bicol international airport development...

70
G R A N D S U M M A R Y 1.0 GENERAL REQUIREMENTS PART A FACILITIES FOR THE ENGINEER 1 l.s. PART B OTHER GENERAL REQUIREMENTS 1 l.s. TOTAL COST - GENERAL REQUIREMENTS 2.0 CIVIL WORKS 2.1 LANDSIDE (Service Road, Parking, Entrance Road, Terminal Road, Drainage System, Signages, Exterior Water System, Sewer System, Exterior Chilled Water Piping, Exterior Electrical Works) 2.1.1 SERVICE ROAD 1 l.s. 2.1.2 PARKING/ ENTRANCE AND TERMINAL ROAD 1 l.s. 2.1.3 DRAINAGE SYSTEM 1 l.s. 2.1.4 EXTERIOR CHILLED WATER PIPING 1 l.s. 2.1.5 SIGNAGES (ROAD SIGNS) 1 l.s. 15 EXTERIOR UTILITY SYSTEM 15.1 NON POTABLE WATER TANK 1 l.s. 15.2 IRRIGATION SYSTEM 1 l.s. 15.3 EXTERIOR WATER SYTSTEM 1 l.s. 15.4 EXTERIOR SEWER SYSTEM 1 l.s. 15.5 MECHANICAL (EXTERNAL WORKS) 15.5.1 Airconditioning System 1 l.s. 15.5.3 Fire Protection System 1 l.s. 16 EXTERIOR ELECTRICAL WORKS (LANDSIDE) 16.1 Overhead Distribution Line 1 l.s. 16.2 Exterior Lighting 1 l.s. 16.3 Duct Bank 1 l.s. 16.4 Exterior (Landside) Auxiliary System 1 l.s. TOTAL COST - LANDSIDE 2.2 AIRSIDE (Runway Completion, Perimeter Road, Perimeter Drainage) 2.2.1 RUNWAY COMPLETION 1 l.s. 2.2.2 PERIMETER ROAD 1 l.s. 2.2.3 PERIMETER DRAINAGE 1 l.s. 2.2.4 GROUTED RIPRAP 1 l.s. 2.2.5 DETENTION POND 1 l.s. TOTAL COST - AIRSIDE TOTAL COST - CIVIL WORKS 3.0 OTHER BUILDINGS 3.1 PASSENGER TERMINAL BUILDING 1 l.s. UNIT COST TOTAL CONSTRUCTION COST BILL OF QUANTITIES BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT Daraga, Albay Package 2B - CONSTRUCTION OF PASSENGER TERMINAL BUILDING, RUNWAY COMPLETION AND OTHER SITE DEVELOPMENT WORKS PAY ITEM NO. D E S C R I P T I O N ESTIMATED QTY UNIT Republic of the Philippines DEPARTMENT OF TRANSPORTATION & COMMUNICATIONS BOQ / Grand Summary Page 1 of 70

Upload: phungkiet

Post on 01-Feb-2018

241 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

G R A N D S U M M A R Y

1.0 GENERAL REQUIREMENTS

PART A FACILITIES FOR THE ENGINEER 1 l.s.

PART B OTHER GENERAL REQUIREMENTS 1 l.s.

TOTAL COST - GENERAL REQUIREMENTS

2.0 CIVIL WORKS

2.1

LANDSIDE (Service Road, Parking, Entrance Road, Terminal Road,

Drainage System, Signages, Exterior Water System, Sewer System,

Exterior Chilled Water Piping, Exterior Electrical Works)

2.1.1 SERVICE ROAD 1 l.s.

2.1.2 PARKING/ ENTRANCE AND TERMINAL ROAD 1 l.s.

2.1.3 DRAINAGE SYSTEM 1 l.s.

2.1.4 EXTERIOR CHILLED WATER PIPING 1 l.s.

2.1.5 SIGNAGES (ROAD SIGNS) 1 l.s.

15 EXTERIOR UTILITY SYSTEM

15.1 NON POTABLE WATER TANK 1 l.s.

15.2 IRRIGATION SYSTEM 1 l.s.

15.3 EXTERIOR WATER SYTSTEM 1 l.s.

15.4 EXTERIOR SEWER SYSTEM 1 l.s.

15.5 MECHANICAL (EXTERNAL WORKS)

15.5.1 Airconditioning System 1 l.s.

15.5.3 Fire Protection System 1 l.s.

16 EXTERIOR ELECTRICAL WORKS (LANDSIDE)

16.1 Overhead Distribution Line 1 l.s.

16.2 Exterior Lighting 1 l.s.

16.3 Duct Bank 1 l.s.

16.4 Exterior (Landside) Auxiliary System 1 l.s.

TOTAL COST - LANDSIDE

2.2 AIRSIDE (Runway Completion, Perimeter Road, Perimeter Drainage)

2.2.1 RUNWAY COMPLETION 1 l.s.

2.2.2 PERIMETER ROAD 1 l.s.

2.2.3 PERIMETER DRAINAGE 1 l.s.

2.2.4 GROUTED RIPRAP 1 l.s.

2.2.5 DETENTION POND 1 l.s.

TOTAL COST - AIRSIDE

TOTAL COST - CIVIL WORKS

3.0 OTHER BUILDINGS

3.1 PASSENGER TERMINAL BUILDING 1 l.s.

UNIT COSTTOTAL

CONSTRUCTION COST

BILL OF QUANTITIES

BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT

Daraga, Albay

Package 2B - CONSTRUCTION OF PASSENGER TERMINAL BUILDING, RUNWAY COMPLETION AND

OTHER SITE DEVELOPMENT WORKS

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT

Republic of the PhilippinesDEPARTMENT OF TRANSPORTATION & COMMUNICATIONS

BOQ / Grand Summary Page 1 of 70

Page 2: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

UNIT COSTTOTAL

CONSTRUCTION COST

BILL OF QUANTITIES

BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT

Daraga, Albay

Package 2B - CONSTRUCTION OF PASSENGER TERMINAL BUILDING, RUNWAY COMPLETION AND

OTHER SITE DEVELOPMENT WORKS

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT

Republic of the PhilippinesDEPARTMENT OF TRANSPORTATION & COMMUNICATIONS

3.2 ARRIVAL & DEPARTURE 1 l.s.

3.3 COVERED DRIVEWAY 1 l.s.

TOTAL COST - BUILDINGS

4.0 SPECIAL EQUIPMENT 1 l.s.

TOTAL COST - SPECIAL EQUIPMENT

TOTAL CONSTRUCTION COST - Package 2B

AMOUNT IN WORDS :______________________________________________________________________________________________________________

Submitted By:

(Name of Firm)

Signing Authority :

(Printed Name and Signature)

Designation:

Datte:

BOQ / Grand Summary Page 2 of 70

Page 3: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

DEPARTMENT OF TRANSPORTATION AND COMMUNICATION

PART A FACILITIES FOR THE ENGINEER

A.1 Field Office for the Engineer

A.1(a) Rental and Maintenance of Office for the Engineer’s Representative 6 mo

A.1(b) Maintenance of Staff House for the Engineer 6 mo

A.1(c)Provide and Maintain Laboratory Building for the Engineer and Engineer’s

Representative1 ls

A.1(d) Maintain Field Office for the Engineer and Engineer’s Representative 1 ls

A.1(e)Furnish Equipment, Furnitures, Fixtures, Office Equipment and

Appliances for the Laboratory Building for the Engineer (Schedule B)1 ls

A.2(a)Provide, Operate and Maintain Communication Equipment for the

Engineer and Engineer’s Representative (Schedule C)30 mo

A.3(a)Provide Supplies and Consumable Stores for Office and Laboratory for

the Engineer and Engineer’s Representative (Schedules D)30 mo

A.4(a)Provide 4W D Pick-up Type, Double Crew Cab, Service Vehicle

Brandnew for the Engineer and Engineer’s Representative (Rental Basis)60 veh-mo

A.4(b)Operate and Maintain 4W D Pick-up Type, Double Crew Cab, Service

Vehicle for the Engineer and Engineer’s Representative60 veh-mo

A.4(c)Operate and Maintain Existing 4W D Pick-up Type, Double Crew Cab,

Service Vehicle for the Engineer and Engineer’s Representative24 veh-mo

A.5(a)Provide and Maintain Survey Instrument/Equipment for the Assistance to

the Engineer (Schedule F)1 ls

A.6(a) Progress Photographs 30 mo

Sub - Total -PART A FACILITIES FOR THE ENGINEER

PART B OTHER GENERAL REQUIREMENTS

B.1 Project Signboard 2 set

B.2 Construction Safety and Health 30 mo.

B.3 Environmental and Social Safeguard 30 mo.

Sub - Total -PART B OTHER GENERAL REQUIREMENTS

TOTAL COST - GENERAL REQUIREMENTS

UNIT COST

BILL OF QUANTITIES

BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT

Daraga, Albay

ITEM NO. DESCRIPTIONESTIMATED

QTYUNIT

TOTAL

CONSTRUCTION COST

BOQ / General Requirements Page 3 of 70

Page 4: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

DEPARTMENT OF TRANSPORTATION AND COMMUNICATION

SUMMARY

2.0 CIVIL WORKS @ LANDSIDE

2.1

LANDSIDE (Service Road, Parking, Entrance Road, Terminal Road,

Drainage System, Signages, Exterior Water System, Sewer System,

Exterior Chilled Water Piping, Exterior Electrical Works)

2.1.1 SERVICE ROAD 1 l.s.

2.1.2 PARKING/ ENTRANCE AND TERMINAL ROAD 1 l.s.

2.1.3 DRAINAGE SYSTEM 1 l.s.

2.1.4 EXTERIOR CHILLED WATER PIPING 1 l.s.

2.1.5 SIGNAGES (ROAD SIGNS) 1 l.s.

15 EXTERIOR UTILITY SYSTEM

15.1 NON POTABLE WATER TANK 1 l.s.

15.2 IRRIGATION SYSTEM 1 l.s.

15.3 EXTERIOR WATER SYTSTEM 1 l.s.

15.3 EXTERIOR SEWER SYSTEM 1 l.s.

15.5 MECHANICAL (EXTERNAL WORKS)

15.5.1 Airconditioning System 1 l.s.

15.5.2 Fire Protection System 1 l.s.

16 EXTERIOR ELECTRICAL WORKS (LANDSIDE)

16.1 Overhead Distribution Line 1 l.s.

16.2 Exterior Lighting 1 l.s.

16.3 Duct Bank 1 l.s.

16.4 Exterior (Landside) Auxiliary System 1 l.s.

TOTAL COST - LANDSIDE

BILL OF QUANTITIES

BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT

Daraga, Albay

TOTAL

CONSTRUCTION COSTITEM NO. DESCRIPTION

ESTIMATED

QTYUNIT UNIT COST

BOQ / Civil Works-Landside Page 4 of 70

Page 5: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COSTITEM NO. DESCRIPTION

ESTIMATED

QTYUNIT UNIT COST

2.0 CIVIL WORKS

2.1

LANDSIDE (Service Road, Parking, Entrance Road, Terminal Road,

Drainage System, Exterior Water System, Sewer System, Exterior

Chilled Water Piping

2.1.1 SERVICE ROAD

Part C Earthworks

105(1) Subgrade Preparation ( Common Materials) 7,172 sq.m.

Part D Subbase and Base Course

201 Aggregate Base Course 959 cu.m.

Part E Surface Courses

311(1)c PCC Pavement , 250mm thick (flexural strength 550 psi) 6,400 sq.m.

Part H Miscellaneous Structures

600(3)a Curb and Gutter ( Cast In place) 719 l.m.

TOTAL - SERVICE ROAD

2.1.2 PARKING / ENTRANCE AND TERMINAL ROAD

Part C Earthworks

105(1) Subgrade Preparation (Common Materials) 36,450 sq.m.

Part D Subbase and Base Course

200 Aggregate Subbase Course 4,795 cu.m.

201 Aggregate Base Course 1,071 cu.m.

Part E Surface Courses

311(1)a PCC Pavement , 150 mm thick (flexural strength 500 psi) 22,098 sq.m.

311(1)c PCC Pavement, 250 mm thick (flexural strength 500 psi) 7,136 sq.m.

311(1)c Side walk, 100 mm thick 2,459 sq.m.

Part H Miscellaneous Structures

600(3)a Curb and Gutter ( Cast In Place), L-Type 3,687 l.m.

600(3)b Recessed Curb ( Cast In Place) 1,352 l.m.

608(2) Placing Top Soil 249 cu.m.

612(1) Reflectorized Markings (Reflectorized Thermoplastic) 236 sq.m.

TOTAL - PARKING / ENTRANCE AND TERMINAL ROAD

2.1.3 DRAINAGE SYSTEM

PART G Drainage and Slope Protection Structures

103(6)Pipe Culverts including excavation, backfill & disposal with granular

bedding

500(1)a Reinforce Concrete Pipe Culvert 375 mm Dia., Class II 656 l.m.

500(1)b Reinforce Concrete Pipe Culvert 450 mm Dia., Class II 827 l.m.

500(1)c Reinforce Concrete Pipe Culvert 600 mm Dia., Class II 410 l.m.

500(1)d Reinforce Concrete Pipe Culvert 750 mm Dia., Class II 74 l.m.

500(1)e Reinforce Concrete Pipe Culvert 900 mm Dia., Class II 48 l.m.

500(1)f Reinforce Concrete Pipe Culvert 1050 mm Dia., Class II 48 l.m.

Reinforced Concrete Box Culvert

SPL 521(a) RCBC 1.80x1.80m Non-traffic type 23 l.m.

SPL 521(b) RCBC 2.0x2.0m Non-traffic type 224 l.m.

Reinforced Concrete Headwall & Wingwall

SPL 521(c) Inlet Headwall at Trapezoidal Canal A 1 set

SPL 521(d) Inlet Headwall at 1.80 x1.80m RC Box Culvert 1 set

BOQ / Civil Works-Landside Page 5 of 70

Page 6: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COSTITEM NO. DESCRIPTION

ESTIMATED

QTYUNIT UNIT COST

Curb Inlet Manholes & Cover

502(1)a-1Manholes, Curb Inlet Manholes for 375 mm dia. Pipes (Ave. Depth =

1.286m)5 ea.

502(1)a-2Manholes, Curb Inlet Manholes for 450 mm dia. Pipes (Ave. Depth =

1.394m)35 ea.

502(1)a-3Manholes, Curb Inlet Manholes for 600 mm dia. Pipes (Ave. Depth =

1.533m)18 ea.

502(1)a-4Manholes, Curb Inlet Manholes for 750 mm dia. Pipes (Ave. Depth =

1.749m)4 ea.

502(1)a-5Manholes, Curb Inlet Manholes for 900 mm dia. Pipes (Ave. Depth =

1.848m)3 ea.

502(1)a-6Manholes, Curb Inlet Manholes for 1050 mm dia. Pipes (Ave. Depth =

2.258m)5 ea.

502(2) Manholes, Curb Inlet for 375mm Dia.(Ave.Depth=1.236m) 42 ea.

502(4)a Concrete Covers, 600 mm dia(For Curb Inlet & Inlet Manholes) 112 ea.

103(1)h Dual Inlet Manholes & Cover

502(1)c-1Manholes, Dual Inlet Manholes for 375 mm Dia. Pipes (Ave. Depth =

1.236m)13 ea.

502(1)c-2Manholes, Dual Inlet Manholes for 450 mm Dia. Pipes (Ave. Depth =

1.344m)10 ea.

502(1)c-3Manholes, Dual Inlet Manholes for 600 mm Dia. Pipes (Ave. Depth =

1.483m)2 ea.

502(4)b Concrete covers,700mmx700mm (For Dual Inlet Manholes) 25 ea.

103(1)h Surface Inlet Manhole & Cover

502(1)bManholes, Surface Inlet Manhole for 375mm Dia. Pipes (Ave. Depth=

1.286m)3 ea.

502(1)bManholes, Surface Inlet Manhole for 450mm Dia. Pipes (Ave. Depth=

1.394m)3 ea.

502(1)bManholes, Surface Inlet Manhole for 600mm Dia. Pipes (Ave. Depth=

1.533m)2 ea.

502(6) Metal Frames and Covers(For Surface Inlet Manhole) 8 ea.

SPL 522CHB Lined Canal, Non – Traffic, W=1000mm, Depth=1000mm (includes

bedding concrete, formworks, rebars, etc to complete the work)

SPL 522(a) Canal A, B=3600mm, b-1200mm, d-1200mm 129 l.m.

SPL 522(b) Canal B, B=4500mm, b-1500mm, d-1500mm 106 l.m.

SPL 522(c) Canal C, B=2400mm, b-800mm, d-800mm 281 l.m.

TOTAL - DRAINAGE SYSTEM

2.1.4 EXTERIOR CHILLED WATER SYSTEM

SPL 512(a) Trench traffic type, W=1.20m, D=0.55m 43 l.m.

SPL 512(a) Trench traffic type, W=1.00m, D=0.825m 154 l.m.

SPL 512(a) Trench traffic type, W=0.90m, D=0.79m 38 l.m.

SPL 512(a) Trench Non-traffic type, W=1.20m, D=0.55m 35 l.m.

SPL 512(a) Trench Non-traffic type, W=1.00m, D=0.825m 62 l.m.

SPL 512(a) Trench Non-traffic type, W=0.90m, D=0.79m 51 l.m.

TOTAL - EXTERIOR CHILLED WATER SYSTEM

2.1.5 SIGNAGES (ROAD SIGNS)

Information Signs

605(3)a Priority Series, Stop Sign(600mmx600mm) 1 ea.

605(3)b Priority Series Give Way(866mmx750mm) 1 ea.

BOQ / Civil Works-Landside Page 6 of 70

Page 7: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COSTITEM NO. DESCRIPTION

ESTIMATED

QTYUNIT UNIT COST

605(3)c Direction Series, two way(750mmx450mm) 2 ea.

605(3)d Direction Series, One way(900mmx300mm) 2 ea.

605(3)e Direction Series, no entry(750mmx450mm) 1 ea.

605(3)f Parking Series, no parking (600mm dia.) 1 ea.

605(3)g Parking Series, no parking anytime(450mmx300mm) 2 ea.

605(3)h Parking Series, no Parking Waiting Anytime(450mmx300mm) 2 ea.

605(3)I Parking Series, Loading & Unloading Anytime(450mmx300mm) 2 ea.

605(3)j Parking Series, Reserve Parking(450mmx300mm) 4 ea.

605(3)k Prohibitive Series, No entry for jeepneys 1 ea.

605(3)l Prohibitive Series, No Overtaking 1 ea.

605(3)m Prohibitive Series, No Left Turn 1 ea.

605(3)n Prohibitive Series, No “U” Turn 1 ea.

605(3)o Direction Signs (2070mmx1100mm) 1 ea.

605(3)p Direction Sign(880mmx550mm) 1 ea.

605(3)q Direction Sign(650mmx550mm) 1 ea.

605(3)r Direction Sign(650mmx450mm) 1 ea.

605(3)q Warning Sign 4 ea.

605(3)r Regulatory Sign 4 ea.

TOTAL - SIGNAGES (ROAD SIGNS)

15 EXTERIOR UTILITY SYSTEM

15.1 NON POTABLE WATER TANK

DIV-02 SITE CONSTRUCTION

2.0 SITE WORKS

2.1.1 Building Layout 113 sq.m.

2.1.2 Structure Excavation 398 cu.m.

2.1.3 Backfilling and filling

2.1.3.2 Gravel base; 150 mm thk 18 cu.m.

2.1.4 Soil Disposal

2.1.4.1 Remove surplus excavated material from site 398 cu.m.

2.1.5 Subgrade Preparation 113 sq.m.

2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of

excavations287 sq.m.

Total "DIV-02" - SITE CONSTRUCTION

DIV-03 CONCRETE WORKS

3.1 Cast-In-Place Structural Concrete

3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa

3.1.1.4 Beams, Coping beams 2 cu.m.

3.1.1.5 Suspended Slab, ramp and canopy 24 cu.m.

3.1.1.11 Water tank (RC wall, slab-on-grade) 116 cu.m.

3.2 Reinforcement in concrete

3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,

binders, and tie wires, etc; grade 60

3.2.1.4 Beams, Coping beams 193 kg.

3.2.1.8 Water tank (RC wall, slab-on-grade) 16,210 kg.

3.2.1.9 Suspended Slab, ramp and canopy 83 kg.

3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,

binders, and tie wires, etc; grade 40

3.2.2.4 Beams, Coping beams 91 kg.

3.2.2.5 Suspended Slab, ramps and canopy 1,583 kg.

3.3 Formwork

3.3.4 Beams, Coping beams 12 sq.m.

3.3.5 Suspended Slab, ramps and canopy 143 sq.m.

3.3.10 Water tank (RC wall, slab-on-grade) 510 sq.m.

3.4 Concrete Accessories

3.4.2 PVC Waterstop 141 l.m.

Total "DIV-03" - CONCRETE WORKS

DIV-05 METAL WORKS

5.10 Miscellaneous Metals

5.10.4 Stainless steel ladder rung (wall mounted)

BOQ / Civil Works-Landside Page 7 of 70

Page 8: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COSTITEM NO. DESCRIPTION

ESTIMATED

QTYUNIT UNIT COST

5.10.4.1 Ht. = 2.50m (W = 0.50m) 1 set

5.10.4.2 Ht. = 1.50m (W = 0.50m) 1 set

5.11 Manhole cover

5.11.1600mm dia. Steel Manhole cover including frame, handle, paint and all

incidentals to complete1 set

5.11.22000 x 1750mm (2 panels) checkered plate manhole cover including

frame, handle, paint and all incidental to complete1 set

5.11.3Steel Louver: W=0.50m, L=1.35m ; including frame, paint and all

incidentals to complete1 set

Total "DIV-05" - METAL WORKS

TOTAL COST -NON POTABLE WATER TANK

15.2 LANDSCAPE IRRIGATION SYSTEM

A. Pumps & Accessories

1.0 3/4 " Sprinkler Head, 18 ft (5.5 m.), full circle spray 401 set

3.0 Inline Strainer filter, 50 mmø PE 2 pc.

4.0 Pressure Regulators

4.1 32 mmø 2 pc.

4.2 25 mmø 7 pc.

4.3 20 mmø 1 pc.

5.0 1/4" (6mm) size Drip Tubing, PE 1,707 l.m.

6.0 Pipes & Fittings

6.1 63 mm PE Pipe 282 l.m.

6.2 50 mmø PE Pipe 1,152 l.m.

6.3 40 mmø PE Pipe 90 l.m.

6.4 32 mmø PE Pipe 1,207 l.m.

6.5 25 mmø PE Pipe 310 l.m.

6.7 20 mmø PE Pipe 30 l.m.

7.0 Coupling

7.1 63 mmø PE 225 pc.

7.2 50 mmø PE 920 pc.

7.3 40 mmø PE 60 pc.

7.4 32 mmø PE 1,102 pc.

7.5 25 mmø PE 134 pc.

7.6 20 mmø PE 10 pc.

8.0 Gate Valve

8.1 63 mmø 5 pc.

8.2 50 mmø 23 pc.

8.3 40 mmø 26 pc.

8.4 32 mmø 34 pc.

8.5 25 mmø 12 pc.

8.6 20 mmø 6 pc.

9.0 Tee

9.1 63 mmø 8 pc.

9.2 63 x 50 mmø 4 pc.

9.3 63 x 32 mmø 29 pc.

9.4 50 x 50 mmø 8 pc.

9.5 50 x 25 mmø 8 pc.

9.6 50 x 40 mmø 4 pc.

9.7 50 x 32 mmø 16 pc.

9.8 50 x 20 mmø 8 pc.

9.9 50 x 25 mmø 11 pc.

9.10 40 x 32 mmø 7 pc.

9.11 32 x 25 mmø 264 pc.

BOQ / Civil Works-Landside Page 8 of 70

Page 9: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COSTITEM NO. DESCRIPTION

ESTIMATED

QTYUNIT UNIT COST

9.12 32 mmø 80 pc.

9.13 25 mmø 92 pc.

10.0 End Cap

10.1 40 mmø 10 pc.

10.2 32 mmø 101 pc.

10.3 25 mmø 46 pc.

10.4 20 mmø 17 pc.

11.0 Elbow

11.1 63 mmø 8 pc.

11.3 50 x 40 mmø 3 pc.

11.3 50 x 32 mmø 1 pc.

11.4 40 mmø 6 pc.

11.5 40 x 25 mmø 4 pc.

11.6 32 mmø 22 pc.

11.7 25 mmø 70 pc.

11.8 20 mmø 2 pc.

12.0 Reducer

12.1 63 x 32 mmø 8 pc.

12.2 50 x 32 mmø 22 pc.

12.3 32 x 25 mmø 39 pc.

12.4 25 x 20 mmø 18 pc.

13.0 Tubing Adapter

13.1 32 mmø 30 pc.

13.2 25 mmø 40 pc.

13.3 20 mmø 60 pc.

14.0 Hose Bibb

14.1 25 mmø 35 pc.

15.0 Union

15.1 50 mmø male 8 pc.

15.2 50 mmø female 15 pc.

16.0 Saddle

16.1 63 mmø Branch Saddle 2 pc.

16.2 50 mmø Branch Saddle 2 pc.

16.3 40 mmø Branch Saddle 4 pc.

16.4 63 mmø Repair Saddle 2 pc.

16.5 50 mmø Repair Saddle 2 pc.

16.6 40 mmø Repair Saddle 4 pc.

16.7 50 mmø Tapping Saddle 8 pc.

16.8 32 mmø Tapping Saddle 14 pc.

16.9 25 mmø Tapping Saddle 12 pc.

17.0 Female Adapter

17.1 32 mmø 28 pc.

17.2 25 mmø 30 pc.

18.0 Male Adapter

18.1 32 mmø 28 pc.

18.2 25 mmø 30 pc.

TOTAL - LANDSCAPE IRRIGATION SYSTEM

15.4 EXTERIOR WATER SYTSTEM

DIV 02500 UTILITY SERVICE

2510 Water Distribution & Fire Protection System

2510.1Water Distribution Lines, PVC Pipes Class 150, includes Trenching,

Bedding, Backfill & etc.

02510.1(a) PVC Pipe, 50 mm ø 372 l.m.

BOQ / Civil Works-Landside Page 9 of 70

Page 10: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COSTITEM NO. DESCRIPTION

ESTIMATED

QTYUNIT UNIT COST

02510.1(b) PVC Pipe, 75 mm ø 120 l.m.

