NOTES
1) Visualinspectionshallpayparticularattentiontotheconditionofcablesheathandinsulation,
whereaccessible.
NoevidenceofdegradationduetochemicalorUVexposureshallbeobserved.
Nomecahnicaldamageshallbeobserved.
Bendingradiishallbecompliantwithmanufacturer'sadvice.
2) Allcableglandshroudsshallberemovedcarefully,soastoavoiddamagingthecablesheath.
3) Insulationresistanceandcontinuitychecksshallbecarriedoutwiththecabledisconnected
fromtheloadandfromtheswitchgear.
4) ConductorcontinuityshallbecheckedusingaproprietaryinstrumentapprovedbyBGT.
5) Insulationresistanceshallbemeasuredusinga1000VMegger,orsimilarinstrumentas
approvedbyBGT.
6) Reportsheetsaresetupforthreecorecables.Whereafourthcoreispresentthatshallbe
includedintheinsulationresistancetestsuchthattheresistancebetweeneachpairofcores
[L1/L2;L2/L3;L3/L4;L4/L1;L2 /L4],andbetweeneachcoreandground,isgreaterthan2M.
Relevantvaluesshallberecordedinthe"Notes"sectionatthebottomoftherelevantsheet.
Wherethefourthcoreisagroundconnectionthecableshallbetreatedashavingthreecores.
7) Cablereinstallationconsiderationsshallinclude:
i. accessibilityforcablepullingii. minimumbendingradiiconstraints
iii. requirementforscaffolding
iv. glandingspaceatswitchgearandloadterminalboxes
v. cableentrysizeprovided
vi. terminalsizeinrelationtorequiredconductorsize
vii. necessityforatransitionjunctionboxtoaccommodateincreasedconductorsize
viii. installedcircuitprotection(fuse/mccbrating)
ix. spaceavailabilityinrelevantcabletransits
x. impactonExcertification,whereapplicable
xi. conductor/glandearthingatsupplyandloadlocations.
8) GENESIScablediametersandglandsizesareshownforreferenceonly.Theyaredeirvedfrom
typicalmanufacturrer'sdata:AEIforcables;Hawkeforglands.Datasheetsareprovidedfor
information.
HOLDS
Cable Installation on Existing SAP Survey Report
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet3of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
4/45
CABLE No. Installed type:
FROM: 400V Switchboard
TO: Dilution Air Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35111-ML1 NYCWY
Installed Circuit Protection
Check sufficient space to accommodate this cable size ...
28
Transition box required?
YES / NO
Check sufficient space to accommodate this gland size ...
YES / NO
YES / NO
N / A
120
[refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
XLPE/SWA/PVC
PASS / FAIL
YES / NO
YES / NO
YES / NO
C-3511A
EL-3503
M40 / C2
39.00
YES / NO
120
Existing Cable Entry Size
Cable Gland Earthing
Cable Installation on Existing SAP Survey Report
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet4of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
5/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Switchboard
TO: Dilution Air Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35111-ML2 NYCWY
120
PASS / FAIL
EL-3503
C-3511A
28
Installed Circuit Protection
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
Existing Cable Entry Size
Cable Gland Earthing
120
39.00
M40 / C2
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
YES / NO Transition box required? YES / NO
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO N / A
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet5of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
6/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Switchboard
TO: Dilution Air Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
N / A
EL-3503
C-3511B
32
W35112-ML1 NYCWY
120
PASS / FAIL
Existing Cable Entry Size
Cable Gland Earthing
Installed Circuit Protection
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
120
39.00
M40 / C2
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
YES / NO Transition box required? YES / NO
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet6of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
7/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Switchboard
TO: Dilution Air Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
N / A
EL-3503
C-3511B
32
W35112-ML2 NYCWY
120
PASS / FAIL
Existing Cable Entry Size
Cable Gland Earthing
Installed Circuit Protection
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
120
39.00
M40 / C2
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
YES / NO Transition box required? YES / NO
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet7of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
8/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Condensate Pump
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
Installed Circuit Protection
N / A
MCC1
P-3513
NYY-JW35130
83
1.5
PASS / FAIL
YES / NO Transition box required? YES / NO
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
4
15.00
M20S / O
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
Existing Cable Entry Size
Cable Gland Earthing
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet8of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
9/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Combustion Air Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as undersized for load
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
Installed Circuit Protection
MCC3
C-3517
60
70
36.00
PASS / FAIL
Existing Cable Entry Size
Cable Gland Earthing
W35171-ML NYCWY
N / A
YES / NO YES / NO
YES / NO Transition box required? YES / NO
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
95
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
M40 / C2
Check sufficient space to accommodate this cable size ...
