&M) costs during the TDP time period are projected to grow  from approximately $2.4 million  in  the FY 2009‐FY 2010 period  to over $2.8 million by FY 2015.  It is assumed that a two percent annual inflation rate is applied to these “base year” costs to estimate the annual O&M costs over the TDP time period.  

Federal  operating  assistance  funds  are  assumed  to  remain  at  essentially  a  constant  amount during  the TDP  time period.    In FY 2010,  the presently budgeted  federal operating assistance fund  level of $1,208,972  is projected to cover approximately 47 percent of Bay Transit’s total annual O&M costs.   This percentage  is projected  to decrease each year during  the TDP  time period since the total O&M costs are assumed to  increase at a rate of two percent each year due  to  inflationary  factors, and  the amount of annual Federal operating assistance  funds are assumed to remain at a constant  level of approximately $1,209,000  from FY 2011 through FY 2015.  

The Virginia Department of Rail  and Public  Transportation  (DRPT) has  identified $469,501  in state  operating  assistance  for  Bay  Transit  in  FY  2010  in  its  Transportation  Improvement Program.   The DRPT’s TIP  reflects a 19 percent growth  in state operating allocations  from  its Mass Transit Trust  Fund on a  statewide basis between  FY 2010 and  FY 2015.   Based on  the 

Page 63: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  7‐2              October 2009 Transit Development Plan:  FY 10‐15

information from DRPT,  little growth  in the allocation of state operating assistance funding to Bay Transit has been assumed beyond the FY 2010 budgeted amount over the duration of this TDP cycle.   The percentage  increases  in  the anticipated annual state operating assistance are 1.77%  in FY 2010‐FY 2011, 2.90%  in FY 2011‐FY 2012, 3.50%  in FY 2012‐FY 2013, 3.16%  in FY 2013‐FY 2014, and 3.16% in FY 2014‐FY 2015.  The annual state operating funding level will be increased  by  these  percentage  increases  from  the  FY  2010  funding  level  (approximately $469,500) through the TDP time period. 

State  formula assistance grants  for public  transportation operating expenses are awarded on the basis of the total annual amount of state funds available expressed as a percentage of the total  annual  amount  of  transit  operating  expenses,  subject  to  a  cap  of  95%  of  eligible expenditures.   Eligible  expenditures  are  defined  as  costs  of  administration,  fuel,  tires,  and maintenance  parts  and  supplies  (payroll  costs  of  mechanics  and  drivers  are  excluded).  Projections  for  state operating  assistance,  as  identified  in  the  TDP  financial plan, have been provided  for planning purposes and may  fluctuate up or down based on  the aforementioned parameters.   

State  capital  program  grants  from  the Mass  Transit  Trust  Funds  (MTTF)  are  awarded  to  all public transportation capital projects deemed to be eligible, reasonable, and appropriate at a uniform  level of state participation.  The goal  is  to  reach  the maximum state share of capital expenses of 95%, but there have not been sufficient funds to support transit capital projects at this  level since the Mass Transit Trust Fund was created  in 1986.  This  level of participation or “state  share” of  capital project expenses  is  calculated by dividing  the amount of  state  funds available for capital projects each year by the amount needed to support the non‐federal share of all eligible transit capital projects for the year.  Beginning in FY 2008, additional capital funds from the Transportation Capital Projects bond proceeds authorized under Chapter 896 of the 2007 Acts of Assembly have been available annually at a maximum state matching share of 80% in the Transit Capital Fund.  

The  estimated  annual  farebox  and  other  revenues  for  Bay  Transit  are  assumed  to  remain essentially the same between FY 2009 and FY 2011.  This assumption reflects the very modest changes in service area population that are anticipated during this period of no more than 1.0 percent each year, and no anticipated change in the annual revenue vehicle‐hours of operation to be provided across the Bay Transit service area.  

Farebox and other revenues are projected to increase more noticeably from FY 2012 to FY 2015 due  to  the  operational  efficiencies  that  are  expected  to  be  experienced  by  the  system  as  a result  of  the  implementation  of  the  computerized  scheduling  and  dispatching  system.    As discussed earlier  in Chapter 4 of  this TDP, Bay Transit anticipates  that  the  implementation of this computerized scheduling and dispatching system  in FY 2011 could generate a 10 percent increase  in ridership compared  to  those anticipated without consideration of  this operational improvement in FY 2012.   

Page 64: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  7‐3              October 2009 Transit Development Plan:  FY 10‐15

Table 7‐1 presents the TDP financial plan for the funding of the annual O&M costs through the TDP six‐year time period.   Using the assumptions  identified above of the  level of Federal and State operating  assistance  funding,  the  required  local  government  funding  requirements  are anticipated to steadily  increase through the TDP time period, from approximately $694,471  in FY 2010 to approximately $891,192 in FY 2015.   

As a percentage of the total estimated system operating costs, the  local government share  is anticipated  to  increase  from approximately 27 percent of  the  total annual cost  in FY 2010  to approximately 31 percent of the total annual cost in FY 2015. 

Page 65: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  7‐4              October 2009 Transit Development Plan:  FY 10‐15

Table 7‐1.  TDP Financial Plan for Funding Annual O&M Costs 

TDP Financial Plan for:  Service O&M Costs  FY2008  FY2009  FY2010  FY2011  FY2012  FY2013  FY2014  FY2015 

                          

Annual Revenue Hours  75,045  75,175  75,175  75,175  75,175  75,175  75,175  75,175 

           

Annual Operating Costs   $ 2,459,305    $ 2,420,176   $2,582,544  $2,634,195  $2,686,879 

  $2,740,616   $2,795,429  $2,851,337 

                          

Anticipated Funding Sources                         

Federal   $ 1,095,597    $ 1,071,118    $1,208,972  $1,209,000  $1,209,000   

$1,209,000   $1,209,000  $1,209,000 

State     $357,891       $411,839   $469,501  $477,811  $491,668      $508,876   $524,957      $541,545 

Farebox  $119,602        $120,000     $121,234  $122,568  $ 123,917    

$125,280   

$126,658    $128,051 

Farebox Recovery Ratio  5%  5%  5%  5%  5%  5%  5%  4% 

Other (Contract Rev & Other)  $277,328        $196,000    $25,000     $25,000     $25,000     $25,000     $25,000     $ 25,000   

Local Gov't Funding Required  $679,436        $621,219      $757,837  $799,816      $837,294     $872,460  

  $909,814 

   $947,741 

Local Gov't  Funding Percentage  28%  26%  29%  30%  31%  32%  33%  33% 

Notes: 

1.  Annual Revenue Hours for FY 2009 provided by Bay Transit and assumed to be constant through the life of the TDP period. 

2. FY2010 Operating Cost obtained from DRPT FY2010 district budget data.  Beginning in FY2011, the Annual Operating Cost calculated assuming a 2.0%/year inflation rate . 3. Federal Operating Assistance reflects estimated FTA Section 5311 and FTA 5316 funds; assumed to remain flat at FY2010 levels. 

4. FY2010 State Operating Assistance obtained from DRPT FY2010 district budget data.  The increase in State Operating Assistance, as per DRPT, is assumed to be 1.77% in FY2011, 2.90% in FY2011‐FY2012, 3.50% in FY2012‐FY2013, 3.16% in FY2013‐FY2014, and 3.16% in FY2014‐FY2015 . 5. FY2010 to FY2015 Passenger Fare and Contract Revenue Total estimate obtained from Diana Giles, CFO, Bay Transit.

     

Page 66: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  7‐5              October 2009 Transit Development Plan:  FY 10‐15

77..22 BBuuss  PPuurrcchhaassee  CCoossttss  aanndd  FFuunnddiinngg  SSoouurrcceess  

As noted in Chapter 6 of this TDP, no service expansion has been proposed that would increase Bay Transit’s bus  fleet  size.   The bus purchases during  the TDP  time period are only  for bus replacements.   

In FY 2009, Bay Transit has been  identified as  the  recipient of  seven  replacement passenger transport vans at a  total  cost of $395,900  through ARRA  funds.   This allocation will  take  the form of 100 percent Federal funding, with no state or local matching funds required.  

Assuming  that  the historically observed cycle of  seven vehicle  replacements per year  for Bay Transit is continued between FY 2011 and the TDP horizon year of FY 2015, the remaining bus purchases  have  been  assumed  to  be  funded  through  FTA’s  Section  5311  Program.    This assumption  anticipates  a  continuation  of  the  traditional  shared  allocation  of  costs with  80 percent  funding  provided  by  the  Federal  Government,  10  percent  funding  by  the  State Government, and 10 percent funding by the Local Governments.  For the bus purchase prices, a 2 percent annual inflation rate is applied.  Table 7‐2 presents the suggested TDP financial plan for funding bus purchases through the TDP six‐year time period.

Table 7‐2.  TDP Financial Plan for Funding Bus Purchases 

TDP Financial Plan for Bus Replacements 

FY2009  FY2010  FY2011  FY2012  FY2013  FY2014  FY2015 

Bus Replacements  7 buses  7 buses  7 buses 7 buses 7 buses  7 buses  7 buses 

Bus Replacement Costs     $395,900   $403,400 $411,500 $419,700   $428,100   $436,700   $ 445,400 

Anticipated Funding Sources   

Federal ‐ ARRA   $395,900 

                 $              ‐ $            ‐ $            ‐  $             ‐   $             ‐  $             ‐

Federal ‐ FTA 5311 Program (80%)   $             ‐   $322,700 $329,200 $335,800   $342,500   $349,400    $356,300 

State (10%)  $             ‐  $   40,300  $41,200  $42,000     $42,800    $43,700     $44,500 

Local Government Funding Required (10%)   $             ‐  $   40,300  $41,200  $42,000      $42,800      $43,700      $44,500 

(All Costs in Year of Expenditure Dollars)             Notes: 1. Bus replacements by year identified in Chapter 6 of TDP.         

2. Bus replacement costs assumed to be $56,500 in current year (FY2009) dollars.     

3. Table reflects 2.0 percent per year inflation in bus acquisition costs.         

4. FY2009 buses being acquired through the use of ARRA funding.         5. All other buses assume 80 percent funding through FTA Section 5311 program, 10 percent funding from State, and remaining 10 percent from local governments. 

Page 67: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  7‐6              October 2009 Transit Development Plan:  FY 10‐15

77..33 FFaacciilliittyy  IImmpprroovveemmeenntt  CCoossttss  aanndd  FFuunnddiinngg  SSoouurrcceess  

Several  facility  improvements  have  been  identified  for  Bay  Transit.    These  improvements include  the  acquisition  and  implementation  of  a  computerized  scheduling  and  dispatching system and  the construction of an administration and maintenance center.    It also should be noticed  that  the construction of a new operations and maintenance  facility  for Bay Transit  in Warsaw, Virginia began on April 27, 2009, and it is anticipated to be completed in 2010.  

Based  the  findings  from  a  similar  study  conducted  by  PBS&J  in  2008  for  Loudoun  County, Virginia, the average cost of acquiring the computerized scheduling package software suitable for Bay Transit’s needs  is estimated to be approximately $350,000.   With the application of a two percent annual inflation rate to the assumed current year cost of $350,000, the cost of this computerized scheduling package software is estimated at approximately $364,140 in FY 2011.  The  funding mechanism  for  the  acquisition  of  the  computerized  scheduling  and  dispatching system has not yet been identified; however, it is assumed that this system will be acquired and first operated within the TDP’s six‐year time‐frame.   

The administration and maintenance center has been proposed to be built somewhere  in the Middle  Peninsula.    The  funding  for  this  administration  and  maintenance  facility  has  been previously  identified as a Federal earmark without  the  requirement of any  local government matching funds.  The total allocated budget for this facility is $2,615,113, and it is expected that this new  facility could be constructed at the end of the TDP’s six‐year time‐frame  in FY 2015.  Note  that  based  on  a  review  of  preliminary  feasibility  studies,  the  cost  of  the  facility  is estimated to be slightly higher than this budgeted amount. 

Table  7‐3  presents  the  TDP  financial  plan  for  the  funding  of  these  two  additional  facility improvements through the TDP six‐year time period. 

Page 68: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  7‐7              October 2009 Transit Development Plan:  FY 10‐15

Table 7‐3.  TDP Financial Plan for Funding Facility Improvements                           

TDP Financial Plan for: Facility Improvements  FY2009  FY2010  FY2011  FY2012 FY2013  FY2014  FY2015 

Computerized Scheduling Package  $30,000    $            ‐  

 $364,140 

 $2,122    $2,165  

 $2,208  $ 2,252 

                  

Warsaw Multimodal Facility   $              ‐  

 $917,000   $            ‐    $        ‐    $        ‐    $               ‐    $           ‐ 

                  

Second Maint. and Operations Center   $              ‐    $            ‐    $            ‐    $        ‐    $        ‐  

 $2,615,100   $           ‐  

                  

Total Facility Improvement Costs 

  $30,000  

 $917,000 

 $364,140 

 $2,122   $2,165  

 $2,617,308 

 $2,252 

                  

Anticipated Funding Sources                 

Federal ‐ ARRA    $              ‐    $            ‐    $            ‐    $        ‐    $        ‐    $               ‐    $             ‐  

Federal ‐ FTA 5309 and 5311 Programs   $              ‐  

 $733,600 

 $291,300 

 $1,700 

  $1,700   $2,093,800    $1,800 

State   

$30,000   

$183,400  

$36,400  

$200   

$200   $523,500  

$200 

Local Gov't Funding Required   $              ‐    $            ‐   $36,400 

 $200 

  $200    $               ‐  

 $200 

Notes:

1. Facility improvement costs identified in Chapter 4 of TDP. 

2. Table reflects 2.0%/year inflation in capital costs beginning in FY2010. 3.  The  cost  of  the  Computerized  Scheduling  Package  includes  $30,000  for  a  feasibility  study  conducted  in  FY2009,  the budgeted package purchase price of $350,000 (FY2009 dollar), and the annual license fee of $2,000. Costs for the system will be finalized in a subsequent update to the TDP once an RFP is issued and proposals are received. 4. Warsaw Multimodal Facility and the Second Maintenance and Operation Center funded through SAFETEA‐LU Federal and State allocations, no Local Funding required. 5. Capital expenditures in FY2011 and beyond assume 80% funding through FTA programs, 10% State funding, and remaining 10% Local Funding. 6. The total construction budget of Warsaw Multimodal Facility is approximately $2.7 million.  $917,000 is allocated in FY2010. The remaining budget has been spent in land acquisition, site plan design, building plan design, etc. in the previous years. 

  

Page 69: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  8‐1             October 2009 Transit Development Plan:  FY 10‐15

88..00    TTDDPP  MMOONNIITTOORRIINNGG  AANNDD  EEVVAALLUUAATTIIOONN   Similar  to  any  other multi‐year  duration  planning  document,  the  transit  development  plan (TDP) for a specific public transit system must be regularly monitored and evaluated in order to maintain  its  usefulness  over  time.  The  previous  chapters  of  this  TDP  have  presented  a comprehensive evaluation of the Bay Transit system’s service and cost characteristics.  The key elements that have been addressed in this TDP effort include: 

The  development  of  suggested  goals,  objectives,  and  general  performance  standards that can be used to help guide the further development of Bay Transit’s services. 

A detailed evaluation of existing service characteristics, with a discussion of the system’s current strengths and weaknesses. 

A peer agency review that compares the recent service and  financial characteristics of Bay  Transit  to  those  of  other  similar  systems  operating  in  the  Commonwealth  of Virginia. 

An on‐board ridership survey that  identified the primary socioeconomic characteristics of the current riders, their satisfaction with the existing services, and potential service improvements that are desired by the riders. 

A  description  of  potential  service  and  facility  improvements  for  consideration  in  the TDP. 

A  series of  recommended  service  and  facility  improvements  for  inclusion  in  the  TDP, with the year of the improvements identified as appropriate.  

A discussion of the funding requirements and potential funding sources for the capital and  operating  costs  associated  with  the  recommended  service  and  facility improvements. 

This TDP represents an  initial step  in the future service and facility  improvements for the Bay Transit system.  In order to ensure the relevance of the TDP over time, it will be important for Bay  Transit  to  regularly  coordinate with  other  transportation  and  land  use  planning  efforts across  its multi‐jurisdictional service area, to continue to monitor service performance, and to provide DRPT with  annual updates  regarding  implementation of  the ultimately  adopted  TDP service and facility improvements program. 

88..11 CCoooorrddiinnaattiioonn  wwiitthh  OOtthheerr  PPllaannss  aanndd  PPrrooggrraammss   The completion of this TDP requires that it be coordinated with a variety of other ongoing land use  and  transportation  planning  efforts  at  the  county,  regional,  and  statewide  levels.    For example,  the  public  transit‐oriented  goals  and  objectives  suggested  by  this  TDP  should  be reviewed and incorporated into the transportation‐related goals and objectives sections of each of the county comprehensive plans for the 12 counties that are currently being served by Bay 

Page 70: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  8‐2             October 2009 Transit Development Plan:  FY 10‐15

Transit.    The multi‐jurisdictional  long‐range  regional  transportation  plans  developed  by  the Northern Neck, Middle  Peninsula,  and  Richmond  Regional  Planning District  Commissions,  in cooperation with the Virginia Department of Transportation (VDOT) and the Department of Rail and Public Transportation (DRPT), should also include appropriate references to the Bay Transit TDP. 

At the statewide  level, the TDP recommendations for Bay Transit should be  incorporated  into the  public  transportation  elements  of  the  DRPT  developed  six‐year  state  transportation improvement  program  (SYTIP)  and  the  statewide multimodal  long‐range  transportation  plan VTrans2035. 

88..22 SSeerrvviiccee  PPeerrffoorrmmaannccee  MMoonniittoorriinngg   In  prior  chapters  of  this  TDP,  a  group  of  specific  system‐wide  performance measures  and operating guidelines have been  identified  for application to a rural demand‐responsive public transit system such as Bay Transit.  The adoption of these operating guidelines will allow for the system’s management to regularly monitor the performance of Bay Transit to help ensure that existing performance characteristics do not degrade over time.  

Where  changes  in  performance  are  identified,  appropriate  corrective  measures  should  be investigated.    These  corrective  actions might  involve  route  adjustments  for  local  fixed‐route services, modifications  to  service  frequency  (headway),  and/or  span  of  service  adjustments.  Bay Transit presently has a basic performance monitoring program  in place, with an emphasis on  tracking  ridership,  service‐hours,  service‐miles,  and  operating  costs  and  revenues  on  a monthly  basis  at  the  county  and  system‐wide  levels.   As  the  system  continues  to  grow  and develop, this process should be expanded as necessary.  

An important element of this performance monitoring process should be a regularly scheduled update of  the on‐board  ridership  survey  conducted as part of  this TDP process.    In order  to comply with  current DRPT  guidelines,  a new on‐board  survey  should be undertaken  at  least once during each six‐year TDP cycle.   With  the  initial system‐wide survey being conducted  in the spring of 2009, the next such survey should be conducted no later than during the spring of 2015. 

