DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION AND SAFETY Approved: [DATE] Prepared for the San Francisco County Transportation Authority By San Francisco Municipal Transportation Agency In Coordination with Bay Area Rapid Transit, Department of Public Works, and Peninsula Corridor Joint Powers Board 1 Item 7 Enclosure M Transportation Authority Board July 22, 2014

Upload: others

Post on 13-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

DRAFT 2014 PROPOS IT ION K

5 -YEAR PR IOR IT IZAT ION PROGRAM

BICYCLE CIRCULATION AND SAFETY

Approved: [DATE] Prepared for the San Francisco County Transportation Authority

By San Francisco Municipal Transportat ion Agency

In Coordination with Bay Area Rapid Transit, Department of Publ ic Works, and Peninsula

Corr idor Joint Powers Board

1Item 7 Enclosure MTransportation Authority Board July 22, 2014

Page 2: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

DRAFT 2014 PROP K 5-YEAR PR IORIT IZATION PROGRAM B ICYCLE C IRCULATION AND SAFETY

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

Table of Contents

Eligibility

Prioritization Criteria

Stretching Your Prop K Sales Tax Dollars Farther

Table 2 - Project Delivery Snapshot

Table 3 - Prioritization Criteria and Scoring Table

Table 4 – Prop K 5-Year Project List (FY 2014/15 – FY 2018/19)

Project Information Forms

2009 Prop K 5-Year Prioritization Program – Program of Projects (as adopted)

2009 Prop K 5-Year Prioritization Program – Program of Projects (as amended)

San Francisco Bicycle Network Map

Primary Bicycle Corridors Analysis Map

Eligibility

Eligibility as identified in the voter approved Prop K Expenditure Plan is as follows:

“Programmatic improvements to the transportation system to enhance its usability and safety for bicycles. Infrastructure improvements on the citywide bicycle network, such as new bike lanes and paths. Bicycle parking facilities such as bike racks and lockers. Support for bicycle outreach and education programs. Improvements must be consistent with the city’s bicycle plan. The first $27.6M is Priority 1. The next $2.4M is Priority 2 and the remainder is Priority 3. Includes project development and capital costs. Sponsoring Agencies: DPT, DPW, BART, PCJPB. Total Funding: $77.6; Prop K: $56.0M.”

DPT stands for Department of Parking and Traffic, DPW stands for Department of Public Works, and BART stands for Bay Area Rapid Transit. DPT is now under the San Francisco Municipal Transportation Agency (SFMTA).

Prioritization Criteria

One of the key required elements of the 5YPPs is a transparent process for how projects get selected. Prop K requires at a minimum that each category include prioritization criteria that address project readiness, community support, and relative level of need or urgency. For this 5YPP update, the Citizens Advisory Committee requested that the Transportation Authority and project sponsors develop a user-friendly, transparent scoring table that could apply to all 5YPPs, and that the scoring prioritize safety and community input highly.

Table 3 shows the new Prioritization Criteria and Scoring Table. Each project can receive a maximum of 20 points, with 10 points allocated programwide criteria and 10 points allocated for category specific criteria.

2

Page 3: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

DRAFT 2014 PROP K 5-YEAR PR IORIT IZATION PROGRAM B ICYCLE C IRCULATION AND SAFETY

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

The Expenditure Plan also requires consideration of geographic equity in terms of project distribution that takes into account the various needs of San Francisco’s neighborhoods. The projects proposed for this category are primarily focused on improving bicycling safety and comfort by expanding and enhancing the existing San Francisco Bikeway Network and Primary Corridors as identified in the SFMTA 2013-18 Bicycle Strategy (See San Francisco Bicycle Network Map and Primary Bicycle Corridors Analysis Map). The proposed project list also includes a number of SFMTA safety, education, and outreach projects that affect San Francisco citywide. The SFMTA will work to ensure geographic equity when selecting locations for these activities, including promotions and bike safety education classes. In addition, the SFMTA’s outreach campaigns will consider proactive outreach to communities of concern and other communities traditionally underrepresented in bicycling.

Stretching Your Prop K Sales Tax Dollars Farther

Leveraging Prop K funds against non-Prop K fund sources (e.g., federal, state, other local funds) is necessary to fully fund the Expenditure Plan projects and programs. For the Bicycle Circulation/ Safety category, the Prop K Expenditure Plan assumes that every $1 of sales tax revenue spent would leverage about $0.39 in non-Prop K funds. The table below compares Prop K Expenditure Plan assumptions with proposed leveraging in the 2014 5-year project lists.

Table 1. Prop K Leveraging1

Category Expected Leveraging (Non-Prop K Funds)

Proposed Leveraging (Non-Prop K Funds)

Bicycle Circulation and Safety 28% 28% 1 This table compares the expected leveraging assumed in the Expenditure Plan with the proposed leveraging assumed in the 5-Year

Project List.

The proposed leveraging for the Bicycle Circulation and Safety category is expected to increase once SFMTA identifies projects for the current placeholders, with budgets and full funding plans showing appropriate leveraging.

3

Page 4: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

Tab

le 2

. Pro

ject

Del

iver

y Sn

apsh

otB

icyc

le C

ircu

lati

on/

Safe

ty

Tab

le 2

a. P

rop

K F

un

ds

Allo

cate

d

5-Y

ear

Pri

orit

izat

ion

Pro

gram

(5Y

PP

) P

erio

d

Pro

gram

med

(A

vaila

ble

for

A

lloca

tion

)T

otal

Allo

cate

d a

s of

3/

31/

2014

% A

lloca

ted

2005

5Y

PP

(F

Y 2

004/

05-2

008/

09)

*$3

,772

,573

$3,0

95,7

5782

%20

09 5

YP

P: (

FY

200

9/10

-20

13/

14)

*$5

,414

,419

$4,6

57,1

2986

%T

otal

*$7

,752

,885

Tab

le 2

b. P

erce

nt

Com

ple

teTa

bles

show

allo

catio

ns a

nd p

erce

nt c

ompl

ete

thro

ugh

Mar

ch 3

1, 2

014,

bas

ed o

n pr

ojec

t spo

nsor

s' pr

ogre

ss re

ports

.

Com

ple

ted

Pro

ject

s/P

roje

ct P

has

es (s

orte

d by

allo

catio

n ye

ar, t

hen

spon

sor,

then

pro

ject n

ame)

Spon

sor

Fis

cal Y

ear

of

Allo

cati

onP

roje

ct N

ame

Ph

ase(

s) F

un

ded

Tot

al A

lloca

ted

as

of 3

/31

/20

14%

Com

ple

te

as o

f 3/

31/

2014

BART

2004

/05

2005

5-Y

ear P

riorit

izat

ion

Prog

ram

Dev

elopm

ent

Plan

ning

-$

10

0%SF

MTA

2004

/05

2006

5-Y

ear P

riorit

izat

ion

Prog

ram

Dev

elopm

ent

Plan

ning

14,6

00$

100%

SFM

TA20

04/0

5Bi

cycle

Pro

jects

and

Pro

gram

s - V

ario

us L

ocat

ions

Env

ironm

enta

l, D

esig

n,

Cons

truct

ion

575,

965

$

100%

SFM

TA20

04/0

5M

arke

t Stre

et B

ike

Lane

sCo

nstru

ctio

n17

,971

$

10

0%SF

MTA

2005

/06

2nd

5th

Tow

nsen

d Bi

ke L

anes

Env

ironm

enta

l94

,600

$

10

0%

SFM

TA20

05/0

6Bi

cycle

Pro

jects

- M

arke

t Stre

etD

esig

n,

Cons

truct

ion

42,5

95$

100%

SFM

TA20

05/0

6Bi

cycle

Pro

jects

- Th

e W

iggl

eD

esig

n,

Cons

truct

ion

25,0

64$

100%

SFM

TA20

05/0

6Bi

cycle

Pro

jects

and

Pro

gram

s - V

ario

us L

ocat

ions

Env

ironm

enta

l, D

esig

n,

Cons

truct

ion

314,

586

$

100%

PCJP

B20

06/0

7Ca

ltrain

4th

& K

ing

San

Fran

cisco

Bicy

cle S

tora

ge F

acili

tyO

pera

tions

38,1

82$

100%

* Fu

nds p

rogr

amm

ed in

the

2009

5Y

PP m

ay in

clud

e pr

ogra

mm

ed b

ut u

nallo

cate

d fu

nds f

rom

the

2005

5Y

PP, a

s wel

l as d

e-ob

ligat

ed fu

nds.

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\Pr

ojec

t Del

iver

y\C

hapt

er 3

Pro

ject

Del

iver

y; E

P 3

9Pa

ge 1

of 5

4

Page 5: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

Tab

le 2

. Pro

ject

Del

iver

y Sn

apsh

otB

icyc

le C

ircu

lati

on/

Safe

ty

Com

ple

ted

Pro

ject

s/P

roje

ct P

has

es (s

orte

d by

allo

catio

n ye

ar, t

hen

spon

sor,

then

pro

ject n

ame)

Spon

sor

Fis

cal Y

ear

of

Allo

cati

onP

roje

ct N

ame

Ph

ase(

s) F

un

ded

Tot

al A

lloca

ted

as

of 3

/31

/20

14%

Com

ple

te

as o

f 3/

31/

2014

SFCT

A20

06/0

7G

eary

Cor

ridor

Bicy

cle N

etw

ork

Revi

ewE

nviro

nmen

tal

16,3

00$

100%

SFM

TA20

06/0

7Bi

cycle

Rep

ort C

ard

Env

ironm

enta

l12

6,21

8$

10

0%SF

MTA

2006

/07

Bicy

cle S

afet

y O

utre

ach

Prog

ram

Co

nstru

ctio

n19

6,07

3$

10

0%SF

MTA

2006

/07

Bicy

cle S

afet

y Pr

ogra

mCo

nstru

ctio

n21

6,76

1$

10

0%

SFM

TA20

06/0

7Bu

ckin

gham

Way

/ 1

9th

Ave

nue

Bike

way

Impr

ovem

ents

Des

ign

25,8

42$

100%

SFM

TA20

06/0

7Fr

emon

t Stre

et B

ike

Lane

, Fol

som

to H

arris

on S

treet

sE

nviro

nmen

tal,

Des

ign

7,42

9$

100%

SFM

TA20

06/0

7G

eary

Cor

ridor

Bicy

cle N

etw

ork

Revi

ewE

nviro

nmen

tal

4,29

5$

100%

SFM

TA20

06/0

7Ill

inoi

s Stre

et B

ike

Lane

, 16t

h St

reet

to Is

lais C

reek

Des

ign

4,21

7$

100%

SFM

TA20

06/0

7Im

prov

e Bi

cycle

Acc

ess t

o 16

th S

treet

BA

RT S

tatio

nE

nviro

nmen

tal

9,99

2$

100%

SFM

TA20

06/0

7La

guna

Hon

da B

oulev

ard

Bike

Lan

e, Pl

aza

to D

ewey

Bo

ulev

ard

Des

ign

23,6

76$

100%

SFM

TA20

06/0

7M

arke

t Stre

et B

ike

Lane

, Oct

avia

Blou

levar

d to

17t

h St

reet

Des

ign

32,5

94$

100%

SFM

TA20

06/0

7Po

int L

obos

Ave

, The

Gre

at H

ighw

ay to

El C

amin

o D

el M

arD

esig

n10

,944

$

10

0%

SFM

TA20

07/0

8Bi

cycle

Saf

ety

Prog

ram

Cons

truct

ion

348,

401

$

100%

SFM

TA20

07/0

8Ce

sar C

have

z Bi

cycle

Impr

ovem

ents

, San

chez

to U

S-10

1D

esig

n65

,100

$

10

0%

SFM

TA20

07/0

8D

ivisi

on S

treet

Bicy

cle Im

prov

emen

ts, 9

th to

11t

hD

esig

n9,

439

$

10

0%

SFM

TA20

07/0

8H

ollo

way

Ave

nue

Bike

Bou

levar

d, L

ee A

ve to

Var

ela A

veD

esig

n13

,122

$

10

0%

SFM

TA20

07/0

8Le

e A

venu

e Bi

ke L

anes

, Hol

low

ay A

ve to

Oce

an A

veD

esig

n16

,629

$

10

0%SF

MTA

2007

/08

Mas

onic

Ave

nue

Bike

Lan

e, Fe

ll St

to G

eary

Blv

dD

esig

n35

,025

$

10

0%

SFM

TA20

07/0

8Po

rtola

Driv

e Bi

ke L

anes

, O'S

haug

hess

y Bl

vd to

Slo

at B

lvd

Des

ign

17,9

97$

100%

SFM

TA20

07/0

8Po

trero

Ave

nue

Bicy

cle Im

prov

emen

ts, 1

7th

to D

ivisi

onD

esig

n16

,982

$

10

0%

SFM

TA20

07/0

8Sa

gam

ore

and

Sick

les S

treet

s Bik

e La

nes,

Alem

any

to

Brot

herh

ood

Way

Des

ign

5,61

8$

100%

SFM

TA20

07/0

8SF

Bicy

cle N

etw

ork

Impr

ovem

ents

-Loc

al M

atch

Env

ironm

enta

l15

,000

$

10

0%

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\Pr

ojec

t Del

iver

y\C

hapt

er 3

Pro

ject

Del

iver

y; E

P 3

9Pa

ge 2

of 5

5

Page 6: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

Tab

le 2

. Pro

ject

Del

iver

y Sn

apsh

otB

icyc

le C

ircu

lati

on/

Safe

ty

Com

ple

ted

Pro

ject

s/P

roje

ct P

has

es (s

orte

d by

allo

catio

n ye

ar, t

hen

spon

sor,

then

pro

ject n

ame)

Spon

sor

Fis

cal Y

ear

of

Allo

cati

onP

roje

ct N

ame

Ph

ase(

s) F

un

ded

Tot

al A

lloca

ted

as

of 3

/31

/20

14%

Com

ple

te

as o

f 3/

31/

2014

Plan

ning

2008

/09

ME

A E

nviro

nmen

tal P

lanne

r III

Pos

ition

Env

ironm

enta

l15

2,94

9$

10

0%SF

MTA

2008

/09

Bicy

cle S

afet

y E

duca

tion

Clas

ses

Cons

truct

ion

111,

573

$

100%

SFM

TA20

08/0

9Bi

ke to

Wor

k D

ay P

rom

otio

nCo

nstru

ctio

n15

3,73

9$

10

0%

SFM

TA20

08/0

9Ci

tyw

ide

Bicy

cle C

ount

ers

Proc

urem

ent,

Cons

truct

ion

123,

279

$

100%

SFM

TA20

08/0

9Co

lore

d Bi

cycle

Lan

e E

xper

imen

tCo

nstru

ctio

n21

3,00

0$

10

0%

SFM

TA20

09/1

02n

d St

reet

Bik

e La

nes

Plan

ning

, E

nviro

nmen

tal,

Des

ign

14,9

64$

100%

SFM

TA20

09/1

0Co

ordi

natio

n (G

len P

ark,

Mar

ina

and

Inne

s)Pl

anni

ng, D

esig

n14

,337

$

10

0%SF

MTA

2009

/10

Gre

en W

ave

and

Back

-in A

ngled

Par

king

Cons

truct

ion

13,4

85$

100%

SFM

TA20

09/1

0Ph

elan

Ave

nue

Bike

Lan

esPl

anni

ng,

Env

ironm

enta

l, D

esig

n30

,000

$

10

0%

SFM

TA20

09/1

0St

ate

of C

yclin

g Re

port

Plan

ning

131,

325

$

100%

SFM

TA20

09/1

0In

nova

tive

Trea

tmen

ts T

oolb

oxPl

anni

ng,

Env

ironm

enta

l, D

esig

n82

,769

$

10

0%

DPW

2010

/11

Mar

ina

Gre

en B

icycle

Tra

ilD

esig

n14

,400

$

10

0%SF

MTA

2010

/11

14th

and

Mar

ket S

treet

s Cur

b Bu

lbD

esig

n25

,527

$

10

0%SF

MTA

2010

/11

23rd

Stre

et B

ike

Lane

s Pro

ject

Cons

truct

ion

2,00

0$

100%

SFM

TA20

10/1

1Ba

ysho

re B

oulev

ard

Bike

Lan

es P

rojec

tCo

nstru

ctio

n1,

848

$

10

0%

SFM

TA20

10/1

1Bi

cycle

Fac

ility

Impl

emen

tatio

n-A

leman

y Bo

ulev

ard

Bike

La

nes

Cons

truct

ion

47,2

23$

100%

SFM

TA20

10/1

1Bi

cycle

Fac

ility

Impl

emen

tatio

n-Po

rtola

Boul

evar

d Bi

ke L

anes

Cons

truct

ion

70,0

00$

100%

SFM

TA20

10/1

1Bi

cycle

Fac

ility

Impl

emen

tatio

n-Jo

hn M

uir B

ike

Lane

sCo

nstru

ctio

n11

5,07

9$

10

0%SF

MTA

2010

/11

Bicy

cle F

acili

ty Im

plem

enta

tion-

McC

oppi

n Bi

kew

ayCo

nstru

ctio

n28

,000

$

10

0%SF

MTA

2010

/11

Bicy

cle F

acili

ty Im

plem

enta

tion-

Potre

ro B

ike

Lane

sCo

nstru

ctio

n29

,903

$

10

0%SF

MTA

2010

/11

Bicy

cle S

afet

y E

duca

tion

Clas

ses

Cons

truct

ion

33,2

17$

100%

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\Pr

ojec

t Del

iver

y\C

hapt

er 3

Pro

ject

Del

iver

y; E

P 3

9Pa

ge 3

of 5

6

Page 7: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

Tab

le 2

. Pro

ject

Del

iver

y Sn

apsh

otB

icyc

le C

ircu

lati

on/

Safe

ty

Com

ple

ted

Pro

ject

s/P

roje

ct P

has

es (s

orte

d by

allo

catio

n ye

ar, t

hen

spon

sor,

then

pro

ject n

ame)

Spon

sor

Fis

cal Y

ear

of

Allo

cati

onP

roje

ct N

ame

Ph

ase(

s) F

un

ded

Tot

al A

lloca

ted

as

of 3

/31

/20

14%

Com

ple

te

as o

f 3/

31/

2014

SFM

TA20

10/1

1Bi

cycle

Saf

ety,

Edu

catio

n, a

nd O

utre

ach

Plan

ning

, Pr

ocur

emen

t71

,278

$

10

0%

SFM

TA20

10/1

1Bi

ke to

Wor

k D

ayCo

nstru

ctio

n79

,912

$

10

0%SF

MTA

2010

/11

Hol

low

ay A

venu

e Bi

ke L

anes

Pro

ject

Cons

truct

ion

2,11

2$

100%

SFM

TA20

10/1

1JF

K D

rive

Park

ing-

Buffe

red

Bike

way

Cons

truct

ion

163,

834

$

100%

SFM

TA20

10/1

1Po

rtola

Driv

e Bi

ke L

anes

Pro

ject

Cons

truct

ion

9,99

3$

100%

SFM

TA20

10/1

1Sa

n Br

uno

Ave

nue

Bike

Lan

es P

rojec

tCo

nstru

ctio

n30

,000

$

10

0%

SFM

TA20

10/1

1Sh

ared

Roa

dway

Bicy

cle M

arki

ngs -

Sha

rrow

sE

nviro

nmen

tal,

Des

ign,

Co

nstru

ctio

n23

0,76

0$

10

0%

SFM

TA20

11/1

22n

d St

Stre

etsc

ape

Plan

ning

20,0

00$

100%

SFM

TA20

11/1

22n

d St

Stre

etsc

ape

Env

ironm

enta

l30

,000

$

10

0%

SFM

TA20

11/1

2Bi

cycle

Par

king

Env

ironm

enta

l, D

esig

n,

Cons

truct

ion

125,

000

$

100%

SFM

TA20

11/1

2Bi

ke to

Wor

k D

ayCo

nstru

ctio

n10

0,00

0$

10

0%SF

MTA

2011

/12

Carg

o W

ay C

yclet

rack

Cons

truct

ion

94,0

00$

100%

SFM

TA20

11/1

2Ce

sar C

have

z St

Bik

e La

nes,

Kan

sas S

t to

Penn

sylv

ania

StCo

nstru

ctio

n20

1,00

0$

10

0%

SFM

TA20

11/1

2Fe

ll an

d O

ak B

ikew

ay Im

prov

emen

tsE

nviro

nmen

tal

132,

500

$

100%

SFM

TA20

11/1

2Fe

ll an

d O

ak B

ikew

ay Im

prov

emen

tsD

esig

n32

,500

$

10

0%SF

MTA

2011

/12

Folso

m S

treet

Bicy

cle L

anes

Cons

truct

ion

27,0

00$

100%

SFM

TA20

11/1

2JF

K D

rive

Park

ing-

Buffe

red

Bike

way

Cons

truct

ion

412,

000

$

100%

SFM

TA20

11/1

2Lo

ng-T

erm

Bik

e Pa

rkin

g St

orag

e Pl

anPl

anni

ng45

,000

$

10

0%SF

MTA

2011

/12

Mas

onic

Ave

nue

Stre

etsc

ape

Impr

ovem

ents

Env

ironm

enta

l32

,146

$

10

0%

SFM

TA20

12/1

3Bi

cycle

Gre

en W

ave

Plan

ning

, E

nviro

nmen

tal

18,5

00$

100%

SFM

TA20

12/1

3Bi

cycle

Gre

en W

ave

Des

ign

52,6

00$

100%

SFM

TA20

12/1

3Re

gion

al Bi

cycle

Sha

re P

ilot

Cons

truct

ion

200,

000

$

100%

SFM

TA20

12/1

3M

anse

ll Co

rrid

or Im

prov

emen

tsPl

anni

ng53

,612

$

10

0%

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\Pr

ojec

t Del

iver

y\C

hapt

er 3

Pro

ject

Del

iver

y; E

P 3

9Pa

ge 4

of 5

7

Page 8: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

Tab

le 2

. Pro

ject

Del

iver

y Sn

apsh

otB

icyc

le C

ircu

lati

on/

Safe

ty

Pro

ject

s/P

roje

ct P

has

es U

nd

erw

ay (s

orte

d by

allo

catio

n ye

ar, t

hen

spon

sor,

then

pro

ject n

ame)

Spon

sor

Fis

cal Y

ear

of

Allo

cati

onP

roje

ct N

ame

Ph

ase(

s) F

un

ded

Tot

al A

lloca

ted

as

of 3

/31

/20

14%

Com

ple

te

as o

f 3/

31/

2014

BART

2011

/12

Civi

c Ce

nter

BA

RT/M

uni B

ike

Stat

ion

Des

ign

85,0

00$

99%

SFM

TA20

11/1

2Bi

cycle

Saf

ety

Edu

catio

n Cl

asse

sCo

nstru

ctio

n13

0,00

0$

73

%SF

MTA

2012

/13

Bicy

cle S

afet

y E

duca

tion

Clas

ses

Cons

truct

ion

175,

000

$

45%

PCJP

B20

12/1

34t

h &

Kin

g Ca

ltrain

Sta

tion

Bike

Stu

dyPl

anni

ng45

,000

$

0%

PCJP

B20

12/1

3SF

Bicy

cle P

arki

ng F

acili

ty C

apita

l Im

prov

emen

tsCo

nstru

ctio

n16

5,00

0$

25

%SF

MTA

2012

/13

Bicy

cle G

reen

Wav

eCo

nstru

ctio

n11

7,17

6$

30

%

SFM

TA20

12/1

3Bi

cycle

Saf

ety

& O

utre

ach

Plan

ning

, Pr

ocur

emen

t13

6,00

0$

65

%

SFM

TA20

12/1

3Bi

ke to

Wor

k D

ayCo

nstru

ctio

n16

2,00

0$

55

%SF

MTA

2012

/13

Polk

Stre

et D

emon

stra

tion

Proj

ect

Cons

truct

ion

65,0

00$

22%

SFM

TA20

12/1

3Sh

ort-T

erm

Bicy

cle P

arki

ngD

esig

n,

Cons

truct

ion,

Pr

ocur

emen

t17

5,00

0$

55

%

BART

2013

/14

Civi

c Ce

nter

BA

RT/M

uni B

ike

Stat

ion

Cons

truct

ion

102,

000

$

0%SF

CTA

2013

/14

Bike

Sha

ring

Opt

iona

l Tec

hnica

l Tas

ksPl

anni

ng25

,000

$

0%

SFM

TA20

13/1

4A

utom

ated

Bicy

cle C

ount

ers U

pgra

de

Des

ign

12,1

00$

25%

SFM

TA20

13/1

4A

utom

ated

Bicy

cle C

ount

ers U

pgra

de

Cons

truct

ion

318,

900

$

3%SF

MTA

2013

/14

City

wid

e Bi

cycle

Way

findi

ng P

lanPl

anni

ng32

,000

$

40

%SF

MTA

2013

/14

Man

sell

Corr

idor

Impr

ovem

ent P

rojec

tE

nviro

nmen

tal

44,1

29$

50%

DPT

2013

/14

Kin

g St

reet

Bicy

cle L

anes

Env

ironm

enta

l5,

000

$

0%

DPT

2013

/14

Kin

g St

reet

Bicy

cle L

anes

Des

ign

8,00

0$

0%D

PT20

13/1

4K

ing

Stre

et B

icycle

Lan

esCo

nstru

ctio

n21

,000

$

0%

For m

ore

info

rmat

ion

on P

rop

K a

nd o

ther

Tra

nspo

rtatio

n A

utho

rity

fund

ed p

rojec

ts, v

isit h

ttp:/

/ww

w.sf

cta.o

rg/m

ystre

etsf

-pro

jects

-map

to a

cces

s an

inte

ract

ive

map

show

ing

proj

ects

in y

our n

eighb

orho

od a

nd c

ityw

ide.

