bharti airtel unified gis
TRANSCRIPT
Bharti Airtel Unified GIS
Feb - 2012
Agenda
UGIS Solution Overview
Solution Architecture
UGIS feasibility & Functionality
Business Benefits
Customer
• Reduce feasibility cost and Turn around time
• Reduce resolution time for customer complaint
Financial
Integrate Broadband, Carrier & Mobility network Management
Drive new Revenue streams
What were the Business Driver?
Drive new Revenue streams
Optimizing Mobility coverage with minimal cost
Duplication or lost opportunity for sharing resources
Process
• Unable to Realize Key Prospects
• Low visibility of spatially spread demographics and Network
What has been deployed
•PNI, WNI, MPlanet for Planning, Operations.
•NIG for Feasibility, Provisioning and MIS reporting.
•SI for Spatial Analytics.
•BM for Fiber Provisioning.
•DM for Workflows.
•PNI, WNI, MPlanet for Planning, Operations.
•NIG for Feasibility, Provisioning and MIS reporting.
•SI for Spatial Analytics.
•BM for Fiber Provisioning.
•DM for Workflows.
•Pan India State, District, Town, Villages & Highways.
•High precision corridormaps.
•Major Buildings, Landmarks.
•Digital Terrain and Land use Maps.
•Pan India State, District, Town, Villages & Highways.
•High precision corridormaps.
•Major Buildings, Landmarks.
•Digital Terrain and Land use Maps.
Landbase Application
•Mobile Network
•Fixed Line Network
•Broadband/ IPTV
•Carrier Network
•Relationship Centers
•Mobile Network
•Fixed Line Network
•Broadband/ IPTV
•Carrier Network
•Relationship Centers
•Provisioning automation
•Analytics and trending
•Fault Localization and Alarm Mapping
•Automation of Network Planning
•Empowering Field Force
•Provisioning automation
•Analytics and trending
•Fault Localization and Alarm Mapping
•Automation of Network Planning
•Empowering Field Force
NetworkProcess
Automation
Project Execution Strategy
Infotech,
IBM
RMSI, IL&FS,
Infotech, Lepton
UGIS eTOM Positioning
Strategy, Infrastructure & Product Operations
Fulfillment Assurance BillingProductLifecycleManagement
InfrastructureLifecycleManagement
OperationsSupport andReadiness
Strategy &Commit
Marketing & Offer Mgmt
Customer
Customer Relationship Mgmt
Ensures network infrastructure is “service ready” to support
provisioningUtilization of network inventory data for operational
control and response to network failures
Supplier/Partner Relationship Mgmt
Service Development & Mgmt
Resource Development and Mgmt
Supply Chain Development & Mgmt
(Application, Computing and Network) (Application, Computing and Network)
Resource Mgmt & Operations
Service Mgmt & Operations
Support planning, construction and maintenance of
the access and core networks
Strategy &InfrastructureLifecycle
OperationsSupport&Readiness
Fulfillment&Assurance
UGIS LandbaseOne Airtel Network
Access Network
Landbase
L5 Landbase for 90 Cities
High Positional Inaccuracy
Non Standardized
Specifications
Transport Network
No GIS was ABD’s Used for Omni-docs
Introduction
of Five LB
Levels
One Airtel Network
and LBNo GIS was
AvailableABD’s Used for
InventorySystem managed
ABDs
Mobile Network
MPetals for GISInaccurate
Positional InfoIncorrect
Demographics
Introduction of
Landbase
Policy
Landbase – Introduction to Five Levels
• Roads – All India
• Villages and 2001 Demographics - All India
• Clutter and DTM at 25/50 Meter Resolution L1• Corridor Maps for 1,00,00 KMs
• Complete ROW Information
• High Positional Accuracy L2• 3/11 Maps for City Planning
