bds portfolio 2014 5

30
boonen ® Design Studio We realize your dream and make your business grow

Upload: frederic-boonen

Post on 07-Apr-2016

220 views

Category:

Documents


4 download

DESCRIPTION

BDS Q4

TRANSCRIPT

Page 1: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

We realize your dreamand make your business grow

Page 2: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

15+50+

125+

YEARS15 years of history of ideas, experiences, discussions, forms, colors, ma-terials, production. Yet every product is ingenious, unique and thought-ful.

More than 50 customers who believe in us and come back because we deliver a qualitative approach with successful products.

Projects that have a sum of technique and creativity. All successfully through a mix of creativity, trends and manufacturability.

CLIENTS

PROJECTS

Page 3: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

BRANDSWe move through a global sector, where cross be several industries and inspire new and successful products.

Page 1 of 3

Project proposal: Energy Conscious Design

Flanders’ DRIVE research domain Clean and Energy-Efficient Vehicles Project goal This collective research project aims to develop a better understanding of the thermal requirements, the availability of on-board energy resources, the existing energy technologies and their interactions to design and to manage thermal systems in electric and hybrid vehicles to lower the energy consumption. Project motivation European regulations enforce the reduction of CO2-emissions of vehicles. In response to this need for radically reduced vehicle fleet CO2 emissions, there is a clear trend towards smaller vehicles and downsized engines. The growing demand for lower consumption and emissions in the coming years will lead to further enhancements in internal combustion engine design. Another development to comply with future CO2-limits is the electrification of the drivetrain. For smaller vehicles, this will result in battery electric vehicles, whereas for larger vehicles this will predominantly result in hybrid vehicles. This electrification not only applies to cars but also to other kinds of vehicles. In hybrid vehicles, the powertrain, containing an internal combustion engine and an electric motor, emits less waste heat compared to conventional diesel or gasoline drivetrains. Accordingly, the heat flows in the coolant will have to be better controlled by thermal management and the energy available in the exhaust gas must be used as an additional power source to fulfill the heat requirements. Additionally, the internal combustion engine is not always activated, depending on an optimized strategy in dealing with vehicle heat and energy requirements. For electric vehicles, the main energy source is the battery. The energy drained from the battery to run cooling and heating systems in an electric vehicle can decrease the range by as much as 50%. To avoid premature aging of the temperature-sensitive lithium-ion cells, the Li-ion batteries will have to be interfaced with the vehicle’s HVAC system. In winter, the HVAC system does not only make the passenger cabin comfortably warm, but it must also ensure that the battery cells do not cool down to the extent as to become damaged during charging or regenerative braking. The temperature of the battery also has a direct impact on its performance. At low temperatures, the power output of the batteries will decrease resulting in reduced performance. On the other hand, at high temperatures, the battery will age more rapidly. So, the battery must be kept within a rather small temperature range in all operating modes to obtain optimum performance and durability. On the other hand, HVAC systems must be designed much more efficiently so as to ensure a high level of cabin comfort in summer and winter without compromising the vehicle’s driving range. Additionally, the air conditioning of light-duty vehicles in e.g. the US consumes 7 billion gallons of gasoline every single year. As such, in addition to improvements in battery thermal management, there are tremendous opportunities for improving the efficiency of heating and cooling systems in general and for developing low-power thermal comfort systems for electric vehicles to minimize reductions in range.

PMS: 2768 PMS: 485

S M A R T L I F E

W I T B O S C HS M A R T L I F E

W I T B O S C H

S M A R T L I F E

W I T B O S C H

S M A R T L I F E

W I T B O S C H

W I T B O S C H

© 2011 Frederic Boonen - All Rights Reserved

boonenD e s i g n S t u d i o

Gorsem-dorp 1673803 Sint-TruidenBELGIUM

[email protected]

SolidslopeTM

MODULAR SIGN S YS TEMS

Page 4: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

BUSINESS INNOVATIONwe identify and develop new opportunities for business growth. using analytical tools and a creative process, we help companies build the future.

our strategic practice is tuned to deliver clear and actionable guidance for our client partners to achieve big leaps forward.

we bring new life to existing brands and create brands from the ground up. our integrated teams ensure the alignment of brand promise and experience.

designing physical products is where we began, and remains a core strength. we continue to reinvent categories with new and better product experiences.

we focus on design for manufacturing with a high cost driven follow up of materials, molds and assembly all over the world.

