bid for supply, installation and commissioning of …...with new generation switches, switch fabrics...
TRANSCRIPT
Page no./clause no
Item RFP Specs/Clause
1 Section: 5 Technical
Specifications Page no. 38
Switch Performance: Switch should support minimum 80 Gbps per slot
switching bandwidth with minimum 255 Mpps forwarding rate for IPV4 & IpV6, There should not be any performance
degradation in case of any switching/routing engine failure.
They have requested to modify the specification as: Switch should support minimum 80 Gbps per slot switching bandwidth with minimum 255 Mpps
forwarding rate for IPV4 & IpV6, There should not be any drop in above mentioned performance in case of any switching/routing engine failure.
They have also provided justification for the same as follows:With new generation switches, switch fabrics provide active-active switching to ensure better
performance in normal working conditions.In case of failure, the available fabrics shall ensure the required performance is met. As active and redundant switch engine is old technology and is
specific to OEM, they have requested to modify the specifications accordingly
Accepted: The revised clause to be read as "Switch should support minimum 80 Gbps
per slot switching bandwidth with minimum 255 Mpps forwarding rate for IPV4 & IpV6,
There should not be any drop in above mentioned performance in case of any
switching/routing engine failure.
2 Section: 5 Technical
Specifications Page no. 39
Layer 3 Features: The Switch should support 128K IPV4 & IPV6
Routes & 100K Multicast Routes for IPV4 & IPV6
They have requested to modify the specification as: The Switch should support 128K IPV4 & 64K IPV6 Routes including Multicast Routes for IPV4 &
IPV6
They have also provided justification for the same as follows:IPv6 packets are having 4x times the size of an IPv4 packet. This limits the same switch memory to
have less number of IPv6 routes. Also, Unicast and multicast routing table shall be shared in switches and hence request to specify the multicast routing table to be part of the combined
routing table.Also the 128 K IPv4 & IPv6 route & 100 K multicast entries are vendor specific and will limit our participation. Request to modify the IPv6 routes count and multicast routing
specification accordingly.
Accepted: The revised clause to be read as "The Switch should support 128K IPV4 &
64K IPV6 Routes including Multicast Routes for IPV4 & IPV6"
3 Section: 5 Technical
Specifications Page no. 40
General / Physical Requirements: Switch should support minimum 48 Gbps per slot switching bandwidth with
minimum 110 Mpps forwarding rate. There should not be any performance degradation in case of any
switching/routing engine failure.
They have requested to modify the specification as: Switch should support minimum 48 Gbps per slot switching bandwidth with minimum 110 Mpps forwarding rate. There should not be any drop in above mentioned performance in case of any
switching/routing engine failure
They have also provided justification for the same as follows:With new generation switches, switch fabrics provide active-active switching to ensure better
performance in normal working conditions.In case of failure, the available fabrics shall ensure the required performance is met. As active and redundant switch engine is old technology and specific
to OEM, they have requested to modify the specifications accordingly
Accepted: The revised clause to be read as "Switch should support minimum 48 Gbps
per slot switching bandwidth with minimum 150 Mpps forwarding rate. There should
not be any drop in above mentioned performance in case of any
switching/routing engine failure"
4 Layer 3 Requirements: Shall have basic Routing-Static IP routing and
RIP v1/v2, hardware enabled advance IP routing protocols like OSPF, OSPFv3, BGPv4, RIPng and policy based routing,
Multicast routing features like PIM-SM, PIM-DM and PIM-SSM, multicast features like PIM RP accept filter, PIM
neighbor filter, multicast route limit, multicastmultipath and IGMP v1, v2, v3
They have requested to modify the specification as: Shall have basic Routing-Static IP routing and RIP v1/v2, hardware enabled advance IP routing
protocols like OSPF, OSPFv3, BGPv4, , RIPng and policy based routing, Multicast routing features like PIM-SM, PIM-DM and PIM-SSM, multicast features like PIM RP accept filter, PIM neighbor filter,
multicast route limit, multicast multipath or ECMP and IGMP v1, v2, v3
They have also provided justification for the same as follows:Multicast Multipath is vendor specific capability. Request to modify the same with industry standard
Equal-cost multipath feature
Accepted: The revised clause to be read as "Shall have basic Routing-Static IP routing and RIP v1/v2, hardware enabled advance
IP routing protocols like OSPF, OSPFv3, BGPv4, , RIPng and policy based routing,
Multicast routing features like PIM-SM, PIM-DM and PIM-SSM, multicast features like PIM RP accept filter, PIM neighbor filter,
multicast route limit, multicast multipath or ECMP and IGMP v1, v2, v3"