02510.1(c) PVC Pipe, 100 mm ø 348 l.m.

2510.2Transmission Lines, PVC Pipe Class 150, includes trenching, bedding,

backfill & etc.

02510.2(a) PVC Pipe 75 mm ø 102 l.m.

02510.2(b) PVC Pipe, 100 mm ø 900 l.m.

2510.5 Pipe Fittings, Includes thrust block

02510.5(a) 100 mm ø Tee 5 ea.

02510.5(b) 100 x 75 mm ø Tee 3 ea.

02510.5(c) 100 x 50 mm ø Tee 1 ea.

02510.5(d) 50 x 50 mm ø Tee 1 ea.

02510.5(e) 90 deg Bend, 100 mm ø 4 ea.

02510.5(f) 90 deg Bend, 75 mm ø 1 ea.

02510.5(g) 90 deg Bend, 50 mm ø 1 ea.

02510.5(h) 100 x 75 mm ø Reducer 1 ea.

02510.5(i) 100 x 50 mm ø Reducer 3 ea.

02510.5(j) 75 x 50 mm ø Reducer 2 ea.

02510.5(k) PVC End Cap, 50 mm ø 6 ea.

02510.5(l) PVC End Cap, 100 mm ø 1 ea.

02510.5(m) PVC Plug, 100 mm dia 1 ea.

2510.6 Gates Valves (includes Brass Union Adaptor)

02510.6(a) Gate Valve, 50 mm ø 3 ea.

02510.6(b) Gate Valve, 75 mm ø 4 ea.

02510.6(c) Gate Valve, 100mm ø 4 ea.

2510.7 Check Valve (include Brass Union Adaptor)

02510.7(a) Check Valve, 75mm ø 1 ea.

02510.7(b) Check Valve, 100 mm ø 1 ea.

2510.8 Valve Box

02510.8(a) PVC Valve Box for 75mm ø and below GV & CV 8 ea.

02510.8(b) Concrete Valve Box (for 100mm ø GV & 100mm ø CV) 5 ea.

2510.1 Blow Off Valve Assembly 2 set

2510.11 Air Release and Vacuum Valve Assembly 2 set

2510.12 Hosebibb, 20mm ø, includes Hose Bibb Box 6 set

2510.14 Service Connections

02510.14(a)Single Service Connection, 75mm dia x 23 lm service pipe

1 set

02510.14(b)Single Service Connection, 65mm dia x 6.0 lm service pipe

1 set

02510.14(c)Single Service Connection, 50mm dia x 10 lm service pipe (average)

5 set

02510.14(d)Single Service Connection, 40mm dia x 13.0 lm service pipe

2 set

02510.14(e)Single Service Connection, 32mm dia x 12.0 lm service pipe (average)

5 set

02510.14(f)Single Service Connection, 25mm dia x 3.0 lm service pipe

1 set

02510.14(g)Single Service Connection, 20mm dia x 25.0 lm service pipe (average)

2 set

TOTAL - EXTERIOR WATER SYTSTEM

15.5 EXTERIOR SEWER SYSTEM

DIV 02530 SANITARY SEWERAGE

2530.1 PVC Pipe, include trenching, bedding, backfill and etc.

02530.1(a) PVC Pipe, 200mm Dia. (Ave Depth = 3.0m) 704 l.m.

02530.1(b) PVC Pipe, 250mm Dia. (Ave Depth = 3.0m) 266 l.m.

2530.2 Sewer Manhole

02530.2(a)Sewer Manhole, Ave Depth= 3.0m, include excavation, backfill

concrete formworks, bedding, manhole cover & etc to complete the

works

37 ea.

2530.3Sewer Service Connection @ Manhole

BOQ / Civil Works-Landside Page 10 of 70

Page 11: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COSTITEM NO. DESCRIPTION

ESTIMATED

QTYUNIT UNIT COST

02530.3(a)Sewer Service Connection , 150mm dia (Ave. service pipe length =

10.0m) 4 ea.

02530.3(b)Sewer Service Connection , 100mm dia (Ave. service pipe length =

9.0m)12 ea.

Div 11300 FLUID WASTE TREATMENT AND DISPOSAL EQUIPMENTS

11390 Sewage Treatment Plant, 200 cu.m. per day 1 ls

TOTAL - EXTERIOR SEWER SYSTEM

15.2.1 Air Conditioning System

15.2.1.1 Chilled Water "External "Piping

15.2.1.1.1

Steel Pipe, ERW Sched 40 including support, trenching, backfilling, sand

bedding, in place, including all incidentals to complete as specified in

Mechanical Drawings and Technical Specifications.

1 200 mm ø 124 l.m.

2 100 mm ø 442 l.m.

3 65 mmø 142 l.m.

4 50 mm ø 72 l.m.

15.2.1.1.2

Black Steel Pipe Fittings. ASTM - A 53. Schedule 40. including paintings

and other consumable materials to complete as specified in Mechanical

Drawings and Technical Specifications.

1 90° Bend

2 200 mm ø 8 ea.

3 100 mm ø 10 ea.

4 65 mmø 4 ea.

5 50 mm ø 2 ea.

15.2.1.1.3 Tee

1 200 x 200 mm dia. 4 pc.

2 100 x 100 mm dia. 2 pc.

15.2.1.1.4 Tee Reducer

1 250 x 200 mm dia. 4 ea.

2 200 x 100 mm dia. 2 ea.

15.2.1.1.5 Coupling Reducer

1 250 x 200 mm dia, Reducer 2 pc.

2 250 x 100 mm dia, Reducer 2 pc.

3 250 x 65 mm dia, Reducer 2 pc.

5 100 x 50 mm dia, Reducer 2 pc.

15.2.1.2

Chilled Water Pipe Insulation, 50mm thk. Flexible closed cell

elastomeric thermal insulation as per ASTM C524 Type II Class 1 c/w

Vapor Barrier.

1 200 mm ø 124 l.m.

2 100 mm ø 442 l.m.

3 65 mm ø 142 l.m.

4 50 mm ø 72 l.m.

15.2.1.3 Aluminum Pipe Cladding

1 200 mm ø 124 l.m.

2 100 mm ø 442 l.m.

3 65 mm ø 142 l.m.

4 50 mm ø 72 l.m.

15.2.2 Valves & Piping Accessories (External)

15.2.2.1 Butterfly Valve

1 200 mmø 2 ea.

2 100 mmø 4 ea.

3 65 mmø 2 ea.

15.2.2.2 Ball valve

1 50 mm ø 2 ea.

BOQ / Civil Works-Landside Page 11 of 70

Page 12: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COSTITEM NO. DESCRIPTION

ESTIMATED

QTYUNIT UNIT COST

15.2.2.3 Flexible Pipe Coupling

1 200 mmø 2 ea.

2 100 mm ø 4 ea.

3 65 mmø 2 ea.

4 50 mm ø 2 ea.

15.2.2.4 Thrust block 24 set

15.2.2.5 Testing and Commisioning 1 lot

Sub - Total

15.2.2 Fire Protection External Piping Works

15.2.2.1

Steel Pipe, ERW Sched 40 including support, trenching, backfilling, sand

bedding, in place, including all incidentals to complete as specified in

Mechanical Drawings and Technical Specifications.

1 200 mm ø 758 l.m.

2 150 mm ø 273 l.m.

3 100 mm ø 380 l.m.

4 80 mm ø 42 l.m.

5 65 mm ø 6 l.m.

15.2.2.2 Black Steel fitting

15.2.2.2.1 90° Bend

1 200 mm ø 7 ea.

2 150 mm ø 6 ea.

3 100 mm ø 16 ea.

4 80 mm ø 1 ea.

5 65 mm ø 34 ea.

15.2.2.2.2 Tee

1 200 x 200 mm dia. 6 pc.

2 150 x 150 mm dia. 1 pc.

3 63 x 63 mm dia. 2 pc.

15.2.2.2.3 Tee Reducer

1 200 x 150 mm dia. 7 pc.

2 200 x 100 mm dia. 5 pc.

3 200 x 75 mm dia. 1 pc.

4 200 x 65 mm dia. 5 pc.

5 150 x 100 mm dia. 1 pc.

6 150 x 65 mm dia. 3 pc.

7 150 x 65 mm dia. 3 pc.

8 100 x 65 mm dia. 6 pc.

End cap

200 mm ø 4 pcs.

15.2.2.3 Valves and Accessories

15.2.2.3.1 Gate Valve

1 200 mm ф for future connection c/w end cap 4 set

15.2.2.3.2 Post Indicator Valve

1 200 mm ф 2 set

2 150 mm ф 2 set

3 100 mm ф 2 set

15.2.2.3.3 Thrust block 24 set

15.2.2.3.4 Painting 1 lot

15.2.2.4 Fire Hose Cabinet

1

Fire Hose Cabinet made from Ga.18 BI steel construction with glass

door, continuous steel hinge. Cabinet shall contain ø40cast brass

angle valve with 30 m of ø40 polyurethane singled line synthetic jacket

hose, brass nipple and coupling. Hose rack swivel type with pin and

water stop. NST thread for fire hose. Cabinet to contain one (1) 4.5 kg

abc dry chemical extinguisher.

14 set

BOQ / Civil Works-Landside Page 12 of 70

Page 13: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COSTITEM NO. DESCRIPTION

ESTIMATED

QTYUNIT UNIT COST

15.2.2.5 Fire Hydrants

1Fire hydrants ,complete with std. accessories as shown in plans,

details and specifications.13 set

15.2.2.6 Testing and Commisioning 1 lot

Sub - Total

TOTAL

DIV-16 EXTERIOR LANDSIDE ELECTRICAL SYSTEM

TS 16302 OVERHEAD DISTRIBUTION LINE

TS 16302/1 CONCRETE POLE

1 Pre-stressed concrete pole, 13.7m high class 5 55 ea.

TS 16302/2 Primary Pole Assembles

1 Type "PA" with "S1E1" secondary construction 1 set

2 Type "P3B1" with "S1E1" secondary construction 10 set

3 Type "P3A1" with "S1E1" secondary construction 40 set

4 Type "P3A1" with "2S1E1" secondary construction 3 set

5 Type "P3B1" with "2S1E1" secondary construction 1 set

TS 16302/3 Pole Guy Assembly

1 Guy Assembly Type "GB" 12 set

2 - Ditto - But Type "GC" 1 set

3 - Ditto - But Type "2XGB" 5 set

4 - Ditto - But Type "2XGA" 4 set

5 Stud Pole, 13.2m High 1 ea.

TS 16302/4 Primary/Secondary Cables Medium Voltages XLPE Cables

1 Primary Cables, 70mm² (2/0 AWG) ACSR (RAVEN) 1,920 l.m.

2100mm² (4/0 AWG) AACPE Insulated with 100mm² (4/0) ACSR

(NEUTRAL) Duplex Secondary Cable1,920 l.m.

3 1Cx95mm² XLPE Cable 150 l.m.

TS 16302/5 Load Break Switch

1 Load Break Switch, Horizontal Type, Three pole Gang Operated 600A, 3P 3 set

2 - Ditto -- but 500A, 3P 3 set

TS 16302/6 Pole Mounted Transformer

1 10kVA, 1Ø, 60Hz, 400V-Primary/230V-Secondary 5 ea.

TS 16302/7 Power Fuse

1 Disconnect Fuse Cut-Out Rated 500A with 400A Fuse Link 6 set

2 - Ditto -- But Rated 50A with 6A Fuse Link 6 set

TS 16302/8 Lightning Arrester

1 Lightning Arrester (Surge) Distribution Type, 10kV 12 set

TS 16302/9 High Voltage Termination

1 High Voltage Termination 13.2/7.62 1 lot

TS 16402 Testing and Commissioning 1 lot

Sub - Total

TS 16530 EXTERIOR LIGHTING

1Type "B" Street Lighting Fixture, 126w Led, On 7.62m Pre-Stressed

Concrete Pole, W/ 1.5m Long Mast Arm, Equipped W/ Photocell.55 set

2- Ditto - Except (Type "A"), 1-126w Led, Mounted On 7.62m Pre-Stressed

Concrete Pole W/ 1.5m Long Mast Arm Equipt W/ Photocell4 set

3- Ditto - Except (Type "B1"), 1-70w Led, Mounted On 7.62m Pre-Stressed

Concrete Pole W/ 1.5m Long Mast Arm Equipt W/ Photocell25 set

4

Type "B2" Prismalence Ca-Series 1-70w Led Perimeter Lighting W/

Electronic Gear & Hid Bulb And Aluminum Die-Cast W/ Powder Coat Or

7.62m High Steel Pole

13 set

5 - Ditto - But W/ Twin Arm 22 set

6 Type "W" Wall Mounted Lighting Fixtures W/ 2x39w Leds, 230v, 60hz. 17 set

7

Type "F1" Floodlight Lighting Fixture Complete With 1x150 Watts Ceramic

Metal Halide Lamp, 240v, 60hz, In Aluminum Die-Cast Housing, Bulb

Mogul Socket, Tempered Glass, With Aluminum Reflector Similar To

Amco Model No. C-85-Al

8 set

8Type "Q" Prismatic Bollard, Tc-0 G24d-3 26w Led Light, Diffuser Lens In

Prismatic And Made From Polycarbonate, Vandal Resistant18 set

BOQ / Civil Works-Landside Page 13 of 70

Page 14: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COSTITEM NO. DESCRIPTION

ESTIMATED

QTYUNIT UNIT COST

TS 16301/1 WIRES, POWER CABLES & TEL./DATA CABLES

1 3.5mm² THHN 11,476 l.m.

2 5.5mm² THHN 100 l.m.

3 8mm² THHN 704 l.m.

4 100mm² THHN 1,560 l.m.

5 200mm² THHN 800 l.m.

6 500mm² THHN 4,008 l.m.

7 3.5mm² TW 4,715 l.m.

8 5.5mm² TW 352 l.m.

9 30mm² TW 390 l.m.

10 50mm² TW 200 l.m.

11 125mm² TW 1,002 l.m.

12 1C x 50mm² XLPE CABLE 180 l.m.

13 50 PAIRS, 24 Awg TEL CABLE 105 l.m.

14 1-4 PAIRS CAT6a UTP DATA CABLE 105 l.m.

15 25 PAIRS. 24 Awg UTP MULTI-PAIR CABLE, CAT6a 1 lot

TS 16301/2 CONCRETE MANHOLES/HANDHOLES AND CONDRETE PEDESTAL

1 Concrete Pedestal For Power Supply 1 lot

2 - Ditto - But Tel./Catv Supply 1 lot

3Concrete Medium Voltage Manhole W/ Steel Frame And Cover Including

Ground Rod, Ground Wire & Exothermic Weld Connection7 lot

4 - Ditto - But Low Voltage Hole 16 lot

5 - Ditto - But Telephone System Manhole 19 lot

6Concrete Handhole W/ Concrete Cover Including Ground Rod &

Exothermic Weld Connection14 lot

7 - Ditto - But Tel. System Handhole 6 lot

8 High Mast Lighting Pedestal 6 set

9 Street Lighting Pedestal 70 set

10 Metering and Concrete Service Pedestal 1 set

11 Power Service Concrete Pedestal 1 set

12 Telecom Service Concrete Pedestal 1 set

13 Bollard Lighting Pedestal 187 set

14 Electrical Handhole, EHH 19 set

15 Concrete Handhole, CHH 14 set

16 Electrical Manhole, EMH 25 set

17 Telecom Manhole, CMH 11 set

TS 16402 Testing and Commissioning 1 lot

Sub - Total

TS 16302 DUCT BANK

A. 110mmø uPVC

A.1 Type "A", 15-110mmø uPVC + 9-110mmø uPVC 18 l.m.

A.2 Type "B", 19-110mmø uPVC + 4-110mmø uPVC 78 l.m.

A.3 Type "C", 17-110mmø uPVC + 4-110mmø uPVC 25 l.m.

A.4 Type "D", 12-110mmø uPVC + 4-110mmø uPVC 123 l.m.

A.5 Type "E", 10-110mmø uPVC + 4-110mmø uPVC 113 l.m.

A.6 Type "F", 7-110mmø uPVC + 4-110mmø uPVC 271 l.m.

A.7 Type "G", 6-110mmø uPVC + 4-110mmø uPVC 204 l.m.

A.8 Type "H", 5-110mmø uPVC + 4-110mmø uPVC 78 l.m.

A.9 Type "I", 4-110mmø uPVC + 3-110mmø uPVC 170 l.m.

A.10 Type "J", 4-110mmø uPVC + 3-110mmø uPVC 103 l.m.

A.11 Type "K", 2-50mmø uPVC 30 l.m.

A.12 Type "L", 3-50mmø uPVC 34 l.m.

A.13 Type "M", 4-50mmø uPVC 30 l.m.

A.14 Type "N", 5-50mmø uPVC 19 l.m.

A.15 Type "P", 4-110mmø uPVC + 4-110mmø uPVC 16 l.m.

A.16 Type "Q", 1-110mmø uPVC 138 l.m.

A.17 Type "R", 2-110mmø uPVC + 2-63mmø uPVC 18 l.m.

A.18 Type "S", 2-110mmø uPVC 10 l.m.

A.19 COMBINE1 4-110mmø uPVC + 4-110mmø uPVC 19 l.m.

A.20 1-50mm² Medium Drawn Bare Copper Wire 790 l.m.

A.21 Grounding Rod, 20mmø x 3048mm long, Copper-Bonded 66 ea.

A.22 Exothermic Connection, Cadweld, Type "GT", Cable to Ground Rod 66 set

Sub - Total

TOTAL EXTERIOR LANDSIDE ELECTRICAL SYSTEM

BOQ / Civil Works-Landside Page 14 of 70

Page 15: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COSTITEM NO. DESCRIPTION

ESTIMATED

QTYUNIT UNIT COST

EXTERIOR (LANDSIDE) AUXILIARY SYSTEM

16.4 Fire Alarm System

16.4.3 Wires & Cables (including connectors etc.)

1 2.0mm² TW wire 915 l.m.

2 1.25mm² Shielded Twisted Pair, Fire Rated Cable 1,790 l.m.

16.4.5 Testing and Commissioning 1 lot

Sub - Total

16.5 Structured Cabling System

16.5.2 Wires & Cables (including connectors , etc.)

1 4-pairs x 0.64mm, UTP Cable, Cat6a 972 l.m.

2 25-Pairs, 24AWG UTP MULTI-PAIR CABLE, CAT6A 5,432 l.m.

3 50 Pairs, 24 AWG, UTP MUlLTI-PAIR CABLE, CAT6A (By Tel Provider) 2,045 l.m.

4 4 pairs x 0.64mm UTP cable, Cat6a (By Tel Provider) 2,045 l.m.

16.5.6 Testing and Commissioning 1 lot

Sub - Total

16.7 CATV System

16.7.2 Wires & Cables (including, connectors, etc)

2# 540 Series Jacketed Coaxial Cable with Integral Messenger wire(By

Service Provider)2,045 l.m.

16.7.4 Testing and Commissioning 1 lot

Sub- Total

16.8 CCTV System

16.8.2 Wires & Cables (including, connectors, etc)

1 CAT 6E UTP Cable 4 Pairs 1,698 l.m.

16.8.5 Testing and Commissioning 1 lot

Sub- Total

TOTAL EXTERIOR (LANDSIDE) AUXILIARY SYSTEM

TOTAL EXTERIOR ELECTRICAL WORKS

BOQ / Civil Works-Landside Page 15 of 70

Page 16: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

DEPARTMENT OF TRANSPORTATION AND COMMUNICATION

S U M M A R Y

3.2 AIRSIDE (Runway Completion, Perimeter Road, Perimeter Drainage)

3.2.1 RUNWAY COMPLETION 1 l.s.

3.2.2 PERIMETER ROAD 1 l.s.

3.2.3 PERIMETER DRAINAGE 1 l.s.

3.2.4 GROUTED RIPRAP 1 l.s.

3.2.5 DETENTION POND 1 l.s.

TOTAL COST - AIRSIDE

TOTAL

CONSTRUCTION COST

BILL OF QUANTITIES

BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT

Daraga, Albay

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

BOQ / Civil Works-Airside Page 16 of 70

Page 17: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

DEPARTMENT OF TRANSPORTATION AND COMMUNICATION

TOTAL

CONSTRUCTION COST

BILL OF QUANTITIES

BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT

Daraga, Albay

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

3.2 AIRSIDE (Runway Completion, Perimeter Road, Perimeter Drainage)

3.2.1 RUNWAY COMPLETION

Part C Earthworks

100.0 Cutting of Trees 250 pc.

101.0 Clearing,Grubbing and Disposal 69,000 sq.m.

102.0 Excavation of Unsuitable Materials & Disposal 34,500 cu.m.

( t = 50 cm )

104-A Embankment from Site Excavation 22,045 cu.m.

104-B Embankment from Source 199,850 cu.m.

105.0 Sub - Grade Preparation 40,320 sq.m.

Sub-Total

Part D/E Subbase and Base Course/ Surface Courses

200.0 Aggregate Sub-Base Course (t = 15 cm ) 1,620 cu.m.

202.0 Crushed Aggregate Base Course ( t = 10 cm ) 1,050 cu.m.

301.0 Bituminous Prime Coat 21 ton

310.0 Bituminous Concrete Surface Course ( t = 7.5 cm ) 1,890 ton

SPL - 1 Econocrete Sub - Base Course ( t = 25 cm. ) 30,420 sq.m.

311.0 Portland Cement Concrete Pavement ( t = 40 cm ) 29,530 sq.m.

311 - A Portland Cement Concrete Pavement ( Tapered ) 209 cu.m.

SPL - 2 Pavement Marking Thermoplastic ( white & yellow ) 2,465 sq.m.

312.0 Sodding 32,950 sq.m.

Sub-Total

Part H Miscellaneous Structures

AUXILLARY WORKS

SPL - 3 Auxiliary Pipes 1,488 l.m.

SPL - 4 Construction Manhole 8 unit

Sub-Total

Total - RUNWAY COMPLETION

3.2.2 PERIMETER ROAD

Part C Earthworks

100.0 Cutting of Trees 150 pc.

101.0 Clearing,Grubbing and Disposal 74,184 sq.m.

102.0 Excavation of Unsuitable Materials & Disposal 19,733 cu.m.

( t = 30 cm )

104-A Embankment from Site Excavation 7,953 cu.m.

104-B Embankment from Source 56,360 cu.m.

105.0 Sub - Grade Preparation 56,179 sq.m.

Sub-Total

Part D/E Subbase and Base Course/ Surface Courses

200.0 Aggregate Sub-Base Course (t = 15 cm ) 4,874 cu.m.

202.0 Crushed Aggregate Base Course ( t = 10 cm ) 4,405 cu.m.

301.0 Bituminous Prime Coat 71 ton

310.0 Bituminous Concrete Surface Course ( t = 5 cm ) 4,409 ton

SPL - 2 Pavement Marking Thermoplastic ( white & yellow ) 1,670 sq.m.

312.0 Top Soil & Sodding 10,500 sq.m.

Sub-Total

BOQ / Civil Works-Airside Page 17 of 70

Page 18: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

DEPARTMENT OF TRANSPORTATION AND COMMUNICATION

TOTAL

CONSTRUCTION COST

BILL OF QUANTITIES

BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT

Daraga, Albay

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

Part H Miscellaneous Structures

1.0Road Barrier L=4.0m complete with barrier arm, joint, kit lighting, short

column, external photocell, module display assembly2 sets

2.0Road Barrier L=5.0m (3sets), L=6.0m (1set) complete with barrier arm,

kit lighting, short column, external photocell, module display assembly4 sets

Sub-Total

Total - PERIMETER ROAD

3.2.3 PERIMETER DRAINAGE

Part C Earthworks

102.0 Excavation of Existing Ground and Disposal 72,930 cu.m.

104-A Embankment From Site Excavation 1,390 cu.m.

Sub-Total

PART G Drainage and Slope Protection Structures

500.0 1 - 900 mm Φ RCP Class "II" DPWH Standard 45 l.m.

2 - 900 mm Φ RCP Class "II" DPWH Standard 13 l.m.

2 - 1070 mm Φ RCP Class "II" DPWH Standard 27 l.m.

1- 1220 mm Φ RCP Class "II" DPWH Standard 7 l.m.

2 - 1220 mm Φ RCP Class "II" DPWH Standard 12 l.m.

3 - 1220 mm Φ RCP Class "II" DPWH Standard 45 l.m.

500 - A 1 - 900 mm Φ RCP Wingwall (1) 2 pc.

2 - 900 mm Φ RCP Wingwall (2) 2 pc.

2 - 1070 mm Φ RCP Wingwall (3) 2 pc.

1- 1220 mm Φ RCP Wingwall (4) 2 pc.

2 - 1220 mm Φ RCP Wingwall (5) 2 pc.

3 - 1220 mm Φ RCP Wingwall (6) 2 pc.

Sub-Total

Total - PERIMETER DRAINAGE

3.2.4 GROUTED RIPRAP

505.0 Grouted Riprap Class "A" 5,400 l.m.

Total - GROUTED RIPRAP

3.2.5 DETENTION POND

102.0 Excavation of Existing Ground and Disposal 91,500 cu.m.

500.0 3 - 1220 mm Φ RCP 23 l.m.

500-A 3 - 1220 mm Φ RCP Wingwall 8 pc.

500-B Pave waterway (Grouted Riprap Class A) 65 cu.m.

312.0 Top Soil and Sodding 11,445 sq.m.

Total - DETENTION POND

BOQ / Civil Works-Airside Page 18 of 70

Page 19: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

DEPARTMENT OF TRANSPORTATION AND COMMUNICATION

S U M M A R Y

3.1 PASSENGER TERMINAL BUILDING

DIV-02 SITE CONSTRUCTION 1 l.s.

DIV-03 CONCRETE WORKS 1 l.s.

DIV-04 MASONRY WORKS 1 l.s.

DIV-05 METAL WORKS 1 l.s.

DIV-06 WOOD AND PLASTIC 1 l.s.

DIV-07 THERMAL AND MOISTURE PROTECTION 1 l.s.

DIV-08 DOORS AND WINDOWS 1 l.s.

DIV-09 FINISHES 1 l.s.

DIV-10 SPECIALTIES 1 l.s.

DIV-12 FURNISHING 1 l.s.

