Port of Astoria Pier 2 Note: Replaced sections/ columns highlighted orange Bents with Good Land Access
Results of Inspection 9/2015 & 1/2016, 9/2016 Current totals as of 9/15/2016 Updating as of 10/7/2016 Need Deck Assessment from Gerrard/Swanstrom
27 40 66 87
103 Access hatch in deck
#22527 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 118
Bt F - A 534 122 14 35 56 2 0 1 18 2 0 0 1530 240 0 0 2680 50 0 0 0 0 0 0 0 0 0 0 287 Access through Hole
Bt 1 - 50 4878 1081 56 90 729 39 37 23 419 4 37 10 17995 3757 8 0 23856 750 0 0 0 30 0 0 0 1 0 0
Bt 51 - 84 6469 0 10 36 643 1 10 25 441 0 12 10 15012 0 0 0 17808 0 0 0 0 10 0 0 0 20 0 0
Totals 11347 1081 66 126 1372 40 47 48 860 4 49 20 33007 3757 8 0 41664 750 0 0 0 40 0 0 0 21 0 0
#22452 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4
Bt 85 - 90 805 0 14 53 113 0 2 6 85 0 5 0 0 2592 0 0 0 3456 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Bt 91 - 110 3316 0 2 169 294 0 13 22 237 1 7 5 0 7464 0 0 0 7936 0 0 0 62 0 0 0 0 0 0 0 0 0 0
Bt 111-146 5810 767 207 481 607 19 13 25 375 3 15 37 0 11292 28 8 0 22656 0 0 34 212 0 1 0 2 0 0 0 3 0 0
Bt 147-201 4246 6 8 64 709 82 50 17 0 0 0 0 0 23496 0 0 0 28518 10 0 30 343 10 0 2 2 0 0 5 7 5 0
Totals 13372 773 217 714 1610 101 76 64 612 4 22 42 0 42252 28 8 0 59110 10 0 64 617 10 1 2 4 0 0 5 10 5 0
#22526 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4 CS1 CS2 CS3 CS4
Bt 202 - 232 0 4659 19 188 466 0 5 10 318 0 17 83 0 10030 50 0 0 15824 0 0 0 0 0 0 0 0 0 0 0 1258 0 86
Bt 233 - 273 2626 0 267 1170 524 7 5 53 378 15 36 112 0 14672 40 96 0 1824 0 0 0 0 0 0 5 0 0 0 0 14442 36 526
Bt 274 - 308 0 6 134 742 437 21 1 41 257 6 26 86 0 12768 360 0 0 3858 0 0 0 0 0 0 9 0 0 0 0 11644 426 1020
Totals 2626 4665 420 2100 1427 28 11 104 953 21 79 281 0 37470 450 96 0 21506 0 0 0 0 0 0 14 0 0 0 0 27344 462 1632
NOTE: Bent #229 not used
Assumptions: As labeled in field
1 Timber Caps, Girders, Decks were in CS1 if not identified as anything worse. If there's only one number, Original Orange Paint and placards
2 Same for Steel Caps and piles and RC Deck; missing columns aren't counted Bent #, correct as of UW
3 Timber Piles, Columns and Steel Piles were in CS1 if not identified as anything worse. Inspection: As determined by lidar
This may or may not be a reasonable assumption (original dwg)
It is based on the idea that we inspected many more piles than girders and caps \\7de7400gl\share\AstoriaPier2\1-25-2016
Note: Posts & Caps are 14 x 14, Therefore 5x-4r-5x = CS2, 3x-8r-3x = CS3
Piles are 14" dia. Therefore 3x-8r-3x = CS3, 2x-10r-2x = CS3 \\S7000b\BridgeMgmt\Images_Other\Port_Astoria_9_15_photos
10% Bearing loss considered CS2 for this purpose, >50% = CS4 (1 ft/ timber cap)
\\7de7400cw\SHARE\Port of Astoria \\S7000b\BridgeMgmt\Images_Other\Port_Astoria_1_16_photos
Aug-16
Steel pile(each)Timber Cap (lf) Timber Pile (each) Timber column (each) Timber Girder (lf) RC Deck (sf) Steel Cap (lf)
Timber Deck (sf)
Steel pile(each)
Timber Cap (lf) Timber Pile (each) Timber column (each) Timber Girder (lf) RC Deck (sf) Steel Cap (lf) Steel pile(each)
Timber Cap (lf) Timber Pile (each) Timber column (each) Timber Girder (lf) RC Deck (sf) Steel Cap (lf) Steel column (each)
Bent No.(Bent No.) (Bent No.)
Port of Astoria Pier 2 Cross Bracing & Girders generally not pictured Green Remaining Bearing #22452 1/4
Results of Inspection 9/2015 & 1/2016 3-4 girders per pile. Girders are 13.5" x 6" Red Section Loss
BEGIN BRIDGE 22452 Caps are 14" x 14" Unless otherwise noted, piles & columns - CS1, caps & girders - CS2
14" Dia Between Piling 4 Between Bents 8 piles 18
Notes: 6" overhang of girders
Green Text Remaining Bearing
14" Dia Between Piling 4 Between Bents 10 ft piles 17
Notes: 6" overhang of girders
Bent 85
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Bent 86
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
4x-6
r-4x
0%
R
4x-6
r-4x
R
25'
0% 0%
0% 0% 0%80% 0% 0% 0% 0%0% 50%
26'75% 70% 0%0% 0% 75% 0% 80%0% 70%
0% 0% 0%
14" Dia Between Piling 5 Between Bents 8 piles 17
Notes: 6" overhang of girders
14" Dia Between Piling 4 Between Bents 8 Piles 19
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 88-107 making boat access impossible.
Bent 87
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
She
llS
hell
3x-8
r-3x
Bent 88
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
She
ll
4x-6
r-4x
R
R
4x-6r-4x
R
4x-6r-4x
R
4x-6
r-4x
R
Floating platforms in the way
CS3
30'75% 70% 0%0% 0% 75% 0% 80%0% 70%
30'
50% 25% 0%10% 60% 50% 50% 25%
14" Dia Between Piling 4 Between Bents 8 Piles 17
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 88-107 making boat access impossible.
14" Dia Between Piling 5 Between Bents 8 Piles 17
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 88-107 making boat access impossible.
Bent 89
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Bent 90
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
4x-6
r-4xR
28'
28'
75% 25% 0%0% 0%50% 0% 0%
She
ll
R
75%
75% 25% 0%0% 0%50% 0% 0%75%
Shell
Shell
She
llR
She
ll
R
She
ll
R
Port of Astoria Pier 2 Cross Bracing & Girders generally not pictured Green Remaining Load Bearing #22452 2/4
Results of Inspection 9/2015 & 1/2016 3-4 girders per pile. Girders are 13.5" x 6" Red Section Loss
BEGIN BRIDGE 22452 Caps are 14" x 14" Unless otherwise noted, piles & columns - CS1, caps & girders - CS2
14" Dia Between Piling 8 Between Bents 10
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
14" Dia Between Piling 6 Between Bents 10
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
From Rick's notes, it looks like the sill partially protudes into or out of the bent with 100% bearing on the vertex
(91)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
3x-8
r-3x
3x-8r-3x
(92)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
She
ll
3x-8
r-3x
50%
R
R
R
cs4 split
3x-8
r-3xR
8 ft
0%50%
26'
27'50%0%0% 0%0%0% 0%
30%10%70% 0%60%0% 0%50%0% 0%
4x-6
r-4xR
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
14" Dia Between Piling 6 Between Bents 10 ft
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
(93)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
She
ll &
Saw
cutt
4x-6
r-4x
(94)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
4x-6
r-4x
cs4 split
3x-8r-3x
26'0%50%0% 0%75%0% 25%0%0% 0% 0%
26'
3' O.C.1'6'
0%25%50% 0%75%0% 0%0%30% 0% 50%
0%0%0%
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
14" Dia Between Piling 4 Between Bents 10
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
(95)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
4x-6
r-4x
She
ll
(96)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
R
R
3x-8
r-3x
3x-8
r-3x
0%5%0% 0%60%0%
cs3 split/ rot
30% 70%0%0% 0%
26'
0%20% 0%0%0%10% 40% 50%0% 0%
24'0% 0%
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
There is an access hatch between bents 102 & 103 near pile 1
(97)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
She
ll
(98)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
4x-6
r-4x
She
ll
She
ll
She
ll
She
ll
CS4 Split
6-8"R
6-8"R
Dolphin at end of this Bent
8'
24'
0% 0%0%0%50% 70% 70%0% 0% 0% 0% 0%
0% 0%0%0%50% 70% 70%0% 0% 0% 0% 0%24'
She
ll
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
There is an access hatch between bents 102 & 103 near pile 1
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
(99)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
4x-6
r-4x
She
ll
(100)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
She
ll
She
ll
6-8"R
6-8"R
Steel Cap
0% 0%0%0%50% 70% 70%0% 0% 0% 0% 0%23'
32'
Steel Cap
0%0%0%0% 70% 70%0% 0% 0% 0% 0%
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
Sheetpile Backwall Starts Here
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
(102)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
4x-6
r-4x
(101)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
0%
% remaining bearing
4 dry
4 dry
25% 0% 0% 0% 10% 0% 10% 10% 0%20%
Rot at x-beam
0% 0% 60% 0% 20% 0% 30% 0% 0% 0%40%
% remaining bearing
20'
20'
29'
32''Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
She
ll
She
ll
She
ll
She
ll
Replaced (was CS4 rot see picture))
14" Dia Between Piling 4 ft Between Bents 10 ft
There is an ACCESS Notes: 6" overhang of girders, severe bearing loss this bent
HATCH at Backwall There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
There is a series of wooden platforms in front of bents 90-107 making boat access impossible.