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet9of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
10/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Scavenging Air Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35191-ML NYY-J
N / A
MCC1
C-3522
75
1.5
PASS / FAIL
XLPE/SWA/PVC
4
15.00
M20S / O
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
[refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
Installed Circuit Protection
Existing Cable Entry Size
Cable Gland Earthing
YES / NO Transition box required? YES / NO
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet10of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
11/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Hot Oil Pump
Scheduled Length: m
Installed csa: mm2 csa calculated as undersized for load
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35311-ML NYCWY
N / A
MCC1
P-3531A
50
50
PASS / FAIL
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
70
31.00
Installed Circuit Protection
Existing Cable Entry Size
Cable Gland Earthing
M32 / C
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
YES / NO Transition box required? YES / NO
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet11of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
12/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Hot Oil Pump
Scheduled Length: m
Installed csa: mm2 csa calculated as undersized for load
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35313-ML NYCWY
N / A
MCC1
P-3531B
50
50
PASS / FAIL
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
70
31.00
M32 / C
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
YES / NO Transition box required? YES / NO
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
Installed Circuit Protection
Existing Cable Entry Size
Cable Gland Earthing
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet12of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
13/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Hot Oil Cooling Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as undersized for load
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35339-ML1 NYCWY
N / A
YES / NO
YES / NO
MCC2
E-3539/1
50
6
PASS / FAIL
Installed Circuit Protection
Existing Cable Entry Size
Cable Gland Earthing
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
10
17.00
M20 / A
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
YES / NO Transition box required? YES / NO
Check sufficient space to accommodate this gland size ...
YES / NO
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet13of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
14/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Hot Oil Cooling Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as undersized for load
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35339-ML2 NYY-J
Installed Circuit Protection
N / A
50
6
PASS / FAIL
YES / NO Transition box required? YES / NO
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
10
19.00
M20 / A
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
MCC1
E-3539/2
Check sufficient space to accommodate this cable size ...
YES / NO
Existing Cable Entry Size
Cable Gland Earthing
YES / NO
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet14of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
15/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Hot Oil Start-Up Pump
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35351-ML NYCY
N / A
MCC2
P-3535
40
2.5
PASS / FAIL
Existing Cable Entry Size
Cable Gland Earthing
Installed Circuit Protection
YES / NO Transition box required? YES / NO
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
4
13.00
M20S / O
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet15of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
16/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Cooling Water HE Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35414-ML1 NYCY
N / A
MCC2
E-3540/1
100
1.5
PASS / FAIL
Existing Cable Entry Size
Cable Gland Earthing
Installed Circuit Protection
Transition box required? YES / NO
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
4
13.00
M20S / O
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
YES / NO
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet16of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
17/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Cooling Water HE Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
Installed Circuit Protection
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
YES / NO
W35414-ML2 NYY-J
N / A
MCC1
E-3540/2
97
1.5
Cable Gland Earthing
PASS / FAIL
Existing Cable Entry Size
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
4
Transition box required? YES / NO
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
15.00
M20 / O
YES / NO
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet17of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
18/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Cooling Water HE Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
Installed Circuit Protection
W35414-ML3 NYY-J
N / A
MCC1
E-3540/3
96
1.5
YES / NO
YES / NO Transition box required? YES / NO
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
4
15.00
M20 / O
Cable Gland Earthing
PASS / FAIL
Existing Cable Entry Size
Check sufficient space to accommodate this cable size ...
YES / NO
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet18of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
19/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Cooling Water HE Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35414-ML4 NYY-J
N / A
15.00
M20 / O
Check sufficient space to accommodate this cable size ...
YES / NO
Cable Gland Earthing
YES / NO
YES / NO Transition box required?
MCC1
E-3540/4
95
1.5
Existing Cable Entry Size
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
PASS / FAIL
Installed Circuit Protection
YES / NO
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
4
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet19of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
20/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Cooling Water Pump
Scheduled Length: m
Installed csa: mm2 csa inadequate for starting volt-drop
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35416 NYY-J
Installed Circuit Protection
N / A
1.5
PASS / FAIL
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
Existing Cable Entry Size
Cable Gland Earthing
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
4
15.00
M20 / O
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
YES / NO Transition box required? YES / NO
MCC1
P-3542A
100
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet20of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
21/45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
22/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Switchboard
TO: Refrigeration Unit
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
Installed Circuit Protection
EL-3503
PASS / FAIL
E-3543
90
120
W35430-PS NYY-J
N / A
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
YES / NO YES / NO
YES / NO Transition box required? YES / NO
4
45.00
M50 / D
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
Existing Cable Entry Size
Cable Gland Earthing
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet22of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
23/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Switchboard
TO: Cooling Air Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35502-ML1 NYCWY
N / A
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
YES / NO YES / NO
YES / NO Transition box required? YES / NO
150
44.00
M50 / D
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
PASS / FAIL
58
150
Cable Gland Earthing
EL-3503
C-3552A
Existing Cable Entry Size
Installed Circuit Protection
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet23of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
24/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Switchboard
TO: Cooling Air Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35502-ML2 NYCWY
N / A
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
Transition box required? YES / NO
150
44.00
M50 / D
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
YES / NO YES / NO
YES / NO
PASS / FAIL
58
150
EL-3503
C-3552A
Installed Circuit Protection
Existing Cable Entry Size
Cable Gland Earthing
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet24of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
25/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Switchboard
TO: Cooling Air Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35504-ML1 NYCWY
N / A
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
YES / NO YES / NO
YES / NO Transition box required? YES / NO
150
44.00
M50 / D
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
PASS / FAIL
55
150
Installed Circuit Protection
Existing Cable Entry Size
EL-3503
C-3552B
Cable Gland Earthing
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet25of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
26/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Switchboard
TO: Cooling Air Blower
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
Check sufficient space to accommodate this gland size ...