DIV-15 MECHANICAL WORKS

15.1 Plumbing Works 1 l.s.

15.2Airconditioning & Ventilation, Fire Protection, Building Management

System including Testing and Commissioning1 l.s.

DIV-16 ELECTRICAL WORKS 1 l.s.

TOTAL COST -PASSENGER TERMINAL BUILDING

TOTAL

CONSTRUCTION COST

BILL OF QUANTITIES

BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT

Daraga, Albay

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

BOQ / Passenger Terminal Bldg. Page 19 of 70

Page 20: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

3.1 PASSENGER TERMINAL BUILDING

DIV-02 SITE CONSTRUCTION

2.0 SITE WORKS

2.1.1 Building Layout 7,295 sq.m.

2.1.2 Structure Excavation 9,271 cu.m.

2.1.3 Backfilling and filling

2.1.3.1 Backfill excavations with suitable excavated materials 6,987 cu.m.

2.1.3.2 Gravel base; 150 mm thk 2,164 cu.m.

2.1.4 Soil Disposal

2.1.4.1 Remove surplus excavated material from site 2,284 cu.m.

2.1.5 Subgrade Preparation 11,092 sq.m.

2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of

excavations23,085 sq.m.

Total "DIV-02" - SITE CONSTRUCTION

DIV-03 CONCRETE WORKS

3.1 Cast-In-Place Structural Concrete

3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa

3.1.1.1 Foundation, Wall Footing 1,188 cu.m.

3.1.1.2 Footing Tie Beam 667 cu.m.

3.1.1.3 Columns and Pedestal 685 cu.m.

3.1.1.4 Beams, Coping beams 739 cu.m.

3.1.1.5 Suspended Slab, ramp and canopy 1,065 cu.m.

3.1.1.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 31 cu.m.

3.1.1.7 Elevator and Escalator Pit 92 cu.m.

3.1.1.8 Stairs 80 cu.m.

3.1.1.9 Equipment Pad 11 cu.m.

3.1.1.10 Counter top 10 cu.m.

3.1.1.12Concrete bleachers at plant box (including top ledge and beam

support)6 cu.m.

3.1.2 Reinforced concrete; 3000 psi or 21 Mpa

3.1.2.1 Slab-on-grade /fill 1,788 cu.m.

3.1.3 Reinforced concrete; 2000 psi or 14 Mpa

3.1.3.1 Lean Concrete 8 cu.m.

3.2 Reinforcement in concrete

3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,

binders, and tie wires, etc; grade 60

3.2.1.1 Foundation, Wall Footing 182,612 kg.

3.2.1.2 Footing Tie Beam 186,082 kg.

3.2.1.3 Columns and Pedestal 122,730 kg.

3.2.1.4 Beams, Coping beams 211,775 kg.

3.2.1.5 Stiffeners columns, lintel and bond beam (Exterior Wall) 2,140 kg.

3.2.1.6 Stairs 7,761 kg.

3.2.1.7 Elevator and Escalator Pit 12,619 kg.

3.2.1.9 Suspended Slab, ramp and canopy 354 kg.

3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,

binders, and tie wires, etc; grade 40

3.2.2.1 Foundation, Wall Footing 1,684 kg.

3.2.2.2 Footing Tie Beam 27,627 kg.

3.2.2.3 Columns and Pedestal 73,773 kg.

3.2.2.4 Beams, Coping beams 32,473 kg.

3.2.2.5 Suspended Slab, ramps and canopy 205,145 kg.

3.2.2.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 2,502 kg.

3.2.2.7 Stairs 8,572 kg.

3.2.2.8 Equipment Pad 971 kg.

3.2.2.9 Counter top 1,878 kg.

3.2.2.10Concrete bleachers at plant box (including top ledge and beam

support)994 kg.

3.2.2.11 Slab on Grade 91,333 kg.

3.3 Formwork

3.3.1 Foundation, Wall Footing 1,387 sq.m.

3.3.2 Footing Tie Beam 3,590 sq.m.

3.3.3 Columns and Pedestal 3,477 sq.m.

3.3.4 Beams, Coping beams 4,486 sq.m.

3.3.5 Suspended Slab, ramps and canopy 8,272 sq.m.

3.3.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 337 sq.m.

3.3.7 Stairs 605 sq.m.

3.3.8 Elevator and Escalator Pit 273 sq.m.

3.3.9 Counter top 142 sq.m.

3.3.11Concrete bleachers at plant box (including top ledge and beam

support)101 sq.m.

3.3.12 Slab on Grade /fill 376 sq.m.

3.3.13 Equipment Pad 18 sq.m.

3.4 Concrete Accessories

BOQ / Passenger Terminal Bldg. Page 20 of 70

Page 21: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

3.4.1 Expansion joint with sealant; pre-formed type

3.4.1.1 At Slab-on-grade 2,067 l.m.

3.4.2 PVC Waterstop 88 l.m.

3.4.3 Non-shrink cement grout 3 cu.m.

Total "DIV-03" - CONCRETE WORKS

DIV-04 MASONRY WORKS

4.1 Accessories

4.1.1 Concrete Grout, 2000 psi 447 cu.m.

4.1.2Concrete lintel and bond beams inclusive of formworks and Steel

reinforcements, Grade 40 (For Interior Walls)108 cu.m.

4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 35,272 kg.

4.2 CHB

4.2.1 200mm thk (700 psi) 448 sq.m.

4.2.2 150mm thk (700 psi) - Interior Wall 3,136 sq.m.

4.2.3 100mm thk (350 psi / 2.5 N/mm2) 2,840 sq.m.

Total "DIV-04" - MASONRY WORKS

DIV-05 METAL WORKS

5.1

Main Roof Frame: Fabrication, delivery and erection of structural steel

roof framing, including girders, beams, purlins, batten supports, plates,

bolts, stiffeners, sagrods, cross bracings with turn buckles, paint and

other incidentals to complete

717,833 kg.

5.2Fabrication, delivery and erection of structural steel with bolts & nuts,

plates and all other incidentals to complete

5.2.1 Second Floor Frame (girders, beams) 416,003 kg.

5.2.2 Roof Canopy at @ 2nd Floor Level 90,722 kg.

5.2.3 Second Floor Lower Ceiling Frame 73,881 kg.

5.2.4 Steel Column 392,919 kg.

5.2.5 Welcome Pylon Signage 44,048 kg.

5.2.6 Skylight Roof framing 77,295 kg.

5.5

Boarding Bridge: Fabrication, delivery and erection of structural steel

members including girders, beams, joist, columns, plates, bolts, purlins

and all other incidentals to complete

101,881 kg.

5.6

Ramp: Fabrication, delivery and erection of structural steel members

including beams, joist, columns, plates, bolts and all other incidentals to

complete

44,582 kg.

5.71.20mm thick Galvanized Steel Deck inclusive of bended materials and

all incidental to complete.468 sq.m.

5.8 Steel Railings

5.8.1

40mm dia. Stainless steel horizontal pipe with 40mm dia. vertical and

horizontal members including all incidentals to complete (supply and

install) @ Access Ramp

36 l.m.

5.8.2

50mm dia. Stainless steel tube/handrail, with grab rail bracket and 12mm

thick tempered clear glass including all incidentals to complete (supply

and install) H=1.20m

165 l.m.

5.8.3Stair Steel Railing; 50mm dia. G.I. pipe handrail and post with 38mm dia.

Subrail including all incidentals to complete 69 l.m.

5.8.450mm dia. Stainless steel guard rail pipe including all incidentals to

complete (supply and install)1,117 l.m.

5.8.5

38mm dia. G.I. pipe, vertical and horizontal members with 25 x 6mm flat

bar subrail including paint and all incidentals to complete (supply and

install)

298 l.m.

5.8.6

50mm dia. G.I. pipe handrail, 32mm dia. Vertical pipe and 25mm dia.

subrail including paint and all incidentals to complete (supply and install)

H=1.10m at Welcome Pylon

43 l.m.

5.925 x 25mm tubular frame column accent including paint and all incidentals

to complete ; at check-in counter130 kg.

5.10 Miscellaneous Metals

5.10.1Steel Trellis: Fabrication, delivery and erection of structural steel with

bolts & nuts, plates and all other incidentals to complete

5.10.1.1 At check-in counter 3,819 kg.

5.10.1.2 At center lounge area 370 kg.

5.10.1.3 At 2F lounge area 24,421 kg.

5.10.2 Artificial plant hanger at 2F interior beam ; 12 sets 13,118 kg.

BOQ / Passenger Terminal Bldg. Page 21 of 70

Page 22: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

5.10.3Ladder rung with cover including bolts, plates, paint and all incidentals to

complete at Pylon

5.10.3.1 Ladder Rung ; W=0.40m, H=13.40m, (Riser @ 0.3m c-c) 2 set

Total "DIV-05" - METAL WORKS

DIV-06 WOOD AND PLASTIC

6.1 Finish Carpentry

6.1.125mm thk. Wood plank for artificial plants, painted finish including all

incidentals to complete

6.1.1.1 W = 125mm ; at check-in counter trellis 45 l.m.

6.1.1.2 W = 150mm ; at check-in lounge area 229 l.m.

6.1.1.3 W = 300mm ; at interior column 8 l.m.

6.1.2 50 x 100mm solid wood trellis, painted finish 224 l.m.

6.2 Custom Cabinets

6.2.1

Counter base cabinet (at toilet partition); comprising :12mm thk. Marine

Plywood cabinet doors and shelves in wood frame including painting,

hardware and all other incidentals to complete (L=2500mm ; W=600mm ;

H = 1200mm)

3 set

6.2.2

Immigration Counter; comprising : 20mm thk. Plyboard counter, desk and

wall including formica laminates, swing door, hardware and all other

incidentals to complete (L = 2400mm ; W = 1900mm ; H = 1200mm) ;

glass door on separate item

5 set

6.3 31mm dia. Rattan pole accent (at interior column) 565 l.m.

Total "DIV-06" - WOOD AND PLASTIC

DIV-07 THERMAL AND MOISTURE PROTECTION

7.1 Dampproofing and Waterproofing

7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 10,724 sq.m.

7.1.2 Waterproofing

7.1.2.1 Polyurethane based liquid applied waterproofing

7.1.2.1.1 25 mils for Canopy and Gutter 400 sq.m.

7.1.2.1.2 32 mils for Suspended Slab deck 1,876 sq.m.

7.1.2.1.3 40 mils for Toilet 428 sq.m.

7.1.2.2 Elastomeric waterproofing at elevator and escalator pits 218 sq.m.

7.3 Insulation

7.3.1 P.E. foam insulation for Roof 9,360 sq.m.

7.3.2

Roof Insulation - 50mm thk Mineral Wool Insulation with two sided

aluminum including chicken wire support and other consumable

accessories to complete

266 sq.m.

7.3.3Wall Insulation - 100mm thk Mineral Wool Insulation and other

consumable accessories to complete352 sq.m.

7.4 Roofing and Accessories

7.4.1Pre-painted horizontal roof sheet including bended materials, metal

capping and all incidentals to complete

7.4.1.1 To Main Roof 7,874 sq.m.

7.4.1.2 2nd Level Canopy 1,752 sq.m.

7.4.26mm thk. Polycarbonate skylight inclusive of all bended materials and

incidentals to complete

7.4.2.1 To Main Roof 1,776 sq.m.

Total "DIV-07"-THERMAL AND MOISTURE PROTECTION

DIV-08 DOORS AND WINDOWS

8.1 WINDOWS & CURTAINWALL

8.1.16mm thk. Tinted tempered glass on aluminum powder coated frame, fixed

window including all incidentals to complete

8.1.1.1 W1 ; 4844 x 3600mm 2 set

8.1.1.2 W2 ; 4856 x 3600mm 2 set

8.1.1.3 W3 ; 8700 x 3600mm 11 set

8.1.1.4 W4 ; 7988 x 3600mm 1 set

8.1.1.5 W5 ; 7517 x 3600mm 1 set

8.1.1.6 W6 ; 3017 x 3600mm 1 set

8.1.1.7 W7 ; 3488 x 3600mm 1 set

8.1.212mm thk. Clear tempered frameless glass panels including all incidentals

to complete

8.1.2.1 GP1 ; 8100 x 3600mm 14 set

8.1.2.2 GP1a ; 8150 x 3600mm 1 set

8.1.2.3 GP2 ; 3225 x 3600mm 1 set

8.1.2.4 GP3 ; 6750 x 3600mm 1 set

8.1.2.5 GP4 ; 6238 x 3600mm 1 set

8.1.2.6 GP5 ; 3275 x 3600mm 2 set

8.1.2.7 GP6 ; 17544 x 3600mm 2 set

8.1.2.8 GP7 ; 5268 x 3600mm 1 set

BOQ / Passenger Terminal Bldg. Page 22 of 70

Page 23: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

8.1.2.9 GP8 ; 5592 x 3600mm 2 set

8.1.2.10 GP10 ; 3752 x 3600mm 1 set

8.1.2.11 GP11 ; 1520 x 3600mm 1 set

8.1.2.12 GP12 ; 6471 x 3600mm 1 set

8.1.2.13 GP13 ; 12778 x 3600mm 1 set

8.1.2.14 GP14 ; 8300 x 3600mm 8 set

8.1.2.15 GP15 ; 8579 x 3600mm 5 set

8.1.2.16 GP16 ; 8200 x 3600mm 5 set

8.1.2.17 GP17 ; 8439 x 3600mm 3 set

8.1.2.18 GP18 ; 17000 x 3600mm 3 set

8.1.2.19 GP19 ; 383 x 3600mm 2 set

8.1.312mm thk. Clear tempered frameless accordion glass panels including all

incidentals to complete

8.1.3.1 GP9 ; 17200 x 3600mm 3 set

8.1.412mm thk. Clear tempered frameless glass partitions with door openings

including all incidentals to complete

8.1.4.1GP at D1 ; 5980 x 3600mm (8100 less 2120 ; double leaf sliding door

on separate item)8 set

8.1.4.2GP at D2 ; 6270/6320/6130 x 3600mm (8390/8440/8250 less 2120 ;

double leaf sliding door on separate item)3 set

8.1.4.3GP at D3 ; 6180 x 3600mm (8300 less 2120 ; double leaf sliding door

on separate item)3 set

8.1.4.4GP at D4 ; 7040 x 3600mm (8100 less 1060 ; single leaf swing door on

separate item)2 set

8.1.4.5GP at D5 ; 7379 x 3600mm (8439 less 1060 ; single leaf swing door on

separate item)1 set

8.1.4.6GP at D6 ; 4293 x 3600mm (5353 less 1060 ; single leaf swing door on

separate item)2 set

8.1.4.7GP at D15 ; 1945 x 3600mm (3005 less 1060 ; single leaf swing door

on separate item)2 set

8.1.4.8GP at D16; 11324 x 3600mm (13444 less 2120 ; double leaf sliding

door on separate item)2 set

8.1.4.9GP at D17 ; 16040 x 3600mm (17100 less 1060 ; single leaf swing

door on separate item)1 set

8.1.4.10GP at D18 ; 2465 x 3600mm (3525 less 1060 ; single leaf swing door

on separate item)1 set

8.1.4.11GP at D19 ; 7240 x 3600mm (8300 less 1060 ; single leaf swing door

on separate item)1 set

8.1.4.12GP at D20 ; 7584 x 3600mm (8644 less 1060 ; single leaf swing door

on separate item)1 set

8.1.4.13GP at D21 ; 14384 x 3600mm (15444 less 1060 ; single leaf swing

door on separate item)1 set

8.1.4.14GP at D22 ; 10635 x 3600mm (14875 less 2x2120 ; double leaf swing

door on separate item)1 set

8.1.4.15GP at D23 ; 5515 x 3600mm (6575 less 1060 ; single leaf swing door

on separate item)1 set

8.1.4.16GP at D24 ; 7140 x 3600mm (8200 less 1060 ; single leaf swing door

on separate item)1 set

8.1.4.17GP at D25 ; 565 x 3600mm (1625 less 1060 ; single leaf swing door on

separate item)2 set

8.1.4.18 GP at D26 ; 2-383 x 3600mm (sliding door on separate item) 1 set

8.1.56mm thk. Tinted tempered glass on aluminum powder coated frame, fixed

and awning window including all incidentals to complete

8.1.5.1 W1 ; 4500 x 2150mm 36 set

8.1.66mm thk. Tempered clear glass on aluminum powder coated frame (sides

& bottom) L=8.60m, H=0.60m at immigration booth5 set

Sub-total "8.1" - WINDOWS

8.2 DOORS AND PANELS

8.2.1 Glass Door

8.2.1.1 12mm thk. Tempered Sliding Glass Door

8.2.1.1.1D-1,2,3,16; 2120 x 3600mm (Automatic double panel; excluding

automatic mechanism)16 set

8.2.1.1.2 D-26; 1000 x 3000mm (Manual single panel) 1 set

8.2.1.212mm thk tempered frameless swing glass door, single leaf including

stainless steel door locks, floor hinges and other incidentals to complete

8.2.1.2.1 D-4, 5,6, 15, 17-21, 23-25; 1060 x 3600mm 15 set

8.2.1.2.2 I.O. Counter ; 600 x 1800mm, including 38mm dia x 170mm handle 5 set

8.2.1.312mm thk tempered frameless swing glass door, double leaf including

stainless steel door locks, floor hinges and other incidentals to complete

8.2.1.3.1 D-22 ; 2120 x 3600mm 2 set

8.2.1.46mm thk. Tinted glass on aluminum analok frame with aluminum encased

grilles ; swing type

8.2.1.4.1 Check-in counter ; 800 x 1200mm 10 set

BOQ / Passenger Terminal Bldg. Page 23 of 70

Page 24: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

8.2.2 Steel Door

8.2.2.1Single leaf swing metal door including door jamb and all incidentals to

complete painted finish (1hr fire rated)

8.2.2.1.1 D-7 ; 1200 x 2450mm 10 set

8.2.2.1.2 D-1 ; 900 x 2100mm 2 set

8.2.2.2Double leaf swing flush metal door with half louver including door jamb

and all incidentals to complete, painted finish

8.2.2.2.1 D-8 ; 2000 x 2400mm 5 set

8.2.2.3Single leaf swing flush metal door with bottom louver including door jamb

and all incidentals to complete, painted finish

8.2.2.3.1 D-9,10,14 ; 1000 x 2400mm 38 set

8.2.2.4Single leaf swing hollow core metal door including door jamb and all

incidentals to complete painted finish

8.2.2.4.1 D-11 ; 1000 x 2400mm (Dakota type) 8 set

8.2.2.4.2 D-12 ; 1000 x 2400mm (Lucas type) 32 set

8.2.2.5Double leaf swing hollow core metal door including door jamb and all

incidentals to complete painted finish

8.2.2.5.1 D-13 ; 2000 x 2400mm (Lucas type) 1 set

Sub-total "8.2" - DOORS AND PANELS

8.3 HARDWARES

8.3.1 Lockset

8.3.1.1 Automatic Door Mechanism 16 set

8.3.1.2 Cylindrical lever type lockset 84 set

8.3.1.3Panic device type 3 function 11 (with lever, key locks or unlocks control

lever)12 set

8.3.2 Closer

8.3.2.1 Surface Mounted Door Closer 102 set

8.3.3 Hinges

8.3.3.1 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 408 pair

8.3.4 Door Accessories

8.3.4.1 Push & pull bars 19 set

8.3.4.2 Dummy lever handle 6 set

8.3.4.3 Push and Pull plate 5 set

8.3.4.4 Flushbolt (top and bottom of inactive door leaf) 6 set

8.3.4.5 Threshold

8.3.4.5.1 Panic threshold 12 set

8.3.4.5.2 Aluminum threshold 57 l.m.

8.3.4.5.3 At 150mm thk masonry wall 52 l.m.

8.3.4.5.4 At 200mm thk masonry wall 51 l.m.

Sub-total "8.3" - HARDWARES

Total "DIV-08" - DOORS AND WINDOWS

DIV-09 FINISHES

9.1 FLOOR FINISHES

9.1.1 Plain cement concrete steel trowel finish 376 sq.m.

9.1.2 Plain cement concrete steel trowel finish (to receive vinyl flooring) 1,182 sq.m.

9.1.3 300 x 300 x 3 mm thk Homogeneous Vinyl Floor Tiles, including tile

adhesive and other incidentals to complete1,182 sq.m.

9.1.4 Mortar Topping 50mm thk. (for waterproofed deck) 1,750 sq.m.

9.1.5 Mortar Topping 25mm thk. (for toilet and AHU) 596 sq.m.

9.1.6 Wiremesh 6mm dia.x100x100mm openings (for Mortar Topping 50mm) 1,750 sq.m.

9.1.7 Raised floor system 21 sq.m.

9.1.8300 x 300 Rubber tiles, including adhesive and other incidentals to

complete232 sq.m.

9.1.9 600 x 600mm polished granite tiles, including mortar bed and other

incidentals to complete10,704 sq.m.

9.1.10 600 x 298mm polished granite tiles, including mortar bed and other

incidentals to complete93 sq.m.

9.1.11 600 x 198mm polished granite tiles, including mortar bed and other

incidentals to complete56 sq.m.

9.1.12 300 x 300mm Paver tiles, including bed and other incidentals to complete 3,672 sq.m.

9.1.13 300 x 300mm unglazed ceramic tiles, including mortar bed and other

incidentals to complete1,724 sq.m.

9.1.14 300 x 300mm unglazed ceramic tiles, including mortar bed and other

incidentals to complete at Toilet468 sq.m.

9.1.15 300 x 300mm unglazed ceramic tiles with non skid nosing, including

mortar bed and other incidentals to complete at Stair107 sq.m.

9.1.16 200 x 200mm ceramic tiles, including mortar bed and other incidentals to

complete7 sq.m.

9.1.17 Abrasive strip nosing 229 l.m.

9.1.18 Rubber mat including adhesive and other incidentals to complete 180 sq.m.

BOQ / Passenger Terminal Bldg. Page 24 of 70

Page 25: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

9.1.19 Plain cement floor finish (to receive rubber tiles and rubber mat) 412 sq.m.

Sub-total "9.1" - FLOOR FINISHES

9.2 WALL FINISHES

9.2.1 Plain cement plaster wall Painted Finish 10,019 sq.m.

9.2.2200 x 200mm ceramic tiles, including mortar bed and other incidentals to

complete8 sq.m.

9.2.3 Natural Stone cladding (Ledge stone) 317 sq.m.

9.2.4Digital printing ceramic board at toilets including mortar bed and other

incidentals to complete85 sq.m.

9.2.5Ceramic art of various airline logos ; 2700 x 1800mm at check-in counters

including mortar bed and other incidentals to complete8 set

9.2.6 300 x 300mm Glazed ceramic wall tiles (including mortar bed) 1,314 sq.m.

9.2.7 3.5mm Ficem board (on both sides) on metal framing system 377 sq.m.

9.2.9 Abuse resistant veneer plaster for painted finish 299 sq.m.

9.2.10600 x 600mm polished granite tiles, including mortar bed and other

incidentals to complete351 sq.m.

9.2.113.5mm Ficem board dropwall (on both sides) on metal framing system,

above exterior glass panels741 sq.m.

9.2.123.5mm Ficem board wall backing (single face) at rear pylon; structural

steel frame on separate item183 sq.m.

9.2.13Ecumenical Chapel wall, 3 layers (letterings on separate item) ; 3.5mm

ficem board on metal studs1 set

9.2.14

Accent wall of airlines at check-in counters ; 3.5mm ficem board on metal

studs (airline logos on separate item) ; 3700 x 3600mm ; 75mm & 100mm

thk.

8 set

Sub-total "9.2" - WALL FINISHES

9.3 CEILING FINISHES

9.3.1 3.5mm Ficem board on metal frame 2,047 sq.m.

9.3.2 3.5mm Ficem board secondary cover at lower 2nd floor ceiling 1,281 sq.m.

9.3.3 12mm thk. Moisture Resistant Gypsum Board on metal frame 644 sq.m.

9.3.4 Exposed Construction Painted Finish 910 sq.m.

9.3.5 Metal spandrel ceiling 5,639 sq.m.

9.3.6 600 x 600mm Acoustic board on powder coated T-runner frame 786 sq.m.

9.3.7 600 x 600mm Metal ceiling on powder coated T-runner frame 9,355 sq.m.

9.3.8Ceiling cove light housing; 12mm thick Gypsum board including framing

and all incidentals to complete339 sq.m.

9.3.9Ceiling cove light housing; 6mm ficem board including framing and all

incidentals to complete120 sq.m.

Sub-total "9.3" - CEILING FINISHES

9.4 BASE BOARD FINISHES

9.4.1 100mm high painted base 290 l.m.

9.4.2 PVC Baseboard, 100mm high 924 l.m.

9.4.5 Stainless steel Baseboard, 150mm high 24 l.m.

9.4.6 Stainless steel Baseboard, 300mm high 43 l.m.

9.4.7 100mm high epoxy paint 267 l.m.

Sub-total "9.4" - BASE BOARD FINISHES

9.5 PAINTING WORKS

9.5.1 At Floor

9.5.1.1 Epoxy floor system with hardener 489 sq.m.

9.5.2 At Wall

9.5.2.1 Painting on concrete surfaces, textured paint finish (exterior) 1,793 sq.m.

9.5.2.2 Painting on concrete surfaces, smooth paint finish (interior) 8,415 sq.m.

9.5.2.3 Painting on ficem board surfaces 905 sq.m.

9.5.3 At Ceiling

9.5.3.1 Semi-gloss paint finish 910 sq.m.

9.5.3.2 Painting on Fiber cement board surfaces 2,191 sq.m.

9.5.3.3 Painting on Gypsum board surfaces 1,139 sq.m.

9.5.4Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy

Paint1,379 sq.m.

