PACKAGE 3 ELEMENTARY AND MIDDLE SCHOOLS IMPROVEMENTS REPORT December 2015 Issue 1

Upload: others

Post on 27-Jul-2020

3 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

PACKAGE 3 ELEMENTARY AND MIDDLE SCHOOLS IMPROVEMENTS REPORT December 2015 Issue 1

Page 2: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

This document created by:

BG Consultants, Inc1405 Wakarusa DriveLawrence, Kansas 66049

Page 3: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

BG Consultants, Inc

PACKAGE 3 ELEMENTARY AND MIDDLE SCHOOLS IMPROVEMENTS REPORT

At BG Consultants, Inc we understand that higher performance schools can provide a better, healthier, and safer learning environ-ment, while reducing life cycle costs through energy conservation and natural resources. Our team has striven to provide unique, comprehensive, and logical comprehensive, safety, and sustainable improvements within the design of the bond project tailored to support the USD 497 vision for better education facilities. The following case studies represent measures and other features, incorporated through design, that are included in school facility improvements for USD 497 Package 3.

1

Page 4: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

Below: Liberty Memorial Central Middle School Corridor Flooring Improvements

2 BG Consultants, Inc

Page 5: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

BG Consultants, Inc 3

Broken Arrow Elementary School

Building Area 40,000 Existing Square Feet 0 New Square Feet 40,000 Total Square Footage

Types and Numbers of New Spaces

Secure Entry 1 Administrative Suite NA Staff Workroom NA Classrooms NA Storm Shelter Areas NA Learning Pockets 4 renovated Gymnasium NA Cafeteria NA Kitchen NA Media Center NA

Comprehensive Improvements Summary:

• Incorporation of a secure entry with communication window, reception desk, and limited office remodel.• Spatial and ADA improvements to Music Room, creation of storage spaces for music and physical education.• Construction of an interior ramp providing ADA access between the main learning wing and the following key spaces: Gymnasium, Music, Cafeteria.• Incorporation of glass partitions between commons area and gymnasium to create enhanced visual connectivity between activity and learning areas.• Creation of 3 distributed special education rooms totaling 456 square feet and remodel of existing learning pockets for enhanced flexibility.• Centralization of restrooms within building core.

Interior Improvements to existing spaces:

• Paint and flooring in commons areas• Low-maintenance and low-life cycle cost epoxy resin for floor and walls in restrooms.• Installation of carpet tile with long-wearing performance characteristics and 50% minimum recycled content.• Acoustical ceiling improvements providing acoustic control and for plenum maintenance access.

Technology Improvements:

• Expansion of existing building telecom system to accommodate the additional data outlets in the remodeled reception and music areas.• Provided security camera at the receptions secure entry.

Mechanical, Electrical, and Plumbing Improvements:

• Auto flush valve control upgrades.• Introduction of fresh air into central learning wing core to improve indoor air quality and ventilation using energy recovery ventilators.• Replacement of exterior wall and grade mounted flood lights with LED.

Site Improvements:

• NA

Page 6: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

Below: Southwest Middle School Restroom Improvements typical of all schools

4 BG Consultants, Inc

Page 7: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

BG Consultants, Inc 5

Prairie Park Elementary School

Building Area 54,579 Existing Square Feet 0 New Square Feet 54,579 Total Square Footage

Types and Numbers of New Spaces

Secure Entry 1 Administrative Suite Renovated Staff Workroom Renovated Classrooms NA Storm Shelter Areas NA Learning Pockets 4 Renovated Gymnasium NA Cafeteria NA Kitchen NA Media Center NA

Comprehensive Improvements Summary:

• Incorporation of a secure entry with communication window and 2,000 square foot administrative office remodel. Spaces modified include Flex Room, Principal Office, Clinic, Reception, and Workroom.

Interior Improvements to existing spaces:

• Paint and flooring in commons area.• Low-maintenance and low-life cycle cost epoxy resin for floor and walls in restrooms.

Technology Improvements:

• Expansion of existing building telecom system to accommodate the additional data outlets and wireless access point in the remodeled receptions area.

