ber 2013 transmittal...ape beams isting syste ted to resis r major ma s up to th ls two and rown to...

33
18 Octo Letter of Departm The Pen Dr. Boot This lette project. support Thank yo Christop ber 2013 f Transmitta ment of Arch nsylvania St hby, er is to prov All necessa ing my claim ou for assist pher Duarte al hitectural E tate Univer ve submitta ry docume ms are inclu tance with t e ngineering sity al of Technic nts are inclu uded in resp this assignm cal Report 3 uded with t pective app ment, 3 for the Orc this submit pendices. chard Plaza tal. Calculat Senior The tions 0 esis

Upload: others

Post on 07-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  •  

     

    18 Octo

    Letter of

    Departm

    The Pen

    Dr. Boot

    This lette

    project.

    support

    Thank yo

    Christop

    ber 2013

    f Transmitta

    ment of Arch

    nsylvania St

    hby,

    er is to prov

    All necessa

    ing my claim

    ou for assist

    pher Duarte

    al

    hitectural E

    tate Univer

    ve submitta

    ry docume

    ms are inclu

    tance with t

    e

    ngineering

    sity

    al of Technic

    nts are inclu

    uded in resp

    this assignm

    cal Report 3

    uded with t

    pective app

    ment,

    3 for the Orc

    this submit

    pendices.

    chard Plaza

    tal. Calculat

    Senior The

    tions

    esis

  •  

     

    TEC

    ORC

    AE S

    Christ

    Advis

    Octob

    CHN

    CHAR

    ENIOR

    topher

    sor: Tho

    ber 18th

    NICA

    D PLA

    R THES

    Duarte

    mas Bo

    , 2013

    AL RE

    AZA

    IS

    - Struct

    othby

    EPO

    tural

    ORT 33

  •  

     

    TABExecutive

    Site Plan…

    Codes……

    Gravity Lo

    Roof Load

    Exterior F

    Alternate 

      Sy

      Sy

      Sy

    Appendix 

    Appendix 

    Appendix 

    Appendix 

    Appendix 

     

     

    BLE O Summary……

    ……………………

    ……………………

    oads………………

    ds…………………

    açade Loads…

    Framing Syst

    ystem 1 – No

    ystem 2 – On

    ystem 3 – No

    A – Gravity L

    B – Existing G

    C – Alternate

    D – Alternate

    E – Alternate

    F CO………………………

    ……………………

    ……………………

    ……………………

    ………………………

    ……………………

    tems ……………

    n‐Composite 

    e‐way Concre

    n‐Composite 

    Load Calculati

    Gravity System

    e Framing Sys

    e Framing Sys

    e Framing Sys

    NTEN……………………

    ………………………

    ……………………

    ………………………

    ……………………

    ………………………

    ……………………

    Steel Joists…

    ete Slab………

    Decking………

    ions………………

    m Check………

    stem 1 Calcul

    stem 2 Calcul

    stem 3 Calcula

    NTS………………………

    ……………………

    ………………………

    ……………………

    ………………………

    ……………………

    ……………………

    ………………………

    ……………………

    ……………………

    ……………………

    ………………………

    ations…………

    ations…………

    ations…………

    ……………………

    ………………………

    ……………………

    ………………………

    ……………………

    ………………………

    ……………………

    ……………………

    ……………………

    ……………………

    ………………………

    ……………………

    ……………………

    ………………………

    ……………………

    ………………………

    ……………………

    ………………..……

    ……………………

    ………………………

    ……………………

    ……………………

    ………………………

    ……………………

    ………………..……

    ……………………

    ………………………

    ……………………

    ……………………

    ……………………

    ……………………

    …………………….

    ……………………

    …………………….

    ……………………

    …………………….

    …………………….

    ……………………

    …………………….

    ……………………

    …………………….

    …………………..

    …………………. 

    …………………….

    …………………. 

    … 3 

    .  4 

      4 

    . 5 

    ….6 

    . 7 

    . 8 

    … 9 

    .10 

    … 11 

     12 

     14 

    22 

     25 

    29 

  •  

     

    EXEOrchard

    level. Th

    an urba

    building

    The stru

    on grad

    eastern

    concrete

    compris

    to the c

    frames t

    The faça

    limeston

    veneer i

    paneling

    the build

    CUTIV Plaza is a s

    e building i

    an environm

    g.

    ctural syste

    de. The site

    side to the

    e retaining

    es of a syste

    aissons. The

    hat are eve

    ade is comp

    ne veneer t

    s found be

    g, proving a

    ding a very

    VE SUsix story off

    is located in

    ment. Com

    em element

    e of Orchar

    e first level o

    wall is foun

    em of W-sh

    e lateral res

    nly distribu

    posed of fou

    that extend

    etween leve

    a modern c

    contempo

    UMMAfice buildin

    n southwes

    mpleted in

    ts include a

    rd building

    on the wes

    nd along the

    hape beams

    sisting syste

    ted to resis

    ur major ma

    ds up to th

    els two and

    rown to the

    rary appear

    ARYg with stre

    tern Pennsy

    2006, Orc

    a foundatio

    slopes up

    stern side. B

    e western h

    s, girders, an

    em is comp

    t both Nort

    aterials. At i

    he second

    d five. The

    e building.

