beam pumping workshop houston, texas october 4 - 7, 2005 rod pumping optimization robert wittman, vp...

13
Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC.

Upload: daniella-shales

Post on 16-Dec-2015

222 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Beam Pumping WorkshopHouston, Texas

October 4 - 7, 2005

ROD PUMPING OPTIMIZATIONROBERT WITTMAN, VP ENGINEERING

FLOTEK INDUSTRIES, INC.

Page 2: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Oct. 4 - 7, 2005 2005 Beam Pumping Workshop 2

PETROVALVE HISTORY

FIRST DEVELOPED IN ALBERTA, CANADA IN 1987

DEVELOPED TO IMPROVE EFFICIENCY OF HEAVY OILPUMPING AND HORIZONTAL PUMP DEPLOYMENT

DEVELOPED TO ELIMINATE GAS LOCKING IN HIGHGOR WELLS

PETROVALVE ACQUIRED BY FLOTEK INDUSTRIES, INC.CURRENTLY OPERATES AS A DIVISION OF FLOTEK

Page 3: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Oct. 4 - 7, 2005 2005 Beam Pumping Workshop 3

PETROVALVE UNIQUE DESIGNFEATURES

REPLACED LOOSE BALL OF API INSERT VALVE WITH ASHAFT GUIDED HEMISPHERE ALWAYS CONFINED TOTHE VALVE AXIS IN LINE WITH THE SEAT

GUIDED HEMISPHERE RESULTS IN A LARGER FLOWAREA WITHIN THE VALVE CAGE AND PERMITSOPERATION WITHOUT LOSS OF SEATING EFFICIENCY FLOW AROUND HEMISPHERE PRODUCES ROTATIONWHICH RESULTS IN THE HEMISPHERE CONTINUALLYLAPPING THE VALVE SEAT

EXTENSION OF THE HEMISPHERE SHAFT BEYOND THEEND OF THE CAGE RESULTS IN POSITIVE VALVEOPENING ELIMINATING GAS TRAPPED BETWEENSTANDING VALVE AND TRAVEL VALVE

Page 4: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Oct. 4 - 7, 2005 2005 Beam Pumping Workshop 4

BASIC PETROVALVE DESIGN CONFIGURATION

Page 5: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Oct. 4 - 7, 2005 2005 Beam Pumping Workshop 5

PETROVALVE FLOW AREA DRAWING

FLOW AREA #1

FLOW AREA #2

FLOW AREA #4

FLOW AREA #3 FLOW AREA #1

Page 6: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Oct. 4 - 7, 2005 2005 Beam Pumping Workshop 6

PETROVALVE FLOW AREA COMPARISON TABLE

Flow Area Comparison Table

Valve Size

Petrovalve Flow Area

#1 sq. ins

Petrovalve Flow Area

#2sq. ins

Petrovalve Flow Area

#3sq. ins

Petrovalve Flow Area

#4sq. ins

Minimum Flow Area

sq. ins

API Insert Valve Flow

Areasq. ins

% Area Increase

Petrovalve Over API

1.25 0.273 0.464 0.278 0.236 0.236 0.166 43

1.50 0.501 0.547 0.576 0.425 0.425 0.292 46

1.75 0.756 0.742 0.687 0.598 0.598 0.353 69

2.00 0.732 0.930 0.886 0.664 0.664 0.569 17

2.25 1.042 1.110 1.194 0.826 0.826 0.568 45

2.75 1.555 1.653 1.635 1.432 1.432 0.935 53

3.25 2.887 2.737 2.348 2.221 2.221 1.068 108

3.75 3.550 3.348 3.283 2.954 2.954 1.394 119

4.75 6.107 5.927 4.914 4.863 4.863 --- ---

5.75 8.994 8.542 6.542 7.854 6.542 --- ---

Reference Petrovalve Flow Area Drawing For Definition Of Flow Area #1, #2, #3 and #4

Page 7: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Oct. 4 - 7, 2005 2005 Beam Pumping Workshop 7