STRATEGY

BRAND

PRODUCT

PRODUCTION

DESIGN SERVICESDesigning is about a global vision which we can create successful products. Result is to realize the dream and grow the company.

Page 5: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

INSIGHT

DESIGN

BRANDINGSTRATEGY

ENGINEERING PRODUCTION

DESIGN PROCESSEach project is led by our plan in stages. But first we make a briefing.

COMPANY

DESIGN

TECHNICAL

PRODUCTION

ERGONOMICS

STYLING

CONCEPT DESIGN

UI & UX

BRANDBOOK

LOGO

INDENTITY

PACKAGING

USERS

COMMERCIAL

FINANCIAL

MARKET IQ

3D CAD

SIMULATIONS

COST-DRIVEN BOM

SUPPLY CHAIN

PROTOTYPE

ZERO-SERIES

PRODUCTION MGMT

PROJECT MGMT

Page 6: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

PRODUCTSOur ability to work in different areas, makes us view on new ideas for new products wider.

MOEBIUS

KITH & KIN

KITH & KIN

BORMET

KITH & KIN

Z-LINE

DESIGNADDICT

FBT

AMIBILIFE

MULTILINE

MAGPPIE

JORI

MOEBIUS

MAMZEL

Page 7: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

CASES

Page 8: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

PIEGA

INZICHT

DESIGN

BRANDING

STRATEGIE

ENGINEERING

Page 9: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

Page 10: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

QiSola

INZICHT

DESIGN

BRANDING

STRATEGIE

Page 11: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

Page 12: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

Buggybooker

INZICHT

DESIGN

BRANDING

STRATEGIE

ENGINEERING

Page 13: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

boonend e s i g n s t u d i o

Strollerfor Familees

ANALYSE

Sfeer

boonend e s i g n s t u d i o

Strollerfor Familees

ANALYSE

Markt analyse / Wandelwagen

boonend e s i g n s t u d i o

Strollerfor Familees

Markt ANALYSE

User Design

boonend e s i g n s t u d i o

Strollerfor Familees

User Design

Page 14: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

Kasar

INZICHT

DESIGN

BRANDING

STRATEGIE

ENGINEERING

Page 15: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

798

,12

104

3,27

502,10

769

,09

C

C

397,46

487,69

313

,14

B

SURFACE MOLD TECH 14269

DETAIL BSCALE 2 : 1

SECTION C-C

SCALE 1 : 5

1:5

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: 1 LINEAR: 0.2 ANGULAR: 1°

FINISH: DEBUR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE: SHEET 1 OF 4

A1

WEIGHT:

BOFR 16/06/2014

Boonen Design Studio bvbaGorsem-dorp 167 - 3803 Sint-Truiden - [email protected]

KASAR

Flexfurn_07p

D

4

6

18

R1

R1

17

1

12

7

4,5

0

1

4,53

16

16

R1

4

13,50

2

10

15

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

Flexfurn07_voetzit

Boonen Design Studio bvbaGorsem-dorp 167 - 3803 Sint-Truiden - [email protected]

16/06/2014BOFR

WEIGHT:

A3

SHEET 4 OF 4SCALE:

DWG NO.

