    NOTES

    1) Visualinspectionshallpayparticularattentiontotheconditionofcablesheathandinsulation,

    whereaccessible.

    NoevidenceofdegradationduetochemicalorUVexposureshallbeobserved.

    Nomecahnicaldamageshallbeobserved.

    Bendingradiishallbecompliantwithmanufacturer'sadvice.

    2) Allcableglandshroudsshallberemovedcarefully,soastoavoiddamagingthecablesheath.

    3) Insulationresistanceandcontinuitychecksshallbecarriedoutwiththecabledisconnected

    fromtheloadandfromtheswitchgear.

    4) ConductorcontinuityshallbecheckedusingaproprietaryinstrumentapprovedbyBGT.

    5) Insulationresistanceshallbemeasuredusinga1000VMegger,orsimilarinstrumentas

    approvedbyBGT.

    6) Reportsheetsaresetupforthreecorecables.Whereafourthcoreispresentthatshallbe

    includedintheinsulationresistancetestsuchthattheresistancebetweeneachpairofcores

    [L1/L2;L2/L3;L3/L4;L4/L1;L2 /L4],andbetweeneachcoreandground,isgreaterthan2M.

    Relevantvaluesshallberecordedinthe"Notes"sectionatthebottomoftherelevantsheet.

    Wherethefourthcoreisagroundconnectionthecableshallbetreatedashavingthreecores.

    7) Cablereinstallationconsiderationsshallinclude:

    i. accessibilityforcablepullingii. minimumbendingradiiconstraints

    iii. requirementforscaffolding

    iv. glandingspaceatswitchgearandloadterminalboxes

    v. cableentrysizeprovided

    vi. terminalsizeinrelationtorequiredconductorsize

    vii. necessityforatransitionjunctionboxtoaccommodateincreasedconductorsize

    viii. installedcircuitprotection(fuse/mccbrating)

    ix. spaceavailabilityinrelevantcabletransits

    x. impactonExcertification,whereapplicable

    xi. conductor/glandearthingatsupplyandloadlocations.

    8) GENESIScablediametersandglandsizesareshownforreferenceonly.Theyaredeirvedfrom

    typicalmanufacturrer'sdata:AEIforcables;Hawkeforglands.Datasheetsareprovidedfor

    information.

    HOLDS

    Cable Installation on Existing SAP Survey Report

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet3of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    4/45

    CABLE No. Installed type:

    FROM: 400V Switchboard

    TO: Dilution Air Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35111-ML1 NYCWY

    Installed Circuit Protection

    Check sufficient space to accommodate this cable size ...

    28

    Transition box required?

    YES / NO

    Check sufficient space to accommodate this gland size ...

    YES / NO

    YES / NO

    N / A

    120

    [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    XLPE/SWA/PVC

    PASS / FAIL

    YES / NO

    YES / NO

    YES / NO

    C-3511A

    EL-3503

    M40 / C2

    39.00

    YES / NO

    120

    Existing Cable Entry Size

    Cable Gland Earthing

    Cable Installation on Existing SAP Survey Report

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet4of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    5/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Switchboard

    TO: Dilution Air Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35111-ML2 NYCWY

    120

    PASS / FAIL

    EL-3503

    C-3511A

    28

    Installed Circuit Protection

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    Existing Cable Entry Size

    Cable Gland Earthing

    120

    39.00

    M40 / C2

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO N / A

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet5of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    6/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Switchboard

    TO: Dilution Air Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    N / A

    EL-3503

    C-3511B

    32

    W35112-ML1 NYCWY

    120

    PASS / FAIL

    Existing Cable Entry Size

    Cable Gland Earthing

    Installed Circuit Protection

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    120

    39.00

    M40 / C2

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet6of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    7/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Switchboard

    TO: Dilution Air Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    N / A

    EL-3503

    C-3511B

    32

    W35112-ML2 NYCWY

    120

    PASS / FAIL

    Existing Cable Entry Size

    Cable Gland Earthing

    Installed Circuit Protection

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    120

    39.00

    M40 / C2

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet7of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    8/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Condensate Pump

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    Installed Circuit Protection

    N / A

    MCC1

    P-3513

    NYY-JW35130

    83

    1.5

    PASS / FAIL

    YES / NO Transition box required? YES / NO

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    4

    15.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    Existing Cable Entry Size

    Cable Gland Earthing

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet8of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    9/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Combustion Air Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as undersized for load

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    Installed Circuit Protection

    MCC3

    C-3517

    60

    70

    36.00

    PASS / FAIL

    Existing Cable Entry Size

    Cable Gland Earthing

    W35171-ML NYCWY

    N / A

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    95

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    M40 / C2

    Check sufficient space to accommodate this cable size ...