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\Pr

ojec

t Del

iver

y\C

hapt

er 3

Pro

ject

Del

iver

y; E

P 3

9Pa

ge 5

of 5

8

Page 9: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

Tab

le 3

- P

rior

itiz

atio

n C

rite

ria

and

Sco

rin

g T

able

Bic

ycle

Cir

cula

tion

an

d S

afet

y (E

P 3

9)

Pro

ject

R

ead

ines

sC

omm

un

ity

Sup

por

tT

ime

Sen

siti

ve

Urg

ency

Safe

tyP

rovi

des

B

enef

its

to

Mu

ltip

le U

sers

Foc

us

on

Com

mu

nit

y of

C

once

rnL

ever

agin

gT

otal

Tot

al P

ossi

ble

Scor

e4

33

33

22

20

Bicy

cle S

afet

y, E

duca

tion

and

Out

reac

hBi

ke T

o W

ork

Day

Pro

mot

ion

41

00

01

06

Bike

Pro

mot

ion

41

01

01

07

Bicy

cle S

afet

y, E

duca

tion

& O

utre

ach

(e.g

., Cl

asse

s)4

20

20

20

10

Pro

ject

R

ead

ines

sC

omm

un

ity

Sup

por

tT

ime

Sen

siti

ve

Urg

ency

Safe

tyP

rovi

des

B

enef

its

to

Mu

ltip

le U

sers

Pri

mar

y C

orri

dor

Lev

erag

ing

Tot

al

Tot

al P

ossi

ble

Scor

e4

33

33

22

20

Syst

em P

erfo

rman

ce a

nd In

nova

tion

Bicy

cle C

ount

ers &

Bar

omet

ers

41

00

12

08

Inno

vativ

e Tr

eatm

ents

Spot

Impr

ovem

ents

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

Shar

row

s4

20

22

10

11W

este

rn A

dditi

on B

ikew

ay [N

TIP]

31

02

12

110

Em

barc

ader

o Bi

ke L

ane/

Enh

ance

men

t [N

TIP]

42

03

32

216

Seco

nd S

treet

Stre

etsc

ape

Impr

ovem

ent (

One

BayA

rea

Gra

nt

mat

ch)

43

23

32

219

Twin

Pea

ks C

onne

ctiv

ity4

03

13

01

12

NTI

P Pl

aceh

olde

rTr

ansit

Acc

ess

4th

and

Kin

g Bi

ke S

tatio

n Re

hab

42

01

12

010

Caltr

ain B

ike

Facil

ity Im

prov

emen

ts16

th/M

issio

n Bi

ke S

tatio

n [N

TIP]

42

01

12

212

24th

/Miss

ion

Bike

Sta

tion

[NTI

P]4

20

11

22

12G

len P

ark

Bike

Sta

tion

42

01

12

212

PR

OP

K P

RO

GR

AM

-WID

E C

RIT

ER

IAC

AT

EG

OR

Y S

PE

CIF

IC C

RIT

ER

IA

This is a placeho

lder. P

roject

spon

sorto scorewhe

n a specific scop

e is id

entified.

This is a placeho

lder. P

roject

spon

sorto scorewhe

n a specific scop

e is id

entified.

This is a placeho

lder. P

roject

spon

sorto scorewhe

n a specific scop

e is id

entified.

This is a placeho

lder. P

roject

spon

sorto scorewhe

n a specific scop

e is id

entified.

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

39\

3 Pr

iori

tizat

ion\

2013

5YP

P U

pdat

e (E

P39

Bicy

cle

Safe

ty a

nd C

ircu

latio

n) P

riori

tizat

ion

Tab

: 05.

14.1

4Pa

ge 1

of 2

9

Page 10: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

Tab

le 3

- P

rior

itiz

atio

n C

rite

ria

and

Sco

rin

g T

able

Bic

ycle

Cir

cula

tion

an

d S

afet

y (E

P 3

9)

Pri

orit

izat

ion

Cri

teri

a D

efin

itio

ns:

Lev

erag

ing:

Pro

ject l

ever

ages

non

-Pro

p K

fund

s.

Pri

mar

y C

orri

dor

: Pro

ject i

s loc

ated

on

a Pr

imar

y Co

rrid

or a

s ide

ntifi

ed in

the

2013

SFM

TA B

icycle

Stra

tegy

or s

ubse

quen

t upd

ates

.

Safe

ty: (

One

poi

nt fo

r eac

h): A

ddre

sses

doc

umen

ted

safe

ty is

sue;

redu

ces p

oten

tial c

onfli

cts b

etw

een

mod

es; a

nd in

crea

ses s

ecur

ity.

Pro

ject

Rea

din

ess:

Pro

ject l

ikely

to n

eed

fund

ing

in fi

scal

year

pro

pose

d. F

acto

rs to

be

cons

ider

ed in

clude

ade

quac

y of

scop

e, sc

hedu

le, b

udge

t and

fund

ing

plan

relat

ive

to c

urre

nt p

rojec

t sta

tus (

e.g. e

xpec

t mor

e de

tail

and

certa

inty

for a

pro

ject a

bout

to e

nter

con

stru

ctio

n th

an d

esig

n); w

heth

er p

rior p

rojec

t pha

ses a

re c

ompl

eted

or e

xpec

ted

to b

e co

mpl

eted

bef

ore

begi

nnin

g th

e ne

xt p

hase

; and

whe

ther

litig

atio

n, c

omm

unity

opp

ositi

on

or o

ther

fact

ors m

ay si

gnifi

cant

ly de

lay p

rojec

t.

Tim

e Se

nsi

tive

Urg

ency

: Pro

ject n

eeds

to p

roce

ed in

pro

pose

d tim

efra

me

to e

nabl

e co

nstru

ctio

n co

ordi

natio

n w

ith a

noth

er p

rojec

t (e.g

., m

inim

ize

cost

s and

con

stru

ctio

n im

pact

s); t

o su

ppor

t ano

ther

fund

ed o

r pr

opos

ed p

rojec

t (e.g

. new

sign

al co

ntro

llers

nee

d to

be

inst

alled

to su

ppor

t TE

P im

plem

enta

tion)

; or t

o m

eet t

imely

use

of f

unds

dea

dlin

es a

ssoc

iated

with

mat

chin

g fu

nds.

Foc

us

on C

omm

un

ity

of C

once

rn: P

rojec

t inc

lude

s spe

cifc

focu

s to

targ

et tr

aditi

onall

y un

derr

epre

sent

ed g

roup

s in

bicy

cling

and

com

mun

ities

of c

once

rn (e

.g.,

mul

ti-lin

gual

mat

erial

s/cla

sses

).

Pro

vid

es B

enef

its

to M

ult

iple

Use

rs: P

rojec

ts re

ceiv

es o

ne p

oint

eac

h fo

r add

ress

ing

the

need

s of p

edes

trian

s, m

otor

ists,

and/

or tr

ansit

use

rs.

Com

mu

nit

y Su

pp

ort:

Pro

ject h

as c

lear a

nd d

iver

se c

omm

unity

supp

ort a

nd/o

r was

it id

entif

ied th

roug

h a

com

mun

ity-b

ased

plan

ning

pro

cess

. An

exam

ple

of a

com

mun

ity-b

ased

plan

is a

neig

hbor

hood

tran

spor

tatio

n pl

an, b

ut n

ot a

cou

ntyw

ide

plan

or a

genc

y ca

pita

l im

prov

emen

t pro

gram

.Th

ree

poin

ts fo

r a p

rojec

t in

an a

dopt

ed c

omm

unity

bas

ed p

lan w

ith e

vide

nce

of d

iver

se c

omm

unity

supp

ort.

Two

poin

ts fo

r a p

rojec

t with

evi

denc

e of

supp

ort f

rom

bot

h ne

ighb

orho

od st

akeh

olde

rs a

nd g

roup

s and

city

wid

e gr

oups

.O

ne p

oint

for a

pro

ject w

ith e

vide

nce

of su

ppor

t fro

m e

ither

neig

hbor

hood

stak

ehol

ders

and

gro

ups o

r city

wid

e gr

oups

.

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

39\

3 Pr

iori

tizat

ion\

2013

5YP

P U

pdat

e (E

P39

Bicy

cle

Safe

ty a

nd C

ircu

latio

n) P

riori

tizat

ion

Tab

: 05.

14.1

4Pa

ge 2

of 2

10

Page 11: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

SFM

TABi

ke T

o W

ork

Day

Pro

mot

ion

CON

Pl

anne

d$5

1,30

0$5

1,30

0

SFM

TABi

ke T

o W

ork

Day

Pro

mot

ion

CON

Pl

anne

d$3

8,47

5$3

8,47

5

SFM

TABi

ke T

o W

ork

Day

Pro

mot

ion

CON

Pl

anne

d$3

8,47

5$3

8,47

5

SFM

TABi

ke T

o W

ork

Day

Pro

mot

ion

CON

Pl

anne

d$3

8,47

5$3

8,47

5

SFM

TABi

ke T

o W

ork

Day

Pro

mot

ion

CON

Pl

anne

d$3

8,47

5$3

8,47

5

SFM

TABi

cycle

Pro

mot

ion

PLA

NPl

anne

d$5

0,00

0$5

0,00

0

SFM

TABi

cycle

Pro

mot

ion

CON

Pl

anne

d$8

0,84

0$8

0,84

0

SFM

TABi

cycle

Pro

mot

ion

CON

Pl

anne

d$3

1,19

8$3

1,19

8

SFM

TABi

cycle

Pro

mot

ion

CON

Pl

anne

d$1

5,59

9$1

5,59

9

SFM

TABi

cycle

Saf

ety,

Edu

catio

n &

O

utre

ach

(e.g

., Cl

asse

s)CO

N

Plan

ned

$120

,400

$120

,400

SFM

TABi

cycle

Saf

ety,

Edu

catio

n &

O

utre

ach

(e.g

., Cl

asse

s)CO

N

Plan

ned

$120

,400

$120

,400

SFM

TABi

cycle

Saf

ety,

Edu

catio

n &

O

utre

ach

(e.g

., Cl

asse

s)CO

N

Plan

ned

$117

,258

$117

,258

SFM

TABi

cycle

Saf

ety,

Edu

catio

n &

O

utre

ach

(e.g

., Cl

asse

s)CO

N

Plan

ned

$117

,258

$117

,258

SFM

TABi

cycle

Cou

nter

s & B

arom

eter

sD

ES/

CON

Plan

ned

$100

,000

$100

,000

SFM

TABi

cycle

Cou

nter

s & B

arom

eter

sD

ES/

CON

Plan

ned

$51,

615

$51,

615

SFM

TAIn

nova

tive

Trea

tmen

tsPL

AN

Plan

ned

$104

,618

$104

,618

SFM

TAIn

nova

tive

Trea

tmen

tsPL

AN

Plan

ned

$5,6

00$5

,600

Tab

le 4

- D

raft

Pro

p K

5-Y

ear

Pro

ject

Lis

t (F

Y 2

014/

15 -

201

8/19

)

Bic

ycle

Cir

cula

tion

an

d S

afet

y (E

P 3

9)P

rogr

amm

ing

Age

ncy

Proj

ect N

ame

Phas

eSt

atus

Fisc

al Y

ear

Tota

l

Bicy

cle S

afet

y, E

duca

tion

and

Out

reac

h

Syst

em P

erfo

rman

ce a

nd In

nova

tion

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

39\

1 Pr

ojec

t Lis

t\20

13 5

YPP

Upd

ate

(EP3

9 B

icyc

le S

afet

y an

d Ci

rcul

atio

n)v4

Ta

b: 0

6.17

.14

Page

1 o

f 8

11

Page 12: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

Tab

le 4

- D

raft

Pro

p K

5-Y

ear

Pro

ject

Lis

t (F

Y 2

014/

15 -

201

8/19

)

Bic

ycle

Cir

cula

tion

an

d S

afet

y (E

P 3

9)P

rogr

amm

ing

Age

ncy

Proj

ect N

ame

Phas

eSt

atus

Fisc

al Y

ear

Tota

l

SFM

TAIn

nova

tive

Trea

tmen

tsPL

AN

Plan

ned

$5,6

00$5

,600

SFM

TAIn

nova

tive

Trea

tmen

tsPL

AN

Plan

ned

$5,6

00$5

,600

SFM

TAIn

nova

tive

Trea

tmen

tsPL

AN

Plan

ned

$5,6

00$5

,600

SFM

TAIn

nova

tive

Trea

tmen

tsD

ES

Plan

ned

$126

,518

$126

,518

SFM

TAIn

nova

tive

Trea

tmen

tsD

ES

Plan

ned

$14,

400

$14,

400

SFM

TAIn

nova

tive

Trea

tmen

tsD

ES

Plan

ned

$14,

400

$14,

400

SFM

TAIn

nova

tive

Trea

tmen

tsD

ES

Plan

ned

$14,

400

$14,

400

SFM

TAIn

nova

tive

Trea

tmen

tsD

ES

Plan

ned

$14,

400

$14,

400

SFM

TAIn

nova

tive

Trea

tmen

tsCO

N

Plan

ned

$520

,288

$520

,288

SFM

TAIn

nova

tive

Trea

tmen

tsCO

N

Plan

ned

$120

,000

$120

,000

SFM

TAIn

nova

tive

Trea

tmen

tsCO

N

Plan

ned

$120

,000

$120

,000

SFM

TAIn

nova

tive

Trea

tmen

tsCO

N

Plan

ned

$120

,000

$120

,000

SFM

TAIn

nova

tive

Trea

tmen

tsCO

N

Plan

ned

$83,

974

$83,

974

SFM

TASp

ot Im

prov

emen

tsCO

N

Plan

ned

$200

,000

$200

,000

SFM

TASp

ot Im

prov

emen

tsCO

N

Plan

ned

$197

,130

$197

,130

SFM

TASp

ot Im

prov

emen

tsCO

N

Plan

ned

$150

,000

$150

,000

SFM

TASp

ot Im

prov

emen

tsCO

N

Plan

ned

$100

,000

$100

,000

SFM

TASp

ot Im

prov

emen

tsCO

N

Plan

ned

$20,

000

$20,

000

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

39\

1 Pr

ojec

t Lis

t\20

13 5

YPP

Upd

ate

(EP3

9 B

icyc

le S

afet

y an

d Ci

rcul

atio

n)v4

Ta

b: 0

6.17

.14

Page

2 o

f 8

12

Page 13: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

Tab

le 4

- D

raft

Pro

p K

5-Y

ear

Pro

ject

Lis

t (F

Y 2

014/

15 -

201

8/19

)

Bic

ycle

Cir

cula

tion

an

d S

afet

y (E

P 3

9)P

rogr

amm

ing

Age

ncy

Proj

ect N

ame

Phas

eSt

atus

Fisc

al Y

ear

Tota

l

SFM

TABi

cycle

Net

wor

k E

xpan

sion

and

Upg

rade

sPL

AN

Plan

ned

$185

,050

$185

,050

SFM

TABi

cycle

Net

wor

k E

xpan

sion

and

Upg

rade

sPL

AN

Plan

ned

$135

,050

$135

,050

SFM

TABi

cycle

Net

wor

k E

xpan

sion

and

Upg

rade

sD

ES

Plan

ned

$168

,126

$168

,126

SFM

TABi

cycle

Net

wor

k E

xpan

sion

and

Upg

rade

sD

ES

Plan

ned

$168

,126

$168

,126

SFM

TABi

cycle

Net

wor

k E

xpan

sion

and

Upg

rade

sCO

N

Plan

ned

$367

,724

$367

,724

SFM

TABi

cycle

Net

wor

k E

xpan

sion

and

Upg

rade

sCO

N

Plan

ned

$282

,970

$282

,970

SFM

TABi

cycle

Net

wor

k E

xpan

sion

and

Upg

rade

sA

NY

Plan

ned

$450

,500

$450

,500

SFM

TABi

cycle

Net

wor

k E

xpan

sion

and

Upg

rade

sA

NY

Plan

ned

$450

,500

$450

,500

SFM

TABi

cycle

Net

wor

k E

xpan

sion

and

Upg

rade

sA

NY

Plan

ned

$450

,057

$450

,057

SFM

TASh

arro

ws

PLA

N/D

ES

Plan

ned

$118

,000

$118

,000

SFM

TASh

arro

ws

CON

Pl

anne

d$1

38,1

00$1

38,1

00

SFM

TAW

este

rn A

dditi

on -

Dow

ntow

n Bi

kew

ay C

onne

ctor

[NTI

P]E

NV

Plan

ned

$62,

000

$62,

000

SFM

TAE

mba

rcad

ero

Bike

way

E

nhan

cem

ents

[NTI

P]E

NV

Plan

ned

$200

,000

$200

,000

DPW

Seco

nd S

treet

Stre

etsc

ape

Impr

ovem

ent (

One

BayA

rea

Gra

nt m

atch

)CO

N

Plan

ned

$110

,000

$110

,000

SFM

TATw

in P

eaks

Con

nect

ivity

PLA

N/E

NV

Plan

ned

$23,

000

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

39\

1 Pr

ojec

t Lis

t\20

13 5

YPP

Upd

ate

(EP3

9 B

icyc

le S

afet

y an

d Ci

rcul

atio

n)v4

Ta

b: 0

6.17

.14

Page

3 o

f 8

13

Page 14: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

Tab

le 4

- D

raft

Pro

p K

5-Y

ear

Pro

ject

Lis

t (F

Y 2

014/

15 -

201

8/19

)

Bic

ycle

Cir

cula

tion

an

d S

afet

y (E

P 3

9)P

rogr

amm

ing

Age

ncy

Proj

ect N

ame

Phas

eSt

atus

Fisc

al Y

ear

Tota

l

SFM

TA, o

r ot

her e

ligib

le sp

onso

rN

TIP

Plac

ehol

der

AN

YPl

anne

d$4

36,0

00$4

36,0

00

Caltr

ain4t

h an

d K

ing

Bike

Sta

tion

Impr

ovem

ents

PLA

NPl

anne

d$2

0,00

0$2

0,00

0

Caltr

ainCa

ltrain

Bik

e Fa

cility

Im

prov

emen

tsD

ES/

CON

Plan

ned

$20,

000

$20,

000

Caltr

ainCa

ltrain

Bik

e Fa

cility

Im

prov

emen

tsD

ES/

CON

Plan

ned

$20,

000

$20,

000

Caltr

ainCa

ltrain

Bik

e Fa

cility

Im

prov

emen

tsCO

N

Plan

ned

$180

,000

$180

,000

Caltr

ainCa

ltrain

Bik

e Fa

cility

Im

prov

emen

tsCO

N

Plan

ned

$180

,000

$180

,000

BART

16th

/Miss

ion

Bike

Sta

tion

[NTI

P]D

ES

Plan

ned

$151

,000

$151

,000

BART

24th

/Miss

ion

Bike

Sta

tion

[NTI

P]D

ES

Plan

ned

$151

,000

$151

,000

BART

Glen

Par

k Bi

ke S

tatio

nD

ES

Plan

ned

$248

,000

$248

,000

$2,9

67,0

24

$2,0

47,0

91

$927

,431

$1

,097

,848

$6

28,1

05

$7,6

67,4

98

$848

,620

$8

93,4

56

$940

,369

$9

89,4

54

$1,0

40,8

10

$4,7

12,7

09

($2,

118,

404)

($3,

272,

039)

($3,

259,

101)

($3,

367,

494)

($2,

954,

789)

($2,

954,

789)

Tran

sit A

cces

s

Tot

al P

rogr

amm

ed in

5Y

PP

Tot

al P

rogr

amm

ed in

201

3 St

rate

gic

Pla

n B

asel

ine

Cu

mu

lati

ve R

emai

nin

g P

rogr

amm

ing

Cap

acit

y

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

39\

1 Pr

ojec

t Lis

t\20

13 5

YPP

Upd

ate

(EP3

9 B

icyc

le S

afet

y an

d Ci

rcul

atio

n)v4

Ta

b: 0

6.17

.14

Page

4 o

f 8

14

Page 15: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

2019

/20

Bike

To

Wor

k D

ay P

rom

otio

n CO

N

$51,

300

$51,

300

Bike

To

Wor

k D

ay P

rom

otio

n CO

N

$38,

475

$38,

475

Bike

To

Wor

k D

ay P

rom

otio

n CO

N

$38,

475

$38,

475

Bike

To

Wor

k D

ay P

rom

otio

n CO

N

$38,

475

$38,

475

Bike

To

Wor

k D

ay P

rom

otio

n CO

N

$38,

475

$38,

475

Bicy

cle P

rom

otio

nPL

AN

$50,

000

$50,

000

Bicy

cle P

rom

otio

nCO

N

$80,

840

$80,

840

Bicy

cle P

rom

otio

nCO

N

$31,

198

$31,

198

Bicy

cle P

rom

otio

nCO

N

$15,

599

$15,

599

Bicy

cle S

afet

y, E

duca

tion

& O

utre

ach

(e.g

., Cl

asse

s)CO

N

$120

,400

$120

,400

Bicy

cle S

afet

y, E

duca

tion

& O

utre

ach

(e.g

., Cl

asse

s)CO

N

$120

,400

$120

,400

Bicy

cle S

afet

y, E

duca

tion

& O

utre

ach

(e.g

., Cl

asse

s)CO

N

$117

,258

$117

,258

Bicy

cle S

afet

y, E

duca

tion

& O

utre

ach

(e.g

., Cl

asse

s)CO

N

$117

,258

$117

,258

Bicy

cle C

ount

ers &

Bar

omet

ers

DE

S/CO

N$1

00,0

00$1

00,0

00

Bicy

cle C

ount

ers &

Bar

omet

ers

DE

S/CO

N$5

1,61

5$5

1,61

5

Inno

vativ

e Tr

eatm

ents

PLA

N$1

04,6

18$0

$0$0

$0$1

04,6

18

Inno

vativ

e Tr

eatm

ents

PLA

N$0

$5,6

00$0

$0$0

$5,6

00

Tab

le 4

- D

raft

Pro

p K

5-Y

ear

Pro

ject

Lis

t (F

Y 2

014/

15 -

201

8/19

)

Bic

ycle

Cir

cula

tion

an

d S

afet

y (E

P 3

9)C

ash

Flo

w

Proj

ect N

ame

Phas

eFi

scal

Yea

rTo

tal

Bicy

cle S

afet

y, E

duca

tion

and

Out

reac

h

Syst

em P

erfo

rman

ce a

nd In

nova

tion

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

39\

1 Pr

ojec

t Lis

t\20

13 5

YPP

Upd

ate

(EP3

9 B

icyc

le S

afet

y an

d Ci

rcul

atio

n)v4

Ta

b: 0

6.17

.14

Page

5 o

f 8

15

Page 16: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

2019

/20

Tab

le 4

- D

raft

Pro

p K

5-Y

ear

Pro

ject

Lis

t (F

Y 2

014/

15 -

201

8/19

)

Bic

ycle

Cir

cula

tion

an

d S

afet

y (E

P 3

9)C

ash

Flo

w

Proj

ect N

ame

Phas

eFi

scal

Yea

rTo

tal

Inno

vativ

e Tr

eatm

ents

PLA

N$0

$0$5

,600

$0$0

$5,6

00

Inno

vativ

e Tr

eatm

ents

PLA

N$0

$0$0

$5,6

00$0

$5,6

00

Inno

vativ

e Tr

eatm

ents

PLA

N$0

$0$0

$0$5

,600

$5,6

00

Inno

vativ

e Tr

eatm

ents

DE

S$1

26,5

18$0

$0$0

$0$1

26,5

18

Inno

vativ

e Tr

eatm

ents

DE

S$0

$14,

400

$0$0

$0$1

4,40

0

Inno

vativ

e Tr

eatm

ents

DE

S$0

$0$1

4,40

0$0

$0$1

4,40

0

Inno

vativ

e Tr

eatm

ents

DE

S$0

$0$0

$14,

400

$0$1

4,40

0

Inno

vativ

e Tr

eatm

ents

DE

S$0

$0$0

$0$1

4,40

0$1

4,40

0

Inno

vativ

e Tr

eatm

ents

CON

$5

20,2

88$0

$0$0

$0$5

20,2

88

Inno

vativ

e Tr

eatm

ents

CON

$0

$120

,000

$0$0

$0$1

20,0

00

Inno

vativ

e Tr

eatm

ents

CON

$0

$0$1

20,0

00$0

$0$1

20,0

00

Inno

vativ

e Tr

eatm

ents

CON

$0

$0$0

$120

,000

$0$1

20,0

00

Inno

vativ

e Tr

eatm

ents

CON

$0

$0$0

$0$8

3,97

4$8

3,97

4

Spot

Impr

ovem

ents

CON

$2

00,0

00$0

$0$0

$0$2

00,0

00

Spot

Impr

ovem

ents

CON

$0

$197

,130

$0$0

$0$1

97,1

30

Spot

Impr

ovem

ents

CON

$0

$0$1

50,0

00$0

$0$1

50,0

00

Spot

Impr

ovem

ents

CON

$0

$0$0

$100

,000

$0$1

00,0

00

Spot

Impr

ovem

ents

CON

$0

$0$0

$0$2

0,00

0$2

0,00

0

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

39\

1 Pr

ojec

t Lis

t\20

13 5

YPP

Upd

ate

(EP3

9 B

icyc

le S

afet

y an

d Ci

rcul

atio

n)v4

Ta

b: 0

6.17

.14

Page

6 o

f 8

16

Page 17: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

2019

/20

Tab

le 4

- D

raft

Pro

p K

5-Y

ear

Pro

ject

Lis

t (F

Y 2

014/

15 -

201

8/19

)