(103)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19
4x-6
r-4x
4x-6
r-4x
4x-6
r-4x
(104)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
4x-6
r-4x
She
ll She
ll
Steel Cap
Steel Girder at end
Ladd
er b
etw
een
104
&10
5
70% 0% 0% 90% 0% 20% 0% 60% 0% 0%60%
100% 0% 90% 0% 0% 0% 50% 0% 0% 90%100%20'
24'
% remaining bearing
29'
29'Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
50% 50% 50% 50% 50%
Replaced (was 4-6-4)
Replaced(No Previous Problems)
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
There is a fiberglass form underneath the deck
(105)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
She
ll
(106)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
4x-6
r-4x
4x-6
r-4x
Steel Girder at end
Steel Girder at end
Steel Cap
6-8"R
20% 10% 0% 10% 10% 0% 60% 0% 0%0%
29'
24'50%0%
0% 20% 60% 0% 0% 20% 0% 40% 0%20%
32'
24'
0%
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
Replaced(Previously a Shell)
4x-6
r-4x
4x-6
r-4x
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders(107)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
Steel CapSteel Caps
Steel girder
large cleats
yellow plackard
60% 0% 0% 20% 0% 0% 0% 0%00%
32'
28'
60%
Split x-Brace
CS4R
Divers: Critical priority to repair Bent 3/2016
Replaced (Previously a Shell)
4x-6
r-4x
Port of Astoria Pier 2 Cross Bracing & Girders generally not pictured Blue Bearing Loss #22452 3/4
Results of Inspection 9/2015 & 1/2016 Shimmed 3-4 girders per pile. Girders are 13.5" x 6" Red Section Loss
BRIDGE 22452 Caps are 14" x 14" Unless otherwise noted, piles & columns - CS1, caps & girders - CS2
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes: Excessive Bearing Loss
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes: Excessive Bearing Loss
(108)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19
Cru
shin
g
(109)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
3x-8r-3x4x
-6r-
4x
3x-8
r-3x
ShellR
5-6"RShellRShellR
Girders 20, 21 have non-severe splits
8 ft
Steel Girder at end
0% 0% 0% 0% 0% 0%0%
'
32'
0%0%0%75%
Chunk out of pile
25% 10% 75% 0% 0% 75%
28' or 38'
0% 0%0%0% 0% 25%
% remaining bearing
% remaining bearing
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
RBI: Urgent priority to repairBent 3/2016
0% 0% 0% 0%0% 0%0%
0% 0% 0%
0% 0% 0% 0%
0% 0%
0%
Replaced (Previously a 4-6-4 with no bearing)
S
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes: Recent Shimming Below Sill Starts
Denoted with
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes: Excessive Bearing Loss
(110)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19
(111)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19
4-6" decay in cap
3x-8
r-3x
Steel Caps
Can Shim to aleviate Bearing Loss
ShellRShellRShellRShellR
ShellR
0% 0% 0% 0% 0% 80%
28'
0% 30%0%25% 0% 40%
#20
#20
75% 10% 0% 0% 0% 0%
30'
0% 0%20%75% 0% 0%
% remaining bearing
% remaining bearing
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
0% 0% 0% 0% 0% 0% 0%
Replaced (Previously 4-6-4 & Shell)
ShellR
S
S S S
S S S
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
(112)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19
She
ll
Crushing/ Bulging timber Cap Girder #20 has large crack
(113)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Steel Caps
She
ll
yellow plackard
0% 0% 0% 0% 0% 60%10% 0%0%10% 0%
30% 30% 40% 25% 0% 0%0% 0%20%0% 0% 0%
30'
30'
% remaining bearing
% remaining bearing
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
RBI: Urgent priority to repair Bent 3/2016
0% 0% 0% 0% 0%0% 0%0%0% 0%
0% 0% 0% 0% 0%
Replaced (Previously no problem)
New
S S S
S S S S
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes: All Driven Piles
14" Dia Between Piling: 2 ft Between Bents: 8 ft
Notes: Firewall/ Seawall north side of bent -- the otherside of which gives unobstructed access to land
(114)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
She
ll
(115)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Access Hole
Steel Caps
6"R 10"R
#21 #22
Broken Girder approx 30 ft from Pile 1. Between Bt. 117 &1186"
Dec
ay
Broken Girder approx 30 ft from Pile 1. Between Bt. 117 &118
4 ft
10% 0% 0% 0% 10% 100%0% 0%0%30% 0% 0%31'
100% 0% 50% 0% 25% 0%5% 0%0%40% 0% 0%31'
% remaining bearing
% remaining bearing
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
0% 0% 0% 0%
New
S S S SS
S S S SS
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
(116)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
4x-6
r-4x
She
ll
Steel Caps
ShellR
6"R10"R
(117)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Steel Cap
R
2-3"
R
4x-6
r-4x
8 ft
Steel girder
Large Cleats
CS4
0% 0% 50% 0% 0% 100%0% 0%0%0% 0%31'
0% 0% 50% 0% 0% 80%0% 0%0% 0%0%0%30'
% remaining bearing
% remaining bearing
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
RBI: Urgent priority to repair Bent 3/2016
0% 0% 0% 0% 0%0% 0%
0% 0% 0%0%0%
S S S SS
S S
0% 0%0%
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes: GOOD BoAT ACCESS HERE
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
(118)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
50% S.L. from abbrasion
0% 2-3"
R
(119)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
Sheet Pile Backwall continues
pile cut - no bearing100% 2-3"
R
3x-8
r-3x
8" decay in cap4' of (cs4) rot
Steel Cap
3x-8
r-3x
Steel girder
Steel Girder at end
Steel Girder
#19
Missing Pile
25% 0% 0% 0% 80% 0%0% 0%0% 80%0%30'
0%
0% 0% 75% 40% 0% 0%30% 0%0% 60%0%0% 0% 26'
% remaining bearing
% remaining bearing
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
0% 0% 0% 0%0% 0%
Need Shim
Access Hole
SS S S S S
S S S S
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
(120)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
50%
3x-8
r-3x
Cap Shell
ShellR
ShellR
Crushing Corbel (CS4)
(121)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
6-8" Decay
ShellR
ShellR
4x-6
r-4x
4x-6
r-4x
ShellRShellR
Crushed Sill
Steel cap
Steel Girder
Steel Girder
Ladd
er b
etw
een
124
& 1
23
missing pile
0% 0% 0% 0% 0% 0%30% 50%50% 0%5%0%26'
0% 0% 0% 0% 0% 100%0% 0%0% 5%0%
28'
% remaining bearing
% remaining bearing
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
Sister Post (I don't think it's new)
New Section (see Pictures)
S S
New
S S S
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
(122)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
4x-6
r-4x Shell
R
4x-6
r-4x
(123)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
6-8" Decay & Crushing(Cs4)
Crushing Corbel
Steel Girder
Steel Girder
Steel cap
Steel cap
100% 0% 10% 60% 0% 0%10% 0%0% 25%0%26'
0%0%
0% 0% 75% 0% 0% 0%70% 0%0% 10%0%30'
% remaining bearing
% remaining bearing
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
S S S S
New (was a shell)
Missing
5x-4
r-5x
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
Shimming is not
Nailed in, i.e. Temporary
(124)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
Crushing Corbel
(125)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
ShellR
Shell
6-8" Decay (Cs3)
8" Rot (cs3)
ShellR
6-8" Decay (cs3)
Sheet Pile Backwall Ends
Steel Girder
Steel Girder
0% 0% 50% 0% 0% 20%60% 0%0% 0%90%
cs3R
31'
80% 50% 0% 0% 0% 40%0% 0%10% 0%
4" gap
cs3R
31'
% remaining bearing
% remaining bearing
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
New (was 6" decay)
ShellR
Shell
50%
ShellR
ShellR
ShellR
SS S S
S S
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
New posts still need
shimming
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
Still need shimming above
sill
(126)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
6-8" Decay (cs3)
(127)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
4x-6
r-4x
6-8" Decay (cs3)
Steel Girder
Steel Girder
0% 0% 0% 0% 0% 0%0% 0%80% 0% 70%
0% 0%0%
31'
Missing Pile
0% 0% 0% 0% 75% 0%0% 0%0% 60% 27'
% remaining bearing
% remaining bearing
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
40% 40% 40% 40% 40%40% 40%
80%
6-8" Decay (cs3)
5x-4
r-5x
SS S S
S S SS S
Needs Shimming
ShellR Shell
R
New
5x-4r-5xR
Mis
sing
5x-4
r-5x
ShellR
SS S S
S S SS S
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
Girders OK
128 is BAD - Rick Shorb
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
(128)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
6-8" Decay (cs3)
(129)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
3x-8
r-3x
6-8" Decay (cs3)
100% 100% 100%
4 Steel Piles, Moderate corrosion
ShellR
ShellR
ShellR
ShellR
Missing Cap - Needs replacement--photo exists from Sept 2015
4' severe split
ShellR
ShellR
Brokencs4
Brokencs4
0% 0% 0% 0% 0%100%30
Steel Cap 15'
0% 0% 0%
Steel Pile CS2
missing pile
CS3 2" Decay
RCS4
R
0% 0% 80% 0% 10%0%
Sill is Missing here. 12" Gap
27
% remaining bearing
Divers: Critical piority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
RBI/Divers: Critical priority to repair Bent 3/2016
ShellR Shell
R
Crushing Corbel
Shell
50% S.L (Failed)
SS S S
S S
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
14" Dia Between Piling: 6' Between Bents: 8 ft
Notes:
#16
(130)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Shell
0%
(131)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
Shell & crushing 6" decay (cs3)
8" decay
0% 0% 0% 10%
100%
CS3R
CS4Shattered
10' Gap
0%
10%0%
0% 0% 5%
Steel Cap
0% 0% 0% 0% 0% 0% 50%0% 0% 0% 80%
27
25'
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
RBI/Divers: Critical priority to repair Bent 3/2016
ShellR
0% 0%
Shell & crushing (Urgent)
14" Dia Between Piling: 6 ft Between Bents: 8 ft
Notes:
14" Dia Between Piling: 5 ft Between Bents: 8 ft
Notes:
(132)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4" decay
40%
(133)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
4" decay (cs3)
10 ft
boom blocksboat access
Split x-Brace
26'
0% 0% 70% 0% 0% 0% 80%50% 0% 80% 20%
100% 0% 10% 50% 80%
0% 50%0% 0%0%0%
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
0% 40% 40% 40% 40%
40% 40% 40% 40% 40% 40%
Skewed sill
SS S S
6" decay (cs3)
S S S S S S S S S SS
14" Dia Between Piling: 6-7 ft Between Bents: 8 ft
Notes:
14" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
Need Shimming
(135)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
4" decay (Cs3)
#18
8" decay (cs3)
(134)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
steel cap
ShellR
8 ft
boom blocksboat access
boom blocksboat access
0% 90% 0% 20% 0% 80%
0%0% 70%
0%70% 0%
Bracing not attached at base 23'
0% 100%
0% 90% 0% 0% 0%0% 0%80% 0% 0% 23'
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
40% 40% 40% 40% 40% 40%
decay around bracing bolt
Needs shimming
6" decay (cs3)
ShellR
14" Dia Between Piling: 3 ft Between Bents: 8 ft
Notes: There is a lot of cross bracing in this area There is also some deck leakage
Tree Lodged in
bent
14" Dia Between Piling: 2 ft Between Bents: 8 ft
Notes: There is a lot of cross bracing in this area
(136)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
Steel Cap
6" decay (cs3)
#18
6"R
(137)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
Steel Cap
#18 #19
2x-8
r-2x
6 ft
4 ft
boom blocksboat access
boom blocksboat access
CS4 Split
0% 100%
0% 90% 0% 0% 0%0% 0%80% 0% 0%
23'
CS4 Split
0% 60% 0% 10% 0% 60%
0%0% 0%0% 0%25'
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
New
ShellNeed shimming Need shimming
S S S S SS
14" Dia Between Piling: 3 ft Between Bents: 8 ft
Notes:(138)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
Steel Cap
Shim
1/2" Split6" decay
6 ft
boom blocksboat access
80% 80% 0% 0% 0% 10%
0%0% 5%0% 0%
0%
CS4 Split
26'
Divers: Critical priority to repair Bent 3/2016
Shell
Crushing
14" Dia Between Piling: 3 ft Between Bents: 8 ft
Notes: Actual Bent # is 139
14" Dia Between Piling: 3 ft Between Bents: 8 ft
Notes: Actual Bent # is 140
Narrower round columns & piles
(139)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
Steel CapCS3 Split6" decay
100%
(140)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
Split corbel (Cs3)6" decay
100%
Split 5' to 5' from top. (See picture by G. Leon)ShellR
boom blocksboat access
boom blocksboat access
Ladd
er b
etw
een
143
& 1
44
6"
R - CS4 (broken)
25'0% 20% 0% 0% 0% 20%0% 0%0% 50%
0% 0% 10% 50% 0% 0%0% 10%0% 60%26'
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
6" decay
0%
14" Dia Between Piling: 5 ft Between Bents: 8 ft
Notes:
14" Dia Between Piling: 5 ft Between Bents: 8 ft
Notes:
(141)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Steel Cap
100%
(142)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Steel Cap
100%
10 ft
0% 0% 0% 0% 0% 30%40% 0%90% 90%26'
#16
#16
0% 50% 0% 0% 0% 0%0% 60%50% 10%29'
Divers: Critical priority to repair Bent 3/2016
Divers: Critical priority to repair Bent 3/2016
50% S.L.