5 Layer 3 Requirements: Should support minimum 128 K IPv4 & IPv6 route & 32 K multicast entries.
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
They have requested to modify the specification as: Should support minimum 16 K IPv4 & 8K IPv6 route including multicast entries
They have also provided justification for the same as follows:IPv6 packets are having 4x times the size of an IPv4 packet. This limits the same switch memory to
have less number of IPv6 routes. Aggregation switch does not need the scalability as in core/distribution switch. Also, Unicast and multicast routing table shall be shared in switches and
hence request to specify the multicast routing table to be part of the combined routing table. accordingly. Also the 128 K IPv4 & IPv6 route & 32 K multicast entries are vendor specific and will
limit our participation. Request to modify the routes count and multicast routing specification
Accepted: The revised clause to be read as: Layer 3 Features: Switch should support
32K IPv4, 32K IPv6 unicast & 32K multicast routes for both IPV4 & IPv6.
RU Distribution
Switch
Building Aggregation
Switch
Section: 5 Technical
Specifications Page no. 41
1 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 6 Section: 5 Technical
Specifications Page no. 42
General / Physical Requirements: Switch should have minimum 24
10/100/1000 Base-T ports. withadditional 4 Nos. of SFP Based ports and additional 2
stacking ports with all accessories for stacking purpose
They have requested to modify the specification as: Switch should have minimum 24 10/100/1000 Base-T ports. with additional 2 Nos. of SFP Based ports and additional 2 dedicated stacking ports with all accessories for stacking purpose. Optional:
Uplink ports shall be upgradeable to 10G in future
They have also provided justification for the same as follows:As the requirement mentions, each switch needs Two (2) 1G Single Mode (SM) SFPs. Request to
modify the 1G SFP slots per switch to two Nos. Also optionally suggest to make these ports upgradeable to 10G in future, to provide investment protection
Accepted: The revised clause to be read as "Switch should have minimum 24 10/100/1000 Base-T ports. with
additional 2 Nos. of SFP Based ports and additional 2 dedicated stacking ports with
all accessories for stacking purpose"
7 Section: 5 Technical
Specifications Page no. 43
Performance Requirements: Switch should have minimum 168 Gbps
switching bandwidth capacity (Gbps)per switch
They have requested to modify the specification as: Switch should have minimum 136 Gbps switching bandwidth capacity (Gbps) per switch
They have also provided justification for the same as follows:With the ports asked for on this switch (24 x Gig-T, 4 x Gig SFP, 2 x Stacking Ports) the total full-duplex performance requirement is 24 x 2 Gbps + 4 x 2 Gbps + 40 Gbps = 96 Gbps. To consider two 10G ports in future, this can be increased to 136 Gbps. The mentioned specification is not
matching on a fixed configuration switch with the given port count. Also 168 Gbps switching bandwidth is propritory to OEM. Request to modify the specification accordingly
Accepted: The revised clause to be read as : Performance
Requirements: Switch should have minimum 136 Gbps switching bandwidth capacity (Gbps) per
switch
8 Article 23: Evaluation
Methodology Page no.24
SI Capability Evaluation
5. Proposed OEM in latest Gartner Magic Quadrant for Enterprise
LAN Infrastructure for last three consecutive yearsLeader's Quadrant in last three consecutive years - 15
marksNot in Leader's Quadrant in last three consecutive years - 0
marks
They have requested to modify the specification as: Proposed OEM in latest Gartner Magic Quadrant for Enterprise LAN Infrastructure for last three
consecutive yearsLeader's/Visionary Quadrant in last three consecutive years - 15 Marks
Challangers Quadrant in last three consecutive years - 10 MarksAny Other Quadrant - 0 Marks
They have also provided justification for the same as follows:Request to kindly relax the clause and consider clause as this is restricting only two OEM's to have
advantage.