Bic

ycle

Cir

cula

tion

an

d S

afet

y (E

P 3

9)C

ash

Flo

w

Proj

ect N

ame

Phas

eFi

scal

Yea

rTo

tal

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

PLA

N$1

85,0

50$0

$0$0

$0$1

85,0

50

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

PLA

N$0

$135

,050

$0$0

$0$1

35,0

50

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

DE

S$1

68,1

26$0

$0$0

$0$1

68,1

26

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

DE

S$0

$168

,126

$0$0

$0$1

68,1

26

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

CON

$1

83,8

62$1

83,8

62$0

$0$0

$367

,724

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

CON

$0

$282

,970

$0$0

$0$2

82,9

70

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

AN

Y$0

$0$2

25,2

50$2

25,2

50$0

$450

,500

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

AN

Y$0

$0$0

$225

,250

$225

,250

$450

,500

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

AN

Y$0

$0$0

$0$2

25,0

29$2

25,0

29$4

50,0

57

Shar

row

sPL

AN

/DE

S$4

1,28

5$7

6,71

5$1

18,0

00

Shar

row

sCO

N

$62,

145

$62,

145

$13,

810

$138

,100

Wes

tern

Add

ition

- D

ownt

own

Bike

way

Co

nnec

tor

EN

V$6

2,00

0$6

2,00

0

Em

barc

ader

o Bi

kew

ay E

nhan

cem

ents

[NTI

P]E

NV

$10,

000

$90,

000

$100

,000

$200

,000

Seco

nd S

treet

Stre

etsc

ape

Impr

ovem

ent

(One

BayA

rea

Gra

nt m

atch

)CO

N

$55,

000

$55,

000

$110

,000

Twin

Pea

ks C

onne

ctiv

ityPL

AN

/EN

V$1

9,86

6$3

,134

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

39\

1 Pr

ojec

t Lis

t\20

13 5

YPP

Upd

ate

(EP3

9 B

icyc

le S

afet

y an

d Ci

rcul

atio

n)v4

Ta

b: 0

6.17

.14

Page

7 o

f 8

17

Page 18: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

2019

/20

Tab

le 4

- D

raft

Pro

p K

5-Y

ear

Pro

ject

Lis

t (F

Y 2

014/

15 -

201

8/19

)

Bic

ycle

Cir

cula

tion

an

d S

afet

y (E

P 3

9)C

ash

Flo

w

Proj

ect N

ame

Phas

eFi

scal

Yea

rTo

tal

NTI

P Pl

aceh

olde

rA

NY

$148

,240

$143

,880

$143

,880

$436

,000

4th

and

Kin

g Bi

ke S

tatio

n Im

prov

emen

tsPL

AN

$20,

000

$20,

000

Caltr

ain B

ike

Facil

ity Im

prov

emen

tsD

ES/

CON

$20,

000

$20,

000

Caltr

ain B

ike

Facil

ity Im

prov

emen

tsD

ES/

CON

$20,

000

$20,

000

Caltr

ain B

ike

Facil

ity Im

prov

emen

tsCO

N

$90,

000

$90,

000

$180

,000

Caltr

ain B

ike

Facil

ity Im

prov

emen

tsCO

N

$90,

000

$90,

000

$180

,000

16th

/Miss

ion

Bike

Sta

tion

[NTI

P]D

ES

$75,

500

$75,

500

$151

,000

24th

/Miss

ion

Bike

Sta

tion

[NTI

P]D

ES

$75,

500

$75,

500

$151

,000

Glen

Par

k Bi

ke S

tatio

nD

ES

$124

,000

$124

,000

$248

,000

$2,2

38,3

13

$2,1

67,0

87

$1,1

53,2

06

$1,1

65,5

38

$718

,327

$2

25,0

29

$7,6

67,4

98

$480

,836

$6

92,3

47

$898

,562

$9

45,7

12

$995

,044

$1

,046

,657

$5

,059

,158

($

1,75

7,47

7)($

3,23

2,21

7)($

3,48

6,86

1)($

3,70

6,68

6)($

3,42

9,96

9)($

2,60

8,34

0)($

2,60

8,34

0)

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

Cas

h F

low

Pro

gram

med

in 5

YP

PC

ash

Flo

w P

rogr

amm

ed in

201

3 St

rate

gic

Pla

n B

asel

ine

Cu

mu

lati

ve R

emai

nin

g C

ash

Flo

w C

apac

ity

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

39\

1 Pr

ojec

t Lis

t\20

13 5

YPP

Upd

ate

(EP3

9 B

icyc

le S

afet

y an

d Ci

rcul

atio

n)v4

Ta

b: 0

6.17

.14

Page

8 o

f 8

18

Page 19: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%)Environmental Studies (PA&ED)Design Engineering (PS&E)R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract)End Construction (i.e. Open for Use)Start Procurement (e.g. rolling stock)Project Close-out

27% of those who were surveyed and had participated in BTWD in 2011 stated that they rode their bicycles more often than before BTWD. survey conducted in June and July of 2010 or registered 2010 BTWD participants across the Bay Area found that 14% of respondents started biking because of the 2010 BTWD, and 20% of respondents reported that they started biking because of a previous BTWD.

Bike to Work Day occurs annually each May. The SFMTA is considering its approach to its Bike to Work Day activities and contracting process.

Citywide

SFMTA - Department of Parking and Traffic (DPT)Carli Paine701.4469

[email protected]

Bike to Work Day (BTWD) is an annual event that promotes cycling as a viable option for commuting to work or school. The event is held nationally on the third Friday of May, but is sponsored locally by public and private advocacy groups. In San Francisco, BTWD is often held on the second Thursday of May, with events being hosted by various groups to reward and celebrate participating bicycle commuters. Typical events include refreshment stations, bicycle repair clinics, and prize giveaways. The SFMTA’s role has traditionally been to promote BTWD and to fund a contract to organize San Francisco’s event.

Start Date End Date

ExemptN/A

N/A

Environmental Clearance

Comments/Concerns

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

FY 2014/15

Citywide

Project Information

iv. Bicycle and Pedestrian Improvements

Bike to Work Day Promotion

b. Bicycle Circulation/Safety

Page 1 of 2

19

Page 20: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g-

$

-$

E

nviro

nmen

tal S

tudi

es (P

A&

ED

)-

$

-$

-

$

Des

ign

Eng

inee

ring

(PS&

E)

-$

-

$

-$

R/

W-

$

-$

-

$

Cons

truct

ion

205,

200

$

205,

200

$

-$

Pr

ocur

emen

t (e.g

. rol

ling

stoc

k)-

$

-$

-

$

Tot

al P

roje

ct C

ost

205,

200

$

205,

200

$

-$

P

erce

nt

of T

otal

100%

0%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

19T

otal

Cons

truct

ion

Prop

KPl

anne

d14

/15

51,3

00$

51,3

00$

Co

nstru

ctio

nPr

op K

Plan

ned

15/1

638

,475

$

38

,475

$

Cons

truct

ion

Prop

KPl

anne

d16

/17

38,4

75$

38,4

75$

Co

nstru

ctio

nPr

op K

Plan

ned

17/1

838

,475

$

38

,475

$

Cons

truct

ion

Prop

KPl

anne

d18

/19

38,4

75$

38,4

75$

-

$

-

$

-

$

T

otal

By

Fis

cal Y

ear

$51,

300

38,4

75$

38,4

75$

38,4

75$

38,4

75$

205,

200

$

Com

men

ts/

Con

cern

s

SFM

TA w

ill in

clude

app

ropr

iate

lever

agin

g in

allo

catio

n re

ques

ts o

nce

the

SFM

TA re

defin

es it

s Bik

e to

Wor

k D

ay a

ppro

ach.

Bike

to W

ork

Day

Pro

mot

ion

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 2

20

Page 21: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

2014/15

Citywide

Project Information

iv. Bicycle and Pedestrian Improvements

Bike Promotion

b. Bicycle Circulation/Safety

Citywide

This proposal is for yearly bicycle encouragement campaign targeting the general public in San Francisco, and focused primarily on able-bodied individuals who currently place a high priority on driving or transit for daily travel. The project aims to encourage San Francisco’s residents, workers, businesses and visitors to ride a bike by promoting bicycling as a fun, easy, safe and healthy way of getting around San Francisco.

Each year, a new campaign theme could be utilized (based on previous years' successes and lessons learned) and will use a range of approaches to change behaviors, combining existing and custom materials and media, and building upon extensive past City efforts by the SFMTA and community partners. The campaign will also leverage the extensive research and recent focus group analysis done by the Bikes Belong Foundation, a national bicycle advocacy group. On-street outreach could be conducted on high-bicycle traffic corridors (Market, Valencia, the Wiggle, Page/the Panhandle, etc.) and will include the distribution of printed materials and equipment that encourages bicycling and bike safety. The SFMTA will work to ensure geographic equity when selecting locations for outreach, and the campaigns will consider proactive outreach to communities of concern and other communities traditionally underrepresented in bicycling.

A successful project will shift public perception and dialogue about bicycling in San Francisco. For example, the SFMTA’s 2012 State of Cycling Report found that many people choose not to ride their bicycle due to their perceptions that: biking in San Francisco is not safe, bicycling is inconvenient for everyday tasks such as shopping, and that destinations are too far away. However, many respondents to the SFMTA’s survey stated that these barriers to biking could be overcome with social, educational and resource-based efforts. A successful project could also help secure more public understanding and support with regards to the importance of the SFMTA's complete streets projects and why sustainable transportation modes, such as bicycling, are important for San Francisco.

Continued on next page.

Page 1 of 3

21

Page 22: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Project Description (Continued)

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%) In-house 3 2014/15 2 2015/16Environmental Studies (PA&ED)Design Engineering (PS&E)R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract) Both 3 2014/15End Construction (i.e. Open for Use) 2 2018/19Start Procurement (e.g. rolling stock) 1 2015/16 2 2018/19Project Close-out

Start Date End Date

Environmental Clearance

Example media and communications strategies will include TV, online, radio and print advertisements. High-visibility signage on streets using advertising space on buses and bus shelters, banners, and on streetlights will also be used. Social media, direct outreach at strategic locations and events, proactive media relations and Internet-based videos are also priorities. Other possibilities include digital property development, such as a web microsite or a mobile app.

A strategic communications consultant with graphics expertise will be contracted to help develop the initiative as well as the targeted media/communications campaign that promotes desired behavior changes among specific populations. The consultant firm will also be tasked with content development and media purchasing where applicable.The SFMTA will coordinate and administer the project, developing the campaign content and strategy. The Bike Promotion project will be coordinated with the SFMTA's other underway bike and pedestrian safety and outreach campaigns.

Promotes utilization of San Francisco's bicycle network infrastructure and using a bicycle as a mode of transportation in general.

SFMTA - Department of Parking and Traffic (DPT)Bridget [email protected]

Categorically ExemptN/A

N/A

Page 2 of 3

22

Page 23: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g23

0,00

0$

50

,000

$

18

0,00

0$

E

nviro

nmen

tal S

tudi

es (P

A&

ED

)-

$

-$

-

$

Des

ign

Eng

inee

ring

(PS&

E)

-$

-

$

-$

R/

W-

$

-$

-

$

Cons

truct

ion

127,

637

$

127,

637

$

-$

Pr

ocur

emen

t (e.g

. rol

ling

stoc

k)-

$

Tot

al P

roje

ct C

ost

357,

637

$

177,

637

$

180,

000

$

Per

cen

t of

Tot

al50

%50

%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

19T

otal

Plan

ning

/Con

cept

ual E

ngin

eerin

gPr

op K

Prog

ram

med

14/1

550

,000

$

50

,000

$

Plan

ning

/Con

cept

ual E

ngin

eerin

gSF

MTA

Ope

ratin

gPr

ogra

mm

ed14

/15

90,0

00$

90,0

00$

180,

000

$

Cons

truct

ion

Prop

KPl

anne

d15

/16

80,8

40$

80,8

40$

Co

nstru

ctio

nPr

op K

Plan

ned

16/1

731

,198

$

31

,198

$

Cons

truct

ion

Prop

KPl

anne

d18

/19

15,5

99$

15,5

99$

-

$

T

otal

By

Fis

cal Y

ear

90,0

00$

170,

840

$

31,1

98$

-$

15

,599

$

35

7,63

7$

Com

men

ts/

Con

cern

s

Fun

ds m

ay a

lso b

e us

ed fo

r con

tract

ed w

ork

from

an

advo

cacy

gro

up o

r com

mun

ity-b

ased

org

aniz

atio

n if

appr

opria

te. O

ther

pot

entia

l fun

d so

urce

s inc

lude

A

TP, S

FMTA

gen

eral

fund

s, SF

MTA

reve

nue

bond

s, or

May

or's

Tran

spor

tatio

n Ta

sk F

orce

mea

sure

s (N

ovem

ber 2

014)

.

Bike

Pro

mot

ion

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

3 o

f 3

23

Page 24: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Year Quarter Year

Planning/Conceptual Engineering (30%)Environmental Studies (PA&ED)Design Engineering (PS&E)R/W Activities/AcquisitionAdvertise Construction 1 2014/15Start Construction (i.e. Award Contract) 3 2014/15End Construction (i.e. Open for Use) 4 2017/18Start Procurement (e.g. rolling stock)Project Close-out

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

2014/15

Citywide

Project Information

iv. Bicycle and Pedestrian Improvements

Bike Safety Education Outreach (e.g., Classes)

b. Bicycle Circulation/Safety

Citywide

SFMTA - Department of Parking and Traffic (DPT)Bridget Smith701-4491

[email protected]

Projects funded by this line item will encourage cycling as a healthy, enjoyable, and environmentally-friendly commuting option. They may include classes for adults and children on how to operate their bicycles, and reports documenting the frequency of cycling and attitudes of and about cyclists in San Francisco. This category may also be used for local match for bicycle safety, education and outreach improvements to be implemented with Active Transportation Program (ATP) grants.

Start Date End Date

Categorically ExemptN/A

N/A

Environmental Clearance

Comments/Concerns

The purpose of this project is to increase bicycling safety and increase bicycle mode share.

Page 1 of 2

24

Page 25: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g-

$

-$

E

nviro

nmen

tal S

tudi

es (P

A&

ED

)-

$

-$

-

$

Des

ign

Eng

inee

ring

(PS&

E)

-$

-

$

-$

R/

W-

$

-$

-

$

Cons

truct

ion

475,

315

$

475,

315

$

-$

Pr

ocur

emen

t (e.g

. rol

ling

stoc

k)-

$

-$

-

$

Tot

al P

roje

ct C

ost

475,

315

$

475,

315

$

-$

P

erce

nt

of T

otal

100%

0%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

19T

otal

Cons

truct

ion

Prop

KPl

anne

d14

/15

$120

,400

120,

400

$

Cons

truct

ion

Prop

KPl

anne

d15

/16

$120

,400

120,

400

$

Cons

truct

ion

Prop

KPl

anne

d16

/17

$117

,258

117,

258

$

Cons

truct

ion

Prop

KPl

anne

d17

/18

$117

,258

117,

258

$

-$

-$

-$

-$

Tot

al B

y F

isca

l Yea

r12

0,40

0$

12

0,40

0$

11

7,25

8$

11

7,25

8$

-

$

475,

315

$

Com

men

ts/

Con

cern

s

Futu

re fu

ndin

g fo

r bik

e sa

fety

edu

catio

n cla

sses

may

pot

entia

lly b

e fu

nded

with

ATP

.

Bike

Saf

ety

Edu

catio

n O

utre

ach

(e.g

., Cl

asse

s)

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 2

25

Page 26: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%)Environmental Studies (PA&ED)Design Engineering (PS&E)R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract)End Construction (i.e. Open for Use)Start Procurement (e.g. rolling stock)Project Close-out

To enhance bicycle data collection to support bicycle planning, evaluate bicycle improvements, and promote bicycle ridership.

Prop K funds are placeholders for design and/or construction phases.

TBD

Community outreach will occur as the conceptual design and and locations are being developed.

SFMTA - Department of Parking and Traffic (DPT)Bridget Smith701.4491

[email protected]

This project will plan, design, construct bicycle counters and barometer devices to enhance data collection related to bicycle ridership. Locations will be chosen based on their impact to the bike network as well as their feasibility of implementation.

Start Date End Date

TBDTBD

TBD

Environmental Clearance

Comments/Concerns

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

2014/15

TBD

Project Information

iv. Bicycle and Pedestrian Improvements

Bicycle Counters & Barometers

b. Bicycle Circulation/Safety

Page 1 of 2

26

Page 27: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g-

$

-$

-

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

Des

ign

Eng

inee

ring

(PS&

E)

-$

-

$

R/W

-$

-

$

-$

Co

nstru

ctio

n15

1,61

5$

$1

51,6

15-

$

Proc

urem

ent (

e.g. r

ollin

g st

ock)

-$

-

$

-$

T

otal

Pro

ject

Cos

t15

1,61

5$

15

1,61

5$

-

$

Per

cen

t of

Tot

al10

0%0%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

19T

otal

Des

ign

Eng

inee

ring

(PS&

E)/

Cons

truct

ion

Prop

KPl

anne

d14

/15

100,

000

$

100,

000

$

Des

ign

Eng

inee

ring

(PS&

E)/

Cons

truct

ion

Prop

KPl

anne

d17

/18

51,6

15$

51,6

15$

-

$

-

$

-

$

-

$

-

$

-

$

-

$

-

$

-

$

T

otal

By

Fis

cal Y

ear

100,

000

$

-

$

-$

51

,615

$

-

$

151,

615

$

Com

men

ts/

Con

cern

s

Oth

er p

oten

tial f

und

sour

ces i

nclu

de A

TP, S

FMTA

gen

eral

fund

s, SF

MTA

reve

nue

bond

s, or

May

or's

Tran

spor

tatio

n Ta

sk F

orce

mea

sure

s (N

ovem

ber 2

014)

.

Bicy

cle C

ount

ers &

Bar

omet

ers

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 2

27

Page 28: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%)Environmental Studies (PA&ED)Design Engineering (PS&E)R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract)End Construction (i.e. Open for Use)Start Procurement (e.g. rolling stock)Project Close-out

To improve bike safety and increase bike ridership.

Project is placeholder for innovative treatments. Projects will be developed on an annual basis. The SFMTA will submit a list of project locations prior to allocation.

TBD

Community outreach will occur as the conceptual design and and locations are being developed.SFMTA - Department of Parking and Traffic (DPT)Bridget Smith415.701.4491

[email protected]

This project will plan, design, construct and evaluate innovative measures to improve the safety of the bicycle network. Each year, emerging best practices will be reviewed and staff will select one measure to be implemented at several pilot locations. Locations will be chosen based on their impact to the bike network as well as their feasability of implementation. Measures that may be considered as part of this project include two-stage left turns, active intersection warning, advisory bike lanes, sharrows approaching intersections, and bicycle traffic calming. Projects funded with innovative treatments funds may include projects developed as part of Vision Zero.

Start Date End Date

TBDTBD

TBD

Environmental Clearance

Comments/Concerns

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

2014/15

TBD

Project Information

iv. Bicycle and Pedestrian Improvements

Innovative Treatments

b. Bicycle Circulation/Safety

Page 1 of 2

28

Page 29: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g12

7,01

8$

127,

018

$

E

nviro

nmen

tal S

tudi

es (P

A&

ED

)-

$

Des

ign

Eng

inee

ring

(PS&

E)

184,

118

$

18

4,11

8$

R/W

-$

-

$

-$

Co

nstru

ctio

n96

4,26

2$

964,

262

$

-

$

Proc

urem

ent (

e.g. r

ollin

g st

ock)

-$

-

$

-$

T

otal

Pro

ject

Cos

t1,

275,

398

$

1,27

5,39

8$

-

$

Per

cen

t of

Tot

al10

0%0%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

19T

otal

Plan

ning

/Con

cept

ual E

ngin

eerin

gPr

op K

Plan

ned

14/1

510

4,61

8$

104,

618

$

Plan

ning

/Con

cept

ual E

ngin

eerin

gPr

op K

Plan

ned

15/1

65,

600

$

5,60

0$

Plan

ning

/Con

cept

ual E

ngin

eerin

gPr

op K

Plan

ned

16/1

75,

600

$

5,60

0$

Plan

ning

/Con

cept

ual E

ngin

eerin

gPr

op K

Plan

ned

17/1

85,

600

$

5,60

0$

Plan

ning

/Con

cept

ual E

ngin

eerin

gPr

op K

Plan

ned

18/1

95,

600

$

5,60

0$

Des

ign

Eng

inee

ring

(PS&

E)

Prop

KPl

anne

d14

/15

126,

518

$

12

6,51

8$

D

esig

n E

ngin

eerin

g (P

S&E

)Pr

op K

Plan

ned

15/1

614

,400

$

14

,400

$

D

esig

n E

ngin

eerin

g (P

S&E

)Pr

op K

Plan

ned

16/1

714

,400

$

14

,400

$

D

esig

n E

ngin

eerin

g (P

S&E

)Pr

op K

Plan

ned

17/1

814

,400

$

14

,400

$

D

esig

n E

ngin

eerin

g (P

S&E

)Pr

op K

Plan

ned

18/1

914

,400

$

14

,400

$

Co

nstru

ctio

nPr

op K

Plan

ned

14/1

526

0,14

4$

260,

144

$

52

0,28

8$

Co

nstru

ctio

nPr

op K

Plan

ned

15/1

612

0,00

0$

120,

000

$

Cons

truct

ion

Prop

KPl

anne

d16

/17

120,

000

$

12

0,00

0$

Co

nstru

ctio

nPr

op K

Plan

ned

17/1

812

0,00

0$

120,

000

$

Cons

truct

ion

Prop

KPl

anne

d18

/19

83,9

74$

83,9

74$

Tot

al B

y F

isca

l Yea

r49

1,28

0$

40

0,14

4$

14

0,00

0$

14

0,00

0$

10

3,97

4$

1,

275,

398

$

Com

men

ts/

Con

cern

s

Oth

er p

oten

tial f

und

sour

ces i

nclu

de A

TP, S

FMTA

gen

eral

fund

s, SF

MTA

reve

nue

bond

s, or

May

or's

Tran

spor

tatio

n Ta

sk F

orce

mea

sure

s (N

ovem

ber 2

014)

.

Inno

vativ

e Tr

eatm

ents

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 2

29

Page 30: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%)Environmental Studies (PA&ED)Design Engineering (PS&E)R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract) 1 2014/15End Construction (i.e. Open for Use) 4 2018/19Start Procurement (e.g. rolling stock)Project Close-out

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

2014/15

Citywide

Project Information

iv. Bicycle and Pedestrian Improvements

Spot Improvements

b. Bicycle Circulation/Safety

Citywide

SFMTA - Department of Parking and Traffic (DPT)Bridget Smith701-4491

[email protected]

This project would fund spot improvements related to bicycle safety around the city. Specific locations would be identified primarily through the crash analysis, bike strategy, and requests from stakeholders. Improvements could include but not be limited to: striping and signing changes, signal hardware or timing modifications, addition/modification of raised elements like safe hit posts and concrete islands, addition of colored markings, bike boxes, wayfinding, bike lurn lanes etc. An estimated 2-3 intersections would be designed and implemented annually.

Start Date End Date

Categorically ExemptNot yet started

TBD

Environmental Clearance

Comments/Concerns

Spot Improvements projects will enhance the safety and circulation of the bicycle network thereby promoting bicycle transport.

Project is placeholder for spot improvements. Projects will be developed on an annual basis. The SFMTA will submit a list of project locations prior to allocation.

Page 1 of 2

30

Page 31: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g-

$

-$

E

nviro

nmen

tal S

tudi

es (P

A&

ED

)-

$

-$

-

$

Des

ign

Eng

inee

ring

(PS&

E)

-$

-

$

-$

R/

W-

$

-$

-

$

Des

ign

Eng

inee

ring

(PS&

E)/

Cons

truct

ion

667,

130

$

667,

130

$

-$

Pr

ocur

emen

t (e.g

. rol

ling

stoc

k)-

$

-$

-

$

Tot

al P

roje

ct C

ost

667,

130

$

667,

130

$

-$

P

erce

nt

of T

otal

100%

0%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

19T

otal

Des

ign

Eng

inee

ring

(PS&

E)/

Cons

truct

ion

Prop

KPl

anne

d14

/15

200,

000

$

200,

000

$

Des

ign

Eng

inee

ring

(PS&

E)/

Cons

truct

ion

Prop

KPl

anne

d15

/16

197,

130

$

197,

130

$

Des

ign

Eng

inee

ring

(PS&

E)/

Cons

truct

ion

Prop

KPl

anne

d16

/17

150,

000

$

150,

000

$

Des

ign

Eng

inee

ring

(PS&

E)/

Cons

truct

ion

Prop

KPl

anne

d17

/18

100,

000

$

100,

000

$

Des

ign

Eng

inee

ring

(PS&

E)/

Cons

truct

ion

Prop

KPl

anne

d18

/19

20,0

00$

20,0

00$

-

$

-

$

-

$

-

$

T

otal

By

Fis

cal Y

ear

200,

000

$

197,

130

$

15

0,00

0$

100,

000

$

20

,000

$

66

7,13

0$

Com

men

ts/

Con

cern

s

Prop

K fu

nds a

re p

laceh

olde

rs fo

r des

ign

and/

or c

onst

ruct

ion

phas

es. O

ther

pot

entia

l fun

d so

urce

s inc

lude

ATP

, SFM

TA g

ener

al fu

nds,

SFM

TA re

venu

e bo

nds,

or

May

or's

Tran

spor

tatio

n Ta

sk F

orce

mea

sure

s (N

ovem

ber 2

014)

.