CS4 Split
CS4 Split
S S S S SS SS
Need shimming
CS4 Split
6" decay
14" Dia Between Piling: 5 ft Between Bents: 8 ft
Notes:
14" Dia Between Piling: 6 ft Between Bents: 8 ft
Notes:
(143)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12
Steel Caps
6" decay
(144)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
Steel Cap
12 ft
27'
28'
5" Gouge at bottom from dredge
CS4 Split
6" decay
S S S S SS
Split
14" Dia Between Piling: 6 ft Between Bents: 8 ft
Notes: Corregated metal deck above girders,
16" Dia Between Piling: 6 ft Between Bents: 8 ft
Notes:
(145)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12
Steel Cap
12 ft
6" decay
(146)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
original Yellow Plackard: 150
12 ft
CS3 split
28'
28'
0%
6" decay
Port of Astoria Pier 2 Cross Bracing & Girders generally not pictured Blue Bearing Loss #22452 4/4
Results of Inspection 9/2015 & 1/2016 Girders: 14 x 6.5" Spacing: 20" O.C. Red Section Loss
#22452 Caps are 14" x 14" Unless otherwise noted, piles & columns - CS1, caps & girders - CS2
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: JOINT with BENT 149 closely spaced with Bent 148
(147)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
30% section loss (see picture)
6x-2r-6xR
(148)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
6x-2r-6xR
50%
26'
6x-2r-6xR
6x-2r-6xR
6x-2r-6xR
26'
6x-2r-6xR
6x-2r-6xR
6x-2r-6xR
6x-2r-6xR
Rotation
6x-2r-6xR
6x-2r-6xR
Rotation & Crushing
14" Dia Between Piling: 4 ft Between Bents: 2 ft
Notes:
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
(149)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
(150)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14
36'
39'
#14
Rotation
Rotation & Crushing
R
2x-8
r-2x
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
Corrosion in steel deck with two leaks
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
(151)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14
(152)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
#15
36'
34'
cs3 split
0%
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
16" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
The backwall here is leaking a lot of water
(153)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(154)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
ShellR
0%
36'
37'
CS2 1" surface decayl
R
Needs Shimming
0%
16" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: Bumper pile at end of this bent is fractured and missing top 8'
201.0619 28.27433 0.140625
16" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: At this point towards increasing bent numbers, the caps are very difficult
to reach
(155)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
14%
ShellR0%
(156)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14
3" S.L.
6x-2r-6x
R
Angled piles this bent to support conc. slab next bent
Steel cap
37'
CS2 1" surface decayl
R
37'
Needs Shimming
0%
16" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
16" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
25%
(157)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
CS2 3" Hole
R37'
(157a)
#1 #2 #3 #4
8 ft
Steel Cap
Battered
38'
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
158 & 161 share a first corbel and it is CS4 - included on 161
(158)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
CS3 split
4x-6
r-4x
R
CS3 split through
R
missing pile
Tie DownsShimed
Steel cap
CS3 split for 8 ft
25%
10 sqft exposed &corroded rebar
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
14" Dia Between Piling: 5ft Between Bents: 12 ft
Notes: Radial Bent
(159)
#1 #2 #3 #4 #5 #6 #7 #8 #9
8 ft
CS3 split4x
-6r-
4x
R4x
-6r-
4x
(160)
#1 #2 #3 #4
10 ft
Spacer between wall & PIleIs a shell
Steel cap
Shimed
CS2 split
CS3 split for 8 ft
#5
CS3Split w/ hole
CS3 LargeSplit
CS3Large Split
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: Radial Bent
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: Radial Bent
40%
(161)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11
8 ft
3" S.L.
(162)
#1 #2 #3 #4 #5 #6
8 ft
ShellR
33'
33'
CS4
R
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: Numbered Bent 160 is actually the 155th Bent
intersects other bents at back
16" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: Numbered Bent 160 is actually the 155th Bent
Not itntersected with other bents
Bent 163
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12
8 ft
Bent 164
#1b
#2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14
Exposed rebar in deck
5x-4
r-5x
50% 50%
34'
0% Shifted off cap
Chair Pile
#1a
CS3 SplitR
34'
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: there's a lot of large piping between bents 170, 171 & 172 Numbered Bent 170 is actually the 163rd Bent
Bent 165
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
ShellR
(166)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
Access Hatch & Ladder
5x-4r-5xR
1" split (CS4)
R
34'
CS3 split
R
5x-4
r-5x
4" check CS2
Steel Cap
CS4 Possibly broke when Driven
#16 #17
33'
20%
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:(167)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
ShellR
One Cap (timber) Steel Capsplit (Cs4)
3 Steel Pile
31'
5x-4
r-5x
RR
3x-8
r-3x
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:(168)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
Split &Shell, Crushing
R
CS3 split
#16 #17
31'R
5x-4
r-5x
ShellR
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: Can walk on bracing at these bents
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: Major Leakage in deck around pile 2
deck
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #16
(169)
CS3 split
R
5x-4
r-5x
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(170)
#15
CS2 CHECKS
33'
#16
33'
4" check CS2
Steel caps
Split/ Shell (cs4)
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(171)Crushing (cs4)
R
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(172)
steel pile 12" dia
Steel Cap
R
3x-8
r-3x
RBI: Urgent priority to repair Bent 3/2016
3 steel columns
3/4" x 3" check
34'
4 dry
#16
R 3x-8
r-3x
#16
1/2" wide split CS2
34'
CS2 6'
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
1" Split
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: deck leaks
1" Split
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(173)
steel column 12" dia
Steel Cap
R
3x-8
r-3x
25% 25%
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(174)Steel Cap
R
3x-8
r-3x
25% 25%
Crushing RBI: Urgent priority to repair Bent 3/2016
#16
31'
31'
4 dry
4 dry
#16
0%
R
5x-4
r-5x
R
12-1
0r-2
x
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: deck leaks
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes: Deck leaks
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(175)Steel Cap
75% 60%
Crushing
25%
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(176)Steel Cap
25% 60%
Crushing
25%
RBI: Urgent priority to repair Bent 3/2016
RBI: Urgent priority to repair Bent 3/2016
32'
33'
4 dry
4 dry
Steel Cap
CS3 Check
3x-8
r-3x
R
R
5x-4
r-5x
Hole drilled for ladder access
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(177)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(178)
32'
33'
3 dry
4 dry
#16
#16
20% Section LossCS3
Steel CapDrainage pipe with broken connection over pile 3
Drainage pipe with broken connection over pile 3 see pictures
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(179)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(180)
36'
4 dry
29'
4 dry
Seawall
Steel cap
Steel Columns
#16 #17
CS3 Split
14" Dia Between Piling: 4 ft Between Bents: 10 ft
Notes:
16" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14
(181)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(182)
CS3 8"
29'
4 dry
Steel cap
37'
CS3 6"Check/ Split
Steel Column
Steel cap
10%
60%60%60%
16" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
16" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(183)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(184)
#16
32'
#16
33'
R
5x-4
r-5x
Crushing
R
3x-8
r-3x
16" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
16" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(185)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(186)
33'
Steel Cap , columns
#16
33'R
5x-4
r-5x
R
5x-4
r-5x
CS3 Split
16" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
16" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(187)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(188)
30'
Steel Cap , columns
Firewall
#16
30'
1" deep check, CS2
4x-6r-4x
16" Dia Between Piling: 3 ft Between Bents: 8 ft
Notes:
16" Dia Between Piling: 3 ft Between Bents: 8 ft
Notes: Bents labeled 197-209 extend to bent labeled 230 (and are labeled 210 - 229)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
6 ft
#14 #15
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
6 ft
#14 #15
(190)
#16
#16 #17
(189)
CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS236'
Decay
Steel Cap
Steel Cap
35'
CS2 CS2 CS2 CS2 CS2 CS2
16" Dia Between Piling: 3 ft Between Bents: 8 ft
Notes: Bents labeled 197-209 extend to bent labeled 230 (and are labeled 210 - 229)
16" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes: Bents labeled 197-209 extend to bent labeled 230 (and are labeled 210 - 229)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
6 ft
#14 #15
(191)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
6 ft
#14 #15
(192)
#16 #17 #18
#16 #17 #18 #19#20
34'
CS2 CS2 CS2 CS2 CS2 CS2 Steel Cap, columns & sillCS3 CS3 CS3
CS2 Check
CS2 CS2 CS2CS2CS2 CS2
34'
CS2
16" Dia Between Piling: 3 ft Between Bents: 8 ft
Notes: Bents labeled 197-209 extend to bent labeled 230 (and are labeled 210 - 229)
The other end of bent 201 is labeled 230
16" Dia Between Piling: 3 ft Between Bents: 8 ft
Notes: Bents labeled 197-209 extend to bent labeled 230 (and are labeled 210 - 229)
The other end of bent 201 is labeled 229
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
6 ft
#14 #15
(193)
#16 #17 #18 #19#20 #21
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
6 ft
#14 #15
(194)
#16 #17 #18 #19 #20 #21 #22
33'
CS2 Check
CS2 Check
CS2 Check
CS2 Check
#23 #24
27'
CS2 CS2 CS2 CS2
16" Dia Between Piling: 3 ft Between Bents: 8 ft
Notes: Bents labeled 197-209 extend to bent labeled 230 (and are labeled 210 - 229)
The other end of bent 203 is labeled 228
16" Dia Between Piling: 3 ft Between Bents: 8 ft
Notes: Bents labeled 197-209 extend to bent labeled 230 (and are labeled 210 - 229)
The other end of bent 204 is labeled 224
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
6 ft
#14 #15
(195)
#16 #17 #18 #19#20 #21 #22
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
6 ft
#14 #15
(196)
#16 #17 #18 #19#20
28'
CS2 CS2 CS2 CS2
CS2 Check
CS2 Check