YES / NO
W35504-ML2 NYCWY
YES / NO
YES / NO N / A
YES / NO
150
44.00
M50 / D
Check sufficient space to accommodate this cable size ...
PASS / FAIL
Transition box required?
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
Installed Circuit Protection
YES / NO YES / NO
YES / NO
EL-3503
C-3552B
55
Existing Cable Entry Size
Cable Gland Earthing
150
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet26of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
27/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Acid Pump 'A'
Scheduled Length: m
Installed csa: mm2 csa calculated inadequate for volt-drop
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
90
1.5
Existing Cable Entry Size
MCC1
P-3563A
W35625-ML NYY-J
N / A
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
YES / NO YES / NO
YES / NO Transition box required? YES / NO
4
15.00
M20S / O
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
PASS / FAIL
Cable Gland Earthing
Installed Circuit Protection
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet27of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
28/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Acid Pump 'B'
Scheduled Length: m
Installed csa: mm2 csa calculated inadequate for volt-drop
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35626-ML NYY-J
Installed Circuit Protection
N / A
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
YES / NO YES / NO
YES / NO Transition box required? YES / NO
4
15.00
M20S / O
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
PASS / FAIL
97
1.5
Cable Gland Earthing
MCC1
P-3563B
Existing Cable Entry Size
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet28of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
29/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Acid Loading Pump 'A'
Scheduled Length: m
Installed csa: mm2 csa calculated undersized for load
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35637-ML NYY-J
N / A
YES / NO YES / NO
YES / NO
YES / NO YES / NO
YES / NO Transition box required? YES / NO
4
15.00
M20S / O
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
98
1.5
MCC1
P-3566A
Existing Cable Entry Size
Cable Gland Earthing
Installed Circuit Protection
PASS / FAIL
Check sufficient space to accommodate this gland size ...
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet29of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
30/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Acid Loading Pump 'B'
Scheduled Length: m
Installed csa: mm2 csa calculated undersized for load
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35638-ML
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
YES / NO YES / NO
YES / NO Transition box required? YES / NO
4
15.00
M20S / O
Check sufficient space to accommodate this cable size ...
N / A
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
PASS / FAIL
98
1.5
MCC1
P-3566B
NYY-J
Cable Gland Earthing
Installed Circuit Protection
Existing Cable Entry Size
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet30of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
31/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Switchboard
TO: E/S Separator
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
W35714-T
N / A
YES / NO
YES / NO Transition box required? YES / NO
70
36.00
M40 / C2
Check sufficient space to accommodate this cable size ...
PASS / FAIL
YES / NO
Installed Circuit Protection
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
101
70
Cable Gland Earthing
EL-3503
F-3570
NYCWY
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
Existing Cable Entry Size
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet31of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
32/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Distribution
TO: Heater Junction Box
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
YES / NO
13.00
M20S / O
Check sufficient space to accommodate this cable size ...
YES / NO YES / NO
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
4
Installed Circuit Protection
YES / NO
Check sufficient space to accommodate this gland size ...
NYY-JW35721-EH
YES / NO
Transition box required?
N / AYES / NO
YES / NO
2.5
107
Cable Gland Earthing
Existing Cable Entry Size
PASS / FAIL
CU
EH-35721
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet32of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
33/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Distribution
TO: Heater Junction Box
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
NYY-JW35722-EH
CU
N / A
Check sufficient space to accommodate this gland size ...
YES / NO
EH-35722
118
2.5
YES / NO Transition box required?
YES / NO
YES / NO
13.00
M20S / O
Check sufficient space to accommodate this cable size ...