Spot

Impr

ovem

ents

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 2

31

Page 32: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%)Environmental Studies (PA&ED)Design Engineering (PS&E)R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract)End Construction (i.e. Open for Use)Start Procurement (e.g. rolling stock)Project Close-out

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

2014/15

TBD

Project Information

iv. Bicycle and Pedestrian Improvements

Bicycle Network Expansion and Upgrades

b. Bicycle Circulation/Safety

TBD

Outreach has been completed to collect data on current comfort of the existing bicycle network. Additional site specific outreach will be conducted when needed.

SFMTA - Department of Parking and Traffic (DPT)Bridget Smitth701-4491

[email protected]

This project will fund bikeway network expansion, enhancement, and spot improvements along key corridors to create a larger, more connected network in line with SFMTA's Bicycle Strategy. Improvements funded with Bicycle Network Expansion and Upgrades may that support other desired outcomes of the SFMTA Bicycle Strategy, including funding for Long Term Bicycle Parking and Bicycle Wayfinding.

Start Date End Date

TBDTBD

TBD

Environmental Clearance

Comments/Concerns

SFMTA’s 2013 Bicycle Strategy found that the existing bicycle network is fragmented and not legible to all current and potential users. Network gaps, areas with drops in rider comfort, and crash-prone intersections all prevent riders from safely traversing the city

The SFMTA will use initial planning funds for project development in 2014 to create a prioritized list of projects. Allocation of any additional funds from the Bicycle Network Expansion and Upgrades line requires an amendment to the 5YPP to reflect the prioritized list of projects to be designed and constructed in

Fiscal Year 2014/15.

Project is placeholder for expansion and upgrade projects to the San Francisco Bikeway Network. Projects for subsequent years after Fiscal Year 2014/15 will be developed on an annual basis. The SFMTA will submit a list of project locations prior to allocation.

Page 1 of 2

32

Page 33: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g32

0,10

0$

320,

100

$

-

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

-$

D

esig

n E

ngin

eerin

g (P

S&E

)33

6,25

2$

336,

252

$

-

$

R/W

-$

-

$

-$

Co

nstru

ctio

n2,

001,

751

$

2,

001,

751

$

-

$

Proc

urem

ent (

e.g. r

ollin

g st

ock)

-$

-

$

-$

T

otal

Pro

ject

Cos

t2,

658,

103

$

2,

658,

103

$

-

$

Per

cen

t of

Tot

al10

0%0%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

1919

/20

20/

2121

/22

22/

2323

/24

24/

25T

otal

Plan

ning

/Con

cept

ual E

ngin

eerin

gPr

op K

Plan

ned

14/1

518

5,05

0$

18

5,05

0$

Pl

anni

ng/C

once

ptua

l Eng

inee

ring

Prop

KPl

anne

d15

/16

135,

050

$

135,

050

$

Plan

ning

/Con

cept

ual E

ngin

eerin

gPr

op K

Plan

ned

16/1

7-

$

Plan

ning

/Con

cept

ual E

ngin

eerin

gPr

op K

Plan

ned

17/1

8-

$

Plan

ning

/Con

cept

ual E

ngin

eerin

gPr

op K

Plan

ned

18/1

9-

$

Des

ign

Eng

inee

ring

(PS&

E)

Prop

KPl

anne

d14

/15

168,

126

$

168,

126

$

Des

ign

Eng

inee

ring

(PS&

E)

Prop

KPl

anne

d15

/16

168,

126

$

168,

126

$

Des

ign

Eng

inee

ring

(PS&

E)

Prop

KPl

anne

d16

/17

-$

D

esig

n E

ngin

eerin

g (P

S&E

)Pr

op K

Plan

ned

17/1

8-

$

Des

ign

Eng

inee

ring

(PS&

E)

Prop

KPl

anne

d18

/19

-$

Co

nstru

ctio

nPr

op K

Plan

ned

14/1

518

3,86

2$

18

3,86

2$

36

7,72

4$

Co

nstru

ctio

nPr

op K

Plan

ned

15/1

628

2,97

0$

28

2,97

0$

Co

nstru

ctio

nPr

op K

Plan

ned

16/1

745

0,50

0$

45

0,50

0$

Co

nstru

ctio

nPr

op K

Plan

ned

17/1

845

0,50

0$

45

0,50

0$

Co

nstru

ctio

nPr

op K

Plan

ned

18/1

945

0,05

7$

45

0,05

7$

T

otal

By

Fis

cal Y

ear

537,

038

$

770,

008

$

450,

500

$

450,

500

$

450,

057

$

-$

-

$

-$

-$

-$

-

$

2,

658,

103

$

Com

men

ts/

Con

cern

s

Allo

catio

n of

Pro

p K

fund

s fro

m th

is pr

ojec

t are

con

ditio

ned

upon

a 5

YPP

am

endm

ent r

equi

ring

the

SFM

TA to

dev

elop

a lis

t of p

riorit

ized

pro

jects

for f

undi

ng

with

fund

s fro

m th

e pr

ojec

t (an

ticip

ated

ear

ly 20

15).

This

cond

ition

doe

s not

app

ly to

Fisc

al Y

ear 2

014/

15 p

lanni

ng fu

nds i

nclu

ded

in th

is pr

ojec

t, w

hich

will

be

used

to d

evelo

p th

e lis

t of p

riorit

ized

pro

jects

for F

iscal

Yea

r 201

4/15

des

ign

and

cons

truct

ion

fund

s.

Oth

er p

oten

tial f

und

sour

ces i

nclu

de A

TP, S

FMTA

gen

eral

fund

s, SF

MTA

reve

nue

bond

s, or

May

or's

Tran

spor

tatio

n Ta

sk F

orce

mea

sure

s (N

ovem

ber 2

014)

.

Bicy

cle N

etw

ork

Exp

ansio

n an

d U

pgra

des

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 2

33

Page 34: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%) In-house 1 2014/15 2 2014/15Environmental Studies (PA&ED)Design Engineering (PS&E) In-house 2 2014/15 4 2015/16R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract) In-house 1 2015/16End Construction (i.e. Open for Use) In-house 1 2017/18Start Procurement (e.g. rolling stock)Project Close-out

Sharrows enhance the safety and circulation of the bicycle network thereby promoting bicycle transport.

Citywide

SFMTA - Department of Parking and Traffic (DPT)Oliver Gajda701-4467

[email protected]

Install an estimated 1,350 Shared Use Lane Markings (“Sharrows”) on approximately 16 miles of San Francisco Bike Network streets (See Planned Locations section). There is an outstanding list of sharrows at 52 locations that need to be implemented. These sharrow locations are different than Prop B Streets Bond funded sharrows, where completion is contingent on DPW's paving schedule. A list of locations is attached is the 'All Sharrows' excel file under the tab 'Planned'.

The SFMTA prioritizes new requests for sharrows based on the existing backlog of requested sharrow locations along with new requests submitted through elected officials (e.g. Board of Supervisors) and 311. Public requests for sharrows can be made by contacting 311.

Start Date End Date

Environmental Clearance

Comments/Concerns

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

2014/15

Citywide

Project Information

iv. Bicycle and Pedestrian Improvements

Sharrows

b. Bicycle Circulation/Safety

Page 1 of 4

34

Page 35: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g-

$

-$

-

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

-$

D

esig

n E

ngin

eerin

g (P

S&E

)11

8,00

0$

118,

000

$

-

$

R/W

-$

-

$

-$

Co

nstru

ctio

n13

8,10

0$

138,

100

$

-

$

Proc

urem

ent (

e.g. r

ollin

g st

ock)

-$

-

$

-$

T

otal

Pro

ject

Cos

t25

6,10

0$

256,

100

$

-

$

Per

cen

t of

Tot

al10

0%0%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

Tot

al

Des

ign

Eng

inee

ring

(PS&

E)

Prop

KPl

anne

d14

/15

41,2

85$

76,7

15$

118,

000

$

Cons

truct

ion

Prop

KPl

anne

d15

/16

62,1

45$

62,1

45$

13,8

10$

138,

100

$

-$

-$

-$

T

otal

By

Fis

cal Y

ear

41,2

85$

138,

860

$

62

,145

$

13

,810

$

25

6,10

0$

Com

men

ts/

Con

cern

s

Proj

ect c

ost i

nclu

des m

inim

al co

sts f

or p

lanni

ng a

nd e

nviro

nmen

tal r

eview

. Cos

ts a

ssoc

iated

with

thes

e ph

ases

are

inclu

ded

in d

esig

n.

Shar

row

s

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 4

35

Page 36: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

Planned Street Segments for Sharrows (Draft 5/28/14)

Street From ToMiddle Drive West Martin Luther King TransverseLincoln Way Great Highway Martin Luther KingGellert Clearfield MiddlefieldFrancisco/Alhambra Lyon Cervantes30th Ave Fulton John F. KennedyCrystal Alemany De LongAshbury Oak ClaytonGoethe De Long San joseChain of Lakes Loop8th Avenue Fulton John F. KennedyRichland Chenery Murray47th Ave Fulton John F. Kennedy23rd St Indiana MinnesotaVermont 26th Cesar ChavezMinnesota 23rd Cesar Chavez26th St Kansas VermontOctavia Bay GreenJohn F. Kennedy Great Highway TransverseMartin Luther King 5th Ave Kezar30th St Sanchez DoloresTransverse John F. Kennedy Martin Luther KingBroadway Columbus Broadway TunnelVan Ness McDowell North PointMarket 17th DouglessDouglass 17th MarketStockton Post BushStockton Sacramento BroadwayLake Merced Skyline City EdgeGreat Highway Fulton LincolnFont Lake Merced HollowaySaint Charles Payson BelleSaint Charles 19th EndLunado Mercedes Holloway15th Ave Lake Wedemeyer

36

Page 37: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

Planned Street Segments for Sharrows (Draft 5/28/14)

Street From ToSkyline Sloat Lake MercedSkyline Sloat City EdgeFulton Park Presidio FunstonMerchant Cranston LincolnCranston ? LincolnLincoln Blvd Storey PattenArguello Moraga PacificPresidio Letterman West PacificKobbe Upton ParkRalston Lincoln Battery DynamiteCowles Lincoln McDowellLincoln Pershing WashingtonBattery Caufiled/Wedemeyer Washington 15thMcDowell Crissy Field CowlesSheridan Lincoln ArguelloLincoln Torney PresidioLincoln Taylor GrahamHalleck Vallejo Lincoln

37

Page 38: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%) 15% In-house 2 2013/14 1 2014/15Environmental Studies (PA&ED) 2 2014/15 4 2014/15Design Engineering (PS&E)R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract)End Construction (i.e. Open for Use)Start Procurement (e.g. rolling stock)Project Close-out

A new bicycle corridor would alleviate bicycle demand on McAllister Street, a high-transit demand corridor, and provide a direct connection from the Golden Gate Park / Richmond District to Polk Street, a planned major bicycle corridor. This will close key directional gaps in the network and provide safe cycling connections to key destinations in the downtown area.

Start Date End Date

TBDTBD

06/30/15

Environmental Clearance

Comments/Concerns

Milestones for future phases will be dependent on outcome of the planning study.

Community outreach is planned as part of the pre-development work soon to be underway and will be continued throughout the project's completion.

SFMTA - San Francisco Municipal Railway (MUNI)Bridget Smith

[email protected]

SFMTA staff is currently studying opportunities to the bicycle network between two economically disadvantaged communities: Western Addition and the Tenderloin. Potential new east-west bikeway corridors include: Golden Gate Avenue, Baker Street to Market Street; Turk Street, Baker Street to Market Street; Eddy Street, Broderick Street to Market Street. This project would further preliminary planning work through detailed concept design.

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

2014/15

See potential corridors listed in project description below.

Project Information

iv. Bicycle and Pedestrian Improvements

Western Addition-Downtown Bikeway Connector [NTIP]

b. Bicycle Circulation/Safety

5,6

Page 1 of 2

38

Page 39: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g15

0,00

0$

-$

15

0,00

0$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

62,0

00$

62,0

00$

-$

Des

ign

Eng

inee

ring

(PS&

E)

TBD

-$

R/W

-$

-

$

-$

Cons

truct

ion

TBD

-$

-

$

Proc

urem

ent (

e.g. r

ollin

g st

ock)

-$

-

$

-$

Tot

al P

roje

ct C

ost

212,

000

$

62

,000

$

15

0,00

0$

Per

cen

t of

Tot

al29

%71

%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

13/

1414

/15

15/

1616

/17

17/

1818

/19

Tot

al

Plan

ning

/Con

cept

ual E

ngin

eerin

gSF

MTA

Ope

ratin

gPr

ogra

mm

ed13

/14

150,

000

$

150,

000

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

Prop

KPl

anne

d14

/15

62,0

00$

62,0

00$

Des

ign

Eng

inee

ring

(PS&

E)

TBD

-$

Cons

truct

ion

TBD

-$

-$

-$

-$

-$

-$

Tot

al B

y F

isca

l Yea

r15

0,00

0$

62

,000

$

-

$

-$

-

$

-$

21

2,00

0$

Com

men

ts/

Con

cern

s

Wes

tern

Add

ition

-Dow

ntow

n Bi

kew

ay C

onne

ctor

[NTI

P]

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 2

39

Page 40: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%) 25% In-house 2 2013/14 4 2015/16Environmental Studies (PA&ED) 1 2014/15 1 2016/17Design Engineering (PS&E) 1 2016/17 4 2016/17R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract)End Construction (i.e. Open for Use)Start Procurement (e.g. rolling stock)Project Close-out

The current design of The Embarcadero includes a marked bike lane on the east side of the street and a “floating” part-time bike lane on the west side of the street, sidewalks, cable car tracks, travel lanes, and parking. The large volume of people traveling by all modes is expected to continue to grow with significant mixed-use development proposals along the waterfront and in SOMA (including South Beach, Rincon Hill and Transbay areas). In order to better accommodate current demand; respond to conflicts and safety issues; and prepare for continued growth, there has been a long-standing desire to evaluate changing conditions and recommend further improvements to The Embarcadero.

6,3

Some outreach for this project occurred in spring 2014 through the Mayor's Transportation Task Force open houses. Formal outreach will begin in summer 2014.

SFMTA - Department of Parking and Traffic (DPT)Bridget Smith415.701.4491

[email protected]

The Embarcadero Enhancement planning effort will develop a vetted conceptual design and cost estimate for improvements on The Embarcadero from Townsend to Powell Streets consisting of a separated bike lane from the 3rd Street Bridge to Powell Street. The Port of San Francisco and SFMTA will lead the project, with a high level of involvement and input from other key agencies, including the Planning Department and Department of Public Works.

Start Date End Date

TBDTBD

06/30/16

Environmental Clearance

Comments/Concerns

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

2014/15

Embarcadero from Townsend to Powell

Project Information

iv. Bicycle and Pedestrian Improvements

Embarcadero Bikeway Enhancements [NTIP]

b. Bicycle Circulation/Safety

Page 1 of 2

40

Page 41: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g50

0,00

0$

-$

50

0,00

0$

E

nviro

nmen

tal S

tudi

es (P

A&

ED

)20

0,00

0$

200,

000

$

-$

D

esig

n E

ngin

eerin

g (P

S&E

)-

$

-

$

-$

R/

W-

$

-

$

-$

Co

nstru

ctio

n-

$

-

$

-$

Pr

ocur

emen

t (e.g

. rol

ling

stoc

k)-

$

-

$

-$

T

otal

Pro

ject

Cos

t70

0,00

0$

200,

000

$

500,

000

$

Per

cen

t of

Tot

al29

%71

%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

19T

otal

Plan

ning

/Con

cept

ual E

ngin

eerin

gPD

APl

anne

d14

/15

125,

000

$

125,

000

$

250,

000

$

Pl

anni

ng/C

once

ptua

l Eng

inee

ring

SFM

TA O

pera

ting

Plan

ned

14/1

512

5,00

0$

12

5,00

0$

25

0,00

0$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

Prop

KPl

anne

d14

/15

10,0

00$

90,0

00$

100,

000

$

200,

000

$

-

$

-$

-

$

-$

-

$

T

otal

By

Fis

cal Y

ear

260,

000

$

340,

000

$

100,

000

$

-

$

-$

70

0,00

0$

Com

men

ts/

Con

cern

s

Dep

endi

ng o

n de

sign

alter

nativ

e, pr

ojec

t cos

t cou

ld b

e up

to $

25 m

illio

n.

Em

barc

ader

o Bi

kew

ay E

nhan

cem

ents

[NTI

P]

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 2

41

Page 42: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%) In-house 4 2011/12 4 2012/13Environmental Studies (PA&ED) Both 1 2013/14 2 2014/15Design Engineering (PS&E) In-house 3 2013/14 4 2014/15R/W Activities/AcquisitionAdvertise Construction 1 2015/16 2 2015/16Start Construction (i.e. Award Contract) 0% Both 2 2015/16End Construction (i.e. Open for Use) 2 2016/17Start Procurement (e.g. rolling stock)Project Close-out 3 2016/17

Prop K Expenditure Plan Information

D. TSM/Strategic Initiatives

44

2015/16Project Information

39

ii. Transportation/Land Use Coordinationb. Transportation/Land Use Coordination

Second Street between Market and King StreetsSecond Street Streetscape Improvement

Comments/Concerns

6

Second Street was identified by the community as a primary pedestrian, bicycle and transit thoroughfare and a ‘green connector’ for the neighborhood as part of the 2008 East SoMa Area Plan, which is included in the City’s 2009 Eastern Neighborhoods Plan. Second Street is also identified as a bicycle route in the City’s bicycle network, and a proposed bike lane design was one of the projects evaluated in the Bicycle Plan EIR. DPW, SFMTA, and the Planning Department conducted extensive public outreach, including four community meetings, door-to-door visits to all buildings on Second Street between Market and King Streets, and meetings with neighborhood and merchant associations.

Department of Public WorksCristina Olea(415) 558-4004

[email protected]

This cycle 1 OneBayArea Grant (OBAG)-funded project will transform the 2nd Street corridor to a pedestrian and bicycle-friendly complete street by implementing wider sidewalks, buffered and raised cycletracks, lane reduction, pedestrian safety improvements, bus stop improvements, a new traffic signal, and associated sewer rehabilitation. To accommodate the proposed project, some on-street parking may be removed along the corridor. More detail can be found on Department of Public Works' (DPW's) project page <http://www.sfdpw.org/index.aspx?page=1489>.

Second Street is a heavily used multi-modal corridor, designated as a key walking and biking route. The street is also served by 10 and 12 Muni bus routes. This project will improve safety, provide a more attractive pedestrian environment, provide a dedicated bicycle facility, and improve Muni travel time.

Start Date End Date

Supplemental Focused EIRUnderway

11/30/14

Environmental Clearance

Page 1 of 2

42

Page 43: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g-

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

489,

531

$

2,29

9$

48

7,23

2$

Des

ign

Eng

inee

ring

(PS&

E)

1,48

6,86

5$

17

0,54

3$

1,31

6,32

2$

R/

W-

$

Cons

truct

ion

11,8

71,2

64$

1,54

9,58

4$

10

,321

,680

$

Proc

urem

ent (

e.g. r

ollin

g st

ock)

-$

T

otal

Pro

ject

Cos

t13

,847

,660

$

1,

722,

426

$

12,1

25,2

34$

Per

cen

t of

Tot

al12

%88

%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

Pre

viou

s14

/15

15/

1616

/17

17/

1818

/19

Tot

al

Env

ironm

enta

l Stu

dies

(PA

&E

D)

Prop

K E

P 44

Allo

cate

d13

/14

862

$

1,

437

$

2,29

9$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

OBA

GA

lloca

ted

13/1

46,

566

$

11,1

80$

17,7

46$

E

nviro

nmen

tal S

tudi

es (P

A&

ED

)G

ener

al Fu

ndA

lloca

ted

13/1

417

3,71

0$

29

5,77

6$

469,

486

$

Des

ign

Eng

inee

ring

(PS&

E)

Prop

K E

P 44

Allo

cate

d13

/14

34,1

09$

136,

434

$

17

0,54

3$

D

esig

n E

ngin

eerin

g (P

S&E

)O

BAG

Allo

cate

d13

/14

263,

264

$

1,05

3,05

8$

1,

316,

322

$

Co

nstru

ctio

nPr

op K

EP

44Pl

anne

d15

/16

719,

792

$

71

9,79

2$

1,

439,

584

$

Co

nstru

ctio

nPr

op K

EP

39Pl

anne

d15

/16

55,0

00$

55,0

00$

11

0,00

0$

Co

nstru

ctio

nO

BAG

Prog

ram

med

15/1

64,

590,

840

$

4,59

0,84

0$

9,18

1,68

0$

Cons

truct

ion

Gen

eral

Fund

Prog

ram

med

15/1

657

0,00

0$

570,

000

$

1,14

0,00

0$

-$

-$

-$

-$

Tot

al B

y F

isca

l Yea

r47

8,51

1$

1,

497,

885

$

5,93

5,63

2$

5,

935,

632

$

-$

-$

13,8

47,6

60$

Com

men

ts/

Con

cern

s

Fund

ing

plan

is b

ased

on

FY 2

013/

14 a

lloca

tion

of fu

nds f

or d

esig

n ph

ase.

Seco

nd S

treet

Stre

etsc

ape

Impr

ovem

ent

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 2

43

Page 44: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

2014/15

Twin Peaks Blvd from Portola to Clarendon

Project Information

iv. Bicycle and Pedestrian Improvements

Twin Peaks Connectivity

b. Bicycle Circulation/Safety

7,8

The project is a collaborative effort between the San Francisco Recreation and Park Department (SFRPD) and the San Francisco Municipal Transportation Agency (SFMTA), and is supported by the Bay Area Ridge Trail Council. SFMTA - Department of Parking and Traffic (DPT)Jerry Robbins415-701-4490

[email protected]

This project will develop a conceptual design that will improve access for people who walk or bicycle to Twin Peaks via Twin Peaks Boulevard between Clarendon and Portola. Staff observations indicate that the roadway, with the exception of tour buses, is underused and could potentially be narrowed. Traffic and engineering studies will be completed to determine road usage for possible redesign. Special consideration will be taken to develop pedestrian and bicycle facilities and improve connections to the Twin Peaks Trail and Bay Area Ridge Trail System. The project will also include the environmental review of the concept design which will prepare the project for future local, state and federal (e.g. Active Transportation Program) funding. In addition to park users, these improvements will benefit residents of the adjacent communities and visitors to this famous tourist destination by providing safe access to the view sheds and trail systems.

TBDNot yet started

12/31/15

Environmental Clearance

Twin Peaks Boulevard provides the only vehicle access to the site and currently there are no pedestrian and bicycle facilities on the roadway. The lack of crosswalks and safe bicycle facilities reduces access to the Twin Peaks Trail system for many park visitors. In addition, the lack of walking paths on the north and south side of Twin Peaks Boulevard reduces safe access to stunning views at the peak. Both the Portola and the Peaks Trails cross Twin Peaks Boulevard at a total of five locations. Minor realignment to portions of the trails where they cross Twin Peaks Boulevard are planned to improve pedestrian visibility between trail connections. Moreover, at the trail summit, Twin Peaks Boulevard changes from a two-lane, two-way road to two separate, one way, two-lane roads. The intersections between the south peak, the north peak and Christmas Tree Point are poorly marked with designs that confuse people walking, driving and riding bicycles. Finally, there is no clear connection to the Bay Area Ridge Trail located on the streets below Twin Peaks. The project will determine if safe and appropriate bicycle access can be provided on Twin Peaks Boulevard.

Page 1 of 3

44

Page 45: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%) 0% 1 2014/15 4 2014/15Environmental Studies (PA&ED) 0% 1 2015/16 2 2015/16Design Engineering (PS&E)R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract)End Construction (i.e. Open for Use)Start Procurement (e.g. rolling stock)Project Close-out

Start Date End Date

Comments/Concerns

Schedule and funding for future phases to be determined as an outcome of the Planning and Environmental phases.

