benjamin franklin elementary school...benjamin franklin elementary school sd presentation set...

8
11/13/2013 BENJAMIN FRANKLIN ELEMENTARY SCHOOL SCHEMATIC DESIGN PRESENTATION SET

Upload: others

Post on 28-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BENJAMIN FRANKLIN ELEMENTARY SCHOOL...benjamin franklin elementary school sd presentation set 11/13/2013 shade tree/ stormwater capture strips bioswale existing fence-line vine-planted

11/13/2013

BENJAMIN FRANKLIN ELEMENTARY SCHOOLSCHEMATIC DESIGN PRESENTATION SET

Page 2: BENJAMIN FRANKLIN ELEMENTARY SCHOOL...benjamin franklin elementary school sd presentation set 11/13/2013 shade tree/ stormwater capture strips bioswale existing fence-line vine-planted

BENJAMIN FRANKLIN ELEMENTARY SCHOOLSD PRESENTATION SET

11/13/2013

SHADE TREE/ STORMWATER CAPTURE STRIPS

BIOSWALE

EXISTING FENCE-LINE

MEASURE S SCOPE PROPOSITION 84 SCOPEVINE-PLANTED FENCE NATIVE HABITAT GARDENS

GARDEN LABS

KINDERGARTEN YARD

INTERPRETIVE HABITAT GARDENS

INTERPRETIVE SIGNS

BIOSWALELOW INFILTRATION POINT

COMMUNITY ACCESS FROM STREET TO FACE OF BUILDING

COMMUNITY ACCESS FROM STREET TO FACE OF BUILDING

PLANTED VINES ON EXISTING FENCE

COMMUNITY ACCESS FROM STREET TO FACE OF BUILDING NEW LANDSCAPE AREAS

(ASPHALT REMOVED)

PERIMETER HABITAT GARDENS

14,508 SF

CONTINUOUS COMMUNITY PATH

(E) CONCRETE

VINE-PLANTED FENCE

COMMUNITY ACCESS FROM STREET TO FENCE LINE

COMMUNITY ACCESS FROM STREET TO FENCE LINE

COMMUNITY GATHERING AREA

COMMUNITY GATHERING AREA

LANDFORM AMPHITHEATER + SEATING

OPEN RECYCLED DECKING

NATIVE LEARNING GARDEN

RAISED PLANTERS

SHADE TREE/ STORMWATER CAPTURE STRIPS

SHADE TREE/ STORMWATER CAPTURE STRIP

PERMEABLE HARDSCAPE

SAFE DISPERSAL AREA

PERMEABLE HARDSCAPE

7,420 SF

SHADE/STORMWATER CAPTURE STRIPS

3,644 SF

SAFE DISPERSAL AREA

12,000 SF

OPEN RECYCLED DECKING

1,062 SF

LANDSCAPE BERMS

4,312 SF

RAIN GARDENS

700 SF

NATIVE LEARNING GARDEN

1,353 SF

GARDEN LABS

TOTAL REMOVED ASPHALT EQUALS 46,546 SF

TOTAL REMAINING ASPHALT EQUALS 32,030 SF

LEGEND

PROPOSED DROUGHT TOLLERANT SHADE TREES

EXISTING PRESERVED TREES

EXISTING PRESERVED EUCALYPTUS TREES

PERMEABLE HARDSCAPE

(E) ASPHALT

PERMEABLE SURFACES

PATH

MULTIPURPOSE LANDSCAPE SURFACE

VINE-PLANTED FENCE

1,547 SF

LANDSCAPING

KINDERGARTEN YARD

PAINTED WALKING PATH, NOT IN GRANT SCOPE

NATIVE BOTANICALRAIN GARDENS + SEATING

NEW CLASSROOM BUILDINGS

LANDSCAPE BERM

LANDSCAPE BERMS

STORMWATER FLOWS

STORMWATER FLOWS

STORMWATER FLOWS

Page 3: BENJAMIN FRANKLIN ELEMENTARY SCHOOL...benjamin franklin elementary school sd presentation set 11/13/2013 shade tree/ stormwater capture strips bioswale existing fence-line vine-planted

BENJAMIN FRANKLIN ELEMENTARY SCHOOLSD PRESENTATION SET

11/13/2013

N

Page 4: BENJAMIN FRANKLIN ELEMENTARY SCHOOL...benjamin franklin elementary school sd presentation set 11/13/2013 shade tree/ stormwater capture strips bioswale existing fence-line vine-planted

BENJAMIN FRANKLIN ELEMENTARY SCHOOLSD PRESENTATION SET

11/13/2013

Page 5: BENJAMIN FRANKLIN ELEMENTARY SCHOOL...benjamin franklin elementary school sd presentation set 11/13/2013 shade tree/ stormwater capture strips bioswale existing fence-line vine-planted

BENJAMIN FRANKLIN ELEMENTARY SCHOOLSD PRESENTATION SET

11/13/2013

Page 6: BENJAMIN FRANKLIN ELEMENTARY SCHOOL...benjamin franklin elementary school sd presentation set 11/13/2013 shade tree/ stormwater capture strips bioswale existing fence-line vine-planted

BENJAMIN FRANKLIN ELEMENTARY SCHOOLSD PRESENTATION SET

11/13/2013

Page 7: BENJAMIN FRANKLIN ELEMENTARY SCHOOL...benjamin franklin elementary school sd presentation set 11/13/2013 shade tree/ stormwater capture strips bioswale existing fence-line vine-planted

BENJAMIN FRANKLIN ELEMENTARY SCHOOLSD PRESENTATION SET

11/13/2013

Page 8: BENJAMIN FRANKLIN ELEMENTARY SCHOOL...benjamin franklin elementary school sd presentation set 11/13/2013 shade tree/ stormwater capture strips bioswale existing fence-line vine-planted

BENJAMIN FRANKLIN ELEMENTARY SCHOOLSD PRESENTATION SET

11/13/2013