be project presentation - energy conservation (bosch pune)
TRANSCRIPT
![Page 1: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/1.jpg)
BOSCH CHASSIS SYSTEMS INDIA LTD
Presented by: Viknesh Subramaniyan
B 1 2 0 0 2 1 2 4 1Guided by: Prof. P.D.Sonawane
Internship at
![Page 2: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/2.jpg)
2
PRODUCTS & CUSTOMER KNOWLEDGE
PRODUCTS • BRAKE BOOSTERS• SAFETY VALVES• TMC • ABS• ESP
CUSTOMERS • TATA MOTORS• MAHINDRA• MARUTI SUZUKI• VOLKSWAGEN• SKODA• GENERAL MOTORS• FIAT• NISSAN• RENAULT• HONDA• KTM• JCB
![Page 3: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/3.jpg)
3
PRODUCTION COST
MATERIAL COST
LOGISTICS
MACHINING COST
MANUFACTURING COST
OTHERS
A TMC FROM BOSCH
![Page 4: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/4.jpg)
4
MY PROJECTPRODUCTION COST CUTTING BY CONSERVING
ELECTRICAL ENERGY
![Page 5: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/5.jpg)
COOLANT BOXMACHINE
PAST SCENARIO
5
CHILLING UNIT
HUGE ELECTRICITY CONSUMPTION
![Page 6: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/6.jpg)
6
TOP VIEW OF PHE
COOLANT / OILFROM MACHINE
WATER FROM COOLING TOWER
HOT COOLANT
COLD COOLANT
COLD WATER
HOTWATER
![Page 7: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/7.jpg)
7
HOT WATER
COOLING TOWER
COLD WATER
![Page 8: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/8.jpg)
COOLANT BOXMACHINE
THE FINAL SET UP
8
P. H. E
WATER LINE FROM COOLING TOWER
COOLING TOWER LOW ELECTRICITY CONSUMPTION
![Page 9: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/9.jpg)
9
PHOTOGRAPHY REPORT
THE REMOVED CHILLING UNIT
INSTALLED PARALLEL PLATE HEAT EXCHANGERTHE COOLING TOWER IN BOSCH
![Page 10: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/10.jpg)
10
PROJECT PLAN / MEASURES
TIMELINE
SR NO STEPS Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15
1 Planning 100%
2 Feasibility Study 100% 100%
3 Data Collection & Analysis 100%
4 Quotation Analysis 100%
5 Approval & Budjet Allocation 20% 80%
6 Order & Installation 100%
7 Observations 100% 100%
8 Project Extension 10%
PROJECT PLANNING SHEET
![Page 11: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/11.jpg)
11
MULTIMETER
THE MULTIMETER MAGIC
P = (1.732) * V * I *(PF)
![Page 12: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/12.jpg)
12
PROJECT SUMMARY SHEET
AIM: PRODUCTION COST CUTTING ON WELDING LINE BY CONSERVING ELECTRICAL ENERGY
CURRENT SYSTEM (LOADING CONDITIONS)
VYB VRY VBR Vavg Iloading Ploading Tloading POWER COST/DAY (LOADING) POWER COST/MONTH (LOADING)
404 V 401 V 403 V 402.67 V 13.05 A 9.01 KW 12 Hrs 756.84 INR 18,921 INR
CURRENT SYSTEM (UNLOADING CONDITIONS)
VYB VRY VBR Vavg Iunloading Punloading Tunloading POWER COST/DAY (UNLOADING) POWER COST/MONTH (UNLOADING)
404 V 401 V 403 V 402.67 V 9.78 A 6.76 KW 8 Hrs 378.56 INR 9,464 INR
TOTAL CONSUMPTION 1135.66 INR 28,391.50 INR
THE PUMP (ALL CONDITIONS)
VYB VRY VBR Vavg Ipump PPump Tpump POWER COST/DAY (UNLOADING) POWER COST/MONTH (UNLOADING)
400 V 401 V 398 V 399.67 V 3.93 A 2.69 KW 20 Hrs 377.06 INR 9426.67 INR
ACTUAL SAVING CALCULATION
P(Chiller) = P(System) - P(Pump) = {P(loading) + P(unloading)} - P(Pump)
TOTAL SAVINGS PER MONTH 18,964.83 INR
QUOTATION ANALYSIS
COST OF PARALLEL PLATE HEAT EXCHANGER COST FOR PIPELINE FROM COOLING TOWER LINE
96,300 INR 25,000 INR*
TOTAL INVESTMENT 1,26,300 INR*
PAY BACK PERIOD 6 MONTHS*
![Page 13: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/13.jpg)
13
THE PROJECT EXTENSION
THE COOLANT MEASUREMENT DATA
Q = m * Cp *(T2 – T1)
![Page 14: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/14.jpg)
14
THE FINAL SUMMARY
![Page 15: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/15.jpg)
15
CONCLUSIONS
• Less Power consumption.• Occupies less space.• Starts automatically.• Low maintenance.• Saving Rs 19,000 /- per month.• Can save around Rs 15,00,000 /- a year.
![Page 16: BE Project Presentation - Energy Conservation (Bosch Pune)](https://reader031.vdocuments.net/reader031/viewer/2022020314/589b750e1a28abdd258b6bc5/html5/thumbnails/16.jpg)
16
LETS SAVE ELECTRICITY FROM TODAYWishing You a very happy New year
Viknesh Subramaniyan