Page 2 of 3

45

Page 46: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g18

8,98

4$

19

,866

$

16

9,11

8$

E

nviro

nmen

tal S

tudi

es (P

A&

ED

)26

,062

$

3,

134

$

22,9

28$

Des

ign

Eng

inee

ring

(PS&

E)

-$

-

$

-$

R/

W-

$

-$

-

$

Cons

truct

ion

-$

-

$

-$

Pr

ocur

emen

t (e.g

. rol

ling

stoc

k)-

$

-$

-

$

Tot

al P

roje

ct C

ost

215,

046

$

23,0

00$

192,

046

$

Per

cen

t of

Tot

al11

%89

%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

19T

otal

Plan

ning

/Con

cept

ual E

ngin

eerin

gPr

op K

Plan

ned

14/1

519

,866

$

3,

134

$

23,0

00$

Plan

ning

/Con

cept

ual E

ngin

eerin

gPr

iorit

y Co

nser

vatio

n A

rea

Fund

sPr

ogra

mm

ed14

/15

144,

661

$

14

4,66

1$

Plan

ning

/Con

cept

ual E

ngin

eerin

gRe

crea

tion

and

Park

Dep

artm

ent

Fund

sPr

ogra

mm

ed14

/15

24,4

57$

24,4

57$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

Prio

rity

Cons

erva

tion

Are

a Fu

nds

Prog

ram

med

15/1

622

,928

$

22

,928

$

-$

-$

-$

-$

Tot

al B

y F

isca

l Yea

r18

8,98

4$

26,0

62$

-$

-

$

-$

21

5,04

6$

Com

men

ts/

Con

cern

s

Twin

Pea

ks C

onne

ctiv

ity

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r C

ash

Flo

w

Page

3 o

f 3

46

Page 47: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%)Environmental Studies (PA&ED)Design Engineering (PS&E)R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract)End Construction (i.e. Open for Use)Start Procurement (e.g. rolling stock)Project Close-out

The San Francisco Transportation Plan's needs assessment identified significant unmet demand for pedestrian and bicycle circulation projects and transit reliability initiatives, and concluded that meeting these transportation needs is an important way to improve mobility in neighborhoods and to address socioeconomic and geographic disparities in San Francisco. As a result of this finding and in response to public and Board input, the Transportation Authority developed the NTIP.

This is a placeholder. Schedule will be determined with project is identified.

TBD

NTIP projects are intended to funds projects that have been identified through community-based transportation planning efforts.

TBD

The NTIP program came out of the San Francisco Transportation Plan's needs assessment that identified significant unmet demand for pedestrian and bicycle circulation projects and transit reliability initiatives. (See Purpose and Need below.) The NTIP has two components: a planning component to fund community-based planning efforts in each Supervisorial district; and a capital component to provide local matching funds for two neighborhood-scale projects in each district in the next five years. Examples of project types include pedestrian signals, bulbouts, and other measures to improve pedestrian and bicyclist safety. Capital placeholders like this project are included in various 5YPPs.

Start Date End Date

Environmental Clearance

Comments/Concerns

Prop K Expenditure Plan Information

39

2015/16

TBD

Project Information

iv. Bicycle and Pedestrian Improvements

Neighborhood Transportation Improvement Program Placeholder

b. Bicycle Circulation/Safety

Page 1 of 2

47

Page 48: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g-

$

-$

-

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

-$

Des

ign

Eng

inee

ring

(PS&

E)

-$

-

$

-$

R/W

-$

-

$

-$

Cons

truct

ion

436,

000

$

43

6,00

0$

-$

Proc

urem

ent (

e.g. r

ollin

g st

ock)

-$

-

$

-$

Tot

al P

roje

ct C

ost

436,

000

$

43

6,00

0$

-$

P

erce

nt

of T

otal

100%

0%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

Pre

viou

s14

/15

15/

1616

/17

17/

1818

/19

Tot

al

Cons

truct

ion

Prop

KPl

anne

d15

/16

148,

240

$

14

3,88

0$

143,

880

$

43

6,00

0$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

Tot

al B

y F

isca

l Yea

r-

$

-$

148,

240

$

14

3,88

0$

14

3,88

0$

-

$

436,

000

$

Com

men

ts/

Con

cern

s

Neig

hbor

hood

Tra

nspo

rtatio

n Im

prov

emen

t Pro

gram

Plac

ehol

der

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Whe

n pr

ojec

ts a

re id

entif

ied, p

rojec

ts a

re e

xpec

ted

to in

clude

app

ropr

iate

lever

agin

g.

Page

2 o

f 2

48

Page 49: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%)Environmental Studies (PA&ED)Design Engineering (PS&E)R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract) Both 1 2014/15End Construction (i.e. Open for Use) Both 3 2014/15Start Procurement (e.g. rolling stock)Project Close-out

The improvmements are part of the JPB's efforts to implement the recommendations and standards outlined in the agency’s 2008 Bicycle Access and Parking Plan (BAPP). This plan identifies needed bicycle capital improvements and recommended best practice standards throughout the Caltrain system.

6

In developing 2008 BAPP, Caltrain sought extensive public comments from the public through a series of station workshops, three community meetings, a number of technical advisory group meetings, as well as two public comment periods.

Peninsula Corridor Joint Powers Board (Caltrain)April Chan 650-508-7818

[email protected]

This project is funding various improvements to the bike station at the 4th and King Caltrain station. Initially, the PCJPB intended to pass through the funding for the improvements directly to the new contract operator. However, after working with PCJPB's attorney and the contracts and procurement department, it was determined that any construction work must be run through PCJPB’s contracting process. Prop K funds included in the project are for construction related charges and to fully fund the revised cost of the bike station improvements.

Start Date End Date

CEExempt

Exempt

Environmental Clearance

Comments/Concerns

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

2014/15

4th and King (Caltrain North Terminal)

Project Information

iv. Bicycle and Pedestrian Improvements

4th and King Bike Station Improvements

b. Bicycle Circulation/Safety

Page 1 of 2

49

Page 50: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g-

$

-$

-

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

-$

D

esig

n E

ngin

eerin

g (P

S&E

)-

$

-$

R/

W-

$

-$

-

$

Cons

truct

ion

185,

000

$

18

5,00

0$

-$

Pr

ocur

emen

t (e.g

. rol

ling

stoc

k)-

$

-$

-

$

Tot

al P

roje

ct C

ost

185,

000

$

18

5,00

0$

-$

P

erce

nt

of T

otal

100%

0%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

Pri

or Y

ear

Fu

nd

s14

/15

15/

1616

/17

17/

1818

/19

Tot

al

Cons

truct

ion

Prop

K

Allo

cate

d12

/13

$165

,000

165,

000

$

Cons

truct

ion

Prop

K

Plan

ned

14/1

520

,000

$

20

,000

$

-$

-$

-$

-$

-$

-$

-$

-$

Tot

al B

y F

isca

l Yea

r16

5,00

0$

20

,000

$

-

$

-$

-

$

-$

18

5,00

0$

Com

men

ts/

Con

cern

s

4th

and

Kin

g Bi

ke S

tatio

n Im

prov

emen

ts

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 2

50

Page 51: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date:

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%)Environmental Studies (PA&ED)Design Engineering (PS&E) 0% Both 1 2015/16 4 2017/18R/W Activities/AcquisitionAdvertise ConstructionStart Construction (i.e. Award Contract) 0% Both 1 2015/16End Construction (i.e. Open for Use) 0% Both 4 2018/19Start Procurement (e.g. rolling stock) 1 2015/16 4 2018/19Project Close-out 4 2019/20

The improvmements are part of the JPB's efforts to implement the recommendations and standards outlined in the agency’s 2008 Bicycle Access and Parking Plan (BAPP). This plan identifies needed bicycle capital improvements and recommended best practice standards throughout the Caltrain system.

Project is placeholder for improving bike parking at San Francisco's Caltrain stations. Projects will be developed on a biennial basis. The PCJPB will submit a list of projects prior to allocation.

6, 10

Caltrain staff will work with Caltrain’s Bicycle Advisory Committee to refine and prioritize capital improvements in the 2008 BAPP into a Bicycle Improvement CIP. It is anticipated that this planning and prioritization effort will be complete in mid FY 2014. In developing 2008 BAPP, Caltrain sought extensive public comments from the public through a series of station workshops, three community meetings, a number of technical advisory group meetings, as well as two public comment periods.

Peninsula Corridor Joint Powers Board (Caltrain)April Chan 650-508-7818

[email protected]

This project will design, procure, install and maintain bicycle parking and access improvements at the 4th & King and 22nd Street Caltrain Stations.Specific improvements may include, but are not limited to projects involving the following: • Parking improvements related to bicycle racks, electronic lockers and shared parking facilities.• Parking improvements related to bicycle parking facility at the San Francisco 4th and King Caltrain station.• Bicycle access improvements including relocation or modification of station amenities and installation oframps and stair channels• Informational signage and striping.• Safety lighting and barriers

Start Date End Date

CEExempt Exempt

Environmental Clearance

Comments/Concerns

Prop K Expenditure Plan Information

C. Street & Traffic Safety

39

2014/15

Caltrain stations in San Francisco (4th and King, 22nd Street)

Project Information

iv. Bicycle and Pedestrian Improvements

Caltrain Bike Facility Improvements

b. Bicycle Circulation/Safety

Page 1 of 2

51

Page 52: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g-

$

-$

-

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

-$

D

esig

n E

ngin

eerin

g (P

S&E

)40

,000

$

40,0

00$

-

$

R/W

-$

-

$

-$

Co

nstru

ctio

n36

0,00

0$

36

0,00

0$

-

$

Proc

urem

ent (

e.g. r

ollin

g st

ock)

-$

-

$

-$

T

otal

Pro

ject

Cos

t40

0,00

0$

40

0,00

0$

-

$

Per

cen

t of

Tot

al10

0%0%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

19T

otal

Des

ign

Eng

inee

ring

(PS&

E)

Prop

K

Plan

ned

15/1

620

,000

$

20

,000

$

Cons

truct

ion

Prop

K

Plan

ned

15/1

690

,000

$

90

,000

$

18

0,00

0$

D

esig

n E

ngin

eerin

g (P

S&E

)Pr

op K

Pl

anne

d17

/18

20,0

00$

20,0

00$

Co

nstru

ctio

nPr

op K

Pl

anne

d17

/18

90,0

00$

90,0

00$

180,

000

$

-$

T

otal

By

Fis

cal Y

ear

-$

11

0,00

0$

90

,000

$

11

0,00

0$

90

,000

$

40

0,00

0$

Com

men

ts/

Con

cern

s

PCJP

B an

ticip

ates

pro

vidi

ng a

ppro

priat

e lev

erag

ing

usin

g ot

her f

und

sour

ces a

t the

tim

e of

pro

ject a

lloca

tion.

Bike

Bik

e Fa

cility

Impr

ovem

ents

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 2

52

Page 53: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

53

Page 54: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ityP

rop

osit

ion

K S

ales

Tax

Pro

gram

Pro

ject

In

form

atio

n F

orm

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Plan

ning

/Con

cept

ual E

ngin

eerin

g-

$

-$

-

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

-$

D

esig

n E

ngin

eerin

g (P

S&E

)55

0,00

0$

550,

000

$

R/

W-

$

-$

-

$

Cons

truct

ion

2,20

0,00

0$

-

$

2,20

0,00

0$

Proc

urem

ent (

e.g. r

ollin

g st

ock)

-$

-

$

-$

T

otal

Pro

ject

Cos

t2,

750,

000

$

550,

000

$

2,

200,

000

$

P

erce

nt

of T

otal

20%

80%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

1919

/20

20/

2121

/22

22/

2323

/24

24/

25T

otal

Des

ign

Eng

inee

ring

(PS&

E)

Prop

KPl

anne

d14

/15

270,

000

$

270,

000

$

540,

000

$

Cons

truct

ion

Prop

1B

Plan

ned

14/1

52,

200,

000

$

2,

200,

000

$

-

$

-

$

-

$

-

$

-

$

-

$

-

$

-

$

-

$

-

$

-

$

-

$

Tot

al B

y F

isca

l Yea

r27

0,00

0$

2,

470,

000

$

-

$

-$

-

$

-$

-

$

-$

-$

-$

-

$

2,

740,

000

$

Com

men

ts/

Con

cern

s

Oth

er p

oten

tial f

und

sour

ces f

or c

onst

ruct

ion

of th

e bi

ke st

atio

ns in

clude

the

Act

ive

Tran

spor

tatio

n Pr

ogra

m a

nd C

ap-a

nd-T

rade

fund

s.

Bike

Sta

tions

at 3

BA

RT S

tatio

ns

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Page

2 o

f 2

54

Page 55: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

MTA

Bicy

cle S

afet

y E

duca

tion

Clas

ses

CON

Prog

ram

med

$165

,000

$165

,000

MTA

Bicy

cle S

afet

y E

duca

tion

Clas

ses

CON

Prog

ram

med

$175

,000

$175

,000

MTA

Bike

To

Wor

k D

ay P

rom

otio

n CO

NPr

ogra

mm

ed$1

80,0

00$1

80,0

00M

TABi

ke T

o W

ork

Day

Pro

mot

ion

CON

Prog

ram

med

$200

,000

$200

,000

MTA

Safe

ty, E

duca

tion,

and

Out

reac

h CO

NPr

ogra

mm

ed$1

30,0

00$1

30,0

00M

TASa

fety

, Edu

catio

n, a

nd O

utre

ach

CON

Prog

ram

med

$136

,000

$136

,000

MTA

Pilo

t Ins

talla

tions

of I

nnov

ativ

e Tr

eatm

ents

Plan

, PS

&E

Prog

ram

med

$200

,000

$200

,000

MTA

Pilo

t Ins

talla

tions

of I

nnov

ativ

e Tr

eatm

ents

Plan

, PS

&E

Prog

ram

med

$200

,000

$200

,000

MTA

Pilo

t Ins

talla

tions

of I

nnov

ativ

e Tr

eatm

ents

Plan

, PS

&E

Prog

ram

med

$200

,000

$200

,000

MTA

Pilo

t Ins

talla

tions

of I

nnov

ativ

e Tr

eatm

ents

Plan

, PS

&E

Prog

ram

med

$200

,000

$200

,000

MTA

Pilo

t Ins

talla

tions

of I

nnov

ativ

e Tr

eatm

ents

- G

reen

Wav

e an

d Ba

ck-I

n A

ngled

Par

king

CON

Allo

cate

d$1

4,00

0$1

4,00

0

MTA

Pilo

t Ins

talla

tions

of I

nnov

ativ

e Tr

eatm

ents

- To

olbo

x

Plan

, PA

&E

D,

PS&

EA

lloca

ted

$86,

000

$86,

000

MTA

Stat

e of

Cyc

ling

Repo

rtPL

AN

Allo

cate

d$1

31,3

25$1

31,3

25M

TASt

ate

of C

yclin

g Re

port

PLA

NPr

ogra

mm

ed$1

8,67

5$1

8,67

5M

TASt

ate

of C

yclin

g Re

port

PLA

NPr

ogra

mm

ed$1

60,0

00$1

60,0

00M

TASt

ate

of C

yclin

g Re

port

PLA

NPr

ogra

mm

ed$1

80,0

00$1

80,0

00

MTA

1-2

Nor

th P

oint

Stre

et b

icycle

lane

s, Th

e E

mba

rcad

ero

to V

an N

ess

Ave

nue

CON

Prog

ram

med

$30,

000

$30,

000

MTA

2-6

Div

ision

Stre

et b

icycle

lane

s, 9t

h-11

th S

treet

sCO

NPr

ogra

mm

ed$5

5,00

0$5

5,00

0

Sub-

Cate

gory

3 (B

icycle

Net

wor

k an

d Fa

ciliti

es

Sub-

Cate

gory

1 (S

afet

y, E

duca

tion

and

Out

reac

h)

Sub-

Cate

gory

2 (S

yste

m P

erfo

rman

ce a

nd

Age

ncy

Proj

ect N

ame

Phas

eSt

atus

Fisc

al Y

ear

Tota

l

Pro

gram

min

g an

d A

lloca

tion

s T

o-d

ate

Last

Upd

ate:

Mar

ch 3

0, 2

010

2009

Pro

p K

5Y

PP

- P

rogr

am o

f P

roje

cts

Bic

ycle

Cir

cula

tion

/Sa

fety

(E

P 3

9)

55

Page 56: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

MTA

3-2

Mas

onic

Ave

nue

bicy

cle la

nes,

Fell

Stre

et to

Gea

ry B

oulev

ard

CON

Prog

ram

med

$155

,000

$155

,000

MTA

4-3

Illin

ois S

treet

bicy

cle la

nes,

16th

St

reet

to C

argo

Way

CON

Prog

ram

med

$138

,000

$138

,000

MTA

5-6

Cesa

r Cha

vez/

26th

Stre

ets

corr

idor

bicy

cle la

nes,

Sanc

hez

Stre

et

to U

S 10

1CO

NPr

ogra

mm

ed$4

6,00

0$4

6,00

0

MTA

6-3

Lag

una

Hon

da B

oulev

ard

bicy

cle

lanes

, Plaz

a St

reet

to W

oods

ide

Ave

nue

CON

Prog

ram

med

$77,

000

$77,

000

MTA

Bicy

cle C

apita

l Pro

jects

CON

Prog

ram

med

$125

,000

$125

,000

MTA

Bicy

cle C

apita

l Pro

jects

CON

Prog

ram

med

$125

,000

$125

,000

MTA

Bicy

cle C

apita

l Pro

jects

CON

Prog

ram

med

$125

,000

$125

,000

MTA

Bicy

cle C

apita

l Pro

jects

CON

Prog

ram

med

$175

,000

$175

,000

MTA

Bicy

cle C

apita

l Pro

jects

CON

Prog

ram

med

$305

,000

$305

,000

MTA

Bicy

cle N

etw

ork

Plan

ning

and

Des

ign

Plan

, PS

&E

Prog

ram

med

$75,

000

$75,

000

MTA

Bicy

cle N

etw

ork

Plan

ning

and

Des

ign

Plan

, PS

&E

Prog

ram

med

$75,

000

$75,

000

MTA

Bicy

cle N

etw

ork

Plan

ning

and

Des

ign

Plan

, PS

&E

Prog

ram

med

$75,

000

$75,

000

MTA

Bicy

cle N

etw

ork

Plan

ning

and

Des

ign

Plan

, PS

&E

Prog

ram

med

$75,

000

$75,

000

MTA

Bicy

cle N

etw

ork

Plan

ning

and

Des

ign

-2n

d St

reet

Bik

e La

nes

Plan

, PA

&E

D,

PS&

EA

lloca

ted

$15,

000

$15,

000

MTA

Bicy

cle N

etw

ork

Plan

ning

and

Des

ign

-Co

ordi

natio

n

Plan

, PA

&E

D,

PS&

EA

lloca

ted

$15,

000

$15,

000

MTA

Bicy

cle N

etw

ork

Plan

ning

and

Des

ign

-Ph

elan

Ave

nue

Bike

Lan

es

Plan

, PA

&E

D,

PS&

EA

lloca

ted

$30,

000

$30,

000

Any

E

ligib

leBi

cycle

Par

king

Plan

, PS

&E

Prog

ram

med

$125

,000

$125

,000

Any

E

ligib

leBi

cycle

Par

king

Plan

, PS

&E

Prog

ram

med

$125

,000

$125

,000

Any

E

ligib

leBi

cycle

Par

king

Plan

, PS

&E

Prog

ram

med

$75,

000

$75,

000

Any

E

ligib

leBi

cycle

Par

king

Plan

, PS

&E

Prog

ram

med

$25,

000

$25,

000

MTA

Bicy

cle P

lan U

pdat

ePL

AN

Prog

ram

med

$300

,000

$300

,000

PCJP

BCa

ltrain

Bicy

cle P

arki

ngPl

an,

PS&

EPr

ogra

mm

ed$1

10,0

00$1

10,0

00

PCJP

BCa

ltrain

Bicy

cle P

arki

ngPl

an,

PS&

EPr

ogra

mm

ed$1

00,0

00$1

00,0

00

56

Page 57: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

BART

Civi

c Ce

nter

Bicy

cle S

tatio

nPl

an,

PS&

EPr

ogra

mm

ed$8

5,00

0$8

5,00

0

MTA

Colo

red

Pave

men

t Tre

atm

ents

Plan

, PS

&E

Prog

ram

med

$50,

000

$50,

000

MTA

Colo

red

Pave

men

t Tre

atm

ents

Plan

, PS

&E

Prog

ram

med

$65,

000

$65,

000

MTA

Shar

ed R

oadw

ay B

icycle

Mar

king

sCO

NPr

ogra

mm

ed$2

75,0

00$2

75,0

00

$765

,000

$1

,440

,000

$1

,286

,000

$1

,086

,000

$8

50,0

00

$5,4

27,0

00

$291

,325

$0

$0

$0

$0

$2

91,3

25

$473

,675

$1

,440

,000

$1

,286

,000

$1

,086

,000

$8

50,0

00

$5,1

35,6

75

$765

,000

$1

,440

,000

$1

,286

,000

$1

,086

,000

$8

50,0

00

$5,4

27,0

00

$0

$0

$0

$0

$0

$0

* Th

e 20

09 S

trate

gic

Plan

was

am

ende

d on

Mar

ch 3

0, 2

010

thro

ugh

Res.

10-5

2.

FO

OT

NO

TE

S:

Boar

d A

ppro

ved

Allo

catio

n/A

ppro

priat

ion

Prog

ram

med

Pend

ing

Allo

catio

n/A

ppro

priat

ion

Tot

al P

rogr

amm

ed in

Am

end

ed 2

009

Stra

tegi

c P

lan

*C

um

ula

tive

Rem

ain

ing

Pro

gram

min

g C

apac

ity

Tot

al A

lloca

ted

Tot

al U

nal

loca

ted

Tot

al P

rogr

amm

ed in

5Y

PP

57

Page 58: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

SFM

TABi

cycle

Saf

ety

Edu

catio

n Cl

asse

s5CO

NA

lloca

ted

$165

,000

$165

,000

SFM

TABi

cycle

Saf

ety

Edu

catio

n Cl

asse

s5CO

ND

eobl

igat

ed($

130,

000)

($13

0,00

0)SF

MTA

Bicy

cle S

afet

y E

duca

tion

Clas

ses5

CON

Deo

blig

ated

($1,

783)

($1,

783)

SFM

TABi

cycle

Saf

ety

Edu

catio

n Cl

asse

s5CO

NA

lloca

ted

$130

,000

$130

,000

SFM

TABi

cycle

Saf

ety

Edu

catio

n Cl

asse

s CO

NA

lloca

ted

$175

,000

$175

,000

SFM

TABi

ke T

o W

ork

Day

Pro

mot

ion

CON

Allo

cate

d$0

$100

,000

$100

,000

SFM

TABi

ke T

o W

ork

Day

Pro

mot

ion

CON

Allo

cate

d$8

0,00

0$8

0,00

0SF

MTA

Bike

To

Wor

k D

ay P

rom

otio

n CO

ND

eobl

igat

ed($

88)

($88

)SF

MTA

Bike

To

Wor

k D

ay P

rom

otio

n CO

NA

lloca

ted

$162

,000

$162

,000

SFM

TASa

fety

, Edu

catio

n, a

nd O

utre

ach

CON

Allo

cate

d$7

5,00

0$7

5,00

0SF

MTA

Safe

ty, E

duca

tion,

and

Out

reac

h CO

NA

lloca

ted

($3,

722)

($3,

722)

SFM

TASa

fety

, Edu

catio

n, a

nd O

utre

ach

CON

Prog

ram

med

$0$0

SFM

TASa

fety

, Edu

catio

n, a

nd O

utre

ach

CON

Allo

cate

d$1

36,0

00$1

36,0

00

SFM

TAPi

lot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts4

Plan

, PS&

EPr

ogra

mm

ed$0

$0SF

MTA

Pilo

t Ins

talla

tions

of I

nnov

ativ

e Tr

eatm

ents

4Pl

an, P

S&E

Prog

ram

med

$0$0

SFM

TAPi

lot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts -

Gre

en

Wav

e an

d Ba

ck-I

n A

ngle

d Pa

rkin

gCO

NA

lloca

ted

$14,

000

$14,

000

SFM

TAPi

lot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts -

Gre

en

Wav

e an

d Ba

ck-I

n A

ngled

Par

king

CON

Deo

blig

ated

($51

5)($

515)

SFM

TAPi

lot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts -

Tool

box

Plan

, PA

&E

D,

PS&

EA

lloca

ted

$86,

000

$86,

000

SFM

TAPi

lot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts -

Tool

box

Plan

, PA

&E

D,

PS&

ED

eobl

igat

ed($

3,23

1)($

3,23

1)

SFM

TAPi

lot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts10

Plan

, PS&

EPr

ogra

mm

ed$0

$0

SFM

TAPi

lot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts -

Bicy

cle G

reen

Wav

ePl

an, P

S&E

Allo

cate

d$7

1,10

0$7

1,10

0SF

MTA

Bicy

cle G

reen

Wav

e10CO

NA

lloca

ted

$117

,176

$117

,176

SFM

TAPi

lot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts20

, 21,

22

Plan

, PS&

EPr

ogra

mm

ed$1

75,2

24$1

75,2

24

SFM

TAK

ing

Stre

et B

icycle

Lan

es20

PA&

ED

, PS&

E,

CON

Allo

cate

d$3

4,00

0$3

4,00

0SF

MTA

Colo

red

Pave

men

t Tre

atm

ents

Plan

, PS&

EPr

ogra

mm

ed$0

$0

Pro

gram

min

g an

d A

lloca

tion

s T

o-d

ate

Am

endm

ent f

or 0

5.20

.14

Boar

d A

ppro

val

2009

Pro

p K

5Y

PP

- P

rogr

am o

f P

roje

cts

Bic

ycle

Cir

cula

tion

/Sa

fety

(E

P 3

9)