88..33 AAnnnnuuaall  TTDDPP  MMoonniittoorriinngg   The current TDP guidelines issued by DRPT require the submittal of an annual update letter that describes the progress being taken towards implementing the TDP’s recommendations and any significant changes  to  the currently adopted TDP.   These changes  should  include, but not be limited  to,  system  expansions  or  reductions,  new  services  or  facilities  being  planned  or implemented,  organizational/governance  changes,  changes  to  the  current  fare  structure,  or other  actions.    The  recommended  contents of  this  “TDP Update”  letter  include, but  are not limited to, the following: 

Page 71: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit  8‐3             October 2009 Transit Development Plan:  FY 10‐15

A summary of ridership trends at the system and service area/local route level for each of the previous 12 months. 

A  description  of  those  TDP  goals  and  objectives  that  have  been  advanced  over  the previous 12 months. 

A description of any service and facility  improvements that have been  implemented  in the previous 12 months, including the identification of those that were identified in this TDP. 

An update  to  the TDP’s  list of  recommended  service and  facility  improvements.   This update should specifically identify those service or facility improvements that are being shifted  to a new year, are being eliminated, and/or are being added.   This update of recommended  improvements should be extended one more fiscal year  into the future in order to maintain a six‐year TDP planning period.   

A  summary  description  of  current  fiscal  year  capital  and  operating  costs  and  the associated federal, state, and local funding sources. 

Updates to the capital and operating financial plan tables presented in Chapter 7 of this TDP.   These tables should be extended one more fiscal year  into the future  in order to maintain a six‐year TDP planning period. 

  

Page 72: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

*Note:    Information  from  the OLGA  system  for  Bay  Transit’s  fleet  inventory was  inaccurate; therefore, the information in this Appendix was obtained from Bay Transit’s actual inventory. 

AAPPPPEENNDDIIXX  CC..      

FFLLEEEETT  IINNVVEENNTTOORRYY  

FFrroomm  DDRRPPTT’’ss  OOnn‐‐LLiinnee  GGrraanntt  AApppplliiccaattiioonn  ((OOLLGGAA))  SSyysstteemm**  

Page 73: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit
Page 74: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit
Page 75: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

AAPPPPEENNDDIIXX  DD..      

OOPPEERRAATTIINNGG  AANNDD  CCAAPPIITTAALL  EEXXPPEENNSSEESS  AANNDD  RREEVVEENNUUEESS  

AA  33‐‐YYeeaarr  RReettrroossppeeccttiivvee  

Page 76: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

FY2006 FY2007 FY2008 FY2009Passenger 

Fares 94,778.97$         101,640.00$       119,602.00$       120,000.00$      

Contract 

Revenue 164,022.00$       158,781.00$       156,937.00$       157,000.00$      

Local 

Government 416,591.00$       619,933.00$       679,436.00$       621,219.00$      

State 445,718.00$       385,318.00$      357,891.00$      411,839.00$      

Federal 693,318.00$       949,759.00$      1,095,597.00$   1,071,118.00$   

Other Match 32,612.00$         120,391.08$      39,000.00$        

Total 1,847,039.97$    2,215,431.00$   2,529,854.08$   2,420,176.00$   

Expenses 1,779,268.00$    2,146,390.00$   2,459,304.89$   2,420,176.00$   

State 26% 19% 15% 18%

Local 

Government 25% 30% 29% 27%

Federal 41% 46% 47% 47%

Contract 

Revenue 10% 8% 7% 7%

Other 2% 0% 5% 2%

Totals 104% 103% 103% 100%

Page 77: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit    October 2009 Transit Development Plan:  FY 10‐15                E‐1 

AAPPPPEENNDDIIXX  EE..  

TTRRAANNSSIITT  RRIIDDEERR  OONN‐‐BBOOAARRDD  SSUURRVVEEYY  RREESSUULLTTSS  

EE..11 OOnn‐‐BBooaarrdd  SSuurrvveeyy  PPrroocceessss  

In  September  2003,  Bay  Transit  conducted  a  transit  customer  satisfaction  survey.    They distributed approximately 300 surveys and achieved a 28 percent  rate of  return.   The survey results generated the following major findings:  

86 percent of the respondents indicated that they were regular riders of Bay Transit. 

90 percent of the respondents said that their basic mobility needs were being met. 

86 percent of  the respondents  indicated that the  transit services were being provided on time. 

77  percent  of  the  respondents  mentioned  that  the  riders  did  not  have  trouble scheduling a return trip. 

Based on the results summary, most of the responses were positive and riders were generally satisfied  with  the  services  that  Bay  Transit  provided  at  that  time.    These  results  were encouraging in that they indicated that the staff of Bay Transit was doing a good job.   

As  an  element  of  this  initial  TDP,  a  more  comprehensive  onboard  passenger  survey  was conducted  in  February  and March  of  2009  to  collect more  up‐to‐date  information  on  the demographic and travel characteristics of current riders.   The summary results are being used as one element of the service evaluation process.  

A copy of the survey questionnaire is presented in Figure E‐1 below.  This survey included four basic groups of questions: 

Demographic information 

Trip‐specific information 

A rating by the passengers of the current day service being provided 

Passenger suggestions as to the importance of future service improvement needs 

The  summary  results of  the 2009 on‐board  ridership  survey are presented  in  the  tables and figures  in the  following sections.   The compiled raw survey data  from the returned surveys  is contained in the Data Input Sheets at the end of this Appendix.  This data includes the written comments provided on the various survey forms.  The contents of this data are sorted by each of  the  individual  county  service areas  to allow  for  comparison between each of  the areas  in which Bay Transit currently operates.  

Page 78: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit    October 2009 Transit Development Plan:  FY 10‐15                E‐2 

Figure E‐1.  On‐Board Survey Questionnaire for Bay Transit 

Page 79: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit    October 2009 Transit Development Plan:  FY 10‐15                E‐3 

EE..22 SSuurrvveeyy  RReessppoonnssee  RRaatteess  

A total of 1,197 on‐board surveys were distributed.  The total number of returned surveys was 523,  which  equates  to  a  return  rate  of  approximately  44  percent.    Table E‐1  presents  the number of surveys distributed and returned in each of the individual county service areas.  The following  tables  summarize  the  system‐wide  results of  the on‐board  ridership  survey of Bay Transit. 

Table E‐1.  Distribution of Passenger Surveys and Return Rate by County 

County / Service Area Number of Surveys 

Distributed

Number of Surveys Returned

Percent Return  Rate 

New Kent/Charles City County 177 42 23.7% King William County/King & Queen County/Town of West Point 

84  70  83.3% 

Gloucester County  274 141 51.5% Mathews County  65 22 33.8% Lancaster County  153 74 48.4% Northumberland County  83 27 32.5% Middlesex County  57 20 35.1% Essex County  122 46 37.7% Westmoreland County  37 14 37.8% Richmond County  52 29 55.8% Town of Colonial Beach  60 24 40.0% Dahlgren  33 14 42.4% 

Totals 1,197 523 43.7% 

Page 80: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit    October 2009 Transit Development Plan:  FY 10‐15                E‐4 

EE..33 RReessppoonnsseess  ttoo  SSuurrvveeyy  QQuueessttiioonnss  

E.3.1 DEMOGRAPHIC SURVEY INFORMATION 

Summary.    Table  E‐2  summarizes  the  passenger  characteristics  of  the  current  Bay  Transit ridership based upon the information contained in the returned surveys.   

Table E‐2.  Summary of Bay Transit Passenger Characteristics 

Gender  Number Percent  Household Annual 

Income Number  Percent

Male  150 29.7%   Under $10,000 193  49.4%

Female  355 70.3%   $10,000 ‐ $20,000 116  29.7%

No Response  18     $20,000 ‐ $30,000 31  7.9%

Total Responding  505 100.0%   $30,000 ‐ $40,000 27  6.9%

         $40,000 ‐ $50,000 10  2.6%

Age  Number Percent   Over $50,000 14  3.6%

19 or  under  29 5.7%   No Response 132   

20‐29  48 9.5%   Total Responding  391  100.0%

30‐39  48 9.5%        

40‐49 78  15.4% 

 Frequency of Ridership 

Number  Percent

50‐59 88  17.4% 

 Less than once a month

16  3.1% 

60 or older  214 42.4%   Once or twice a month  33  6.5%

No Response  18     1 day a week 26  5.1%

Total Responding  505 100.0%   2‐3 days a week 242  47.4%

         4 or more days a week  194  38.0%

Race  Number Percent   No Response 12   

Caucasian  169 33.8%   Total Responding  511  100.0%

African‐American  302 60.4%        

Hispanic  6  1.2%        

Other  23 4.6%      

No Response  23        

Total Responding  500 100.0%      

            

Educational Level  Number Percent      

Not High School Graduate  156 31.5%      

High School Graduate / GED  236 47.6%      

Some College  75 15.1%        

College Degree or Higher  29 5.8%        

No Response  27           Total  Responding 496 100.0%          

Page 81: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

Gender  

 As Figureresponse 

t velopment Pla

e E‐2 shows,es reported a

n:  FY 10‐15 

Fig

 female passat approxim

 

F

        

gure E‐2.  Su

sengers respately 29.7 p

Female70%

     E‐5 

urvey Result

ponded at a ercent.   

ts:  Gender

rate of 70.3

Male30%

 percent, wi

October

 

th male 

r 2009 

Page 82: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

Age  

The  passwere defof Bay Trpercent oage categ

Among  tage  bracThose paof  the  toservices perceive

t velopment Pla

sengers’  agefined.  Basedransit, with of survey regories.  

the  riders yockets, while assengers thotal  ridershto a broad  it to be, a s

n:  FY 10‐15 

F

es  are  relatid on the ridethe percent

espondents. 

ounger  thanapproximat

hat reportedip.    These  fcross‐sectio

system trans

60 or older42%

        

Figure E‐3.  S

ively well‐diership survetage of tran This value 

n 60, approxtely  19.0  ped their age afindings  sugon of  the  sesporting only

r

     E‐6 

Survey Resu

istributed  acey results, ridsit passengeis also the h

ximately 32.ercent wereas 19 or undggest  that  Bervice area y elderly res

19 or und6%

50‐5917%

ults:  Age 

cross  each  oders age 60 ers that are highest sing

8 percent we  in  the  20‐der represenBay  Transit populationsidents. 

der

20‐2910%

31

of  the  diffeor older are60 or olderle percentag

were  in  the 29  and  30‐3nt approximais  providin and  is not,

30‐3910%

40‐4915%

October

rent  rangese the major r making upge for any o

40‐49 and 539  age  bracately 5.7 peg  basic mo, as  some m

r 2009 

s  that users  42.4 of the 

50‐59 ckets.  rcent bility might 

Page 83: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

Race  

African‐Acombineonly 1.2 p

   

t velopment Pla

American  ad percentagpercent and

n:  FY 10‐15 

F

nd  Caucasiage of these tw 4.6 percent

 

AfricAme

60

        

Figure E‐4.  S

an  are  the wo races is 9t of the repo

can‐rican0%

Hispanic1%

Oth5%

     E‐7 

Survey Resu

 top  two  r

94.2 percentorted ridersh

er%

lts:  Race 

races  using t   Hispanic ahip, respectiv

Caucasian34%

Bay  Transand Other ravely. 

n

October

 

sit  service.aces represe

r 2009 

  The ented 

Page 84: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

Educatio 

With  resindicatedfrom  higattendedbachelor

  

t velopment Pla

n Level 

spect  to  thed that they egh  school  (3d  some  coller’s degree.   

n:  FY 10‐15 

Figure 

  reported eeither posse1.5  percentege, while  5

 

G

Some

College Dor High

6%

        

E‐5.  Survey

education  leessed a high t).   Approxim5.8  percent 

High School Graduate / GED

48%

e College15%

egree her

     E‐8 

y Results:  Ed

vel,  approxischool degrmately  15.1reported  h

Not

D

ducation Lev

imately 79.1ree (47.6 pe  percent  ofaving  earne

t High School Graduate

31%

vel 

1 percent ofercent) or haf  the  riders ed  at  least  a

October

f  the passenad not gradureported  haa  collegiate 

r 2009 

ngers uated aving level 

Page 85: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

Annual H 

Persons total Baywith 49.4per year.and $30,$40,000 $50,000 incomes persons degree represen

   

t velopment Pla

Household In

with  low  iny Transit  res4 percent of.  Approxima,000, while per year.   Twere  approof over $50surveyed  (2of  non‐respnting all of th

$20,000 ‐$30,000

8%

n:  FY 10‐15 

ncome 

Figure E‐6.  

ncome are  tspondents  ref  the passenately 7.9 pean additionaThose  reporoximately  20,000 per ye25.2  percenpondents,  ihe income le

 

$10,0$20,030%

$30,000$40,000

7%

        

Survey Resu

he major useported  lessngers reportrcent of rideal 6.9 percerting annual .6  percent ear were 3.6t)  did  not  rit  would  aevels found i

000 ‐000%

 ‐0

$40,000 $50,000

2%

     E‐9 

ults:  Annual

sers of Bay s  than $20,0ting a houseers reportedent  reportedhousehold of  the  tota6 percent.   respond  to ppear  that n the Bay Tr

‐0

Over $504%

l Household

Transit.   A 000  for  theiehold  incomd an annual d annual  incincome  leveal  ridership, Interestinglythis  questiothe  syste

ransit service

Under 4

0,000

d Income 

total of 79.r household

me  level of  leincome of bomes betweels of betwewhile  thos

y,  just over on.  Yet  evem  is  transe area. 

$10,0009%

October

1 percent od annual  incess  than $10between $20een $30,000een $40,000se  with  repoa quarter on with  this porting  pe

r 2009 

of  the come, 0,000 0,000 0 and 0 and orted of  the high rsons 

Page 86: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

Frequenc 

Most  of regular bdays  a wCombininthat  respclassifiedindicatesits passe

t velopment Pla

cy of Ridersh

the  riders  tbasis.  A totaweek, with  ang these twponded  used as “regulars that Bay Trngers. 

n:  FY 10‐15 

hip 

Figure E‐7

that  participal of 38.0 pean  additionao values  inde  Bay  Transr” rather tharansit is pro

L

4 or moa w38

          

.  Survey Re

pated  in  thiercent of theal  47.4 percdicates that it  services an occasionaoviding an es

Less than oncemonth3%

ore days week8%

   E‐10 

sults:  Frequ

is  survey  ree riders repocent  reportinapproximatemore  than al riders.  Thssential mob

e a 

uency of Rid

ported  usinorted a riderng use of  thely 85.4 pertwo  days  p

his high levebility service

Once or twicemonth7%

2‐3 days a47%

dership 

ng  Bay  Transrship frequehe  system  2rcent of the per  week  ael of repeat e to a broad

e a 

1 day a we5%

a week%

October

sit  services ncy of 4 or 2‐3 days  a wtotal passenand  can  thuridership fud cross‐sectio

eek

r 2009 

on  a more week.  ngers us  be rther on of 

Page 87: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit    October 2009 Transit Development Plan:  FY 10‐15                E‐11 

E.3.2 TRIP‐SPECIFIC SURVEY RESULTS 

Summary.  Table E‐3 summarizes responses to the on‐board survey questions related to the trip being made at the time of the administration of the survey. 

Table E‐3.  Results of Survey Topic ‐ About Your Trip Today 

Trip Origin Type Number Percent

 Trip Destination 

TypeNumber  Percent

Home  427 84.7%   Home 53  10.5%

Work  30 6.0%   Work 193  38.2%

School/College  6 1.2%   School/College 23  4.6%

Shopping  4 0.8%   Shopping 38  7.5%

Medical/Dental  11 2.2%   Medical/Dental 53  10.5%

Social/Recreational  6 1.2%   Social/Recreational  56  11.1%

Service Agency  3 0.6%   Service Agency 20  4.0%

Other  17 3.4%   Other 69  13.7%

No Response  19     No Response 18   

Total Responding  504 100.0%   Total Responding  505  100.0%

              

Reason for Riding  Number Percent        

Don't have a car  251 50.4%        

Car not available  63 12.7%        

Prefer to ride bus  46 9.2%        

To save time  7 1.4%        

To save money  19 3.8%        

Disability/unable to drive  82 16.5%        

Other  30 6.0%        

No Response  25          

Total Responding  498 100.0%         

 

 

   

Page 88: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

Trip Orig

The vast the  naturegion, th

Approximlocation. “Medical

 

t velopment Pla

in 

majority (8ure  of  the he remainin

mately  6.0  p    The  thrl/Dental”, “S

Home

Medical/De

n:  FY 10‐15 

Figu

84.7 percentBay  Transit g trip origins

percent  of  tree  next  mSchool/Colle

 

6

11

W

ental So

          

ure E‐8.  Surv

t) of the passystem’s  ds were distri

the  passengmost  frequeege”, and “So

6%

1%1%

2% 1%

Work

ocial/Recreati

   E‐12 

 vey Results:

ssengers stademand‐respibuted acros

gers  reporteent  trip  orocial/Recrea

1%

3%

Schoo

ional Servic

  Trip Origin

rted their trponsive  opess a wide ran

ed  starting rigins  wereational”.  

85%

ol/College

ce Agency

rips from therations  acrnge of trip p

their  trips e  cited  as 

Shopping

Other

October

eir home.  Goss  a  12‐courposes.   

from  their being  “Ot

g

r 2009 

 Given ounty 

work ther”, 

Page 89: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

Trip Dest 

The  top percent, four destfor 10.5 These remobility 

 

t velopment Pla

tination 

four  trip de”Social/Rectinations accpercent of tsults demonpurposes be

1

1

Home

Medic

n:  FY 10‐15 

Figure 

estinations wcreational” acount for 73the trips, fonstrate thatetween thei

 

10%

1%

4%

al/Dental

          

E‐9.  Survey

were noted at 11.1 perc3.5 percent ollowed by “St the currentir homes an

8%

14%

Work

Social/Re

   E‐13 

y Results:  Tr

as being  ”Wcent, and ”Mof the total tShopping”, “t ridership isd their work

10%

5%

ecreational

rip Destinat

Work”  at 38Medical/Dentrips.  “Hom“School/Colls using the kplace or ot

%

School/Colle

Service Age

ion 

8.2 percent, tal” at 10.5

me” was the lege”, and “Bay Transit ther importa

38%

ege Sh

ncy O

October

“Other”  at  percent.   Tcited destin“Service Agesystem for ant destinat

hopping

ther

r 2009 

13.7 

These ation ncy”.  basic ions.   

Page 90: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

Reason fo 

When asmost freqAvailablereasons fhighest rsuch as “the respo These reis, they hnot provtrips  beicould resmeaning

t velopment Pla

for Riding Tra

sked to identquently indie”  (12.7 percfor using Baresponse at “To save timondents, res

sponses indhave  few  if vided, the sung made  fosult in signifful employm

1%

n:  FY 10‐15 

ansit 

Figure E‐10.

tify the princated that tcent).   Comy Transit ser16.5 percenme” or “To sspectively.   

dicate that thany other tubject trip wor work,  shoficant negatiment or nece

9%

4%

17%

Don't have Prefer to riTo save moOther

          

.  Survey Res

ncipal reasonhey “Did Nobined, theservice.  The fat, followed bave money”

he current rtravel optiowould probaopping,  or mive effects oessary medic

13%

%

6

a carde busoney

   E‐14 

sults:  Reaso

n why they wot Have a Cae two respoactor of “Disby “Prefer to” were only 

idership canons availableably not be medical/denton the abilitycal services.