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet9of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    10/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Scavenging Air Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35191-ML NYY-J

    N / A

    MCC1

    C-3522

    75

    1.5

    PASS / FAIL

    XLPE/SWA/PVC

    4

    15.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    Installed Circuit Protection

    Existing Cable Entry Size

    Cable Gland Earthing

    YES / NO Transition box required? YES / NO

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet10of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    11/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Hot Oil Pump

    Scheduled Length: m

    Installed csa: mm2 csa calculated as undersized for load

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35311-ML NYCWY

    N / A

    MCC1

    P-3531A

    50

    50

    PASS / FAIL

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    70

    31.00

    Installed Circuit Protection

    Existing Cable Entry Size

    Cable Gland Earthing

    M32 / C

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet11of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    12/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Hot Oil Pump

    Scheduled Length: m

    Installed csa: mm2 csa calculated as undersized for load

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35313-ML NYCWY

    N / A

    MCC1

    P-3531B

    50

    50

    PASS / FAIL

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    70

    31.00

    M32 / C

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    Installed Circuit Protection

    Existing Cable Entry Size

    Cable Gland Earthing

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet12of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    13/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Hot Oil Cooling Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as undersized for load

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35339-ML1 NYCWY

    N / A

    YES / NO

    YES / NO

    MCC2

    E-3539/1

    50

    6

    PASS / FAIL

    Installed Circuit Protection

    Existing Cable Entry Size

    Cable Gland Earthing

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    10

    17.00

    M20 / A

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    Check sufficient space to accommodate this gland size ...

    YES / NO

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet13of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    14/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Hot Oil Cooling Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as undersized for load

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35339-ML2 NYY-J

    Installed Circuit Protection

    N / A

    50

    6

    PASS / FAIL

    YES / NO Transition box required? YES / NO

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    10

    19.00

    M20 / A

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    MCC1

    E-3539/2

    Check sufficient space to accommodate this cable size ...

    YES / NO

    Existing Cable Entry Size

    Cable Gland Earthing

    YES / NO

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet14of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    15/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Hot Oil Start-Up Pump

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35351-ML NYCY

    N / A

    MCC2

    P-3535

    40

    2.5

    PASS / FAIL

    Existing Cable Entry Size

    Cable Gland Earthing

    Installed Circuit Protection

    YES / NO Transition box required? YES / NO

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    4

    13.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet15of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    16/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Cooling Water HE Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35414-ML1 NYCY

    N / A

    MCC2

    E-3540/1

    100

    1.5

    PASS / FAIL

    Existing Cable Entry Size

    Cable Gland Earthing

    Installed Circuit Protection

    Transition box required? YES / NO

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    4

    13.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    YES / NO

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet16of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    17/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Cooling Water HE Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    Installed Circuit Protection

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    YES / NO

    W35414-ML2 NYY-J

    N / A

    MCC1

    E-3540/2

    97

    1.5

    Cable Gland Earthing

    PASS / FAIL

    Existing Cable Entry Size

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    4

    Transition box required? YES / NO

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    15.00

    M20 / O

    YES / NO

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet17of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    18/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Cooling Water HE Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    Installed Circuit Protection

    W35414-ML3 NYY-J

    N / A

    MCC1

    E-3540/3

    96

    1.5

    YES / NO

    YES / NO Transition box required? YES / NO

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    4

    15.00

    M20 / O

    Cable Gland Earthing

    PASS / FAIL

    Existing Cable Entry Size

    Check sufficient space to accommodate this cable size ...

    YES / NO

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet18of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    19/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Cooling Water HE Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35414-ML4 NYY-J

    N / A

    15.00

    M20 / O

    Check sufficient space to accommodate this cable size ...

    YES / NO

    Cable Gland Earthing

    YES / NO

    YES / NO Transition box required?

    MCC1

    E-3540/4

    95

    1.5

    Existing Cable Entry Size

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    PASS / FAIL

    Installed Circuit Protection

    YES / NO

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    4

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet19of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    20/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Cooling Water Pump

    Scheduled Length: m

    Installed csa: mm2 csa inadequate for starting volt-drop

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35416 NYY-J

    Installed Circuit Protection

    N / A

    1.5

    PASS / FAIL

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    Existing Cable Entry Size

    Cable Gland Earthing

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    4

    15.00

    M20 / O

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    MCC1

    P-3542A

    100

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet20of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    21/45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    22/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Switchboard

    TO: Refrigeration Unit

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    Installed Circuit Protection

    EL-3503

    PASS / FAIL

    E-3543

    90

    120

    W35430-PS NYY-J

    N / A

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    4

    45.00

    M50 / D

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    Existing Cable Entry Size

    Cable Gland Earthing

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet22of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    23/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Switchboard

    TO: Cooling Air Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35502-ML1 NYCWY