9.5.5 Painting on wood doors 223 sq.m.

Sub-total "9.5" - PAINTING WORKS

Total "DIV-09" - FINISHES

DIV-10 SPECIALTIES

10.1 Countertops

10.1.1 Granite Countertop W=600mm 122 sq.m.

10.26mm thick Facial mirror on 6mm thick marine plywood backing inclusive

all incidentals to complete

10.2.1 600 x 1000mm 3 set

10.2.2 650 x 1000mm 9 set

10.2.3 1100 x 1000mm 1 set

10.2.4 1550 x 1000mm 4 set

10.2.6 2100 x 1000mm 3 set

BOQ / Passenger Terminal Bldg. Page 25 of 70

Page 26: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

10.2.7 2180 x 1000mm 1 set

10.2.8 2195 x 1000mm 1 set

10.2.9 2200 x 1000mm 1 set

10.2.10 2355 x 1000mm 2 set

10.2.11 2955 x 1000mm 2 set

10.2.12 3175 x 1000mm 2 set

10.2.13 3880 x 1000mm 2 set

10.2.14 4140 x 1000mm 4 set

10.2.15 4350 x 1000mm 6 set

10.2.16 4750 x 1000mm 2 set

10.2.17 900 x 1800mm 2 set

10.2.18 1295 x 1800mm 2 set

10.2.19 1320 x 1800mm 1 set

10.2.20 1655 x 1800mm 1 set

10.2.21 2845 x 1800mm 4 set

10.3 Stainless Steel Grab bar at PWD Toilet 10 set

10.4

Toilet compartments/cubicles - comprising 12mm thk intermediate panels,

doors, and partitions/compartments (compact laminated phenolic board)

including all hardwares and accessories in nylon finish and all other

incidentals to complete

248 sq.m.

10.5 Phenolic Urinal Partition 400 x 1400mm 12 set

10.6 Plumbing Fixtures Accessories

10.6.1 Soap Holder 4 set

10.6.2 Paper Holder, wall mounted 72 set

10.6.3 Deck Type Liquid Soap Dispenser 79 set

10.6.4 Wall mounted baby changing station (folding) 5 set

10.7Modular Partition, inclusive of swing door and all other incidentals to

complete; at travel tax & ticket sales counters5 sq.m.

10.8Aluminum Composite Panel, inclusive of metal frame, sealant and all

incidentals to complete

10.8.1 Exterior and Interior Column 1,703 sq.m.

10.8.2 Roof Eaves 4,004 sq.m.

10.8.3 Exposed Beam at 2F Lower Ceiling 669 sq.m.

10.8.4 Exposed Beam at 2F Main Ceiling 2,438 sq.m.

10.8.5 Cylindrical Plant box 50 sq.m.

10.8.6 Welcome pylon signage 240 sq.m.

10.9 Roller Blinds 1,777 sq.m.

10.10

900mm dia x H =200mm clay pot with 3.5mm thk Fiber board wall on

steel angle frame including embedded plates, anchor bolts, paint and all

incidentals to complete

30 sq.m.

10.11 Signages including fixing material, frame and all incidentals to complete

10.11.1 Item 1 - ( ENT ) Entrance - Flush Wall mounted 2 set

10.11.2 Item 2 - ( TS ) Ticket Sales Office - Pendant mounted illuminated 1 set

10.11.3 Item 3 - ( TBC ) Ticket Baggage Check - Pendant mounted illuminated 1 set

10.11.4 Item 4 - ( TO ) Ticket Office - Pendant mounted illuminated 2 set

10.11.5Item 5 - ( BSC ) Baggage Security Check - Pendant mounted

illuminated4 set

10.11.6 Item 6 - ( IM ) Immigration - Pendant mounted 3 set

10.11.7Item 7 - ( INT'L ) International Pre-departure Lounge Area - Pendant

mounted2 set

10.11.8Item 8 - ( DOM ) Domestic Pre-departure Lounge Area - Pendant

mounted illuminated3 set

10.11.9Item 9 - ( G1, G2 ) G1, G2 Boarding Gates (International) - Pendant

mounted illuminated2 set

10.11.10Item 10 - ( G3 ) G3 Arrival Gate (International) - Pendant mounted

illuminated1 set

10.11.11Item 11 - ( G4, G5 ) G4, G5 Boarding Gates (Domestic) - Pendant

mounted illuminated2 set

10.11.12Item 12 - ( DEP ) Departure - Pendant mounted with pictogram of

airplane illuminated3 set

10.11.13Item 13 - ( AR ) Arrivals - Pendant mounted w/ pictogram of airplane

illuminated5 set

10.11.14Item 14 - ( BC (D) ) Baggage Claim (Domestic) - Pendant mounted

illuminated2 set

10.11.15Item 15 - ( BC (I) ) Baggage Claim (International) - Pendant mounted

illuminated3 set

10.11.16Item 16 - ( EL ) Elevator - Pendant mounted & flag mounted w/

pictogram7 set

BOQ / Passenger Terminal Bldg. Page 26 of 70

Page 27: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

10.11.17Item 17 - ( ESC ) Escalator - Pendant flag mounted with pictogram of

escalator1 set

10.11.18Item 18 - ( SW ) Stairway - Flag mounted with pictogram of stair &

pendant mounted illuminated2 set

10.11.19Item 19 - ( FE ) Fire Exit - Flush wall mounted & flag mounted with

pictogram16 set

10.11.20Item 20 - ( T1 ) Restrooms - Pendant mounted w/ pictogram of

international symbol of man, woman & handicapped accessibility11 set

10.11.21Item 21 - ( T2 ) Female Toilet - Flush wall mounted with pictogram of

international symbol of woman10 set

10.11.22Item 22 - ( T3 ) Male Toilet - Flush wall mounted with pictogram of

international symbol of man10 set

10.11.23Item 23 - ( T4 ) PWD Toilet - Flush wall mounted with pictogram of

international symbol of handicapped accessibility5 set

10.11.24 Item 24 - ( PA ) Powder Area - Flag mounted with pictogram 5 set

10.11.25 Item 25 - ( DCA ) Diaper Changing Area - Flag mounted with pictogram 5 set

10.11.26 Item 26 - ( RN ) Room Name - Flush wall mounted 28 set

10.11.27 Item 27 - ( APO ) Authorized Personnel Only - Flush wall mounted 14 set

10.11.28 Item 28 - ( DS ) Danger Sign - Flush wall mounted 6 set

10.11.29Item 29 - ( CS ) Concessionaire - Flush wall mounted & pendant

mounted with pictogram5 set

10.11.30Item 30 - ( TB ) Telephone Booth - Flag mounted with pictogram &

pendant mounted illuminated8 set

10.11.31Item 31 - ( ATM ) Automated Teller Machine - Flag mounted with

pictogram2 set

10.11.32Item 32 - ( LA ) Lounge Area - Flush wall mounted & pendant mounted

illuminated6 set

10.11.33 Item 33 - ( VIP ) VIP Lounge - Flush wall mounted 1 set

10.11.34Item 34 - ( CBC ) Customs Baggage Check - Pendant mounted

illuminated2 set

10.11.35 Item 35 - ( TRY ) Trolley - Flag mounted with pictogram 5 set

10.11.36Item 36 - ( IC ) Information Counter - Pendant mounted & flag mounted

with pictogram6 set

10.11.37 Item 37 - ( EXT ) Exit - Flush wall mounted 5 set

10.11.38 Item 38 - ( DFS ) Duty Free Shop - Pendant mounted illuminated 1 set

10.11.39 Item 39 - ( EC ) Ecumenical Chapel - Flush wall mounted 1 set

10.11.40

BICOL INTERNATIONAL AIRPORT MABUHAY WELCOME Signage;

900 x 1800 Ceramic board art; W=17.50m, H=4.20m at rear pylon,

including mortar bed/adhesive and other incidentals to complete

1 set

10.12Door signs (metal plate) including fixing material and all incidentals to

complete

10.12.1 Ladies 10 set

10.12.2 Gentlemen 10 set

10.12.3 PWD 5 set

10.12.4 Common Toilet 3 set

10.12.5 Janitor's closet 5 set

10.13Stainless steel finish wall letterings at ecumenical chapel including fixing

materials, backing, and all incidentals to complete

10.13.1 "BE STILL and KNOW THAT I AM GOD… -PSALM 46:10" 1 set

10.13.2"PAY A VISIT TO THE ECUMENICAL CHAPEL for a SAFE

JOURNEY…"1 set

10.14

Mabuhay Entrance signage pylon ; inclusive of log cabins frame, stainless

steel signage, ceramic board art of perspective plan, paint, fixing

materials, mortar bed/adhesive and all other incidentals to complete (see

Landscaping)

1 set

10.15

Welcome Entrance signage pylon ; inclusive of log cabins frame, stainless

steel signage, ceramic board art of site development plan, paint, fixing

materials mortar bed/adhesive and all other incidentals to complete (see

Landscaping)

1 set

Total "DIV-10" - SPECIALTIES

DIV-12 FURNISHING

12.1 Public Furniture

12.1.1 Information Counter at Arrival Area (W=1m x L=3.5m) 2 set

12.1.2 Ticket Sales Counter (W=0.80m x L=7.20m) 1 set

12.1.3 Information /Assistance Desk (W=0.80m x L=4.80m) 1 set

12.1.4 Custom counter 2 set

12.1.5Ticket /Baggage check-in counters ; 3.5mm thk. Ficem board on metal

stud including paint and all incidentals to complete (see detail drawing)10 set

12.1.6 Boarding Gate Counter (W=0.85m x L=1.20m) 4 set

12.1.7 Lounge Seats ; 4 attached chairs 84 set

BOQ / Passenger Terminal Bldg. Page 27 of 70

Page 28: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

12.1.8 Lounge Seats ; 6 attached chairs 8 set

12.1.9 Lounge Seats ; 8 attached chairs 181 set

12.1.10 Lounge Center Table ; 300 x 600mm 20 set

12.1.12 Lounge Center Table ; 800 x 1500mm 2 set

12.1.13 High chair with footring at Information /Taxi Counter 4 set

12.1.14 High chair with footring at Customs counter 4 set

12.1.15 High chair with footring at Information /Assistance Desk 2 set

12.1.16 High chair with footring at Check-in counters 20 set

12.1.17 High chair with footring at Boarding gates 8 set

12.1.18 Office chair at Immigration booth 10 set

12.1.19 Waiting chair at ticket sales 4 set

12.1.20 Office chair at Ticket sales 4 set

Total "DIV-10" - SPECIALTIES

BOQ / Passenger Terminal Bldg. Page 28 of 70

Page 29: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

DIV-15 MECHANICAL WORKS

15.1 PLUMBING WORKS

15.1.1 PLUMBING FIXTURES

1Water closet elongated including seat and cover with flush valve fitting

complete with standard accessories14 set

2

Water closet elongated including seat and cover with exposed sensor

type flushmeter DC type power supply complete with standard

accessories

58 set

3Urinal wall-hung with flush valve fitting complete with standard

accessories3 set

4Urinal wall-hung with exposed sensor type flushmeter DC type power

supply complete with standard accessories17 set

5Under-the-counter-lavatory complete with single lever faucet, angle valve,

flexible hose, p-trap, drains and standard accessories7 set

6

Under-the-counter-lavatory complete with sensor faucet DC type power

supply, angle valve, flexible hose, p-trap, drains complete with standard

accessories

69 set

7Wall hung lavatory complete with faucet, angle valve, flexible hose, p-

trap, drains complete with standard accessories7 set

8

Wall hung lavatory complete with sensor faucet DC type power supply,

angle valve, flexible hose, p-trap, drains complete with standard

accessories

17 set

9 Shower set with valve and bath fittings 4 set

Sub-Total

15.1.2 DOMESTIC WATER PIPING

15.1.2.1

Polypropylene Pipe (PPR PN 20), including couplings, hangers, brackets,

clamps, u-bolts, supports, sleeves, paintings and other consumable

materials to complete as specified in Mechanical Drawings and Technical

Specifications.

1 100mm dia PPR Pipe 25 l.m.

2 75mm dia PPR Pipe 290 l.m.

3 65mm dia PPR Pipe 196 l.m.

4 50 mm dia PPR Pipe 255 l.m.

5 40 mm dia PPR Pipe 177 l.m.

6 32 mm dia PPR Pipe 209 l.m.

7 25 mm dia PPR Pipe 207 l.m.

8 20 mm dia PPR Pipe 296 l.m.

9 15 mm dia PPR Pipe 125 l.m.

15.1.2.2

Polypropylene Pipe Fittings (PPR PN 20), including paintings,

miscellaneous supports, consumable materials and other accessories to

complete

15.1.2.2.1 PPR Tee

1 100mm dia, PPR Tee 1 ea.

2 75 mm dia, PPR Tee 6 ea.

3 75 x 65 mm dia, PPR Tee 3 ea.

4 75 x 50 mm dia, PPR Tee 1 ea.

5 75 x 20 mm dia, PPR Tee 2 ea.

6 65 mm dia, PPR Tee 3 ea.

7 65 x 50 mm dia PPR Tee 11 ea.

8 65 x 40 mm dia, PPR Tee 2 ea.

9 65 x 32 mm dia, PPR Tee 3 ea.

10 50 mm dia, PPR Tee 11 ea.

11 50 x 40 mm dia, PPR Tee 1 ea.

12 50 x 32 mm dia, PPR Tee 19 ea.

13 50 x 25 mm dia, PPR Tee 2 ea.

14 50 x 20 mm dia, PPR Tee 2 ea.

15 40 mm dia, PPR Tee 2 ea.

BOQ / Passenger Terminal Bldg. Page 29 of 70

Page 30: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

16 40 x 32 mm dia, PPR Tee 30 ea.

17 40 x 25 mm dia, PPR Tee 13 ea.

18 40 x 20 mm dia, PPR Tee 12 ea.

20 32 mm dia, PPR Tee 110 ea.

21 32 x 25 mm dia, PPR Tee 13 ea.

22 32 x 20 mm dia, PPR Tee 20 ea.

24 25 mm dia, PPR Tee 5 ea.

25 25 x 20 mm dia, PPR Tee 6 ea.

26 25 x 15 mm dia, PPR Tee 24 ea.

27 20 mm dia, PPR Tee 43 ea.

28 20 x 15 mm dia, PPR Tee 43 ea.

29 15 mm dia, PPR Tee 115 ea.

15.1.2.2.2 Reducer

1 100 x 65 mm dia, PPR Reducer 1 ea.

2 75 x 65 mm dia, PPR Reducer 2 ea.

3 75 x 50 mm dia, PPR Reducer 1 ea.

4 75 x 40 mm dia, PPR Reducer 1 ea.

5 75 x 32 mm dia, PPR Reducer 1 ea.

6 65 x 50 mm dia, PPR Reducer 1 ea.

7 65 x 40 mm dia, PPR Reducer 2 ea.

8 65 x 32 mm dia, PPR Reducer 1 ea.

9 50 x 40 mm dia, PPR Reducer 13 ea.

10 50 x 32 mm dia, PPR Reducer 3 ea.

11 50 x 20 mm dia, PPR Reducer 1 ea.

12 40 x 32 mm dia, PPR Reducer 24 ea.

13 40 x 20 mm dia, PPR Reducer 2 ea.

14 40 x 15 mm dia, PPR Reducer 2 ea.

15 32 x 25 mm dia, PPR Reducer 5 ea.

16 32 x 20 mm dia, PPR Reducer 98 ea.

17 32 x 15 mm dia, PPR Reducer 3 ea.

18 25 x 20 mm dia, PPR Reducer 28 ea.

19 20 x 15 mm dia, PPR Reducer 147 ea.

15.1.2.2.3 Adapter

1 Female adapter 15 mm dia. 131 ea.

2 Female adapter 20 mm dia. 56 ea.

3 Female adapter 25mm dia. 20 ea.

4 Female adapter 38 mm dia. 104 ea.

15.1.2.2.4 End Cap

1 25mm dia. 96 ea.

2 20mm dia. 115 ea.

15.1.2.2.5 90 deg. Bend

1 100 mm x 90 deg. PPR Bend 1 ea.

2 75 mm x 90 deg. PPR Bend 5 ea.

3 65 mm x 90 deg. PPR Bend 2 ea.

4 50 mm x 90 deg. PPR Bend 37 ea.

5 40 mm x 90 deg. PPR Bend 29 ea.

6 32 mm x 90 deg. PPR Bend 43 ea.

7 25 mm x 90 deg. PPR Bend 19 ea.

8 20 mm x 90 deg. PPR Bend 43 ea.

9 15 mm x 90 deg. PPR Bend 7 ea.

BOQ / Passenger Terminal Bldg. Page 30 of 70

Page 31: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

15.1.2.2.6 Hosebibb

1 20 mm dia (@ AHU Rooms) 4 ea.

2 15 mm dia ( Irrigation) 4 ea.

1 15 mm dia (Slop Sink Faucet) 5 ea.

15.1.2.2.7 Sleeve Type Coupling/ Union

2 100 mm dia, Sleeve Type Coupling 1 ea.

3 75 mm dia, Sleeve Type Coupling 2 ea.

4 65 mm dia, PPR Union 1 ea.

5 50 mm dia, PPR Union 15 ea.

6 40 mm dia, PPR Union 3 ea.

7 32 mm dia, PPR Union 7 ea.

8 25 mm dia, PPR Union 8 ea.

9 20 mm dia, PPR Union 23 ea.

15.1.2.2.8

Gates Valves and devices including grooves / flanges, gasket, bolts &

nuts, adaptors, tagging, sealant and all other necessary accessories to

complete the system

1 100 mm dia Gate Valve 1 ea.

2 75 mm dia Gate Valve 2 ea.

3 65 mm dia Gate Valve 1 ea.

4 50 mm dia Gate Valve 15 ea.

5 40mm dia Gate Valve 3 ea.

6 32mm dia Gate Valve 7 ea.

7 25mm dia Gate Valve 8 ea.

8 20 mm dia Gate Valve 23 ea.

15.1.2.2.9 Water Hammer Arrester

1 Type A 44 ea.

2 Type B 13 ea.

3 Type C 11 ea.

15.1.2.3NON-POTABLE WATER TANK AND BOOSTER STATION (piping,

fittings and miscellaneous items and valves)

15.1.2.3.1 G.I. Pipe and Fittings

1 150 mm dia 9 I.m.

2 100 mm dia 15 I.m.

3 75 mm dia 2 I.m.

4 50 mm dia 1 l.m.

15.1.2.3.2 Tee

1 150 mm dia, Tee 3 ea.

2 150 X 75 mm dia, Tee 2 ea.

3 150 X 50 mm dia, Tee 1 ea.

4 100 mm dia, Tee 1 ea.

5 100 X 75 mm dia, Tee 2 ea.

6 100 X 50 mm dia, Tee 1 ea.

15.1.2.3.3 90 deg. Bend

1 150 mm x 90 deg. Bend 2 ea.

2 100 mm x 90 deg. Bend 4 ea.

15.1.2.3.4 PVC Pipe and Fittings

1 300 mm dia uPVC Pipe 6 l.m

2 200 mm dia uPVC Pipe 57 l.m

15.1.2.3.5 90 deg. Bend

1 300 mm x 90 deg. Bend 2 ea.

2 200 mm x 90 deg. Bend 1 ea.

15.1.2.3.6 Reinforced Concrete Pipe, includes trenching, bedding, disposal, etc.

BOQ / Passenger Terminal Bldg. Page 31 of 70

Page 32: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

1 450 mm dia. RCP 34 l.m.

15.1.2.3.7 Valves and Accessories

1 100mm dia Float valve 2 ea.

2 100mm dia Equalizing Valve 1 ea.

3 150mm dia Gate Valve 4 ea.

4 100mm dia Gate Valve 4 ea.

5 75mm dia Gate Valve 4 ea.

6 50mm dia Gate Valve 2 ea.

7 100mm dia Check Valve 2 ea.

8 75mm dia Check Valve 2 ea.

9 50mm dia Check Valve 1 ea.

10 Water Level Indicator 2 set

11 Blind Flange, 150mm dia. 3 ea.

12 Blind Flange, 100mm dia. 1 ea.

13 Flange, 150mm dia. 36 ea.

14 Flange, 100mm dia. 53 ea.

15 Flexible connector 75 mm dia 2 ea.

16 Flexible connector 50 mm dia 1 ea.

17 Vortex Plate 150 mm dia 2 ea.

18 Pressure gauge 1 ea.

19 Air Relief valve 1 ea.

20 100mm dia. Flow Meter 1 ea.

21 Air Vent, 100 mm dia 2 ea.

15.1.2.3.9 Rain water Vortex Filter, 300mm dia 2 ea.

15.1.2.3.10 Drainage Check Valve, 200 mm dia 1 ea.

15.1.2.3.11 Trench Grating 400 x 1500, Cast Iron 1 ea.

15.1.2.3.12 Junction Box (675 x 675 x 1500 mm) 1 ea.

Sub – Total

15.1.3 SANITARY WASTE PIPING

15.1.3.1

Unplasticized Polyvinyl Chlorine (uPVC) Pipe conforming to ASTM D2729

Series 1000m including hangers and supports and other necessary

accessories to complete the system

1 150 mm dia Soil/Waste uPVC Pipe 193 I.m.

2 100 mm dia Soil/Waste uPVC Pipe 473 I.m.

3 75 mm dia Soil/Waste uPVC Pipe 330 I.m.

4 50 mm dia Waste uPVC Pipe 517 I.m.

15.1.3.2 uPVC Wye

1 150 uPVC Wye 6 ea.

2 150 x 100mm uPVC Wye 7 ea.

3 150 x 75mm uPVC Wye 2 ea.

4 150 x 50mm uPVC Wye 4 ea.

5 100 mm uPVC Wye 42 ea.

6 100 x 75 mm uPVC Wye 82 ea.

7 100 x 50 mm uPVC Wye 100 ea.

8 75 mm uPVC Wye 10 ea.

9 75 x 50 mm uPVC Wye 104 ea.

15.1.3.3 90 deg Bend

1 150 mm dia, 90 deg uPVC Bend 1 ea.

2 100 mm dia, 90 deg uPVC Bend 40 ea.

10.1 75 mm dia, 90 deg uPVC Bend 75 ea.

10.1 50 mm dia , 90 deg uPVC Bend 119 ea.

15.1.3.4 45 deg Bend

BOQ / Passenger Terminal Bldg. Page 32 of 70

Page 33: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

1 150mm dia., 45 deg uPVC Bend 13 ea.

2 100mm dia, 45 deg uPVC Bend 81 ea.

3 75 mm dia, 45 deg uPVC Bend 45 ea.

4 50 mm dia, 45 deg uPVC Bend 134 ea.

15.1.3.5 Reducer

1 150 x100 mm dia., uPVC Reducer 1 ea.

2 100 x 75 mm dia, uPVC Reducer 9 ea.

15.1.3.6 P- Trap

1 P- Trap, 100 mm dia 4 ea.

2 P- Trap, 75 mm dia 9 ea.

3 P- Trap, 50 mm dia 80 ea.

15.1.3.7 Sanitary Tee

1 50 mm dia, uPVC Santee 117 ea.

2 75 x 50 mm ø , uPVC Tee 70 ea.

3 50 mm ø , uPVC Tee 82 ea.

15.1.3.8 Clean Out

1 150 mm dia Floor Clean Out 5 ea.

2 100 mm dia Floor Clean Out 22 ea.

3 75 mm dia Floor Clean Out 11 ea.

4 50 mm dia Floor Clean Out 2 ea.

5 100 mm dia Ground Clean Out 4 ea.

6 100 mm dia Wall Clean Out 4 ea.

7 150 mm dia Wall Clean Out 1 ea.

Sub-Total

15.1.4 VENT PIPING

15.1.4.1

Unplasticized Polyvinyl Chlorine (uPVC) Pipe conforming to ASTM D2729

Series 1000, including hangers and supports and other necessary

accessories to complete the system

1 150 mm dia uPVC Pipe 6 I.m.

2 100 mm dia uPVC Pipe 300 I.m.

3 75 mm dia uPVC Pipe 106 I.m.

4 65 mm dia uPVC Pipe 51 I.m.

5 50 mm dia uPVC Pipe 1,110 I.m.

15.1.4.2 uPVC Tee

1 100 mm dia., uPVC Tee 6 ea.

2 100 x 75 mm dia , uPVC Tee 10 ea.

3 100 x 50 mm dia, uPVC Tee 30 ea.

4 75 mm dia, uPVC Tee 16 ea.

5 75 x 50 mm dia, uPVC Tee 161 ea.

7 50 mm dia, uPVC Tee 77 ea.

15.1.4.3 90 deg uPVC Bend

1 100 mm dia., 90 deg uPVC Bend 18 ea.

2 75 mm dia., 90 deg uPVC Bend 5 ea.

4 50 mm dia, 90 deg uPVC Bend 163 ea.

15.1.4.4 uPVC Reducer

1 150 x 100 mm dia, uPVC Reducer 2 ea.

2 100 x 75 mm dia, uPVC Reducer 12 ea.

3 100 x 50 mm dia, uPVC Reducer 3 ea.

5 75 x 50 mm dia, uPVC Reducer 15 ea.

15.1.4.5 Vent Thru Wall

2 100 mm dia 5 ea.

BOQ / Passenger Terminal Bldg. Page 33 of 70

Page 34: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

3 75 mm dia 3 ea.

Sub-Total

15.1.5 STORM DRAINAGE PIPING

15.1.5.1

Unplasticized Polyvinyl Chlorine (uPVC) Pipe conforming to ASTM D2729

Series 1000, including hangers and supports and other necessary

accessories to complete the system

1 200 mm dia. uPVC Pipe 710 I.m.

2 150 mm dia. uPVC Pipe 123 I.m.

3 100 mm dia. uPVC Pipe 47 I.m.

15.1.5.2Unplasticized Polyvinyl Chlorine (uPVC) Pipe conforming to ASTM D2729

Series 1000, includes trenching, bedding, disposal, etc.

1 250 mm dia. uPVC Pipe 82 l.m.

15.1.5.3 Reinforced Concrete Pipe, includes trenching, bedding, disposal, etc.

1 300 mm dia. Reinforced Concrete Pipe 303 l.m.

2 375 mm dia. Reinforced Concrete Pipe 72 l.m.

15.1.5.4 uPVC Tee

1 200 x 100 mm dia, uPVC Tee 43 ea.

2 200 mm dia, uPVC Tee 42 ea.

4 200 mm dia, uPVC Wye 29 ea.

15.1.5.5 90 deg. uPVC Bend

1 200 mm dia 90 deg Bend 129 ea.

2 150 mm dia, 90 deg. Bend 71 ea.

4 150 mm dia, 45 deg. Bend 29 ea.

15.1.5.6 uPVC Reducer

1 200 x 150 mm dia, uPVC Reducer 71 ea.

15.1.5.7 Roof Strainers

1 Roof Strainer, 150 mm dia. 71 ea.

2 Roof Strainer, 100 mm dia. 43 ea.

15.1.5.8 Junction Box

1 Junction Box (900 x 900 x 1200 mm) 47 ea.

15.1.5.9 Ceiling Cleanout

1 200 mm dia. 42 ea.

