Status Report, ENTM 02/11/2010 BEAM INTERCEPTING DEVICES FOR LINAC 4

Upload: shiloh

Post on 24-Feb-2016

92 views

Category:

Documents


0 download

DESCRIPTION

beam intercepting devices for LINAC 4. Status Report, ENTM 02/11/2010. Overview. Beam stoppers for source/LEBT and for Linac4 transfer line Chopper line collimator Beam dumps for the movable bench (C. Maglioni) 50-100 MeV measurements bench dump Beam dumps for LBE/LBS lines and LBS slit - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: beam intercepting devices for LINAC 4

Status Report, ENTM 02/11/2010

BEAM INTERCEPTING DEVICES FOR LINAC 4

Page 2: beam intercepting devices for LINAC 4

2

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Overview Beam stoppers for source/LEBT and for

Linac4 transfer line Chopper line collimator Beam dumps for the movable bench (C.

Maglioni) 50-100 MeV measurements bench dump Beam dumps for LBE/LBS lines and LBS slit Head, tail, H0/H- internal dumps for the PSB

injection region (R. Chamizo) Linac4 main dump (R. Chamizo)

Page 3: beam intercepting devices for LINAC 4

3

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

LINAC 4 layout

Page 4: beam intercepting devices for LINAC 4

4

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

LINAC 4 layout

Beam stoppers for source/LEBT

Beam dumps for the movable bench (C. Maglioni) Linac4 main dump

(R. Chamizo)

50-100 MeV measurements bench dump

Chopper line collimator

Page 5: beam intercepting devices for LINAC 4

5

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Beam stoppers for source/LEBT

LINAC4 Project Document No.L4-T-ES-0001EDMS Document No.1057463

Racetrack flanges are housing the beamstopper. Two flanges facing each other (180°)

3MeV L4-Nom

Maximum H- Current 40 mA 80 mA

Pulse Length 150µs 400µs

Max Rep-Rate 2Hz

Beam Energy 45 keV

Beam parameters

Page 6: beam intercepting devices for LINAC 4

6

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Beam stoppers for source/LEBT

Design finished

Production started

Ready by the end of the year

One unit withIris to produce a pencil beam

Page 7: beam intercepting devices for LINAC 4

7

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Produced and installed

Chopper line collimator (3MeV)

Page 8: beam intercepting devices for LINAC 4

8

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Beam stopper forLinac4 transfer line

Slit LBS

Slits LBE

Fast beam stopper

Sieve (removed)

Beam stopper

Page 9: beam intercepting devices for LINAC 4

9

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Beam stopper forLinac4 transfer line Intension to reuse the existing stopper tank (layout

dimensions and functionality) Simulations for the material to be done Cooling to be foreseen (additional piping)

Page 10: beam intercepting devices for LINAC 4

10

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Beam dumps for LBE/LBS lines and LBS slit SPECIFICATIONS FOR BEAM

DUMPS IN LINAC4 DUMP LINE, LBE AND LBS LINES

F. Regis will work on that LBE dump LBS dump, feasibility study for

integration done LBS slit

Start with the 3-12 MeV slit design Go towards a stripping foil with a

dedicated dump (below the spectro-meter magnet?

Have a thick slit,absorb most, but less clean beam?

LINAC4 Project Document No.L4-B-ES-0001 v.1.0EDMS Document No.1056611  v.1.0

Page 11: beam intercepting devices for LINAC 4

11

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

50-100 MeV measurements bench dump

USER SPECIFICATIONS FOR LINAC4 COMMISSIONING DUMP AT 50 AND 100 MEV

To be treated together with the main dump (160MeV)

Two solutions: A “movable“ version for 50 and 100 MeV Use a stationary dump for 160 MeV

LINAC4 Project Document No.L4-T-EP-0004 v.0.2EDMS Document No.1094599 v.0.2

Page 12: beam intercepting devices for LINAC 4

12

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

50-100 MeV measurements bench dump

50 MeV

100 MeV

Page 13: beam intercepting devices for LINAC 4

13

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Chopper collimator done Source stopper ready in January 2011 Dumps for the measurement bench April

