best practices for exceeding project goals and reducing risk on … · 2016-10-24 · 2...

33
Best Practices for Exceeding Project Goals and Reducing Risk on Construction Projects Presented by: Robyn Minter Smyers Alan S. Ritchie Heather A. Bartzi Erin Luke

Upload: others

Post on 15-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

Best Practices for Exceeding Project Goalsand Reducing Risk on Construction Projects

Presented by:Robyn Minter SmyersAlan S. RitchieHeather A. BartziErin Luke

Page 2: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

2

Presentation Team

Robyn Minter SmyersPartner, Thompson [email protected]

Alan RitchiePartner, Thompson [email protected]

Heather BartziPartner, Thompson [email protected]

Erin LukeSenior Associate, Thompson [email protected]

Page 3: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

3

Beginning of Design and ConstructionProject• Ideal Process

• Plenty of Time

• Ample Budget

• Project Goals ClearlyIdentified

• Competitive Selection ofDesigner and Constructor

• Abundant Information

Page 4: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

4

But, IRL…

• Starting Tomorrow

• Way Over Budget

• Unresponsive Proposals

• Scope of Project is a

Moving Target

Result: Do what you did for the last project with the

same design and construction team.

Page 5: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

5

• Late Completion

• Over-Budget

• Bad Fit, No Cooperation Among Team

• Disappointment

• Unhappy Stakeholders

What Happens?

Basically…

Page 6: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com
Page 7: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

7

The Fix

• Effectively Plan the ProjectEarly

• Align Goals and AddressProject Risks and Challenges

• Select Appropriate ProjectDelivery Method

• Use Good RFP/RFQ forSelection of Designers andConstructors

Page 8: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

8

Best Practices of Construction Projects:Front End Planning and Process• We will discuss in this seminar:

• Review and prioritize critical projectparameters

• Identify constraints that limit possibledelivery options

• Review project delivery methodologies

• Compare options based upon stakeholderpriorities

• Identify special tools to enhance projectdelivery success

Page 9: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

9

Address Key Questions

• What are the critical project parameters?

• Absolute constraints that limit options?

• What is owner’s need for control vs. shifting risk todesigner and/or constructor?

• Type of project? (e.g., manufacturing,office building, infrastructure)

• Other concerns? (e.g., real estate,environmental, health & safety)

Page 10: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

10

Roles & Responsibilities Of Stakeholders

• Management Profile:In-House Expertise &Resources

• Approach to DesignManagement

• Tolerance for Risk

• Relationship Network

Page 11: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

11

Project Management – The Problem

• Project delivery system oftenselected without objective analysis…

• The way we always do it

• What the Architect/Engineer wanted

• The form the lawyer used

• LET’S DO WHAT’S NEW AND EXCITING!!!

• … and not tailored to solve project specific issues.

• Can lead to project failure—time, scope and cost

Page 12: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

12

What is Project Delivery?

• Business and legal structure that identifies andaligns:

• Project Goals

• Project Requirements

• Project Processes

• Legal Structures

• Risk Mitigation

Page 13: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

Budget

Schedule

Changes

Legal Structure

Process and Risk

Management

Safety

Quality

Aesthetics

Page 14: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

14

Acceleration of Detail/Decisions into Design

Page 15: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

15

Project Delivery Methodologies

• Multiple Prime Contracting

• Design-Bid-Build (General Contractor)

• Construction Management

• As Advisor – Not utilized often

• At-Risk (As Constructor)

• Design-Build

• Bridging Design-Build

• Integrated Project Delivery

Page 16: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

16

Design/Bid/Build (General Contractor)Approach

A/E Owner

General

Contractor

SUB SUB SUB

Consultant Consultant Consultant

Design Construction

PR

IC

E

Page 17: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

17

Design Construction

Construction Manager at Risk Approach

A/E OwnerConstruction

Manager

SUB SUB SUB

Consultant Consultant Consultant

+ Precon

PR

IC

E

Page 18: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

18

Bridging Design/Build Approach

Owner

Design/

Builder

SUB

Consultant

A/E

Consultant Consultant

SUB SUB

Criteria

A/E

Consultant Consultant Consultant

Page 19: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

19

Project Compensation Models

• Lump Sum, Stipulated Price

• Cost of the Work – No GMP

• Cost of the Work with GMP

• Target Price

Page 20: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

20

Basis of Design and PricingOwner’s Basis

of Design

Design-

Build

Bridging

Design-

Build

CM @

Risk

General

Contractor

(D-B-B)

Complete

Construction

Documents

Performance

Requirements

35% to 95%

Construction

Documents

Schematic orDesign

DevelopmentDocuments

Page 21: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

21

Lump Sum vs. GMP Approach

GMP ContractLump Sum Contract

Lump Sum

Fee

GCs

Contingency

GMP

Fee

GCs

Cost

of the

Work

Final

Cost

of the

Work

Savings

Page 22: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

22

Lump Sum vs. GMP Approach

GMP ContractLump Sum Contract

Lump Sum

Fee

GCs

Contingency

GMP

Fee

GCs

Cost

of the

Work

Final

Cost

of the

Work

Loss

Page 23: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

23

Target Pricing

Page 24: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

24

Selection of Design and Construction Team

Set Team

• Facilities

• Finance

• Management

• Legal

• EHS

• Owner’s Rep

Identify Goals

• Uses & Needs

• Budget & Contingency

• Schedule & Milestones

• What’s Important

• What’s Unique

Page 25: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

25

Good Paperwork – RFQ / RFP

Uniform Requests

=

Uniform Submissions

Page 26: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

26

Required Submissions

• Firm Profile

• Insurance and Bonding

• Litigation History

• Financial Strength

• References

• Approach / Method

• Project Experience

• Current Workload

• Key Personnel / Staffing

• Agreement Comments

• Pricing Proposal

• Value Add Ideas

Page 27: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

27

Due Diligence Review

• Preliminary Research

• Firm Interviews

• Contact References

• Assemble Information

• Discuss and Evaluate

• Teamwork v. Price

Page 28: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

28

Project Partnering

• Communication Protocols

• ID Key Stakeholders

• Address Concerns

• Collaboration

• Team Work

• Project Success!

Page 29: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

29

• Project Sponsorship/Resources

• Project Delivery

• Facilitated GMP Process

• Contingency Management

• Insurance Review

• Dispute Resolution Issues

Tools to Enhance Project Success

Page 30: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com
Page 31: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

Yippee-

Kai-Yay!

Page 32: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

32

Questions?

Robyn Minter SmyersPartner, Thompson [email protected]

Alan RitchiePartner, Thompson [email protected]

Heather BartziPartner, Thompson [email protected]

Erin LukeSenior Associate, Thompson [email protected]

Page 33: Best Practices for Exceeding Project Goals and Reducing Risk on … · 2016-10-24 · 2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine 216.566.5830 Robyn.Smyers@ThompsonHine.com

33

This presentation may be reproduced, in whole or in part, with the prior permission of Thompson Hine LLP and acknowledgement of itssource and copyright. This publication is intended to inform clients about legal matters of current interest. It is not intended as legal advice.Readers should not act upon the information contained in it without professional counsel.

This document may be considered attorney advertising in some jurisdictions.

© 2016 THOMPSON HINE LLP. ALL RIGHTS RESERVED.