Last

Upd

ate:

May

13,

201

4

Age

ncy

Proj

ect N

ame

Phas

eSt

atus

Fisc

al Y

ear

Sub-

Cate

gory

1 (S

afet

y, E

duca

tion

and

Out

reac

h)

Sub-

Cate

gory

2 (S

yste

m P

erfo

rman

ce a

nd In

nova

tion)

Tota

l

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 3

9Pa

ge 1

of 6

58

Page 59: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

Pro

gram

min

g an

d A

lloca

tion

s T

o-d

ate

Am

endm

ent f

or 0

5.20

.14

Boar

d A

ppro

val

Bic

ycle

Cir

cula

tion

/Sa

fety

(E

P 3

9)

Last

Upd

ate:

May

13,

201

4

Age

ncy

Proj

ect N

ame

Phas

eSt

atus

Fisc

al Y

ear

Tota

l

SFM

TASa

fe S

treet

s Aw

aren

ess &

Com

mun

icatio

ns B

ridge

Ca

mpa

ign21

Plan

, CO

NA

lloca

ted

$250

,000

$250

,000

SFM

TABi

cycle

& P

edes

trian

Pro

jects

- Sp

eed

& V

olum

e Su

rvey

s 22Pl

anA

lloca

ted

$21,

500

$21,

500

SFM

TASt

ate

of C

yclin

g Re

port

PLA

NA

lloca

ted

$131

,325

$131

,325

SFM

TASt

ate

of C

yclin

g Re

port

PLA

NPr

ogra

mm

ed$0

$0SF

MTA

Stat

e of

Cyc

ling

Repo

rt11, 1

3, 1

5, 2

1PL

AN

Prog

ram

med

$0$0

SFM

TASt

ate

of C

yclin

g Re

port21

PLA

NPr

ogra

mm

ed$0

$0

SFM

TA1-

2 N

orth

Poi

nt S

treet

bicy

cle la

nes,

The

Em

barc

ader

o to

Van

Nes

s Ave

nue1

CON

Prog

ram

med

$0$0

SFM

TA2-

6 D

ivisi

on S

treet

bicy

cle la

nes,

9th-

11th

Stre

ets1

CON

Prog

ram

med

$0$0

SFM

TABi

cycle

Net

wor

k Pl

anni

ng a

nd D

esig

n - 2

nd S

treet

Bi

ke L

anes

Plan

, PA

&E

D,

PS&

EA

lloca

ted

$15,

000

$15,

000

SFM

TABi

cycle

Net

wor

k Pl

anni

ng a

nd D

esig

n -

Coor

dina

tion

Plan

, PA

&E

D,

PS&

EA

lloca

ted

$15,

000

$15,

000

SFM

TABi

cycle

Net

wor

k Pl

anni

ng a

nd D

esig

n -

Coor

dina

tion

Plan

, PA

&E

D,

PS&

ED

eobl

igat

ed($

663)

($66

3)

SFM

TABi

cycle

Net

wor

k Pl

anni

ng a

nd D

esig

n - P

helan

A

venu

e Bi

ke L

anes

Plan

, PA

&E

D,

PS&

EA

lloca

ted

$30,

000

$30,

000

SFM

TASh

ared

Roa

dway

Bicy

cle M

arki

ngs

CON

Allo

cate

d$2

40,0

00$2

40,0

00SF

MTA

John

Mui

r Bik

e La

nes1

CON

Allo

cate

d$1

39,0

00$1

39,0

00SF

MTA

John

Mui

r Bik

e La

nes1

CON

Deo

blig

ated

($23

,921

)($

23,9

21)

SFM

TAM

cCop

pin

Bike

way

1CO

NA

lloca

ted

$28,

000

$28,

000

SFM

TAM

cCop

pin

Bike

way

1CO

ND

eobl

igat

ed($

3,42

1)($

3,42

1)SF

MTA

Potre

ro B

ike

Lane

s1CO

NA

lloca

ted

$30,

000

$30,

000

SFM

TAPo

trero

Bik

e La

nes

CON

Deo

blig

ated

($97

)($

97)

SFM

TAA

leman

y Bi

ke L

anes

CON

Allo

cate

d$9

0,00

0$9

0,00

0SF

MTA

Alem

any

Bike

Lan

esCO

ND

eobl

igat

ed($

42,7

77)

($42

,777

)SF

MTA

Porto

la Bi

ke L

anes

CON

Allo

cate

d$7

0,00

0$7

0,00

0SF

MTA

FY 2

010/

11 B

TA L

ocal

Mat

ch -

23rd

CON

Allo

cate

d$2

,000

$2,0

00SF

MTA

FY 2

010/

11 B

TA L

ocal

Mat

ch -

Bays

hore

CON

Allo

cate

d$2

,000

$2,0

00SF

MTA

FY 2

010/

11 B

TA L

ocal

Mat

ch -

Bays

hore

CON

Deo

blig

ated

($15

2)($

152)

SFM

TAFY

201

0/11

BTA

Loc

al M

atch

- Hol

low

ayCO

NA

lloca

ted

$3,0

00$3

,000

Sub-

Cate

gory

3 (B

icycle

Net

wor

k an

d Fa

ciliti

es Im

prov

emen

t)

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 3

9Pa

ge 2

of 6

59

Page 60: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

Pro

gram

min

g an

d A

lloca

tion

s T

o-d

ate

Am

endm

ent f

or 0

5.20

.14

Boar

d A

ppro

val

Bic

ycle

Cir

cula

tion

/Sa

fety

(E

P 3

9)

Last

Upd

ate:

May

13,

201

4

Age

ncy

Proj

ect N

ame

Phas

eSt

atus

Fisc

al Y

ear

Tota

l

SFM

TAFY

201

0/11

BTA

Loc

al M

atch

- Hol

low

ayCO

ND

eobl

igat

ed($

888)

($88

8)SF

MTA

FY 2

010/

11 B

TA L

ocal

Mat

ch -

Porto

laCO

NA

lloca

ted

$10,

000

$10,

000

SFM

TAFY

201

0/11

BTA

Loc

al M

atch

- Po

rtola

CON

Deo

blig

ated

($7)

($7)

SFM

TAFY

201

0/11

BTA

Loc

al M

atch

- San

Bru

noCO

NA

lloca

ted

$30,

000

$30,

000

SFM

TAFY

201

0/11

BTA

Loc

al M

atch

- San

Bru

noCO

ND

eobl

igat

ed($

30,0

00)

($30

,000

)D

PWM

arin

a G

reen

Bicy

cle T

rail2

PS&

EA

lloca

ted

$14,

400

$14,

400

SFM

TA14

th a

nd M

arke

t Stre

ets C

urb

Bulb

3PS

&E

Allo

cate

d$3

5,00

0$3

5,00

0SF

MTA

14th

and

Mar

ket S

treet

s Cur

b Bu

lbPS

&E

Deo

blig

ated

($9,

473)

($9,

473)

SFM

TA2n

d St

reet

Stre

etsc

ape

7Pl

an, P

A&

ED

Allo

cate

d$5

0,00

0$5

0,00

0SF

MTA

2nd

Stre

et S

treet

scap

e 7

Plan

, PA

&E

DD

eobl

igat

ed($

1,87

3)($

1,87

3)A

ny E

ligib

leBi

cycle

Par

king

Plan

, PS&

EA

lloca

ted

$125

,000

$125

,000

SFM

TAJF

K D

rive

Park

ing-

Buff

ered

Bik

eway

8Pl

an, P

S&E

Allo

cate

d$1

12,0

00$1

12,0

00SF

MTA

JFK

Driv

e Pa

rkin

g-Bu

ffer

ed B

ikew

ay8

Plan

, PS&

ED

eobl

igat

ed($

50,9

00)

($50

,900

)SF

MTA

JFK

Driv

e Pa

rkin

g-Bu

ffer

ed B

ikew

ay8

Plan

, PS&

ED

eobl

igat

ed($

934)

($93

4)SF

MTA

JFK

Driv

e Pa

rkin

g-Bu

ffer

ed B

ikew

ay8

CON

Allo

cate

d$4

12,0

00$4

12,0

00

SFM

TAJF

K D

rive

Park

ing-

Buff

ered

Bik

eway

CON

Deo

blig

ated

($57

,028

)($

57,0

28)

SFM

TAFe

ll/O

ak B

ikew

ay Im

prov

emen

ts4

Plan

, PS&

EA

lloca

ted

$165

,000

$165

,000

SFM

TAFe

ll/O

ak B

ikew

ay Im

prov

emen

ts10

, 11

CON

Prog

ram

med

$0$0

SFM

TACa

rgo

Way

bik

e lan

es, f

rom

Illin

ois t

o Je

nnin

gs

stre

ets

PS&

E, C

ON

Allo

cate

d$9

4,00

0$9

4,00

0

SFM

TAM

ason

ic A

venu

e Co

rrid

or M

ultim

odal

Stre

etsc

ape

Impr

ovem

ents

EIR

PA&

ED

Allo

cate

d$4

1,00

0$4

1,00

0

SFM

TAM

ason

ic A

venu

e Co

rrid

or M

ultim

odal

Stre

etsc

ape

Impr

ovem

ents

EIR

PA&

ED

Deo

blig

ated

($8,

854)

($8,

854)

SFM

TAM

ason

ic A

venu

e Co

rrid

or M

ultim

odal

Stre

etsc

ape

Impr

ovem

ents

16, 1

7PS

&E

, CO

NPr

ogra

mm

ed$0

$0

SFM

TAM

ason

ic A

venu

e Co

rrid

or M

ultim

odal

Stre

etsc

ape

Impr

ovem

ents

16, 1

7CO

NPr

ogra

mm

ed$4

9,17

5$4

9,17

5SF

MTA

Aut

omat

ed B

icycle

Cou

nter

s Upg

rade

16CO

NA

lloca

ted

$331

,000

$331

,000

SFM

TACi

tyw

ide

Bicy

cle W

ayfin

ding

Plan

15PL

AN

Allo

cate

d$3

2,00

0$3

2,00

0SF

MTA

Sloa

t Bou

levar

d Bi

cycle

Lan

es11

PS&

E, C

ON

Prog

ram

med

$0$0

SFM

TAPo

lk S

treet

Bicy

cle L

anes

11PS

&E

, CO

NPr

ogra

mm

ed$0

$0SF

MTA

Bicy

cle P

arki

ng N

ear T

rans

it11PS

&E

, CO

NPr

ogra

mm

ed$0

$0SF

MTA

Elec

troni

c Bi

cycle

Loc

kers

11PS

&E

, CO

NPr

ogra

mm

ed$0

$0SF

MTA

Cesa

r Cha

vez,

I-28

0 to

US

101

CON

Allo

cate

d$2

01,0

00$2

01,0

00

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 3

9Pa

ge 3

of 6

60

Page 61: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

Pro

gram

min

g an

d A

lloca

tion

s T

o-d

ate

Am

endm

ent f

or 0

5.20

.14

Boar

d A

ppro

val

Bic

ycle

Cir

cula

tion

/Sa

fety

(E

P 3

9)

Last

Upd

ate:

May

13,

201

4

Age

ncy

Proj

ect N

ame

Phas

eSt

atus

Fisc

al Y

ear

Tota

l

SFM

TAFo

lsom

Stre

et B

icycle

Lan

es, 1

3th

Stre

et to

19t

h St

reet

CON

Allo

cate

d$2

7,00

0$2

7,00

0SF

MTA

Man

sell

Corr

idor

Impr

ovem

ents

9Pl

anA

lloca

ted

$53,

612

$53,

612

SFM

TAM

anse

ll Co

rrid

or Im

prov

emen

ts18

EN

VA

lloca

ted

$44,

129

$44,

129

SFM

TABi

cycle

Sha

ring

CON

Allo

cate

d$2

00,0

00$2

00,0

00SF

MTA

Polk

Stre

et D

emon

stra

tion

Proj

ect13

CON

Allo

cate

d$6

5,00

0$6

5,00

0

SFM

TACi

tyw

ide

Long

-Ter

m B

icycle

Par

king

Stra

tegy

Plan

Allo

cate

d$4

5,00

0$4

5,00

0A

ny E

ligib

leBi

cycle

Par

king

11, 1

4TB

DPr

ogra

mm

ed$0

$0BA

RTCi

vic

Cent

er B

ART

/Mun

i Bik

e St

atio

n14CO

NA

lloca

ted

$102

,000

$102

,000

Any

Elig

ible

Bicy

cle P

arki

ng14

TBD

Prog

ram

med

$0$0

PCJP

BCa

ltrain

Bicy

cle P

arki

ngPl

an, P

S&E

Prog

ram

med

$0$0

PCJP

BCa

ltrain

Bicy

cle P

arki

ngPS

&E

, CO

NPr

ogra

mm

ed$0

$0PC

JPB

4th

and

Kin

g Ca

ltrain

Bik

e St

udy

PLA

NA

lloca

ted

$45,

000

$45,

000

PCJP

BSF

Bicy

cle P

arki

ng F

acili

ty C

apita

l Im

prov

emen

tsCO

NA

lloca

ted

$165

,000

$165

,000

SFM

TASh

ort-T

erm

Bicy

cle P

arki

ng11

PS&

E, C

ON

, Pro

cA

lloca

ted

$175

,000

$175

,000

BART

Civi

c Ce

nter

Bicy

cle S

tatio

nPS

&E

Allo

cate

d$8

5,00

0$8

5,00

0

SFM

TAM

atch

for D

iscre

tiona

ry G

rant

s12Pl

an, P

S&E

, CO

NPr

ogra

mm

ed$1

64,0

00$1

64,0

00

SFM

TAM

atch

for D

iscre

tiona

ry G

rant

sPl

an, P

S&E

, CO

NPr

ogra

mm

ed$2

20,0

00$2

20,0

00SF

MTA

2013

5Y

PP D

evel

opm

ent 12

Plan

Allo

cate

d$1

6,00

0$1

6,00

0SF

CTA

Bike

Sha

ring

SAR 1

9Pl

anA

ppro

priat

ed$2

5,00

0$2

5,00

0

$286

,915

$8

27,2

37

$1,4

07,2

46

$1,5

44,8

88

$1,2

84,0

28

$5,3

50,3

14

$291

,325

$1

,121

,678

$1

,475

,000

$1

,380

,888

$8

39,6

29

$5,1

08,5

20

($4,

410)

($29

4,44

1)($

67,7

54)

$0

$0

($36

6,60

4)$0

$0

($

0)$1

64,0

00

$444

,399

$6

08,3

99

$765

,000

$1

,440

,000

$1

,286

,000

$1

,086

,000

$8

50,0

00

$5,4

27,0

00

$90,

225

$90,

225

$568

,309

$1

,181

,072

$1

,059

,826

$6

00,9

38

$166

,910

$1

66,9

10

* Th

e 20

09 S

trate

gic

Plan

was

am

ende

d on

Mar

ch 3

0, 2

010

thro

ugh

Res.

10-5

2.

Tot

al P

rogr

amm

ed in

5Y

PP

Tot

al U

nallo

cate

d in

5Y

PP

Tot

al P

rog

ram

med

in A

men

ded

200

9 St

rate

gic

Pla

n *

Tot

al A

lloca

ted

an

d P

end

ing

in 5

YP

PT

otal

Deo

blig

ated

in 5

YP

P

Deo

blig

ated

fro

m P

rior

5Y

PP

Cyc

les

**C

um

ula

tive

Rem

ain

ing

Pro

gra

mm

ing

Cap

acit

y

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 3

9Pa

ge 4

of 6

61

Page 62: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

Pro

gram

min

g an

d A

lloca

tion

s T

o-d

ate

Am

endm

ent f

or 0

5.20

.14

Boar

d A

ppro

val

Bic

ycle

Cir

cula

tion

/Sa

fety

(E

P 3

9)

Last

Upd

ate:

May

13,

201

4

Age

ncy

Proj

ect N

ame

Phas

eSt

atus

Fisc

al Y

ear

Tota

l

FO

OT

NO

TE

S:

Boar

d A

ppro

ved

Allo

catio

n/A

ppro

priat

ion

1 5Y

PP to

add

thre

e ne

w p

rojec

ts: J

ohn

Mui

r Driv

e Bi

ke L

anes

; McC

oppi

n Bi

kew

ay; a

nd P

otre

ro A

venu

e Bi

ke L

anes

, whi

ch to

geth

er c

ompr

ise th

e Bi

cycle

Fac

ility

Impl

emen

tatio

n Pr

ojec

t (Re

solu

tion

11-1

3,

$138

,000

in F

iscal

Yea

r 200

9/10

fund

s for

the

4-3

Illin

ois S

treet

Bic

ycle

Lane

s pro

ject a

nd $

59,0

00 o

f $77

,000

in F

iscal

Yea

r 200

9/10

fund

s pro

gram

med

to th

e 6-

3 La

guna

Hon

da B

oulev

ard

Bicy

cle L

anes

$1

8,00

0 pr

ogra

mm

ed to

the

Lagu

na H

onda

Pro

ject.

** "

Deo

blig

ated

from

prio

r 5Y

PP c

ycles

" in

clude

s deo

blig

atio

ns fr

om a

lloca

tions

app

rove

d pr

ior t

o th

e cu

rren

t 5Y

PP p

erio

d, e

xclu

ding

deo

blig

atio

ns in

corp

orat

ed in

the

first

200

9 St

rate

gic

Plan

am

endm

ent,

as

of D

ecem

ber 3

1, 2

012.

Prog

ram

med

Pend

ing

Allo

catio

n/A

ppro

priat

ion

Shar

ed R

oadw

ay B

icycle

Mar

king

s: Re

duce

d pr

ogra

mm

ing

from

$35

,000

to $

0.

4 5Y

PP a

men

dmen

t to

add

$165

,000

for t

he F

ell a

nd O

ak B

ikew

ay Im

prov

emen

ts P

roje

ct (R

esol

utio

n 11

-63,

06.

28.2

011)

.Fe

ll an

d O

ak B

ikew

ay Im

prov

emen

ts P

rojec

t: A

dded

new

pro

ject.

Fisc

al Y

ear 2

010/

11 P

ilot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts: R

educ

ed p

rogr

amm

ing

from

$88

,000

to $

0.

Fisc

al Y

ear 2

011/

12 P

ilot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts: R

educ

ed p

rogr

amm

ing

from

$20

0,00

0 to

$12

3,00

0.

5 5Y

PP a

men

dmen

t to

repr

ogra

m $

130,

000

for t

he F

iscal

Yea

r 201

1/12

Bicy

cle S

afet

y E

duca

tion

Clas

ses P

rojec

t (Re

solu

tion

11-6

2, 0

6.28

.201

1).

$125

,000

in u

nallo

cate

d Fi

scal

Yea

r 200

9/10

fund

s for

the

Bicy

cle C

apita

l Pro

jects

plac

ehol

der.

$55,

000

in F

iscal

Yea

r 201

0/11

fund

s for

the

2-6

Div

ision

Stre

et B

icycle

Lan

es P

rojec

t (fu

nded

by

anot

her s

ourc

e) w

ere

repr

ogra

mm

ed to

the

Fisc

al Y

ear 2

010/

11 B

icycle

Cap

ital P

rojec

ts p

laceh

olde

r as a

n 2 5

YPP

to a

dd D

PW's

Mar

ina

Gre

en B

icycle

Tra

il us

ing

Prop

K fu

nds r

epro

gram

med

from

the

Fisc

al Y

ear 2

010/

11 M

TA B

icycle

Net

wor

k Pl

anni

ng a

nd D

esig

n pl

aceh

olde

r (Re

solu

tion

11-3

3, 1

2.14

.10)

.3 5

YPP

am

endm

ent t

o ad

d $3

5,00

0 fo

r the

14t

h an

d M

arke

t Stre

ets C

urb

Bulb

pro

ject

(Res

olut

ion

11-4

3, 0

2.15

.201

1).

14th

and

Mar

ket S

treet

s Cur

b Bu

lb: A

dded

new

pro

ject.

2nd

Stre

et S

treet

scap

e Pr

ojec

t: A

dded

Pro

ject.

8 JFK

Driv

e Pa

rkin

g-Bu

ffer

ed B

ikew

ay (c

onst

ruct

ion;

Res

olut

ion

12-1

4, 0

9.27

.201

1) in

clud

ed $

50,9

00 d

eobl

igat

ed fr

om JF

K D

rive

Park

ing-

Buff

ered

Bik

eway

(plan

ning

/des

ign;

Res

olut

ion

11-5

1, 0

4.26

.201

1).

9 5Y

PP a

men

dmen

t to

add

Man

sell

Corr

idor

Impr

ovem

ents

(Res

olut

ion

13-3

0, 0

1.29

.201

3)Cu

mul

ativ

e Re

main

ing

Prog

ram

min

g Ca

pacit

y: Re

duce

d by

$53

,612

in F

iscal

Yea

r 201

2/13

. M

anse

ll Co

rrid

or Im

prov

emen

ts: A

dded

pro

ject w

ith $

53,6

12 in

Fisc

al Y

ear 2

012/

13 fu

nds f

or p

lanni

ng/c

once

ptua

l eng

inee

ring.

10 5

YPP

am

endm

ent t

o fu

lly fu

nd p

rojec

t: Bi

cycle

Gre

en W

ave

(Res

olut

ion

13-4

7, 0

4.23

.201

3).

Fisc

al Y

ear 2

011/

12 B

icycle

Saf

ety

Edu

catio

n Cl

asse

s Pro

ject:

Add

ed n

ew p

rojec

t. Fi

scal

Yea

r 201

0/11

Bicy

cle S

afet

y E

duca

tion

Clas

ses P

rojec

t: D

e-ob

ligat

ion

of $

130,

000.

6 Th

is F

iscal

Yea

r 201

1/12

allo

catio

n fo

r the

Bik

e to

Wor

k D

ay P

rom

otio

n pr

ojec

t util

ized

the

$100

,000

orig

inall

y pr

ogra

mm

ed in

Fisc

al Y

ear 2

010/

11 to

the

sam

e pr

ojec

t.7 5

YPP

am

endm

ent t

o ad

d $5

0,00

0 fo

r the

2nd

Stre

et S

treet

scap

e Pr

ojec

t (Re

solu

tion

12-5

2, 0

3.27

.201

2).

Cum

ulat

ive

Rem

ainin

g Pr

ogra

mm

ing

Capa

city:

Prog

ram

med

$50

,000

to F

iscal

Yea

r 201

1/12

.

Bicy

cle G

reen

Wav

e pr

ojec

t: A

dded

pro

ject w

ith $

91,9

00 fr

om P

ilot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts.

Fell/

Oak

Bik

eway

Impr

ovem

ents

pro

ject

: Red

uced

from

$30

,000

to $

4,72

4 in

Fisc

al Y

ear 2

012/

13.

11 5

YPP

am

endm

ent t

o fu

lly fu

nd p

rojec

t: Sh

ort-T

erm

Bicy

cle P

arki

ng (R

esol

utio

n 13

-47,

04.

23.2

013)

.

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 3

9Pa

ge 5

of 6

62

Page 63: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

Pro

gram

min

g an

d A

lloca

tion

s T

o-d

ate

Am

endm

ent f

or 0

5.20

.14

Boar

d A

ppro

val

Bic

ycle

Cir

cula

tion

/Sa

fety

(E

P 3

9)

Last

Upd

ate:

May

13,

201

4

Age

ncy

Proj

ect N

ame

Phas

eSt

atus

Fisc

al Y

ear

Tota

l

Bicy

cle P

arki

ng N

ear T

rans

it: R

educ

ed fr

om $

73,0

00 to

$0

in F

iscal

Yea

r 201

1/12

.E

lectro

nic

Bicy

cle L

ocke

rs: R

educ

ed fr

om $

28,0

00 to

$0

in F

iscal

Yea

r 201

1/12

.Sl

oat B

oule

vard

: Red

uced

from

$14

,000

to $

0 in

Fisc

al Y

ear 2

011/

12.

Polk

Stre

et: R

educ

ed fr

om $

3,00

0 to

$0

in F

iscal

Yea

r 201

1/12

.Fe

ll/O

ak B

ikew

ay Im

prov

emen

ts: R

educ

ed fr

om $

4,72

4 to

$0

in F

iscal

Yea

r 201

2/13

.12

5Y

PP a

men

dmen

t to

add

2013

5Y

PP D

evel

opm

ent (

Reso

lutio

n 13

-49,

04.

23.2

013)

.

Shor

t Ter

m B

icycle

Par

king

: Add

ed n

ew p

rojec

t in

Fisc

al Y

ear 2

012/

13.

Stat

e of

Cyc

ling

Repo

rt: R

educ

ed p

rogr

amm

ing

from

$16

0,00

0 to

$13

2,72

4 in

Fisc

al Y

ear 2

011/

12 .

Bicy

cle P

arki

ng: R

educ

ed fr

om $

102,

000

to $

77,0

00 in

Fisc

al Y

ear 2

011/

12 (t

o be

mad

e w

hole

in F

iscal

Yea

r 201

3/14

with

$25

,000

pro

gram

med

for B

icycle

Par

king

in F

iscal

Yea

r 201

3/14

).