6%

on for Riding

were riding r” (50.4 peronses accounsability/unabo ride bus” acited by 1.4

n be classifiee and  if themade.   Wittal  purposesy of the stud

Car not To saveDisabilit

g Transit 

the bus, surcent) or thanted  for 63.ble to drive”at 9.2 percen4 percent an

ed as “trans current trath a  large ps,  the  lack  ody area pop

50%

availablee timety/unable to 

October

rvey respondt a “Car Wa1 percent o” was the sent.  Other fand 3.8 perce

it captives”;ansit serviceercentage oof  basic moulation to o

drive

r 2009 

dents s Not of the econd actors ent of 

; that e was of the obility btain 

Page 91: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

E.3.3 SE

Figure  Edevelopeoffered b

R

B

H

C

 For  eachprovidedpercent fthose for

 

Courtes

t velopment Pla

ERVICE RATI

E‐11  and  Taed  to  obtainby Bay Trans

eservation p

us on‐time p

Hours of bus 

ost of bus fa

h  of  these d  combined for almost er “Bus On‐tim

Reservat

Bus On‐Tim

Hour

C

Sense of Se

Clean

sy/Friendlines

n:  FY 10‐15 

INGS SURVE

able  E‐4  sun  the  view sit.  The serv

procedures 

performance

service  

are 

eight  evaluratings of “every measume Performa

Figure 

tion Procedure

me Performanc

s of Bus Servic

Cost of Bus Far

ecurity on Buse

nliness of Buse

ss of Bus Driver

Overall Servic

Very Good

          

EY RESULTS 

mmarize  thof  the  currice factors p

uation  mea“Very Goodurement.  Tance” and “H

E‐11.  Surve

0% 10%

es

ce

ce

re

es

es

rs

ce

Good Ok

   E‐15 

he  responseent  riders  apresented fo

surements, d” or “Goodhe two servHours of Bus

ey Results:  S

 

20% 30% 4

kay Poor 

es  to  the  sas  to  qualityor rating wer

Sense of

Cleanline

Courtesy

Overall s

those  thatd”  in  the  ranvice factors ws Service”. 

Service Ratin

40% 50% 60

Very Poor

survey  quesy  of  servicere as follows

f security on

ess of buses

y/friendlines

service ratin

t  respondednge of apprwith the low

ngs

% 70% 80%

Not Sure

October

stions  thate  currently  bs: 

 the buses 

 

ss of bus driv

d  to  the  suroximately 8west ratings 

% 90% 100%

r 2009 

were being 

vers  

urvey 80‐95 were 

 

Page 92: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit    October 2009 Transit Development Plan:  FY 10‐15                E‐16 

Table E‐4.  Survey Results:  Service Ratings Reservation Procedures 

Number  Percent  

Sense of Security on Buses

Number  Percent 

Very Good  218  45.8%   Very Good 286  59.7%

Good  182  38.2%   Good 165  34.4%

Okay  61  12.8%   Okay 27  5.6%

Poor  7  1.5%   Poor 1  0.2%

Very Poor  2  0.4%   Very Poor 0  0.0%

Not Sure  6  1.3%   Not Sure 0  0.0%

No Response  47      No Response 44   

Total Responding 476  100.0%   Total Responding  479  100.0%

              

Bus On‐Time Performance 

Number  Percent    Cleanliness of Buses  Number  Percent 

Very Good  202  41.5%   Very Good 269  55.8%

Good  189  38.8%   Good 172  35.7%

Okay  76  15.6%   Okay 34  7.1%

Poor  15  3.1%   Poor 5  1.0%

Very Poor  3  0.6%   Very Poor 1  0.2%

Not Sure  2  0.4%   Not Sure 1  0.2%

No Response  36      No Response 41   

Total Responding 487  100.0% Total Responding  482  100.0%

              

Hours of Bus Service  Number  Percent   Courtesy / Friendliness 

of Bus DriversNumber  Percent 

Very Good  174  38.7%   Very Good 335  69.4%

Good  179  39.8%   Good 129  26.7%

Okay  74  16.4%   Okay 16  3.3%

Poor  10  2.2%   Poor 1  0.2%

Very Poor  2  0.4%   Very Poor 0  0.0%

Not Sure  11  2.4%   Not Sure 2  0.4%

No Response  73      No Response 40   

Total Responding 450  100.0% Total Responding  483  100.0%

              

Cost of Bus Fare  Number  Percent   Overall Service Number  Percent

Very Good  356  74.9%   Very Good 283  59.6%

Good  96  20.2%   Good 159  33.5%

Okay  22  4.6%   Okay 29  6.1%

Poor  1  0.2%   Poor 2  0.4%

Very Poor  0  0.0%   Very Poor 0  0.0%

Not Sure  0  0.0%   Not Sure 2  0.4%

No Response  48      No Response 48   

Total Responding 475  100.0% Total Responding  475  100.0%

Page 93: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit    October 2009 Transit Development Plan:  FY 10‐15                E‐17 

 For “Bus On‐time Performance”, 80.3 percent of the riders rated this service factor “Very Good” or “Good”.  Approximately 15.6 percent of the riders rated this service factor as being “Okay”, with a total of 3.7 percent rating this factor as “Poor” (3.1 percent) or “Very Poor” (0.6 percent).   

In  the  case  of  “Hours  of  Bus  Service”,  78.4  percent  rated  this  service  factor  as  being  “Very Good” or “Good”.   Approximately 16.4 percent of the riders rated this service factor as being “Okay”, with a total of only 2.6 percent rating this factor as “Poor” (2.2 percent) or “Very Poor” (0.4 percent). 

The  highest  positive  service  factor  ratings were  for  “Cost  of  Bus  Fare”, with  a  total  of  95.2 percent rating this “Very Good” and “Good”, and “Courtesy/Friendliness of Bus Drivers”, at 96.1 percent rating this factor “Very Good” or “Good”.     

The “Overall Service” rating for Bay Transit was 93.1 percent “Very Good” or “Good”, and 6.1 percent “Okay”.   Only 0.4 percent of the riders rated the current service as “Poor”, with none rating it as being “Very Poor”.  

These  findings  represent a very positive  reaction  from  the passengers of Bay Transit.   They also  indicate  that  the  current users are  satisfied with  the overall  services provided by Bay Transit.  

   

Page 94: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit    October 2009 Transit Development Plan:  FY 10‐15                E‐18 

E.3.4 FUTURE SERVICE IMPROVEMENTS SURVEY RESULTS 

Table E‐5  and  Figure E‐12  summarize  the  responses  to  those  survey questions pertaining  to potential service  improvements that Bay Transit might wish to consider.   The three suggested areas of potential service improvement were: 

Less advance time to schedule trip 

Expand hours / days of service 

Improve security on buses 

Table E‐5.  Survey Results:  Future Service Improvements 

 

Less Advance Time  to Schedule Trip 

Number Percent  Improve Security  

on BusesNumber  Percent

Very Important  142  37.5%   Very Important 80  23.3%

Somewhat Important  109  28.8%   Somewhat Important 84  24.4%

Not Important  92  24.3%   Not Important 143  41.6%

Not Sure  36  9.5%   Not Sure 37  10.8%

No Response  144      No Response 179   

Total Responding  379  100.0% Total Responding  344  100.0%

              Expand Hours/  Days of Service 

Number Percent  

 

Very Important  226  54.7%  

Somewhat Important  82  19.9%  

Not Important  81  19.6%  

Not Sure  24  5.8%  

No Response  110     Total Responding  413  100.0%  

   

   

Page 95: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay TransiTransit Dev

Given  thcategorieare  the should fo

With resas  beingresponde

With  resbeing  “Vresponde

The respis not viepercent o41.6 perc

Less Ad

Ex

t velopment Pla

Fig

he  number es, those fortwo  potentocus on.   

pect to “Lesg  “Very  Iments rated th

pect  to “ExVery  Imporents rated th

onses to theewed as beinof the passecent rated it

dvance Time to

xpand Hours/D

Improve Sec

Very

n:  FY 10‐15 

gure E‐12.  S

of  responder “Less Advatial  service 

s Advance Tportant”  orhis service fa

pand Hours/rtant”  or  “his service fa

e potential nng a high priengers ratedt as “Not Imp

o Schedule Trip

Days of Service

curity on Buses

y Important

          

Survey Resul

ents  to  eacnce Time to improvemen

Time to Scher  “Somewhaactor as bein

/Days of Se“Somewhat actor as bein

need to “Impority need fd this as beinportant”.  

0% 10% 2

p

e

s

Somewhat 

   E‐19 

lts:  Future S

h  question, Schedule Trnts  that  the

edule Trip”, 6at  Importanng “Not Impo

rvice”, 74.6Important”

ng “Not Impo

prove Securirom the pasng “Very Imp

0% 30% 40%

Important

Service Impr

of  the  potrip” and “Exe  current  p

66.3 percennt”.    Conveortant”.   

percent of ”.    Conversortant”. 

ty on the Bussengers’ vieportant” or 

% 50% 60%

Not Importa

rovements 

tential  servipand Hours/assengers  t

t of respondersely,  24.3

respondentsely,  19.6 

uses” indicatewpoint.  Ap“Somewhat

70% 80% 90

nt Not Su

October

ce  improve/Days of Serhink  Bay  Tr

dents viewed3 percent  of

ts viewed  thpercent  of

te that this fproximately Important”

0% 100%

ure

r 2009 

ment rvice” ransit 

d this f  the 

his as f  the 

factor y 47.7 ”, and 

Page 96: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

On

-Bo

ard

Rid

ersh

ip S

urv

ey (

Dem

and

Res

po

nse

Ser

vice

) -

Dat

a In

pu

t S

hee

tS

yste

m N

ame:

Bay

Tra

nsit

Su

rvey

Dat

e:2/

09/0

9 ~

3/2

0/09

No

te:

"0"

or "

Bla

nk"

= N

o R

espo

nse

to q

uest

ion

Ab

ou

t Y

ou

r T

rip

To

day

Co

mm

ent

Sys

tem

ID

(01-

06)

Ser

ial

Nu

mb

er

(100

1 o

r g

reat

er)

Ro

ute

or

Ser

vice

Are

a

Boarding Time

Sex (1-2)

Age (1-6)

Race (1-4)

Education (1-4)

Household Income (1-6)

Ride Frequency of Demand-Response Service (1-5)

Ride Frequency of Fixed Route Service (1-5)

Trip Origin (Type 1-8)

Trip Origin (Place)

Destination (Type 1-8)

Destination (Place)

Ride Reason (1-7)

Reservation Procedures (1-6)

Bus On-time (1-6)

Hours (1-6)

Cost of bus fare(1-6)

Security (1-6)

Cleanliness (1-6)

Courtesy (1-6)

Overall Rating (1-6)

Less advance time (1-4)

Expand Hours/Days of Service (1-4)

Improve Security (1-4)

Other (1-4)

110

01N

ew K

ent/C

harle

s C

ity C

ount

y1

52

22

41

111

040

Bar

notts

Roa

d2

New

Ken

t Cou

nty

22

31

11

11

11

11

01

1018

New

Ken

t/Cha

rles

City

Cou

nty

25

21

15

11

Cha

rles

City

Cou

nty

2C

harle

s C

ity C

ount

y O

ld H

igh

Sch

ool

12

22

11

22

11

11

0 S

houl

d co

nsid

er s

ome

trip

s to

Hop

ewel

l VA

or

to C

aval

ier

Sho

ppin

g C

ente

r.1

1033

New

Ken

t/Cha

rles

City

Cou

nty

14

23

35

11

8532

Old

Ela

m C

emet

ery

Roa

d2

2401

Rex

olry

Roa

d3

32

21

11

11

22

30

110

34N

ew K

ent/C

harle

s C

ity C

ount

y2/

11/0

9 7:

301

31

32

21

119

001

Eith

nal o

f Wes

t Bin

t2

13

34

12

13

21

13

01

1035

New

Ken

t/Cha

rles

City

Cou

nty

2/18

/09

8:15

26

42

14

11

Sae

law

isel

le5

Wor

ge-W

illia

msb

urg

62

22

22

22

21

13

1 M

ore

rout

es.

110

36N

ew K

ent/C

harle

s C

ity C

ount

y2

62

21

40

15

00

30

33

33

32

22

21

1049

New

Ken

t/Cha

rles

City

Cou

nty

2/11

/09

12:4

52

31

23

31

1C

ount

y3

Cha

rles

City

Cou

nty

20

22

11

21

21

10

01

1050

New

Ken

t/Cha

rles

City

Cou

nty

2/11

/09

14:0

02

12

10

51

1C

harle

s C

ity C

ount

y 3

Cha

rles

City

Cou

nty

76

63

33

22

34

32

41

1035

New

Ken

t/Cha

rles

City

Cou

nty

2/18

/09

8:15

26

42

14

11

Sae

law

isel

le5

Wor

ge-W

illia

msb

urg

62

22

22

22

21

13

1 M

ore

rout

es.

110

36N

ew K

ent/C

harle

s C

ity C

ount

y2

62

21

40

15

00

30

33

33

32

22

21

1049

New

Ken

t/Cha

rles

City

Cou

nty

2/11

/09

12:4

52

31

23

31

1C

ount

y3

Cha

rles

City

Cou

nty

20

22

11

21

21

10

01

1050

New

Ken

t/Cha

rles

City

Cou

nty

2/11

/09

14:0

02

12

10

51

1C

harle

s C

ity C

ount

y 3

Cha

rles

City

Cou

nty

76

63

33

22

34

32

41

1051

New

Ken

t/Cha

rles

City

Cou

nty

2/11

/09

15:0

01

11

10

41

115

800

San

dy P

oint

Roa

d3

Cha

rles

City

Cou

rt H

ouse

61

31

12

11

23

33

01

1052

New

Ken

t/Cha

rles

City

Cou

nty

2/11

/09

15:1

51

12

10

41

1W

illco

x N

eck

Roa

d3

155

02

32

11

11

11

12

01

1065

New

Ken

t/Cha

rles

City

Cou

nty

23

43

12

11

Rt 1

065

Pro

vred

ence

For

ge1

11

11

11

11

42

44

110

66N

ew K

ent/C

harle

s C

ity C

ount

y2/

11/0

9 15

:45

22

22

24

01

CC

Rt 5

811

601

John

Tyl

er M

emor

ial H

ighw

ay1

55

51

22

14

12

10

110

05N

ew K

ent/C

harle

s C

ity C

ount

y1

42

30

51

1C

harle

s C

ity2

Cha

rles

City

13

33

12

22

22

14

01

1006

New

Ken

t/Cha

rles

City

Cou

nty

15

21

24

11

1104

0 C

harle

s C

ity V

A1

72

21

11

11

10

10

01

1007

New

Ken

t/Cha

rles

City

Cou

nty

26

21

14

18

Wes

t Poi

nt8

Will

iam

sbur

g1

21

21

11

11

11

20

110

08N

ew K

ent/C

harle

s C

ity C

ount

y2

62

11

41

8W

est P

oint

8W

illia

msb

urg

12

12

22

22

21

11

01

1009

New

Ken

t/Cha

rles

City

Cou

nty

26

21

14

18

Wes

t Poi

nt8

Will

iam

sbur

g1

22

21

21

21

10

00

110

10N

ew K

ent/C

harle

s C

ity C

ount

y2

62

11

41

1W

est P

oint

8W

illia

msb

urg

12

22

12

12

22

00

01

1011

New

Ken

t/Cha

rles

City

Cou

nty

16

21

15

11

00

11

11

11

11

11

11

110

12N

ew K

ent/C

harle

s C

ity C

ount

y2

62

01

44

12

22

22

22

22

21

11

11

1013

New

Ken

t/Cha

rles

City

Cou

nty

24

22

25

11

Cou

nty

2C

ount

y1

24

33

21

13

11

20

110

14N

ew K

ent/C

harle

s C

ity C

ount

y1

32

22

51

1C

ount

y2

Cou

nty

10

00

00

00

01

12

01

1015

New

Ken

t/Cha

rles

City

Cou

nty

10

21

04

11

New

Ken

t2

Jam

es C

ity C

ount

y1

33

31

22

22

12

40

110

40N

ew K

ent/C

harle

s C

ity C

ount

y3/

18/0

9 8:

152

62

12

40

1R

oute

60

and

Fox

wel

l Roa

d6

Cha

rles

City

Com

mun

ity C

ente

r3

23

01

12

12

00

00

110

41N

ew K

ent/C

harle

s C

ity C

ount

y3/

17/2

009

26

21

04

01

Rt 2

49 A

ngel

Vie

w6

Cha

rles

City

Com

mun

ity C

ente

r3

03

03

22

12

00

30

110

42N

ew K

ent/C

harle

s C

ity C

ount

y3/

17/0

9 9:

222

62

00

40

1G

eorg

e W

atki

ns R

oad

and

Pin

e F

ork

63

02

02

12

12

12

20

110

43N

ew K

ent/C

harle

s C

ity C

ount

y3/

17/0

9 9:

102

42

10

40

1T

eleg

raph

and

Dis

patc

h R

oad

2R

oxbu

ry In

dust

rial C

ente

r6

20

30

22

12

12

20

110

44N

ew K

ent/C

harle

s C

ity C

ount

y3/

17/0

9 9:

272

31

00

50

1R

t 106

2R

oxbu

ry In

dust

rial C

ente

r6

23

01

11

12

22

20

110

45N

ew K

ent/C

harle

s C

ity C

ount

y3/

17/0

9 9:

322

02

10

40

1G

olde

n W

heel

Roa

d0

Rt 1

55 N

.K1

34

31

11

12

12

20

110

46N

ew K

ent/C

harle

s C

ity C

ount

y3/

17/0

9 9:

502

52

40

50

1S

ign

Pos

t Apa

rtm

ents

2C

harle

s C

ity C

omm

unity

Cen

ter

12

30

12

21

20

10

01

1047

New

Ken

t/Cha

rles

City

Cou

nty

3/17

/09

9:58

26

21

04

01

Chu

rch

Lane

6C

harle

s C

ity C

omm

unity

Cen

ter

60

40

02

02

00

01

01

1048

New

Ken

t/Cha

rles

City

Cou

nty

3/17

/09

10:0

82

62

10

40

1R

uthv

ille

Roo

d6

Cha

rles

City

Com

mun

ity C

ente

r1

03

00

22

21

23

40

110

53N

ew K

ent/C

harle

s C

ity C

ount

y3/

17/0

9 9:

501

22

20

50

1S

ign

Pos

t Apa

rtm

ents

2M

cdon

ald'

s R

t 60

and

249

11

44

11

21

21

10

01

1054

New

Ken

t/Cha

rles

City

Cou

nty

3/17

/09

10:2

52

02

40

20

1R

t 60,

800

0 F

oxw

ell R

oad

3H

erita

ge L

ibra

ry0

34

41

12

13

11

20

110

55N

ew K

ent/C

harle

s C

ity C

ount

y3/

17/2

009

13

22

05

01

The

Loe

p R

oad

2M

cdon

ald'

s R

t 60

and

249

13

43

12

22

21

13

01

1056

New

Ken

t/Cha

rles

City

Cou

nty

3/17

/09

11:4

01

62

10

50

0R

t 60,

Pro

vide

nce

For

ge1

Lane

xa1

11

22

22

12

22

20

110

67N

ew K

ent/C

harle

s C

ity C

ount

y3/

18/0

9 13

:20

23

22

24

11

Cha

rles

City

Cou

nty

4C

harle

s C

ity1

35

31

23

13

23

31

Not

to w

ait f

or a

rid

e ov

er a

long

per

iod

of ti

me.