    N / A

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    150

    44.00

    M50 / D

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    PASS / FAIL

    58

    150

    Cable Gland Earthing

    EL-3503

    C-3552A

    Existing Cable Entry Size

    Installed Circuit Protection

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet23of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    24/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Switchboard

    TO: Cooling Air Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35502-ML2 NYCWY

    N / A

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    Transition box required? YES / NO

    150

    44.00

    M50 / D

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    YES / NO YES / NO

    YES / NO

    PASS / FAIL

    58

    150

    EL-3503

    C-3552A

    Installed Circuit Protection

    Existing Cable Entry Size

    Cable Gland Earthing

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet24of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    25/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Switchboard

    TO: Cooling Air Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35504-ML1 NYCWY

    N / A

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    150

    44.00

    M50 / D

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    PASS / FAIL

    55

    150

    Installed Circuit Protection

    Existing Cable Entry Size

    EL-3503

    C-3552B

    Cable Gland Earthing

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet25of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    26/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Switchboard

    TO: Cooling Air Blower

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    Check sufficient space to accommodate this gland size ...

    YES / NO

    W35504-ML2 NYCWY

    YES / NO

    YES / NO N / A

    YES / NO

    150

    44.00

    M50 / D

    Check sufficient space to accommodate this cable size ...

    PASS / FAIL

    Transition box required?

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    Installed Circuit Protection

    YES / NO YES / NO

    YES / NO

    EL-3503

    C-3552B

    55

    Existing Cable Entry Size

    Cable Gland Earthing

    150

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet26of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    27/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Acid Pump 'A'

    Scheduled Length: m

    Installed csa: mm2 csa calculated inadequate for volt-drop

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    90

    1.5

    Existing Cable Entry Size

    MCC1

    P-3563A

    W35625-ML NYY-J

    N / A

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    4

    15.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    PASS / FAIL

    Cable Gland Earthing

    Installed Circuit Protection

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet27of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    28/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Acid Pump 'B'

    Scheduled Length: m

    Installed csa: mm2 csa calculated inadequate for volt-drop

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35626-ML NYY-J

    Installed Circuit Protection

    N / A

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    4

    15.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    PASS / FAIL

    97

    1.5

    Cable Gland Earthing

    MCC1

    P-3563B

    Existing Cable Entry Size

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet28of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    29/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Acid Loading Pump 'A'

    Scheduled Length: m

    Installed csa: mm2 csa calculated undersized for load

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35637-ML NYY-J

    N / A

    YES / NO YES / NO

    YES / NO

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    4

    15.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    98

    1.5

    MCC1

    P-3566A

    Existing Cable Entry Size

    Cable Gland Earthing

    Installed Circuit Protection

    PASS / FAIL

    Check sufficient space to accommodate this gland size ...

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet29of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    30/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Acid Loading Pump 'B'

    Scheduled Length: m

    Installed csa: mm2 csa calculated undersized for load

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35638-ML

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    4

    15.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    N / A

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    PASS / FAIL

    98

    1.5

    MCC1

    P-3566B

    NYY-J

    Cable Gland Earthing

    Installed Circuit Protection

    Existing Cable Entry Size

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet30of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    31/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Switchboard

    TO: E/S Separator

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    W35714-T

    N / A

    YES / NO

    YES / NO Transition box required? YES / NO

    70

    36.00

    M40 / C2

    Check sufficient space to accommodate this cable size ...

    PASS / FAIL

    YES / NO

    Installed Circuit Protection

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    101

    70

    Cable Gland Earthing

    EL-3503

    F-3570

    NYCWY

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    Existing Cable Entry Size

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet31of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    32/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Distribution

    TO: Heater Junction Box

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    YES / NO

    13.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    YES / NO YES / NO

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    4

    Installed Circuit Protection

    YES / NO

    Check sufficient space to accommodate this gland size ...

    NYY-JW35721-EH

    YES / NO

    Transition box required?

    N / AYES / NO

    YES / NO

    2.5

    107

    Cable Gland Earthing

    Existing Cable Entry Size

    PASS / FAIL

    CU

    EH-35721

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet32of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    33/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Distribution

    TO: Heater Junction Box

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    NYY-JW35722-EH

    CU

    N / A

    Check sufficient space to accommodate this gland size ...

    YES / NO

    EH-35722

    118

    2.5

    YES / NO Transition box required?

    YES / NO

    YES / NO

    13.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    YES / NO

    PASS / FAIL

    YES / NO

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    4

    Existing Cable Entry Size

    Cable Gland Earthing

    YES / NO

    Installed Circuit Protection

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet33of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    34/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Distribution

    TO: Heater Junction Box

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    Installed Circuit Protection

    NYY-JW35723-EH

    N / A

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    4

    XLPE/SWA/PVC

    13.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    PASS / FAIL

    EH-35723

    119

    2.5

    CU

    Cable Gland Earthing

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    Existing Cable Entry Size

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet34of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    35/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Distribution

    TO: Heater Junction Box

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    N / A

    Installed Circuit Protection

    EH-35724

    W35724-EH NYY-J

    4

    13.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    PASS / FAIL

    108

    2.5

    CU

    YES / NO

    Existing Cable Entry Size

    Cable Gland Earthing

    Check sufficient space to accommodate this gland size ...