2 100 mm dia. 8 ea.

3 75 mm dia. 8 ea.

15.1.5.10 Floor Drain

1 100mm dia. 4 ea.

2 50mm dia. 67 ea.

Sub-Total

15.1.6 FCU DRAIN

15.1.6.1 PVC Pipe with insulation

1 75 mm dia Waste uPVC pipe 5 I.m.

2 50 mm dia Waste uPVC pipe 20 I.m.

15.1.6.2 uPVC Fittings

1 50 mm dia, uPVC Tee 1 ea.

2 75 mm, uPVC Wye 1 ea.

4 50 mm, uPVC Wye 1 ea.

5 50 mm dia, 90 deg uPVC Bend 1 ea.

6 75 mm dia, 45 deg uPVC Bend 1 ea.

BOQ / Passenger Terminal Bldg. Page 34 of 70

Page 35: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

7 50 mm dia, 45 deg uPVC Bend 4 ea.

8 75 x 50 mm dia, uPVC Reducer 1 ea.

9 Ceiling Cleanout, 75 mm dia. 1 ea.

10 Ceiling Cleanout, 50 mm dia. 1 ea.

15.1.6.3 uPVC Pipe drain

1 75 mm dia Waste uPVC pipe 79 I.m.

2 50 mm dia Waste uPVC pipe 20 I.m.

15.1.6.4 uPVC Fittings

2 75 mm uPVC Wye 2 ea.

3 75 x 50 mm uPVC Wye 4 ea.

4 50 mm uPVC Wye 6 ea.

5 75 mm dia, 90 deg uPVC Bend 1 ea.

6 50 mm dia, 90 deg uPVC Bend 8 ea.

7 75 mm dia, 45 deg uPVC Bend 10 ea.

8 50 mm dia, 45 deg uPVC Bend 14 ea.

9 75 x 50 mm dia, uPVC Reducer 1 ea.

10 Floor Cleanout, 75 mm dia. 1 ea.

11 Floor Cleanout, 50 mm dia. 4 ea.

Sub-Total

15.1.6 SUBMERSIBLE PUMPS

15.1.6.1@ Elevator Pit (3/4 HP Portable Submersible Sump Pump, Capacity =

15GPM, TDH=25ft)4 assy

15.1.6.2

Constant Pressure Booster System, Triplex Type vertical multi -stage

Centrifugal Pumps with one external frequency converter, complete with

34 Gallons bladder tank, air vent and other standard accessories. Pump

bases and heads are made of cast iron; other vital parts are made of

stainless steel. Total Capacity=250GPM x TDH=100 ft; 1-3.0

HP/2-5.0 HP; 230V; 3Phase;60Hz; 3500 RPM

1 assy

Sub-Total

TOTAL - PLUMBING WORKS

15.2HEATING, VENTILATION & AIR CONDITIONING/ FIRE PROTECTION/

BMS

15.2.1 Air Conditioning System

Equipment, see schedule for specifications (to include all other necessary

works to make the unit complete and operational.)Note: AHU/PAHU's are

with VFD motor and VFD Panel & LMCP (Bypass) for each Unit.

15.2.1.1 Chilled Water Type -Air Handling Unit

1 AHU-1 : Horizontal Draw Thru, Vertical Upblast, 14 TR 1 set

2 AHU-2 : Horizontal Draw Thru, Vertical Upblast, 9.5 TR 1 set

3 AHU-3 : Horizontal Draw Thru, Vertical Upblast, 14.72 TR 1 set

4 AHU-4 : Horizontal Draw Thru Vertical Upblast, 20 TR 1 set

5 AHU-5 : Horizontal Draw Thru Vertical Upblast, 55 TR 1 set

6 AHU-6 : Horizontal Draw Thru, Vertical Upblast, 11 TR 1 set

7 AHU-7 : Horizontal Draw Thru, Vertical Upblast, 11 TR 1 set

8 AHU-8 : Horizontal Draw Thru, Vertical Upblast, 48 TR 1 set

9 PAHU-1: Horizontal Draw Thru, Vertical Draw Thru, 38 TR 1 set

BOQ / Passenger Terminal Bldg. Page 35 of 70

Page 36: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

10 PAHU-2: Horizontal Draw Thru, Vertical Draw Thru, 63 TR 1 set

11 PAHU-3: Horizontal Draw Thru, Vertical Draw Thru, 51 TR 1 set

12 PAHU-4: Horizontal Draw Thru, Vertical Draw Thru, 79 TR 1 set

15.2.1.2 Fan Coil Unit (Chilled Water Type)

FCU , Ceiling cassette free blow type, 0.25˚wg, chw ∆T10˚F

,230V,1PH,60Hz, & std accessories

1 FCU-1 : Ceiling Cassette Chw Type, 2 TR (Taxi Waiting LW ) 2 set

2 FCU-2 : Ceiling Cassette Chw Type, 2 TR (Taxi Waiting RW ) 2 set

3 FCU-3 : Ceiling Cassette Chw Type, 1 TR (Custom Officer ) 1 set

4 FCU-4 : Ceiling Cassette Chw Type, 1.5 TR (Airline Offices ) 8 set

5 FCU-5 : Ceiling Cassette Chw Type, 1.5 TR ( Conference Room ) 2 set

6 FCU-6 : Ceiling Cassette Chw Type, 2 TR ( Baggage Security Rm. ) 1 set

7 FCU-7 : Ceiling Cassette Chw Type, 2 TR ( Lounge ) 1 set

8 FCU-8 : Ceiling Cassette Chw Type, 2.5 TR ( POEA Rm. ) 1 set

9 FCU-10 : Ceiling Cassette Chw Type, 3.5 TR ( Ticket Sales ) 2 set

10 FCU-11 : Ceiling Cassette Chw Type, 1.5 TR ( Quarantine Room) 2 set

11 FCU-12 : Ceiling Cassette Chw Type, 2.4 TR ( Fixed Bridge ) 6 set

15.2.1.3

DX split type Air-conditioning Unit complete with support, hangers, base

and all necessary accessories as specified in the Mechanical Drawings

and Technical Specifications.

1FCU / ACCU -1A - B: 2.5 TR, Ceiling Suspended (VIP Room @ 2F

Level)1 set

2FCU / ACCU -1B: 2TR, Ceiling Suspended (Ecumenical Chapel @ 2f

Level)1 set

15.2.1.4

Multi-Split type Air-cooled Condensing Units; complete with C/W

refrigerant piping, drain pipe, insulation, pre-filter and remote controller

and all other necessary accessories, support/hangers/connections, base

as specified in the Mechanical Drawings and Technical Specifications.

1Variable Refrigerant Volume Type; Ceiling Suspended type; cooling

capacity 11.6 KW (4.0HP)2 set

2Variable Refrigerant Volume Type; Ceiling Suspended type; cooling

capacity 3.7 KW (1.3HP)2 set

3Variable Refrigerant Volume Type; Ceiling Suspended type; cooling

capacity 7.3 KW (2.5HP)1 set

4VRV IV Outdoor Unit R-410A refrigerant 16 series, Cooling only model,

380V-3ph-60 Hz 1 set

15.2.1.5 Galvanized Steel Duct including support

1 Ga 26 531 sq.m.

2 Ga 24 3,290 sq.m.

3 Ga 22 2,290 sq.m.

4 Ga 20 235 sq.m.

5 Ga 18 204 sq.m.

15.2.1.6 Flexible Duct Connector c/w supports and straps

1 350mm dia. 38 l.m.

2 300mm dia. 195 l.m.

3 250mm dia. 14 l.m.

4 200mm dia. 8 l.m.

5 150mm dia. 34 l.m.

15.2.1.7Duct fabric with properties of: Antibacterial, anti-static, fire retardant c/w

stainless cables, turn buckle and wire lock suspension support.

1 900 mm x 900 mm x 75 meter length 1 unit

2 1120 mm ф x 54 meter length 1 unit

3 1120 mm ф x 18 meter length 1 unit

4 900 mm x 900 mm x 45 meter length 1 unit

5 900 mm x 900 mm x 7 meter length 1 unit

15.2.1.8 Flexible Air Duct

BOQ / Passenger Terminal Bldg. Page 36 of 70

Page 37: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

1 350mm dia. 23 l.m.

2 300mm dia. 118 l.m.

3 250mm dia. 9 l.m.

4 200mm dia. 45 l.m.

5 150mm dia. 20 l.m.

15.2.1.9 Fresh air duct with volume dampers, supports, w/o insulation, Ga.26 61 sq.m.

15.2.1.10Exhaust air duct with volume dampers, supports, etc. (w/o insulation),

Ga.26

1 800 x 400 mm 175 sq.m.

2 600 x 300 mm 67 sq.m.

3 550 x 300 mm 10 sq.m.

4 500 x 300 mm 25 sq.m.

5 200 x 150 mm 72 sq.m.

6 150 x 150 mm 57 sq.m.

7 375 mm dia. 6 l.m.

8 Flexible Air Duct, 150mm dia. 10 l.m.

15.2.1.11 AHU/PAHU Duct take-off / elbow -turning vanes

1 1500 x 500 4 no.

2 1500 x 450 1 no.

3 1350 x 750 1 no.

4 1350 x 450 1 no.

5 1250 x 750 1 no.

6 1250 x 450 1 no.

7 1200 x 550 1 no.

8 1000 x 500 1 no.

9 1000 x 400 1 no.

10 1000 x 250 2 no.

11 1100 x 500 2 no.

12 1100 x 450 1 no.

13 1000 x 450 2 no.

14 950 x 400 2 no.

15.2.1.11 Duct Insulation and Liner

1 Duct Insulation, 50 mm thick, rigid mineral fiber 48kg/ m3 density 6,550 sq.m.

2 Acoustical duct liner, 25 mm thk flexible unicellular rubber 655 sq.m.

15.2.1.12Variable Air Volume Unit c/w thermostat, step-down transformer & other

access.

1 VAV @ 1168 Lps (2,474 cfm ) 1 sets

2 VAV @ 968 Lps ( 2,050 cfm ) 6 set

3 VAV @ 776 Lps ( 1,644 cfm ) 4 set

4 VAV @ 684 Lps ( 1,452 cfm ) 5 sets

5 VAV @ 584 Lps ( 1,238 cfm ) 12 sets

6 VAV @ 560 Lps ( 1,186 cfm ) 10 sets

7 VAV @ 480 Lps ( 1,016 cfm ) 3 sets

8 VAV @ 400 Lps ( 848 cfm ) 5 sets

9 VAV @ 388 Lps ( 822 cfm ) 1 sets

10 VAV @ 290 Lps ( 614 cfm ) 6 sets

11 VAV @ 250 Lps ( 530 cfm ) 5 sets

12 VAV @ 200 -222 Lps ( 470 cfm ) 2 sets

13 VAV @ 156 -168 Lps ( 356 cfm ) 4 sets

14 VAV @ 111 -116 Lps ( 246 cfm ) 2 sets

BOQ / Passenger Terminal Bldg. Page 37 of 70

Page 38: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

15.2.1.14 Supply Linear Bar Grille (SLBG) with OBD, c/w Plenum Boxes & liner

1 200 mm x 3.75 meter 8 set

2 150 mm x 1 meter 4 set

3 100 mm x 16 meter 2 set

15.2.1.15 Return Linear Bar Grille ( RLBG) with OBD c/w plenum boxes.

1 150 mm x 1 meter 1 set

2 100 mm x 16 meter 2 set

3 100 mm x 6.5 meter 1 set

15.2.1.16

Supply Ceiling Diffuser c/w OBD (Opposed Blade Damper), plenum

boxes & liner.

1 450 x 450 15 set

2 375 x 375 70 set

3 300 x 300 28 set

4 225 x 225 12 set

5 150 x 150 8 set

15.2.1.17 Return Ceiling Diffuser c/w OBD and plenum boxes

1 450 x 450 27 set

2 375 x 375 9 set

3 375 x 375 "Dummy" (w/o OBD) 15 set

4 300 x 300 19 set

5 225 x 225 3 set

6 150 x 150 4 set

15.2.1.18 Jet Diffuser c/w plenum boxes and liner

1 200 mm ф ( with 2- element ) 57 set

15.2.1.19 Fresh Air Intake Louver c/w Insect screen (exposed type -weatherproof)

1 1500 x 1200 1 set

2 1500 x 750 1 set

3 1500 x 550 2 set

4 1250 x 450 1 set

5 950 x 550 1 set

15.2.1.20 Exhaust Air Louver c/w insect screen (exposed -weatherproof)

1 375 mm dia. 1 set

2 1500 x 550 2 set

3 900 x 900 2 set

4 600 x 600 2 set

5 950 x 550 1 set

15.2.1.21 Ventilation Exhaust Air Diffuser (EAD)c/w plenum boxes

1 150 x 150 90 set

15.2.1.22 Duct Fire Damper -Curtain type ( 1 hr rated ) c/w access hole

1 1500 x 500 1 ea.

2 1500 x 450 1 ea.

3 1150 x 520 1 ea.

4 1250 x 750 1 ea.

5 1350 x 750 1 ea.

6 1250 x 500 1 ea.

7 1100 x 500 2 ea.

BOQ / Passenger Terminal Bldg. Page 38 of 70

Page 39: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

8 1100 x 450 1 ea.

9 1000 x 500 1 ea.

10 1000 x 450 2 ea.

11 1000 x 400 1 ea.

12 950 x 400 2 ea.

13 750 x 500 3 ea.

14 700 x 600 1 ea.

15 600 x 500 1 ea.

15.2.1.22 Motorized Volume -Damper (@ AHU/PAHU's)

1 2790 x 620 mm 1 ea.

2 2480 x 620 mm 1 ea.

3 2170 x 460 mm 2 ea.

4 1860 x 465 mm 2 ea.

5 1860 x 310 mm 2 ea.

6 1550 x 310 mm 3 ea.

7 1240 x 310 mm 2 ea.

8 916 x 916 mm 2 ea.

9 818 x 818 mm 2 ea.

10 732 x 732 mm 2 ea.

11 524 x 524 mm 3 ea.

12 422 x 422 mm 2 ea.

13 378 x 378 mm 1 ea.

15.2.1.23 Chilled Water Piping (Internal of PTB)

15.2.1.23.1 Steel Pipe, ERW Sched 40 including fittings and support

1 250 mm ø 24 l.m.

2 200 mm ø 443 l.m.

3 150 mm ø 44 l.m.

4 100 mm ø 76 l.m.

5 75 mm ø 72 l.m.

6 65 mmø 23 l.m.

7 50 mm ø 274 l.m.

8 40 mm ø 109 l.m.

9 32 mm ø 76 l.m.

10 25 mm ø 44 l.m.

11 20 mm ø 64 l.m.

15.2.1.23.2Chilled Water Pipe Insulation, 50mm thk. Flexible closed cell elastomeric

thermal insulation as per ASTM C524 Type II Class 1 c/w Vapor Barrier.

1 250 mm ø 24 l.m.

2 200 mm ø 443 l.m.

3 150 mm ø 44 l.m.

4 100 mm ø 76 l.m.

5 75 mm ø 72 l.m.

6 65 mm ø 23 l.m.

7 50 mm ø 274 l.m.

8 40 mm ø 109 l.m.

9 32 mm ø 76 l.m.

10 25 mm ø 44 l.m.

11 20 mm ø 64 l.m.

15.2.1.23.3

Black Steel Pipe Fittings. ASTM - A 53. Schedule 40. including paintings

and other consumable materials to complete as specified in Mechanical

Drawings and Technical Specifications.

15.2.1.23.3.1 90° Bend

BOQ / Passenger Terminal Bldg. Page 39 of 70

Page 40: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

1 200 mm ø 2 ea.

2 150 mm ø 20 ea.

3 125 mm ø 6 ea.

4 100 mm ø 22 ea.

5 75 mm ø 27 ea.

6 65 mmø 6 ea.

7 50 mm ø 40 ea.

8 40 mm ø 8 ea.

9 32 mm ø 24 ea.

10 25 mm ø 47 ea.

11 20 mm ø 8 ea.

15.2.1.23.3.2 45° Bend

1 150 mm ø 12 ea.

15.2.1.23.3.3 Tee

1 32 x 32mm dia. 4 ea.

2 25 x 25mm dia. 12 ea.

15.2.1.23.3.4 Tee Reducer

1 200 x 100 mm dia. 2 ea.

2 200 x 75 mm dia. 2 ea.

3 200 x 50 mm dia. 2 ea.

4 150 x 65 mm dia. 2 ea.

5 150 x 50 mm dia. 18 ea.

6 125 x 100 mm dia. 2 ea.

7 125 x 75 mm dia. 2 ea.

8 100 x 150 mm x 125 mm dia. 2 ea.

9 100 x 75 mm x 100 mm dia. 4 ea.

10 75 x 50 mm dia. 4 ea.

11 65 x 50 mm dia. 4 ea.

12 50 x 32 mm dia. 6 ea.

13 50 x 25 mm dia. 2 ea.

14 38 x 32 mm dia. 6 ea.

15 32 x 25 mm dia. 12 ea.

16 32 x 20 mm dia. 2 ea.

17 25 x 19 mm dia. 2 ea.

15.2.1.23.3.5 Coupling Reducer

1 200 x 150 mm dia. 2 ea.

2 150 x 100 mm dia. 2 ea.

3 100 x 65 mm dia. 2 ea.

4 75 x 50 mm dia. 2 ea.

5 65 x 50 mm dia. 2 ea.

6 50 x 40 mm dia. 8 ea.

7 50 x 32 mm dia. 2 ea.

8 50 x 25 mm dia. 4 ea.

9 50 x 20 mm dia. 2 ea.

10 40 x 32 mm dia. 4 ea.

11 32 x 25 mm dia. 4 ea.

15.2.1.23.3.6 End Cap

1 100 mm ø 4 ea.

2 75 mm ø 4 ea.

3 50 mm ø 2 ea.

4 32 mm ø 6 ea.

5 25 mm ø 8 ea.

6 15 mm ф 2 ea.

BOQ / Passenger Terminal Bldg. Page 40 of 70

Page 41: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

15.2.1.23.4 Flexible Pipe Connector

1 100 mm ø 4 ea.

2 75 mm ø 8 ea.

3 50 mm ø 10 ea.

4 40 mm ø 2 ea.

5 32 mm ø 12 ea.

6 25 mm ø 14 ea.

7 20 mm ф 29 ea.

8 15 mm ф 4 ea.

15.2.1.25 Valves & Piping work including adaptors and flanges as required.

15.2.1.25.1 Butterfly Valve (Wafer type)

1 200 mmø 2 ea.

2 125 mmø 2 ea.

3 100 mmø 4 ea.

4 75 mm ø 10 ea.

5 65 mmø 2 ea.

15.2.1.25.2 Gate valve (Ball valve)

1 50 mm ø 10 ea.

2 40 mm ø 2 ea.

3 32 mm ø 12 ea.

4 25 mm ø 14 ea.

5 20 mm ø 30 ea.

6 15 mm ø 4 ea.

15.2.1.25.3

Auto Flow Control Valve (Balancing Valve ). Complete with stem

indicator, pressure taps, capable for shut-off, locking device, and body tap

for attaching drain hose.

1 125 mmø 2 ea.

2 100 mmø 6 ea.

3 75 mmø 6 ea.

4 65 mmø 2 ea.

5 50 mmø 13 ea.

6 40 mmø 4 ea.

7 32 mm ø 8 ea.

8 25 mm ø 11 ea.

9 20 mm ø 15 ea.

10 15 mm ø 2 ea.

15.2.1.25.4 Motorized 2-way control valve

1 100 mmø 2 ea.

2 75 mmø 4 ea.

3 50 mmø 10 ea.

4 40 mm ø 1 ea.

5 32 mm ø 6 ea.

6 25 mm ø 7 ea.

7 20 mm ø 15 ea.

8 15 mm ф 2 ea.

15.2.1.25.5 Wye Strainer with blow-off valve

1 100 mm ø 2 ea.

2 75 mm ø 4 ea.

3 50 mmø 5 ea.

4 40 mmø 1 ea.

5 32 mm ø 6 ea.

BOQ / Passenger Terminal Bldg. Page 41 of 70

Page 42: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

6 25 mm ø 7 ea.

7 20 mm ø 15 ea.

8 15 mm ø 2 ea.

15.2.1.25.6 Auto Air Vent, c/w valve

1 200 mmø 2 ea.

2 125 mmø 2 ea.

3 100 mmø 6 ea.

4 75 mmø 8 ea.

5 65 mmø 2 ea.

6 50 mmø 10 ea.

7 40 mmø 2 ea.

8 32 mm ø 12 ea.

9 25 mm ø 14 ea.

10 20 mm ø 30 ea.

11 15 mm ø 4 ea.

15.2.1.26 Chw Piping Ancillaries

15.2.1.26.1 Pressure Gauge w/ pet cock & pressure gauge well

1 Tap to 200 mm ф 2 ea.

2 Tap to 125 mm ф 2 ea.

3 Tap to 100 mm ф 4 ea.

4 Tap to 75 mm ф 2 ea.

5 Tap to 65 mm ф 2 ea.

6 Tap to 50 mm ф 8 ea.

7 Tap to 40 mm ф 2 ea.

8 Tap to 32 mm ф 2 ea.

9 Tap to 25 mm ф 4 ea.

15.2.1.26.2 Pressure Gauge

1 Tap to 100 mm ф 2 ea.

2 Tap to 75 mm ф 8 ea.

3 Tap to 50 mm ф 10 ea.

4 Tap to 40 mm ф 2 ea.

5 Tap to 32 mm ø 12 ea.

6 Tap to 25 mm ø 14 ea.

7 Tap to 20 mm ø 30 ea.

8 Tap to 15 mm ф 4 ea.

15.2.1.26.3 Thermometer and well

1 Tap to 200 mm ф 2 set

2 Tap to 125 mm ф 2 set

3 Tap to 100 mm ф 4 set

4 Tap to 75 mm ф 2 set

5 Tap to 65 mm ф 2 set

6 Tap to 50 mm ф 8 set

7 Tap to 40 mm ф 2 set

8 Tap to 32 mm ф 2 set

9 Tap to 25 mm ф 4 set

15.2.1.26.4 Temperature Gauge

1 Tap to 100 mm ф 2 set

2 Tap to 75 mm ф 8 set

3 Tap to 50 mm ф 10 set

4 Tap to 40 mm ф 2 set

5 Tap to 32 mm ø 12 set

6 Tap to 25 mm ø 14 set

7 Tap to 20 mm ø 30 set

BOQ / Passenger Terminal Bldg. Page 42 of 70

Page 43: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

8 Tap to 15 mm ф 4 set

15.2.1.27 Refrigerant Line System

15.2.1.27.1 Refrigerant Piping , copper Type L

1 9.52 mm ø copper, RL 43 l.m.

2 15.88 mm ø, RS 43 l.m.

15.2.1.27.2 Refrigerant Pipe insulation, flexible elastomeric rubber, 25 mm thk

1 9.52 mm ø copper RL 43 l.m.

2 15.88 mm ø copper , RS 43 l.m.

15.2.1.28 Condensate Drain Line System

15.2.1.28.1 Condensate Drain Piping, PVC pipe, sch 40, class 150 including fittings

1 50 mm ø 118 l.m.

2 25 mm ø 129 l.m.

15.2.1.28.2 Condensate Drain pipe insulation, 19 mm thk flexible elastomeric

1 50 mm ø 118 l.m.

2 25 mm ø 129 l.m.

15.2.1.28.3 Aluminum Pipe Cladding

1 15.88 mm Ø 15 l.m.

2 9.53 mmØ 15 l.m.