To

get t

o de

stin

atio

n on

tim

e.1

1068

New

Ken

t/Cha

rles

City

Cou

nty

3/18

/09

15:1

01

11

10

40

1C

harle

s C

ity

3C

harle

s C

ity C

ount

y7

04

31

22

22

33

30

111

01K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/20

/09

6:45

15

21

24

11

Kin

g W

illia

ms

5T

appa

hann

ock

VA

32

12

21

21

12

21

01

1102

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

21

14

11

Tap

paha

nnoc

k V

A8

Chu

rch

12

22

11

11

10

20

01

1103

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

25

23

14

15

Tap

paha

nnoc

k V

A1

Kin

g an

d Q

ueen

Cou

nty

21

12

11

21

13

13

0W

eeke

nd T

rips

111

04K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/09

8:20

25

22

25

11

2M

ango

hick

Va

63

33

12

22

20

00

0W

eeke

nd D

river

s1

1106

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/0

9 8:

151

42

21

51

1K

ing

and

Que

en C

ount

y2

Kin

g W

illia

ms

61

11

11

11

10

00

0P

leas

e ke

ep s

ervi

ce g

oing

111

07K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/09

16:0

01

42

22

51

2T

appa

hann

ock

VA

1K

ing

and

Que

en C

ount

y1

11

11

11

11

10

00

111

08K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/09

9:00

26

21

14

11

Kin

g W

illia

ms

6K

ing

Will

iam

s3

11

00

01

10

40

00

111

09K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/09

9:15

26

22

14

11

Kin

g W

illia

ms

6K

ing

Will

iam

s1

11

00

01

10

40

00

111

10K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/09

9:15

26

21

14

11

Kin

g W

illia

ms

8K

ing

Will

iam

s1

11

23

21

11

22

20

111

11K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/09

9:35

16

21

14

10

00

62

62

22

12

44

30

111

15K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

92

61

22

21

0K

ing

Will

iam

s1

Kin

g W

illia

ms

23

22

12

21

21

23

01

1117

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

22

14

11

Sen

ior

Cen

ter

6S

enio

r C

ente

r1

22

21

22

22

33

30

111

19K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

92

62

21

41

1S

enio

r C

ente

r6

Sen

ior

Cen

ter

12

22

12

22

23

33

01

1120

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

19/2

009

16

21

14

11

Sen

ior

Cen

ter

6S

enio

r C

ente

r1

22

21

22

22

33

30

111

21K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/200

92

62

11

41

1S

enio

r C

ente

r6

Sen

ior

Cen

ter

62

22

12

22

23

33

01

1122

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

19/2

009

26

22

14

11

Sen

ior

Cen

ter

6S

enio

r C

ente

r6

22

21

22

22

33

30

111

23K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/200

92

62

21

41

1S

enio

r C

ente

r6

Sen

ior

Cen

ter

62

22

12

22

23

33

01

1124

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

19/2

009

26

20

14

11

Sen

ior

Cen

ter

6S

enio

r C

ente

r6

22

21

22

22

33

30

111

25K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/200

91

62

21

41

1K

ing

Will

iam

s5

Tap

paha

nnoc

k V

A6

22

21

22

22

22

30

111

26K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/200

92

52

21

51

1S

enio

r C

ente

r2

Sen

ior

Cen

ter

12

22

12

22

22

33

01

1127

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

19/2

009

25

22

24

11

Sen

ior

Cen

ter

2S

enio

r C

ente

r7

22

21

22

22

20

33

111

28K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/200

92

52

21

41

1S

enio

r C

ente

r2

Sen

ior

Cen

ter

12

22

12

22

22

03

31

1129

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

19/2

009

15

22

14

11

Sen

ior

Cen

ter

3S

enio

r C

ente

r1

22

21

22

22

23

30

111

30K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/200

92

52

21

21

1S

enio

r C

ente

r5

Sen

ior

Cen

ter

71

11

11

11

10

00

01

1136

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

23

22

31

72

22

22

22

22

12

44

111

37K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/09

8:45

26

23

04

05

7S

enio

r C

ente

r2

03

01

23

12

11

20

111

38K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

92

61

41

11

0S

enio

r C

ente

r0

04

43

11

11

21

13

01

1142

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

32

14

07

7S

enio

r C

ente

r7

10

00

00

00

00

00

111

43K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

92

62

21

45

1W

est P

oint

2W

est P

oint

Va

12

00

20

02

00

00

01

1144

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

02

04

51

Wes

t Poi

nt1

70

20

00

00

10

31

01

1145

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

01

04

51

1W

est P

oint

Va

71

00

00

00

00

00

01

1146

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

10

21

11

Wes

t Poi

nt6

Wes

t Poi

nt V

a1

22

21

22

22

22

20

111

47K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

92

61

22

11

1W

est P

oint

6W

est P

oint

Va

21

22

21

11

22

32

01

1148

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/0

9 8:

302

62

20

44

15

31

23

20

11

20

00

01

1149

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

22

15

11

Sen

ior

Cen

ter

2W

est P

oint

Va

72

22

12

22

23

33

01

1150

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

22

15

11

Sen

ior

Cen

ter

2W

est P

oint

Va

72

22

12

31

13

33

01

1151

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

02

14

11

5W

illia

msb

urg

62

22

12

22

23

33

01

1152

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

22

14

11

2W

est P

oint

Va

72

22

12

22

23

33

01

1153

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

22

03

11

Sen

ior

Cen

ter

2W

est P

oint

Va

22

22

12

22

23

33

01

1154

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

24

22

05

11

Wes

t Poi

nt2

Wes

t Poi

nt V

a7

22

21

22

22

33

30

111

55K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

92

42

24

41

1S

hack

lefo

rds

Va

7K

ing

& Q

ueen

Co.

12

11

11

11

10

10

01

1156

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

21

15

51

21

23

22

23

22

22

00

111

57K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/09

6:35

24

22

45

52

Wes

t Poi

nt2

61

11

11

11

11

11

11

1158

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/0

9 7:

452

42

21

54

2W

est P

oint

1W

est P

oint

Va

11

11

11

11

10

00

1ca

ll w

hen

bus

is la

te

Ab

ou

t Y

ou

Ser

vice

Ch

arac

teri

stic

s R

atin

gF

utu

re Im

pro

vem

ent

Nee

ds

Page 97: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

111

60K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/09

7:00

26

21

15

07

23

11

01

11

11

11

10

111

61K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/09

7:15

24

21

14

11

Kin

g &

Que

en C

o.2

Wes

t Poi

nt V

a1

22

21

22

12

02

20

111

62K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/09

7:30

23

22

14

11

7W

est P

oint

Va

12

22

12

22

23

33

01

1163

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

19/0

9 9:

000

62

21

41

1W

est P

oint

5W

est P

oint

Va

12

22

12

22

23

33

31

1164

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

19/2

009

22

12

14

11

Wes

t Poi

nt2

Wes

t Poi

nt V

a1

22

21

22

22

33

33

111

65K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/200

91

12

20

31

14

11

11

11

11

13

23

01

1166

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

19/2

009

22

12

14

11

Wes

t Poi

nt2

Wes

t Poi

nt V

a1

22

21

22

22

33

30

111

67K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/200

92

62

21

41

1W

est P

oint

5G

louc

este

r, V

A6

22

21

22

22

33

30

111

68K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/200

92

52

21

41

1W

est P

oint

5W

est P

oint

Va

62

22

12

21

13

33

01

1169

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

19/2

009

24

22

05

11

Wes

t Poi

nt2

Wes

t Poi

nt V

a5

22

21

22

11

33

30

111

70K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/200

91

42

30

41

1W

est P

oint

2W

est P

oint

Va

22

22

12

21

13

33

01

1171

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

19/2

009

26

22

14

11

Wes

t Poi

nt5

Wes

t Poi

nt V

a2

22

21

22

11

33

30

111

72K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/19

/200

92

12

20

41

1K

ing

Will

iam

s3

Gle

nns

12

22

12

21

13

33

01

1173

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

19/2

009

15

22

04

11

Kin

g

6K

ing

Will

iam

s7

22

21

22

11

33

30

111

74K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

92

52

20

51

2K

ing

Will

iam

s2

Kin

g W

illia

ms

11

21

11

11

11

11

01

1175

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/0

9 7:

502

12

20

41

1K

ing

Will

iam

s3

Gle

nns

73

43

22

22

30

00

01

1176

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

26

12

21

11

Wes

t Poi

nt6

Wes

t Poi

nt V

a0

22

22

22

22

00

00

111

77K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

92

14

20

50

1W

est P

oint

3G

lenn

s1

22

22

22

22

22

20

111

78K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

92

42

30

50

2W

est P

oint

2W

est P

oint

Va

10

30

11

21

23

12

01

1179

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

15

11

03

00

00

12

11

11

11

42

44

111

80K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

92

52

10

41

00

01

11

11

11

14

44

41

1181

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

13

11

05

01

Kin

g &

Que

en C

o.4

Kin

g W

illia

ms

12

12

11

11

12

12

01

1182

Kin

g W

illia

m C

ount

y/K

ing

& Q

ueen

Cou

nty/

Tow

n of

Wes

t Poi

nt3/

18/2

009

24

11

04

00

02

12

11

11

11

00

00

111

83K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

91

42

21

21

1W

est P

oint

72

22

21

22

22

33

30

111

84K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

92

11

20

51

3W

est P

oint

1K

ing

Will

iam

s2

22

21

22

22

33

30

111

85K

ing

Will

iam

Cou

nty/

Kin

g &

Que

en C

ount

y/T

own

of W

est P

oint

3/18

/200

92

42

21

41

1W

est P

oint

5G

louc

este

r, V

A1

22

21

22

11

33

30

111

87G

louc

este

r C

ount

y2/

15/0

9 6:

301

61

40

41

1G

louc

este

r8

63

34

11

22

30

12

11

1188

Glo

uces

ter

Cou

nty

2/11

/09

7:30

12

13

24

11

Glo

uces

ter

Poi

nt3

Gle

nns

12

36

13

33

22

42

01

1189

Glo

uces

ter

Cou

nty

26

11

04

21

2H

ays

Sho

ppin

g C

ente

r6

11

11

12

11

10

10

111

90G

louc

este

r C

ount

y2/

9/09

7:3

02

61

10

42

12

Hay

s S

hopp

ing

Cen

ter

01

11

01

11

11

11

01

1191

Glo

uces

ter

Cou

nty

25

02

05

01

Urb

anna

Mar

ket

5U

rban

na M

arke

t6

11

11

11

11

41

41

Pra

ise

the

serv

ice

111

96G

louc

este

r C

ount

y2

42

31

51

185

07 D

aven

port

Roa

d2

Ham

pton

Inn,

Glo

uces

ter

11

11

11

11

13

13

01

1217

Glo

uces

ter

Cou

nty

2/11

/200

92

42

10

51

1S

hopp

ing

Cen

ter

2S

hopp

ing

Cen

ter

10

22

22

22

22

21

01

1218

Glo

uces

ter

Cou

nty

2/11

/200

90

62

10

54

06

22

22

22

02

24

44

01

1220

Glo

uces

ter

Cou

nty

2/10

/09

8:20

16

23

24

01

6M

ain

Str

eet,

Glo

uces

ter

62

31

11

11

12

22

2

112

21G

louc

este

r C

ount

y2/

11/0

9 8:

401

41

40

41

8G

louc

este

r C

ourt

Hou

se8

Glo

uces

ter

Cou

rt H

ouse

65

40

12

21

31

00

1

Nee

d be

tter

rout

ing

of b

uses

. Bet

ter

com

mun

icat

ion

betw

een

driv

ers

and

disp

atch

er. A

bilit

y to

em

ail r

eque

st fo

r rid

ers.

Abi

lity

to s

ched

ule

rides

on

a w

eekl

y or

m

onth

ly b

asis

.1

1222

Glo

uces

ter

Cou

nty

2/11

/09

11:0

02

31

21

31

1N

orth

ern

Nec

k R

t. 17

175

11 R

iver

pack

Roa

d, H

ayes

, VA

230

772

11

11

11

11

23

30

112

24G

louc

este

r C

ount

y2

41

22

50

1G

louc

este

r P

oint

2H

ayes

Sho

ppin

g C

ente

r1

33

41

11

12

31

30

112

44G

louc

este

r C

ount

y1

52

21

41

11

13

33

12

42

33

13

01

1246

Glo

uces

ter

Cou

nty

2/11

/09

7:30

26

22

14

01

Hay

es, G

louc

este

r6

Glo

uces

ter

Cou

rt H

ouse

11

12

12

21

10

10

0 B

ette

r co

mm

unic

atio

n be

twee

n dr

iver

s an

d ba

se1

1247

Glo

uces

ter

Cou

nty

2/12

/09

7:15

24

12

15

11

9845

Lin

e F

ence

Roa

d, H

ayes

275

41 Z

anon

i Roa

d, G

louc

este

r2

22

21

11

11

22

44

112

48G

louc

este

r C

ount

y1

21

20

51

1G

louc

este

r P

oint

2G

louc

este

r C

ount

y1

23

32

22

22

32

20

112

49G

louc

este

r C

ount

y2/

11/0

9 6:

401

51

23

51

1G

lass

, VA

2W

al-M

art,

Rt.

17 a

nd C

ourt

Hou

se B

ypas

s1

03

31

12

22

21

31

Impr

ove

sche

dulin

g1

1251

Glo

uces

ter

Cou

nty

26

12

14

31

11

11

11

11

11

01

00

112

52G

louc

este

r C

ount

y2/

11/0

9 9:

002

61

11

41

1D

affo

dil G

arde

n, G

rove

6M

ain

Str

eet,

Glo

uces

ter

61

11

11

11

10

00

0 E

xpan

d th

eir

serv

ices

to w

eeke

nd.

112

54G

louc

este

r C

ount

y2/

9/09

9:0

02

61

32

41

1D

affo

dil G

arde

n, G

rove

8M

ain

Str

eet,

Glo

uces

ter

11

11

11

11

12

20

0 S

atur

day

serv

ice

112

56G

louc

este

r C

ount

y2/

11/0

9 9:

301

32

22

41

2G

louc

este

r V

A2

Wal

ter

Ree

d P

laza

21

11

11

11

10

20

01

1257

Glo

uces

ter

Cou

nty

2/11

/09

9:30

25

23

15

11

Glo

uces

ter

VA

2G

louc

este

r V

A1

33

01

11

10

01

00

112

60G

louc

este

r C

ount

y2

31

10

41

62

Glo

uces

ter

VA

11

11

11

11

11

11

11

1261

Glo

uces

ter

Cou

nty

06

22

24

01

7256

Doe

Driv

e2

Hay

es V

A1

22

01

12

11

00

00

Cro

ss to

Ham

pton

Roa

ds.

112

63G

louc

este

r C

ount

y1

04

12

51

8G

louc

este

r C

ourt

Hou

se2

Abi

ngto

n E

lem

enta

ry S

choo

l6

23

21

11

12

00

00

112

64G

louc

este

r C

ount

y2/

11/0

9 13

:15

21

41

05

11

Glo

uces

ter

VA

2H

ayes

VA

22

32

12

31

21

11

01

1265

Glo

uces

ter

Cou

nty

2/11

/200

91

24

13

41

1H

ospi

tal

2H

ospi

tal

11

11

11

11

12

13

01

1276

Glo

uces

ter

Cou

nty

2/11

/09

8:30

26

22

14

51

Cou

nty

6C

ount

y3

23

31

22

21

11

20

112

77G

louc

este

r C

ount

y2/

11/0

9 8:

302

62

21

40

1C

ount

y8

Cou

nty

63

32

11

21

11

22

01

1278

Glo

uces

ter

Cou

nty

15

22

15

11

Glo

uces

ter

VA

2G

louc

este

r V

A6

22

21

11

11

22

20

112

79G

louc

este

r C

ount

y2/

13/0

9 6:

052

52

21

40

5G

louc

este

r V

A, R

WR

H5

21

12

11

11

11

00

01

1293

Glo

uces

ter

Cou

nty

16

44

44

11

Ced

ar B

ush

Roa

d5

Riv

ersi

de H

ospi

tal

13

33

13

11

23

23

01

1294

Glo

uces

ter

Cou

nty

26

12

54

01

Cou

nty

5H

ospi

tal

61

11

10

11

11

00

01

1295

Glo

uces

ter

Cou

nty

26

23

24

11

4523

Geo

rge

Was

hing

ton

HW

Y1

4523

Geo

rge

Was

hing

ton

HW

Y3

22

21

12

22

21

20

112

96G

louc

este

r C

ount

y2/

11/0

9 9:

352

64

00

41

1F

ire S

tatio

n8

Sen

ior

Cen

ter

12

22

21

21

11

22

01

1297

Glo

uces

ter

Cou

nty

2/11

/200

92

01

21

40

16

Bay

Agi

ng1

11

11

10

10

00

00

112

98G

louc

este

r C

ount

y2/

11/0

9 9:

052

61

22

41

1G

louc

este

r V

A8

Glo

uces

ter

VA

12

32

22

21

21

12

1 E

xpan

d ro

utes

to th

e ot

her

side

of C

olem

an B

ridge

.1

1299

Glo

uces

ter

Cou

nty

26

22

05

18

86

20

00

00

00

10

00

113

00G

louc

este

r C

ount

y2/

11/0

9 8:

402

61

12

41

1G

louc

este

r V

A8

Glo

uces

ter

VA

21

11

11

11

13

43

01

1301

Glo

uces

ter

Cou

nty

26

12

04

11

Hay

es V

A8

Mai

n S

tree

t, G

louc

este

r7

11

11

11

11

00

00

Tim

e as

it is

113

02G

louc

este

r C

ount

y2

61

21

41

1T

inde

rnec

k, G

louc

este

r8

Mai

n S

tree

t, G

louc

este

r1

11

11

11

11

00

00

Goo

d as

is1

1303

Glo

uces

ter

Cou

nty

2/13

/09

8:30

26

12

24

11

Hay

es V

A1

Map

le D

rive,

Glo

uces

ter

12

22

22

22

22

13

1 W

ish

bus

runn

ing

on w

eeke

nds

113

04G

louc

este

r C

ount

y2/

13/0

9 8:

301

61

32

51

14

Map

le D

rive,

Glo

uces

ter

12

22

12

31

21

13

0 W

ish

bus

runn

ing

on w

eeke

nds

and

expa

nd s

ervi

ces

over

Col

eman

Brid

ge1

1305

Glo

uces

ter

Cou

nty

2/18

/200

92

61

01

10

129

49 C

hero

kee

Roa

d8

Glo

uces

ter

VA

61

11

11

11

10

00

01

1306

Glo

uces

ter

Cou

nty

22

42

22

51

3412

Lee

's W

eek

Far

m R

oad

2H

arde

e's

11

33

23

33

20

00

01

1308

Glo

uces

ter

Cou

nty

2/11

/09

6:30

26

21

04

11

248

52 F

letc

her

Roa

d, G

louc

este

r V

A3

11

21

11

11

01

01

Wee

kend

Rid

es1

1309

Glo

uces

ter

Cou

nty

2/11

/09

7:50

26

11

65

11

1184

3 H

arcu

m R

oad,

Glo

uces

ter

VA

6G

louc

este

r V

A1

61

11

11

11

43

30

113

11G

louc

este

r C

ount

y2/

11/0

9 8:

102

62

22

41

151

79 F

letc

her

Roa

d, G

louc

este

r V

A6

Mai

n S

tree

t, G

louc

este

r3

11

00

11

11

00

00

Eve

ryth

ing

is fi

ne1

1313

Glo

uces

ter

Cou

nty

2/11

/09

8:25

26

21

24

11

8964

Dav

enpa

nt R

oad

13

11

11

11

11

00

00

113

14G

louc

este

r C

ount

y2/

11/2

009

26

11

25

11

Rt.