• Major Buildings and Roads – Complete CityL3
•Mobile Planning &
Inventory
•Fibre Feasibility
•All India Fiber Planning
•TNG Fiber Inventory
•High Rise Building
Coverage Planning• Major Buildings and Roads – Complete City
• DTM and Clutter at 5 Meter ResolutionL3• 3/11 Maps for High Level Wireline Planning
• High Positional Accuracy
• Residential/Industrial/Commercial ClassificationsL4• Complete ROW
• Individual Buildings
• Maps Available for Core City AreasL5
Coverage Planning
•PAI for L5
•Wireline Planning
•ANG Inventory
•Fiber Inventory
•ANG Inventory
•Wireline Planning
Application
Architecture
UGIS Architecture
ee--CRMCRM
SMSSMS
MetaSolvMetaSolv MPlanetMPlanet
GPSGPS
Busin
ess
Busin
ess
Inte
lligence
Inte
lligence
B i l l i n
gB
i l l i n g
Integrating SystemsIntegrating Systems
Order MgmtOrder Mgmt
ee--CRMCRM GPSGPS
Landbase & Network
Data
PNI WNI NIG SI
Unified GIS Business Process
Application
Features &
Functionality
UGIS GUI Feature
Standardized Layer Control Standardized Legend UGIS Pan India View
Unified View
Empowerment through Automation
�Response from UGISField Force
Cell/Site Inventory on Map Cell/Site Coverage Map
Legend
Plot View with Shelter & Tower Information Shelter Internal
Tower
Shelter Plot Boundary
Battery Bank
BTS
Information
Tower Internal
Tower 3
Side View
with antenna
details
Customer Experience Management View
BusinessBusiness
Benefits
360o view of Network
Benefits• Infrastructure Sharing Opportunity
• Integrated Market Planning
• Leverage on Synergy Opportunities
• Visibility of Pan India Network Deployment and Rollout• Visibility of Pan India Network Deployment and Rollout
Wireless Market and Network Planning
Benefits• Optimize Mobility Coverage
• Accurate Coverage Prediction with 20 new models
• Identification of untapped potential and revenue leakagesleakages
• Retailer/distribution planning by spatially analyzing competitor market share
• Launching new marketing schemes by analyzing performance reports
Customer Lifecycle Management
Unified GIS
Feasibility
Order
Entry
Work-order
Resource
Allocation• Network & Resource Availability analysis• Network & Resource Availability analysis
Feasibility
• Automated allocation of free resource• Automated allocation of free resource
Resource Allocation
Unified GIS
Installation
Activation
Change
Mgmt
Customer
Care
Fault
Mgmt
• Automated resolution and conflict handling• Automated resolution and conflict handling
Change Management
• Service impact analysis• Service impact analysis
Fault Management
Customer Feasibility
Feasibility Response Time in Days
Before After
UGISEnterprise Feasibility Cost
Retail Feasibility Cost
thank you
Level 1
SHOPS
RE
SID
EN
CE
RE
SID
EN
CE
RE
SID
EN
CE
RE
SID
EN
CE
RE
SID
EN
CE
NA
GA
R N
IGA
M S
CH
OO
L
RE
SID
EN
CE
RO
AD
CH
-4.1
35
M O T H E R D A IR Y
SHOPS
VASHIST AUTO MOBILES-B2B
CH
-4.0
61
CH
-4.0
99
CH
-4.1
12
CH
-4.1
32
PU
MP
HO
US
E
RO
AD
RO
AD
DD
A M
KT
.
RO
AD
RO
AD
CH
-4.0
24
CH
-4.0
36
SERVICE ROAD
6-S
NALA
6-S
PA
RK
R-1
18
R-1
48
Level 2
SHOPS
CO
MM
ER
CA
IL
BA
LA
JI S
HO
P
CO
MM
ER
CA
IL
CO
MM
ER
CA
IL
GO
PA
L S
HO
P
SW
EE
T S
HO
P
NE
WD
EL S
HO
P S.T
.D.
RE
SID
EN
CE
RE
SID
EN
CE
TO
SH
RI B
HU
MIA
DE
V
F-1
1
VA
RA
N S
HO
P
SU
PR
AM
JI S
HO
P
CO
MM
ER
CA
ILD
-56
C-5
4
C-5
4
BA
JA
J
SH
OP
AD
ITY
A
JO
GIN
DE
R S
HO
P
C-9
9
C-9
8 C-9
7
VA
SH
IST
CO
MP
LE
X
NA
GA
R N
IGA
M S
CH
OO
L
RO
AD
PLE
MA
RG
RO
AD
CH
-3.9
62
CH
-3.9
68
R2
6-S
TE
MP
LE
RESIDENCE
Level 3
Level 5