15.2.1.28.4 Fiter Dryer, 9.53 mm ø 2 set

15.2.1.28.5 Sight Glass, 9.53 mm ø 2 set

15.2.1.28.6 Flexible Pipe Connector

1 18.88mmø 4 set

2 9.53mmø 4 set

Sub - Total

15.2.2 Ventilation System

15.2.2.1 Fans and Blower Equipment

Equipment see schedule for specifications (to include all other necessary

works to make the unit complete and operational)

15.2.2.1.1

Return air fan, in-line centrifugal type, cabinet, complete with disconnect

switch, vibration isolator, support hangers and all necessary accessories

and connections

1 RAF-1, Return air fan NYB FC-DIDW with cabinet, in-line centrifugal

type, 7,500 CFM, ESP 0.50, 900 RPM, belt driven, 2.0 HP,

230V/1P/60Hz

1 set

2 RAF-2, Return air fan NYB FC-DIDW with cabinet, in-line centrifugal

type, 6180 CFM, ESP 0.50, 715 RPM, belt driven, 2.0 HP, 230V/1P/60Hz 1 set

3 RAF-3, Return air fan NYB FC-DIDW with cabinet, in-line centrifugal

type, 3200 CFM; ESP 0.625, 1960 RPM, belt driven, 1.50 HP,

230V/1P/60Hz

1 set

4 RAF-4, Return air fan NYB FC-DIDW with cabinet, in-line centrifugal

type, 6478 CFM; ESP 0.44, 1750 RPM, belt driven, 2.25 HP,

380V/3P/60Hz

1 set

5 RAF-5A, Return air fan FC-DIDW with cabinet, in-line centrifugal type,

348 CFM, ESP 0.25, 1245 RPM, direct driven, 0.50 HP, 230V/1P/60Hz 1 set

6

RAF-5B, Return air fan NYB FC-DIDW with cabinet, in-line centrifugal

type, 12749 CFM; ESP 0.75, belt driven, 1225 RPM, belt driven, 2.70 HP,

380V/3P/60Hz

1 set

7

RAF-6, Return air fan NYB FC-DIDW with cabinet, in-line centrifugal

type, 5766 CFM; ESP 0.50, belt driven, 1225 RPM, belt driven, 3.0 HP,

380V/3P/60Hz

1 set

8

RAF-7, Return air fan NYB FC-DIDW with cabinet, in-line centrifugal

type, 11446 CFM; ESP 0.75, belt driven, 1225 RPM, belt driven, 6.0 HP,

380V/3P/60Hz

1 set

9

RAF-8, Return air fan NYB FC-DIDW with cabinet, in-line centrifugal

type, 890 CFM, ESP 0.375, belt driven, 1225 RPM, belt driven, 1.0 HP,

230V/1P/60Hz

1 set

10

RAF-9, Return air fan NYB FC-DIDW with cabinet, in-line centrifugal

type, 890 CFM, ESP 0.375, belt driven, 1225 RPM, belt driven, 1.0 HP,

230V/1P/60Hz

1 set

BOQ / Passenger Terminal Bldg. Page 43 of 70

Page 44: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

11

RAF-10, Return air fan NYB FC-DIDW with cabinet, in-line centrifugal

type, 18054 CFM, ESP 1.25, belt driven, 1225 RPM, belt driven, 6.0 HP,

380V/3P/60Hz

1 set

15.2.2.1.2

Transfer air fan, low nose, cabinet type, complete with disconnect switch,

vibration isolator, support hangers and all necessary accessories and

connections

1 TAF-1, Transfer air fan FC-DIDW with cabinet, low noise, 500 CFM, ESP

0.25, 1245 RPM, belt driven, 0.213 HP, 230V/1P/60Hz 1 set

2 TAF-2, Transfer air fan FC-DIDW with cabinet, low noise, 500 CFM, ESP

0.25, 1245 RPM, belt driven, 0.213 HP, 230V/1P/60Hz 1 set

3 TAF-3, Transfer air fan FC-DIDW with cabinet, low noise, 500 CFM, ESP

0.25, 1245 RPM, belt driven, 0.213 HP, 230V/1P/60Hz 1 set

15.2.2.1.3

Toilet Exhaust fan, low nose, cabinet type, complete with disconnect

switch, vibration isolator, support hangers and all necessary accessories

and connections

1 TEF-1/2, Toilet exhaust fan FC-DIDW with cabinet, low noise, 500 CFM,

ESP 0.25, 1245 RPM, direct driven, 0.213 HP, 230V/1P/60Hz 2 set

2 TEF-1A, Toilet exhaust fan NYB FC-DIDW with cabinet, low noise, 1246

CFM, ESP 0.60, 1380 RPM, belt driven, 0.50 HP, 230V/1P/60Hz 1 set

3 TEF-1B, Toilet exhaust fan NYB FC-DIDW with cabinet, low noise, 2475

CFM, ESP 0.52, 1530 RPM, belt driven, 0.75 HP, 230V/1P/60Hz 1 set

4 TEF-4, Toilet exhaust fan FC-DIDW with cabinet, low noise, 500 CFM,

ESP 0.25, 1245 RPM, direct driven, 0.213 HP, 230V/1P/60Hz 1 set

15.2.2.1.4

Smoke Removal Fan, spark-proof, in-line centrifugal type, complete with

backdraft damper, disconnect switch, vibration isolator, support hangers

and all necessary accessories and connections

1 SRF-1, Smoke Removal Fan, NYB tubular , in-line centrifugal type, 6478

CFM, ESP 1.0, 1750 RPM, belt driven, 2.25 HP, 380V/3P/60Hz 1 set

15.2.2.1.5

Skylight Heat Removal Fan (Exhaust Fan), in-line centrifugal type,

cabinet, complete with disconnect switch, vibration isolator, support

hangers and all necessary accessories and connections

1 SHR-1, NYB FC-DIDW with cabinet, in-line centrifugal type, 8700 CFM,

ESP 0.50, 1750 RPM, belt driven, 3.0 HP, 1200V/3P/60Hz 2 set

615.2.2.1.6

Skylight make-up air fan, in-line centrifugal type, cabinet, complete with

disconnect switch, vibration isolator, support hangers and all necessary

accessories and connections

1 SMA-1, NYB FC-DIDW with cabinet, in-line centrifugal type, 8700 CFM,

ESP 0.50, 1750 RPM, belt driven, 3.0 HP, 1200V/3P/60Hz 1 set

615.2.2.1.7 Air Curtains:

1 Air Curtain -1 Length = 1.20 m ; cap. =737 cfm; power = 312 watts 5 ea.

2 Air Curtain -1 Length = 0.90 m ; cap. =637 cfm; power = 312 watts 7 ea.

15.2.2.2.2 PVC duct

1 200 mmø 161 l.m.

2 100 mmø 14 l.m.

15.2.2.2.3 Vent Cap

1 200mm 12 set

2 100 mmø 7 sets

Sub - Total

15.2.3 Fire Protection System

15.2.3.1 Piping System

15.2.3.1.1 Black Steel Pipe, ERW schedule 40 with fitting and support

1 200 mm ø 48 l.m.

2 160 mm ø 156 l.m.

3 125 mm ø 12 l.m.

4 100 mm ø 789 l.m.

5 90 mm ø 30 l.m.

6 80 mm ø 21 l.m.

7 65 mm ø 735 l.m.

8 50 mm ø 321 l.m.

9 40 mm ø 1,450 l.m.

BOQ / Passenger Terminal Bldg. Page 44 of 70

Page 45: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

10 32 mm ø 141 l.m.

11 25 mm ø 2,305 l.m.

15.2.3.2 Black Steel fitting

15.2.3.2.1 Tread-o-let

1 168 mm ø 2 pc.

2 80 mm ø 39 pc.

3 65 mm ø 18 pc.

4 50 mm ø 11 pc.

5 40 mm ø 141 pc.

6 32 mm ø 4 pc.

7 25 mm ø 69 pc.

15.2.3.2.2 Elbow

1 100 mm ø 19 pc.

2 80 mm ø 35 pc.

3 65 mm ø 76 pc.

4 50 mm ø 7 pc.

5 40 mm ø 144 pc.

6 32 mm ø 5 pc.

7 25 mm ø 1,918 pc.

15.2.3.2.3 Tee

1 160 mm ø 1 pc.

2 100 mm ø 19 pc.

3 65 mm ø 18 pc.

4 50 mm ø 97 pc.

5 40 mm ø 71 pc.

6 32 mm ø 66 pc.

7 25 mm ø 109 pc.

15.2.3.2.4 Tee Reducer

1 200 x 160 mm dia. 1 pc.

2 160 x 125 mm dia. 1 pc.

3 100 x 50 mm dia. 2 pc.

4 65 x 25 mm dia. 161 pc.

5 65 x 32 mm dia. 2 pc.

6 50 x 40 mm dia. 3 pc.

7 50 x 32 mm dia. 3 pc.

8 50 x 25 mm dia. 33 pc.

9 40 x 32 mm dia. 1 pc.

10 40 x 25 mm dia. 393 pc.

11 32 x 25 mm dia. 10 pc.

15.2.3.2.5 Reducer

1 200 x 168 mm dia, Reducer 1 pc.

2 160 x 125 mm dia, Reducer 2 pc.

3 125 x 90 mm dia, Reducer 1 pc.

4 100 x 90 mm dia, Reducer 1 pc.

5 100 x 50 mm dia, Reducer 16 pc.

6 90 x 80 mm dia, Reducer 3 pc.

7 80 x 65 mm dia, Reducer 2 pc.

8 65 x 40 mm dia, Reducer 1 pc.

9 65 x 50 mm dia, Reducer 3 pc.

10 50 x 40 mm dia, Reducer 22 pc.

11 50 x 32 mm dia, Reducer 1 pc.

12 50 x 25 mm dia, Reducer 3 pc.

13 40 x 32 mm dia, Reducer 35 pc.

BOQ / Passenger Terminal Bldg. Page 45 of 70

Page 46: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

14 40 x 25 mm dia, Reducer 13 pc.

15 32 x 25 mm dia, Reducer 64 pc.

16 25 x 15 mm dia, Reducer 1,034 pc.

15.2.3.2.6 End cap

1 50 mm ø 20 pc.

2 40 mm ø 2 pc.

3 25 mm ø 4 pc.

15.2.3.3 Sprinkler Heads, k = 5.6 , 155˚ F temp rating (GF/2F)

1 Pendent 1,991 set

2 Upright 16 set

3 Sidewall 9 set

4 Sidewall Quick Response 100 set

Fire Hose Cabinet

1

Fire Hose Cabinet made from Ga.18 BI steel construction with glass

door, continuous steel hinge. Cabinet shall contain ø40cast brass

angle valve with 30 m of ø40 polyurethane singled line synthetic jacket

hose, brass nipple and coupling. Hose rack swivel type with pin and

water stop. NST thread for fire hose. Cabinet to contain one (1) 4.5 kg

abc dry chemical extinguisher.

38 set

15.2.3.5 Fire Extinguisher

1

FE-1 : 4.5 kg. Siliconized mono ammonium phosphate dry chemical

wall mounted multi- purpose portable fire extinguisher complete with

hose and horn, wall bracket, UL listed and FM approved.

30 set

2FE-2 : 4.5 kg. Carbon Dioxide portable fire extinguisher complete with

hose and horn, wall bracket, UL listed and FM approved.5 set

15.2.3.6 Sway Brace

15.2.3.6.1 Two-Way Sway Brace, Longitudinal (GF)

1 Two-way sway brace, 200mm dia. 6 set

1 Two-way sway brace, 150mm dia. 32 set

1 Two-way sway brace, 125mm dia. 2 set

1 Two-way sway brace, 100mm dia. 22 set

1 Two-way sway brace, 80mm dia. 12 set

1 Two-way sway brace, 65mm dia. 7 set

15.2.3.6.2 Two-Way Sway Brace, Longitudinal (2F)

1 Two-way sway brace, 100mm dia. (including Bar Joist Adapter) 153 set

15.2.3.6.3 Four-way sway brace

1 Four-way sway brace, 200mm dia. 2 set

2 Four-way sway brace, 100mm dia. 2 set

15.2.3.6.4 Sway Brace Pipe Support

15.2.3.6.4.1 Black Steel Pipe, ERW schedule 40

1 50 mm ø 486 l.m.

15.2.3.6 Valves and Accessories

15.2.3.6.1

ø100 mm Alarm Check Valve Assembly c/w pressure gages, switch,

alarm, gong, retard chamber, trimmings and other standard

accessories

2 set

15.2.3.6.2 150mmø OS&Y Gate Valve w/ supervisory switch 2 set

15.2.3.6.3 OS&Y Gate Valve w/ monitor switch, 100 mmø 2 set

15.2.3.6.4 Fire Dept. Connection, 100 x 65 x 65 ø 3 set

15.2.3.6.5 Zone control Valve Assembly w/ supervisory switch, ø100mm 4 set

15.2.3.6.6 Flow Switch, ø100mm 4 set

15.2.3.6.7 Check valve, 100mmø 1 set

15.2.3.6.8 Water flow detector 4 set

15.2.3.6.9 Flushing Connection

BOQ / Passenger Terminal Bldg. Page 46 of 70

Page 47: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

1 50 mm ø 4 set

2 25 mm ø 4 set

15.2.3.6.10 Inspector Test Connection, ø25 mm 8 set

15.2.3.6.11 Mechanical Groove Coupling,

1 ø200 mm 2 set

2 ø150 mm 3 set

3 ø100 mm 1 set

4 ø80 mm 1 set

5 ø65 mm 1 set

15.2.3.6.12 Flexible Coupling

1 100 mm dia. 1 set

15.2.3.6.13 Gate Valve

1 100 mm dia. 1 set

2 50 mm dia. 1 set

3 40mmø 1 set

4 25mmø 7 set

15.2.3.6.14 Sight Glass , 25 mmø 12 set

15.2.3.6.15 Splash Block 2 lot

15.2.3.6.16 Painting 1 lot

15.2.3.7 FM 200 Fire Suppression System

Supply and Installation of Fire Suppression System (FM-200),

Including Cylinder Assemblies, Valves, Pipe & Fittings, Wires &

Conduit, Fire Alarm Control Panels & accessories and other

miscellaneous, consumable items to complete as specified in

Mechanical Drawings and Technical Specifications.

1 @ FIDS Room 1 lot

2 @ BGMPA Room 1 lot

3 @ BMS Room 1 lot

4 @ SEcurity Room 1 lot

Sub - Total

15.2.4 Building Management System

1To control and monitor status AHU's, VAV's, FCU's, Fans & Blowers,

CO2 sensor, sump, Fire Alarm, Elevator monitoring and accessories695 pt.

Sub - Total

15.2.5 Testing and Commissioning (ACV and FP) 1 lot

Sub - Total

TOTAL - HEATING, VENTILATION & AIR CONDITIONING/ FIRE

PROTECTION/ BMS

DIV-16 ELECTRICAL WORKS

16.1 Lighting System

16.1.1Roughing- ins (All necessary fittings, supports and other accessories are

already included from straight pipes)

3 20mmØ IMC 730 I.m.

4 20mmØ EMT 17,730 l.m.

5 15mmØ Flexible Metal Conduit 2,283 I.m.

16.1.2 Wires & Cables (Including connectors , tapes, etc)

1 30mm² THHN 160 I.m.

2 22mm² THHN 336 I.m.

3 5.5mm² THHN 1,502 I.m.

4 3.5mm² THHN 70,781 I.m.

5 8.0mm² TW (G) 124 I.m.

7 3.5mm² TW(G) 16,784 I.m.

16.1.3 Lighting Fixtures including necessary supports

BOQ / Passenger Terminal Bldg. Page 47 of 70

Page 48: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

1

Type "P", Recessed Mounted Lighting Fixture With Parabolic Semi-

Specular Louver. 3 X 9w, T8 Led Tube, 230v, 60hz, Capital & Small

Letters Indicate Fixture Type & Controlling Switch, Respectively.

90 set

2 -Ditto-, Except With 2 X 9w, T8 Led Tube, 230v, 60hz. 120 set

3

Type "P", Recessed Mounted Lighting Fixture With Parabolic Semi

Specular Louver. 55 Cell, 3 X 22w, T8 Led Tube, 230v, 60hz, Capital &

Small Letters Indicate Fixture Type & Controlling Switch, Respectively.

14 set

4

Type "P", Recessed Mounted Lighting Fixture With Parabolic Semi

Specular Louver. 4 X 9w, T8 Led Tube, 230v, 60hz, Capital & Small

Letters Indicate Fixture Type & Controlling Switch, Respectively.

147 set

5Type "PO-1", Downlight, Aluminum Single Wall Construction, 172 Mmø,

With 1-39w Leds, 240v, 60 Hz.606 set

6Type "Po-7", Downlight, Aluminum Single Wall Construction, 172 Mmø,

With 1-9w Led's, Emitting Yellow Color Light, 240v, 60 Hz.55 set

7

Type "N2", Surface Mounted Led Tube Lighting Fixture, 2 X 22w, T8,

230v, 60 Hz; Housing: Fiberglass Reinforced Polyester; Lens:

Polycarbonate Lens, Ip 65 Rating; Gasket: Non-Thixotropic Polyol; Ceiling

Mounted Bracket: Stainless Steel; Complete With Electronic Ballast To

Support T8 Led Lamps.

20 set

8

Type "U", Consisting Of 1 Nos. 22w Led Tube Lighting Fixture, Yellow

Colored Light, Box Type, 230v, 60 Hz, For Cove Lighting At Waiting

Lounge

100 set

9

Type "P6", Track Light, Surface Mounted, With Electronic Gear For G12,

Ceramic \ Metal Halide Lamp, Lamp Housing Of Diecast Aluminum, Lamp

Type: Mt 35w, G12, Energy Consumption: 44 W, Form Of Protection: Ip

20, Class I, Color Temp.: 3000k, Ballast: Built-In, Safety Glass: Included,

Reflector: High Quality Anodized Cylindrical Reflector, Main (Input)

Voltage: 220-240 V, Beam Spread: Spot, Color: Black.

17 set

10

Type "U1", Uplighter, Surface Mounted, Powder Coated Aluminum Body,

Electronic Ballast In Separate Water Safe Casing, Quick Release

Between Fixture And Ballast For Fast Service And Assembly, Built-Lens

Protection, Multiple Rectangular Light Pictures Via Patented Prismatic

Lens System, Main: 220-240 Vac, Total Weight: 13 Gs Fixture Including

Ballast; Ip 66, Class I, Lamp Type: Led Individual Chips, Energy

Consumption: 232 Watts.

86 set

11

Type "U2", Uplighter, Surface Mounted, Powder Coated Aluminum Body,

Electronic Ballast In Separate Water Safe Casing, Quick Release

Between Fixture And Ballast For Fast Service And Assembly, Built-Lens

Protection, Multiple Rectangular Light Pictures Via Patented Prismatic

Lens System, Main: 220-240 Vac, Total Weight: 13 Gs Fixture Including

Ballast; Ip 66, Class I, Lamp Type: Led Individual Chips, Energy

Consumption: 120 Watts.

12 set

12

Type "P3", Led Downlight, With Separate Electronic Gear For leds, Chip

On Board, Color Rendering Index: +90, Lamp Housing: Aluminum For

Optimal Cooling, Long Lifetime And Low Weight, Form Of Protection: Ip

20, Class Iii, Color Rendering Index: +90, Operating Position: Vertical,

Energy Consumption: 49.8 W, 220-240 V, 60 Hz, Color Temperature:

3000k, Control Gear: Electronic Ballast: Separate.

55 set

BOQ / Passenger Terminal Bldg. Page 48 of 70

Page 49: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

13

Type "WW", Wall Washer Downlight, Maxi Tube, Wall Up/Down,

Dimensions: 175 Mm Ø X 269 Mm High, Body Components: Extruded

And Die-Cast Aluminum, Highly Corrosion Resistant To Any Extreme

Environment, Ip Protection: Ip 65 Class I, Protected From Ingress Of Dust

And Water, Used Both Outdoor And Indoor Environments, Luminaire: 6

Led 16.8 Watts 700 Ma 864 Lumens, 3000k, 7 Deg., 220-240v, 60 Hz.

212 set

14

Type "P7", Recessed Rotating Led Downlight, With Separate Nl Power

Led Gear And 16 High Power leds, Lamp Housing: Die-Cast Aluminum

For Optimal Cooling, Long Lifetime And Low Weight, Form Of Protection:

Ip 20, Class Iii, With Polycarbonate Lens Operating Position: Vertical,

Energy Consumption: 39 W, 220-240 V, 60 Hz, Color Temperature:

3000k, Control Gear: Electronic, Ballast: Separate.

16 set

15

Type "P8", Retractable And Rotating Led Downlight, With Separate

Electronic Led Gear And 16 High Power leds, Lamp Housing: Die-Cast

Aluminum For Optimal Cooling, Long Lifetime And Low Weight, Form Of

Protection: Ip 20, Class Iii, With Polycarbonate Lens Operating Position:

Vertical, Energy Consumption: 48 W, 220-240 V, 60 Hz, Color

Temperature: 3000k, Control Gear: Electronic, Ballast: Separate.

3 set

16Type "X", Exit Light, 2 X 8w T8 Led Tube, Shaded Quadrant Indicates

Face And Direction Respectively.73 set

17Type "I", Industrial Type With Heavy Gauge Apertured Reflector, 2 X 22w

T8 Led Tube, 230v, 60hz.67 set

18Type "V", Vaportight Industrial Type With Internal Prismatic Lens, 2 X

22w T8 Led Tube, 230v, 60hz.102 set

19Type "N" Led Tube Lighting Fixture, 2 X 32w, T8, 230v, 60hz, With Cut-

Off Parabolic Louver41 set

20-Same As Type"C"- Except Type "K", Wet Location Listed White Trim

With Fresnel Lens.219 set

211x22w Led Tube Lighting Fixture, Box Type, Emitting Yellow Colored

Light, 230v, 60hz12 set

22 Emergency Lighting Fixture, With 2 X 9w Par 36 Lamp, 230v, 60hz. 107 set

16.1.4 Box & Wiring Devices

1 Octagonal Box 2,315 ea.

2 Utility Box 185 ea.

3 Switch Bank "A1" : Consist of the ff: 1 set

6 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, TWO-GANG.

4 Switch Bank "B1" : Consist of the ff: 1 set

8 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, SINGLE-

GANG.

11 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, TWO-GANG.

3 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, THREE-

GANG.

5 Switch Bank "C1" : Consist of the ff: 1 set

11 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, TWO-GANG.

2 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, THREE-

GANG.

6 Switch Bank "D1" : Consist of the ff: 1 set

3 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, SINGLE-

GANG.

10 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, TWO-GANG.

5 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, THREE-

GANG.

7 Switch Bank "E1" : Consist of the ff: 1 set

4 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, SINGLE-

GANG.

13 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, TWO-GANG.

BOQ / Passenger Terminal Bldg. Page 49 of 70

Page 50: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

2 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, THREE-

GANG.

8 Switch Bank "A2" : Consist of the ff: 1 set

9 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, TWO-GANG.

1 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, THREE-

GANG.

9 Switch Bank "B2" : Consist of the ff: 1 set

6 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, TWO-GANG.

1 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, THREE-

GANG.

10 Switch Bank "C2" : Consist of the ff: 1 set

18 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, TWO-GANG.

2 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, THREE-

GANG.

11 Switch Bank "D2" : Consist of the ff: 1 set

17 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, TWO-GANG.

2 sets of light switch, 15A, 230V, 1P, GROUNDING TYPE, THREE-

GANG.

12 Light switch, 15A, 230V, 1P, GROUNDING TYPE, SINGLE-GANG. 100 set

13 DITTO, EXCEPT TWO GANG 37 set

14 DITTO, EXCEPT THREE GANG 9 set

15 DITTO, EXCEPT THREE-WAY, SINGLE GANG 11 set

16 DITTO, EXCEPT THREE-WAY, TWO GANG 16 set

17 DITTO, EXCEPT THREE-WAY, THREE GANG 3 set

18 Convenience Outlet for Emergency Lamp 101 set

19 Testing and Commissioning 1 lot

Sub - Total

16.2 Power System

16.2.1Roughing- ins (All necessary fittings, supports and other accessories are

already included from straight pipes)

1 90mmø IMC 60 l.m.

5 40mmø IMC 303 l.m.

8 20mmø IMC 13,147 l.m.

10 15mmø Flexible Metal Conduit 384 l.m.

11 40mmø IMC Flexible Metal Conduit 16 l.m.

16.2.2 Wires & Cable (including Connectors, Tapes, Etc.)

1 250mm² THHN 100 I.m.

2 200mm² THHN 840 I.m.

3 150mm² THHN 50 I.m.

4 100mm² THHN 100 I.m.

6 50mm² THHN 100 I.m.

7 38mm² THHN 100 I.m.

8 30mm² THHN 100 I.m.

9 22mm² THHN 1,172 I.m.

11 5.5mm² THHN 5,892 I.m.

12 3.5mm² THHN 31,866 I.m.

16 50mm² TW(G) 250 I.m.

17 30mm² TW(G) 100 I.m.

19 14mm² TW(G) 30 I.m.

20 8.0mm² TW(G) 363 I.m.

21 5.5mm² TW(G) 1,473 I.m.

22 3.5mm² TW(G) 11,896 I.m.