669,

Glo

uces

ter

VA

2G

uine

s C

ircle

Mar

yus,

Glo

uces

ter

51

11

11

11

10

20

01

1315

Glo

uces

ter

Cou

nty

2/12

/09

8:35

16

12

25

11

2425

Isla

nd R

oad,

Glo

uces

ter

8M

ain

Str

eet,

Glo

uces

ter

61

11

11

11

10

00

01

1316

Glo

uces

ter

Cou

nty

26

21

04

11

11

30

00

00

00

00

00

113

17G

louc

este

r C

ount

y2/

11/0

9 9:

002

61

31

52

1C

hest

nut F

ork

Roa

d4

Mai

n S

tree

t, G

louc

este

r1

22

21

11

11

01

00

113

18G

louc

este

r C

ount

y2/

11/0

9 9:

052

62

35

45

10

Cou

nty

61

11

11

11

10

00

0 P

rais

e th

e se

rvic

e1

1319

Glo

uces

ter

Cou

nty

2/12

/09

8:00

16

21

14

41

Glo

uces

ter

VA

1G

louc

este

r V

A1

21

12

22

22

11

11

113

71G

louc

este

r C

ount

y2

64

32

51

1P

rosp

ect R

oad,

Glo

uces

ter

8G

louc

este

r C

ourt

Hou

se6

11

61

12

21

44

44

113

72G

louc

este

r C

ount

y2

61

11

51

1M

ain

Str

eet,

Wes

t Poi

nt8

Glo

uces

ter

Cou

rt H

ouse

61

26

11

22

14

44

41

1373

Glo

uces

ter

Cou

nty

23

11

25

11

Dog

woo

d F

ores

t Driv

e, G

louc

este

r8

Glo

uces

ter

Cou

rt H

ouse

66

26

11

22

14

44

41

1374

Glo

uces

ter

Cou

nty

26

21

15

11

Dra

gon

Driv

e, S

alud

a8

Glo

uces

ter

Cou

rt H

ouse

66

26

11

22

14

44

41

1375

Glo

uces

ter

Cou

nty

16

14

35

11

Hic

kony

For

k R

oad,

Glo

uces

ter

8G

louc

este

r C

ourt

Hou

se6

32

22

22

22

11

22

(C

heap

er b

us fa

re fo

r A

DB

rid

e (p

ay $

1 pr

ivat

ely,

$1.

50 fo

r A

DB

)1

1376

Glo

uces

ter

Cou

nty

16

12

44

11

Cla

y B

ark,

Glo

uces

ter

8G

louc

este

r C

ourt

Hou

se6

21

61

12

21

44

44

112

04G

louc

este

r C

ount

y3/

18/2

009

23

11

35

11

Glo

uces

ter,

VA

8G

louc

este

r, V

A6

22

22

22

22

44

44

112

05G

louc

este

r C

ount

y3/

18/2

009

14

22

15

11

Glo

uces

ter,

VA

8G

louc

este

r, V

A6

22

22

22

22

44

44

112

06G

louc

este

r C

ount

y3/

18/2

009

26

11

15

11

Wes

t Poi

nt8

Glo

uces

ter,

VA

62

22

23

22

24

42

41

1207

Glo

uces

ter

Cou

nty

3/18

/200

92

64

32

51

1G

louc

este

r, V

A8

Glo

uces

ter,

VA

62

22

22

22

24

44

41

1208

Glo

uces

ter

Cou

nty

3/18

/200

91

62

11

51

1G

louc

este

r, V

A8

Glo

uces

ter,

VA

62

22

22

22

24

44

41

1209

Glo

uces

ter

Cou

nty

3/18

/200

92

61

13

51

1G

louc

este

r, V

A8

Glo

uces

ter,

VA

62

22

22

22

24

44

41

1210

Glo

uces

ter

Cou

nty

3/18

/200

92

62

11

51

1S

alud

a, M

iddl

esex

8G

louc

este

r, V

A6

22

22

22

22

44

44

112

11G

louc

este

r C

ount

y3/

18/2

009

16

12

35

11

Glo

uces

ter,

VA

8G

louc

este

r, V

A6

22

22

22

22

44

44

112

12G

louc

este

r C

ount

y3/

18/2

009

26

12

24

11

Glo

uces

ter,

VA

8G

louc

este

r, V

A6

22

22

22

22

44

44

112

19G

louc

este

r C

ount

y2/

12/2

009

24

12

25

11

Glo

uces

ter,

VA

2G

louc

este

r, V

A1

11

11

11

11

31

31

112

53G

louc

este

r C

ount

y2/

16/2

009

26

21

24

15

Hos

pita

l5

Hos

pita

l4

11

11

11

11

01

01

Wee

kend

s1

1254

Glo

uces

ter

Cou

nty

2/13

/09

10:5

02

64

23

41

1G

louc

este

r, V

A5

Glo

uces

ter,

VA

64

44

11

13

62

41

1B

eing

on

Tim

e1

1265

Glo

uces

ter

Cou

nty

3/18

/200

92

62

10

40

1G

louc

este

r, V

A2

Glo

uces

ter,

VA

53

12

21

11

10

10

0W

eek

end

serv

ice

112

66G

louc

este

r C

ount

y3/

18/2

009

26

22

04

11

Glo

uces

ter,

VA

7G

louc

este

r, V

A3

01

00

11

11

00

00

112

67G

louc

este

r C

ount

y3/

18/2

009

26

21

04

01

Glo

uces

ter,

VA

6G

louc

este

r, V

A0

33

33

33

33

01

00

112

68G

louc

este

r C

ount

y3/

18/2

009

26

11

65

11

Glo

uces

ter,

VA

7G

louc

este

r, V

A1

11

11

11

11

01

00

112

69G

louc

este

r C

ount

y3/

18/2

009

16

41

14

11

61

21

22

22

01

12

22

112

70G

louc

este

r C

ount

y3/

18/2

009

16

31

24

01

61

22

22

22

22

40

00

Sat

urda

y S

ervi

ce1

1271

Glo

uces

ter

Cou

nty

3/18

/200

92

61

31

51

1G

louc

este

r, V

A1

Glo

uces

ter,

VA

22

23

22

22

20

00

1S

atur

day

Ser

vice

112

72G

louc

este

r C

ount

y3/

18/2

009

21

22

34

11

Glo

uces

ter,

VA

7G

louc

este

r, V

A1

11

11

11

11

11

11

112

73G

louc

este

r C

ount

y3/

18/2

009

26

22

24

11

Glo

uces

ter,

VA

7G

louc

este

r, V

A3

11

11

11

11

01

00

112

80G

louc

este

r C

ount

y3/

18/2

009

26

14

25

11

Glo

uces

ter,

VA

7G

louc

este

r, V

A1

22

22

22

22

11

11

112

81G

louc

este

r C

ount

y3/

18/2

009

26

03

15

11

Glo

uces

ter,

VA

7G

louc

este

r, V

A6

22

22

22

22

11

11

Page 98: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

112

82G

louc

este

r C

ount

y3/

18/2

009

26

12

14

01

Glo

uces

ter,

VA

1G

louc

este

r, V

A1

12

21

12

11

10

00

Sat

urda

y S

ervi

ce1

1283

Glo

uces

ter

Cou

nty

3/18

/200

90

62

21

41

1G

louc

este

r, V

A6

Glo

uces

ter,

VA

61

11

11

11

11

00

01

1284

Glo

uces

ter

Cou

nty

3/18

/200

91

61

32

51

1G

louc

este

r, V

A8

Glo

uces

ter,

VA

12

22

12

21

12

12

0W

eeke

nd s

ervi

ce1

1285

Glo

uces

ter

Cou

nty

3/18

/200

92

61

26

41

11

11

11

11

11

10

00

01

1287

Glo

uces

ter

Cou

nty

3/18

/200

92

61

22

41

1G

louc

este

r, V

A1

Glo

uces

ter,

VA

13

33

22

22

21

12

0W

eeke

nd s

ervi

ce1

1288

Glo

uces

ter

Cou

nty

3/18

/200

92

61

22

51

1G

louc

este

r, V

A8

12

22

11

11

12

22

0W

eeke

nd s

ervi

ce1

1289

Glo

uces

ter

Cou

nty

3/18

/200

90

00

00

00

00

00

00

00

00

00

00

01

1290

Glo

uces

ter

Cou

nty

3/18

/200

90

00

00

00

00

00

00

00

00

00

00

01

1291

Glo

uces

ter

Cou

nty

3/18

/200

90

00

00

00

00

00

00

00

00

00

00

01

1320

Glo

uces

ter

Cou

nty

3/18

/200

92

62

22

40

1G

louc

este

r, V

A5

Glo

uces

ter,

VA

63

11

11

11

10

10

01

1321

Glo

uces

ter

Cou

nty

3/18

/200

91

61

22

40

1G

louc

este

r, V

A5

Glo

uces

ter,

VA

62

20

11

11

20

10

01

1322

Glo

uces

ter

Cou

nty

3/18

/200

91

21

32

41

1G

louc

este

r, V

A3

Gle

nns

12

36

13

32

22

42

01

1323

Glo

uces

ter

Cou

nty

3/18

/200

91

41

26

51

1G

louc

este

r, V

A2

Glo

uces

ter,

VA

63

22

21

11

11

21

01

1324

Glo

uces

ter

Cou

nty

3/18

/200

92

61

11

51

1G

louc

este

r, V

A2

Glo

uces

ter,

VA

62

12

22

21

21

11

01

1325

Glo

uces

ter

Cou

nty

3/18

/200

92

64

10

41

11

31

00

00

00

01

00

01

1326

Glo

uces

ter

Cou

nty

3/18

/200

92

61

10

42

11

60

23

10

13

11

32

41

1327

Glo

uces

ter

Cou

nty

11

13

13

01

Glo

uces

ter,

VA

3G

louc

este

r, V

A2

32

31

11

11

00

00

113

28G

louc

este

r C

ount

y2

61

03

40

1G

louc

este

r, V

A5

Glo

uces

ter,

VA

61

11

11

11

10

10

01

1329

Glo

uces

ter

Cou

nty

11

12

05

01

Glo

uces

ter,

VA

2G

louc

este

r, V

A6

22

22

22

22

00

00

113

30G

louc

este

r C

ount

y2

41

33

20

1G

louc

este

r, V

A5

Glo

uces

ter,

VA

61

11

11

11

14

14

01

1331

Glo

uces

ter

Cou

nty

25

12

05

01

Glo

uces

ter,

VA

8G

louc

este

r, V

A6

11

11

11

11

11

33

113

32G

louc

este

r C

ount

y1

11

12

31

3G

louc

este

r, V

A1

Glo

uces

ter,

VA

11

11

11

11

11

11

11

1333

Glo

uces

ter

Cou

nty

26

22

04

01

Glo

uces

ter,

VA

5G

louc

este

r, V

A6

11

11

11

11

31

30

113

34G

louc

este

r C

ount

y2

62

20

50

1G

louc

este

r, V

A2

Glo

uces

ter,

VA

12

23

12

21

23

23

01

1335

Glo

uces

ter

Cou

nty

15

14

55

11

Glo

uces

ter,

VA

56

23

32

22

12

32

31

113

36G

louc

este

r C

ount

y3/

19/0

9 10

:50

26

42

34

11

Glo

uces

ter,

VA

5G

louc

este

r, V

A2

33

32

20

12

11

11

Sch

edul

ed T

ime

113

37G

louc

este

r C

ount

y1

42

22

40

12

21

33

11

11

21

12

01

1338

Glo

uces

ter

Cou

nty

25

23

15

11

Glo

uces

ter,

VA

2G

louc

este

r, V

A1

33

01

11

11

21

00

113

39G

louc

este

r C

ount

y3/

19/2

009

25

12

05

01

21

21

11

12

11

21

20

113

40G

louc

este

r C

ount

y3/

18/0

9 8:

151

62

32

40

1G

louc

este

r, V

A6

Glo

uces

ter,

VA

61

02

22

01

14

44

41

1341

Glo

uces

ter

Cou

nty

3/18

/200

92

62

11

45

18

Glo

uces

ter,

VA

30

00

10

10

01

00

01

1342

Glo

uces

ter

Cou

nty

3/18

/200

91

51

41

31

1G

louc

este

r, V

A2

Hay

es V

A1

11

11

11

11

01

00

113

43G

louc

este

r C

ount

y3/

18/2

009

20

32

04

01

Cou

nty

82

01

00

03

00

01

00

113

44G

louc

este

r C

ount

y3/

18/0

9 7:

302

60

11

40

127

29 P

igeo

n H

ill R

oad,

Hay

es, V

A1

Mai

n S

tree

t, G

louc

este

r C

ourt

Hou

se1

02

02

24

22

01

00

113

45G

louc

este

r C

ount

y3/

18/0

9 9:

252

64

36

45

173

80 W

alke

r A

venu

e6

Bay

Agi

ng, M

ain

Str

eet

13

33

22

32

21

13

41

1346

Glo

uces

ter

Cou

nty

3/18

/200

92

61

22

51

270

00 E

lm S

tree

t, H

ayes

8R

oute

17

10

00

00

00

00

00

01

1347

Glo

uces

ter

Cou

nty

3/20

/09

5:45

25

22

14

11

Mai

n S

tree

t5

Ren

tal A

dvan

tage

11

11

11

11

11

32

01

1348

Glo

uces

ter

Cou

nty

3/20

/09

6:15

25

13

25

11

3245

Woo

dsto

ck R

oad,

Glo

uces

ter

VA

2M

ain

Str

eet,

Glo

uces

ter

21

11

11

11

10

24

01

1349

Glo

uces

ter

Cou

nty

3/20

/09

8:20

26

12

12

11

Ark

Roa

d5

Hos

pita

l1

41

11

11

11

11

10

113

50G

louc

este

r C

ount

y3/

20/2

009

14

12

05

16

Wel

lnes

s C

ente

r, G

louc

este

r6

Bow

ling

Alle

y, G

louc

este

r6

33

31

12

12

31

04

113

51G

louc

este

r C

ount

y3/

20/0

9 8:

502

42

20

51

1G

louc

este

r, V

A8

Glo

uces

ter,

VA

12

22

12

22

21

11

01

1352

Glo

uces

ter

Cou

nty

3/20

/200

92

61

20

51

1G

louc

este

r, V

A8

Glo

uces

ter,

VA

12

22

12

21

12

30

31

1353

Glo

uces

ter

Cou

nty

3/20

/200

92

51

24

40

5H

ayes

5C

ount

y3

12

21

22

22

01

00

113

54G

louc

este

r C

ount

y3/

20/2

009

25

13

13

11

2538

Ced

arw

ood

Driv

e, G

louc

este

r5

Hay

es V

A1

22

21

11

11

31

40

113

55G

louc

este

r C

ount

y3/

20/2

009

21

12

12

11

7100

Mar

gare

t Driv

e5

Hay

es M

edic

al C

ente

r1

21

21

11

11

33

30

113

56G

louc

este

r C

ount

y3/

20/2

009

26

23

24

11

Glo

uces

ter,

VA

5G

louc

este

r M

edic

al D

octo

rs B

uild

ing

22

20

11

11

12

23

01

1357

Glo

uces

ter

Cou

nty

3/20

/200

91

31

30

55

0G

louc

este

r P

oint

2G

louc

este

r C

ourt

Hou

se1

11

11

11

11

22

30

113

58G

louc

este

r C

ount

y3/

20/2

009

24

12

25

11

Glo

uces

ter

Brid

ge2

Hay

es S

hopp

ing

Cen

ter

13

25

11

11

12

13

01

1359

Glo

uces

ter

Cou

nty

3/20

/200

92

61

13

40

14

Glo

uces

ter

VA

60

20

22

31

10

00

01

1361

Glo

uces

ter

Cou

nty

3/19

/09

6:50

24

12

25

11

Glo

uces

ter

Vill

age

Sou

th A

part

men

ts2

Glo

uces

ter

Dar

11

11

11

11

11

11

01

1362

Glo

uces

ter

Cou

nty

25

21

14

11

Glo

uces

ter

2T

own

Glo

uces

ter

50

11

11

11

00

00

01

1363

Glo

uces

ter

Cou

nty

12

12

15

11

1635

Tyn

all P

oint

2G

louc

este

r C

ourt

Hou

se1

33

32

32

22

22

10

113

64G

louc

este

r C

ount

y3/

20/2

009

14

11

25

11

Yor

k H

avar

d La

ne, G

louc

este

r2

Glo

uces

ter

VA

11

11

11

11

10

10

01

1370

Glo

uces

ter

Cou

nty

25

22

05

11

2C

ourt

Hou

se6

11

11

13

11

41

40

113

77G

louc

este

r C

ount

y3/

19/2

009

24

12

03

11

Kin

g W

illia

m4

Kin

g W

illia

m1

11

11

11

11

13

20

Pra

ise

the

syst

em1

1378

Glo

uces

ter

Cou

nty

3/20

/09

7:00

12

11

15

01

286

Bel

la T

rea,

Nor

th V

A2

6632

Mai

n S

tree

t , G

louc

este

r V

A6

22

31

12

11

11

10

Exp

and

tran

spor

tatio

n ar

ea1

1379

Glo

uces

ter

Cou

nty

3/20

/09

7:20

15

22

15

01

3334

Map

le K

nol L

ane

266

32 M

ain

Str

eet ,

Glo

uces

ter

VA

62

23

11

21

11

33

41

1447

Mat

hew

s C

ount

y2/

12/0

9 9:

302

21

21

31

1M

obja

ck B

ay2

Glo

uces

ter

Mat

hew

s F

ree

Clin

ic1

22

21

11

11

01

00

Pra

ise

the

serv

ice

114

50M

athe

ws

Cou

nty

26

21

14

11

Riv

ersi

de H

ospi

tal

181

15 B

uckl

ey H

all R

oad,

Hud

gins

VA

11

11

11

11

10

20

0 S

atur

day

serv

ice

114

80M

athe

ws

Cou

nty

2/11

/200

91

31

22

52

1M

athe

ws

VA

2G

oust

er2

11

11

11

11

31

30

114

81M

athe

ws

Cou

nty

2/11

/09

11:4

51

41

23

41

1D

iggs

VA

8G

louc

este

r2

11

11

11

11

11

00

114

82M

athe

ws

Cou

nty

26

10

04

12

Glo

uces

ter

VA

1M

athe

ws

VA

73

23

11

11

21

10

0 F

eel s

afe

now

114

83M

athe

ws

Cou

nty

2/11

/09

15:3

02

11

20

41

8M

athe

ws

VA

1M

athe

ws

VA

11

12

21

11

11

20

4

114

88M

athe

ws

Cou

nty

2/11

/09

15:0

52

22

20

51

2G

louc

este

r S

ubw

ay1

Mat

hew

s V

A5

22

21

12

11

11

31

Whe

n yo

u ha

ve ti

me

to g

et p

icke

d up

why

sho

uld

othe

rs h

ave

to w

ait

beca

use

that

per

son

is n

ot r

eady

.1

1489

Mat

hew

s C

ount

y2/

11/0

9 8:

452

62

21

41

1S

usan

VA

4W

al-M

art

11

11

01

11

10

00

01

1490

Mat

hew

s C

ount

y2/

11/2

009

26

22

12

16

64

20

11

11

10

10

00

114

93M

athe

ws

Cou

nty

2/11

/200

91

61

32

50

6M

athe

ws

VA

2M

athe

ws

VA

23

22

22

21

12

22

01

1495

Mat

hew

s C

ount

y2/

11/2

009

26

22

15

06

Mat

hew

s V

A6

Mat

hew

s C

ourt

Hou

se6

32

22

21

11

12

10

114

96M

athe

ws

Cou

nty

2/11

/200

92

62

11

45

1M

athe

ws

VA

6M

athe

ws

VA

63

33

33

11

22

22

01

1497

Mat

hew

s C

ount

y2/

11/2

009

26

22

11

11

Car

dina

l Are

a R

t. 67

57

Mat

hew

s C

ourt

Hou

se7

22

01

11

11

12

00

Add

at l

east

one

mor

e bu

s in

Mat

hew

s1

1499

Mat

hew

s C

ount

y2/

11/2

009

26

22

34

11

Por

t Hay

woo

d, V

A6

Mak

Cen

ter

01

00

00

00

01

10

01

1501

Mat

hew

s C

ount

y2/

10/0

9 9:

002

22

23

55

2M

athe

ws

VA

2G

louc

este

r V

A5

11

11

11

11

11

11

Nig

ht s

ervi

ce a

vaila

ble?