Mechanical, Electrical, and Plumbing Improvements:

• Energy modeling was performed to understand life-cycle costing and systems performance. • Proposed boiler replacement to switch to high efficiency boilers. • Proposed domestic water heater replacement to switch to high efficiency water heaters.• Alternate for Chiller replacement improvements.• Replacement of HD parking lot lights with LED.• Replacement of exterior building mounted lights with LED.• Auto flush valve control upgrades.

A life cycle cost analysis was performed to determine the feasibility of a complete HVAC system replacement. The existing multi-zone system was compared to a Variable Refrigerant Flow Zoning (VRF)System. The results of the analysis yielded a greater than 20 year payback. USD 497 administration directed us not to pursue a complete HVAC replacement. In lieu of a complete system replacement, certain equipment was targeted to provide energy improvements at this school. This equipment includes:

1. Replacement of two chillers with one, high efficiency variable flow unit. (This item requires piping distribution changes) 2. Replacement of both heating hot water boilers with high efficiency units and installation of a variable flow pumping system. 3. Replacement of the kitchen domestic water heater with a high efficiency unit. Items 1,2 3 will be noted as alternate bid items on the constriction documents

Site Improvements:

• NA

Page 8: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

Below: Quail Run Elementary School Roof Replacement and Addition

6 BG Consultants, Inc

Page 9: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

BG Consultants, Inc 7

Quail Run Elementary School

Building Area 49,324 Existing Square Feet 2126 New Square Feet 51,450 Total Square Footage

Types and Numbers of New Spaces

Secure Entry 1 Administrative Suite Renovated Staff Workroom NA Classrooms NA Storm Shelter Areas 1 (part of 2 classrooms) Learning Pockets 4 Gymnasium NA Cafeteria NA Kitchen NA Media Center NA

Comprehensive Improvements Summary:

• Incorporation of a secure entry with communication window.• Addition of 2 new 780 square foot classrooms that function also as one safe room. • Incorporation of windows at storm shelter to add natural daylight and reduce artificial lighting use.• Net Usable Area increase of one existing kindergarten classroom to meet district standards.• Creation of 4 learning pockets totaling approximately 900 square feet.• Incorporation of operable glass partition wall between Commons and Gymnasium to create enhanced visual connectivity between activity and learning areas.

Interior Improvements to existing spaces:

• Paint and flooring in commons area.• Dyed and polished concretes in corridors to reduce maintenance and for long life-cycle cost value.• Low-maintenance and low-life cycle cost epoxy resin for floor and walls in restrooms.• Installation of carpet tile with long-wearing performance characteristics and 50% minimum recycled content.• Acoustical ceiling improvements providing acoustic control and for plenum maintenance access.• Entry walk-off mats and replacement to control entry of pollutants into building.

Technology Improvements:

• Expansion of the existing building telecom system to accommodate additional data outlets, wireless access points, and security cameras.• Provided additional security cameras in the new building addition along with other areas within the existing building foot print that was not under surveillance previously. This includes interior and exterior security cameras.• Each classroom affected by the bond project received an interactive short throw projector.

Mechanical, Electrical, and Plumbing Improvements:

• Mechanical system replacement for improved indoor air quality and energy efficiency, including installation of new VRF system throughout non-assembly spaces.• Packaged units used for assembly spaces are equipped with energy recovery wheels, and variable capacity scroll compressors to maximize energy efficiency.• Dedicated outdoor air system will be used with VRF system and will use energy recovery wheels.

Site Improvements:

• Limited sidewalk improvements / replacement as affected by the work of construction.