15 5

YPP

am

endm

ent t

o ad

d Ci

tyw

ide

Bicy

cle W

ayfin

ding

Plan

(Res

olut

ion

14-2

0, 0

9.24

.201

3).

Stat

e of

Cyc

ling

Repo

rt: R

educ

ed p

rogr

amm

ing

by $

32,0

00 in

Fisc

al Y

ear 2

011/

12.

City

wid

e Bi

cycle

Way

findi

ng P

lan: A

dd $

32,0

00 in

Fisc

al Y

ear 2

013/

14 p

lanni

ng fu

nds.

16 5

YPP

am

endm

ent t

o ad

d A

utom

ated

Bicy

cle C

ount

ers U

pgra

de (

Reso

lutio

n 14

-20,

09.

24.2

013)

.M

ason

ic A

venu

e Co

rrid

or M

ultim

odal

Stre

etsc

ape

Impr

ovem

ents

: Red

uced

pro

gram

min

g by

$24

0,17

5 in

Fisc

al Y

ear 2

011/

12 a

nd $

90,8

25 in

Fisc

al Y

ear 2

013/

14.

Mat

ch fo

r Disc

retio

nary

Gra

nts:

Redu

ced

prog

ram

min

g by

$16

,000

in F

iscal

Yea

r 201

2/13

.20

13 5

YPP

Dev

elop

men

t: A

dded

pro

ject

with

$16

,000

in F

iscal

Yea

r 201

2/13

plan

ning

fund

s. 13

5Y

PP a

men

dmen

t to

add

Polk

Stre

et D

emon

stra

tion

Proj

ect (

Reso

lutio

n 13

-55,

05.

21.2

013)

.St

ate

of C

yclin

g Re

port:

Red

uced

pro

gram

min

g by

$65

,000

in F

iscal

Yea

r 201

1/12

.Po

lk S

treet

Dem

onst

ratio

n Pr

ojec

t: A

dded

pro

ject w

ith $

65,0

00 in

Fisc

al Y

ear 2

012/

13 fu

nds.

14 B

icycle

Par

king

: Red

uced

pro

gram

min

g fr

om $

77,0

00 in

Fisc

al Y

ear 2

011/

12 to

$0

in F

iscal

Yea

r 201

3/14

and

from

$25

,000

in F

iscal

Yea

r 201

3/14

to $

0 in

Fisc

al Y

ear 2

013/

14.

21 5

YPP

am

endm

ent t

o ad

d Sa

fe S

treet

s Aw

aren

ess &

Com

mun

icatio

ns B

ridge

Cam

paig

n (R

esol

utio

n 14

-72,

04.

22.2

014)

.St

ate

of C

yclin

g Re

port:

Red

uced

pro

gram

min

g by

$35

,724

in F

iscal

Yea

r 201

1/12

and

by

$180

,000

in F

iscal

Yea

r 201

3/14

.Pi

lot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts: R

educ

ed p

rogr

amm

ing

by $

34,2

76 in

Fisc

al Y

ear 2

013/

14.

Safe

Stre

ets A

war

enes

s & C

omm

unica

tions

Brid

ge C

ampa

ign:

Add

ed p

rojec

t with

$25

0,00

0 in

Fisc

al Y

ear 2

013/

14 fu

nds.

22 5

YPP

am

endm

ent t

o ad

d Bi

cycle

& P

edes

trian

Pro

jects

- Sp

eed

& V

olum

e Su

rvey

s (Re

solu

tion

14-7

9, 0

5.20

.201

4).

Pilo

t Ins

talla

tions

of I

nnov

ativ

e Tr

eatm

ents

: Red

uced

pro

gram

min

g by

$21

,500

in F

iscal

Yea

r 201

3/14

.Bi

cycle

& P

edes

trian

Pro

jects

- Sp

eed

& V

olum

e Su

rvey

s: A

dded

pro

ject w

ith $

21,5

00 in

Fisc

al Y

ear 2

013/

14 fu

nds.

Aut

omat

ed B

icycle

Cou

nter

s Upg

rade

: Add

ed $

331,

000

in F

iscal

Yea

r 201

3/14

for c

onst

ruct

ion

fund

s.17

Mas

onic

Ave

nue

Corr

idor

Mul

timod

al St

reet

scap

e Im

prov

emen

ts is

fund

ed w

ith O

neBa

yAre

a G

rant

fund

s and

SFM

TA re

venu

e bo

nds.

19 5

YPP

am

endm

ent t

o ad

d Bi

ke S

harin

g SA

R (R

esol

utio

n 14

-35,

11.

26.2

013)

Cum

ulat

ive

Rem

ainin

g Pr

ogra

mm

ing

Capa

city:

Redu

ced

by $

25,0

00 in

Fisc

al Y

ear 2

013/

14.

Bike

Sha

ring

SAR

: Add

ed p

roje

ct w

ith $

25,0

00 in

Fisc

al Y

ear 2

013/

14 fu

nds.

20 5

YPP

to a

dd K

ing

Stre

et B

icycle

Lan

es u

sing

Prop

K fu

nds r

epro

gram

med

from

the

Fisc

al Y

ear 2

013/

14 P

ilot I

nsta

llatio

ns o

f Inn

ovat

ive

Trea

tmen

ts p

laceh

olde

r (Re

solu

tion

14-X

X, M

O.D

A.Y

EA

R).

