Before, During, After the Storm: The Keys to Emergency Response. Outline. What’s Being Protected? A little more about the Santa Ana River and Brine Line Storm Response Pre-Planning – Emergency Response Plans, Training The Event Storm Impacts and Follow-On Actions – repairs, lessons learned. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Before, During, After the Storm: The Keys to Emergency Response
Page 2: Before, During, After the Storm: The Keys to Emergency Response

What’s Being Protected? A little more about the Santa Ana River and Brine

Line Storm Response

Pre-Planning – Emergency Response Plans, Training

The Event Storm Impacts and Follow-On Actions – repairs,

lessons learned

Page 3: Before, During, After the Storm: The Keys to Emergency Response
Page 4: Before, During, After the Storm: The Keys to Emergency Response
Page 5: Before, During, After the Storm: The Keys to Emergency Response
Page 6: Before, During, After the Storm: The Keys to Emergency Response

“Tee” Levees in Orange County

Page 7: Before, During, After the Storm: The Keys to Emergency Response

Major Dischargers 6 Brackish Groundwater Desalters (50 MGD of potable

water) 3 Power Plants (2000 MW; ~1.5 M Homes) 2 State Prisons (10,000 inmates) Various Industries Hauled Brine Wastewater (4 stations, 60 trucks/day)

Economy of Inland Empire - over $1B, 4,000 jobs

Water Quality of Santa Ana River, OC Beaches

OCSD Treatment Plants

Page 8: Before, During, After the Storm: The Keys to Emergency Response

Pre-Planning Emergency Response Plan – OCSD, SAWPA,

Corps Annual plan update, meeting, training in fall “Just-in Time” Training

The Event Lots of rain in short period of time resulting

in high river flow and volume Twice daily coordination: Corps, OCSD,

SAWPA, OCWD, OC PW, RCFC

Page 9: Before, During, After the Storm: The Keys to Emergency Response

Top of Embankment

Conservation Pool 505’

543’

Spillway Elevation (188k AF)

594.4’

Inspection/Repair 100cfs

5,000cfs 3,000cfs

Debris Pool 498’

Page 10: Before, During, After the Storm: The Keys to Emergency Response
Page 11: Before, During, After the Storm: The Keys to Emergency Response
Page 12: Before, During, After the Storm: The Keys to Emergency Response

SAVI Ranch

Gypsum

Canyon

Coa

l Can

yon

91

241

Green R

iver Golf

Course

Page 13: Before, During, After the Storm: The Keys to Emergency Response
Page 14: Before, During, After the Storm: The Keys to Emergency Response
Page 15: Before, During, After the Storm: The Keys to Emergency Response

Grade Stabilizer at Green River Golf Course

Grade Stabilizer at SAVI Ranch

Page 16: Before, During, After the Storm: The Keys to Emergency Response

1/13/11 topographic survey over pipe 3 locations within floodplain - Orange County Two “scour pockets” over pipe found

SAVI Ranch Grade Stabilizer Green River Golf Course Grade Stabilizer

Coal Canyon – minor erosion, debris accumulation Work ongoing, OCSD contractor

Emergency rock placement, debris removal 1/20 - 25/11

Cost unknown at this time FEMA reimbursement will be requested by OCSD

Page 17: Before, During, After the Storm: The Keys to Emergency Response

Reach IV

Aliso Creek

Page 18: Before, During, After the Storm: The Keys to Emergency Response

Lateral to CA Rehabilitation Center

Auburndale Street Looking South

Page 19: Before, During, After the Storm: The Keys to Emergency Response

Euclid Ave. Looking North

Page 20: Before, During, After the Storm: The Keys to Emergency Response

Reach V Temescal Canyon RD near Trilogy RD

Page 21: Before, During, After the Storm: The Keys to Emergency Response

SAR is operated as an integrated system Team approach to response – lots of coordination Existing relationships key to success Ongoing joint activities, projects

Emergency Response Plan Good overall plan. Some fine tuning required. “Just-in-time” training for key participants was invaluable.

Prado Dam Water Surface at Record Elevation (529.4 ft) Water-tightness of the pipe, MASs confirmed. Seals at several MASs to be evaluated for improvement

especially at the higher water surface elevation.

Page 22: Before, During, After the Storm: The Keys to Emergency Response

Brine Line in Orange County Coordination team established: Corps, OCPW, OCSD,

OCWD, RCFCD, SAWPA created Effectively communicated issues and identified solutions. Result: reduction in dam outflow from 5,000 cfs to 2,500

cfs for 4 days and a reduction to 100 cfs to facilitate inspection/repair.

Group should be formalized in the agencies’ emergency response documents.

Areas of erosion over pipe, around MAS Traditional trouble spots remain. New locations identified. Erosion locations need to be evaluated for protection

measures to prevent or reduce future erosion.