CS2 CheckCS2 CS2 CS2
CS2 CS2
Steel Cap, columns & Sill
28'
16" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes: Bents labeled 197-209 extend to bent labeled 230 (and are labeled 210 - 229)
The other end of bent 205 is labeled 220
16" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
#14 #15
(197)
#16
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
8 ft
(198)
25'
CS2 CS2 CS2 CS2CS2 CS2
25'
CS2 CS2 CS2 CS2 CS2
16" Dia Between Piling: 4 ft Between Bents: 8 ft
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12
8 ft
(199)
28'
16" Dia Between Piling: 4 ft Between Bents: 4 ft
Notes:
16" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
#1 #2 #3 #4 #5 #6 #7 #8 #9
8 ft
(200)
#1 #2 #3
4ft
Bent 199A
Overhang/missing piles
28'25'
CS2 CS2 CS2CS2
16" Dia Between Piling: 4 ft Between Bents: 8 ft
Notes:
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11
After Bent 200 (201)
(12 piles 3
8 ft
#12Missing
Plan View
Batter Piles
CS2 CS2 CS2
Port of Astoria Pier 2 Cross Bracing & Girders generally not pictured Blue Bearing Loss #22526 1/3
Results of Inspection 9/2015 & 1/2016 Girders: 14 x 6.5" Spacing: 20" O.C. Red Section Loss No Bent 229
Structure #22526 Caps are 14" x 14" Unless otherwise noted, piles & columns - CS1, caps & girders - CS2
Note that Bents numbered on the site as 210-229 are just the other end of bents 201 to 189. See figure
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:Bent 202
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
14" x 14" square posts
Cedar Piling
Timber Sills are 6" x 14'
8 ft
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes: Between 203 & 204 the deck is blowing out (see pictures)
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes: Between 203 & 204 the deck is blowing out (see pictures)
Bent 203
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
14" x 14" square posts
Cedar Piling
Timber Sills are 6" x 14'
Bent 204
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
14" x 14" square posts
Cedar Piling
Timber Sills are 6" x 14'
#16 #17
0% 0% 100% 5% 10% 10% 10% 0% 40% 50% 0% 0% 0% 0% 10% 10% 50%
8 ft
50% 40% 0% 5% 00% 0% 10% 10% 60% 50% 25% 50% 10% 50% 50%
8 ft
5x-4
r-5x
R
She
ll
R
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
Bent 205
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
14" x 14" square posts
Cedar Piling
Timber Sills are 6" x 14'3x-8
r-3x
R
Bent 206
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
14" x 14" square posts
Broken Sill
Timber Sills are 6" x 14'She
ll
R
Shell for 10'
RBI: Urgent priority to repair Bent 3/2016
2z-8
r-2x
R
8 ft
50% 0% 0% 0% 0% 10% 50% 10% 30% 30% 100% 100% 50% 22'
Missing
22'50%
#16
10% 10% 50% 10% 10% 50% 10%
Shell
5x-4
r-5xR
5x-4
r-5x
R5x
-4r-
5xR
5x-4
r-5x
R
50%
80% 80%
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
UW Insp:
Caps & Stringers
In CS2 & CS3
She
ll
Bent 207
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
3x-8
r-3x
R
4x-6
r-4x
R
3x-8
r-3x
R
4x-6
r-4x
R
Abbrasion to sheet pile
behind timber backwall
RBI: Urgent priority to repair Bent 3/2016
30% 50% 50% 10% 10%
Broken Sill Corbel, 100%
offset
4x-6r-4x
5x-4
r-5x
R
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
UW Insp:
Caps & Stringers
In CS2 & CS3
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
Bent 208
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
She
ll
R
Bent 209
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
5x-4
r-5x
R
4x-
6r-
4x
R
5x-4
r-5x
R
4x-6r-4x
3x-8
r-3x
R
100%
Shell for 8'
Shell for 6'
100% 100% 100%
see pictures
She
ll
R
RBI: Urgent priority to repair Bent 3/2016
RBI: Urgent priority to repair Bent 3/2016
Broken Sill
50% 100% 50% 10% 10% 100%
15% 10% 50% 10%
5x-4
r-5x
R
3x-8
r-3x
R
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
Bent 210
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
50% 100% 100% 100%
3x-8
r-3x
R
4x-6
r-4x
R
3x-8
r-3x
R
Bent 211
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
She
lll
R
50% 100% 100% 100%
4x-6
r-4x
R
She
ll
R
Failed/ Split Pile
50% 10% 75% 10%
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
Bent 212
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
50%
4x-6
r-4x
R
4x-6
r-4x
R
4x-6
r-4x
R
4x-6
r-4x
R
4x-6
r-4x
R
50% 100%
Bent 213
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
20% 20% 20% 20% 20% 20% 6x
-3r-
6x
R
6x-3
r-6x
R
6x-3
r-6x
R
6x-3
r-6x
R
6x-3
r-6x
R
6x-3
r-6x
R
RBI: Urgent priority to repair Bent 3/2016
RBI: Urgent priority to repair Bent 3/2016
Missing pile & column
50% 50% 50% 50% 10%
10% 10% 20% 10% 10%
4x-6
r-4x
R
4x-6
r-4x
R
4x-6
r-4x
R
4x-6
r-4x
R
4x-6
r-4x
R
4x-6
r-4x
R
4x-6
r-4x
R
She
ll
R
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes: Still under steel deck
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
Bent 214
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
6x-3
r-6x
R
6x-3
r-6x
R
6x-3
r-6x
R
6x-3
r-6x
R
6x-3
r-6x
R
6x-3
r-6x
R
Bent 215
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
6x-3
r-6x
R
She
ll
R
6x-3
r-6x
R
6x-3
r-6x
R
CS3 Split
RBI: Urgent priority to repair Bent 3/2016
Dolphin
20% 50% 50%
#17#16
20%
50% 30% 50% 50% 20% 75% 10%
30%
20% 20%
20%
6" Decay
20%
20%
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
Bent 216
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
5x-4
r-5x
R
Bent 217
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
She
ll
R
50%
20% 20% 20% 10% 75%
20% 75% 50% 50% 10% 10% 10%
50%
25% 25% 25%
50%
20% 25%
6" Decay
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
14" x 14" Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes: There is a large BLUE CRANE over this Bent
Bent 218
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
5x-4
r-5x
R
Bent 219
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
20% 20% 20% 20% 20% 20%
50% -100%
50% -100%
50% -100%
50% -100%
50% -100% 50% -
100% 50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
20%
40-50%
40-50%
40-50%
40-50%
40-50%
40-50%
40-50%
50% -100%
50% -100%
Crushing
Crane between bents 218 & 219
Crane between bents 218 & 219
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
Missing
20% 75% 50% 50% 10% 10% 10%
10% 75% 50% 50% 10% 75% 10%
Undermined6"
14" x 14" Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
14" x 14" Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
Bent 220
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
50%
40-50%
40-50%
40-50%
40-50%
40-50%
40-50%
40-50%
50% -100%
50% -100%
1x-6r-1x Girder between 248 & 249
Bent 221
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
40-50%
40-50%
40-50%
40-50%
40-50%
40-50%
40-50%
50% -100%
50% -100%
1x-6r-1x Girder between 248 & 249
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
#16
50% 10% 20% 50% 10% 20% 20%
50% 50% 20% 30% 20% 50% 10% 10%
Shell
Undermined6"
14" x 14" Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
14" x 14" Between Piling (ft): 6 Between Bents (ft): 10 Piles 15
Notes:
Bent 222
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
50%
Edge Girder between 250 & 251 6" decay (2x-6r-2x)
Bent 223
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Edge Girder between 250 & 251 6" decay (2x-6r-2x)
Girder between 250 & 251 6" decay (2x-6r-2x)
3x-8
r-3x
R
She
ll
R
She
ll
R
She
ll
R
She
ll
R
large crack (cs4)
RBI: Urgent priority to repair Bent 3/2016
4x-6
r-4x
R
4x-6
r-4x
R
4x-6
r-4x
R
25%
Missing column/ pile
100% 100% 10% 10% 25%
20% 50% 10% 10% 5% 5%
10%
14" x 14" Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
14" x 14" Between Piling (ft): 4 Between Bents (ft): 10 Piles 15
Notes:
Bent 224
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
RR
She
ll
R
Crushing
She
ll
R
She
ll
She
ll
Bent 225
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
RR
3x-
8r-
3x
3x-
8r-
3x
RBI: Urgent priority to repair Bent 3/2016
20% 50% 10% 10%
Missing column
10% 10% 40%
Missing column
20% 50% 40% 10% 10% 20% 30% R3
x-8
r-3
x40% 30%
10%
R
4x-
4r-
4x
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:
Bent 226
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
3x-
8r-
3x
Sh
ell
Sh
ell
R R R
3x-
8r-
3x
R
4x-
6r-
4x
Sh
ell
R
Shell
Bent 227
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Sh
ell
RS
he
ll
R
6 ft
RBI: Critical priority to repair Bent 3/2016
50% 50%
20% 50% 40% 10% 10% 20% 30% 40% 30%
R
3x-
8r-
3x
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 14
Notes:
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 14
Notes: There may be another jilly available here Timber Deck W/ Steel Plates
Starts about here
Leaning
Bent 228 (There is no 229)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6r-4x
3x-
8r-
3x
R
Sh
ell
R
crushing
3x-
8r-
3x
R
6x-
4r-
6x
RMissing Piles
6x-
4r-
6x
R
Bent 230 (There is no 229)
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
5x-
4r-
5x
R
Sh
ell
R
Severe split (Cs4)
Sh
ell
R
Sh
ell
R
Sh
ell
R
4x-
6r-
4x
R
4x-
6r-
4x
R
shell bulging
cap
Leaking deck/
Missing column
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
20% 25% 40%
35% 25% 10%
20% 50%
10% 30% 20% 10%
Sh
ell
R
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:Bent 231
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
shell4x-6r-4x
she
ll
R
3x-
8r-
3x
R
she
ll
R
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
50% -100%
RBI: Critical priority to repair Bent 3/2016
40% 40% 10% 10% 20% 30% 50%
20%
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:
off center50% -100%
Bent 232
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
shell
50 sqft of leaking & bellying deck
she
ll
R
3x-
8r-
3x
R
she
ll
R
50% -100%
50% -100%
50% -100%
50% -100%
she
ll
R
she
ll
R
3x-
8r-
3x
RRBI: Urgent priority to repair Bent 3/2016
20% 30% 40%
Bulging
New
Port of Astoria Pier 2 Cross Bracing & Girders generally not pictured Blue Bearing Loss #22526 2/3
Results of Inspection 9/2015 & 1/2016 Girders: 14 x 6.5" Spacing: 20" O.C. Red Section Loss Green Remaining Bearing
Structure #22526 Caps are 14" x 14" Unless otherwise noted, piles & columns - CS1, caps & girders - CS2
Note that Bents numbered on the site as 202-229 are just the other end of bents 201 to 189. See figure
Need to update water depths 9/15/2016
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:
Bent 233
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
shell4x-6r-4x
R
3x-
8r-
3x
Rsh
ell
R RR
3x-
8r-
3x
3x-
8r-
3x
3x-
8r-
3x
R
3x-
8r-
3x
Bulging
Bent 234
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6r-4x4x-6r-4x
R
3x-
8r-
3x
R
R
2x-
10
r-2
xR R
3x-
8r-
3x
3x-
8r-
3x
6x-
4r-
6x
R
5x-
4r-
5x
R
4x-
6r-
4x
50 sqft of leaking & bellying deck
100% 100% 100% 100% 100% 100% 100% 100% 100%
completely decayed and crushing
end girder severely decayed between
bents 262 & 265
6 ft
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
missing
25% 20% 50% 20% 20% 70% 30%
missing?