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 3

9Pa

ge 6

of 6

63

Page 64: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

Grant Ave

Hyde St

Hyde St

Sac

ram

en

to S

t

Sac

ram

en

to S

t

Pac

ific

Ave

Jack

son

St

Jack

son

St

Jack

son

St

Mason St

Bu

sh S

t

Bu

sh S

t

Un

ion

St

Val

lejo

St

Brannan

St

Lo

mb

ard

St

Lo

mb

ard

St

Lo

mb

ard

St

Richar

dson A

ve

Linc

oln

Blv

d

16

th S

t

16

th S

t

Ch

est

nu

t S

t

Pin

e S

t

10th S

t

Mission St

Mis

sion S

t

Steve

nson

St

Baker St

Sanchez St Sanchez St

Vicksburg St

Dolores St

Fair Oaks St

Mile

sCt

Jerr

old

Ave

Wisconsin St

Co

rtla

nd

Ave

Griffit

h St

Hoffman Ave

Inge

rson

Ave

18

th S

t

Girard St

LosPalmo

sD

r

Han

over

St

Mis

sion

St

15

th S

t

19

th S

t1

9th

St

Cum

berla

nd S

t

Kearny St

26th Ave

Elm

St

Jud

ah S

t

Filb

ert

St

Fra

nci

sco

St

Pal

om

aA

ve

6th Ave

Val

lejo

St

Val

lejo

St

Andover St

Po

wh

atta

n A

ve

Mun

ich

St

Normandie Ter

Ord

way

St

Ch

est

nu

t S

t

Cal

ifo

rnia

St

Cal

ifo

rnia

St

Fitz

gera

ld A

ve

Church St

Church St

Kirk

woo

dAve

Mission St

Mission St

Mission St

San

tiag

o S

t

Mor

aga

Ave

Larkin St

Gre

en

wic

h S

t

Wa r ren Dr

Whittier St

1st S

t

Sto

rey

Ave

Laguna St

De Haro St

21

st S

t

Bay

St

Noe StNoe St

Arguello Blvd

Russ S

t

Delta St

Harold Ave

Eu

caly

ptu

sD

r

Pre

sidi

oBlvd

Peek Ln

Mono St

Alabama St

5th Ave

Har

knes

sA

ve

Mis

sion S

t

Ullo

a S

t

Oce

an A

ve

Waw

ona

St

Jones St

Jones St

Hyde St

Leavenworth St

Leavenworth St

Taylor St

41stAve

Be

lgra

ve A

ve

Elli

s S

t

Irvi

ng

St

Mason St

Mason St

O’F

arre

ll S

t

Turk

St

Turk

St

Romolo St

Donahue St

Franklin St

Gough St

Gough St

Franklin St

Waw

ona

St

Yose

mite

Ave

Piza

rro

Way

19

th S

t

11th Ave

9th Ave

Treat Ln

12th Ave

14th Ave

Texas St

Funston Ave

Hoffm

anS

t

Bur

row

s S

t

An

za S

t

An

za S

t

Cri

sp R

d

Se

aV

iew

Ter

Filb

ert

St

Qu

inta

ra S

t

Child St

Fort

Mil

ey

7

Johnst

one

Dr

Douglass St

Riv

era

St

Will

iam

s A

ve

Be

nto

nA

ve

Fern

and

ez

St

May

fair

Dr

Fountain St

Cas

elli

Ave

Jau

ss S

t

Joo

st A

ve

Woo

lsey

St

37th Ave

42nd Ave

Truby St

25

th S

t

24t

h S

t

Rever

e Ave

Gillette Ave

Selby St

Newhall St

4th Ave

26

th S

t

25

th S

t2

5th

St

23r

d S

t

24

th S

t

38th Ave

Val

ley

St

Lyon St

Bache St

Racc

oonD

r

Baker St

Gre

en

St

Exce

lsio

r Av

eBr

azil

Ave

Pers

ia A

ve

2nd Ave

Lane St

Slo

at

Blv

d

De

en

s R

d

Sant

aRo

saA

ve

War

d S

t

Oly

mp

iaW

ay

36th Ave

Fran

ce A

ve

Jennings St

Drumm St35th Ave

Yorb

a S

t

Bru

nsw

ick

St

Mansfield St

Jad

e P

l

Pac

he

co S

t

Ort

ega

St

Bal

bo

a S

tB

alb

oa

St

Fult

on S

t

Qu

inta

ra S

t

Cle

me

nt

St

3rd Ave

Que

sada

Ave

No

rie

ga

St

Law

ton

St

KalmanovitzSt

Fult

on

St

Qu

inta

ra S

t

Tara

val

St

Mo

rag

a S

tM

ora

ga

St

Buchanan St

Rever

e Ave

Fillmore St

Fillmore St

Fillmore St

Pa

loA

lto

Ave

9th S

t

San

Juan

Ave

Madison St

8th S

t

Orizaba Ave

Elli

s S

t

La Grande Ave

Ed

dy

St

Ed

dy

St

Cyril Magnin St

Pennsylvania AveS

ea

cli

ffA

ve

Octavia St

Alpha St

Cadell Pl

Hudson Ave

Craig Ct

Broderick St

Emery Ln

Powell St

Stockton St

Par

k S

t

Castro StCastro St

McA

llist

er

St

Divisadero St

Schwerin St

Rey St

27

th S

t

Channel S

t

Torn

eyA

ve

Ge

ary

St

27th Ave

Ad dison

St

Sabin Pl

Pierce St

Laurel St

43rd Ave

6th S

t

4th S

t

3rd S

t

Edie

Rd

Hav

elo

ck S

t

Nagle

e Ave

Funston Ave

Anderson St

Graham St

Ce

sar

Ch

ave

z S

t

Yale St

Co

smo

Pl

Pierce St

20

th S

t

20

th S

t

22nd

St

Ag

ua

Wa

y

Congo St

Be

ach

St

Pra

gue

St

Foote A

ve

29

th S

t

Pra

do

St

Hahn St

Treat Ave

Sw

eeny

St

Concord St

Chr

istopherDr

SantosSt

Bowdoin St

Gilm

an A

ve

South Van Ness Ave

Mel

rose

Ave

Mar

ipo

sa S

t

DelanoAve

Rankin St

18

th S

t

Gates St

Spru

ceSt

Todd

St

Bemis

St

Cre

sta

Vis

taD

r

Castro St

Min

t St

16th Ave

Nim

itz

Ave

Lapham Way

Spe

ar A

ve

37th Ave

46th Ave

Arroyo Way

New

com

b Ave

NewhallSt

36th Ave

32nd Ave

31st Ave

Holladay Ave

SanJoseAve

16th Ave

16

th S

t

44th Ave

Avery St

Jamesto

Fre

de

rick

St

47th Ave

Go

lde

n G

ate

Ave

O’F

arre

ll S

t

Ala

dd

in T

er

Wayne Pl

Clin

ton

Par

k

17th Ave

Pre

ci t

aA

ve

Fa rnum St

Rus

sia

Ave

Somerset St

Be

ach

St

20

th S

t

Ital

y Av

e

Rolp

h St

Om

ar W

ay

Am

azon

Ave

Sunn

ydal

e Av

e

Ray

mon

d Av

e

Car r

oll

Ave

Harper St

Belvedere St

Belvedere St

Locust St

Gl a

dst

on

e

Dr

19th Ave

Esc

olta

Wa

y

Cayuga A

ve

Tara St

Taylor Rd

Aval

on A

ve

Peru

Ave

18th Ave

Law

ton

St

Amherst St

Ridgewood Ave

33rd Ave

Portola

DrFunston Ave

Craut St

Sola

Ave

Lock

woo

d St

Rome

St

Alt

a S

t

23

rd S

t

Sie

rra

St

24

th S

t

Gal

vez

Ave

Chu

la L

n

Devonsh

ire

Way

Paris St Lisbon St Madrid

StAthens St

West Po

intR

d

Rankin St

Banks St

44th Ave45th Ave

Thom

as A

ve

Parker Ave

Edna St

Mendell St

Hawes St

Car

l S

t

5th St

Beacon St

University St

Florida St

45th Ave

Berry S

t

Head St

Shaf

ter A

ve

Britton St

Natom

a St

Natom

a St

Dw

ight

St

Guerrero St

Will

s S

t

Loehr StD

e M

on

tfo

rt A

ve

20th Ave

Felt

on S

t

Bac

on S

t

Hicks Rd

Pio

che

St

Silli

man

St

Sheld

on

Ter

Wil

deAv

e

Ru

sse

ll S

t

Bronte St

McnairCt

Min

na St

Ort

ega S

t

Flint St

Co

rnw

all

St

Ge

ary

Blv

d

Wels

h St

Harrie

t St

Sce

nic

Way

Java

St

Jeff

ers

on

St

Ad

air S

t

Nor

iega

St

Sh

ore

Vie

wA

ve

Joice St

Monticello St

Gav

enS

t

Davis St

Divisadero St

Mck

inno

n Ave

Ross Aly

Inca Ln

Belm

ont A

ve

Garnett

Ter

Jud

ah S

t

46th Ave

Ho

ust

on

St

Shrader St

Shrader St

J St

Hollis St

Broderick St

Lyon St

Pierce St

5th Ave

4th Ave

Midway St

Cole St

Cole St

2nd Ave

15th Ave

Castle St

Kearny St

Varennes St

Hal

e S

t

10th Ave

Grant Ave

21st Ave

Orben Pl

Hamilton St

Roscoe St

Howth St

London St

Wool Ct

Clare

ndon

Ave

Man

seau

St

So

uth

St

Marshall St

Morrell St

Ba

lce

taAve

Ervine St

Tennessee St

Sha

fter

Rd

Sta

ple

s A

ve

Louisburg St

SantaRitaAve

Fe

lix A

ve

Font

Blvd

Riv

oli

St

Car

me

l S

t

Alm

a S

tG

ratt

an S

t

Pasadena St

Mahan S

t

26th Ave

Josiah Ave

York St

Sad

ow

a S

t

Mis

sio

nB

ay

Blv

d

Was

hin

gto

n S

t

Was

hin

gto

n S

t

Hic

kory

St

Fell

St

Hay

es S

tGoettingen St

Do

ran

tes

Ave

Peabody St

Ch

icag

o

Way

29th Ave

Rhode Island St

Vermont St

Brussels St

24th Ave

Bea umont Ave

Newburg

St

De

Lo

ng

St

Riverton Dr

Mck

inno

n Ave

12th Ave

Chester Ave

28th Ave

Nido Ave

Rossi Ave

Fe

rn S

tA

ust

in S

t

Dartmouth St

Nevada St

Hampshire St

Th

rift

St

Oliv

e S

t

Princeton St

Utah St25th Ave 26th Ave

Mississippi St

Harbor Rd

Niagar

a Ave

Connecticut St

Arkansas St

Alabama St

Forest View Dr

Miramar Ave

Kansas StVermont St

Laura

St

Gar

de

n S

t

Spear S

t

Will

ow

St

Alt

on

Ave

Bay

St

Jeff

ers

on

St

Val

par

aiso

St

Myr

tle

St

Pin

to A

ve

Wilm

ot

St

Pe

rin

e P

l

Cla

y S

t

Cla

y S

t

No

rth

Po

int

St

No

rth

Po

int

St

Mag

no

lia S

t

Vi da

lD

r

Lar

ch S

t

Oak

St

Fe

ll S

t

Victoria St

Vernon St

Divisadero St

Prague St

Cook St

Grijalva D

r

He

nry

St

Se

vil

leS

t

Dia

z A

veCre

spi D

r

Aloha

Av

e

ApolloSt

Sears

St

28th Ave

Margaret Ave

One

ida

Ave

Mill St

Lu

r lin

eS

t

MasonicAve

Oce

an A

ve

Crags

Ct

Po

pp

yLn

Mesa St

Girard Rd

Munich St

Treat Ave

Barcelona Ave

Hartford St

Homestead St

Oakwood St

Lapidge St

Julian Ave

H

St

7th Ave

Guerrero St

Park Hill Ave

Oreilly Ave

Mo

nta

na

St

Gon

zale

z D

r

Majestic Ave

6th A

ve

Delta St

KeyesAve

Main

St

Hill

St

Eri

e S

t

Wis

ser

Ct

Ritch S

t

Hawth

orne S

t

28

th S

t

Fisher Ave

Funston Ave

Alv

arad

o S

t

Grand View Ave

Byxbee St

Hill

St

Han

cock

St

Fo

rd S

t

Penny LnC

om

erf

ord

St

DeSotoSt

Custe

r Ave

Lib

ert

y S

t

Tuck

erA

ve

Bright St

Great Hwy

Pomona St

Flora St

Cre

stl a

keD

r

Don

ner A

ve

Gould St

Encanto Ave

6th S

t

Mo

nte

rey

Blv

d

Bancr

oft A

ve

Gal

vez A

ve

Egbe

rt A

ve

Hud

son A

ve

Gorga

sAve

40th Ave

38th Ave

Caine Ave

41st Ave40th Ave

39th Ave

27th Ave

Ewing Ter

29th Ave

17th Ave17th Ave

21st Ave

38th Ave

32nd Ave

24th Ave

22nd Ave22nd Ave

23rd Ave

26th Ave

23rd Ave

27th Ave

14th Ave

33rd Ave

35th Ave

39th Ave

40th Ave

31st Ave

Gladys St

48th Ave

Rico

Wa

y

13

th S

t

Palm AveAnza Ave Jordan Ave

Bro

ad S

t

W

agner Rd

Commonwealth Ave

Bank St

Gal

vez

Ave

Ki ska

Rd

Burke

Ave

I St

Treat Ave

Elsie St

E St

Whitney St

Mir

abel

Ave

West

Portal A

ve

Mar

in S

t

Bluxo

me S

t

Idora

Ave

R St

Edge

hil l Way

Man

sel l

St

Bro

the

rho

od

Way

Sumne

rAv e

Nap

oleo

nS

t

Am

ado

r S

t

Ma

rin

eD

r

Spr

ec

kel s

La

keD

r

Jo

hn

FS

hel l

ey

Dr

Harris

on St

Pers

hing Dr

14th Ave

SanBrunoA

ve

Bel

laV

ista

Wa y

22nd Ave

Am

be

rDr

Mar

iett

a

Dr

Stanyan St

3rd Ave

Virg

inia

Ave

Tere

sita

Blv

d

Montgomery St

25th Ave

B

ernal

Hei

gh

tsBl

vd

Congdon St

Carolina St

10th Ave

LongBrid

geSt

Ma

rtin

Luth

er

Kin

gJr

Dr

30th Ave

BoricaSt

9th Ave

Cra

gm

ontA

ve

Bryan

t St

Bryant St

Avila St

Ro

ose

velt

Way

UptonAve

Buchanan St

Scott St

Scott St

Casitas

Ave

To pa

z

W

ay

GlenviewD

r

15th Ave

La

nsd

ale

Ave

Mi r

a

lomaD

r

Missouri St

Saint Charles Ave

Fairf

ax A

ve

CoronaSt

Visi

taci

on

Ave

8th Ave

Hester Ave

Bennington St

LaSa

l leAve

15th Ave

ForestKnollsDr

Macarthur Ave

Peralta Ave

30th Ave

Sawyer St

14th Ave

Yerb

aBuena

Ave

Ingalls St

Por tola St

Taylor St

Shotwell St

47th Ave

Carolina St

39th Ave

Arch St

Swiss Ave

Diamond St

3rd St

11th Ave

31st Ave

43rd Ave

Athens St

Sta nyan Blvd

MolimoDr

Talbert St

Owens S

t

Ralston St

Collingwood St

Wood St

Capp St

Bartlett St

42nd Ave

Sible

y Rd

25th Ave

La Playa

48th Ave

Van Ness Ave

Van Ness Ave

19th Ave19th Ave

Sunset Blvd

Park Presidio Blvd

Mcra e St

Ma l ta Dr

19th Ave

Sim

onds

Loop

Arm

iste

adR

d

Lu

nd

ee

nS

t

Diamon

dHei

ghtsBl vd

Clark

eSt

BowleySt

3rd St

Piper

Loop

Sc hofi

eldR

d

Presi

dio

Ter

Ale

ma

ny

Blv

d

Vete

r an

sDr

Yach

t R

d

Junipero Serra Blvd

Park

Pre

sid

ioB

ypa

ssD

r

Min

erv

a S

t

Gar

field

St

Lake

view

Ave

Lobo

s S

t

Linc

oln

Way

Linc

oln

Way

23

rd S

t

Music Con

cour

se Dr

Mar

tin

Luth

er K

ing Jr D

r

Bro

ther

ho

od W

ay

John

F K

enn

edy

Dr

Fort

Fun

ston

Dr

Quint St

Jack

son

St

Arg

uello

Blvd

Cow

les

St

Lincoln Blvd

Patte

r n R

d

Ho war

d St

Fran

c

onia St

O’F

arre

ll S

t

Ge

ary

Blv

d

Douglass St

Ale

man

y B

lvd

Bat

tery

Eas

t

Clarendon Ave Pano

r am

a D

r

Gardenside Dr

Steiner St

Steiner St

8th S

t

Cla

y S

t

14

th S

t

McC

op

pin

St

7th S

t

7th S

t

Sil

ver

Ave

Ma

son

St

Howar

d St

TiffanyAve

Lom

bar

d

St

Pac

ific

Ave

Mar

ket S

t

Mar

ket S

t

Larkin St

Win

sto

nD

r

2nd St

30

th S

t

Ca

lifo

rnia

St

Palo

u Ave

Octavia St

Octavia St

17th

St

17th

St

Div

isio

nS

t

Ce

sar

Ch

ave

z S

t

Ho

llo

way

Ave

Ho

llo

way

Ave

Eureka St

Potrero Ave

Colum

bus Ave

Oce

anA

ve

Ull

oa

St

22

nd

St

Gen

eva

Ave

Arguello Blvd

Yorb

a S

t

Su

tter

St

11th

St

Ma

rin

a B

lvd

Sansome St

Kir

kha

m S

t

Powell St

36th Ave

Ma

rip

osa

St

Taylor St

Polk St

Polk St

LoomisSt

Webster St

Webster St

Baker St

4th S

t

3rd S

t

Cre

sce

nt

Ave

Evan

s Ave

Tow

nsend S

t

10th

St

5th S

t

Valencia St

Folsom St

Valencia St

Phelps S

t

Silv

er A

ve

Po

st S

t

29

th S

t

MerchantRd

AlemanyBlvd

Battery St

Clayton St

19th Ave

Slo

atB

lvd

Parn

assu

sA

ve

Wal

ler S

t

St F

ran

cis

Blv

d

Woo

dsid

eA

ve

Bos

wo

rth

St

Alh

am

bra

St

Transverse Dr

Turk

St

30th Ave

26

th S

t

Murray St

14th Ave

15th Ave

16

th S

t

Arelious W

alker D

r

OtisSt

Keith S

t

10th Ave

8th Ave

Dolores St

Diamond St

Sanchez St

Chattanooga St

ElC

amin

oDe

lM

arFre

mont

St

Man

sell

St

Lincoln

Blvd

Pau

l Ave

23rd

St

He

ars

t A

ve

Oce

an A

ve

Vic

en

te S

t

Tara

val

St

La

ke S

t

Ca

bri

llo

St

Ove

rloo

k D

r

Cle

me

nt

St

Hug

o S

t

Irv

ing

St

Lunado Wy

Waw

on

a S

t

Inne

s Ave

21st

St

Jers

ey S

t

Cherry St

Presidio Blvd

Oak

dale

Ave

Stockton St

Front St

Hu

ntersPoint Blv d

Church St

Ba

lbo

a S

t

Harne

yW

y

Scott St

Lyon St

Ju

dso

n A

ve

Laguna St

Carg

oW

ay

Ric

hla

nd

Ave

Ge

ary

Blv

d

Indiana St

Henry Adams St

Illinois St

Minnesota St

Kansas St

No

rth

Po

int

St

Ha

igh

t St

Pag

e S

t

Pag

e S

t

Bro

ad

way

Gre

en

St

Fra

nci

sco

St

Gro

ve S

t

Gro

ve S

tFu

lto

n S

t

McA

llist

er S

t

Go

lden

Gat

e A

ve

Bay

St

Gre

en

wic

h S

t

Fran

cisc

o S

t

Hay

es S

t

Fell

St

Oak

St

Sea

lRo

ckD

r

Downey St

35th Ave

Lee Ave

Hoff St

Ce

rrit

os

Ave

Cli

pp

erS

t

Steuart

St

Gel

lert

Dr

Carro

ll Ave

Cir

cula

r Ave

Gilm

an A

ve

20th Ave

6th Ave

23rd Ave

34th Ave

47thAve

43rd Ave

Funston Ave

25th Ave

La Playa St

Goet

he St

21st Ave

Plymouth Ave

Sunset Blvd

O

Sha

ughnessyBlvd

Sa

ga

mo

re S

t

Guerrero St

Dewey

Blv

dPo

rtol

a D

r

King S

t

Barneveld Ave

San

Jose

Ave

Com

pto

nRd

Beale S

t

Port

ola

Dr

Jamest

own

Ave

Kez

arDr

Phelan Ave

Legion

Of

Hon

orDr

Ro

ber

t C

Lev

y Tu

nn

el

John

Mui

r Dr

Fols

om S

t

7th Ave

3rdSt

SantaClaraAve

Clearfield Dr

Harrison St

San Bruno Ave

San Bruno Ave

Ashbury St

Halleck St

Chener

y St

Masonic Ave

TunnelAve

SanBenitoWy

34th Ave

Beverly St

Lake Merced Blvd

RalstonAve

H

untersPointEx

Skyline Blvd

SanJoseAve

ParkBlvd

Great Hwy

Great Hwy

Great Hwy

Wes

t P

acif

ic A

ve

Font Blv

d

Gen

eva

Ave

Bow

lin

g Green Dr

Co

nse

rvat

ory

East Dr

Claremont Blvd

Terry A Francois Blvd

Du

bo

ce A

ve

Win

ston D

r

20th Ave

Gennessee St

Industria

l St

23

rd S

t

Ces

ar C

hav

ez S

t

Clayton St

Jo

hn F

Ken

ned

y D

r

30th Ave

San Fra

ncis

co B

ay

Tra

il

The Embarcadero

Corb

ett A

ve

Washington Blvd

Battery Caulfield Rd

W

ashin

gton

Blv

d

She

ridan A

ve

The

Embar

cadero

Sunset Blvd

Sti

ll S

t

Bay Shore Blvd

Skyline Blvd

Lake M

erce

d B

lvd

Mid

dle

Dr W

SFSU Pat

h

San

Fra

ncis

co B

ay Trail

Ale

many

Blv

d

Bro

ad

wa

y

Wa

shin

gto

n S

t

Mar

tin L

uth

er K

ing,

Jr

Dr

Park

Blvd

Linc

oln

Bl v

d

Rom

ain

St

Mont ere

y Bl

vd

Evan

s A

ve

Laguna H o nda B

lvd

Corbett Ave

Point Lo

bos

Ave

Se

ac

liff

La

ke

Str

ee

t

Pre

sid

ioN

ati

on

al

Pa

rk Pre

sid

ioTe

rra

ce

Inn

er

Ric

hm

on

d

Su

tro

He

igh

ts

Lin

co

ln P

ark

/ F

t. M

ile

y

Ou

ter

Ric

hm

on

d

Go

lde

nG

ate

Pa

rk

Pre

sid

ioH

eig

hts

La

ure

l H

eig

hts

/ J

ord

an

Pa

rk

An

za

Vis

ta

Co

wH

oll

ow

Un

ion

Str

ee

t

Ma

rin

a

Te

leg

rap

hH

ill

Ten

de

rlo

in

Civ

icC

en

ter

Haye

sV

all

ey

Pa

nh

an

dle

Ha

igh

t

Ash

bu

ry

Lo

we

rH

aig

ht

Min

tH

ill

Du

bo

ce

Tri

an

gle

Co

leV

all

ey

Rin

co

nH

ill

So

uth

Be

ach

So

uth

of

Ma

rke

t

Sh

ow

pla

ce

Sq

ua

re

Mis

sio

nB

ay

Mis

sio

nD

olo

res

Ca

str

o

Ou

ter

Su

nse

t

Pa

rksid

e

Sto

ne

sto

wn

Pa

rkm

erc

ed

La

ke

sh

ore

Go

lde

nG

ate

He

igh

ts

Fo

rest

Hil

l

We

st

Po

rta

l

Cla

ren

do

nH

eig

hts

Mid

tow

nTe

rra

ce

La

gu

na

Ho

nd

a

Up

pe

r

Ma

rke

t

Do

lore

sH

eig

hts

Mis

sio

n

Po

tre

roH

ill

Do

gp

atc

h

Ce

ntr

al

Wa

terf

ron

t

Dia

mo

nd

He

igh

ts

Fa

irm

ou

nt

Pe

ralt

aH

eig

hts

Me

rce

dM

an

or

Ba

lbo

aTe

rra

ce

Ing

lesid

e

Me

rce

dH

eig

hts

Ou

ter

Mis

sio

n

Ing

lesid

eTe

rra

ce

s

Mt.

Da

vid

so

nM

an

orH

eig

hts

We

stw

oo

dH

igh

lan

ds

We

stw

oo

dP

ark

Mir

alo

ma

Pa

rk

Cro

ck

er

Am

azo

n

Mc

La

ren

Pa

rk

Su

nn

yd

ale

Vis

ita

cio

nV

all

ey

Ind

iaB

asin

Hu

nte

rsP

oin

t

Ca

nd

lesti

ck

Po

int

Ca

yu

ga

Oc

ea

nv

iew

Ap

pa

rel

Cit

y

Be

rna

lH

eig

hts

No

eV

all

ey

Pro

du

ce

Ma

rke

t

Ba

yv

iew

Sil

ve

rTe

rra

ce

Bre

tH

art

e

Lit

tle

Ho

lly

wo

od

Po

rto

la

Un

ive

rsit

yM

ou

nd

St.

Ma

ry's

Pa

rk

Mis

sio

nTe

rra

ce

Exc

els

ior

Su

nn

ysid

e

Gle

nP

ark

Aq

ua

tic

Pa

rk /

Ft.

Ma

so

n

Fis

he

rma

n's

Wh

arf

Ca

the

dra

lH

ill

Ja

pa

nto

wn

Pa

cif

icH

eig

hts

Lo

we

rP

ac

ific

He

igh

ts

We

ste

rnA

dd

itio

n

Ch

ina

tow

nN

ob

Hil

l

Lo

we

rN

ob

Hil

l

Po

lkG

ulc

h

No

rth

Be

ach

Ru

ssia

nH

ill

Fin

an

cia

lD

istr

ict

Inn

er

Su

nse

t

Pa

rna

ssu

sH

eig

hts

Fo

rest

Kn

oll

s

Ash

bu

ryH

eig

hts

Eu

rek

aV

all

ey

St.

Fra

nc

isW

oo

d

Sh

erw

oo

dF

ore

st

Mo

nte

rey

Ferri

es

To

Alam

eda

/ Oa

kland

Fe

rries

To

Larkspur

Ferries To Sausalito

Ferries To Tiburon & Vallejo

Ferr

ies

to V

alle

jo,

Saus

alito

, Tib

uron

,An

gel I

slan

d, O

akla

nd

Mar

itim

ePl

aza

Croc

ker

Amaz

onPl

aygr

ound

Ange

loJ.

Ros

siPl

aygr

ound

Lake

Mer

ced

Park

Lake

Mer

ced

Park

Fort

Funs

ton/

Gold

en G

ate

Nat

’l Re

c Ar

ea

Balb

oaN

atur

alAr

ea

Alam

oSq

uare

Haye

sVa

lley

Play

grou

nd

24th

& Yo

rkM

ini P

ark

Mt.

Davi

dson

Park

Unio

nSq

uare

Prec

itaPa

rk

Broo

ksPa

rk

Villa

Mer

ced

Park

John

McL

aren

Park

Alta

Plaz

aPa

rk

Loui

s Su

tter

Play

grou

nd

Jose

phCo

nrad

Min

i Par

k

Gene

vaAv

enue

Strip

29th

&Di

amon

dOp

en S

pace

Diam

ond

& F

arnu

mOp

en S

pace

Cow

Hol

low

Play

grou

nd

Haw

kHi

ll

Herz

Play

grou

nd

Doro

thy

Ersk

ine

Park

Argo

nne

Play

grou

nd

Mt.

Olym

pus

Edge

hill

Mou

ntai

n

Alio

toM

ini P

ark

Broa

dway

Tunn

el E

ast

Min

i Par

k

Juliu

s Ka

hnPl

aygr

ound

Sout

hPa

rk

Alic

eCh

alm

ers

Play

grou

nd

Bay

View

Play

grou

nd

Ally

nePa

rk

Kello

ch&

Vel

asco

Min

i Par

k

Linc

oln

Park

Pala

ce o

fFi

ne A

rts

Rock

yOu

tcro

p

Lake

view

& A

shto

nM

ini P

ark

Pine

Lak

ePa

rk

Tank Hill

Twin

Peak

s

Gilm

anPl

aygr

ound

LeCo

nte

Min

i Par

k

Satu

rnSt

reet

Step

s

Parq

ueN

inos

Unid

os

Brot

herh

ood

& C

hest

erM

ini P

ark

Lafa

yette

Park

Wes

t Por

tal

Play

grou

nd

Cabr

illo

Play

grou

nd

Fulto

nPl

aygr

ound

Mur

iel L

eff

Min

i Par

k

DuPo

ntTe

nnis

Cour

ts

Roch

ambe

auPl

aygr

ound

Rich

mon

dRe

crea

tion

Cent

er

Laur

el H

illPl

aygr

ound

Bern

alHe

ight

sPa

rk

Jeffe

rson

Squa

re

Sgt.

John

Mac

aula

yPa

rkFa

ther

Alfre

d E.

Boed

deke

r Par

k

Cotta

ge R

owM

ini P

ark

Buch

anan

Stre

et M

all

Bush

&Br

oder

ick

Min

i Par

k

Kosh

land

Park

Dubo

cePa

rk

“The

Wig

gle”

Mis

sion

Dolo

res

Park

Corw

inCo

mm

unity

Gard

en

Wol

fe L

ane

Com

mun

ityGa

rden

McC

oppi

nSq

uare

Silv

erTe

rrac

ePl

aygr

ound

Cole

ridge

Min

i Par

k

Kidp

ower

Park

Less

ing

& S

ears

Min

i Par

k

Mic

hela

ngel

oPl

aygr

ound

Mira

lom

aPl

aygr

ound

Mos

cone

Recr

eatio

nCe

nter

Cris

sy F

ield

Noe

Valle

yCo

urts

Noe

& B

eave

rM

ini P

ark

Pres

idio

Heig

hts

Play

grou

nd

Ports

mou

thSq

uare Ye

rba

Buen

aGa

rden

sSF M

OMA

Vict

oria

Man

alo

Grav

es P

ark

AT&

TPa

rk

Ham

ilton

Play

grou

nd

Robe

rt Ki

mbe

llPl

aygr

ound

San

Fran

cisc

oZo

o

Potre

rode

l Sol

Jack

son

Play

grou

nd

Ocea

n Vi

ewPl

aygr

ound

Pale

gaPl

aygr

ound

Exce

lsio

rPl

aygr

ound

Suns

etPl

aygr

ound

Mis

sion

Recr

eatio

nCe

nter

Rand

olph

& B

right

Min

i Par

k

SOM

A Re

cCe

nter

Sout

h Su

nset

Play

grou

nd

Uppe

r Noe

Play

grou

nd

Was

hing

ton

Squa

re

Youn

gblo

od-C

olem

anPl

aygr

ound

Yach

tHa

rbor

and

Mar

ina

Gree

n

Whi

teCr

ane

Sprin

gs

Wes

t Sun

set

Play

grou

nd

Was

hing

ton

& H

yde

Min

i Par

k

Visi

taci

onVa

lley

Gree

nway

Utah

& 1

8th

Min

i Par

k

Sunn

ysid

ePl

aygr

ound

Sunn

ysid

eCo

nser

vato

ry

St. M

ary'

sPl

aygr

ound

Selb

y &

Palo

uM

ini P

ark

Roos

evel

t&

Hen

rySt

airs

Rolp

h N

icol

Play

grou

nd

Pren

tiss

Min

i Par

k

Ster

n Gr

ove

Amph

ithea

tre

Carl

Lars

enPa

rk

Colli

ns P

.Hu

ntin

gton

Park

Doug

lass

Play

grou

nd

Espr

itPa

rk

Eure

kaVa

lley

Play

grou

nd

Fay

Park

Pier

39

Ferr

y Bu

ildin

g

Expl

orat

oriu

m

Garfi

eld

Squa

re

Grat

tan

Play

grou

nd

Hillt

opPa

rk

Hyde

&Va

llejo

Min

i Par

k

J.P.

Mur

phy

Play

grou

nd

Jose

ph L

eeRe

crea

tion

Cent

er

Juni

pero

Serr

aPl

aygr

ound

Juri

Com

mon

s

Ogde

n Te

rrac

eCo

mm

unity

Gard

en

Good

Pro

spec

tCo

mm

unity

Gard

en

Potre

ro H

illRe

crea

tion

Cent

er

Park

St.

Gard

en

Palo

u &

Phel

ps P

ark

Mou

ntai

nLa

ke P

ark

Mon

ster

Park

McK

inle

ySq

uare

Fran

klin

Squa

re

Fairm

ont

Plaz

a

Coro

naHe

ight

s

Mt.

Sutro

Ope

nSp

ace

Rese

rve

Mid

tow

n Te

rrac

ePl

aygr

ound

Cayu

gaPl

aygr

ound

Cayu

ga &

Lam

artin

eM

ini P

ark

Balb

oaPa

rk

15th

Aven

ueSt

eps Gr

and

View

Park

Potre

ro H

illM

ini P

ark

Buen

aVi

sta

Park

Porto

laOp

enSp

ace

Patri

cia'

sGr

een

Mis

sion

Play

grou

nd

Indi

aBa

sin/

Shor

elin

e

Hero

n’s

Head

Park

Park

Holly

Park

Gold

en G

ate

Heig

hts

Park

Ches

nut &

Kear

nyOp

en S

pace

Bay

View

Park

Bay

View

Park

Glen

Cany

onPa

rk

Apto

sPl

aygr

ound

Gold

enGa

te P

ark

Gold

enGa

te P

ark

Bake

rBe

ach

De Y

oung

Mus

eum

CA A

cade

my

of S

cien

ces

Billy

Goat

Hill

St. M

ary'

sSq

uare

Littl

eHo

llyw

ood

Park

Upper Terr

SFM

TA

City

Hall

CCSF

John

Ada

ms

Cam

pus

UC H

astin

gsCo

llege

of L

aw

City

Colle

ge of

San

Fran

cisc

o

USF

Lone

Mou

ntai

n Ca

mpu

s

USF

SF S

tate

Unive

rsity

UCSF

Parn

assu

s Cam

pus

CCSF

SE C

ampu

s

CCSF

SE C

ampu

s

UCSF

Miss

ion

Bay C

ampu

s

UCSF

Mt. Z

ion

Med

. Ctr.

CCSF

Miss

ion

Cam

pus

Ocea

nBe

ach

Golden Gate Bridge

San Francisco/O

akland Bay B

ridge

Fran

cisc

o St

Rese

rvoi

r

Mou

ntai

nLa

ke

Spre

ckel

sLa

keLl

oyd

Lake

Lily

Pond

Stow

Lake

Nor

thLa

ke

Stra

wbe

rry

Hill

Rese

rvoi

rW

ildfo

wl

Pond

Mid

dle

Lake

Elk

Glen

lake

Met

son

Lake

Nur

sery

Pond

Mal

lard

Lake

Sout

h La

ke

Twin

Pea

ksRe

serv

oir

Sum

mit

Rese

rvoi

r

Lagu

naHo

nda

Rese

rvoi

r

Suns

etRe

serv

oir

Stan

ford

Heig

hts

Rese

rvoi

r

Colle

geHi

llRe

serv

oir

Pine

Lake

Lake

Mer

ced

Lake

Mer

ced

Univ

ersi

tyM

ound

Rese

rvoi

r

McN

abLa

keYo

sem

iteM

arsh

Pacif

icO

cean

Pacif

icO

cean

San

Fra

ncis

co

Bay

San

Fra

ncis

co

Bay

So

uth

Basi

n

Ind

iaB

asi

n

Isla

is C

reek

Mis

sio

n C

reek

Emba

rcad

ero

Stat

ion

Futu

re T

rans

bay

Term

inal

Emba

rcad

ero

Bike

Sta

tion

Mon

tgom

ery

StSt

atio

n

Pow

ell

Stat

ion

Civi

c Ce

nter

Stat

ion

16th

Stre

et

& M

issi

on S

tSt

atio

n

24th

Stre

et&

Mis

sion

St

Stat

ion

Glen

Par

kSt

atio

n

Balb

oa P

ark

Stat

ion

Daly

City

Stat

ion

San

Fran

cisc

oCa

ltrai

n Te

rmin

alBi

ke S

tatio

n

22nd

St.

Caltr

ain

Stat

ion

Bays

hore

Caltr

ain

Satio

n

280

280

101

101

101

101

101

80

80

280

2801

1

Dis

clai

mer

: S

FMTA

d

oes

n

ot

assu

me

any

resp

on

sib

ility

o

r lia

bili

ty

for

any

pro

per

ty d

amag

e, i

nju

ry,

or

oth

er a

dve

rse

circ

um

stan

ces

that

m

ay

aris

e w

hile

u

sin

g

the

San

Fra

nci

sco

Bik

eway

Net

wo

rk M

ap.

No

re

pre

sen

tati

on

is

in

ten

ded

o

r m

ade

as t

o t

he

fitn

ess

or

safe

ty o

f th

e fa

cilit

ies

sho

wn

on

th

is m

ap.

Yo

u a

re u

ltim

atel

y re

spo

nsi

ble

for

you

r o

wn

saf

ety

and

the

safe

ty o

f o

ther

s.

You

mu

st d

eter

min

e fo

r yo

urs

elf

the

suit

abili

ty o

f al

l ro

ute

s an

d o

ther

fac

iliti

es s

ho

wn

on

th

is m

ap,

wit

h

con

sid

erat

ion

g

iven

to

p

rese

nt

con

dit

ion

s, y

ou

r le

vel o

f ab

ility

, an

d a

ny

oth

er r

elev

ant

fact

ors

.

14th

St

Cal

ifor

nia

Ave

13th

St

12th

St

3rd

St

Avenue H

6th

St

8th

St

Har

riet

Ln

M

ari

ne

rD

r

Avenue M

Avenue Of The Palms

12th

St

Cal

ifor

nia

Ave

Avenue B

Ave

nue B

Chi

nook

Ct

Avenue D

9th

St

Stu

rgeo

nSt

4th

St

Avenue I

Avenue N

Flounder

Ct

11th

St

Hal

ibut

Ct

Fresnel Way

10th

St

Avenue E

NimitzD

r

Avenue FAvenue C5t

h S

t

Gateview

Ave

Trea

sure

Island RdHealy

Ave

Gate

Rd

Wests ide Dr

Northpo

int D

r

Fore

stR

d

Mac

alla

Rd

Perimeter Pat

h

80

Tre

asu

re I

sla

nd

Ye

rba

Bu

en

aIs

lan

d

BUS

Road

way

Obs

tacl

es:

Alw

ays

cros

s st

reet

car

and

rail

track

s w

hile

tra

velin

g as

pe

rpen

dicu

lar

to

the

track

s as

pos

sibl

e.

Wat

ch o

ut f

or

grat

es,

man

hole

cov

ers,

pot

hole

s, a

nd

slic

k su

rface

s.

Inte

rsec

tions

: Al

way

s be

caut

ious

whe

n pr

ocee

ding

thro

ugh

inte

rsec

tions

. Be

es

peci

ally

w

atch

ful

for

pede

stria

ns a

nd t

urni

ng c

ars.

M

ake

eye

cont

act w

ith d

river

s to

ens

ure

they

see

you

!

Curb

Acc

ess:

Yi

eld

to ta

xis

and

para

trans

it ve

hicl

es in

the

cycl

etra

ck o

r bik

e la

ne. T

hese

veh

icle

s ha

ve

curb

acc

ess

prio

rity.

Mix

ing

Zone

s:

Whe

n co

min

g to

geth

er w

ith o

ther

veh

icle

s in

mix

ing

zone

s, a

void

con

flict

s by

pay

ing

atte

ntio

n to

sha

rrow

s, l

ane

mar

king

s, a

nd

mos

t im

porta

ntly,

car

s!

Be

Awar

e:

Shar

e th

e ro

ad w

ith o

ther

s an

d us

e ha

nd

sign

als

to s

how

you

r in

tent

ions

. F

ollo

w

shar

row

s to

sta

y ou

t of t

he d

oor z

one!

Truc

ks:

Give

tru

cks

a w

ide

berth

! T

hey

have

larg

e bl

ind

spot

s to

both

side

s and

to th

e re

ar.

Take

th

e la

ne to

car

eful

ly g

et a

roun

d rig

ht-tu

rnin

g ve

hicl

es.

Bus

es:

Nev

er p

ass

buse

s on

the

rig

ht a

nd d

on’t

follo

w t

oo c

lose

ly. K

eep

an e

ye o

ut f

or

pede

stria

ns a

nd s

udde

n st

ops.

The

Vehi

cula

r Lef

t Tur

n:

Look

and

dou

ble

chec

k fo

r on

com

ing

cars

be

fore

mov

ing

into

the

left-

turn

lane

. Yi

eld

to

onco

min

g tra

ffic

and

com

plet

e yo

ur le

ft tu

rn.

The

Two-

Stag

e Le

ft Tu

rn:

Wai

t fo

r th

e gr

een

light

and

rid

e ca

refu

lly

next

to th

e cr

ossw

alk.

Wai

t for

the

light

and

fo

llow

the

cros

swal

k ac

ross

the

stre

et.

Han

d Si

gnal

s:

Cont

act I

nfo:

Bic

ycle

Saf

ety

Tips

:

Gen

eral

SFM

TA In

form

atio

n:31

1

SFM

TA W

ebsi

te:

ww

w.s

fmta

.co

m

Polic

e/Fi

re/A

mbu

lanc

e:91

1

Liva

ble

Stre

ets:

1 S

Van

Nes

s A

ven

ue

7th

Flo

or

San

Fra

nci

sco

, CA

941

03

Requ

est B

ike

Park

ing:

ww

w.s

fmta

.co

m/

bik

epar

kin

g

San

Fran

cisc

o B

icyc

le

Coal

ition

:w

ww

.sfb

ike.

org

Bik

eMap

per

:b

icyc

ling

.511

.org

/map

s

Left

Rig

ht

Sto

p

Mak

e o

ther

s aw

are

of

you

r in

ten

tio

ns

wit

h t

hes

e h

and

si

gn

als:

NEV

ER ri

de in

the

wro

ng d

irec

tion

or o

n th

e si

dew

alk!

Thes

e ar

e m

ajor

cau

ses

of c

ollis

ions

.

Trea

sure

Is

land

01/

41/

21

Mile

s

N

Lege

ndSe

para

ted

Bicy

cle

Lane

(stri

ped,

mar

ked,

and

sig

ned

bicy

cle

lane

s bu

ffere

d fro

m v

ehic

le tr

affic

)

Bicy

cle

Lane

(stri

ped,

mar

ked,

and

sig

ned

lane

s fo

r bic

ycle

trav

el)

Bicy

cle

Rout

e (s

hare

d tra

vel l

ane

mar

ked

and

sign

ed fo

r sha

red

use)

Bicy

cle

Path

(off-

stre

et m

ulti-

use

path

)

One-

Way

Stre

et

BART

Sta

tion

Caltr

ain

Stat

ion

Park

or O

pen

Spac

e

Colle

ge o

r Uni

vers

ity

Maj

or S

treet

Nei

ghbo

rhoo

d St

reet

Free

way

Hill

s

Stee

p Hi

ll (m

ore

than

10%

gra

de)

Mod

erat

e Hi

ll(5

-10%

gra

de)

(arro

w p

oint

s up

hill)

San

Fra

nci

sco

B

ikew

ay N

etw

ork

Map

SFM

TA-L

ivab

le-S

tree

ts

sfm

ta_m

uni

Follo

w u

s on

line:

- FR

EE

! -

Bik

eway

Net

wo

rk M

ap

cour

tesy

of

SFM

TA L

ivab

le S

tree

ts

San FranciscoBike

Bikeway Network Map

Th

is

pro

ject

is

m

ade

po

ssib

le

by

the

San

Fr

anci

sco

C

ou

nty

Tr

ansp

ort

atio

n

Au

tho

rity

th

rou

gh

a

gra

nt

of

Pro

po

siti

on

K

Lo

cal

Tran

spo

rtat

ion

Sal

es Ta

x Fu

nd

s.

64

Page 65: BICYCLE CIRCULATION AND SAFETYarchive.sfcta.org/sites/default/files/content/Executive/Meetings/board/2014/07...DRAFT 2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM BICYCLE CIRCULATION

6

Pri

mary

Bic

yc

le c

orr

ido

rs a

naly

sis

Focus o

n t

he 5

0 m

iles o

f prim

ary

corr

idors

65