Title Click to edit Master subtitle style Dock Line Descaling Project 2007 Baker Hughes Pipeline Management Group

Upload: robert-l-watt-jr

Post on 21-Feb-2017

31 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: BH Descaling Project Port Everglades

Title

Click to edit Master subtitle style

Dock Line Descaling Project 2007

Baker Hughes Pipeline Management Group

Page 2: BH Descaling Project Port Everglades

Title

Click to edit Master subtitle style

4,000’ Fueling Line Descaling

Background• A major petroleum company wanted to clean and

inspect two parallel 12” and 14” gasoline terminal pipelines as due diligence prior to purchase.

• Located in Port Everglades, Florida, these pipelines offloaded gasoline from tankers. These same pipelines were then used to send salt water ballast back to the tankers.

• Prior to project start, a number of known miter bends needed to be removed and replaced with forged 3D bends.

Page 3: BH Descaling Project Port Everglades

Title

Click to edit Master subtitle style

Scale Discovery

Excessive internal scale build-up is evident in this miter bend cutout.

Page 4: BH Descaling Project Port Everglades

Title

Click to edit Master subtitle style

Pig Selection

A variety of ultra high density Descaling Pigs were employed for descaling operations. Increasingly aggressive carbide descaling inserts were used as the cleaning progressed. Compressed air provided motive force for the pigs.

Page 5: BH Descaling Project Port Everglades

Title

Click to edit Master subtitle style

Surfactant / Scale Slurry

Baker Petrolite’s® CLW3063 water based surfactant was used to slurry the scale for removal from the pipeline.

Page 6: BH Descaling Project Port Everglades

Title

Click to edit Master subtitle style

Pitting Beneath ScaleA cutout was flanged and re-installed prior to descaling operations to evaluate cleaning progress. As cleaning progressed, corrosion pitting beneath the scale was exposed.

Page 7: BH Descaling Project Port Everglades

Title

Click to edit Master subtitle style

Final Results

A total of 159 descaling and flushing runs were made on the two pipelines to bring the internal diameter to bare metal condition.