TITLE:

REVISIONDO NOT SCALE DRAWING

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: 1 LINEAR: 0.2 ANGULAR: 1°

Q.A

MFG

APPV'D

CHK'D

DRAWN

2:1

Page 16: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

SCATTO

INZICHT

DESIGN

BRANDING

STRATEGIE

ENGINEERING

S M A R T L I F E

W I T B O S C HS M A R T L I F E

W I T B O S C H

S M A R T L I F E

W I T B O S C H

S M A R T L I F E

W I T B O S C H

W I T B O S C H

Page 17: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

MOODBOARD

boonend e s i g n s t u d i o

Plantensteunfor WITBOSCH

Concepten

3

12x7

160

HH

DIKTE 1.5

150

1,500

R15 240

300

I

SECTION H-H

1,5

00

15

R2

9,700

DETAIL I SCALE 2 : 1

ITEM NO. PART NUMBER DESCRIPTION MATERIAL QTY.1 Scatto_bbq_grill AINSI316 1

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

Scatto_bbq_schaal

Boonen Design Studio bvbaGorsem-dorp 167 - 3803 Sint-Truiden - [email protected]

14/06/2013BOFR

WEIGHT:

MateriaalA3

SHEET 1 OF 22SCALE: 1:2

DWG NO.

TITLE:

REVISIONDO NOT SCALE DRAWING

MATERIAL:

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: 1 LINEAR: 0.2 ANGULAR: 1°

Q.A

MFG

APPV'D

CHK'D

DRAWN

100

22,

5

18

10

14

10

R7

R3

99

39,3 25,

043

V

12

100

15

R3

R1

0,2

DETAIL V SCALE 2 : 1

ITEM NO. PART NUMBER DESCRIPTION MATERIAL QTY.1 Scatto_naamplaat CORK 1

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

Scatto_naamplaat

Boonen Design Studio bvbaGorsem-dorp 167 - 3803 Sint-Truiden - [email protected]

20/06/2013BOFR

WEIGHT:

CORKA3

SHEET 11 OF 24SCALE: 1:2

DWG NO.

TITLE:

REVISIONDO NOT SCALE DRAWING

MATERIAL:

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: 1 LINEAR: 0.2 ANGULAR: 1°

Q.A

MFG

APPV'D

CHK'D

DRAWN

Page 18: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

AIRBOX

INZICHT

DESIGN

STRATEGIE

ENGINEERING

Page 19: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

boonend e s i g n s t u d i o

AirBoxfor ABN

Design

2

©2012 Frederic Boonen - All Richts Reserved

Market Analyse

© 2011 Frederic Boonen - All Rights Reserved

boonenD e s i g n S t u d i o

Gorsem-dorp 1673803 Sint-TruidenBELGIUM

www.fredericboonen.eu

BASI

CTRADITIONAL

EXCLUSIVE

MODERN

EXCLUSIVETRADITIONAL

TEMPORARY DESIGN

MAINSTREAMBASIC

MAINSTREAM

TRENDY

VINTAGE

EXCLUSIVEMINIMAL

boonend e s i g n s t u d i o

AirBoxfor ABN

Design

3

©2012 Frederic Boonen - All Richts Reserved

Style & shape

© 2011 Frederic Boonen - All Rights Reserved

boonenD e s i g n S t u d i o

Gorsem-dorp 1673803 Sint-TruidenBELGIUM

www.fredericboonen.eu

1330

39

39

400

400

C

C

281

299

,50

688

,50

R690

30

735

R10

D

E

C-C (1 : 5)

31

26

11,50

7

106

°

D (2 : 5)

45

5

13,

50 70,53°

E (2 : 5)

7 Ra6,3

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

Airbox_Frontplaat

Z:\ABN\Airbox\4-Engineering\

Boonen Design Studio bvbaGorsem-dorp 167 - 3803 Sint-Truiden - BELGIUMwww.fredericboonen.eu - [email protected]

26/10/2011BOFR

WEIGHT:

AlA3

SHEET 4 OF 7SCALE: 1:10

DWG NO.