Page 10: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

Safe Room design criteria:

• Incorporation of a net usable 1,562 square foot two-classroom internal safe room to accommodate approximately 312 occupants.• Design Intent: The safe room was designed to meet structural performance requirements of the “Design and Construction Guidance for Community Safe Rooms” document prepared by FEMA, however, was not specified to be or required to be FEMA rated or registered. Safe room structural design criteria as follows: Risk Category III, ultimate design wind speed of 250 mph, wind exposure category C.• Enclosing structure is solid grouted concrete masonry unit (CMU) wall construction with reinforcing steel, and 8 inch reinforced concrete roof assembly cast on structural metal decking.• Opening construction includes • Frame Construction: 12-guage steel frames fully grouted and secured with four 1/2” diameter anchors each jamb. • Steel doors and shutters of 14-guage steel channels as the hinge and lock rails and 16-gauge channels at the top and bottom with 12-gauge minimum hardware reinforcement. The skin welded the full height of the door/shutter. The weld spacing on the lock and hinge rails established at a maximum of 5 inches on center. The skin welded to the 14-gauge channel at the top and bottom of the door/shutters with a maximum spacing of 2 1/2 inches on center. The interior construction of doors/shutters were specified to include internal 20-gauge steel ribs. Infill between internal stiffeners was permitted to be either polystyrene or a honeycomb core. • Hardware was specified to meet tornado resistant approvals. Three heavy duty hinges and three grade 1 points of locking each leaf.

8 BG Consultants, Inc

Page 11: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

BG Consultants, Inc 9

Sunflower Elementary School

Building Area 49,623 Existing Square Feet 6,895 New Square Feet 55,100 Total Square Footage

Types and Numbers of New Spaces

Secure Entry 1 Administrative Suite 1 relocated Staff Workroom 1 relocated Classrooms 3 new, 2 renovated Storm Shelter Areas 1 (part of 2 classrooms) Learning Pockets 4 renovated Gymnasium NA Cafeteria NA Kitchen NA Media Center NA

Comprehensive Improvements Summary:

• Incorporation of a secure entry and relocated administration offices to building entry.• Addition of 3 new 950 square foot classrooms to create a total of 23 regular classrooms, of which two classrooms will function as a safe room. • Incorporation of windows at storm shelter to add natural daylight and reduce artificial lighting use.• Creation of an additional 800 square feet of learning pocket space. Finishes and furniture upgrades to existing.• Relocate Art room to 860 square foot area in addition to Kiln area and separate storage space.• Creation of a BEST classroom.• Incorporation of secure classroom hardware.• Update restroom fixtures.

Interior Improvements to existing spaces:

• Paint and flooring in commons area and learning pockets.• Alternate for dyed and polished concretes in corridors to reduce maintenance and for long life-cycle cost value.• Low-maintenance and low-life cycle cost epoxy resin for floor and walls in restrooms.• Installation of carpet tile with long-wearing performance characteristics and 50% minimum recycled content.• Acoustical ceiling improvements providing acoustic control and for plenum maintenance access.• Entry walk-off mats to control entry of pollutants into building .

Technology Improvements:

• Upgraded the building telecom system infrastructure to accommodate the new building addition and the remodeled areas within the school. This includes an additional data cabinet, data outlets, wireless access points and security cameras.• Upgraded the building security cameras in existing locations. Provided additional security cameras in the new building addition along with other areas within the existing building footprint that was not under surveillance previously. This includes both interior and exterior security cameras.• Each classroom in the new building addition received an interactive short throw projector.

Mechanical, Electrical, and Plumbing Improvements:

• Auto flush valve control upgrades.• Replacement of exterior HID/CFL with LED.• VRF system with dedicated ERV unit will be proved for the new classroom addition and office remodel area. (one system for each area)• Replacement of exterior building-mounted lights with LED type.

Page 12: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

Site Improvements:

• Alternate for driveway and parking circulation improvements. • 5 new dedicated drop-off/pick-up stalls. • Transition to one continuous circulation route through use of traffic control bollards. • Incorporation of dedicated exit turn lanes to reduce vehicular stacking issues.

