bbs 2216 - installation instruction
DESCRIPTION
BBS 2216 - Installation InstructionTRANSCRIPT
-
Ericssonwide InternalINSTALLATION INSTR. 1 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
Connecting BBS 2216 to RBS 2216
RBS Site Solution
Copyright
Ericsson AB 2006 All Rights Reserved
Disclaimer
No part of this document may be reproduced in any form without the writtenpermission of the copyright owner.
The contents of this document are subject to revision without notice due tocontinued progress in methodology, design and manufacturing. Ericsson shallhave no liability for any error or damage of any kind resulting from the useof this document.
Contents Page
1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21.1 Documentation .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21.2 Tools .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2 Preparations .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
3 Connecting the Battery Power Cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
4 Connecting the Communication Link Cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
5 Connecting the External Alarm Cable .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
6 Connecting the Transmission Cables (Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . 137 Concluding Routines .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147.1 Powering up the RBS ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
A4 XSEIF R4
-
Ericssonwide InternalINSTALLATION INSTR. 2 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
1 Introduction
This document describes how to connect Battery Backup System (BBS) 2216to the RBS 2216.
1.1 Documentation
Ensure that the following documents have been read and understood:
Personal Health and Safety Information, 124 46-2885
System Safety Information, 124 46-2886
RBS Installation Instructions, 2/1531-LZA 701 0001
BBS 2216 Installation Instructions, 190 08-EN/LZT 751 0056
DF-OVP Installation Instructions, 190 08-EN/LZT 0040
1.2 Tools
Table 1 Tools Required
Product Description Product NumberTool set Maintenance tool set LTT 601 137/1Tool set 0.54 Nm torque set, which
includes 8 mm open-endedhead for SMA connectors
LTT 601 145/1
2 Preparations
This section describes what to do before starting to connect the power cableand the communication link cable.
To unlock and open the door, do the following:
1. Use the key to unlock the handles on both sides of the RBS.
2. Turn the left-hand handle clockwise while turning the right-hand handleanti-clockwise.
3. Lift and detach the cabinet cover, as shown in the figure below.
-
Ericssonwide InternalINSTALLATION INSTR. 3 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
1234P015907A
Figure 1 Cabinet Cover Detachment
4. Connect the Electrostatic Discharge (ESD) wrist strap to the earthgrounding point of the RBS.
-
Ericssonwide InternalINSTALLATION INSTR. 4 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
P015911B
Earth grounding point
3M
Figure 2 ESD Wrist Strap Connection Points
5. Switch off all Internal Distribution Module (IDM) circuit breakers.6. Unlock and detach the BBS cover in the same way as the RBS cover
was detached.
7.
-
Ericssonwide InternalINSTALLATION INSTR. 5 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
Connect the ESD wrist strap to theearth grounding point of the BBS.
P016665A
Earth grounding point
3M
8. Switch off the main switch of the BBS.
9. Switch off the power to the RBS.
3 Connecting the Battery Power Cable
This section describes how to connect Battery Power Cable from the BatteryFuse Unit (BFU) in the BBS to the IDM in the RBS.Note: Before connecting the power cable, make sure that both the BBS
and RBS are earth grounded. For instructions on handling the earthgrounding connection, see documents RBS Installation Instructionsand BBS 2216 Installation Instructions.
Caution!
Improper handling of batteries can result in the batteries short-circuiting, whichcan result in serious injury due to high energy levels. Exercise the necessarycare when working with batteries.
Note: Make sure that both the AC power and the battery switches are in theOFF position before working with the battery connection.
To route the battery power cable, do the following:
1. Route the cable as shown in the figures below and fasten it in place withcable ties.
-
Ericssonwide InternalINSTALLATION INSTR. 6 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
P016560A
RBS 2216
BBS 2216
Power cable
BFU
IDM PSU
Figure 3 Power Cable Routing
-
Ericssonwide InternalINSTALLATION INSTR. 7 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
P016561A
Power cable
RBS 2216BBS 2216
BFU
IDM PSU
Figure 4 Power Cable Routing
2.
Connect the power cable connectorto the RBS connector on the BFUin the BBS.
P016562A
Power cable
BFU
RBS
BBS
3.
-
Ericssonwide InternalINSTALLATION INSTR. 8 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
Connect the terminals of the powercable to the battery connection onthe IDM in the RBS. See documentRBS installation instructions.