TITLE:

REVISIONDO NOT SCALE DRAWING

MATERIAL:

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: 1 LINEAR: 0.2 ANGULAR: 1°

Q.A

MFG

APPV'D

CHK'D

DRAWN

A

A

B B

A-A

1

9

5

14

8

7

3

16

12

B-B

13 10 2

6

DIKTE 1,5mm

16 Airbox_roosterplaat 1

15 Muur 1

14 Spring Pin ISO 13337 - 5 x 55 - St 4

13 MirrorAirbox_Zijconsole 1

12 Airbox_Zijconsole 1

11 MirrorAirbox_Frontplaat_bovenhaak 1

10 MirrorAirbox_Frontplaat_Onderhaak 1

9 Airbox_Frontplaat_bovenhaak 1

8 Airbox_Frontplaat_Onderhaak 1

7 Airbox_Frontplaat 1

6 MirrorAirbox_binnenframe_voor 1

5 Airbox_binnenframe_voor 1

4 Airbox_Binnenframe_boven 1

3 Fusjitsu_AFYR18BL 1

2 MirrorAirbox_binnenframe 1

1 Airbox_binnenframe 1

ITEM NO. PART NUMBER MATERIAL NOTE NORM QTY.

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

Airbox

Z:\ABN\Airbox\4-Engineering\

Boonen Design Studio bvbaGorsem-dorp 167 - 3803 Sint-Truiden - BELGIUMwww.fredericboonen.eu - [email protected]

23/10/2011BOFR

WEIGHT:

AlA3

SHEET 1 OF 7SCALE: 1:10

DWG NO.

TITLE:

REVISIONDO NOT SCALE DRAWING

MATERIAL:

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: 1 LINEAR: 0.2 ANGULAR: 1°

Q.A

MFG

APPV'D

CHK'D

DRAWN

Page 20: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

Electric Step

INZICHT

DESIGN

STRATEGIE

Page 21: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

Page 22: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

Bodyscanner

DESIGN

ENGINEERING

Page 23: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

ITEM NO. PART NUMBER DESCRIPTION QTY.1 Biosleep_Scanner_in

wendig_custom8 1

2 Yuno_Scanner_Mantel ALMg3 RAL 9006 1

3 Yuno_Scanner_ST2001 2

4 Yuno_scanner_montagekopplaat ALMg3 RAL 9006 1

5 Yuno_scanner_LEDplaat

Transparant PP; buitenzijde gemat 1

6 Yuno_scanner_vertarm_afdek ALMg3 RAL 9006 2

7 Yuno_scanner_vertarm_koppel ALMg3 RAL 9006 1

8 Yuno_scanner_vertarm_dwars ALMg3 RAL 9006 1

9 Yuno_scanner_horzarm_afdek ALMg3 RAL 9006 1

10 Yuno_scanner_bodemplaat

AISI 304; Lengterichting geschuurd 1

11 Yuno_scanner_Voetplaat Polypropeen; parelstraal 1

12 Yuno_scanner_weegplaat MDF 1

13 yuno_scanner_weegplaat_top

AISI 304; Lengterichting geschuurd 1

14 User Library-iPad iPad Apple 115 Yuno_scanner_iPad

stand Polypropyleen; parelstraal 1

ITEM NO. PART NUMBER DESCRIPTION QTY.16 Yuno_Scanner_Dwa

rsarm_kopplaat ALMg3 RAL 9006 2

17 Yuno_scanner_Dwarsarm_Hoekbuis ALMg3 RAL 9006 1

18 Yuno_Scanner_Dwarsarm_Horbuis ALMg3 RAL 9006 1

19 Yuno_Scanner_Dwarsarm_frame AISI 304 1

20 DIN 7991 - M3 x 8 --- 8N 24

21 Yuno_Scanner_Dwarsarm_frame_Mir 1

22MirrorYuno_scanner_Dwarsarm_Hoekbuis

1

23 MirrorYuno_Scanner_Dwarsarm_Horbuis 1

24 Yuno_Scanner_Dwarsarm_wielsteun Zincor 2

25 PEM F-M6-3 ---S 626 PEM F-M6-3 ---N 627 DIN 7991 - M6 x 12 --

- 5.7S 6

28 DIN 912 M6 x 10 --- 10S 4

29 PEM SKC-6060-16 430 Yuno_scanner_Kop

plaat_steun ZIncor 131 bead1 132 bead2 133 DIN 7991 - M6 x 35 --

- 35S 2

34 Yuno_scanner_Borstelklem Inox 4

35 Yuno_scanner_viltvoet 6

36 Yuno_scanner_ipaddock_beugel Zincor 2

37 DIN 7984 - M3 x 5 --- 5S 2

38 DIN 7984 - M5 x 12 --- 12N 1

39 DIN 7984 - M5 x 12 --- 12S 5

YUNO

Yuno_scanner_V3

Boonen Design Studio

WEIGHT:

A3

SHEET 1 OF 2SCALE:1:20

DWG NO.