115

03M

athe

ws

Cou

nty

2/14

/200

92

62

11

41

119

4 S

andb

era

Lane

, Car

dina

l, V

A6

Mat

hew

s C

ount

y S

enio

r C

ente

r1

22

22

22

22

21

30

115

05M

athe

ws

Cou

nty

2/11

/09

8:00

26

12

45

01

Nor

th M

athe

ws

2P

eary

Lan

e2

41

21

11

11

22

22

115

06M

athe

ws

Cou

nty

2/12

/09

7:07

23

12

15

11

Rt.

3, M

athe

ws

VA

2G

louc

este

r V

A6

44

31

11

11

22

30

115

07M

athe

ws

Cou

nty

2/11

/09

7:00

12

12

15

11

Nor

th V

A2

Glo

uces

ter

VA

11

33

11

41

11

13

01

1508

Mat

hew

s C

ount

y2/

11/0

9 6:

451

22

23

54

125

5 C

hape

l Nec

k R

oad

225

5 C

hape

l Nec

k R

oad

11

11

11

11

10

10

01

1509

Mat

hew

s C

ount

y2/

12/0

9 6:

501

61

12

50

11

Boh

anno

n V

A6

10

01

11

11

00

00

Pra

ise

the

serv

ice

115

10M

athe

ws

Cou

nty

2/11

/200

92

42

11

51

1N

orth

VA

2M

athe

ws

Har

dee'

s1

22

22

22

02

11

00

115

11La

ncas

ter

Cou

nty

2/11

/09

5:42

14

21

05

01

Nut

tsvi

lle V

A2

Kilm

arno

ck V

A4

21

22

22

22

22

12

115

12La

ncas

ter

Cou

nty

2/11

/09

5:44

15

23

04

51

Nut

tsvi

lle V

A2

41

11

11

11

13

31

01

1513

Lanc

aste

r C

ount

y2/

11/0

9 6:

002

40

20

51

1O

ttom

on V

A2

Whi

te S

tone

22

22

22

22

20

10

01

1514

Lanc

aste

r C

ount

y2/

11/0

9 6:

112

22

32

51

1M

ollu

sk V

A2

Mos

quito

Poi

nt R

oad,

Whi

te S

tone

23

43

22

22

32

11

01

1515

Lanc

aste

r C

ount

y2/

11/0

9 6:

152

22

33

51

1R

iver

Roa

d, M

ollu

sk V

A2

CM

G L

ivel

y O

ffice

, Liv

ely

VA

13

14

22

21

32

13

1 E

very

one

pays

sam

e ra

te1

1516

Lanc

aste

r C

ount

y2/

11/0

9 8:

232

61

20

40

1La

ncas

ter

VA

6K

ilmar

nock

VA

11

22

11

11

13

33

01

1517

Lanc

aste

r C

ount

y2/

11/2

009

13

32

44

11

Kilm

arno

ck V

A2

Mor

atti

Co

12

22

22

22

21

13

01

1518

Lanc

aste

r C

ount

y2/

11/0

9 7:

531

52

11

51

1La

ncas

ter

VA

5K

ilmar

nock

VA

12

33

11

11

12

11

01

1519

Lanc

aste

r C

ount

y2/

11/0

9 7:

532

52

21

51

1La

ncas

ter

VA

2K

ilmar

nock

VA

12

22

11

11

22

11

01

1520

Lanc

aste

r C

ount

y2/

11/2

009

26

23

21

11

Kilm

arno

ck V

A5

Kilm

arno

ck V

A1

11

11

12

11

21

20

115

21La

ncas

ter

Cou

nty

2/11

/09

9:30

24

21

04

11

Wee

ms

2K

ilmar

nock

VA

12

22

22

22

21

11

01

1522

Lanc

aste

r C

ount

y2/

11/0

9 10

:08

24

21

24

11

Lanc

aste

r V

A2

Irvi

ngto

n V

A1

33

31

11

13

11

10

115

23La

ncas

ter

Cou

nty

2/11

/09

11:0

82

51

11

21

1Li

b-La

nshi

re1

Kilm

arno

ck V

A3

11

11

11

11

11

11

115

24La

ncas

ter

Cou

nty

2/11

/09

11:5

52

34

26

50

128

8 S

choo

l Str

eet

1K

ilmar

nock

VA

11

11

11

11

10

00

01

1541

Lanc

aste

r C

ount

y2/

11/0

9 6:

302

32

13

55

1C

oan

Sta

ge R

oad

213

42 L

ittle

Bay

Roa

d, W

hite

Sto

ne V

A1

11

11

11

11

00

04

115

42La

ncas

ter

Cou

nty

2/11

/09

7:10

11

21

24

11

Prid

e of

Virg

inia

2P

ride

of V

irgin

ia1

21

02

11

11

22

22

115

43La

ncas

ter

Cou

nty

2/11

/09

8:30

26

11

14

11

439

Lum

ber

Lost

Roa

d T

rail

Kilm

arno

ck6

Kilm

arno

ck V

A6

11

21

21

11

22

20

115

44La

ncas

ter

Cou

nty

2/11

/09

10:0

01

61

46

21

1La

ncas

ter

VA

4K

ilmar

nock

VA

31

22

11

11

12

33

01

1545

Lanc

aste

r C

ount

y2/

11/0

9 10

:00

26

12

14

51

Kilm

arno

ck V

A8

Kilm

arno

ck V

A1

22

22

22

11

32

30

115

25La

ncas

ter

Cou

nty

3/18

/09

6:25

24

11

24

11

Mid

dles

ex V

A2

Mid

dles

ex V

A1

11

11

11

11

33

30

115

26La

ncas

ter

Cou

nty

3/18

/200

92

52

31

21

8La

ncas

ter

Cou

nty

5K

ilmar

nock

, Va

61

11

12

11

10

10

01

1527

Lanc

aste

r C

ount

y3/

18/2

009

25

13

23

11

Urb

anna

2M

iddl

esex

VA

11

11

11

11

12

02

01

1528

Lanc

aste

r C

ount

y3/

17/2

009

15

23

14

11

21

33

33

33

33

01

00

115

29La

ncas

ter

Cou

nty

3/18

/200

92

21

22

41

55

Kilm

arno

ck, V

a1

22

01

21

22

11

20

115

30La

ncas

ter

Cou

nty

3/18

/200

92

21

22

31

1K

ilmar

nock

1K

ilmar

nock

13

33

12

31

31

12

01

1531

Lanc

aste

r C

ount

y3/

18/2

009

23

12

45

18

Pilo

t Hou

se2

NN

SB

72

22

11

11

10

10

0N

eed

notif

icat

ion

if 15

min

late

115

32La

ncas

ter

Cou

nty

3/18

/200

92

61

30

21

1M

iddl

esex

VA

4W

alm

art

21

11

11

11

11

10

01

1533

Lanc

aste

r C

ount

y3/

18/2

009

22

22

15

52

2U

rban

na M

arke

t1

33

33

33

33

11

00

115

34La

ncas

ter

Cou

nty

3/18

/200

90

62

11

44

22

71

00

00

00

00

00

01

1535

Lanc

aste

r C

ount

y3/

18/2

009

12

12

45

11

Har

tfiel

d V

A2

13

32

12

11

32

13

01

1536

Lanc

aste

r C

ount

y3/

18/0

9 10

:30

12

22

24

11

Mid

dles

ex V

A2

12

24

12

21

32

12

01

1537

Lanc

aste

r C

ount

y3/

18/2

009

12

23

12

11

Har

tfiel

d V

A8

Del

tavi

lle V

A2

13

31

11

11

11

14

Page 99: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

115

38La

ncas

ter

Cou

nty

3/18

/200

92

62

20

40

01

10

30

00

00

00

00

01

1539

Lanc

aste

r C

ount

y3/

20/0

9 8:

402

32

41

41

1Lo

cust

Hill

,VA

4

Glo

uces

ter,

VA

21

22

11

11

13

13

01

1540

Lanc

aste

r C

ount

y3/

18/2

009

23

13

13

11

Kilm

, VA

3G

louc

este

r, V

A1

12

13

31

11

21

30

redu

ce $

2 fa

re to

$1

115

46La

ncas

ter

Cou

nty

3/18

/09

8:25

26

22

04

01

Mid

dles

ex V

A7

Mid

dles

ex V

A1

11

11

11

11

31

30

115

47La

ncas

ter

Cou

nty

3/18

/09

7:25

26

21

04

01

Mid

dles

ex V

A6

Mid

dles

ex V

A1

11

31

11

11

21

20

115

48La

ncas

ter

Cou

nty

3/18

/09

7:15

16

11

04

51

Mid

dles

ex V

A6

Mid

dles

ex V

A1

11

11

11

11

33

30

115

49La

ncas

ter

Cou

nty

3/18

/200

92

62

10

40

1U

rban

na6

Mid

dles

ex V

A1

21

31

11

11

21

30

115

50La

ncas

ter

Cou

nty

3/18

/200

92

62

20

40

1W

ater

view

6M

iddl

esex

VA

12

23

11

11

12

13

01

1551

Lanc

aste

r C

ount

y3/

18/0

9 8:

302

62

22

31

1U

rban

na7

Mid

dles

ex V

A1

11

11

11

11

12

20

115

52La

ncas

ter

Cou

nty

3/18

/09

7:45

16

21

04

01

drag

on R

un7

Mid

dles

ex V

A5

11

11

11

11

01

00

115

62La

ncas

ter

Cou

nty

3/18

/09

6:18

14

21

25

01

Nor

thum

berla

nd V

A2

Kilm

arno

ck1

22

21

11

11

41

40

115

63La

ncas

ter

Cou

nty

3/18

/09

6:35

23

21

25

01

Nor

thum

berla

nd V

A2

Nor

thum

berla

nd V

A2

22

22

22

22

31

10

Wee

kend

ser

vice

115

64La

ncas

ter

Cou

nty

3/18

/09

7:35

25

13

05

01

Nor

thum

berla

nd V

A2

Lanc

aste

r 2

23

32

22

22

21

10

Wee

kend

ser

vice

115

65La

ncas

ter

Cou

nty

3/18

/09

6:25

15

21

00

01

Nor

thum

berla

nd V

A5

Ric

hmon

d C

ount

y1

11

11

11

11

31

30

Wee

kend

ser

vice

115

66La

ncas

ter

Cou

nty

3/18

/09

8:25

24

22

14

01

Nor

thum

berla

nd V

A2

Ric

hmon

d C

ount

y1

23

62

21

22

01

03

Wee

kend

ser

vice

115

67La

ncas

ter

Cou

nty

3/18

/09

6:15

13

22

05

01

Nor

thum

berla

nd V

A3

Ric

hmon

d C

ount

y2

22

21

11

21

01

00

115

68La

ncas

ter

Cou

nty

3/18

/09

8:00

14

22

15

42

21

21

21

11

21

14

13

115

69La

ncas

ter

Cou

nty

3/20

/200

91

62

10

40

1N

orth

umbe

rland

VA

81

21

11

11

11

33

33

115

70La

ncas

ter

Cou

nty

3/20

/200

92

42

31

40

1N

orth

umbe

rland

VA

2N

orth

umbe

rland

VA

11

11

11

11

13

13

0W

eeke

nd s

ervi

ce1

1578

Lanc

aste

r C

ount

y3/

18/0

9 6:

401

42

21

55

1K

ilmar

nock

2K

ilmar

nock

21

11

11

11

11

11

11

1579

Lanc

aste

r C

ount

y3/

18/0

9 6:

452

51

22

51

1K

ilmar

nock

2K

ilmar

nock

11

22

22

21

10

10

01

1580

Lanc

aste

r C

ount

y3/

18/0

9 7:

102

61

22

41

1La

ncas

ter

Cou

nty

5La

ncas

ter

02

22

22

22

23

23

01

1582

Lanc

aste

r C

ount

y3/

18/0

9 7:

401

12

12

41

2P

ride

of V

irgin

ia2

Whi

te S

tone

11

11

11

11

12

13

01

1583

Lanc

aste

r C

ount

y3/

18/2

009

00

00

00

00

00

00

00

00

00

00

00

115

84La

ncas

ter

Cou

nty

3/18

/09

8:45

26

12

14

46

Kilm

arno

ck6

Kilm

arno

ck6

23

21

22

12

11

10

115

85La

ncas

ter

Cou

nty

3/18

/09

9:30

24

24

05

11

Kilm

arno

ck2

Kilm

arno

ck1

11

11

11

11

11

44

115

86La

ncas

ter

Cou

nty

3/18

/09

9:30

23

12

05

01

Kilm

arno

ck2

Irvi

ngto

n V

A1

10

00

00

00

00

00

115

91La

ncas

ter

Cou

nty

3/18

/09

6:24

22

23

45

11

Mol

lusk

VA

2D

r of

fice

13

14

41

11

22

12

1on

e ra

te fo

r al

l rid

ers

115

92La

ncas

ter

Cou

nty

3/18

/09

7:32

13

32

45

11

Kilm

arno

ck2

Mor

atti

Co

13

33

33

33

31

13

01

1593

Lanc

aste

r C

ount

y3/

18/0

9 6:

212

22

31

51

1M

ollu

sk V

A2

Whi

te S

tone

22

33

21

12

32

11

01

1594

Lanc

aste

r C

ount

y3/

18/0

9 6:

001

52

22

51

1S

enor

a R

d2

Irvi

ngto

n V

A2

23

31

11

11

11

00

115

95La

ncas

ter

Cou

nty

3/18

/09

6:00

24

12

04

11

Lanc

aste

r2

Whi

te S

tone

22

22

22

22

20

10

01

1596

Lanc

aste

r C

ount

y3/

18/0

9 8:

102

52

21

51

2La

ncas

ter

2K

ilmar

nock

VA

12

13

11

11

12

11

0C

hg fa

re b

ack

to $

11

1597

Lanc

aste

r C

ount

y3/

18/0

9 8:

202

32

21

01

1La

ncas

ter

7K

ilmar

nock

VA

11

12

12

11

11

11

01

1598

Lanc

aste

r C

ount

y3/

18/2

009

25

24

25

11

Lanc

aste

r V

A2

Wee

ms

VA

21

11

11

11

10

00

01

1599

Lanc

aste

r C

ount

y3/

18/0

9 8:

322

42

12

41

1La

ncas

ter

VA

7La

ncas

ter

11

11

11

11

10

00

0C

hg fa

re b

ack

to $

11

1600

Lanc

aste

r C

ount

y3/

18/0

9 8:

300

61

26

40

1La

ncas

ter

VA

8K

ilmar

nock

VA

12

22

22

22

20

00

01

1601

Lanc

aste

r C

ount

y3/

18/0

9 9:

522

21

21

31

1W

hite

sto

ne8

Lanc

aste

r 1

11

11

11

11

11

30

116

02La

ncas

ter

Cou

nty

3/18

/09

10:0

82

42

32

41

2La

ncas

ter

VA

2La

ncas

ter

12

33

11

11

20

10

01

1603

Lanc

aste

r C

ount

y3/

18/0

9 10

:50

26

21

14

11

8K

ilmar

nock

VA

13

22

22

22

21

11

01

1604

Lanc

aste

r C

ount

y2

31

20

50

1K

ilmar

nock

VA

1La

ncas

ter

11

11

11

11

10

00

01

1605

Lanc

aste

r C

ount

y1

22

12

41

1K

ilmar

nock

VA

2La

ncas

ter

22

22

22

22

22

12

01

1626

Nor

thum

berla

nd C

ount

y2/

11/0

9 6:

151

51

20

51

1K

ilmar

nock

Was

te W

ater

Pla

nt2

Kilm

arno

ck V

A5

11

11

11

11

01

00

116

27N

orth

umbe

rland

Cou

nty

2/11

/09

6:25

14

21

25

11

Ree

dvill

e 2

Lanc

aste

r 2

11

11

11

11

21

40

116

28N

orth

umbe

rland

Cou

nty

2/11

/09

7:08

26

21

14

11

89 S

choo

l Str

eet,

Kilm

arno

ck V

A2

1621

Qic

Roa

d1

11

11

11

11

00

00

116

29N

orth

umbe

rland

Cou

nty

2/11

/09

7:20

05

13

05

11

Nor

thum

berla

nd V

A7

Soc

ial S

ervi

ces

Nor

thum

berla

nd2

33

31

03

13

32

00

116

30N

orth

umbe

rland

Cou

nty

2/11

/200

90

52

20

43

22

12

30

32

02

21

11

01

1631

Nor

thum

berla

nd C

ount

y2/

11/0

9 8:

402

22

31

41

1N

orth

umbe

rland

VA

2N

orth

umbe

rland

VA

12

00

00

00

00

20

01

1637

Nor

thum

berla

nd C

ount

y2/

11/2

009

15

04

02

11

00

22

21

11

22

21

00

116

38N

orth

umbe

rland

Cou

nty

2/11

/200

91

32

20

44

22

03

33

33

33

32

32

21

1642

Nor

thum

berla

nd C

ount

y2/

12/2

009

22

20

05

11

2C

ount

y5

11

11

11

11

10

00

116

43N

orth

umbe

rland

Cou

nty

2/11

/09

9:15

25

13

15

11

Hea

thsv

ille

2R

eedv

ille

62

22

11

11

12

23

01

1644

Nor

thum

berla

nd C

ount

y2/

11/2

009

24

23

25

12

Foo

d Li

on H

eath

svill

e2

Foo

d Li

on H

eath

svill

e7

33

32

22

22

01

00

116

45N

orth

umbe

rland

Cou

nty

2/11

/200

92

62

20

01

1N

orth

umbe

rland

VA

6G

ame

12

00

00

00

00

00

01

1647

Nor

thum

berla

nd C

ount

y2/

10/0

9 6:

202

42

12

50

2N

orth

umbe

rland

VA

21

22

22

22

22

22

22

116

48N

orth

umbe

rland

Cou

nty

2/11

/09

6:30

14

21

15

11

1154

Che

stnu

t Gro

ve, B

row

nsto

re2

Blu

ff P

oint

Roa

d2

22

21

11

11

41

40

116

49N

orth

umbe

rland

Cou

nty

2/11

/09

6:32

23

24

54

11

Nor

thum

berla

nd V

A2

Kilm

arno

ck V

A2

13

01

13

12

01

00

116

50N

orth

umbe

rland

Cou

nty

2/11

/09

7:48

22

12

14

11

Bur

gess

, Nor

thum

berla

nd8

War

saw

VA

73

12

11

11

21

12

01

1651

Nor

thum

berla

nd C

ount

y2/

11/0

9 7:

481

51

01

54

1B

urge

ss, N

orth

umbe

rland

2B

urge

ss, N

orth

umbe

rland

73

11

12

11

21

12

01

1652

Nor

thum

berla

nd C

ount

y2/

11/0

9 7:

451

42

21

31

1F

olly

Roa

d, H

eath

svill

e V

A8

Hea

thsv

ille

VA

12

22

11

11

23

13

01

1653

Nor

thum

berla

nd C

ount

y2/

11/2

009

24

23

11

11

8B

urge

ss, N

orth

umbe

rland

12

22

22

22

22

11

01

1654

Nor

thum

berla

nd C

ount

y2/

11/2

009

25

21

14

11

Nor

thum

berla

nd V

A2

12

22

22

22

21

11

11

1655

Nor

thum

berla

nd C

ount

y2/

11/0

9 8:

322

42

20

51

1C

alla

o, N

orth

umbe

rland

Apa

rtm

ent

2W

arsa

w, B

uyrit

e1

22

21

11

11

11

30

116

56N

orth

umbe

rland

Cou

nty

2/11

/09

8:32

22

11

14

51

Nor

thum

berla

nd V

A4

Tap

paha

nnoc

k1

12

21

11

11

31

20

116

57N

orth

umbe

rland

Cou

nty

2/11

/09

8:32

26

11

14

11

Nor

thum

berla

nd V

A4

Tap

paha

nnoc

k1

12

21

11

11

31

20

116

58N

orth

umbe

rland

Cou

nty

2/12

/200

92

42

11

51

22

30

00

00

10

01

00

01

1659

Nor

thum

berla

nd C

ount

y2/

11/0

9 8:

571

32

32

51

1V

illag

e B

P H

andy

Sto

re3

War

saw

13

33

11

11

22

13

01

1691

Nor

thum

berla

nd C

ount

y2/

11/0

9 14

:20

24

23

44

11

Lofts

burg

, Nor

thum

berla

nd V

A2

War

saw

, Ric

hmon

d C

ount

y2

11

11

11

11

11

10

116

93N

orth

umbe

rland

Cou

nty

2/11

/200

92

32

00

51

1N

orth

umbe

rland

VA

21

03

02

22

22

11

10

117

41M

iddl

esex

Cou

nty

2/11

/09

6:28

24

11

25

01

Mid

dles

ex V

A2

Mid

dles

ex V

A5

11

11

11

11

11

30

117

42M

iddl

esex

Cou

nty

2/11

/09

6:50

25

23

14

11

Lanc

aste

r V

A5

Kilm

arno

ck V

A1

12

21

22

10

42

20

117

43M

iddl

esex

Cou

nty

2/11

/09

7:00

13

14

35

11

War

e V

A2

Kilm

arno

ck V

A5

11

11

11

11

21

30

117

44M

iddl

esex

Cou

nty

2/11

/09

8:05

16

41

24

01

Mid

dles

ex V

A5

Glo

uces

ter

VA

30

00

00

00

01

00

01

1745

Mid

dles

ex C

ount

y2/

11/0

9 8:

251

52

21

21

1H

artfi

eld

VA

8M

iddl

esex

VA

12

22

12

22

22

23

01

1746

Mid

dles

ex C

ount

y2/

11/0

9 8:

302

52

21

55

22

11

11

11

11

01

11

01

1747

Mid

dles

ex C

ount

y2/

11/0

9 8:

452

32

41

41

14

Rt.

33 /

Rt.

619

22

22

11

11

13

13

0 N

eed

wee

kend

ser

vice

s1

1748

Mid

dles

ex C

ount

y2/

11/0

9 9:

002

23

21

54

22

51

21

23

22

34

00

01

1749

Mid

dles

ex C

ount

y2/

10/2

009

20

22

14

48

87

01

00

00

20

10

00

117

50M

iddl

esex

Cou

nty

2/11

/09

9:30

22

22

25

51

Mid

dles

ex V

A2

Glo

uces

ter

VA

11

11

11

11

14

21

01

1751

Mid

dles

ex C

ount

y2/

11/0

9 10

:35

12

12

45

01

Top

ping

VA

21

13

31

21

11

21

30

117

52M

iddl

esex

Cou

nty

2/10

/200

92

51

22

51

1M

iddl

esex

VA

2D

elta

ville

VA

12

23

11

11

20

10

01

1753

Mid

dles

ex C

ount

y2/

11/0

9 11

:30

16

14

14

14

Del

tavi

lle M

arke

t1

Wee

ms

VA

51

26

11

11

10

00

01

1754

Mid

dles

ex C

ount

y2/

10/0

9 11

:50

15

22

25

11

7237

Geo

rge

Pul

ler

HW

Y4

Tra

star

11

11

11

11

10

00

01

1772

Mid

dles

ex C

ount

y2/

11/0

9 7:

151

61

10

45

1W

are

VA

6M

iddl

esex

VA

11

21

11

11

13

33

01

1773

Mid

dles

ex C

ount

y2/

11/0

9 7:

452

42

10

45

1M

iddl

esex

VA

6M

iddl

esex

VA

11

21

11

11

13

33

31

1774

Mid

dles

ex C

ount

y2/

11/0

9 8:

101

52

10

44

1M

iddl

esex

VA

6M

iddl

esex

VA

41

11

11

11

13

33

31

1778

Mid

dles

ex C

ount

y2/

11/0

9 8:

302

62

12

31

1W

arne

r, M

iddl

esex

6S

alud

a, M

iddl

esex

13

33

33

33

22

32

01

1779

Mid

dles

ex C

ount

y2/

11/0

9 8:

302

62

11

31

1S

alud

a, M

iddl

esex

6S

alud

a, M

iddl

esex

13

33

33

33

12

31

01

1780

Mid

dles

ex C

ount

y2/

11/0

9 8:

002

62

10

44

1M

iddl

esex

VA

6M

iddl

esex

VA

11

21

11

11

13

33

31

1816

Ess

ex C

ount

y2/

11/0

9 6:

102

02

12

55

12

12

33

33

22

22

24

41

1817

Ess

ex C

ount

y2/

11/0

9 6:

432

60

21

11

12

32

00

00

00

00

10

01

1818

Ess

ex C

ount

y2/

11/2

009

26

21

14

11

Ess

ex C

ount

y2

Sho

ppin

g C

ente

r1

22

22

22

22

10

00

118

19E

ssex

Cou

nty

2/11

/09

6:43

26

22

14

11

Ess

ex C

ount

y6

12

00

00

00

01

00

01

1820

Ess

ex C

ount

y2/

11/0

9 7:

002

42

22

51

1E

ssex

Cou

nty

2T

app

VA

12

22

01

21

11

12

41

1821

Ess

ex C

ount

y2/

11/0

9 7:

032

42

43

21

1E

ssex

Cou

nty

5E

ssex

Cou

nty

61

11

11

11

10

00

1 C

ompl

aint

the

disp

atch

ers

118

22E

ssex

Cou

nty

2/11

/09

7:28

25

22

25

11

1955

Bat

tery

Roa

d, E

ssex

2S

outh

side

Hot

el, E

ssex

13

22

23

22

31

11

01

1824

Ess

ex C

ount

y2/

11/0

9 7:

281

54

45

30

36

51

46

34

56

11

23

41

1825

Ess

ex C

ount

y2/

11/0

9 7:

232

62

15

40

18

10

00

00

00

00

00

01

1826

Ess

ex C

ount

y2/

11/0

9 7:

361

61

32

34

1La

nevi

ew V

A4

Tap

paha

nnoc

k2

11

11

11

11

33

00

118

27E

ssex

Cou

nty

2/11

/09

8:36

26

22

12

11

Tap

paha

nnoc

k4

Wal

-Mar

t, T

appa

hann

ock

10

00

00

00

00

00

01

1828

Ess

ex C

ount

y2/

11/0

9 8:

442

42

33

51

129

49 A

shda

le R

oad

2T

ES

31

11

11

11

10

00

01

1829

Ess

ex C

ount

y2/

11/0

9 10

:02

25

22

14

41

4F

ood

Lion

1

03

30

00

00

01

00

118

30E

ssex

Cou

nty

2/11

/09

10:0

62

52

32

21

1T

appa

hann

ock

4W

al-M

art,

Tap

paha

nnoc

k1

11

11

11

11

01

00

118

31E

ssex

Cou

nty

2/11

/09

11:1

72

42

11

40

1B

ehin

d R

acew

ay8

Rig

ht in

Tow

n1

43

31

33

44

23

20

Com

plai

nt th

e di

spat

cher

s1

1832

Ess

ex C

ount

y2/

11/0

9 11

:17

26

23

13

11

1000

C W

inst

on R

oad

4E

ssex

Squ

are

13

13

11

11

21

13

0 C

ompl

aint

the

disp

atch

ers

118

33E

ssex

Cou

nty

2/12

/09

11:5

32

32

11

54

1T

own

2T

own

12

22

22

22

21

11

0 W

eeke

nd R

ides

118

34E

ssex

Cou

nty

2/10

/09

10:3

41

52

23

51

1C

ount

y2

Tow

n3

12

11

11

11

31

30

118

35E

ssex

Cou

nty

2/11

/09

10:0

62

21

11

51

1K

ing

Str

eet

2W

inst

on S

tree

t1

11

11

11

11

21

10

118

36E

ssex

Cou

nty

2/11

/09

10:3

42

42

42

41

1T

appa

hann

ock

Bou

leva

rd8

Tap

paha

nnoc

k B

oule

vard

12

13

11

11

11

10

01

1837

Ess

ex C

ount

y2/

11/0

9 11

:00

16

21

14

11

1000

H W

inst

on R

oad

8T

appa

hann

ock

VA

12

22

12

21

22

32

01

1857

Ess

ex C

ount

y2/

11/0

9 6:

091

51

12

51

114

52 E

ssex

Mill

Roa

d2

780

Ber

ryhi

ll R

oad

51

11

11

11

10

10

01

1858

Ess

ex C

ount

y2/

11/0

9 6:

140

00

00

00

00

00

00

00

00

00

00

0

Page 100: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

118

59E

ssex

Cou

nty

2/11

/09

6:23

00

00

00

00

00

00

00

00

00

00

00

118

60E

ssex

Cou

nty

16

22

14

11

Tap

paha

nnoc

k V

A5

Tap

paha

nnoc

k V

A6

11

11

11

11

33

33

118

61E

ssex

Cou

nty

2/11

/09

7:10

25

24

24

11

1036

Tow

nhou

se D

rive,

Ess

ex C

ount

y2

Wal

-Mar

t, E

ssex

Cou

nty

13

22

12

21

12

12

01

1862

Ess

ex C

ount

y2/

11/0

9 7:

102

22

20

41

1C

ount

y2

12

22

22

22

12

22

21

1863

Ess

ex C

ount

y1

32

21

55

82

11

11

11

11

10

00

01

1864

Ess

ex C

ount

y2/

11/0

9 7:

102

32

21

41

3T

appa

hann

ock

VA

3T

appa

hann

ock

VA

11

12

11

11

11

11

11

1865

Ess

ex C

ount

y2

52

01

51

22

11

11

11

11

11

11

11

1866

Ess

ex C

ount

y2

62

21

54

1T

appa

hann

ock

VA

2T

appa

hann

ock

VA

11

11

11

11

10

00

01

1867

Ess

ex C

ount

y2/

11/0

9 7:

351

42

11

45

17

War

saw

12

23

11

11

10

10

01

1868

Ess

ex C

ount

y2/

11/0

9 8:

001

52

22

51

1K

ing

and

Que

en C

ount

y2

Tap

paha

nnoc

k V

A6

12

22

22

11

12

24

118

69E

ssex

Cou

nty

2/11

/09

8:10

24

21

14

15

Hos

pita

l1

Ess

ex M

oble

Hom

e T

raile

r P

ark

11

11

11

11

12

13

41

1870

Ess

ex C

ount

y0

00

00

00

00

00

00

00

00

00

00

01

1871

Ess

ex C

ount

y2/

11/0

9 9:

102

62

26

55

11

Cou

nty

11

11

11

11

00

00

01

1872

Ess

ex C

ount

y2/

11/0

9 9:

422

60

10

30

1C

ount

y8

Cou

nty

31

11

11

11

11

11

11

1873

Ess

ex C

ount

y2/

11/2

009

12

22

35

51

Dun

nsvi

lle2

Tap

paha

nnoc

k V

A7

11

31

11

11

31

30

118

74E

ssex

Cou

nty

2/11

/09

10:3

51

22

21

45

12

31

11

11

66

61

11

11

1875

Ess

ex C

ount

y2/

11/0

9 12

:35

23

10

01

11

Sun

ny S

ide

Roa

d5

Tap

paha

nnoc

k V

A1

11

11

11

11

11

10

118

76E

ssex

Cou

nty

15

11

04

11

Ess

ex C

ount

y4

Tap

paha

nnoc

k V

A3

22

22

22

22

02

00

119

19E

ssex

Cou

nty

2/11

/09

14:3

41

31

23

51

1T

appa

hann

ock

VA

2T

appa

hann

ock

VA

11

11

11

11

12

12

01

1920

Ess

ex C

ount

y2/

11/0

9 15

:05

24

21

34

11

2T

appa

hann

ock

VA

11

00

00

00

00

00

11

1921

Ess

ex C

ount

y2/

11/0

9 15

:00

11

10

05

13

Tap

paha

nnoc

k S

enio

r A

cade

my

8O

mal

ly T

imbe

r P

rodu

cts

71

11

11

11

13

31

1 O

pen

clos

ed r

oute

s1

1922

Ess

ex C

ount

y2/

11/0

9 15

:24

14

22

25

12

Tap

paha

nnoc

k V

A1

Kin

g an

d Q

ueen

Cou

nty

11

21

01

11

01

21

11

1923

Ess

ex C

ount

y2/

11/0

9 15

:55

15

22

24

11

Kin

g W

illia

ms

5T

appa

hann

ock

Dia

lyis

32

22

11

11

13

33

01

1966

Wes

tmor

elan

d C

ount

y2/

11/0

9 6:

451

12

12

51

1M

ontr

oss,

Wes

tmor

elan

d2

Mon

tros

s, W

estm

orel

and

11

11

11

11

10

00

0 P

ick

us u

p w

here

they

dro

p us

off

at1

1967

Wes

tmor

elan

d C

ount

y2/

11/0

9 7:

001

12

12

51

1M

ontr

oss,

Wes

tmor

elan

d2

Mon

tros

s, W

estm

orel

and

11

12

12

11

23

23

0 P

ick

up in

the

afte

rnoo

n w

here

I ge

t off

at p

each

grov

e1

1968

Wes

tmor

elan

d C

ount

y2/

11/0

9 7:

301

12

22

51

13

13

53

11

32

34

02

11

1969

Wes

tmor

elan

d C

ount

y2/

11/0

9 7:

502

42

21

41

1Je

rusa

lem

Bap

tist C

hurc

h3

Rap

p. C

omm

. Col

lege

, War

saw

11

11

11

11

10

10

0 M

ore

buse

s1

1970

Wes

tmor

elan

d C

ount

y2/

11/0

9 8:

002

32

21

54

2W

estm

orel

and

2W

estm

orel

and

32

22

22

22

21

11

11

1971

Wes

tmor

elan

d C

ount

y2/

11/0

9 8:

302

52

11

23

1W

estm

orel

and

8W

estm

orel

and

72

22

22

22

21

11

11

1972

Wes

tmor

elan

d C

ount

y2/

11/2

009

26

21

12

41

Wes

tmor

elan

d C

ount

y8

10

10

00

00

00

00

21

1973

Wes

tmor

elan

d C

ount

y2/

11/2

009

11

03

33

01

81

11

11

11

11

22

22

119

74W

estm

orel

and

Cou

nty

2/12

/09

9:00

16

11

24

11

Mon

tros

s, W

estm

orel

and

5W

arsa

w6

12

21

21

11

33

30

119

75W

estm

orel

and

Cou

nty

2/11

/200

90

64

14

45

1M

ontr

oss,

Wes

tmor

elan

d8

War

saw

31

11

11

11

12

22

21

1976

Wes

tmor

elan

d C

ount

y2/

11/2

009

16

22

14

11

Kin

sale

, Wes

tmor

elan

d5

War

saw

50

20

11

21

12

33

01

1977

Wes

tmor

elan

d C

ount

y2/

11/2

009

16

24

44

11

2924

MT

. Hol

ly R

oad

5W

arsa

w D

ial

61

11

11

21

12

12

01

1978

Wes

tmor

elan

d C

ount

y2/

11/0

9 10

:40

25

23

24

15

DC

A -

War

saw

VA

1H

ague

, VA

62

22

11

11

12

23

01

1992

Wes

tmor

elan

d C

ount

y2/

11/2

009

23

21

15

18

Wes

tmor

elan

d C

ount

y1

Wes

tmor

elan

d C

ount

y3

11

11

11

11

11

11

120

41R

ichm

ond

Cou

nty

2/11

/09

7:20

13

22

04

11

Far

nham

, Ric

hmon

d8

Rt.

