Page 1: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

Bergisch Gladbach June 18 2012

Page 2: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

German Standard 2012

• Binder Course AC 22 BS and AC 16 BS– Bitumen 25/55-55 or 30/45 or 10/40-65– Wheel tracking not specified but must be

documented– Voids Vmin 3.5 % - Vmax 6.5 – Binder content Bmin 4.2 M.-% (AC 22 B S)

and 4.4 M.-% (AC 16 B S)– Grading according to TL Asphalt-StB 07

Page 3: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

German Standard 2012• Wearing Course

SMA 8 S and SMA 11 S– Bitumen 25/55-55 or 50/70– Wheel tracking not specified but must be

documented– Voids Vmin 2.5 – Vmax 3.0 – Binder content Bmin 6.6 M.-% (SMA 11 S)

and 7.2 M.-%(SMA 8 S)– Fiber or other substances 0.3 -1.5 M.-%– Grading according to TL Asphalt-StB 07

Page 4: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

German Standard 2012• Does it work?• Yes; this is a well proven design that stood the

test of time.• Problems?

– If any; workmanship, workmanship; work…..• Fit for future?

– SMA with even 25/55-55 deforms under highest traffic on inclines and on truck parking areas, also on bus terminals. SMA with 10/40-65 successfully used as remedy

Page 5: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 6: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 7: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 8: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 9: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 10: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 11: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 12: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 13: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

Client requirement for dimensioning

200 Van-Carrier - Axles 125 kN/day

365 days / year

life 20 Years

Result by APSDS & BISAR

30 cm Schottertragschicht 0/45

8 cm Binder 0/16

6 cm SMA 0/16

With use of special bitumen

Page 14: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

HOCHSTANDFESTE FLÄCHEN MIT ASPHALT

TATSÄCHLICH ABER:2600 Container- bzw.

1000 LKW-Bewegungen pro Tag

Page 15: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

Construction in layers

Mineral Base 0/45 mm

Binder 0/16 mm

SMA 0/16 mm6 cm 6 cm

8 cm 8 cm

30 cm40 cm

6 cm

10 cm

30 cmHydraulically bound base 0/32 mm

1997 2002 2005

Page 16: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

Year of construction

Track @

50° C [mm] 60° C [mm]

Delta

50° to 60° C [mm]

Container Terminal B

Container Terminal B

Container Terminal C

Container Terminal C

2000

2000

1998

1998

2,2

4,0

3,0

3,2 18,3*

12,6

6,4

3,7

+ 15,5**

+ 1,5

+ 9,6

+ 2,4

* Failure after 16600 asses, stripping

** Detla at failure point 16600

(Hamburg) Wheel Tracking

Page 17: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 18: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 19: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 20: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 21: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified
Page 22: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

Baumaßnahme BAB A1 ZTV Asphalt StBMischwerk A Asphaltbinder 0/16 25 % RAP elastic recovery 55 %Mischwerk B Asphaltbinder 0/16 26 % RAP elastic recovery 54 %Mischwerk C Asphaltbinder 0/16 27 % RAP elastic recovery 62 %Mischwerk D Asphaltbinder 0/16 28 % RAP elastic recovery 62 %Mischwerk E Asphaltbinder 0/16 29 % RAP elastic recovery 57 %

Baumaßnahme BAB A1 ZTV/St.-Hmb.Mischwerk B Asphaltbinder 0/16 30 % RAP elastic recovery 51 %

Baumaßnahme B-5 ZTV/St.-Hmb.Mischwerk B Asphaltbinder 0/16 40 % RAP elastic recovery 44 %

Page 23: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

PmB SmB(Sasobit)

Asphaltbinder 0/16gem. ZTV/St-Hmb.

Spurbildungsergebnisse gem.TPA - StB

mit PmB 453,3 mm

mit PmB 252,5 mm

mit SmB 35(97 M.-% 50/70 + 3 M.-% Sasobit)

2,3 mm

PmB 25 RC + 3 % Sasobit1,1 mm

Page 24: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

Proven Asphalt onContainer Terminals in Hamburg

Bezeichnung Bitumen RAPWheel tracking

@ 50°C Wheel tracking

@ 60°C Asphalttragschicht B 0/22 SmB 35 SD2 50 % 3,04 mmAsphalttragschicht CS 0/22 SmB 35 SD2 50 % 2,12 mmAsphalttragschicht CS 0/22 Caribit 25 RCSD4 30 % 2,12 mmAsphalttragschicht B 0/22 SmB 25 SD4 50 % 2,21 mmAsphalttragschicht CS 0/22 Nypol 25 HR 50 % 1,72 mm 3,28 mm

Asphaltbinder 0/16 Caribit 25 RCSD2 30 %Asphaltbinder 0/16 S Caribit 25 RCSD3 20 % 1,90 mmAsphaltbinder 0/16 S Nypol 25 HR 20 % 2,65 mm

Asphaltbeton 0/8 hs Caribit 25 RCSD4 20 % 1,94 mmAsphaltbeton 0/8 hs Nypol 25 HR 20 % 1,44 mmAsphaltbeton 0/11 hsAsphaltbeton 0/11 hs

Caribit 25 RCSD4Nypol 25 HR

20 %20 %

SMA 0/8SMA 0/8

Caribit 25 RCSD4Nypol 25 HR

20 %20 %

1,12 mm1,55 mm

SMA 0/16SMA 0/16

Caribit 25 RCSD3Nypol 25 HR

20 %20 % 3,31 mm

SMA 0/16SMA 0/16

Caribit 25 RCSDNypol 25 HR

1,12 mm1,52 mm

Page 25: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

The Future…..• Has anybody got money to pay for cost

increase?• Crumb Rubber appears to be a solution• New pre activated dry compound for mixer

addition• Dosing like filler

Page 26: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

The Future…..

Page 27: Bergisch Gladbach June 18 2012. German Standard 2012 Binder Course AC 22 BS and AC 16 BS –Bitumen 25/55-55 or 30/45 or 10/40-65 –Wheel tracking not specified

HOCHSTANDFESTE FLÄCHEN MIT ASPHALT

-LICHEN DANK FÜR IHREAUFMERKSAMKEIT