2011 50/100 MeV dump – 160 MeV main dump

for the end of 2012 LBE/LBS and slit from 2013 onwards TL beam stopper for 2014 Head and tail /H0/H- for 2014

Planning

Page 14: beam intercepting devices for LINAC 4

14

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

EVM / Planningwu v1.0 Generated: 28-oct-2010 13:48

cmd wu WU ID Baseline Status Description WBS Holders EMail   Start Date Finish Date Commentscmd Pxx #   Skill [Missing] Email or Profile Org Code [Recharging] Duration Unit (M.WK, %) Start Date Finish Date Comments

cmd de #   Weight Deliverable description Actual Qty Total Qty Unit Start Date Finish Date Comments

                     

wu 48032Baseline 2 PL TL Stopper LINAC4 2.13 [email protected] 1-Nov-2010 31-Mar-2012new date

MSP 10 Materials & machining 55151 35000CHFMIS.S 20 FSU support 55151 10000CHFMSP 30 Design office 55151 25000CHFde 10 26 Materials and oders 0 100% 1-Jun-2011 31-Jul-2011delayedde 20 6 Electric parts 0 100% 1-Jun-2011 31-Jul-2011delayedde 30 13 Machining 0 100% 1-Aug-2011 30-Sep-2011delayedde 40 0 Parts manufactured 0 100% 1-Aug-2011 30-Sep-2011delayed

de 45 0Technical specification & validation 0 1U 1-Nov-2010 28-Feb-2011new date

de 50 0 Beam stoppers assembled 0 1U 30-Sep-2011 1-Dec-2011delayedde 60 0 Stopper fully tested 0 1U 1-Dec-2011 1-Feb-2012delayedde 70 25 Stopper execution drawings 0 100% 1-Mar-2011 30-Jun-2011delayedde 80 0 dump installed 0 1U 1-Mar-2012 31-Mar-2012

wu 48028Baseline 2 AC Stopper Ion source LINAC4 2.13 [email protected] 1-Nov-2009 30-Jan-2011Date modified

MSP 10 Materials & machining 55150 50000CHFMIS.S 20 FSU support 55150 20000CHFMSP 30 Design office 55150 25000CHFde 10 35 Materials and oders 60 100% 1-Nov-2009 30-Sep-2010modifiedde 20 14 Electric parts 40 100% 1-Nov-2009 29-Oct-2010modifiedde 30 21 Machining 25 100% 1-Nov-2009 30-Sep-2010productionde 40 0 Parts manufactured 25 100% 1-Nov-2009 30-Sep-2010productionde 45 25 Stopper execution drawings 100 100% 30-Nov-2009 26-May-2010Design finishedde 50 0 Beam stoppers assembled 0 2U 1-Feb-2010 11-Oct-2010Date modifiedde 60 0 Stopper fully tested 0 2U 31-Oct-2010 30-Nov-2010Date modifiedde 70 0 Stopper installed 0 2U 1-Dec-2010 30-Jan-2011Renaming

wu 48038Baseline 2 AC Dump conceptual design LINAC4 2.13 [email protected] 1-Apr-2009 1-Oct-2010

de 10 1Technical specification & validation 0.6 1U 1-Apr-2009 1-Oct-2010

Checking new operation scenarios

wu 48034Baseline 2 AC

Ho/H-,head & tail dumps - conceptual design LINAC4 2.13 [email protected] 1-Jan-2009 1-Oct-2010Studies on going

de 10 1 Technical specification ready 0.8 1U 1-Jan-2009 1-Oct-2010

Page 15: beam intercepting devices for LINAC 4

15

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

EVM / Planning EVM to be created for:

3-12 MeV measurement bench LBE/LBS dumps and LBS slit And the 50/100 MeV dump

DRAFT

Page 16: beam intercepting devices for LINAC 4

16

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Reserve slides

Page 17: beam intercepting devices for LINAC 4

17

O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Reserve