16.2.3 Boxes & Wiring Devices

1 Octagonal Box 550 ea.

2 Utility Box 126 ea.

3 Duplex convenience outlet, 20A, 2P, 3W, 230V, Grounding type 260 set

4 Ditto except weatherproof type 6 set

5 Ditto except floor mounted type 190 set

16.2.4 Board & Equipment

1MDP - PT1: 400V,3Ø, 3+N+G, 60Hz, 145KAIC, Nema 1 Encl, Floor

Mounted1

assembl

y

Main: 3200AT / 4000AF, 3P, AIR CIRCUIT BREAKER

Branches: 2-1000AT / 1200AT, 3P

1 - 800AT / 1200AF, 3P

1 - 400AT / 400AF, 3P

3 -50AT / 100AF, 3P

BOQ / Passenger Terminal Bldg. Page 50 of 70

Page 51: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

2MDP - PT2: 400V,3Ø, 3+N+G, 60Hz, 145KAIC, Nema 1 Encl, Floor

Mounted1 assembly

Main: 3200AT / 4000AF, 3P, AIR CIRCUIT BREAKER

Branches: 1-1200AT / 1200AF, 3P

1-800AT / 1200AF, 3P

1 - 300AT / 400 AF, 3P

1 - 150 AT / 225 AF, 3P

1 - 100AT / 100AF, 3P

2-50AT / 100AF, 3P

1 - 30AT / 100AF, 3P

3DPPT: 230V, 3ø, 3W+G, 60Hz, 25KAIC, Nema 1 Encl, Surface

Mounted1 assembly

Main: 2500AT / 3200AF, 3P, MCCB

Branches: 1-500AT / 600AF, 3P

1-300AT / 400AF, 3P

6-175AT / 225AF, 3P

2-150AT / 225AF, 3P

2-125AT / 225AF, 3P

1-100AT / 100AF, 3P

1-30AT / 100AF, 3P

1 - TVSS , 100kA / phase

4 LPPT1A: 400/230V, 3Ø, 4W+G, 60Hz, 18KAIC, Nema 1 Encl, Surface 1 assembly

Main: 80AT / 100AF, 3P

Branches: 16-20AT / 100AF, 1P

5LPPT1B: 400/230V, 3Ø, 4W+G, 60Hz, 18KAIC Nema 1 Encl, Surface

Mounted1 assembly

Main: 100AT / 100AF, 3P

Branches: 24-20AT / 100AF, 1P

6LPPT1C: 400/230V, 3Ø, 4W+G, 60Hz, 18KAIC Nema 1 Encl, Surface

Mounted1 assembly

Main: 150T / 225AF, 3P

Branches: 21-20AT / 100AF, 2P

1-50AT / 100AF, 3P

7LPPT1D:400/230V, 3Ø, 4W+G, 60Hz, 18KAIC Nema 1 Encl, Surface

Mounted1 assembly

Main: 100AT / 100AF, 3P

Branches: 22-20AT / 100AF, 1P

9LPPT1F: 400/230V, 3ø, 4W+G, 60Hz, 18KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 180AT / 100AF, 3P

Branches: 22-20AT / 100AF, 1P

10LPPT1G: 400/230V, 3ø, 4W+G, 60Hz, 18KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 180AT / 100AF, 3P

Branches: 22-20AT / 100AF, 1P

11LPPT2A: 400/230V, 3ø, 4W+G, 60Hz, 18KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 80AT / 100AF, 3P

Branches: 18-20AT / 100AF, 1P

12LPPT2B: 400/230V, 3ø, 4W+G, 60Hz, 18KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main : 80AT / 100AF, 3P

Branches 12-20AT / 100AF,1P

14LPPT2D: 400/230V, 3ø, 4W+G, 60Hz, 18KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 80AT / 100AF, 3P

Branches: 18-20AT / 100AF, 1P

15LPPT2E: 400/230V, 3ø, 4W+G, 60Hz, 18KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 80AT / 100AF, 3P

Branches: 18-20AT / 100AF, 1P

16LPPT2F: 400/230V, 3ø, 4W+G, 60Hz, 18KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 80AT / 100AF, 3P

Branches: 18-20AT / 100AF, 1P

17LPPT2G: 400/230V, 3ø, 4W+G, 60Hz, 18KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 80AT / 100AF, 3P

Branches: 18-20AT / 100AF, 1P

18PPPT1A: 400/230V, 3ø, 4W+G, 60Hz, 35KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main : 225AT / 275AF, 3P

Branches: 11-100AF/50AT,3P

1-30AT / 100AF, 3P

BOQ / Passenger Terminal Bldg. Page 51 of 70

Page 52: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

2-30AT / 100AF, 3P

1-TVES, 50KA/PHASE

19PPPT1B: 400/230V, 3ø, 4W+G, 60Hz, 25KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 100AT / 100AF, 3P

Branches: 24-20AT / 100AF, 1P

20PPPT1C: 400/230V, 3ø, 4W+G, 60Hz, 25KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 100AT / 100AF, 3P

Branches: 18-20AT/100AF, 1P

21PPPT1D: 400/230V, 3ø, 4W+G, 60Hz, 25KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 100AT / 100AF, 3P

Branches: 24-20AT / 100AF, 1P

22PPPT1E: 400/230V, 3ø, 4W+G, 60Hz, 25KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 100AT / 100AF, 3P

Branches: 24-20AT / 100AF, 1P

23PPPT1F: 400/230V, 3ø, 4W+G, 60Hz, 25KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 100AT / 100AF, 3P

Branches: 24-20AT / 100AF, 1P

24PPPT1H: 400/230V, 3ø, 4W+G, 60Hz, 35KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main: 300AT / 400AF, 3P

Branches: 1-100AT / 100AF, 3P

7-50AT/100AF, 3P

7-50AT/100AF, 3P

7-50AT/100AF, 3P

TVES, 50KA/PHASE

25PPPT1I: 230V, 3ø, 4W+G, 60Hz, 35KAIC, Nema 1 Enclosure, Surface

Mounted1 assembly

Main: 125AT / 225AF, 3P

Branches: 20-20AT / 100AF, 3P

TVES, 50KA/PHASE

26PPPT1J: 230V, 3ø, 4W+G, 60Hz, 35KAIC, Nema 1 Enclosure, Surface

Mounted1 assembly

Main: 125AT / 225AF, 3P

Branches: 20-20AT / 100AF, 3P

TVES, 40KA/PHASE

27PPPT1K: 230V, 3ø, 4W+G, 60Hz, 35KAIC, Nema 1 Enclosure, Surface

Mounted1 assembly

Main: 300AT / 400AF, 3P

Branches: 20-20AT / 100AF, 3P

TVES, 40KA/PHASE

28PPPT2A: 400/230V, 3ø, 4W+G, 60Hz, 25KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main : 100AT / 100AF, 3P

Branches: 24-20AT/100AF, 1P

29PPPT2B: 400/230V, 3ø, 4W+G, 60Hz, 25KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main : 100AT / 100AF, 3P

Branches: 24-20AT/100AF, 1P

30PPPT2C: 400/230V, 3ø, 4W+G, 60Hz, 42KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main : 250AT / 400AF, 3P

Branches: 1-100AT / 100AF, 3P

1-100AT / 100 AF, 3P

1-150AT / 100AF, 3P

6-20AT/100AF, 3P

TVES, 50KA/PHASE

31PPPT2D: 400/230V, 3ø, 4W+G, 60Hz, 42KAIC, Nema 1 Enclosure,

Surface Mounted1 assembly

Main : 300AT / 400AF, 3P

Branches: 2-100AT/100AF, 3P

7-50AT / 100 AF, 3P

7-50AT / 100 AF, 3P

3-20AT / 100AF, 3P

32 ECB 20AT, 100AF 1P, 230V, 60Hz, NEMA 1 Enclosure, Surface Mounted 4 assembly

33 -DITTO- but NEMA 3R 400V/60Hz 6 assembly

34ECB 100AT, 100AF 3P, 400V 60Hz, NEMA 1 Enclosure, Surface

Mounted3 assembly

35 -DITTO- but 50AT/100AF/3P 19 assembly

36 -DITTO- but 20AT/100AF/3P 5 assembly

BOQ / Passenger Terminal Bldg. Page 52 of 70

Page 53: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

37ECB, 50AT, 100AF, 3P, 400V, 60Hz, NEMA 3P Enclosure, Surface

Mounted16 assembly

38 -DITTO- but 20AT 20 assembly

39Dry Type Transformer, WYE-DELTA, 75KVA,3P,400V Primary-230V

Secondary, 60Hz including 100mm high, concrete pad1

assembl

y

40 Cable Tray (All necessary fittings, supports and other accessories are

40.1Cable Tray, Ladder Type 600mmW x 150mmD x 2400mL, GA. 16 with

rung spacing of 300mm max. (Straight, 2.4m / Length)25 lgth.

40.2Cable Tray, Ladder Type 600mmW x 150mmD, GA. 16 with rung spacing

of 300mm max. (Bend 90 deg.)4 lgth.

40.3 Pre-fabricated pull box, 200x600x1000 GA. 16 4 ea.

41 Testing and Commissioning 1 lot

Sub - total

16.3 Gounding System (Auxiliary System Included)

16.3.1Roughing-ins (all necessary fittings, supports and other accessories are

already included from straight pipes)

1 63 mmø uPVC 15 l.m.

2 50 mmø uPVC 66 l.m.

3 32 mmø uPVC 9 l.m.

4 25 mmø uPVC 81 l.m.

16.3.2 Wires & Cables (including connectors, etc.)

1 100mm² Medium Drawn Bare Copper Wire 660 I.m.

2 100mm² TW 15 l.m.

3 50mm² TW 100 l.m.

4 30mm² TW 10 l.m.

5 22mm² TW 33 l.m.

6 14mm² TW 56 I.m.

7 8mm² TW 45 l.m.

16.3.3 Grounding

1 20 mmø x 3048 mm long Copper Bonded Ground Rod 74 set

2 Ground Test Well 5 set

3 Air Terminal Lightning Arrester, ESE Type 1 set

4 Exothermic Welded Joint, CADWELD

Type "GT" Cable to Ground Rod 70 set

Type "TA" Cable to Cable 47 set

Type "RJ" Cable to Rebar 47 set

16.3.4 Testing and Commissioning 1 lot

Sub - Total

16.4 Fire Alarm System

16.4.1Roughing-Ins (All necessary fittings, supports and other accessories are

already included from straight pipes)

1 20mmø IMC pipes 2,130 I.m.

2 15mmø Flexible Metal Conduit 140 I.m.

16.4.2 Boxes

1 Octagonal Box, 50 mm x 100 mm x 54 mm 285 ea.

2 Utility box, 50 mm x 100 mm x 54 mm 92 ea.

3 Pullbox (200mm x 325mm x 175mm) 2 ea.

16.4.3 Wires & Cables (including connectors etc.)

1 2.0mm² TW wire 1,110 I.m.

2 1.25mm² Shielded Twisted Pair, Fire Rated Cable 2,240 I.m.

16.4.4 FA Equipment & Devices

1 Fire Alarm Horn with Strobe Light 20 set

2 Manual Pull Station, Break Glass Type 22 set

3 Smoke Detector 272 set

4 Smoke Detector, Duct Type 12 set

5 Fire Alarm Control Panel, Addressable Type (FACP) with TVSS 1 set

6 Zone addressable module 32 set

7 Heat Detector 20 set

16.4.5 Testing and Commissioning 1 lot

Sub - Total

16.5 Telephone System

16.5.1Roughing-ins(All necessary fittings, supports and other accessories are

already included from straight pipes)

1 20 mmø PVC 125 l.m.

2 25 mmø PVC 699 l.m.

3 32 mmø PVC 2,790 l.m.

BOQ / Passenger Terminal Bldg. Page 53 of 70

Page 54: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

4 63 mmø PVC 5 l.m.

5 75 mmø PVC 10 l.m.

6 90 mmø PVC 10 l.m.

7 110 mmø PVC 100 l.m.

16.5.2 Wires & Cables (including connectors , etc.)

1 4-pairs x 0.64mm, UTP Cable, Cat6a 7,252 l.m.

2 25-Pairs, 24AWG UTP MULTI-PAIR CABLE, CAT6A 36 l.m.

16.5.3 Boxes

1 Utility box 90 ea.

2 Pullbox(256x296x182) 1 ea.

3 Pullbox(504x389x213) 1 ea.

4 Pullbox(200x175x175) 1 ea.

16.5.4 Devices

1 Double Work Station outlet, Voice Direct Line(RJ11) & Data Line (RJ45) 67 set

2 ditto except floor mounted 43 set

3 ditto except voice only 22 set

16.5.5 Equipment

1 MTTC 1 assembly

2 MDF 1 assembly

3 IDF-P1 1 assembly

4 PABX 1 assembly

16.5.6 Testing and Commissioning 1 lot

Sub - Total

16.6 Public Address System

16.6.1Roughing-ins(All necessary fittings, supports and other accessories are

already included from straight pipes)

1 20mmø IMC 1,992 l.m.

2 15mmø FMC 165 l.m.

16.6.2 Wires & Cables (Including connectors, etc)

1 2.0mm2 Shielded Twisted Pair 2,189 l.m.

16.6.3 Boxes

1 Octagonal Box 96 ea.

2 Utility Box 10 ea.

3 Pullbox (256x182x182) 1 ea.

4 Pullbox (256x410x182) 1 ea.

16.6.4 PA Devices

1PA Equipment (incl. 5-100W ampl., dvd/cd player, usb, mixer frame, mic.

Pre amplifiers, power supply, mounting raCK, remote microphone, etc.)1 lot

2 10 watt Speaker, Cone Type Ceiling Mounted 48 set

3 10 watt Speaker, Cone Type Wall Mounted 26 set

4 Horn Type Speaker, 15W 13 set

16.6.5 Testing and Commissioning 1 lot

Sub - Total

16.7 CATV System

16.7.1Roughing-ins(All necessary fittings, supports and other accessories are

already included from straight pipes)

1 25 mm ø PVC 786 l.m.

16.7.2 Wires & Cables (including, connectors, etc)

1 CAT 6E UTP Cable, 4 pairs 812 l.m.

2# 540 Series Jacketed Coaxial Cable with Integral Messenger wire(By

Service Provider)88 l.m.

16.7.3 Boxes and CATV Devices

1 Utility Box 22 ea.

2 Pull Box (500x500x182) 1 ea.

3 Pull Box (910x910x200) 1 ea.

4 CATV System 1 set

16.7.4 Testing and Commissioning 1 lot

Sub- Total

16.8 CCTV System

16.8.1Roughing-ins(All necessary fittings, supports and other accessories are

already included from straight pipes)

1 20mmø IMC 6,319 l.m.

16.8.2 Wires & Cables (including, connectors, etc)

1 CAT 6E UTP Cable 4 Pairs 6,437 l.m.

16.8.3 Boxes

1 Junction Box 76 ea.

16.8.4 CCTV Devices

BOQ / Passenger Terminal Bldg. Page 54 of 70

Page 55: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

1 Fixed CCTV Camera Dome Type 43 ea.

2 Zoom Pan Tilt CCTV Camera Dome Type 33 ea.

3

CCTV Equipments (including Power Supply, TVSS and 7 -16ch NVR

LED Monitor, Camera Controller, Network Switch, CPU & NVR Server

PC.)

1 lot

16.8.5 Testing and Commissioning 1 lot

Sub- Total

16.9 Flight Information Display System

16.9.1Roughing-ins(All necessary fittings, supports and other accessories are

already included from straight pipes)

1 20 mmø IMC 1,128 l.m.

16.9.3 Wires & Cables (including connectors, etc.)

1 CAT 6E UTP Cable, 4 Pairs 1,180 l.m.

16.9.4 Flight Information Display System Devices

1FID LCD 32" (including monitor, display system, ups, transmitter,receiver,

mounting support & other accs needed)2 set

2FID LCD 46" (including monitor, display system, ups, transmitter,receiver,

mounting support & other accs needed)11 set

3FID LCD 62" (including monitor, display system, ups, transmitter,receiver,

mounting support & other accs needed)1 set

4FIDS console (including computer, software, server, monitor, hub, spare

& other accs to complete the system)1 set

16.9.5 Testing and Commissioning 1 lot

Sub - Total

16.10 Master Clock System

16.10.1 Roughing-ins(All necessary fittings, supports and other accessories are

1 20 mmø IMC 816 l.m.

16.10.2 Boxes

1 Junction Box 20 ea.

2 Pull Box, 300x500x200mm 2 l.m.

16.10.3 Wires & Cables (including connectors, etc.)

1 CAT 6E UTP Cable, 4 Pairs 8,162 l.m.

16.10.4 Clock System devices mounted wall clock unit 16 ea.

16.10.5 Master Electric Clock Equipments

1

Master Clock System including time control center, wired control,

extended battery back-up module, interface module, UPS, close bay rack

and all miscellaneous as specified in Electrical Drawings and Technical

Specifications.

1 lot

16.10.7 Testing and Commissioning 1 lot

Sub - Total

TOTAL - ELECTRICAL WORKS

BOQ / Passenger Terminal Bldg. Page 55 of 70

Page 56: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

DEPARTMENT OF TRANSPORTATION AND COMMUNICATION

S U M M A R Y

3.1 ARRIVAL & DEPARTURE

DIV-02 SITE CONSTRUCTION 1 l.s.

DIV-03 CONCRETE WORKS 1 l.s.

DIV-04 MASONRY WORKS 1 l.s.

DIV-05 METAL WORKS 1 l.s.

DIV-07 THERMAL AND MOISTURE PROTECTION 1 l.s.

DIV-08 DOORS AND WINDOWS 1 l.s.

DIV-09 FINISHES 1 l.s.

DIV-10 SPECIALTIES 1 l.s.

DIV-12 FURNISHING 1 l.s.

DIV-15 MECHANICAL WORKS

15.1 Plumbing Works 1 l.s.

15.2Airconditioning & Ventilation, Fire Protection System including Testing

and Commissioning1 l.s.

DIV-16 ELECTRICAL WORKS 1 l.s.

TOTAL COST -ARRIVAL & DEPARTURE

TOTAL

CONSTRUCTION COST

BILL OF QUANTITIES

BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT

Daraga, Albay

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

BOQ / Arrival & Departure Page 56 of 70

Page 57: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

3.1 ARRIVAL & DEPARTURE

DIV-02 SITE CONSTRUCTION

2.0 SITE WORKS

2.1.1 Building Layout 486 sq.m.

2.1.2 Structure Excavation 382 cu.m.

2.1.3.1 Backfill excavations with suitable excavated materials 297 cu.m.

2.1.3.2 Gravel base; 150 mm thk 101 cu.m.

2.1.4 Soil Disposal

2.1.4.1 Remove surplus excavated material from site 85 cu.m.

2.1.5 Subgrade Preparation 486 sq.m.

2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of

excavations1,060 sq.m.

Total "DIV-02" - SITE CONSTRUCTION

DIV-03 CONCRETE WORKS

3.1 Cast-In-Place Structural Concrete

3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa

3.1.1.1 Foundation, Wall Footing 56 cu.m.

3.1.1.2 Footing Tie Beam 18 cu.m.

3.1.1.3 Columns and Pedestal 26 cu.m.

3.1.1.4 Beams, Coping beams 20 cu.m.

3.1.1.5 Stiffeners columns, lintel and bond beam (Exterior Wall) 3 cu.m.

3.1.1.10 Counter top 1 cu.m.

3.1.2 Reinforced concrete; 3000 psi or 21 Mpa

3.1.2.1 Slab-on-grade /fill 79 cu.m.

3.2 Reinforcement in concrete

3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,

binders, and tie wires, etc; grade 60

3.2.1.1 Foundation, Wall Footing 5,409 kg.

3.2.1.2 Footing Tie Beam 4,316 kg.

3.2.1.3 Columns and Pedestal 4,641 kg.

3.2.1.4 Beams, Coping beams 4,641 kg.

3.2.1.5 Stiffeners columns, lintel and bond beam (Exterior Wall) 168 kg.

3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,

binders, and tie wires, etc; grade 40

3.2.2.1 Footing Tie Beam 1,279 kg.

3.2.2.2 Columns and Pedestal 2,559 kg.

3.2.2.3 Beams, Coping beams 1,960 kg.

3.2.2.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 573 kg.

3.2.2.9 Counter top 101 kg.

3.2.2.11 Slab on Grade 5,032 kg.

3.3 Formwork

3.3.1 Foundation, Wall Footing 75 sq.m.

3.3.2 Footing Tie Beam 142 sq.m.

3.3.3 Columns and Pedestal 162 sq.m.

3.3.4 Beams, Coping beams 182 sq.m.

3.3.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 53 sq.m.

3.3.9 Counter top 7 sq.m.

3.3.12 Slab on Grade /fill 10 sq.m.

3.4 Concrete Accessories

3.4.1 Expansion joint with sealant; pre-formed type

3.4.1.1 At Slab-on-grade 116 l.m.

Total "DIV-03" - CONCRETE WORKS

DIV-04 MASONRY WORKS

4.1 Accessories

4.1.1 Concrete Grout, 2000 psi 16 cu.m.

4.1.2Concrete lintel and bond beams inclusive of formworks and Steel

reinforcements, Grade 40 (For Interior Walls)2 cu.m.

4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 1,019 kg.

4.2 CHB

4.2.2 150mm thk (700 psi) - Interior Wall 186 sq.m.

4.2.3 100mm thk (350 psi / 2.5 N/mm2) 2 sq.m.

Total "DIV-04" - MASONRY WORKS

DIV-05 METAL WORKS

5.3

Roof Framing: Fabrication, delivery and erection of structural steel

including trusses, rafters, battens, purlins, sag rods, cross bracings with

turn buckles, bolts, plates, paint and all other incidentals to complete

21,990 kg.

Total "DIV-05" - METAL WORKS

DIV-07 THERMAL AND MOISTURE PROTECTION

7.1 Dampproofing and Waterproofing

7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 486 sq.m.

7.3 Insulation

7.3.1 P.E. foam insulation for Roof 522 sq.m.

BOQ / Arrival & Departure Page 57 of 70

Page 58: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

7.4 Roofing and Accessories

7.4.1Pre-painted horizontal roof sheet including bended materials, metal

capping and all incidentals to complete

7.4.1.1 To Main Roof 522 sq.m.

Total "DIV-07"-THERMAL AND MOISTURE PROTECTION

DIV-08 DOORS AND WINDOWS

8.1 WINDOWS & CURTAINWALL

8.1.212mm thk. Clear tempered frameless glass panels including all incidentals

to complete

8.1.2.20 W-3, 8400 x 3600mm 4 set

8.1.412mm thk. Clear tempered frameless glass partitions with door openings

including all incidentals to complete

8.1.4.19W-1, 6600 x 3000mm (8400 less 1800; double leaf swing door on

separate item)2 set

8.1.4.20W-2, 6600 x 3000mm (8400 less 1800; double leaf swing door on

separate item)2 set

8.1.4.21W-4, 6600 x 3000mm (8400 less 1800; double leaf swing door on

separate item) 1 set

Sub-total "8.1" - WINDOWS

8.2 DOORS AND PANELS

8.2.1 Glass Door

8.2.1.312mm thk tempered frameless swing glass door, double leaf including

stainless steel door locks, floor hinges and other incidentals to complete

8.2.1.3.2 D1 ; 1800 x 3000mm 5 set

8.2.2 Steel Door

8.2.2.3Single leaf swing flush metal door with bottom louver including door jamb

and all incidentals to complete, painted finish

8.2.2.3.2 D-2 & D-3 ; 850 x 2100mm 3 set

Sub-total "8.2" - DOORS AND PANELS

8.3 HARDWARES

8.3.1 Lockset

8.3.1.2 Cylindrical lever type lockset 3 set

8.3.3 Closer

8.3.3.1 Surface Mounted Door Closer 3 set

8.3.4 Hinges

8.3.4.2 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 12 pair

8.3.5 Door Accessories

8.3.5.3 Push and Pull plate 1 set

Sub-total "8.3" - HARDWARES

Total "DIV-08" - DOORS AND WINDOWS

DIV-09 FINISHES

9.1 FLOOR FINISHES

9.1.13 300 x 300mm unglazed ceramic tiles, including mortar bed and other

incidentals to complete430 sq.m.

9.1.14 300 x 300mm unglazed ceramic tiles, including mortar bed and other

incidentals to complete at Toilet57 sq.m.

Sub-total "9.1" - FLOOR FINISHES

9.2 WALL FINISHES

9.2.1 Plain cement plaster wall Painted Finish 299 sq.m.

9.2.2200 x 200mm ceramic tiles, including mortar bed and other incidentals to

complete3 sq.m.

9.2.6 300 x 300mm Glazed ceramic wall tiles (including mortar bed) 151 sq.m.

9.2.89mm Gypsum board (on both sides) on metal framing system at

Telephone booth10 sq.m.

Sub-total "9.2" - WALL FINISHES

9.3 CEILING FINISHES

9.3.1 3.5mm Ficem board on metal frame 430 sq.m.

9.3.3 12mm thk. Moisture Resistant Gypsum Board on metal frame 57 sq.m.

9.3.5 Metal spandrel ceiling 144 sq.m.

Sub-total "9.3" - CEILING FINISHES

9.4 BASE BOARD FINISHES

9.4.1 100mm high painted base 37 l.m.

Sub-total "9.4" - BASE BOARD FINISHES

9.5 PAINTING WORKS

9.5.2 At Wall

9.5.2.1 Painting on concrete surfaces, textured paint finish (exterior) 118 sq.m.

9.5.2.2 Painting on concrete surfaces, smooth paint finish (interior) 180 sq.m.

9.5.2.4 Painting on gypsum board surfaces 20 sq.m.

9.5.3 At Ceiling

9.5.3.2 Painting on Fiber cement board surfaces 430 sq.m.

BOQ / Arrival & Departure Page 58 of 70

Page 59: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

9.5.3.3 Painting on Gypsum board surfaces 57 sq.m.

9.5.4Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy

Paint17 sq.m.

Sub-total "9.5" - PAINTING WORKS

Total "DIV-09" - FINISHES

DIV-10 SPECIALTIES

10.1 Countertops

10.1.1 Granite Countertop W=600mm 6 sq.m.

10.26mm thick Facial mirror on 6mm thick marine plywood backing inclusive

all incidentals to complete

10.2.1 650 x 1000mm 1 set

10.2.5 1875 x 1000mm 2 set

10.3 Stainless Steel Grab bar at PWD Toilet 2 set

10.4

Toilet compartments/cubicles - comprising 12mm thk intermediate panels,

doors, and partitions/compartments (compact laminated phenolic board)

including all hardwares and accessories in nylon finish and all other

incidentals to complete

44 sq.m.

10.5 Phenolic Urinal Partition 400 x 1400mm 3 set

10.6 Plumbing Fixtures Accessories

10.6.2 Paper Holder, wall mounted 13 set

10.6.3 Deck Type Liquid Soap Dispenser 3 set

10.8Aluminum Composite Panel, inclusive of metal frame, sealant and all

incidentals to complete

10.8.1 Exterior and Interior Column 54 sq.m.

10.8.2 Roof Eaves 254 sq.m.

10.9 Roller Blinds 227 sq.m.

10.11 Signages including fixing material, frame and all incidentals to complete

10.11.20Item 20 - ( T1 ) Restrooms - Pendant mounted w/ pictogram of

international symbol of man, woman & handicapped accessibility1 set

10.11.29Item 29 - ( CS ) Concessionaire - Flush wall mounted & pendant

mounted with pictogram1 set

10.12Door signs (metal plate) including fixing material and all incidentals to

complete

10.12.1 Ladies 1 set

10.12.2 Gentlemen 1 set

10.12.3 PWD 1 set

Total "DIV-10" - SPECIALTIES

DIV-12 FURNISHING

12.1 Public Furniture

12.1.7 Lounge Seats ; 4 attached chairs 32 set

12.1.10 Lounge Center Table ; 300 x 600mm 32 set

12.1.11 Lounge Center Table, 400 x 400mm 2 set

12.1.21 Dining Table and chair for 4 persons 16 set

Total "DIV-10" - SPECIALTIES

BOQ / Arrival & Departure Page 59 of 70

Page 60: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

DIV-15 MECHANICAL WORKS

15.1 PLUMBING WORKS

15.1.1 PLUMBING FIXTURES

1Water closet elongated including seat and cover with flush valve fitting

complete with standard accessories13 set

3Urinal wall-hung with flush valve fitting complete with standard

accessories4 set

5Under-the-counter-lavatory complete with single lever faucet, angle valve,

flexible hose, p-trap, drains and standard accessories4 set

Sub-Total

15.1.2 DOMESTIC WATER PIPING

15.1.2.1

Polypropylene Pipe (PPR PN 20), including couplings, hangers, brackets,

clamps, u-bolts, supports, sleeves, paintings and other consumable

materials to complete as specified in Mechanical Drawings and Technical

Specifications.

4 50 mm dia PPR Pipe 28 l.m.

5 40 mm dia PPR Pipe 5 l.m.

6 32 mm dia PPR Pipe 12 l.m.

7 25 mm dia PPR Pipe 76 l.m.

8 20 mm dia PPR Pipe 9 l.m.

9 15 mm dia PPR Pipe 6 l.m.

15.1.2.2

Polypropylene Pipe Fittings (PPR PN 20), including paintings,

miscellaneous supports, consumable materials and other accessories to

complete

15.1.2.2.1 Tee

10 50 mm dia, PPR Tee 3 ea.

12 50 x 32 mm dia, PPR Tee 4 ea.

16 40 x 32 mm dia, PPR Tee 4 ea.

17 40 x 25 mm dia, PPR Tee 2 ea.

19 40 x 15 mm dia, PPR Tee 1 ea.

20 32 mm dia, PPR Tee 18 ea.

21 32 x 25 mm dia, PPR Tee 3 ea.

23 32 x 15 mm dia, PPR Tee 2 ea.

29 15 mm dia, PPR Tee 7 ea.