Accepted. The revised clause to be read as: "Proposed OEM in latest Gartner Magic
Quadrant for Enterprise LAN Infrastructure for all the three consecutive years
Leader's Quadrant in all three consecutive years - 15 marks
Visionary/Challenger/Niche Quadrant in all the three consecutive years - 8 marks
Not in Gartner's Quadrant in all the three consecutive years - 0 marks"
9 Switch Features: The Switch should support hot-swappable fan
trays & power supplies & should be supplied with 1:1 power supply. One power supply should be able to run the
switch in case any power supplyfails.
They have requested to modify the specification as: The Switch should support hot-swappable fan trays and power supplies & should be supplied with
N+N redundant power supply.
They have also provided justification for the same as follows:Different OEM's have different architecture and may require more than one power supply to run the Complete chassis. Hence request to kindly relax the clause. Also consider N+N redundancy instead
of 1+1 redundancy.
Accepted: The revised clause to be read as: The Switch should support hot-swappable
fan trays & power supplies & should be supplied with N:N power supply. One power supply should be able to run the switch in
case any power supply fails."
10 Switch Features: The Switch should support 1 Gbps , 10 Gbps & 40 Gbps interfaces
They have requested to modify the specification as: The Switch should support 1 Gbps & 10 Gbps interfaces
They have also provided justification for the same as follows:Asked support of 40Gbps interface is not aligned with the switch performance, per slot bandwidth
and network architecture. Hence request to kindly remove the same.
Accepted: The revised clause to be read as: Switch Features: The Switch should support 1 Gbps , 10 Gbps interfaces
11 Switch Performance: Switch should support minimum 80 Gbps per slot
switching bandwidth with minimum 255 Mpps forwarding rate for IPV4 & IpV6, There should not be any performance
degradation in case of any switching/routing engine failure.
They have requested to modify the specification as: Switch should support minimum 80 Gbps per slot switching bandwidth with minimum 833 Mpps forwarding rate for IPV4 & IpV6, There should not be any performance degradation in case of any
switching/routing engine failure.
They have also provided justification for the same as follows:Chassis should have 7 slots for Line/payload slots where per slot bandwidth is 80Gbps. Total for 7
slots = 80*7=560Gbps = 833 Mpps for IPv4 and IPv6 (1Gbps=1.488Mpps). Request to kidly consider the same .
Not Accepted. As per Bid.
Floor Access Switch
Section: 5 Technical
Specifications Page no. 38
RU Distribution
Switch
2 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 12 Layer 3 Features: Shall have basic Routing-Static IP routing, RIP
v1/v2, RIPng, policy based routing, hardware enabled advance IP routing protocols OSPF, OSPFv3, BGPv4, IGMP V1, V2, V3, MLD V1, V2, PIM-SM, PIM-DM , PIM-SSM etc
They have requested to modify the specification as: Shall have basic Routing-Static IP routing, RIP v1/v2, RIPng, policy based routing, hardware
enabled advance IP routing protocols OSPF, OSPFv3, IGMP V1, V2, V3, MLD V1, V2, PIM-SM, PIM-DM , PIM-SSM etc
They have also provided justification for the same as follows:Based on the network architecture, all the swiches would be placed in LAN environment, Thus BGP
is not required. Request to kindly remove the same.
BGP is normally required at the WAN Gateway Router/Switch.
Not Accepted. As per Bid.