YES / NO
PASS / FAIL
YES / NO
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
4
Existing Cable Entry Size
Cable Gland Earthing
YES / NO
Installed Circuit Protection
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet33of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
34/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Distribution
TO: Heater Junction Box
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
[refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
Installed Circuit Protection
NYY-JW35723-EH
N / A
YES / NO YES / NO
YES / NO Transition box required? YES / NO
4
XLPE/SWA/PVC
13.00
M20S / O
Check sufficient space to accommodate this cable size ...
PASS / FAIL
EH-35723
119
2.5
CU
Cable Gland Earthing
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
Existing Cable Entry Size
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet34of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
35/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Distribution
TO: Heater Junction Box
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
YES / NO YES / NO
YES / NO Transition box required? YES / NO
N / A
Installed Circuit Protection
EH-35724
W35724-EH NYY-J
4
13.00
M20S / O
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
PASS / FAIL
108
2.5
CU
YES / NO
Existing Cable Entry Size
Cable Gland Earthing
Check sufficient space to accommodate this gland size ...
YES / NO
YES / NO
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet35of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
36/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Dilute Acid Pump 'A'
Scheduled Length: m
Installed csa: mm2 csa inadequate for starting volt-drop
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
Installed Circuit Protection
N / A
W35741-ML NYY-J
Transition box required? YES / NO
4
15.00
M20S / O
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
PASS / FAIL
98
1.5
MCC1
P-3574A
Cable Gland Earthing
Existing Cable Entry Size
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
YES / NO YES / NO
YES / NO
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet36of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
37/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V MCC
TO: Dilute Acid Pump 'B'
Scheduled Length: m
Installed csa: mm2 csa inadequate for starting volt-drop
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
N / A
Installed Circuit Protection
W35742-ML NYY-J
Check sufficient space to accommodate this gland size ...
YES / NO
YES / NO YES / NO
YES / NO
YES / NO
YES / NO
4
15.00
M20S / O
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
PASS / FAIL
98
1.5
Cable Gland Earthing
Transition box required? YES / NO
Existing Cable Entry Size
MCC1
P-3574B
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet37of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
38/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400V Switchboard
TO: E/S Separator
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
36.00
M40 / C2
NYCWY
Transition box required?
Installed Circuit Protection
YES / NO
70
W35754-T
N / A
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
YES / NO YES / NO
YES / NO
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
PASS / FAIL
100
70
F-3575
EL-3503
Cable Gland Earthing
Existing Cable Entry Size
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet38of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
39/45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
40/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400VDistribution
TO: Heater
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
Installed Circuit Protection
PASS / FAIL
N / A
YES / NO YES / NO
YES / NO Transition box required? YES / NO
4
13.00
M20S / O
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
EH-35762
W35762-EH NYY-J
116
2.5
CU
Cable Gland Earthing
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
Existing Cable Entry Size
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet40of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
41/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400VDistribution
TO: Heater
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
N / A
YES / NO YES / NO
YES / NO Transition box required? YES / NO
4
13.00
M20S / O
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
Installed Circuit Protection
PASS / FAIL
Cable Gland Earthing
EH-35763
W35763-EH NYY-J
118
2.5
CU
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO
Existing Cable Entry Size
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet41of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
42/45
Cable Installation on Existing SAP Survey Report
CABLE No. Installed type:
FROM: 400VDistribution
TO: Heater
Scheduled Length: m
Installed csa: mm2 csa calculated as adequate
Measured length installed: m
Physical condition: Visual at Switchboard: mm
Continuity: at Load: mm
Insulation Resistance L1/ L2: [to be > 2M]
Insulation Resistance L1/ Gnd: [to be > 2M] at Load:
Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5
Insulation Resistance L2/ Gnd: [to be > 2M]
Insulation Resistance L1/ L3: [to be > 2M] Type:
Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A
GENESIS REQUIREMENTType:
csa: mm2
Nominal o/d: mm refer Note 8
Nominal Gland Size: refer Note 8
Ladder rack / cable tray: Cable transit(s):
Terminals / terminal boxes:
At terminal box: At switchgear:
Certification maintained?
NOTES:
Check sufficient space to accommodate this gland size ...
YES / NO YES / NO
YES / NO N / A
YES / NO YES / NO
YES / NO Transition box required? YES / NO
4
13.00
M20S / O
Check sufficient space to accommodate this cable size ...
XLPE/SWA/PVC [refer Electrical Design Philosophy
BG-TUN-PROJ-AGM-08-KD-00013]
Installed Circuit Protection
PASS / FAIL
Existing Cable Entry Size
Cable Gland Earthing
EH-35764
W35764-EH NYY-J
117
2.5
CU
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet42of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
43/45
Appendix 1: AEI Cable Dimensions
Cable Installation on Existing SAP Survey Report
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet43of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
44/45
Cable Installation on Existing SAP Survey Report
BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet44of45
-
8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report
45/45
Cable Installation on Existing SAP Survey Report
Appendix 2: Hawke Cable Gland Details