31

43

41

32

22

12

20

Mor

e fr

eque

nt d

rop-

off a

nd p

ick-

up in

the

area

120

42R

ichm

ond

Cou

nty

00

00

00

00

00

00

00

00

00

00

00

120

43R

ichm

ond

Cou

nty

2/11

/09

6:17

26

21

25

11

New

land

Roa

d, W

arsa

w2

War

saw

13

33

13

33

21

14

01

2044

Ric

hmon

d C

ount

y2/

11/0

9 6:

171

42

11

51

1R

ichm

ond

Cou

nty

2T

appa

hann

ock

VA

11

11

11

11

10

10

01

2045

Ric

hmon

d C

ount

y2/

11/2

009

14

22

45

32

2T

appa

hann

ock

VA

41

11

11

11

11

11

11

2046

Ric

hmon

d C

ount

y2/

11/0

9 6:

442

24

24

31

1W

arsa

w2

War

saw

11

11

11

11

12

31

01

2047

Ric

hmon

d C

ount

y2/

11/0

9 7:

002

51

34

51

134

47 R

ichm

ond

Roa

d, W

arsa

w2

Wal

-Mar

t Tap

paha

nnoc

k1

11

21

11

11

21

30

120

48R

ichm

ond

Cou

nty

2/11

/09

7:09

25

21

15

11

Tap

paha

nnoc

k V

A2

Ric

hmon

d C

ount

y7

11

11

11

11

33

30

120

49R

ichm

ond

Cou

nty

2/11

/09

7:32

11

22

15

11

1036

Tow

nhou

se D

rive,

Ess

ex C

ount

y3

War

saw

11

21

11

21

12

12

01

2050

Ric

hmon

d C

ount

y2/

11/0

9 8:

102

42

21

12

1F

arnh

am, R

ichm

ond

4W

arsa

w2

12

32

33

23

33

33

120

51R

ichm

ond

Cou

nty

2/11

/09

8:30

26

21

24

58

Ric

hmon

d C

ount

y8

121

Jone

s La

ne, R

ichm

ond

70

00

00

00

10

00

11

2052

Ric

hmon

d C

ount

y2/

11/0

9 8:

452

62

11

41

1R

ichm

ond

Cou

nty

8R

ichm

ond

Cou

nty

32

22

02

22

22

22

01

2053

Ric

hmon

d C

ount

y2/

11/0

9 9:

002

52

44

51

1W

arsa

w2

Hay

nesv

ille,

Ric

hmon

d1

11

11

11

11

11

33

120

54R

ichm

ond

Cou

nty

2/11

/09

9:50

26

13

21

11

77 F

reed

om W

ay, W

arsa

w4

War

saw

21

11

11

11

13

33

31

2055

Ric

hmon

d C

ount

y2/

11/0

9 10

:05

23

21

14

11

Jone

s La

ne, R

ichm

ond

547

09 W

arsa

w, R

ichm

ond

Cou

nty

13

22

11

11

11

12

1 K

eep

up th

e go

od w

ork

120

56R

ichm

ond

Cou

nty

2/11

/09

10:3

02

61

11

41

1N

orth

umbe

rland

VA

4T

appa

hann

ock

VA

11

11

11

11

12

12

01

2057

Ric

hmon

d C

ount

y2/

11/0

9 10

:30

22

11

14

51

Nor

thum

berla

nd V

A4

Tap

paha

nnoc

k V

A1

11

11

11

11

21

20

120

58R

ichm

ond

Cou

nty

2/11

/09

10:3

02

41

31

21

15

Ric

hmon

d C

ount

y1

33

33

33

33

44

44

120

59R

ichm

ond

Cou

nty

2/11

/09

10:4

51

62

22

41

5W

arsa

w1

993

Con

ly P

ond

Roa

d3

11

11

11

11

33

33

120

60R

ichm

ond

Cou

nty

2/11

/09

10:4

52

62

11

41

5F

arnh

am, R

ichm

ond

1F

arnh

am, R

ichm

ond

11

11

11

11

13

33

31

2061

Ric

hmon

d C

ount

y2/

11/0

9 10

:45

21

23

04

11

War

saw

3R

CC

12

32

11

32

22

13

01

2062

Ric

hmon

d C

ount

y2/

11/0

9 12

:00

16

21

14

15

War

saw

1T

appa

hann

ock

VA

11

11

11

11

13

33

31

2072

Ric

hmon

d C

ount

y2/

11/0

9 14

:30

16

21

12

11

2321

Cop

le H

ighw

ay, M

ontr

oss

123

21 C

ople

Hig

hway

, Mon

tros

s1

22

22

22

21

11

10

120

74R

ichm

ond

Cou

nty

2/11

/09

15:1

01

22

41

51

2W

arsa

w V

illag

e S

hopp

ing

Cen

ter

1T

hree

way

, Ric

hmon

d C

ount

y1

12

11

11

11

21

30

120

75R

ichm

ond

Cou

nty

00

00

00

00

00

00

00

00

00

00

00

120

76R

ichm

ond

Cou

nty

2/11

/09

15:3

02

22

21

41

22

War

saw

13

42

22

11

10

00

0 R

un o

n w

eeke

nds

120

77R

ichm

ond

Cou

nty

2/11

/200

92

21

21

41

185

69 H

isto

ryla

nd H

WY

, War

saw

244

4 W

ater

Lan

e, T

appa

hann

ock

11

22

12

21

13

34

01

2078

Ric

hmon

d C

ount

y2/

11/2

009

11

22

14

11

Ess

ex C

ount

y1

11

11

11

11

12

30

01

2079

Ric

hmon

d C

ount

y2/

11/2

009

12

22

14

13

Tap

paha

nnoc

k V

A1

Tap

paha

nnoc

k V

A1

11

11

11

11

23

44

121

16T

own

of C

olon

ial B

each

2/11

/09

8:40

15

22

44

51

12th

Str

eet a

nd R

t. 20

54

Col

onia

l Bea

ch1

11

11

11

11

01

00

121

17T

own

of C

olon

ial B

each

2/11

/09

9:35

26

12

25

51

Livi

ngst

ove

Str

eet

5C

olon

ial P

laza

Sho

ppin

g C

ente

r1

11

11

11

11

31

33

121

18T

own

of C

olon

ial B

each

2/11

/09

10:5

22

61

43

44

14

Sho

ppin

g C

ente

r2

11

11

11

11

01

00

121

19T

own

of C

olon

ial B

each

2/11

/09

10:1

52

61

41

45

1Lo

ssin

g A

venu

e4

Sho

ppin

g C

ente

r- C

olon

ial B

each

11

21

21

21

10

13

01

2120

Tow

n of

Col

onia

l Bea

ch2/

11/0

9 10

:15

20

10

04

51

Ban

crof

t Ave

nue

4C

olon

ial B

each

Gat

e1

12

21

11

11

11

30

121

21T

own

of C

olon

ial B

each

2/11

/09

12:0

72

64

11

40

1B

ay A

ging

at C

olon

ial B

each

4B

each

Gat

e R

ite A

id3

11

11

11

11

01

30

121

22T

own

of C

olon

ial B

each

2/11

/09

12:5

32

52

01

54

1C

olon

ial B

each

11

11

11

11

11

01

30

121

23T

own

of C

olon

ial B

each

2/11

/09

12:5

32

12

11

23

1C

olon

ial B

each

11

11

11

11

11

00

30

121

40T

own

of C

olon

ial B

each

2/12

/09

8:30

26

12

24

51

1107

Dav

is S

tree

t, C

olon

ial B

each

5N

W H

ospi

tal

31

11

11

11

13

13

01

2141

Tow

n of

Col

onia

l Bea

ch2/

12/0

9 8:

232

62

11

44

14

61

00

00

00

00

10

01

2142

Tow

n of

Col

onia

l Bea

ch3/

18/0

9 8:

302

41

36

45

1C

olon

ial B

each

6C

olon

ial B

each

& F

redr

icks

burg

21

11

11

11

13

23

1E

veni

ng h

ours

1-2

times

a w

k1

2143

Tow

n of

Col

onia

l Bea

ch3/

18/0

9 8:

301

51

36

45

1C

olon

ial B

each

6C

olon

ial B

each

21

11

11

11

13

23

2P

m h

ours

121

45T

own

of C

olon

ial B

each

3/18

/09

9:30

23

13

61

18

24 H

awth

orn

4F

ood

Lion

, Bau

k2

11

11

11

11

11

10

121

48T

own

of C

olon

ial B

each

3/18

/09

8:30

26

12

52

11

Tap

paho

nnoc

k V

A1

Tap

paha

nnoc

k V

A6

22

22

23

22

22

10

Ser

vice

to P

otom

ac M

ills

121

49T

own

of C

olon

ial B

each

3/18

/09

8:30

25

13

52

11

War

saw

, Ric

hmon

d C

o.2

War

saw

52

22

22

32

22

21

0p/

u at

War

saw

for

Pot

Mill

s1

2150

Tow

n of

Col

onia

l Bea

ch2/

18/0

9 8:

302

61

22

23

4P

otom

ac M

ills

,Prin

ce W

m C

o4

Pot

omac

Mill

s, P

rince

Wm

Co

21

11

11

11

13

33

31

2151

Tow

n of

Col

onia

l Bea

ch2

60

00

23

14

21

11

11

11

10

00

0re

plac

e th

e bi

g bu

s1

2152

Tow

n of

Col

onia

l Bea

ch3/

18/0

9 8:

302

52

24

11

1F

irst S

tree

t, C

olon

ial B

each

VA

4P

otom

ac M

ills,

Dal

e C

ity V

A3

22

22

21

22

01

10

121

53T

own

of C

olon

ial B

each

3/18

/09

8:30

25

22

02

34

War

saw

1W

arsa

w R

ichm

ond

Cou

nty

32

22

22

21

21

00

01

2154

Tow

n of

Col

onia

l Bea

ch3/

18/0

9 8:

302

62

20

21

41

Col

onia

l Bea

ch3

22

21

22

12

10

00

121

55T

own

of C

olon

ial B

each

3/19

/09

8:20

26

02

25

11

409

Livi

ngst

ion

Str

eet

41

11

11

11

11

00

00

121

56T

own

of C

olon

ial B

each

3/19

/09

8:30

16

01

01

07

Bay

Tra

nsit

Offi

ce8

Rt 3

70

10

11

11

10

13

01

2158

Tow

n of

Col

onia

l Bea

ch3/

19/0

9 8:

152

51

36

11

8C

olon

ial A

venu

e4

Sho

ppin

g C

ente

r3

11

11

11

00

01

00

121

60T

own

of C

olon

ial B

each

3/19

/09

8:10

26

12

24

41

1107

Dav

is S

tree

t, C

olon

ial B

each

4C

entr

al P

ark

31

11

11

11

13

13

01

2161

Dah

lgre

n2/

11/0

9 5:

502

52

24

51

8C

olon

ial B

each

2D

ahlg

ren

31

11

11

11

10

00

0 P

ick

up in

Oak

Gro

ve1

2162

Dah

lgre

n2/

11/0

9 6:

012

21

34

51

1C

olon

ial B

each

2D

ahlg

ren

52

23

11

21

20

00

0 P

rais

e th

e se

rvic

e1

2163

Dah

lgre

n2/

11/0

9 6:

401

22

20

44

195

6 B

ryan

t Driv

e2

Wal

-Mar

t1

12

11

11

11

00

00

121

64D

ahlg

ren

2/11

/09

6:05

25

22

55

11

306

3rd

Str

eet,

Col

onia

l Bea

ch2

NS

WC

FC

U D

ahlg

ren

30

10

11

41

10

00

0 N

ewer

impr

oved

bus

es to

rid

e1

2165

Dah

lgre

n2/

11/0

9 6:

122

42

24

55

1C

olon

ial B

each

2D

ahlg

ren

11

11

11

21

12

20

01

2166

Dah

lgre

n2/

11/0

9 6:

051

12

10

51

130

6 3r

d S

tree

t, C

olon

ial B

each

8D

ahlg

ren

10

10

31

41

10

00

0 B

ette

r bu

ses

121

67D

ahlg

ren

3/19

/09

5:50

25

21

05

18

Col

onia

l Bea

ch2

Dah

lgre

n3

02

01

11

11

00

00

121

68D

ahlg

ren

3/19

/09

6:10

23

21

15

41

Col

onia

l Bea

ch2

Dah

lgre

n2

11

11

11

11

11

11

121

69D

ahlg

ren

3/19

/09

6:05

22

13

45

11

Ban

crof

t Ave

nue

2D

ahlg

ren

51

22

11

21

13

33

3S

eat C

lean

ing

121

70D

ahlg

ren

3/19

/09

6:05

13

13

45

11

Sec

ond

Str

eet,

Col

onia

l Bea

ch2

Dah

lgre

n1

11

21

23

11

00

00

121

71D

ahlg

ren

3/19

/09

6:30

16

14

65

51

3 A

zale

a R

oad,

Col

onia

l Bea

ch V

A2

NS

WC

Nav

al B

ase,

Dah

lgre

n3

11

11

11

11

33

33

121

72D

ahlg

ren

3/19

/09

6:10

25

22

55

11

306

Thi

rd S

tree

t, C

olon

ial B

each

2N

SW

C N

aval

Bas

e, D

ahlg

ren

31

11

31

11

13

33

01

2173

Dah

lgre

n3/

19/0

9 6:

102

42

23

55

1C

olon

ial B

each

2D

ahlg

ren

11

11

11

11

13

33

01

2174

Dah

lgre

n3/

19/0

9 5:

502

42

24

51

2C

olon

ial B

each

2D

ahlg

ren

42

22

12

20

12

22

0N

ew B

uses

, veh

icle

s ar

e ol

d

Page 101: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit    October 2009 Transit Development Plan:  FY 10‐15                F‐ 1 

AAPPPPEENNDDIIXX  FF..  

BBAAYY  TTRRAANNSSIITT  SSTTAAFFFF  AANNDD  SSTTAAKKEEHHOOLLDDEERRSS  MMEEEETTIINNGG    Interviews with Bay  Transit  staff  and  stakeholders were held on March  12,  2009  at  the Bay Transit office in Urbanna, Virginia.    Agenda  

PROJECT STAKEHOLDERS MEETING AGENDA

Bay Transit Urbanna, Virginia

March 12, 2009

10:00 AM

1. Self Introduction of Attendees

2. Overview of Transit Development Program (TDP) Process

3. Review of Project Scope of Work Elements

4. Summary of Initial Findings

a. Transit system service and operating characteristics and history b. Service area demographic and travel characteristics c. Transit agency interaction with other public and private organizations

5. Stakeholder Perspectives on:

a. Project specific issues and concerns b. Potential system goals, objectives, and service standards c. Desired outcomes of the project

6. Next Steps in Study Process

7. Potential Next Meeting Date(s)

8. Adjourn

LUNCH SERVED

   

Page 102: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit    October 2009 Transit Development Plan:  FY 10‐15                F‐ 2 

Attendees  

Attendee  Organization 

Christina Greene  Charles City County 

Trish King  Colonial Beach 

David Whitlow  Essex County 

Georgette Hurley  Gloucester County 

Frank Pleva  King William County 

William Pennell  Lancaster County 

John Shaw  Mathews County 

Marcia Jones  Middlesex County 

Kelli Le Duc  New Kent 

Vonnie Reynolds  NNPDC 

Luttrell Tadlock  Northumberland County 

Trent Funkhouser  West Point 

Russ Culver  Westmoreland County 

Allyn Gemerek  Bay Aging 

Cle Johnson  Bay Transit Southern Division 

Darrel Feasel  DRPT 

Lenea England  Bay Transit 

Melissa Phillips  Bay Transit 

Pat Sanders  Bay Transit Northern Division 

Lewis Grimm  PBS&J 

Kevin Chiang  PBS&J 

 Session Notes  Following  self  introductions,  Lewis  Grimm  provided  an  overview  of  the  TDP  process  and  a summary of the initial findings from the on‐board ridership surveys conducted by Bay Transit in February 2009.   The following is a summary of comments and discussion items:   Financials 

Darrel Feasel indicated that funding is an issue for each transit system in Virginia; however, DRPT  has matched  the maximum  funding  available  to  Bay  Transit  for  the  last  couple  of years.  

 

Darrel Feasel had a question about the FY 2007 Contract Revenues that were shown in the presentation  slide of Revenues  and Operating Assistance.    The  FY 2007  revenue number seems considerably lower than the revenue numbers in FY 2006 and FY 2008.   

  

Page 103: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit    October 2009 Transit Development Plan:  FY 10‐15                F‐ 3 

Darrel Feasel described the sources of funding for transit systems in Virginia.  In general, the federal  government  contributes  50  percent,  the  state  government  contributes  25  to  30 percent, and the local government contributes 20 to 25 percent of the cost. 

 

Darrel  Feasel mentioned  that  the  Stimulus  Funding  for  DRPT  will  be  used  to  purchase replacement buses. 

 

Representatives  suggested  the  following  uses  for Bay  Transit  Stimulus  Funding: maintain current  fare  structure;  explore  the  potential  for  commuter  rail;  add  more  buses  in Westmoreland  County;  provide  additional  driver  training;  expand  services  in  the  tourist attraction areas; build biking trails; and reroute buses to cover more of the service area. 

 Security 

Lenea  England  suggested  that  for  security  purposes,  Bay  Transit  should  install  video recording systems in their vehicles. 

 

Darrel Feasel explained that there are a  limited number of bus security  incidents reported to DRPT.  He could only recall one specific incident.  

 

In general, surveillance cameras are  installed to provide additional evidence regarding any potential disagreements or altercations that could occur on buses.  

 

Driver training  is very  important.   In an emergency situation, the driver should contact the dispatcher and call 911 immediately.  

   Services 

Trish King mentioned  that  there were demands  for  transit service  from Colonial Beach  to Montross, but it was discussed that the services cannot be provided by Bay Transit. 

 

Westmoreland  County,  the  second  biggest  county  in  Northern  Neck,  only  has  one  Bay Transit vehicle.  

 

Colonial Beach provides some of their own transit bus service; however, Ms. King expressed a willingness to cooperate with Bay Transit of Westmoreland to work out a plan to provide transit service between the jurisdictions.   

 

The County board members asked about the buses with empty seats running in the middle of  the  day.    Bay  Transit  staff  responded  that  they  need  the  capacity  (number  of  seats) provided  by  those  vehicles  to meet  the  AM  and  PM  peak  demands.    These  same  size vehicles are thus running empty in the middle of the day as the demand is lower. 

 

Page 104: BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS … · BAY TRANSIT TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2010 – 2015 Prepared for: Prepared by: Under contract to: ... Bay Transit

Bay Transit    October 2009 Transit Development Plan:  FY 10‐15                F‐ 4 

Darrel Feasel mentioned that  if Bay Transit thought that fixed‐route service for some “hot spots”  should  be  provided,  then  it  should  be  indicated  in  the  TDP  as  a  potential improvement if funding is available for its implementation. 

 

Some private business owners  are willing  to  subsidize  the operating  cost  for Bay  Transit fixed‐route services if the route serves their location. 

 

One representative suggested that we should gather the opinions of residents who do not currently use the transit system.  This information would help to determine their willingness to use transit services if the transit system could be designed to fit their needs. 

 

One  representative  mentioned  that  the  connection  to  another  transit  system  is  an important need for their system. 

 

Bay Transit staff mentioned that a reduction in county funding contributions would result in a reduction of services provided by Bay Transit. 

 

The potential was considered  for service expansion to Newport News or Richmond  in  five years.    There  are  residents  in  the  Bay  Transit  service  area  that  currently  commute  to Richmond. 

 

One representative asked how gas prices are affecting the Bay Transit operation.   

One  representative  suggested  that  DRPT  should  encourage  carpool,  vanpool,  and  other transportation programs to increase the usage of the public transit systems. 

 

Darrel Feasel asked the consultant staff to  identify the boundaries of the TDP study areas with  regard  to  the different planning agencies  (MPO and US Census).   This delineation  is important to clarify the transit system funding sources.   

 

Bay Transit hopes to expand their services to include fixed‐route services.