bicycle highway

1
105 95 110 115 100 105 kingsway boundary THE BICYCLE HIGHWAY kick-starting sustainable transportation kevin zhang 50% 40% $3.0m 2% increase in population by 2040 in metro vancouver percentage of total GHG emitted by automobiles $5,000 annual budget for bicycle infrastructure individual annual savings if driving replaced with walking or biking percentage of trips via 5km maximum distance travelled for half of all trips 800km total length of bike facilities in metro vancouver current bike network + proposal intensity 1:100,000 nlow nmedium nhigh nlow intensity situation 1:75 1 kingsway bridge perspective plan + route diagrams 1:2,000 skytrain ave speed: 70km/hr track density: 100ppl/km exit every: 3000m operation hrs: 19hrs/day bicycle highway ave speed: 20km/hr track density: 600ppl/km exit every: 0-60m operation hrs: 24hrs/day bc parkway ave speed: 5km/hr track density: infinite exit every: 0m operation hrs: 24hrs/day 2 telus-skytrain connection 3 boundary bridge perspective nmedium intensity situation 1:75 nhigh intensity situation 1:75 commercial ave size: 1600sqft attached to bike highway encourage vertical travel residential ave size: 800sqft attached to bc parkway encourage cross corridor movement bicycle station section 1:50 bicycle station plan 1:50 4 bicycle station + development 1 2 3 4

Upload: kevin-j-zhang

Post on 18-Mar-2016

217 views

Category:

Documents


0 download

DESCRIPTION

Proposal for a hanging cycling bridge along a planning bicycle highway paralleling the Expo SkyTrain line in Metro Vancouver - Kevin Jingyi Zhang - www.kjzhang.com

TRANSCRIPT

Page 1: Bicycle Highway

100

105

100

95

110

115

110

100

105

10 500

35.500000

49.9994

1.5000

kingsway

boun

dary

THE BICYCLE HIGHWAY kick-starting sustainable transportation kevin zhang

50% 40% $3.0m 2% increase in population by 2040 in metro vancouver

percentage of total GHGemitted by automobiles

$5,000 annual budget for bicycle

infrastructureindividual annual savings

if driving replaced with walking or biking

percentage of trips via

5kmmaximum distance

travelled for half of all trips

800kmtotal length of bike facilities in metro

vancouver

current bike network + proposal intensity 1:100,000nlow nmedium nhigh

nlow intensity situation 1:75

1 kingsway bridge perspective

plan + route diagrams 1:2,000

skytrainave speed: 70km/hrtrack density: 100ppl/kmexit every: 3000moperation hrs: 19hrs/day

bicycle highwayave speed: 20km/hrtrack density: 600ppl/kmexit every: 0-60moperation hrs: 24hrs/day

bc parkwayave speed: 5km/hrtrack density: infiniteexit every: 0moperation hrs: 24hrs/day

2 telus-skytrain connection 3 boundary bridge perspective

nmedium intensity situation 1:75 nhigh intensity situation 1:75

commercialave size: 1600sqft

attached to bike highwayencourage vertical travel

residentialave size: 800sqft

attached to bc parkwayencourage cross corridor

movement

bicycle station section 1:50 bicycle station plan 1:50

4 bicycle station + development

1

2

3

4