25% 60% 20% 20% 20% 10% 25%
3x-
8r-
3x
R
3x-
8r-
3x
R
22'
22'
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: Crane right over bent 264
Bent 235
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Crushing and
broken cap
RR
Sh
ell
&
rota
ted
Sh
ell
10% 20%
100% 100% 100% 100%
10%
100%
Need Replacement
100%
Bent 236
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Crushing cap
100% 100% 100%
Entire Bent Tilts 15-20°
(out of plumb 6")
Large crane over bent
New (were leaning)
end girder severely decayed between
bents 262 & 265
end girder severely decayed between
bents 262 & 265
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
25% 50% 25% 70%
#16
20% 40% 50% 20% 30%
22'
22'
New section
New section
R
6x-
4r-
6x R
6x-
4r-
6xR
6x-
4r-
6x R
6x-
4r-
6x
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: Crane right over bent 264
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: Crane right over bent 264
Bent 237
#1 #2 #3 #4 #5 #6 #7 #8 #9 #11 #12 #13 #14 #15 #16
Crushing cap & severe decay
100% 100% 100%
Entire Bent Tilts 15-20°
(out of plumb 6")
Large crane over bent
end girder severely decayed between
bents 262 & 265
Bent 238
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
100% 100% 100% 100%
New cap section
replaced crushing cap
new (replaced leaning)
posts
Crushing cap & severe decay
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
#10
new( replaced leaning/
missing posts)30% 50% 20% 20%
80% 25% 50% 20%
50%
22'
R
SH
ell R
Sh
ell
R
Sh
ell
R
6x-
4r-
6x R
4x-
6r-
6x
30%
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: OUTSIDE ACCESS LIMITED BY CABLE
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
6" holes in deck Notes: OUTSIDE ACCESS LIMITED BY CABLE
Bent 239
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
Sh
ell
cap crushing
new, replaced leaning
and decayed posts
18" x 9" girder is a shell between bents New replaced shell
Bent 240
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
bulging4x-6r-4x
30%
100% 100%
completely decayed and crushing
R
Sh
ell
R
Sh
ell
R
Sh
ell
R
3x-
8r-
3x
R3
x-8
r-3
x R
3x-
8r-
3x
100%
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
missing
80%
failed sill
50%
50% 50% 50%
0.5" deep check
80% 22'
Crushing
corbel
R
Sh
ell
R
4x-
6r-
6x R
Sh
ell
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:
2' x 2' hole in deck
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:
Bent 241
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
Shell
100% 100% 100%
R RR
R
Sh
ell
R
3x-
8r-
3x
R
3x-
8r-
3x
100% 100% 3x-
8r-
3x
3x-
8r-
3x
3x-
8r-
3x
Bent 242
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
Shell - Crushing (see photo)
R R
Sh
ell
3x-
8r-
3x
2x-10r-2x Large girder between bents
Large girder between bents
R
Sh
ell
crushing
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
40% 50% 20% 50% 100%
twisted column
20%
50% 50% 60% 50% 50% 20%
22'
Shell
Leans
R
Sh
ell
R
Sh
ell
R
Sh
ell R
Sh
ell
LeansWarping Sill
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Deck Decay Notes:
Leaning
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:
Bent 243
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
2x-10r-2x
R
Sh
ell
R R
4x-
6r-
4x
4x-
6r-
4x
Bent 244
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
Shell
R
Sh
ell
R R
4x-
6r-
4x
4x-
6r-
4x
R4
x-6
r-4
xR
4x-
6r-
4x
R
3x-
8r-
3x
crushing
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
50% 50% 60% 50% 40% 50%
40% 40%
40%
40% 20%
R
3x-
8r-
3x
R
3x-
8r-
3x
40% 50%
full depth hole 3" wide
50%
22'
22'
R
Sh
ell
6" decay
Crushing on Sill
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:
Started Here 10/17
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:
Bent 245
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
4x-6r-4x
R
2x-
10
r-2
x
R
4x-
6r-
4x
R4
x-6
r-4
x
girder is a shellshell
crushing corbel
Bent 246
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
Sh
ell R
Sh
ell
R
4x-
6r-
4x RBI: Critical priority
to repair Bent 3/2016
40%
40% 100% 80% 30% 20%
20% 40% 30% 20% 40% 20%
Missing
8' cant
crushing
R
4x-
6r-
4x
R
4x-
6r-
4x
R
4x-
6r-
4x R
4x-
6r-
4x R
4x-
6r-
4x
50%
50%
8" dia pile
crushing
R
4x-
6r-
4x
22'
0% 0%
6" decay
R
Sh
ell
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: SIGNIFICANT TIMBER DECK DECAY (100 sqft)
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: SIGNIFICANT TIMBER DECK DECAY (100 sqft)
Bent 247
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
R
4x-
6r-
4x
crushing4x-6r-4x
Bent 248
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Bulging
6 ft
SHell
50% -Failed
2 sqft holes in deck
RBI: Urgent priority to repair Bent 3/2016
leans out
20% 50% 30% 50%
Dolphin
R
4x-
6r-
4x
Missing
20% 20% 70%
20%
50% 30% 10%
R
4x-
6r-
4x R
4x-
6r-
4x R
4x-
6r-
4x R
4x-
6r-
4x R
4x-
6r-
4x R
4x-
6r-
4x
22'
22'
Bulging
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: SIGNIFICANT TIMBER DECK DECAY (100 sqft)
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: SIGNIFICANT TIMBER DECK DECAY (100 sqft)
Bent 249
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6r-4x TO Shell
Bent 250
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6r-4x TO Shell (both caps) Bulshing over 3, 4
crushing
18" x 9" girder is a shell
R
SH
ELL
R
SH
ELL
50% crushing
2 sqft holes in deck
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016 This bend has all but Failed
Missing
30% 50% 70% 30% 20%
R
4x-
6r-
4x R
4x-
6r-
4x
R
4x-
6r-
4xR
4x-
6r-
4x
split20%
Failed
Missing 2 piles & 2 columnssplit50% 20%
FailedR
SH
ELL
R
SH
ELL
22'
22'
R
3x-
8r-
3x
0%
30%
0%
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: SIGNIFICANT TIMBER DECK DECAY (100 sqft)
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: SIGNIFICANT TIMBER DECK DECAY (100 sqft)
100%
Bent 252 - See below for 251
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6r-4x TO Shell (both caps) 18" x 9" girder is a shell
piles leaning (see pictures)
18" x 9" girder is a shell
cs3 split
Sill has failed
Hatch
Bent 251 - See above for 252
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6r-4x
R
SH
ELL
100% 100% 100% 100%
100% 100% 100% 100%
RBI: Critical priority to repair Bent 3/2016
Leans/ Failed
90% 90%
90% 50%
R
SH
ELL R
SH
ELL
R
SH
ELL
R
6x-
4r-
6x
22'
22'
SHell
R
3x-
8r-
3x R
6x-
4r-
6x
3x-8r-3x
30% 30% 30%
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 8 Piles 15
Notes: Between Bent 253 & Bent 254, bent was removed and a steel lowering platform was built with an open gap of ~1ft on either side
Spacing between 253 & 254 is therefore approx 2x normal distance
14" x 14" Square Between Piling (ft): 4-Jan Between Bents (ft): 8 Piles 15
Notes: Between Bent 253 & Bent 254, bent was removed and a steel lowering platform was built
Spacing between 253 & 254 is therefore approx 2x normal distance
Bent 253
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Tilting piles All Stringers and caps showing major issues. Caps: class 3 or 3 Stringers: Class 2 or 3
Ste
el
Bent 254
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Shell
R
4x-
6r-
4x
100%
Missing post
RBI: Urgent priority to repair Bent 3/2016
Ste
el
Tilting piles All Stringers and caps showing major issues. Caps: class 3 or 3 Stringers: Class 2 or 32' overhang, some stringers are shells
crushing cap
Sill has failed
10% 0% 0% 20% 0% 0% 0% 0%50% 60%
0% 15% 0% 0% 10% 0%0% 0% 0% Green percentages indicate remaining load bearing
Green percentages indicate remaining load bearing
10% 50%
22'
22'
Leans
R
3x-
8r-
3x
4x-6r-4x
R
4x-
6r-
4x
R
3x-
8r-
3x
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 8 Piles 15
Notes: USEABLE CATWALK AT 255Bent 255
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
Sh
ell
crushing corbel
CS4 pile below water
RBI: Urgent priority to repair Bent 3/2016
10% 0% 0% 30% 0% 10%50% 10%
Green percentages indicate remaining load bearing
CS2 CHeck
Shell
8'
6'
22'
crushing corbel
R
4x-
6r-
4x
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes:
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6 piles between labeled 285 & 290
Bent 256
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
4x-
6r-
4x
crushing corbel
Shell - Crushing/ Bulging
Bent 257
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
Sh
ell
R
Sh
ell
Sill has failed
80%
Shells
RBI: Urgent priority to repair Bent 3/2016
10% 0% 0% 30% 0% 10%50% 10%
Green percentages indicate remaining load bearing
Missing
Cs2 Check
R
Sh
ell
8 ft
0% 30% 40% 30% 30%50% 0% 10% 5% 10%5%
22'
22'
Bulging
4x-
6r-
4x
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6 piles between labeled 285 & 290
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6 piles between labeled 285 & 290Bent 259
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
3x-
8r-
3x
4x-6r-4x
R RR
4x-
6r-
4x
4x-
6r-
4x
3x-
8r-
3xR
4x-
6r-
4x
R
3x-
8r-
3x R
4x-
6r-
4x
R
4x-
6r-
4x R
4x-
6r-
4x
100% 100% 100% 100% 100%
Bent 258
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
3x-
8r-
3x
Shell4x-6r-4x
RR
4x-
6r-
4x
4x-
6r-
4x
3x-
8r-
3x
100% 100% 100% 100% 100%
4x-6r-4xShell
large cleatShell
5x-4r-5x
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
Missing
60% 40% 0% 40% 0%5% 0% 20% 0% 10%80%20% 5%
30% 5% 0% 20% 0%0% 10% 10% 0% 0%10%0% 0% 50%
Pile Failed
22'
22'
4x-
6r-
4x
4x-
6r-
4x
R R R
100% 100% 50% R
4x-
6r-
4x
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6 piles between labeled 285 & 290
14" x 14" Between Piling (ft):Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6 piles between labeled 285 & 290
Bent 260
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Bent 261
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6r-4x
crushing
shell
leans north
Shell
leans north
large cleat4x-6r-4x
100% 100% 100%
100% 100% 100%
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
Broken Sill
20% 0% 0% 0%40% 10% 0% 30% 0%0%0% 0% 10%
Missing column
0% 50% 0% 50%10% 0% 75% 0% 0%75%0% 10% 0%
22'
22'
R
4x-
6r-
4xR
4x-
6r-
4x
50% S.L 50% S.L
R
4x-
6r-
4x R
Sh
ell
R
Sh
ell
14" x 14" Square Between Piling (ft): 6 Between Bents (ft): 8 Piles 15
Notes: 6 piles between labeled 285 & 290
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6 piles between labeled 285 & 290
Bent 262
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13
#16 #17
3x-8r-3x Shellgirder is a shell
Bent 263
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
Sh
ell
50%
100%
R
4x-
6r-
4x R
4x-
6r-
4x
R
4x-
6r-
4x
R
she
ll
R
4x-
6r-
4x
shell
leans southR
Sh
ell
50%
100%
RBI: Critical priority to repair Bent 3/2016
