benefits of gml-3 (gprs based meter and data logger) over traditional meters

1
Version-1.3 GML-3: An E C GPRS BASED METER AND LO Initial cost of GML-3 is in the ra ( including Server subscriptio Rs 99/month for SIM + 5w energy means Rs.9/month Per Year meter running cost(108x12 Free software prov Total cost of GML-3 for fi Rs.26,500+Rs.1,296x Rs.32,980/ Simple to install: just like a thre Your electrician can easily replace location. No wire connection require to a computer/laptop. Install on any machine easily and events on internet from any rem Effective Solution for Energy Man COMPARISON SHEET OGGER (GML-3) TRADITIONAL ENERG INTIAL COST ange of 26,500 on for 5 years) Initial c 50,00 30,000 f + data converter+ meters+ in RUNNING COST M card for electricity. 2) = Rs 1296.00 Meter + electronic circuit @ Rs 720/month (Some Companies charge ex Per Year Meter runnin SOFTWARE LICENSING COST vided More than Rs.40 TOTAL COST FOR FIVE YEAR PERIOD ive year is x5 = Total cost of Tradition m Rs.50,000+Rs.30,000 Rs.1,6 COMPLEXITY ee phase meter. or install at other Specialized persons visit f and insta You cannot change the s access data on any . Requires a table/Chair and the comp d view data and mote location. Need to buy specialized SC at any other location Date: 02-05-14 ©Embuilt Technologies nagement GY MANAGEMENT SYSTEM cost is high. 00 upward + for computer nstallation+ software customization t + data converter + computer @200 W power h for electricity only xtra per year for software license) ng cost :12X720=RS 8,640 0,000 + customization meter system for five year is 0+Rs.8,640X5 +Rs.40000= 63,200 plus from the company to do wiring allation for you. system yourself after they go. d dedicated persons to monitor puter for 24 hrs CADA System if you want to view

Upload: embuilt-technologies

Post on 22-Jul-2015

37 views

Category:

Technology


1 download

TRANSCRIPT

Page 1: Benefits Of GML-3 (GPRS BASED METER AND  DATA LOGGER) Over Traditional Meters

Version-1.3

GML-3: An Effective Solution for Energy Management

COMPARISON SHEET

GPRS BASED METER AND LOGGER

Initial cost of GML-3 is in the range of

( including Server subscription

Rs 99/month for SIM card

+

5w energy means Rs.9/month for electricity.

Per Year meter running cost(108x12)

Free software provided

Total cost of GML-3 for five year

Rs.26,500+Rs.1,296x5

Rs.32,980/

Simple to install: just like a three phase meter.

Your electrician can easily replace or install at other

location.

No wire connection require to access data on any

computer/laptop.

Install on any machine easily and view data and

events on internet from any remote location.

An Effective Solution for Energy Management

COMPARISON SHEET

GPRS BASED METER AND LOGGER (GML-3)

TRADITIONAL ENERGY MANAGEMENT

INTIAL COST

3 is in the range of 26,500

subscription for 5 years)

Initial cost is high.

50,000 upwa

30,000 for computer+ data converter+ meters+ installation+ software customization

RUNNING COST

Rs 99/month for SIM card

/month for electricity.

(108x12) = Rs 1296.00

Meter + electronic circuit +

� @200

Rs 720/month for electricity(Some Companies charge ex

Per Year Meter running cost

SOFTWARE LICENSING COST

Free software provided More than Rs.40,000

TOTAL COST FOR FIVE YEAR PERIOD

for five year is

x5 =

Total cost of Tradition meter system

Rs.50,000+Rs.30,000+

Rs.1,63

COMPLEXITY

just like a three phase meter.

electrician can easily replace or install at other

Specialized persons visit from the company to do wiring

and installation for you.

You cannot change the system yourself after they go.

No wire connection require to access data on any

computer/laptop.

Requires a table/Chair and dedicated persons to mo

the computer for 24 hrs

Install on any machine easily and view data and

events on internet from any remote location.

Need to buy specialized SCADA System if you want to view

at any other location

Date: 02-05-14

©Embuilt Technologies

An Effective Solution for Energy Management

AL ENERGY MANAGEMENT SYSTEM

Initial cost is high.

,000 upward

+

000 for computer meters+ installation+ software customization

electronic circuit + data converter + computer

@200 W power

/month for electricity only Some Companies charge extra per year for software license)

Meter running cost :12X720=RS 8,640

Rs.40,000 + customization

Tradition meter system for five year is

0,000+Rs.8,640X5 +Rs.40000=

63,200 plus

persons visit from the company to do wiring

and installation for you.

cannot change the system yourself after they go.

hair and dedicated persons to monitor

the computer for 24 hrs

Need to buy specialized SCADA System if you want to view