TITLE:

REVISIONDO NOT SCALE DRAWING

MATERIAL:

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

Q.A

MFG

APPV'D

CHK'D

DRAWN

Page 24: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

UMTO

INZICHT

DESIGN

BRANDING

STRATEGIE

ENGINEERING

Page 25: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

Soleco

my soleco

charge points

charge pointImpermo

Sint-Truidennavigeer

info

login

usernamexxxxxxxx

passwordxxxx

charge

slowfast

connect plug to car

4

6

8

8

9

1

2

3

5

ITEM NO. PART NUMBER DESCRIPTION QTY.1 Laadpaal_Bodyleft 12 Laadpaal_Panelbot

tom 1

3 Laadpaal_Panelside 2

4 Laadpaal_interfacepanel 1

5 Laadpaal_Staander 16 Laadpaal_cablepa

nel 17 Laadpaal_klepje 38 Laadpaal_klepjepa

nel 39 Laadpaal_Kabel 1

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

Laadpaal_Body

Boonen Design Studio bvbaGorsem-dorp 167 - 3803 Sint-Truiden - BELGIUMwww.fredericboonen.eu - [email protected]

19/04/2012BOFR

WEIGHT:

AlA3

SHEET 1 OF 10SCALE: 1:10

DWG NO.

TITLE:

REVISIONDO NOT SCALE DRAWING

MATERIAL:

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: 1 LINEAR: 0.2 ANGULAR: 1°

Q.A

MFG

APPV'D

CHK'D

DRAWN

107,74 + 0,500

6

50

R20

2

36,

93

24,87

30°

12

210

ITEM NO. PART NUMBER DESCRIPTION QTY.1 Laadpaal_Panelbot

tom 1

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

Laadpaal_Panelbottom

Boonen Design Studio bvbaGorsem-dorp 167 - 3803 Sint-Truiden - BELGIUMwww.fredericboonen.eu - [email protected]

19/04/2012BOFR

WEIGHT:

A3

SHEET 3 OF 10SCALE: 1:10

DWG NO.

TITLE:

REVISIONDO NOT SCALE DRAWING

MATERIAL:

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: 1 LINEAR: 0.2 ANGULAR: 1°

Q.A

MFG

APPV'D

CHK'D

DRAWN

107,74 -00,50

28,

47

120

+ 0,50

0

R5

30

86,60 + 0,500

120

+ 0,50

0

30

120

+ 0,50

0

R14

110

R5

20,94

R10,47

D

D

E E

119

4

6

G

SECTION D-D SCALE 1 : 5

6

20,94

2 R4

SECTION E-E

SCALE 1 : 1

45°

5

DETAIL G SCALE 1 : 1

ITEM NO. PART NUMBER DESCRIPTION QTY.1 Laadpaal_cablepa

nel 1

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

Laadpaal_cablepanel

Boonen Design Studio bvbaGorsem-dorp 167 - 3803 Sint-Truiden - BELGIUMwww.fredericboonen.eu - [email protected]

19/04/2012BOFR

WEIGHT:

A3

SHEET 6 OF 10SCALE: 1:10

DWG NO.