50% 50% 0% 10%50% 0% 20% 0% 10%10%0%
20% 0%50% 10% 0% 50%00% 0% 50% 30%0% 20%
leans south
0% 0% 30%
8 ft
22'
22'
R
Sh
ell
R
Sh
ell
50%
14" x 14" Square Between Piling (ft): 4 Between Bents (ft): 8 Piles 15
Notes: 6 piles between labeled 285 & 290
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: Posts lean north
Bent 264
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-
6r-
4xR
Bent 265
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6r-4x
leans
4x-
6r-
4xR
yellow plackard
20% 0%50% 10% 0% 50%00% 0% 50% 30%0% 20%
8 ft8 ft
15 ft 3ft 3 ft 1 ft 4 ft 8 ft 8 ft
2 ft 8 ft
4x-
6r-
4xR
2x-
10
r-2
xR0% 0%10% 40% 0% 20%50% 0% 0%0% 0% 0%
22'
22'
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: posts lean south
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: posts lean south Metal plate/ deck on girders
Grey Water Spout/ Leakage towards backwall, this bent
Bent 266
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
SH
ELL
R
Bent 267
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6r-4x Shells
leans
50-%
Shelll
leans
20% 0%50% 10% 0% 50%00% 0% 0%0% 20%
5 ft
10 ft 10 ft
0%
0% 0%0% 0% 20% 50%30% 0% 0%0% 20% 50%
split
22'
22'
4x-
6r-
4xR
Sh
ell
R
4x-
6r=
4xR
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: Posts lean towards north
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: Posts lean towards north Metal plate/ deck on girders Grey Water Spout/ Leakage towards backwall, this bent
Bent 268
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6r-4x
Bent 269
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
SH
ELL
R
10th girder has 1/2" split at 30°
10th girder has 1/2" split at 30°8 large girders
50-100%
50-100%
50-100%
50-100%
50-100%
50-100%
80% 25% 100% 100% 50% 80%
Shells
leans
8 large girders
Shells
leans
Missing
RBI: Urgent priority to repair Bent 3/2016
50% 75%50% 10% 0% 20%0% 20% 20%0% 50% 10% 20%0%
10 ft 10 ft
100% 90% 100% 70% 100% 50%
22'
22'
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: Posts lean towards north Metal plate/ deck on girders
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: Posts lean towards north Metal plate/ deck on girders
Bent 270
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6r-4x
Bent 271
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
3x-8r-3x
SH
ELL
R
Shells
leans
50-100%
50-100%
50-100%
50-100%
50-100%
50-100%
100% 100% 100% 100% 100% 100%
50-100%
50-100%
50-100%
50-100%
50-100%
50-100%
25% 90% 50% 80%
90% 40%
leans
Shells
8 large girders
8 large girders
RBI: Urgent priority to repair Bent 3/2016
RBI: Urgent priority to repair Bent 3/2016
80% 100% 80% 90% 100% 50% 100% 80%
CS2
80% 100% 100% 20% 95% 60%
22'
22'
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
rotated & not Notes: 6-12" Overhang for girders Metal plate/ deck on girders
bearing any load
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Metal plate/ deck on girders
Bent 272
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
SH
ELL
R
Bent 273
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
3x-8r-3x
girders 5, 6, 7 are warped with 4-8" of decay
Shells
3x-8r-3x
8 large girders
large girders
15 ft
10 ft 10 ft
3x-
8r-
3x
R3
x-8
r-3
x
R
3x-
8r-
3x
R
10% 20%20% 50% 10% 10%0% 50% 50%0% 0%0%
0% 75%20% 40% 0% 0%75% 10% 20%0% 50% 0%0%22'
22'
3x-8r-3x
Port of Astoria Pier 2 Cross Bracing & Girders generally not pictured Blue Bearing Loss #22526 3/3
Results of Inspection 9/2015 & 1/2016 Girders: 14 x 6.5" Spacing: 20" O.C. Red Section Loss Updating 8/12/2016
Structure #22526 Unless otherwise noted, piles & columns - CS1, caps & girders - CS2 Caps are 14" x 14" Green Remaining Bearing
Note that Bents numbered on the site as 202-229 are just the other end of bents 201 to 189. See figure
14" x 14" Square Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Metal plate/ deck on girders
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Metal plate/ deck on girders
Bent 274
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
3x-
8r-
3x
100%
R3
x-8
r-3
x R
3x-
8r-
3x R
3x-
8r-
3x R
3x-
8r-
3x R
3x-
8r-
3x
Bent 275
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
3x-
8r-
3xR
Sh
ell
100%
6 ft
Dolphin
dolphin
large cleat
large cleat
RBI: Urgent priority to repair Bent 3/2016
15 ft
0% 50%0% 40% 50% 10%50% 0% 0%0% 30% 10%50%
Missing
10 ft10 ft
0% 0%10% 10% 0% 0%0% 10% 0%0% 0%0%
50%
50%
Missing
18'
18'
3 Lean
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 12 Piles 15
Notes: 6-12" Overhang for girders
Girder #12 is broken between bents 276 & 275
from pile 12 out, the section has failed
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 12 Piles 15
Notes: 6-12" Overhang for girders Bt. 303 from outside, might be marked 305 toward land
ORIGINAL
Pile & column #7 & 8 have been fixed as of 4/24/2016
Bent 276
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
40%
R
Sh
ell
Bent 277
#1 #2#3 #4 #5 #6 #7 #8
10ft
cap is ~8" x 10"
#15
10 ft
0% 0%0% 0% 50% 40%50% 0% 0%0% 30%25% 0%
CS2 CS2 CS2 CS2 CS2
18'
22'
50% 50% 50% 50% 50%
50%
Off Center
R
4x-
6r-
4x
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Fiberglass formwork below concrete deck
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Fiberglass formwork below concrete deck
BEGIN NEWISH SUBSTRUCTURE
Bent 278
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
R4
x-6
r-4
x
Bent 279
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
Sh
ell
cap is ~8" x 8 to accomodate size change in girders
cs2
sp
lit
0% 35%25% 0% 80% 100%0% 75%0%
90% 90%25%
steel piles Retaining Wall
50% typical
#16 #17 #18
19'
19'
R
Sh
ell
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Fiberglass formwork below concrete deck
NEWISH SUBSTRUCTURE
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Fiberglass formwork below concrete deck
NEWISH SUBSTRUCTURE
Bent 280
#5 #6 #9#1 #2 #3 #4 #7 #8 #10 #11 #12 #13
Bent 281
#1#2 #3 #4#2 #3 #8#7#6 #9 #10 #11 #12 #13
crane between 307 & 308
20'
16'
Retaining Wall
0%
10%
25%
50%
80%
100%0% 70% 0%90% 90% 25%
#1 #2 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14#15
#3
10%
10%
Retaining Wall
#1 #2 #4 #5 #6 #7 #8#3
#1
steel pile
40%
80%0%
0%0%10%0%0%
70%50%
20% 0%
10 ft
7 ft
steel pile
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Fiberglass/ stay-in-place steel
NEWISH SUBSTRUCTURE formwork below concrete deck
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Fiberglass formwork below concrete deck
NEWISH SUBSTRUCTURE
Bent 282
#1
#2 #3
#4
#5
crane between 307 & 308
R3
x-8
r-3
x
Steel Driven Pile
6 x 16" sill with good cross bracing
Bent 283
Steel Driven Pile
6 x 16" sill with good cross bracing
16'
17'
35%
#1 #2 #4 #5 #6 #7 #8#3
10%
80%0%
0%10%50%75%50%
75% 0%
10 ft
#4#2 #3 #8#7#6 #9 #10 #11 #12 #13#1
0%50%
R3
x-8
r-3
x
0%
#1 #4 #5 #6 #7 #8#3
0%
0%
50%10%10%50%
50%
10 ft
0%20% 0%
CS2 check
Retaining Wall
0%
#2
#1
#2 #3 #5#4#2 #3
#8#7#6
#9 #10 #11 #12 #13#1
R
3x-
8r-
3x
8 ft
R
Ro
t in
Re
tain
ing
Wa
ll
R
Ro
t in
Re
tain
ing
Wa
ll
Retaining Wall
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Fiberglass formwork below concrete deck
NEWISH SUBSTRUCTURE
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Fiberglass formwork below concrete deck
THIS BENT was previously in really bad shape - new end post
Bent 284
#5
Steel Driven Pile
6 x 16" sill with good cross bracing
Bent 285
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12#13 #14
R
3x-
8r-
3x
6 x 16" sill
pile leans back
17'
17'
#1 #4 #5 #6 #7 #8#3
10 ft
Retaining Wall
#2
#1
#2 #5#4#2 #3
#8#7 #9 #10 #11 #12 #13#1
8 ft
0%0%
0%
20%50%10%100%
0% 60%80%80% 0%
#6 #14 #15
0%
10%
New post 4/24/2016
#15
20% 5%0% 0% 50% 20%0% 0% 20%10%30% 20%
R
Ro
t in
Re
tain
ing
Wa
ll
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Fiberglass formwork below concrete deck
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders
Bent 286
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
3x-
8r-
3x
6 x 16" sill with good cross bracing
shellsshells
split
Bent 287
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Access hole throughdeck
Shell
missing
R
Sh
ell
R
Sh
ell
R
Sh
ell
R
Sh
ell
R
Sh
ell
R
Sh
ell
deck is failing
pile missing
RBI: Critical priority to repair Bent 3/2016
RBI: Urgent priority to repair Bent 3/2016
17'
17'
0% 20%10% 0% 20% 0%0% 0% 0%0%0% 0%10% 0%
R
3x-
8r-
3x
0% 15%15% 30% 0% 20%5% 5% 0%40%0% 02%40%
CrushingDeck blowing out 286 - 294
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders
Bent 288
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
Shell
missing
R
Sh
ell
RS
he
ll
Shel/ Crushedl
R
Sh
ell
Bent 289
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Shell
R
Sh
ell
Shell
R
Sh
ell
RBI: Urgent priority to repair Bent 3/2016
RBI: Urgent priority to repair Bent 3/2016
15'
15'
large cleat
20% 0%0% 0% 0% 0%10% 10%
10%
0%50% 20%20%30%
8 ft 8 ft
10% 0%5% 5% 0% 0%5% 0%25% 0%0%30% 0%
leaning/ failed
80%
R
4x-
6r-
4x
R
Sh
ell
Deck blowing out 286 - 294
Deck blowing out 286 - 294
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders
The whole bent is leaning
South
Bent 290
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Shell
R
Sh
ell
R
Sh
ell
80%
Bent 291
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
3x-
8r-
3x R
Sh
ell
4' x 4' hole in deck between 290,291
Shell
4x-6r-4x4' x 4' hole in deck between 290, 291
Shell
RBI: Urgent priority to repair Bent 3/2016
RBI: Urgent priority to repair Bent 3/2016
15'
15'
leaning/ failed
10%
10% 0%5% 5% 0% 0%5% 0%25% 0%30%0% 0%
5%
10% 0%5% 5% 0% 10%5% 0%25% 0%95%0% 0%
leaning/ failed
R
4x-
6r-
4x R
4x-
6r-
4x
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders Between 293 & 294, deck is missing ~ 20ft2
Bent 292
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Shell
R
Sh
ell
R
Sh
ell
RS
he
ll
R
4x-
6r-
4x R
4x-
6r-
4x
R
4x-
6r-
4x R
3x-
8r-
3xR
3x-
8r-
3x R
3x-
8r-
3x
R 3x-
8r-
3x
Missing
Bent 293
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
Sh
ell
4x-6r-4x
3x-
8r-
3xR
3x-
8r-
3xR
3x-
8r-
3xR
3x-
8r-
3xR
R
Sh
ell
Shell
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
14'
14'
split
10% 0%5% 5% 0% 10%5% 0%20% 20%0%0% 0%
6 ft
0% 0%60% 50% 0% 10%0%40% 20%0%80% 0%
0%
Missing
R
Crushing4x-6r-4x
0%
R
Sh
ell
Deck blowing out 286 - 294
Deck blowing out 286 - 294
14" x 14" Square Between Piling:Between Piling (ft): 6 Between Bents (ft): 8 Piles: 14
Notes: 6-12" Overhang for girders Between 293 & 294, deck is missing ~ 20ft2
14" x 14" Square Between Piling:Between Piling (ft): 6 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders
THIS BENT HAS ALL BUT FAILED
Bent 294
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
Sh
ell
Shell
3x-
8r-
3xR
3x-
8r-
3xR
4x-6r-4x
R
Sh
ell
0% 0% 0% 0% 0%
missing3x-
8r-
3xR
Bent 295
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
Sh
ell
Shell
3x-
8r-
3xRR
Sh
ell missing
3x-
8r-
3xR
missing
RS
he
llR
Sh
ell
R
4x-
6r-
4x
4x-6r-4x Crushing over #7 deck failure between g10, 11
Bent 321
RBI: Critical priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
10% 0% 0% 0% 0% 0%
Column 8 has failed/ kicked off
13'
14'
0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0%
0%
Rot in backwall
Rot in backwall
Deck blowing out 286 - 294
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders
No Bearing
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders
No Bearing at all
No Bearing
Bent 296
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Shell
R
Sh
ell R
she
ll
R
she
ll
missing
R
Sh
ell
R
Sh
ell
4x-6r-4xdeck failure between g10, 11
1/4" split
Bent 297
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
Sh
ell
large cleat
Bent 320
RBI: Critical priority to repair Bent 3/2016
CS4
Dolphin
14'
14'
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 30%
failed
Rot/ failing backwall
R
Sh
ell
Rot/ failing backwallCRUSHING
SAGGING
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
Notes: 6-12" Overhang for girders
THIS BENT HAS ALL BUT FAILED
Only drift pins connect sills to piles
14" x 14" Square Between Piling:Between Piling (ft): 4 Between Bents (ft): 8 Piles 15
THIS BENT HAS ALL BUT FAILED Only drift pins connect sills to piles
Bent 298
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
Sh
ell
large cleat
R
Sh
ell
R
Sh
ell
R
Sh
ell
R5
x-4
r-5
x
R
5x-
4r-
5x
Bent 299
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
Sh
ell
shell
3x-
8r-
3xR
3x-
8r-
3xR
3x-
8r-
3xR
0% 0% 0%
R
Sh
ell
R
Sh
ell
R
Sh
ell
Crushing6 pairs of closely spaced girdersspaced 4'-12' apart
missing
RBI: Urgent priority to repair Bent 3/2016
RBI: Urgent priority to repair Bent 3/2016
Dolphin
R
Sh
ell
R
Sh
ell
0% 0%
R
Sh
ell
Missing
0% 0% 0% 0% 0%
8 ft
14'
14'
R
Sh
ell
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
THIS BENT HAS ALL BUT FAILED
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 15
THIS BENT HAS ALL BUT FAILED
Bent 300
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
R
6x-
4r-
6x
0% 0% 0%
R6
x-4
r-6
x R
Sh
ell
shell/ BULGING6 pairs of closely spaced girdersspaced 4'-12' apart
missing
R
6x-
4r-
6x R
6x-
4r-
6x
large cleat
Bent 301
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
R
she
ll
0% 0% 0%
RR
Sh
ell
Sh
ell
shell6 pairs of closely spaced girdersspaced 4'-12' apart
R
Sh
ell
R
Sh
ell
Sh
ell
RBI: Urgent priority to repair Bent 3/2016
RBI: Critical priority to repair Bent 3/2016
0% 0% 0% 0% 0% 0% 0% 0%
R
Sh
ell
R
Sh
ell
Fa
ile
dLeaning/ failed
Sh
ell
#15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0%
3x-
8r-
3xR
3x-
8r-
3xR
8 ft
13'
11'
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 14
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 14
Bent 302
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
R
she
ll
0% 0% 0%
RR
4x-
6r-
4x
Sh
ell
BULGING
R
Sh
ell
R
Sh
ell
4x-
6r-
4x
shellCrushing
R
hole in deck between g10 & g11
3x-
8r-
3xR
Bent 303
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
0% 0% 0%
shell
3x-
8r-
3xR
RBI: Urgent priority to repair Bent 3/2016
0% 0% 0%
0% 0% 0% 0% 0% 0%
Crushing/Failed
she
ll
R
Sh
ell
0% 0% 0% 0% 0% 0% 0%
11'
11'
0% 0% 0%
Deck between post 7 & 8 - 10 sf CS4
Cru
shin
g/
Sp
lit
RR
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 14
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 14
Bent 304
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
100% 50% 50%
R
Sh
ell
R
Sh
ell
4x-6r-4x
Bent 305
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
50%
R
Sh
ell
R
Sh
ell
4x-6r-4x
11'
11'
3x-
8r-
3x
R
3x-
8r-
3xR
#15
85% 100% 20% 50% 50% 100% 20% 100%
50%
7 ft
80% 80% 80% 0% 0% 60% 0% 50% 0% 100% 100% 60%
3x-
8r-
3x
R
3x-
8r-
3x
R
90%
RS
he
ll
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 14
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 14
Bent 306
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
4x-6r-4x
R
Sh
ell
R
Sh
ell
Bent 307
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14
4x-6r-4x
R
Sh
ell
R
Sh
ell
large cleat between 307 & 308
11'
10'
#15 #16
20% 90% 0% 20% 0% 20% 90%
100% 90% 0% 90%
20%
90%
80% 50% 50% 0% 80% 0% 100% 100% 80% 0% 100% 100%
cs2 check
14" x 14" Square Between Piling:Between Piling (ft): 3 Between Bents (ft): 8 Piles 14 Bent 308
#1 #2 #3 #4 #5 #6
RS
he
llR
Sh
ell
large cleat between 307 & 308
9'
20% 10% 30% 0% 90% 80%
Port of Astoria Pier 2 Cross Bracing & Girders generally not pictured Blue Bearing Loss
Results of Inspection 9/2015 & 1/2016 3-4 girders per pile. Girders are 13.5" x 6" Red Section Loss
22527 Caps are 14" x 14" Between Bents (ft): 6 #22527 1/3
14" Dia Between Piling 6 Between Bents 10
Notes: 6" overhang of girders Access F-A from opening in Deck (may need help getting back up though)
East West
14" Dia Between Piling 6 Between Bents 10
Notes: 6" overhang of girders
Now looking in direction of increasing
Bent Numbers (North)
Bent F
#6 #5 #4 #3 #2 #1
12 ft
Backwall
Bent E
#1 #2 #3 #4 #5 #6
12 ft
#7 #8
Green is Percent Bearing Remaining
5x-
4r-
5xR
R3x-8r-3x 6x-4r-6x
14" Dia Between Piling 6 Between Bents 10
The Backwall
Here is detereorating
significantly
14" Dia Between Piling 6 Between Bents 10
The Backwall
Here is detereorating
significantly
Bent D
0% 10%
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10
0%
12 ft
Bent C
0% 20%
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10
50%
12 ft
0%
R 5x-4r-5x
RShell
4x-6r-4x
14" Dia Between Piling 6 Between Bents 10
14" Dia Between Piling 6 Between Bents 10
Backwall
Corbel
has 6-8" of rot
Bent B
10% 10%
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10
50%
12 ft
10%
#11 #12
Bent A
10% 70%
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10
30%
12 ft
30%
#11 #12
20% 10%
20% 50% 30%
R
Shell
5x-4r-5x
R6x-4r-6x
R
4x-6r-4x
5x-4r-5x
Port of Astoria Pier 2 Cross Bracing & Girders generally not pictured Blue Bearing Loss
Results of Inspection 9/2015 & 1/2016 3-4 girders per pile. Girders are 13.5" x 6" Red Section Loss
22527 Caps are 14" x 14" Between Bents: 10 ft #22527 2/3
14" Dia Between Piling 4 Between Bents 10
Between Piling
4-6 ft
Between Bents
10 ft
14" Dia Between Piling 6 Between Bents 10
Between Piling
4-6 ft
Between Bents
10 ft
All Round Piles/
Columns
Bent 2
50% 100%
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
100%
Bent 1
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Open to Air
decay at end of sill
8 ft
CS4
7'
8'
R5x-4r-5x3
R
5x-4r-5x
R
5x-4r-5x
Green is Percent Bearing Loss
Between Piling
5 ft
Between Bents
10 ft
All Round Piles/
Columns
Between Piling
5 ft
Between Bents
10 ft
All Round Piles/
Columns
Bent 4
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6r-4x for 14 ft
Bent 3
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
#16
girders 2x deeper than typical
3x-
8r-
3xR
3x-
8r-
3xR
10 ft
CS3
CS3
R
5x-4r-5x
Between Piling
5 ft
Between Bents
10 ft
All Round Piles/
Columns
Between Piling
5 ft
Between Bents
10 ft
All Round Piles/
Columns
Bent 6
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Bent 5
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
#16
4x-6r-4x for 20 ft
100% 100%
4"-6"DecayR
50% 70%
50%
50%
CS3
CS3
50%
Between Piling (ft): 5 Between Bents (ft): 10 Piles 17
All Round Piles/
Columns
Between Piling (ft): 5 Between Bents (ft): 10 Piles 16
All Round Piles/
Columns
Bent 8
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Bent 7
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
#16
10'
#17
80%
40%
40%
80%
40% 40% 70%
40%
RR
RR
4x-
6r-
4x
R
4x-
6r-
4x
4x-
6r-
4x
4x-
6r-
4x
4x-
6r-
4x
CS3
CS3
3x-8r-3x for 6 ft
Between Piling (ft): 5 Between Bents (ft): 10 Piles 17
Between Piling (ft): 5 Between Bents (ft): 10 Piles 16
All round piles/
Columns
Bent 10
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Bent 9
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
#16
#17
Steel, 14"x14", 1/2" flange width for ~30 ft
2x-1
0r-2
x
R
60%
60%
30%
100%
R
R
80%
80%
4x-
6r-
4x
R
4x-
6r-
4x
R
4x-
6r-
4x
4x-
6r-
4x
4x-
6r-
4x
4x-
6r-
4xR
CS3CS4
CS3
100%
Between Piling (ft): 5 Between Bents (ft): 10 Piles 16
Between Piling (ft): 5 Between Bents (ft): 10 Piles 15
Bent 11
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
2x-1
0r-2
x
Bent 12
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6
r-4x
4x-
6r-
4xR
4x-
6r-
4xR
4x-
6r-
4x
R
4x-
6r-
4x
R
4x-
6r-
4xR
4x-
6r-
4xR
4x-
6r-
4xR
4x-
6r-
4xR
CS4 CS3
CS3
CS3
#17 #18 #19 #20
50% 50% 50%
5 degree off vertical
4x-6r-4x
Between Piling (ft): 5 Between Bents (ft): 10 Piles 16
All round piles/
columns
Between Piling (ft): 5 Between Bents (ft): 10 Piles 16
Bent 13
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
Bent 14
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
3x-8
r-3x
70%
50%
100%
15% 50% 50%
30%
70%
70%
4x-
6r-
4xR
4x-
6r-
4xR
4x-
6r-
4xR
4x-
6r-
4xR
CS3
CS3
CS3
4x-6r-4x
5x-
4r-
5xR
Between Piling (ft): 5 Between Bents (ft): 10 Piles 16
Between Piling (ft): 5 Between Bents (ft): 10 Piles 16
Bent 15
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
Bent 16
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
100% 100% 100% 100% 70%
100%
4x-
6r-
4xR
4x-
6r-
4xR
#16
yellow placard
CS3
Between Piling (ft): 5 Between Bents (ft): 10 Piles 16
All round piles/
columns
Between Piling (ft): 5 Between Bents (ft): 10 Piles 16
All round piles/
columns
Bent 17
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
R
R
RR
60%
100%
100%
50%
R
Bent 18
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
4x-
6r-
4x
4x-
6r-
4x
4x-
6r-
4x
5x-
4r-
5x R
4x-
6r-
4x
CS3
yellow placard
R
4x-
6r-
4x
Between Piling (ft): 5 Between Bents (ft): 10 Piles 16
Between Piling (ft): 5 Between Bents (ft): 10 Piles 17
Bent 19
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
6x-4
r-6x
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
4x-6r-4xR R
100% 100% 40%
#17
ShellR
Bent 20
CS3
CS4
CS3
Between Piling (ft): 5 Between Bents (ft): 10 Piles 16
All round piles/
columns
Between Piling (ft): 5 Between Bents (ft): 10 Piles 17
Bent 21
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
Split
90% 100% 100%
2x-1
0r-2
x
4x-6r-4xR
Bent 22
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
R
4x-
6r-
4xR
4x-
6r-
4x
R
4x-
6r-
4x
#17
CS4 CS3
CS3
R