P016563A
IDM
PSU 3 PSzxczaU 4PSU 2PSU 1
DRU 130A
DRU 230A
DRU 330A
DRU 430A
DRU 530A
DRU 630A
DXU 3A
FAN 10ATMA-CM1 3ATMA-CM2 3ALIGHTING 0.5ACLU 11A
Operational
BatteryConnection+24 V DC250A
+24V 0V +24V 0V +24V 0V +24V 0V
RBS
4 Connecting the Communication Link Cable
This section describes how to connect the communication link cable betweenthe BBS and the RBS.
To route the communication link cable, do the following:
1. Route the cable and as shown in the figures below and fasten it in placewith cable ties.
-
Ericssonwide InternalINSTALLATION INSTR. 9 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
P016938A
RBS 2216
BBS 2216
Communication link cable
BFU
IDM PSU
Figure 5 Communication Link Cable Routing
-
Ericssonwide InternalINSTALLATION INSTR. 10 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
P016939A
Communication link cable
RBS 2216BBS 2216
BFU
IDM PSU
Figure 6 Communication Link Cable Routing
2.
Connect one end of the cableto the Power Supply Unit (PSU)connector on the BFU in the BBS.
P016564A
Communication link cable
BBS
BFU
RBS
PSU
3.
-
Ericssonwide InternalINSTALLATION INSTR. 11 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
Connect the other end of the cableto the A1 connector on the firstPSU from the left in the RBS.
P016565A
RBS PSUA1 connector
Communication link cable
5 Connecting the External Alarm Cable
This section describes how to connect the external alarm cable between theBBS and RBS.
To route the external alarm cable, do the following:
1. Route the cable as shown in the figures below and fasten it in place withcable ties.
-
Ericssonwide InternalINSTALLATION INSTR. 12 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
P016951A
RBS 2216
BBS 2216
BFU
PSUDXU
External alarms connector
Ext. alarm connector
DF-OVP
Figure 7 External Alarm Cable Routing
-
Ericssonwide InternalINSTALLATION INSTR. 13 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
P016952A
RBS 2216BBS 2216
BFU
DXU
DF-OVP
Ext. alarm connector
External alarms connector
Figure 8 External Alarm Cable Routing
2. Strip the insulation from the cable and insert the wires into External Alarmsconnector.
Note: Write down the designation of the wires in the external alarm cable.
3. Connect the external alarm cable to the Distribution Frame withOvervoltage Protection (DF-OVP), and then connect the DF-OVP to theDistribution Switch Unit (DXU) in the RBS. See the DF-OVP InstallationInstructions.
6 Connecting the Transmission Cables (Optional)This section describes how to connect the transmission cables.
To connect the transmission cables, do the following:
1.
-
Ericssonwide InternalINSTALLATION INSTR. 14 ( 14 )
/ XSNHSSG 26/1531-LZA 701 0001 Uen
EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
Route the transmission cables on the right-hand side of the BBS and theRBS as shown in the figure below and fasten them in place with cableties.
P015836B
2. Connecting the transmission cable from the transmission equipment to thetransmission ports on the DXU in the RBS. If the BBS and RBS are in adifferent Electromagnetic Compatibility (EMC) environment, DF-OVP isrecommended to be connected between the BBS and the RBS. For detailson how to connect DF-OVP, See DF-OVP Installation Instructions.
7 Concluding Routines
7.1 Powering up the RBS
1. Disconnect the ESD wrist strap.
2. Switch on the power switch outside the cabinet.
3. Switch on the IDM circuit breakers for the units installed in the cabinet.
4. Switch on the RBS switch on the BFU in the BBS.
5. Put back and lock the Cover of BBS.
6. Put back and lock the Cover of RBS cover.
tocConnecting BBS 2216 to RBS 22161 Introduction1.1 Documentation1.2 Tools
2 PreparationsFigure 1 Cabinet Cover DetachmentFigure 2 ESD Wrist Strap Connection Points
3 Connecting the Battery Power CableFigure 3 Power Cable RoutingFigure 4 Power Cable Routing
4 Connecting the Communication Link CableFigure 5 Communication Link Cable RoutingFigure 6 Communication Link Cable Routing
5 Connecting the External Alarm CableFigure 7 External Alarm Cable RoutingFigure 8 External Alarm Cable Routing
6 Connecting the Transmission Cables (Optional)7 Concluding Routines7.1 Powering up the RBS
tablesTable 1 Tools Required