    rance.

    et level reta

    ylvania on t

    chard Plaza

    n of caisson

    pward from

    Because of

    half of the b

    nd columns

    posed of six

    th-South an

    ts base, Orc

    or third lev

    sixth level

    All glazing

    ail on the g

    the corner o

    a is also a

    ns, grade b

    the groun

    f this differe

    building. The

    s that carry

    x eccentrica

    nd East-Wes

    chard Plaza

    vel. Next, re

    is wrapped

    is green in

    ground and

    of two stree

    LEED Cert

    eams, and

    nd floor on

    ence in gra

    e gravity sy

    all vertical l

    ally braced

    st forces.

    is wrapped

    ed-orange

    d in sleek m

    color and g

    d first

    ets in

    tified

    slabs

    n the

    de, a

    stem

    oads

    steel

    d in a

    brick

    metal

    gives

  •  

     

    SITE

    Orchard

    streets.

    construc

    requirem

    retail on

    CODThe follo

    • 2

    • M

    • B

    • A

    E PLA

    Plaza is sit

    The build

    cted next t

    ments for t

    n the groun

    DES owing code

    003 Interna

    Minimum De

    uilding Cod

    AISC Manua

    N

    tuated in an

    ing is loca

    to an abov

    he building

    d and first l

    es were used

    ational Build

    esign Loads

    de Requirem

    l of Steel Co

    n urban en

    ated in so

    ve ground

    g. The buil

    levels.

    d for the de

    ding Code

    s for Buildin

    ments for St

    onstruction

    vironment

    outhwestern

    parking ga

    ding is pri

    esign of Orc

    ng and Othe

    tructural Co

    , Allowable

    with close

    n Pennsylv

    arage whic

    marily ope

    chard Plaza

    er Structure

    oncrete (AC

    Stress Desi

    e proximity

    vania. Orch

    h accomm

    en office sp

    es (ASCE 7-0

    CI 318-02)

    ign (ASD)

    to neighbo

    hard Plaza

    modates par

    pace with s

    02)

    oring

    was

    rking

    some

  •  

     

    GRA

    A comp

    AVITY

    lete estimat

    LOA

    te of the bu

    DS

    uilding’s graavity loads ccan be founnd in Appenndix A

  •  

     

    ROO

    The roof

    Concre

    • 4

    • 2

    • 6

    1.5B20

    OF LO

    f system of

    ete Mechan

    ” Normal W

    ”-18Gage C

    x6 ‒ W2.9 x

    0 Roof Deck

    OADS

    Orchard Pla

    nical Pad

    Weight Conc

    Composite

    x W2.9 Weld

    king ‒ Vulcr

    aza is comp

    crete

    Decking

    ded Wire Fr

    raft

    prised of the

    rame

    e two compponents shoown below

    .

  •  

     

    A cross s

    EXT

    Weight o

    estimate

    section of b

    ERIOR

    of the exter

    ed to accou

    both the roo

    R FAÇ

    rior façade w

    unt for forty

    of decking a

    ÇADE

    was estimat

    percent of

    and concret

    LOAD

    ted using A

    the total bu

    te mechan

    DS

    ASCE 7-02. E

    uilding wei

    ical pad is s

    Exterior faça

    ght.

    shown belo

    ade loads a

    ow.

    re

  •  

     

    ALT

    For this r

    Plaza. Th

    analyzed

    existing

    \

    35” x 4

    35’ x 2

    TERNA

    report, thre

    he building

    d. The existi

    roof, beam

    42’ Bay area

    8’ Bay area

    ATIVE

    e alternativ

    consists of

    ng floor sys

    , girder, and

    coverage ‒

    coverage

    FRAM

    ves were exp

    two standa

    stem uses c

    d column g

    ‒ Analyzed

    MING

    plored for t

    ard bay size

    composite b

    ravity chec

    for this rep

    SYST

    he floor fram

    s. For this e

    beams and

    ks can be fo

    port

    EMS

    ming system

    exercise, a 35

    girders. De

    ound in Ap

    m of Orcha

    5’ x 42’ bay

    etails regard

    pendix B.

    rd

    was

    ing

  •  

     

    SYST

    The first

    lightwei

    long dis

    can be f

    W30x9

    32LH1

    W30x1

    TEM 1

    system exp

    ght design

    tances. Belo

    found in Ap

    90 [44] for e

    3 Joist Gird

    08 Girder

    ‒ NO

    plored was

    and ease o

    ow is a layo

    ppendix C.

    exterior faça

    ders spaced

    ON-CO

    non-comp

    of construct

    out of the jo

    ade suppor

    5’ OC

    42’‐0”

    OMPO

    posite steel j

    tion. Also, s

    oist and gird

    rt

    OSITE S

    joists. This

    steel joists f

    der system

    STEEL

    system wa

    function we

    . Calculatio

    35’‐0

    JOIST

    as chosen fo

    ell for spann

    ons for Syste

    350 

    TS

    or its

    ning

    em 1

  •  

     

    SYST

    The seco

    girders.

    achieve

    Append

    12” x 2

    24” x 2

    24” x 2

    TEM 2

    ond system

    The bay siz

    a 14’ tribut

    dix D.