AVAILABLE PETROVALVE COMPONENTS AND MATERIALS

AVAILABLE FOR PUMP SIZES FROM 1.06 INCHTHROUGH 5.75 INCH

AVAILABLE IN CLOSED CAGE AND OPEN CAGE VALVE CONFIGURATIONS – STANDARD APICONNECTION THREADS

TRAVEL AND STANDING VALVES AVAILABLE FOR ALL INSERT PUMP AND TUBING PUMPCONFIGURATIONS

PIN AND BOX CROSSOVER CONNECTORS FORBARRELS AND PLUNGERS

STANDARD MATERIALS INCLUDING CARBIDES, ALLOY STEEL, STAINLESS STEEL, MONEL

Page 8: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Oct. 4 - 7, 2005 2005 Beam Pumping Workshop 8

PETROVALVE ILLUSTRATIONS

CLOSED CAGE OPEN CAGE

Page 9: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Oct. 4 - 7, 2005 2005 Beam Pumping Workshop 9

PETROVALVE DESIGN BENEFITS

IMPROVED FLOW DYNAMICS REDUCES GAS BREAKOUT

IMPROVED SEATING RESPONSE MEANS LESS LEAKAGE AND IMPROVED EFFICIENCY

REDUCED COMPRESSION LOADING RESULTS IN LESS ROD DAMAGE

IMPROVED PUMP FILLAGE IMPROVES PUMP EFFICIENCY

HORIZONTAL PUMPING POSSIBLE WITHOUT LOSS OF EFFICIENCY

SLOWER PUMP SPEEDS POSSIBLE TO ACHIEVE SAME PRODUCTION LEVEL – REDUCES WEAR AND TEAR AND LOWERS ENERGY COST

ELIMINATES GAS LOCKING USING GAS BREAKER TRAVEL VALVE

Page 10: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Oct. 4 - 7, 2005 2005 Beam Pumping Workshop 10

GAS BREAKER TRAVEL VALVEILLUSTRATION

Page 11: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Oct. 4 - 7, 2005 2005 Beam Pumping Workshop 11

GAS BREAKER VALVE FUNCTION

SHAFT STRIKES TRIP SUB,OPENS VALVE, RELIEVINGGAS LOCK

PUMP SPACING AT BOTTOM OF STROKE

TRIP SUB CONNECTOR STANDING VALVEGAS BREAKERTRAVELING VALVE

PLUNGER BARREL GAS FILLED CHAMBER

Page 12: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Oct. 4 - 7, 2005 2005 Beam Pumping Workshop 12

PETROVALVE APPLICATIONS

PETROVALVES ARE IN MORE THAN 15,000 WELLS WORLDWIDE

EXCELLENT PERFORMANCE IN STEAM ASSISTED HEAVY OIL APPLICATIONS – INCLUDING HORIZONTAL AND LARGE DIAMETER WITH TEMPERATURES IN EXCESS OF 200 C

PERFORMANCE LIFE IN EXCESS OF 2 YEARS IN OIL WELLS WITH HIGH SAND CONTENT

GAS BREAKER USED IN VERTICAL AND HORIZONTAL WELLS AND TO DEPTHS OF 12,000 FEET

GAS BREAKER OPTIMIZATION CAN BE DIFFICULT IN DEEP WELLS AND WHEN PUMPING UNDER A PACKER

PETROVALVE STANDING VALVE USED EFFECTIVELY AS FLOW REVERSAL CHECK WITH ESP AND PC PUMPS

Page 13: Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC

Oct. 4 - 7, 2005 2005 Beam Pumping Workshop 13

CONCLUSIONS

PETROVALVE DESIGN INCREASES PUMP EFFICIENCY RESULTING IN GREATER FLUID PRODUCTION OR LOWER OPERATING COSTS OR BOTH

GOOD RESULTS IN HEAVY OIL APPLICATIONS

GOOD LIFE IN “SANDY” WELLS

GOOD RESULTS IN HORIZONTAL PUMPING WELLS

GAS BREAKER OPTION CAPABLE OF LIFTING FLUID WITHOUT GAS LOCKING IN VERY HIGH GAS/FLUID RATIO WELLS

PETROVALVES ARE INHERENTLY MORE EXPENSIVE THAN COMPARABLEAPI INSERT VALVES BUT CONSTITUTE A SMALL FRACTION OF TOTAL PUMPSYSTEM COST

DEGREE OF ENHANCEMENT DEPENDS ON RESERVIOR CONDITIONS