bfc 43303 integrated design project (idp)

17
HB Koh, 20 February 2012 BFC 43303 Integrated Design Project (IDP) Faculty of Civil and Environmental Engineering Semester 1, Session 2013/2014

Upload: moanna

Post on 05-Feb-2016

157 views

Category:

Documents


3 download

DESCRIPTION

BFC 43303 Integrated Design Project (IDP). Semester 1, Session 2013/2014. Faculty of Civil and Environmental Engineering. Outline. Introduction to IDP Why IDP? / Aims & Objectives/Learning Outcomes of IDP Lecture plan (RPP) & Method of Implementation/ assessments - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

BFC 43303Integrated Design Project

(IDP)

Faculty of Civil and Environmental Engineering

Semester 1, Session 2013/2014

Page 2: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Outline

• Introduction to IDP• Why IDP? / Aims & Objectives/Learning

Outcomes of IDP• Lecture plan (RPP) & Method of Implementation/

assessments• Types of project development & local

authorities/departments • Tasks of design engineer in the C&S consulting

firm• Professional engineer• Schedule of work/project

Page 3: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Introduction To IDP

• It has been conducted since Semester 1 Session 2009/2010.

• IDP is a core course for Civil Engineering Program

• It offered for the student on the fourth year 1st semester.

• Currently is 6 hours practical. In the coming semester it has suggested change to 1 hour lecture plus 4 hours practical.

Page 4: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Why IDP?

Aims/GoalsTo provide students with practical experience in order to develop and expand their understanding of the nature of the civil engineering design process, through a simulation of design activities of professional engineer in professional consultancy environment.

Page 5: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Lecture Plan – Course Content

• Students are required to complete infrastructure design and building structure design projects.

• Students will be working in team of maximum 5 persons from the beginning until end of the semester to complete the projects.

• For the infrastructure design, students are required to carry two types of infrastructure design such as:- Earthwork- Water reticulation- Sewerage reticulation- Road & drainage

• The earthwork planning and design is compulsory.

Page 6: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Lecture Plan – Course Content

• For the building structure design, students are required to conduct minimum one building structure planning and design.

• Cost estimation of the infrastructure and structural design output is required to include in the final report.

• Fundamental of Civil Engineering Exam (FCEE) is included in IDP as part of the evaluation.

Page 7: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Assessment

1. CLO 1 – 85% (markah = 66/80)- Preliminary report r/b struktur bangunan = 6%- Final report r/b infrastruktur = 30%- Final report r/b struktur bangunan = 30%

2. CLO 2 – 7.5% (markah = 8/80)- Preliminary report r/b infrastruktur = 8%

3. CLO 3 – 7.5% (markah = 6/80)- Presentation / interview = 6%

4. FCEE (markah = 20)

Page 8: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Types of Project Development

• Residential / Housing• Commercial• Industry• Education (School / Higher learning Institution)• Etc.Some questions to be answered:1. What is the size of the development?2. How many local authorities/departments involved?3. What are the guidelines to be followed?4. What are the documents and drawings to be

submitted?

Page 9: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Tasks of Civil Engineer in C&S Consulting Firm

Main tasks• Infrastructure planning & design

- Urban drainage design, earthwork, road & drainage, water reticulation and sewerage reticulation.

• Structural planning & design - Reinforced concrete structure, steel structure, prestressed concrete, bridges, water tank, retaining wall.

Page 10: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Tasks of Civil Engineer in C&S Consulting Firm (Cont’..)

• Site inspection/ supervision

• Structural assessment & rehabilitation

• Drafting

• **EIA / TIA report

• **Costing & tender document

** Usually done by others professional firm

Page 11: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Professional Engineer (PE)

• A Professional Engineer (PE) is an engineer who is registered or licensed within certain jurisdictions to offer professional services directly to the public.

• The professional status and the actual practice of professional engineering is legally defined and protected by a government body. In some jurisdictions only registered or licensed engineers are permitted to use the title, or to practice professional engineering. The earmark that distinguishes a licensed or registered engineer is the authority to sign and seal or "stamp" engineering documents (reports, drawings, and calculations) for a study, estimate, design or analysis, thus taking legal responsibility for it.

• The title of Ir is used in Malaysia for PE.

Source: Wikipedia

Page 12: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Work ScheduleWeek Activity Facilitator

1 Briefing & Grouping Facilitator A/B/C

2 - 4 Structural Planning & Design – Part 1 or

Infrastructure Planning & Design – Part 1

Facilitator A or

Facilitator B

5 - 7 Structural Planning & Design – Part 2 or

Infrastructure Planning & Design – Part 2

Facilitator A or

Facilitator B

8 Fundamental of Civil Engineering Exam All Facilitators, Coordinator & OBE Committee

9 Mid-Term Break -

10 - 13 Structural Planning & Design – Part 3 or

Infrastructure Planning & Design – Part 3

Facilitator A or

Facilitator B

14 & 15 Final report presentation/ interview

Structural Planning & Design

Infrastructure Planning & Design

Facilitator A, B,

Page 13: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Student’s Tasks For Week 1

1. To form the team. The list of team members need to be submitted latest by week 2.

2. To discuss with their team members.3. To obtain/search for a development layout and

architectural building drawings. 4. To review some of the previous courses

lecture notes such as open channel design, urban drainage design, fluid mechanic (loop), cut & fill of earthwork, reinforced concrete & structural steel design.

Page 14: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Assessment Rubrics

Page 15: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Page 16: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012

Page 17: BFC 43303 Integrated Design Project (IDP)

HB Koh, 20 February 2012