15.1.2.2.2 Reducer

9 50 x 40 mm dia, PPR Reducer 1 ea.

10 50 x 32 mm dia, PPR Reducer 12 ea.

16 32 x 20 mm dia, PPR Reducer 17 ea.

17 32 x 15 mm dia, PPR Reducer 4 ea.

18 25 x 20 mm dia, PPR Reducer 17 ea.

19 20 x 15 mm dia, PPR Reducer 7 ea.

15.1.2.2.3 Adapter

1 Female adapter 15 mm dia. 7 ea.

4 Female adapter 38 mm dia. 13 ea.

15.1.2.2.4 End Cap

1 25mm dia. 17 ea.

2 20mm dia. 7 ea.

15.1.2.2.5 90 deg. Bend

3 65 mm x 90 deg. PPR Bend 1 ea.

4 50 mm x 90 deg. PPR Bend 3 ea.

5 40 mm x 90 deg. PPR Bend 2 ea.

6 32 mm x 90 deg. PPR Bend 7 ea.

7 25 mm x 90 deg. PPR Bend 16 ea.

9 15 mm x 90 deg. PPR Bend 1 ea.

BOQ / Arrival & Departure Page 60 of 70

Page 61: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

15.1.2.2.6 Hosebibb

2 15 mm dia ( Irrigation) 2 ea.

15.1.2.2.7 Sleeve Type Coupling

5 50 mm dia, Union 3 ea.

6 40 mm dia, Union 1 ea.

15.1.2.2.8

Gates Valves and devices including grooves / flanges, gasket, bolts &

nuts, adaptors, tagging, sealant and all other necessary accessories to

complete the system

4 50 mm dia Gate Valve 3 ea.

5 40mm dia Gate Valve 1 ea.

15.1.2.2.9 Water Hammer Arrester

2 Type B 8 ea.

Sub – Total

15.1.3 SANITARY WASTE PIPING

15.1.3.1

Unplasticized Polyvinyl Chlorine (uPVC) Pipe conforming to ASTM D2729

Series 1000m including hangers and supports and other necessary

accessories to complete the system

2 100 mm dia Soil/Waste Pipe 22 I.m.

3 75 mm dia Soil/Waste Pipe 19 I.m.

4 50 mm dia Waste Pipe 18 I.m.

5 100 mm uPVC Wye 4 ea.

6 100 x 75 mm uPVC Wye 17 ea.

7 100 x 50 mm uPVC Wye 18 ea.

8 75 mm uPVC Wye 1 ea.

9 75 x 50 mm uPVC Wye 19 ea.

15.1.3.3 90 deg uPVC Bend

1 150 mm dia, 90 deg uPVC Bend 1 ea.

2 100 mm dia, 90 deg uPVC Bend 9 ea.

10.1 75 mm dia, 90 deg uPVC Bend 13 ea.

10.1 50 mm dia , 90 deg uPVC Bend 9 ea.

15.1.3.4 45 deg uPVC Bend

2 100mm dia, 45 deg uPVC Bend 7 ea.

3 75 mm dia, 45 deg uPVC Bend 1 ea.

4 50 mm dia, 45 deg uPVC Bend 10 ea.

15.1.3.6 P- Trap

3 P- Trap, 50 mm dia 8 ea.

15.1.3.7 Sanitary Tee

1 50 mm dia, uPVC Santee 9 ea.

15.1.3.8 Floor Clean Out

2 100 mm dia Floor Clean Out 6 ea.

8 Gully Trap (3-way inlet), 75 mm dia 4 ea.

Sub-Total

15.1.4 VENT PIPING

15.1.4.1

Unplasticized Polyvinyl Chlorine (uPVC) Pipe conforming toASTM D2729

Series 1000, including hangers and supports and other necessary

accessories to complete the system

1 150 mm dia uPVC Pipe Pipe 8 I.m.

2 100 mm dia uPVC Pipe 8 I.m.

3 75 mm dia uPVC Pipe 10 I.m.

4 65 mm dia uPVC Pipe 12 I.m.

5 50 mm dia uPVC Pipe 14 I.m.

BOQ / Arrival & Departure Page 61 of 70

Page 62: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

15.1.4.2 PVC Tee

1 100 mm dia., uPVC Tee 2 ea.

3 100 x 50 mm dia, uPVC Tee 5 ea.

5 75 x 50 mm dia, uPVC Tee 3 ea.

6 65 x 50 mm dia, uPVC Tee 5 ea.

7 50 mm dia, uPVC Tee 6 ea.

15.1.4.3 90 deg uPVC Bend

2 75 mm dia., 90 deg uPVC Bend 2 ea.

3 65 mm dia., 90 deg uPVC Bend 4 ea.

4 50 mm dia, 90 deg uPVC Bend 13 ea.

15.1.4.4 Reducer

2 100 x 75 mm dia, uPVC Reducer 2 ea.

3 100 x 50 mm dia, uPVC Reducer 1 ea.

4 75 x 65 mm dia, uPVC Reducer 2 ea.

6 65 x 50 mm dia, uPVC Reducer 2 ea.

15.1.5.12 Vent Thru Roof

1 100 mm dia 1 ea.

Sub-Total

15.1.5 STORM DRAINAGE PIPING

15.1.5.1

Unplasticized Polyvinyl Chlorine (uPVC) Pipe conforming to ASTM D2729

Series 1000, including hangers and supports and other necessary

accessories to complete the system

2 150 mm dia. uPVC Pipe 18 I.m.

4 75 mm dia. uPVC Pipe 55 l.m.

15.1.5.2Unplasticized Polyvinyl Chlorine (uPVC) Pipe conforming to ASTM D2729

Series 1000, includes trenching, bedding, disposal, etc.

1 250 mm dia. uPVC Pipe 6 l.m.

2 200 mm dia. uPVC Pipe 18 l.m.

3 150 mm dia. uPVC Pipe 38 l.m.

15.1.5.4 uPVC Tee

3 150 mm dia uPVC Tee 4 ea.

15.1.5.5 90 deg. uPVC Bend

2 150 mm dia, 90 deg. uPVC Bend 8 ea.

3 75 mm dia, 90 deg uPVC Bend 38 ea.

15.1.5.6 Reducer

2 150 x 75 mm dia, uPVC Reducer 4 ea.

15.1.5.7 Roof Strainers

3 Roof Strainer, 75 mm dia. 14 ea.

15.1.5.8 Junction Box

3 Junction Box (675 x 675 x 1200 mm) 10 ea.

Sub-Total

TOTAL - PLUMBING WORKS

15.2 HEATING, VENTILATION & AIR CONDITIONING/ FIRE PROTECTION

15.2.1 Air Conditioning System

Equipment, see schedule for specifications (to include all other necessary

works to make the unit complete and operational.)Note: AHU/PAHU's are

with VFD motor and VFD Panel & LMCP (Bypass) for each Unit.

BOQ / Arrival & Departure Page 62 of 70

Page 63: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

15.2.1.1

Multi-Split type Air-cooled Condensing Units; complete with C/W

refrigerant piping, drain pipe, insulation, pre-filter and remote controller

and all other necessary accessories, support/hangers/connections, base

as specified in the Mechanical Drawings and Technical Specifications.

1Variable Refrigerant Volume Type; Ceiling Mounted Cassette type 2-Way

Double Flow; cooling capacity 14.5 KW (5.0HP); 220V-1ph-60 Hz6 set

2VRV IV Outdoor Unit R-410A refrigerant 16 series, Cooling only model,

380V-3ph-60 Hz 1 set

3VRV IV Outdoor Unit R-410A refrigerant 14 series, Cooling only model,

380V-3ph-60 Hz 1 set

15.2.1.2Exhaust air duct with volume dampers, supports, etc. (w/o insulation),

Ga.26

1 500 x 300 mm 25 sq.m.

2 150 x 150 mm 14 sq.m.

15.2.1.3

Supply Ceiling Diffuser c/w OBD (Opposed Blade Damper), plenum

boxes & liner.

1 525 x 525 2 set

15.2.1.4 Return Ceiling Diffuser c/w OBD and plenum boxes

1 400 x 400 2 set

15.2.1.5 Exhaust Air Louver c/w insect screen (exposed -weatherproof)

1 500 x 300 2 set

15.2.1.6 Ventilation Exhaust Air Diffuser (EAD)c/w plenum boxes

1 225 x 225 8 set

15.2.1.7 Condensate Drain Line System

15.2.1.7.1 Condensate Drain Piping, PVC pipe, sch 40, class 150 including fittings

1 25 mm ø 119 l.m.

15.2.1.7.2 Condensate Drain pipe insulation, 19 mm thk flexible elastomeric

1 25 mm ø 119 l.m.

Sub - Total

15.2.2 Ventilation System

15.2.2.1 Fans and Blower Equipment

Equipment see schedule for specifications (to include all other necessary

works to make the unit complete and operational)

1 EF - Inline, 1188 CMH, 230v/1ph/60hz 2 set

Sub - Total

15.2.3 Fire Protection System

15.2.3.1 Fire Extinguisher

1

FE-1 : 4.5 kg. Siliconized mono ammonium phosphate dry chemical

wall mounted multi- purpose portable fire extinguisher complete with

hose and horn, wall bracket, UL listed and FM approved.

2 set

Sub - Total

15.2.4 Testing and Commisioning (ACV and FP) 1 lot

Sub - Total

TOTAL - HEATING, VENTILATION & AIR CONDITIONING/ FIRE

PROTECTION

BOQ / Arrival & Departure Page 63 of 70

Page 64: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

DIV-16 ELECTRICAL WORKS

16.1 Lighting System

16.1.1 Roughing- ins (All necessary fittings, supports and other accessories are

1 32mmØ IMC 2 I.m.

2 25mmØ IMC 32 I.m.

4 20mmØ EMT 520 l.m.

5 15mmØ Flexible Metal Conduit 34 I.m.

16.1.2 Wires & Cables (Including connectors , tapes, etc)

2 22mm² THHN 10 I.m.

4 3.5mm² THHN 2,200 I.m.

5 8.0mm² TW 3 I.m.

7 3.5mm² TW 520 I.m.

16.1.3 Lighting Fixtures including necessary supports

4

Type "P", Recessed Mounted Lighting Fixture With Parabolic Semi

Specular Louver. 4 X 9w, T8 Led Tube, 230v, 60hz, Capital & Small

Letters Indicate Fixture Type & Controlling Switch, Respectively.

46 set

6Type "PO-7", Downlight, Aluminum Single Wall Construction, 172 Mmø,

With 1-9w Led's, Emitting Yellow Color Light, 240v, 60 Hz.1 set

13

Type "WW", Wall Washer Downlight, Maxi Tube, Wall Up/Down,

Dimensions: 175 Mm Ø X 269 Mm High, Body Components: Extruded

And Die-Cast Aluminum, Highly Corrosion Resistant To Any Extreme

Environment, Ip Protection: Ip 65 Class I, Protected From Ingress Of Dust

And Water, Used Both Outdoor And Indoor Environments, Luminaire: 6

Led 16.8 Watts 700 Ma 864 Lumens, 3000k, 7 Deg., 220-240v, 60 Hz.

20 set

16Type "X", Exit Light, 2 X 8w T8 Led Tube, Shaded Quadrant Indicates

Face And Direction Respectively.4 set

19Type "N" Led Tube Lighting Fixture, 2 X 32w, T8, 230v, 60hz, With Cut-

Off Parabolic Louver4 set

21-Same As Type"C"- Except Type "K", Wet Location Listed White Trim

With Fresnel Lens.10 set

23 Emergency Lighting Fixture, With 2 X 9w Par 36 Lamp, 230v, 60hz. 2 set

24

Type "FRE" Fluorescent Lighting Fixture Surface Mounted, 1x28w, T8,

230v, 60hz W/ Electronic Gear For T8 Linear Fluorescent Tube, Housing:

Extruded Aluminum W/ Protection Glass, Form Of Protection: Ip 20 Class

1, Energy Consumption: 30w, Dimensions: 1173mm X 34mm X 53.50mm,

Mounted Atop Lavatory

2 set

16.1.4 Box & Wiring Devices

1 Junction Box 90 ea.

2 Utility Box 12 ea.

12 Light switch, 15A, 230V, 1P, GROUNDING TYPE, SINGLE-GANG. 1 set

13 DITTO, EXCEPT TWO GANG 3 set

14 DITTO, EXCEPT THREE GANG 2 set

16 DITTO, EXCEPT THREE-WAY, TWO GANG 4 set

19 Testing and Commissioning 1 lot

Sub - Total

16.2 Power System

16.2.1Roughing- ins (All necessary fittings, supports and other accessories are

already included from straight pipes)

1 90mmø IMC 1 l.m.

3 65mmø IMC 36 l.m.

6 32mmø IMC 1 l.m.

8 20mmø IMC 155 l.m.

12 100mmø PVC 306 I.m.

16.2.2 Wires & Cable (including Connectors, Tapes, Etc.)

2 200mm² THHN 10 I.m.

4 100mm² THHN 1,320 I.m.

5 80mm² THHN 48 I.m.

12 3.5mm² THHN 160 I.m.

16 50mm² TW(G) 3 I.m.

17 30mm² TW(G) 5 I.m.

18 22mm² TW(G) 330 I.m.

22 3.5mm² TW(G) 12 I.m.

BOQ / Arrival & Departure Page 64 of 70

Page 65: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

16.2.3 Boxes & Wiring Devices

1 Octagonal Box ea.

2 Utility Box 10 ea.

3 Duplex convenience outlet, 20A, 2P, 3W, 230V, Grounding type 6 set

16.2.4 Board & Equipment

DPAL: 400v, 3p, 3W+N+G, 60hz Nema 1 Enclosure, Surface Mounted1 assembly

Main: 400AT/400AF/3P

Branches: 1-200AT/225AF/3P

1-80AT/100AF/3P

6-20AT/100AF/1P

LPAL: 400V, 3Ø, 3+N+G, 60Hz, Nema 1 Enclosure, Surface Mounted 1 assembly

Main: 80AT/100AF/3P

Branches: 12-20AT/100AF/1P

PPAL: 400V, 3Ø, 3W+N+G, 60Hz, Nema 1 1 assembly

Main: 300AT/400AF/3P

Branches: 1-250AT/400AF/3P

1-50AT/100AF/3P

6-20AT/100AF/1P

ECB, 300AT/400AF/3P, 380V, 60Hz In Nema 3r Enclosure 1 assembly

41 Testing and Commissioning 1 lot

Sub - total

16.3 Gounding System (Auxiliary System Included)

16.3.2 Wires & Cables (including connectors, etc.)

1 100mm² Medium Drawn Bare Copper Wire 160 I.m.

16.3.3 Grounding

2 Ground Test Well 4 set

4 Exothermic Welded Joint

Type "GT" Cable to Ground Rod 14 set

Type "TA" Cable to Cable 6 set

Type "RJ" Cable to Rebar 4 set

16.3.4 Testing and Commissioning 1 lot

Sub - Total

16.4 Fire Alarm System

16.4.1Roughing-Ins (All necessary fittings, supports and other accessories are

already included from straight pipes)

1 20mmø IMC pipes 55 I.m.

15mmø IMC pipes 8 I.m.

25mmø PVC 65 I.m.

16.4.2 Boxes

1 Octagonal Box, 50 mm x 100 mm x 54 mm 8 ea.

2 Utility box, 50 mm x 100 mm x 54 mm 2 ea.

3 Pullbox (200mm x 325mm x 175mm) 1 ea.

16.4.3 Wires & Cables (including connectors etc.)

1 2.0mm² TW wire 130 I.m.

2 1.25mm² Shielded Twisted Pair, Fire Rated Cable 130 I.m.

16.4.4 FA Equipment & Devices

1 Fire Alarm Horn with Strobe Light 1 set

2 Manual Pull Station, Break Glass Type 1 set

3 Smoke Detector 1 set

16.4.5 Testing and Commissioning 1 lot

Sub - Total

16.7 CATV System

16.7.1Roughing-ins(All necessary fittings, supports and other accessories are

already included from straight pipes)

1 25 mm ø PVC 65 Im

20mmø IMC 50 Im

16.7.2 Wires & Cables (including, connectors, etc)

BOQ / Arrival & Departure Page 65 of 70

Page 66: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

1 CAT 6E UTP Cable, 4 pairs 130 Im

16.7.3 Boxes and CATV Devices

1 Utility Box 4 ea.

Pull Box (200x150x100) 1 ea.

Junction Box 2 set

16.7.4 Testing and Commissioning 1 lot

Sub- Total

16.8 CCTV System

16.8.1Roughing-ins(All necessary fittings, supports and other accessories are

already included from straight pipes)

1 20mmø IMC 50 Im

25mmø PVC 65 Im

16.8.2 Wires & Cables (including, connectors, etc)

1 CAT 6E UTP Cable 4 Pairs 130 Im

16.8.3 Boxes

1 Junction Box 2 ea.

Pull Box (200x150x125) 1 ea.

16.8.4 CCTV Devices

1 Fixed CCTV Camera Dome Type 2 ea.

16.8.5 Testing and Commissioning 1 lot

Sub- Total

16.9 Flight Information Display System

16.9.1Roughing-ins(All necessary fittings, supports and other accessories are

already included from straight pipes)

1 20 mmø IMC 50 Im

3 25 mmø PVC 60 Im

16.9.2 Boxes

1 Junction Box 2 set

Pull Box (200x150x125) 1 ea.

16.9.3 Wires & Cables (including connectors, etc.)

1 CAT 6E UTP Cable, 4 Pairs 128 Im

16.9.4 Flight Information Display System Devices

1FID LCD 32" (including monitor, display system, ups, transmitter,receiver,

mounting support & other accs needed)2 set

16.9.5 Testing and Commissioning 1 lot

Sub - Total

TOTAL - ELECTRICAL WORKS

BOQ / Arrival & Departure Page 66 of 70

Page 67: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

DEPARTMENT OF TRANSPORTATION AND COMMUNICATION

S U M M A R Y

3.1 COVERED DRIVEWAY

DIV-02 SITE CONSTRUCTION 1 l.s.

DIV-03 CONCRETE WORKS 1 l.s.

DIV-06 WOOD AND PLASTIC 1 l.s.

DIV-07 THERMAL AND MOISTURE PROTECTION 1 l.s.

DIV-09 FINISHES 1 l.s.

DIV-10 SPECIALTIES 1 l.s.

DIV-15 MECHANICAL WORKS

15.1 Plumbing Works 1 l.s.

DIV-16 ELECTRICAL WORKS 1 l.s.

TOTAL COST -COVERED DRIVEWAY

TOTAL

CONSTRUCTION COST

BILL OF QUANTITIES

BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT

Daraga, Albay

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

BOQ / Covered Driveway Page 67 of 70

Page 68: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

3.1 COVERED DRIVEWAY

DIV-02 SITE CONSTRUCTION

2.0 SITE WORKS

2.1.1 Building Layout 2,499 sq.m.

2.1.2 Structure Excavation 197 cu.m.

2.1.3.1 Backfill excavations with suitable excavated materials 126 cu.m.

2.1.3.2 Gravel base; 150 mm thk 21 cu.m.

2.1.4 Soil Disposal

2.1.4.1 Remove surplus excavated material from site 71 cu.m.

2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of

excavations589 sq.m.

Total "DIV-02" - SITE CONSTRUCTION

DIV-03 CONCRETE WORKS

3.1 Cast-In-Place Structural Concrete

3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa

3.1.1.1 Foundation, Wall Footing 25 cu.m.

3.1.1.2 Footing Tie Beam 36 cu.m.

3.1.1.3 Columns and Pedestal 16 cu.m.

3.2 Reinforcement in concrete

3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,

binders, and tie wires, etc; grade 60

3.2.1.1 Foundation, Wall Footing 1,593 kg.

3.2.1.2 Footing Tie Beam 4,040 kg.

3.2.1.3 Columns and Pedestal 1,627 kg.

3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,

binders, and tie wires, etc; grade 40

3.2.2.2 Footing Tie Beam 1,843 kg.

3.2.2.3 Columns and Pedestal 1,483 kg.

3.3 Formwork

3.3.1 Foundation, Wall Footing 51 sq.m.

3.3.2 Footing Tie Beam 234 sq.m.

3.3.3 Columns and Pedestal 90 sq.m.

Total "DIV-03" - CONCRETE WORKS

DIV-05 METAL WORKS

5.4

Column and Roof Frame: Fabrication, delivery and erection of structural

steel column and roof framing, including girders, beams, plates, bolts,

stiffeners, paint and other incidentals to complete

208,755 kg.

Total "DIV-06" - WOOD AND PLASTIC

DIV-07 THERMAL AND MOISTURE PROTECTION

7.4 Roofing and Accessories

7.4.26mm thk. Polycarbonate skylight inclusive of all bended materials and

incidentals to complete

7.4.2.1 To Main Roof 3,294 sq.m.

Total "DIV-07"-THERMAL AND MOISTURE PROTECTION

DIV-09 FINISHES

9.2 WALL FINISHES

9.2.3 Natural Stone cladding (Ledge stone) 23 sq.m.

Sub-total "9.1" - WALL FINISHES

Total "DIV-09" - FINISHES

DIV-10 SPECIALTIES

10.8Aluminum Composite Panel, inclusive of metal frame, sealant and all

incidentals to complete

10.8.1 Exterior and Interior Column 369 sq.m.

Total "DIV-10" - SPECIALTIES

DIV-15 MECHANICAL WORKS

15.5 STORM DRAINAGE PIPING

15.5.1

Unplasticized Polyvinyl Chlorine (uPVC) Pipe conforming to ASTM D2729

Series 1000, including hangers and supports and other necessary

accessories to complete the system

2 150 mm dia. uPVC Pipe 105 I.m.

15.5.2Unplasticized Polyvinyl Chlorine (uPVC) Pipe conforming to ASTM D2729

Series 1000, includes trenching, bedding, disposal, etc.

3 150 mm dia. uPVC Pipe 98 l.m.

15.5.4 uPVC Tee

3 150 mm dia uPVC Tee 13 ea.

15.5.5 90 deg. Bend

BOQ / Covered Driveway Page 68 of 70

Page 69: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

TOTAL

CONSTRUCTION COST

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

2 150 mm dia, 90 deg. uPVC Bend 61 ea.

15.5.6 Reducer

15.5.7 Roof Strainers

1 Roof Strainer, 150 mm dia. 34 ea.

15.5.8 Junction Box

3 Junction Box (675 x 675 x 1200 mm) 20 ea.

Sub-Total

TOTAL

DIV-16 ELECTRICAL WORKS

16.1 Lighting System

16.1.1Roughing- ins (All necessary fittings, supports and other accessories are

already included from straight pipes)

4 20mmØ EMT 704 l.m.

5 15mmØ Flexible Metal Conduit 18 I.m.

16.1.2 Wires & Cables (Including connectors , tapes, etc)

4 3.5mm² THHN 2,760 I.m.

7 3.5mm² TW(G) 704 I.m.

16.1.3 Lighting Fixtures including necessary supports

25

Type "N2a", Surface Mounted Led Tube Fixture, Vapor/Dustproof, 2 X

22w, T8, 230v, 60 Hz.; Housing: Sturdy 18 Ga. Steel White Powdered

Coated; Lens: 3/16" Tempered Glass With Acrylic And Polycarbonate

Lens; Front Access Fixture; Hinged Front Door Frame; Hinged Ballast

Tray; Spring-Loaded Lampholders, Complete With Electronic Driver To

Support T8 Led Lamps.

36 set

16.1.4 Box & Wiring Devices

1 Junction Box 36 ea.

19 Testing and Commissioning 1 lot

TOTAL ELECTRICAL WORKS

BOQ / Covered Driveway Page 69 of 70

Page 70: BICOL INTERNATIONAL AIRPORT DEVELOPMENT …dotr.gov.ph/images/Public_Bidding/CivilWorks/Air_Sector/2015/... · PART A FACILITIES FOR THE ENGINEER 1 l.s. ... Drainage System, Signages,

DEPARTMENT OF TRANSPORTATION AND COMMUNICATION

SPECIAL EQUIPMENT

Supply and Instllation of Baggage handling System

1.0 Departure Area

1.1

Weighing Conveyor, 600 mm belt width x 1.20 meters length, brand new,

complete with gear motor drive, electronic weigh scales, load cells,

operator and passenger panels and electrical controls, including

installation and commissioning

18 set

Note:

2 units will be designated for oversized baggage, hence dimension of

conveyor shall be 1000 mm belt width x 2"00 meters length

1.2

Discharge Conveyors, 600 mm belt width x 1.20 meters length, brand

new, complete with gear motor drive and controls, including installation

and commissioning

18 set

1.3

Collecting Conveyor, 1000 mm belt width x 39.00 meters length with gear

motor drive and controls, including stainless steel 304 guarding on one

side of the conveyor complete with 4.0 kW drive motor and controls

1 set

1.4Curve Belt Conveyor, 1000mm belt width x 90 degree curve, complete

with 0.75 kW drive motor and controls2 set

1.5

Take-Away Conveyor, 1000 mm belt width x 33.00 meters length with

gear motor drive and controls, including stainless steel 304 guarding on

one side of the conveyor complete with 3.0 kW drive motor and controls

1 set

1.6

Gravity Roller Conveyor, 1,000 mm roller width, 6.00 meter length, 340

mm height, 75 mm pitch, stainless steel roller material. mild steel painted

frame

1 set

2.0 Arrival Area

2.1

Claim Carousel, "L" - Shape, Flat Type, 1,000 mm slat width x 58.25

meters equivalent straight length (ESL), brand new, overlapping slat type,

complete with 2 sets 2.2 kW friction drive and VFD controller and control

panel.

2 set

lncluding:

1 .) Center ln-fill of carousel, with plywood decking and structural supports

and covered with fine carpeting including stainless steel cladding on up-

stand paneling.

2.) 4 sets Roll-up Doors

3.) 4 sets Rubber Curtain

2.2 Delivery, lnstallation and Commissioning Cost 1 lot

3.0 Elevator, cap 800kg (For Passenger Terminal Building) 4 set

4.0 Escalator (For Passenger Terminal Building) 3 set

TOTAL COST - SPECIAL EQUIPMENT

BILL OF QUANTITIES

BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT

Daraga, Albay

PAY ITEM

NO.D E S C R I P T I O N

ESTIMATED

QTYUNIT UNIT COST

TOTAL

CONSTRUCTION COST

BOQ / Special Equipment Page 70 of 70