The Giant Ormen Lange Field Development Hydro’s model for arctic offshore projects. World Gas Conference Amsterdam, June 6 th 2006. Bengt Lie Hansen Senior Vice President, Hydro Oil & Energy. Ormen Lange paves the way to an exciting future. Ormen Lange field, discovered 1997 - PowerPoint PPT Presentation

TRANSCRIPT

  • Bengt Lie HansenSenior Vice President, Hydro Oil & Energy The Giant Ormen Lange Field Development Hydros model for arctic offshore projects

    World Gas ConferenceAmsterdam, June 6th 2006

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    Ormen Lange paves the way to an exciting futureOrmen Lange field, discovered 1997Large technological challenges in deep water solved in time Hydro has operator responsibility for the development amounting to USD 10 billionThe gas is brought ashore for processing in Norway and piped 1200 km to the UKTo come on stream in 2007

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    Source: Global Insight (July 2005) Ormen Lange securing Europes largest gas marketHydros Ormen Lange project will secure 20% of UKs gas demandWill make Norway the second largest gas supplier in the world after RussiaProbably the most challenging gas development globally todayOrmen Lange to supply Europes largest gas market

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    Key technology challenges OffshoreExtremely uneven seabed for subsea- and pipeline design and installation

    Main production area in an avalanche / slide area

    Extreme temperatures, minus 1.2C at seabed

    Challenging waves and winds

    Strong current

    850 1100 metres water depth

    High subsea production

    Long tie back

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    Ormen Lange Field Location Storegga slide area (8200 years ago) Only a new ice age will bring about the conditions for new large scale slide

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    2x30" multiphase lines-250mStoregga slide edgeTemplates A & BControl umbilicalsand MEG linesTemplates C & D-850m

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    Ormen Lange technologically groundbreakingAll production templates sub-sea at 850 meter water depthRugged seabed with steep hillsFlow assurance in temperatures below zero CelsiusFuture compression sub sea system being qualified at NyhamnaLargest sub sea development in the world

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    Ormen Lange - onshore processing at NyhamnaSeparation of gas, condensate and waterRemote operation of sub-sea installations 120 km offshoreAnnual Export of 21 BCMReady for use in October 2007

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    Langeled - breaking records from Norway to UKThe world's longest sub-sea pipeline systemFirst delivery of Norwegian gas to the UK this yearOrmen Lange gas will flow through Langeled October 2007

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    BPCentrica Easington Receiving Facilities in the UK

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    Ormen Lange - on schedule and within budget 70% completedOffshore (62%)Onshore (60%)Langeled (79%)

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    Ormen Lange summary:We are on schedule and within budget!Well defined concept at time of decisionInnovative and cost effective solutionsFocus on risk management throughout executionOnshore experience from Sunndalsra and QatarActive stakeholder management

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    Shtokman the offshore locomotive in the ArcticMega project. Contains 3600 billion cubic meters of gasSize allows for own infra structureShtokman is a door opener for further offshore developments in the region Shtokman can secure both US and European energy supply

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    Additional Challenges on Shtokman Beyond Ormen LangeTechnicalDistance to shoreFlow AssuranceControl of long tie-back wellsOperationalGas Liquefaction LNG Offloading

    Health, Safety & Environmental (HSE)Arctic environment

    Ice/MetoceanDesign parameterIce management

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    The Arctic: A strategic area for world energy supplyThe arctic may contain 24 per cent of remaining undiscovered global resources *US and EU looking for energy supply diversityOrmen Lange a model for future arctic projects

    *Source: USGS

    LHB Date: 2005-06-07 Page: * Hydro Oil & Energy

    Europe has a gas demand challenge; it is currently becoming more and more dependent on natural gasEuropean gas demand increasing from present around 500bcm to 735 bcm in 2020 (mainly increase in gas for power)The indigenous EU availability is fallinglargely due to the sharp decrease in UK productionUk has traditionally been a gas exporter, but is now converting to having a strong import needWhen Ormen Lange comes onstream in October 2007, it will have also contributed to significantly improving the Norwegian gas export infrastructure by increasing volume capacity by 25%.

    Dette skal vi se litt nrmere p gjennom foredrageneOrmen Lange lies in The Norwegian Sea, Regarded as one of the toughest seas in the world concerning wind, waves and currents Future developments in the arctic faces the same challenges that Hydro has solved on Ormen LangeQualification work for future compression sub sea

    Norway and Russia sharing strategic borders in the Arctic, holding petroleum deposits on both sides of the borderThe Arctic petroleum locomotive lies in the Russian Barents Sea - Shtokman