    YES / NO

    YES / NO

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet35of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    36/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Dilute Acid Pump 'A'

    Scheduled Length: m

    Installed csa: mm2 csa inadequate for starting volt-drop

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    Installed Circuit Protection

    N / A

    W35741-ML NYY-J

    Transition box required? YES / NO

    4

    15.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    PASS / FAIL

    98

    1.5

    MCC1

    P-3574A

    Cable Gland Earthing

    Existing Cable Entry Size

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    YES / NO YES / NO

    YES / NO

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet36of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    37/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V MCC

    TO: Dilute Acid Pump 'B'

    Scheduled Length: m

    Installed csa: mm2 csa inadequate for starting volt-drop

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    N / A

    Installed Circuit Protection

    W35742-ML NYY-J

    Check sufficient space to accommodate this gland size ...

    YES / NO

    YES / NO YES / NO

    YES / NO

    YES / NO

    YES / NO

    4

    15.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    PASS / FAIL

    98

    1.5

    Cable Gland Earthing

    Transition box required? YES / NO

    Existing Cable Entry Size

    MCC1

    P-3574B

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet37of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    38/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400V Switchboard

    TO: E/S Separator

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    36.00

    M40 / C2

    NYCWY

    Transition box required?

    Installed Circuit Protection

    YES / NO

    70

    W35754-T

    N / A

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    YES / NO YES / NO

    YES / NO

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    PASS / FAIL

    100

    70

    F-3575

    EL-3503

    Cable Gland Earthing

    Existing Cable Entry Size

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet38of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    39/45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    40/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400VDistribution

    TO: Heater

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    Installed Circuit Protection

    PASS / FAIL

    N / A

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    4

    13.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    EH-35762

    W35762-EH NYY-J

    116

    2.5

    CU

    Cable Gland Earthing

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    Existing Cable Entry Size

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet40of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    41/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400VDistribution

    TO: Heater

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    N / A

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    4

    13.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    Installed Circuit Protection

    PASS / FAIL

    Cable Gland Earthing

    EH-35763

    W35763-EH NYY-J

    118

    2.5

    CU

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO

    Existing Cable Entry Size

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet41of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    42/45

    Cable Installation on Existing SAP Survey Report

    CABLE No. Installed type:

    FROM: 400VDistribution

    TO: Heater

    Scheduled Length: m

    Installed csa: mm2 csa calculated as adequate

    Measured length installed: m

    Physical condition: Visual at Switchboard: mm

    Continuity: at Load: mm

    Insulation Resistance L1/ L2: [to be > 2M]

    Insulation Resistance L1/ Gnd: [to be > 2M] at Load:

    Insulation Resistance L2/ L3: [to be > 2M] to be < 0.5

    Insulation Resistance L2/ Gnd: [to be > 2M]

    Insulation Resistance L1/ L3: [to be > 2M] Type:

    Insulation Resistance L3/ Gnd: [to be > 2M] Rating: A

    GENESIS REQUIREMENTType:

    csa: mm2

    Nominal o/d: mm refer Note 8

    Nominal Gland Size: refer Note 8

    Ladder rack / cable tray: Cable transit(s):

    Terminals / terminal boxes:

    At terminal box: At switchgear:

    Certification maintained?

    NOTES:

    Check sufficient space to accommodate this gland size ...

    YES / NO YES / NO

    YES / NO N / A

    YES / NO YES / NO

    YES / NO Transition box required? YES / NO

    4

    13.00

    M20S / O

    Check sufficient space to accommodate this cable size ...

    XLPE/SWA/PVC [refer Electrical Design Philosophy

    BG-TUN-PROJ-AGM-08-KD-00013]

    Installed Circuit Protection

    PASS / FAIL

    Existing Cable Entry Size

    Cable Gland Earthing

    EH-35764

    W35764-EH NYY-J

    117

    2.5

    CU

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet42of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    43/45

    Appendix 1: AEI Cable Dimensions

    Cable Installation on Existing SAP Survey Report

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet43of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    44/45

    Cable Installation on Existing SAP Survey Report

    BGTUNPROJAGM08TCH00029RevBCableInstallationonExistingSAPSurveyReport Sheet44of45

  • 8/10/2019 BG-TUN-PROJ-AGM-08-TCH-00029 Rev B Cable Installation on Existing SAP Survey Report

    45/45

    Cable Installation on Existing SAP Survey Report

    Appendix 2: Hawke Cable Gland Details