    23” Beam w

    24” Girder w

    24” Column

    2 ‒ O

    m considere

    ze was kept

    tary width b

    with (3) #6 re

    with (5) #8 re

    ONE W

    d was a on

    t at 35’ x 45

    between be

    ebar

    ebar

    WAY C

    e-way conc

    5’ with two

    eams. Calcu

    CONC

    crete slab o

    beams plac

    ulations for

    RETE

    on concrete

    ced inside t

    System 2 c

    SLAB

    e beams an

    the bay to

    can be foun

    10 

    B

    d

    nd in

  •  

     

    SYST

    A non-c

    system.

    span de

    compos

    W21 x

    W30 x

    W27 x

    TEM 3

    omposite d

    An identic

    cking as pr

    site decking

    68 Beams

    90 Exterior

    84 Girders

    3 ‒ N

    deck was an

    al beam an

    escribed by

    g design ca

    r Beam

    ON-C

    nalyzed to c

    nd girder lay

    y the buildi

    lculations.

    42’

    COMP

    compare to

    yout was us

    ng’s specifi

    ‐0”

    POSIT

    o the existin

    sed for this

    ications. Ap

    TE DEC

    ng compos

    system, as

    ppendix E d

    35’‐0

    ” 

    CKING

    ite deck

    well as 3+

    details non-

    11 

    G

    -

  •  

     

    APP

    PENDIIX A ‒

    ‒ GRAVVITY LOOAD CAALCULAATIONS

    12 

    S

  •  

     

    APP

    PENDIIX A ‒

    ‒ GRAVVITY LOOAD CAALCULAATIONS

    13 

    S

  •  

     

    APP

    PENDIIX B ‒

    ‒ EXISTING GRAAVITY SYYSTEM CHECK

    14 

  •  

     

    APP

    PENDIIX B ‒

    ‒ EXISTING GRAAVITY SYYSTEM CHECK

    15 

  •  

     

    APP

    PENDIIX B ‒

    ‒ EXISTING GRAAVITY SYYSTEM CHECK

    16 

  •  

     

    APP

    PENDIIX B ‒‒ EXISTING GRAAVITY SYYSTEM CHECK

    17 

  •  

     

    APP

    PENDIIX B ‒

    ‒ EXISTING GRAAVITY SYYSTEM CHECK

    18 

  •  

     

    APP

    PENDIIX B ‒

    ‒ EXISTING GRAAVITY SYYSTEM CHECK

    19 

  •  

     

    APP

    PENDIIX B ‒

    ‒ EXISTING GRAAVITY SYYSTEM CHECK

    20 

  •  

     

    APP

    PENDIIX B ‒

    ‒ EXISTING GRAAVITY SYYSTEM CHECK

    21 

  •  

     

    APP

    PENDIIX C ‒

    ‒ ALTERNAATIVE SYSTTEM 1

    22 

  •  

     

    APP

    PENDIIX C ‒

    ‒ ALTERNAATIVE SYSTTEM 1

    23 

  •  

     

    APP

    PENDIIX C ‒

    ‒ ALTERNAATIVE SYSTTEM 1

    24 

  •  

     

    APP

    PENDIIX D ‒

    ‒ ALTTERNAATIVE SYSTTEM 2

    25 

    2

  •  

     

    APP

    PENDIIX D ‒

    ‒ ALTTERNAATIVE SYSTTEM 2

    26 

    2

  •  

     

    APP

    PENDIIX D ‒

    ‒ ALTTERNAATIVE SYSTTEM 2

    27 

    2

  •  

     

    APP

    PENDIIX D ‒

    ‒ ALTTERNAATIVE SYSTTEM 2

    28 

    2

  •  

     

    APP

    PENDIIX E ‒

    ‒ ALTEERNAATIVE SYSTEEM 3

    29 

  •  

     

    APP

    PENDIIX E ‒

    ‒ ALTEERNAATIVE SYSTEEM 3

    30 

  •  

     

    APP

    PENDIIX E ‒

    ‒ ALTEERNAATIVE SYSTEEM 3

    31 

  •  

     

    APP

    PENDIIX E ‒‒ ALTEERNAATE SYYSTEMM 3

    32