Between Piling (ft): 5 Between Bents (ft): 10 Piles 16
Between Bents: 8 ft
Between Piling (ft): 4 Between Bents (ft): 8 Piles 15
Bent 23
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
2x-1
0r-2
x
Bent 24
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
100% 60%
100%
ShellR
R
#17 #18
40%
R
4x-
6r-
4xR
4x-
6r-
4x
4x-
6r-
4x
8 ft
CS3CS4
yellow placard
CS4
CS3
50%
80%
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Bent 25
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
50% 40% 100%
#17 #18
8-10"R
6"R
75%
50%
Bent 26
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
100% 100%
10" RotR
8-10"R
#17 #18
CS4
CS3
CS4
ShellR
6" decay in cap over 7-9
10" RotR
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Good Acces Between 27 & 28
Spacing 3 ft
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18 Splits in outside
Girder (cs3)
Bent 27
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
Firewall/ Seawall Along this Bent
#17 #18
Bent 28
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
She
ll (C
S4)
#17 #18
4x-6
r-4x
She
ll
6" decay in cap over 3,4
2x-1
0r-2
x
6 ft
RR
5x-4
r-5xR
5x-4
r-5xR
5x-4
r-5xR
5x-4
r-5xR
5x-4
r-5xR
5x-4
r-5xR
5x-4
r-5xR
cs3
split
yellow placard
CS3
RBI: Urgent priority to repair Bent 3/2016
Newly replaced as of 9/2016 (old condition for reference)
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Bent 29
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
Bent 30
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
Piplline runs along cap
#17 #18
5x-4
r-5xR
5x-4
r-5xR
5x-4
r-5xR
5x-4
r-5xR
CS3
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Bent 31
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
She
ll
Bent 32
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
newish girders
3x-8
r-3x
R
R
newish girders
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Leansand 1/4" split
Bent 33
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
Bent 34
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19
newish girders
newish girders large cleat over 33yellow placard
CS4
She
ll
R CS4
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Bent 35
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
She
ll
Bent 36
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
newish girders
newish girders
R
R R
5x-4
r-5x
5x-4
r-5x
50% 50% 50%
CS4
CS3
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Bent 37
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
Bent 38
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
3x-8
r-3x
newish girders
leans CS4
R
R
5x-4
r-5x
(C
S3)
CS4
yellow placard
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Bent 39
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
She
ll
Bent 40
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
3x-
8r-
3xR
3x-
8r-
3xR
6 ft
newish girders
newish girders
R RR
3x-8
r-3x
3x-8
r-3x
CS3
CS3
4x-6
r-4x
R
4x-6
r-4x
R
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Bent 41
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
4x-6r-4x (Cs3)
Bent 42
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
2x-10r-2x (CS4)
newish girders
newish girders
4x-6
r-4x
R
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
CS4
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
CS3
Bent 43
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
Bent 44
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
2x-
10
r-2
x
R
2x-
10
r-2
xR
3x-
8r-
3x
(CS
3)
R
newish girders
3x-
8r-
3xR
yellow placard
4x-6r-4x
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Bent 45
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
She
ll (C
S4)
Bent 46
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
RR
ShellR
ShellR
ShellR
ShellR2
x-1
0r-
2x
3x-
8r-
3x
#19
CS4CS3RBI: Urgent priority
to repair Bent 3/2016No change as of 9/2016
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Between Piling (ft): 4 Between Bents (ft): 8 Piles 18
Bent 47
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
R
ShellR
100%
Bent 48
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15
4x-6
r-4x
large cleat over 50
R
5x-
4r-
5x
3x-
8r-
3x
CS4CS3
CS2CS3
CS3
yellow placard
Dolphin at end of bent
R
5x-
4r-
5x
Port of Astoria Pier 2 Cross Bracing & Girders generally not pictured Blue Bearing Loss
Results of Inspection 9/2015 & 1/2016 Girders (12" x 4") at 16" to 18" O.C. Typical Red Section Loss
22527 Caps are 14" x 14" Between Bents: 8 ft #22527 3/3
Pile Dia 14"
Between Piling 5 ft
Between Bents 8 ft
Notes: 26 Girders (12" x 4")
18" to 16" o.c.
+4 Girders
(24" x 10")
4' o. c.
Towards end of
bent
14 Dia
5 ft Between Piling
8 ft Between Bents
Notes:
Bent 49
Bent 50
#3 #5 #13 #14 #15#1 #2 #4 #10 #11 #12 #16 #17 #18#6 #9#7 #8
#3 #5 #13 #14 #15#1 #2 #4 #10 #11 #12 #16 #17#6 #9#7 #8
R
3x-
8r-
3x
10 ft
4x-6r-4x (cs3)
10 ft
R
6x-
2r-
6x
14" Dia
5 ft Between Piling
8 ft Between Bents
Notes:
14" Dia
5 ft Between Piling
8 ft Between Bents
Notes:
Bent 51
Bent 52
#3 #5 #13 #14 #15#1 #2 #4 #10 #11 #12 #16 #17#6 #9#7 #8
#3 #5 #13 #14 #15#1 #2 #4 #10 #11 #12 #16 #17#6 #9#7 #8
R
5x-
4r-
5x
R
3x-
8r-
3xR
3x-
8r-
3x
14" Dia
6 ft Between Piling
8 ft Between Bents
Notes:
14" Dia
5 ft Between Piling
8 ft Between Bents
Notes:
Bent 53
Bent 54
#3 #5 #13 #14 #15#1 #2 #4 #10 #11 #12 #16 #17#6 #9#7 #8
#3 #5 #13 #14 #15#1 #2 #4 #10 #11 #12 #16 #17#6 #9#7 #8
5x-
4r-
5x
R
5x-
4r-
5x
R
5x-
4r-
5x
R
5x-
4r-
5x
R
3x-
8r-
3x
R
3x-
8r-
3x
R
14" Dia
5 ft Between Piling
8 ft Between Bents
Notes:
14" Dia
5 ft Between Piling
8 ft Between Bents
Notes:
Bent 55
Bent 56
#7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
Steel Girder at end
#3 #5 #13 #14 #15#1 #2 #4 #10 #11 #12 #16 #17#6 #9#7 #8
#3 #5#1 #2 #4 #6
3x-
8r-
3x
R
3x-
8r-
3x
R
3x-
8r-
3x
R
sHE
LL
R
14" Dia
5 ft Between Piling
8 ft Between Bents
Notes:
14" Dia
5 ft Between Piling
8 ft Between Bents
Notes:
Bent 57
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
Bent 58
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
Steel Girder at end
Steel Girder at end
3x-
8r-
3x
(Cs3
)
R
Small Access Hole (~3' x 3')
14" Dia
5 ft Between Piling
8 ft Between Bents
Notes:
14" Dia
5 ft Between Piling
8 ft Between Bents
Notes:
Bent 59
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
Bent 60
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
She
ll
She
llS
hell
Steel Girder at end
Steel Girder at end
R
R R
14" Dia
5 ft Between Piling
8 ft Between Bents
Notes:
14" Dia
4 ft Between Piling
8 ft Between Bents
Notes:
Bent 61
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
She
ll
#18
Bent 62
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
Steel Girder at end
Steel Girder at end
Large Cleats
R
CS4
8 ft
4x-6
r-4x
R
14" Dia
4 ft Between Piling
8 ft Between Bents
Notes:
14" Dia
4 ft Between Piling
8 ft Between Bents
Notes:
Bent 63
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
Bent 64
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
Steel Girder at end
Steel Girder at end
She
ll
R
14" Dia
4 ft Between Piling
8 ft Between Bents
Notes:
Good Land Access, This Bent
14" Dia
Between Piling
3 ft
Between Bents
8 ft
Notes:
Bent 65
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18
Bent 66
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
She
ll
#18 #19 #20
Steel Girder at end
Steel Girder at end
4x-6
r-4xR
R
CS4
CS3
6 ft
14" Dia Between Piling 2 ft Between Bents 8 ft
Notes:
14" Dia Between Piling 2 ft Between Bents 8 ft
Notes:
Bent 67
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17
Spl
it/ C
rack
ed
#18 #19 #20 #21 #22
100%
Bent 68
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20 #21 #22
Steel Girder at end
Steel Girder at endCS4
3x-8
r-3xR
14" Dia Between Piling 2 ft Between Bents 8 ft
Notes:
14" Dia Between Piling 2 ft Between Bents 8 ft
Notes:
Bent 69
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20 #21
Bent 70
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Steel Girder at end
Steel Girder at end
closely spaced taller girders
closely spaced taller girders
She
ll
R
4 ft
She
ll
R
Need Shim (cs3)
She
ll
R
She
ll
R4x-6
r-4xR
14" Dia Between Piling 3 ft Between Bents 10 ft
Notes:
14" Dia Between Piling 3 ft Between Bents 10 ft
Notes:
Bent 71
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Bent 72
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
closely spaced taller girders
closely spaced taller girders
She
ll
R
6 ft
4x-6r-4x (cs3)
14" Dia Between Piling 3 ft Between Bents 10 ft
Notes:
14" Dia Between Piling 3 ft Between Bents 10 ft
Notes: 6" overhang of girders
Bent 73
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Bent 74
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
2x-1
0r-2
x
She
llDolphin
Dolphin
Large Cleats
R R
She
ll
R
14" Dia Between Piling 3 ft Between Bents 10 ft
Notes: 6" overhang of girders
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
Bent 75
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Bent 76
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
closely spaced taller girders
3x-8
r-3x
R
3x-8
r-3x
R
3x-8
r-3x
R
3x-8
r-3x
R
Spl
it/ C
rack
ed
8 ft
Steel Girder at end
CS4
CS4
She
ll
R
4x-6
r-4x
R
She
ll
R
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 3" overhang of girders
Bent 77
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Bent 78
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
100% 100% 100%
yellow plackard (also marked 700 with white sign)
steel capclosely spaced taller girders
Spl
it/ C
rack
ed
sporadic bearing loss
4x-6
r-4x
R
Spl
it/ C
rack
ed
Spl
it/ C
rack
ed
Spl
it/ C
rack
ed
100%
CS4
CS4
100% 100%
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
Bent 79
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Bent 80
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
large cleats
Spl
it/ C
rack
ed
Spl
it/ C
rack
ed
Spl
it/ C
rack
ed
3x-8
r-3x
R
4x-6r-4x (cs3)
3x-8
r-3x
R
3x-8
r-3x
R
100%
CS4
She
ll
R
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
Bent 81
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Bent 82
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
100% 100% 100% 100%
100%
3x-8
r-3x
100% 100%
100% 100% 100%
R
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
14" Dia Between Piling 4 ft Between Bents 10 ft
Notes: 6" overhang of girders
Bent 83
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
Bent 84
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20
4x-6
r-4x
Steel Girder at end
100% 100% 100%
100% 100% 100%
R
100% 100% 100%
100% 100% 100%
4x-6
r-4x
R
She
ll
R