TITLE:

REVISIONDO NOT SCALE DRAWING

MATERIAL:

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: 1 LINEAR: 0.2 ANGULAR: 1°

Q.A

MFG

APPV'D

CHK'D

DRAWN

Page 26: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

MANDRILL

INZICHT

DESIGN

STRATEGIE

ENGINEERING

Page 27: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

Page 28: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

ARCHITRAVE

INZICHT

DESIGN

BRANDING

STRATEGIE

ENGINEERING

Page 29: Bds portfolio 2014 5

boonen®

D e s i g n S t u d i o

824

9888

800

1

36 E

beton

afwerklaag

afgewerkte vloer

500

4

DETAIL E SCALE 1 : 5

afge

wer

kte

vloe

r

824 1648

FAchteraf monteren

90

DETAIL F SCALE 1 : 5

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

Architrave V403

Boonen Design Studio bvbaGorsem-dorp 167 - 3803 Sint-Truiden - BELGIUMwww.fredericboonen.eu - [email protected]

5/02/2013BOFR

WEIGHT:

$PRP:”Material”A3

SHEET 2 OF 2SCALE: 1:100

Project

REVISIONDO NOT SCALE DRAWING

MATERIAL:

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: 1 LINEAR: 0.2 ANGULAR: 1°

Q.A

MFG

APPV'D

CHK'D

DRAWN

Part conf: 6 palen

Architravev403Part:

35 26 2524 2

1

31

28

16

11

17

12

32

23

13

18

7

9

14

634

33

10

19

15

ITEM NO. PART NUMBER

SW-Configuration Name(Configuration

Name)QTY.

1 Architravev4_Extrusie verticaal 45° 12 Architravev4_Extrusie horizontaal 45° 16 Architravev4_voet Default 27 Architravev4_voetplaatje Default 18 Architravev4_tussenplaat Default 19 Architravev4_ankerplaat Default 1

10 Architravev4_anker Default 511 Architravev4_volkern_horz horizontaal achter schuin 112 Architravev4_volkern_horz horizontaal voor schuin 113 Architravev4_volkern_vert vertikaal boven schuin 114 Architravev4_volkern_vert vertikaal beneden schuin 115 Architravev4_eprofiel horizontaal schuin 216 Architravev4_eprofiel vertikaal schuin 217 Architravev4_plexi horizontaal schuin 218 Architravev4_plexi vertikaal schuin 119 Architravev4_plexisteun plexisteun schuin 123 MirrorArchitravev4_volkern_vert3 vertikaal beneden schuin 124 MirrorArchitravev4_volkern_vert3 vertikaal boven schuin 125 MirrorArchitravev4_volkern_horz3 horizontaal achter schuin 126 MirrorArchitravev4_volkern_horz3 horizontaal voor schuin 127 Architravev4_square default 228 Architravev4_afvoergoot default 129 Architravev4_eindplaat Default 130 Architravev4_eindplaat_bevestiging Default 131 zelftapper M5 #10 x 1" 2732 torx panel alu 90232 6 10-mattssons 4633 Architravev4_washerM16 Default 834 Nut M16 Default 1235 Architravev403_eindkap Default 1

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

Architravev4_Bracket

Boonen Design Studio bvbaGorsem-dorp 167 - 3803 Sint-Truiden - BELGIUMoffice@boonendesignstudio;be

5/02/2013BOFR

WEIGHT:

A3

SHEET 1 OF 1SCALE: 1:50

DWG NO.

TITLE:

REVISIONDO NOT SCALE DRAWING

MATERIAL:

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: 1 LINEAR: 0.2 ANGULAR: 1°

Q.A

MFG

APPV'D

CHK'D

DRAWN

Page 30: Bds portfolio 2014 5

B o o n e n D e s i g n S t u d i o b v b aG o r s e m - d o r p 1 6 7 • 3 8 0 3 S i n t - Tr u i d e n

t : + 3 2 1 1 7 4 3 4 7 2e : i n f o @ b o o n e n d e s i g n s t u d i o . b ew : w w w. b o o n e n d e s i g n s t u d i o . b e

A l l r i g h t s r e s e r v e d © - F r e d e r i c B o o n e n 1 9 9 8 - 2 0 1 4

We m a k e h a p p y c u s t o m e r s

boonen®

D e s i g n S t u d i o