Page 1: Beam Test Plan 1999 P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999

Beam Test Plan 1999

P. Roger Williamson

Hansen Experimental Physics Laboratory

Stanford University

GLAST Collaboration Meeting

GSFC

February 10, 1999

Page 2: Beam Test Plan 1999 P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999

prw 2/10/99

Beam End

Workstations

SETS acquirehextabulartrackerhisto

Tornadowindshlaunchwindview

Reflective Memory

Cisco 2924C-XL Fast Ethernet Switch

Instrument Data Bus

Counting House

To Internet &Beam Control, non-event data

NIM Bin

Fiber-optic100 Base FX

PowerConditioner120V AC

28V Powersupply

Beam Tower

Beam DPHSK

L1Trigger

SpacecraftSimulatorCommandTelemetry

S/C Data packetACS Simulator

GPS Position & Time Simulator

PrototypeTowerTracker

CalorimeterAnti-coincidence

HSKL1T, L2T, L3T

ESA BeamEvent Data

Beam Pulse REQTTL level50Ω Term.

Position Sensor and Control

Cisco 2924C-XL Fast Ethernet Switch

Stanford/HEPL Provided

SLAC Provided

Beam Test 1999 Components

Page 3: Beam Test Plan 1999 P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999

prw 2/10/99

Level 1 Trigger

• Beam Tower – Utilize ACDREQ in

L1T FPGA

– Beam pulse variable delay time w.r.t. particle arrival (includes pre-trigger)

– Input can be enabled or disabled by command

• Prototype Tower– L1T

• ACD

• CAL

• TKR

– All inputs can be enabled or disabled

Page 4: Beam Test Plan 1999 P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999

prw 2/10/99

Spacecraft Simulator

• Forward commands

• Forwards telemetry data packet

• Assembles SC data packet

• Attitude simulator– Reads table position

controllers

– Transmits simulated attitude data to towers

• GPS simulator– Transmits simulated

position data to towers

– Transmits simulated GPS time data to towers

– Transmits GPS sync to towers

Page 5: Beam Test Plan 1999 P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999

prw 2/10/99

Simulated Spacecraft Communications

• Cisco 2924C-XL Switch

• 10 or 100Mb/S twisted pair Ethernet between towers

• 100Base-FX fiber Ethernet uplink/downlink

• Simulated uplink for commands

• Simulated X-band downlink at 100 Mbps

Page 6: Beam Test Plan 1999 P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999

prw 2/10/99

Run Control

• Enter data in web page– Boxes auto-fill

– Replaces “Run Log” pages

• Start sends the start run command – To Spacecraft Simulator

– To Beam Control

• Does NOT replace written logbook

GLAST Run ControlRun # GMT

Comment Box

Run data sheet infoin this section

(previously on paper)

Add Comment

(Re)Start Run Stop Run

Page 7: Beam Test Plan 1999 P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999

prw 2/10/99

Beam Test 1999 Software Tasks

• Run Control input form

• SETS startup scripts– stripcharts

– tabular displays

– striptabs

• SETS histograms

• glastsim analysis interface

• Revitalize tjrecon, etc

• glastdaq– data packet definition

– data acquisition

– L2T

– L3T

– file management

– watchdog timer

– setup scripts

• beamtower– data packet definition

– data acquisition

– L2T

– L3T