Safe Room design criteria:

• Incorporation of a net usable 1,916 square foot two-classroom internal safe room to accommodate approximately 383 occupants. Design includes 1 unisex restroom each classroom.• Design Intent: The safe room was designed to meet structural performance requirements of the “Design and Construction Guidance for Community Safe Rooms” document prepared by FEMA, however, was not specified to be or required to be FEMA rated or registered. Safe room structural design criteria as follows: Risk Category III, ultimate design wind speed of 250 mph, wind exposure category C.• Enclosing structure is solid grouted concrete masonry unit (CMU) wall construction with reinforcing steel, and 8 inch reinforced concrete roof assembly cast on structural metal decking.• Opening construction includes • Frame Construction: 12-guage steel frames fully grouted and secured with four 1/2” diameter anchors each jamb. • Steel doors and shutters of 14-guage steel channels as the hinge and lock rails and 16-gauge channels at the top and bottom with 12-gauge minimum hardware reinforcement. The skin welded the full height of the door/shutter. The weld spacing on the lock and hinge rails established at a maximum of 5 inches on center. The skin welded to the 14-gauge channel at the top and bottom of the door/shutters with a maximum spacing of 2 1/2 inches on center. The interior construction of doors/shutters were specified to include internal 20-gauge steel ribs. Infill between internal stiffeners was permitted to be either polystyrene or a honeycomb core. • Hardware was specified to meet tornado resistant approvals. Three heavy duty hinges and three grade 1 points of locking each leaf.

10 BG Consultants, Inc

Page 13: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

West Middle School

Building Area 122,409 Existing Square Feet 0 New Square Feet 122,409 Total Square Footage

Types and Numbers of New Spaces

Secure Entry 1 Administrative Suite Remodel Staff Workroom NA Classrooms NA Storm Shelter Areas NA Learning Pockets NA Gymnasium NA Cafeteria NA Kitchen Remodel Media Center NA

Comprehensive Improvements Summary:

• Secure entry and administrative office remodel to incorporate reception, five (5) offices, one (1) small conference, one (1) standard conference, registrar, unisex restroom, and storage spaces.• Kitchen remodel including new walk-in freezer and cooler replacement.

Interior Improvements to existing spaces:

• Low-maintenance and low-life cycle cost epoxy resin for floor and walls in restrooms.

Technology Improvements:

• Expanded the existing building telecom system to accommodate additional data outlets and wireless access points in the remodeled reception and kitchen areas.

Mechanical, Electrical, and Plumbing Improvements:

• HVAC replacement at renovated administration area. A new VRF system with dedicated energy recovery ventilator was provided in the office/nurse area.• Auto flush valve control upgrades.• Fire alarm control panel, device, and wiring replacement upgrades.• Electrical distribution replacement.• Replacement of exterior wall packs with LED type for efficiency.

Site Improvements:

• NA

F

EXIST TUNNEL

TUNNELACCESS

BACKSTAGE

AUDITORIUM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOMCLASSROOMCLASSROOMCLASSROOMCLASSROOMCLASSROOMCLASSROOM

OFFICE

MENWOMEN JANITOR

MENWOMEN

JANITOR

CLASSROOMCLASSROOMCLASSROOMCLASSROOM

CLASSROOM CLASSROOM CLASSROOM CLASSROOM

STORAGE

STORAGE

CORRIDOR

MEN

WOMEN

AUX. GYM

ENTRY

STORAGE ELECTRICALMECH ROOM

CLASSROOMCLASSROOM

CLASSROOMCLASSROOM

CLASSROOM

CLASSROOM

MENWOMEN

JANITOR

LIBRARY

CLASSROOM

CLASSROOM

STORAGE

MECH ROOM

CLASSROOM

CORRIDOR

STORAGE

CLASSROOM

OFFICE

OFFICE

OFFICEOFFICE

CONFERENCEOFFICE

STORAGE

RESOURCE ROOM

CLASSROOMCLASSROOMCLASSROOM

CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM

MENWOMEN

JANITOR

CHOIR

BAND

MECH ROOM

OFFICE OFFICE

STORAGE STORAGE

PRACTICE ROOM

PRACTICE ROOM

PRACTICE ROOM

PRACTICE ROOM

STORAGE

GYM

WOMEN LOCKER ROOM

OFFICETOILET RM STORAGE

SHOWERS

TOILETS

STORAGE

STORAGE

STORAGE

TOILETS

SHOWERS

BOYS LOCKER ROOMOFFICE

TOILET RM

STORAGE

CLASSROOM SHOP

STORAGE

ART

STORAGE

STORAGE

STORAGE

MULTIPURPOSE ROOM

SERVING LINE

STORAGE

STORAGE

STORAGE

STORAGE

OFFICE

FINISH ROOM

CORRIDOR

CORRIDOR

MECH ROOM

D

CCD

GG

DCC

624x48

18x488

C

624x48

C HD

C

HD

H

STORAGE

CLASSROOM

OFFICECOMPUTERLAB

FOOD PREP AREA

DISHWASH

FREEZER

COOLER

SHOP

01-21-201401-21-2014

01-21-2014

SECURE ENTANCE IMPROVEMENTS

BUILDING NOT IN CONTRACT

OFFICE RENOVATION AND IMPROVEMENTS

RESTROOM IMPROVEMENTS

KEYNOTES LEGEND

KITCHEN IMPROVEMENTS

NOT SHOWN: ELECTRICAL SYSTEM REPLACEMENTEMERGENCY LIGHTING IMPROVEMENTSREPLACE EXTERIOR WALL PACKS WITH LED TYPEPARKING AND FRONT DRIVE AREA LIGHTSREPLACE FIRE ALARM CONTROL PANEL & ALL WIRING DEVICESREPLACE INCANDECENT DOWN LIGHTS & TRACK IN THEATRE

BG Consultants, Inc 11

Page 14: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

Below: West Middle School Secure Vestibule

12 BG Consultants, Inc

Page 15: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

Liberty Memorial Central Middle School

Building Area 129,385 Existing Square Feet 0 New Square Feet 129,385 Total Square Footage

Types and Numbers of New Spaces

Secure Entry 1 Administrative Suite NA Staff Workroom NA Classrooms NA Storm Shelter Areas NA Learning Pockets NA Gymnasium NA Cafeteria NA Kitchen NA Media Center NA

Comprehensive Improvements Summary:

• Secure entry improvements to include door control hardware.• Skylight replacement and partial re-roof.• Incorporation of storm windows at auditorium windows for enhanced thermal performance and to reduce maintenance and historic window degradation.

Interior Improvements to existing spaces:

• Interior finish improvements in commons areas including accent painting and corridor flooring replacement with carpet tile.• Addition of acoustical tectum ceiling tile in Loumis Gymnasium. • Low-maintenance and low-life cycle cost epoxy resin for floor and walls in restrooms and in corridors on second and third floors.

Technology Improvements:

• NA

Mechanical, Electrical, and Plumbing Improvements:

• Replacement of HVAC system performed by separate contract.• Replacement of exterior wall packs with LED type for efficiency.

Site Improvements:

• NA

COMMONS

STORAGE

GUIDANCE OFFICE

ASSISTANT PRINCIPAL

STOR

CIRCULATION

WCSTORAGE

OFFICE

OFFICE

OFFICE

WC

AUDITORIUM STAGE

TOILET

TEACHER'S WORKROOM

CLASSROOM

STORAGE

LOUMIS GYMNASIUM

GIRLS' LOCKER ROOM

DUVER GYMNASIUM

COACH PE

OFFICE

MECHANICAL

FREEZER

KITCHEN

OFFICE

OFFICE

GIRLS' TOILET

ENGLIISH CLASS.SCIENCEMATH CLASSROOM

NURSE

CONFERENCE

WC

WC

ATTENDANCEPRINCIPAL

MAIN OFFICE

SAFE

MATH CLASSROOM

SOCIAL WORKER

SCIENCEENGLISH

DN

DN

CAFETERIA

BOYS

CUSTODIAN

CUSTODIAN

CUSTODIAN

CUSTODIAN

ROOM 107

RM 106

RM 105

RM 104

RM 103RM 102

RM 101

ART ROOMRM 100

RM 118

RM 118A

RM 117

RM 116A

WC

SHOWER

STORAGE

BOY'S LOCKER RM

MEN

WOMEN

STORRM 115

ENTRY

CORRIDOR

ORCHESTRARM 114

WC

CORRIDOR

RM 113E

CLASSROOMRM 113D

CLASSROOMRM 113C

RM 113

TIME-OUT

CLASSROOMRM 113B

RM 113A

RM 112RM 111RM 110

RM 109

RM 108

OFFICE

OFFICE

DN

UP

DN

DN

UP

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

UPUP

UP

UP

UP

UP

COACH PE

WC

SHOWER

VESTIBULERM V100

RM C100

PLAN

SECURE ENTRANCE

ALTERNATE BID FRONT ENTRY CORRIDOR IMPROVEMENTSAND GYMNASIUM CEILING REPAIR

RESTROOM IMPROVEMENTS

KEYNOTES LEGEND

NOT SHOWN: STORM WINDOW AND WINDOW REPAIRADD BRANCH CIRCUIT PANELSELECTRICAL SERVICE TVSSEMERGENCY LIGHTING IMPROVEMENTSREPLACE EXTERIOR WALL PACKS WITH LED TYPEWALL PROTECTION BOARD REPAIR/REPLACEMENTCLAY TILE COPING REPLACEMENT

BG Consultants, Inc 13

Page 16: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

Below: Liberty Memorial Central Middle School Storm Window Improvements

14 BG Consultants, Inc

Page 17: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

South Middle School

Building Area 114,469 Existing Square Feet 0 New Square Feet 114,469 Total Square Footage

Types and Numbers of New Spaces

Secure Entry 1 Administrative Suite Remodel Staff Workroom NA Classrooms NA Storm Shelter Areas NA Learning Pockets NA Gymnasium NA Cafeteria NA Kitchen NA Media Center NA

Comprehensive Improvements Summary:

• Secure entry and administrative office remodel to incorporate one (1) flex space.

Technology Improvements:

• Expanded the existing building telecom system to accommodate additional data outlets in the remodeled receptions area.

Mechanical, Electrical, and Plumbing Improvements:

• Auto flush valve control upgrades.• Replacement of exterior flood lights and wall packs with LED type for efficiency.

Site Improvements:

• NA

22'-4 63/64"

11'-4"

REF

DW

PLANNORTH

PLANNORTH

1 Main Floor Plan 1/16" = 1'-0"2 Lower Floor Plan 1/16" = 1'-0"

SECURE ENTRANCE IMPROVEMENTS

BUILDING NOT IN CONTRACT

OFFICE RENOVATION AND IMPROVEMENTS

RESTROOM IMPROVEMENTS

KEYNOTES LEGEND

NOT SHOWN: ELECTRICAL SERVICE TVSSEMERGENCY LIGHTING IMPROVEMENTSREPLACE FLOOD LIGHTS WITH LED TYPE

BG Consultants, Inc 15

Page 18: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

Below: South Middle School Secure Vestibule

16 BG Consultants, Inc

Page 19: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

Southwest Middle School

Building Area 131,531 Existing Square Feet 0 New Square Feet 131,531 Total Square Footage

Types and Numbers of New Spaces

Safe Entry Modified Administrative Suite NA Staff Workroom NA Classrooms NA Storm Shelter Areas NA Learning Pockets NA Gymnasium NA Cafeteria NA Kitchen NA Media Center NA

Comprehensive Improvements Summary:

• Secure entry improvements including design of 1 flex room.

Interior Improvements to existing spaces:

• Wayfinding Signage improvements throughout.

Technology Improvements:

• NA

Mechanical, Electrical, and Plumbing Improvements:

• Auto flush valve control upgrades.• Replacement of exterior wall packs with LED type for efficiency.• Replacement of parking lot lights with LED type for efficiency.

Site Improvements:

• NA

BG Consultants, Inc 17

Page 20: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

Top Left: Quail Run Elementary School Commons Operable Partition Wall. Top Right: South Middle School Flex Room and Administration Office. Below: Southwest Middle School Secure Vestibule with Mascot. Next Page: Typical Learning Pocket at Quail Run Elementary School.

18 BG Consultants, Inc

Page 21: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

BG Consultants, Inc 19

Page 22: BG Package 3 ES.MS Schools Improvements Report€¦ · IMPROVEMENTS REPORT December 2015 Issue 1. This document created by: BG Consultants, Inc 1405 Wakarusa Drive ... • Each classroom

1405 Wakarusa DriveLawrence, Kansas 66049T 785/749 4474F 785/749 7340

BG Consultants, Inc