13 Layer 3 Features: Should support MPLS VPN, MPLS mVPN (Multicast
VPN), MPLS Class of Service (CoS), VRF-Aware Services (Telnet, ICMP, Syslog), VPLS with minimum VRF support
upto 8K
They have requested to remove the clause
They have also provided justification for the same as follows:Request to kindly remove the clause and allow leading OEM's to participate.
MPLS not required here and is normally required at the WAN Gateway Router/Switch, while making own MPLS Cloud.
Clause stands deleted
14 Availability: Switch should have the capability to extend the control plane across two active switches making it
a virtual chassis, enabling interconnected switches to be managed as a single common fabric with one IP address with support for stateful switch over in case of a failure of
the Active Fabric/Supervisor.
They have requested to remove the clause
They have also provided justification for the same as follows:Request to kindly remove the clause and allow leading OEM's to participate.
The required feature is not supported by all OEM's on chassis based switches.
Clause stands deleted
15 Availability: The Virtual switch should support the fabric/Controller in one chassis as the Active
fabric/Controller and the fabric/Controller in the other chassis as the Standby supervisor
They have requested to remove the clause
They have also provided justification for the same as follows:Request to kindly remove the clause and allow leading OEM's to participate.
The required feature is not supported by all OEM's on chassis based switches.
Accepted: The revised clause to be read as:The switches should support
virtualization where the fabric/Controller in one chassis act as the Active
fabric/Controller and the fabric/Controller in the other chassis as the Standby
supervisor or equivalent technologies like Virtual Router Redundancy Protocol ( VRRP ) to increases the availability and reliability
of the network.
16 Interface Requirements: The switch should have minimum 12 10-Gigabit
Ethernet Ports spread across multiple line cards for card level redundancy, 40 no’s of 1G Fiber (SFP based) ports
spread across multiple line cards for card level redundancy.
They have Requested for ClarificationKindly clarify if we need to populate the SFP's for mentioned interfaces or SFP count mentioned in
Form F-1 on page 47 is final?
Also clarify is the populated interfaces need to be non-blocking wirepeed.
Accepted: The revised clause to be read as: Interface Requirements: The switch should have minimum 12 10-Gigabit Ethernet Ports spread across multiple line cards for card level redundancy, 40 no’s of 1G Fiber (SFP based) ports spread across multiple line cards for card level redundancy. All 1G& 10G ports should work on line rate.In RU distribution switches, 10G SFP's needs to be factored separately. SI/Bidder need to check 10G port availability of SDC Core Switch.
17 General / Physical Requirements: The Switch should support hot-swappable
power supplies & should be supplied with 1:1 power supply. One power supply should be able to run the switch
in case any power supply fails.
They have requested to modify the specification as: The Switch should support hot-swappable power supplies & should be supplied with N+N power
supply.
They have also provided justification for the same as follows:Different OEM's have different architecture and may require more than one power supply to run the Complete chassis. Hence request to kindly relax the clause. Also consider N+N redundancy instead
of 1+1 redundancy.
Accepted: The revised clause to be read as: The Switch should support hot-swappable
fan trays & power supplies & should be supplied with N:N power supply.
Section: 5 Technical
Specifications Page no. 39
Section: 5 Technical
Specifications Page no. 40
Building Aggregation
Switch
3 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 18 General / Physical Requirements: Switch should support minimum 48 Gbps per slot switching bandwidth with
minimum 110 Mpps forwarding rate. There should not be any performance degradation in case of any
switching/routing engine failure.
They have requested to modify the specification as: Switch should support minimum 48 Gbps per slot switching bandwidth with minimum 357
Mpps forwarding rate for IPv4 and IPv6. There should not be any performance degradation in case of any switching/routing engine failure.
They have also provided justification for the same as follows:Chassis should have 5 slots for Line/payload slots where per slot bandwidth is 48Gbps. Total for 5
slots = 48*5=240Gbps = 357 Mpps for IPv4 and IPv6 (1Gbps=1.488Mpps). Request to kidly consider the same performance for IPv4 and IPv6 as IPv6 protocols are asked in the specification
and performance in Distribution switch is mentioned for both IPv4 and IPv6.
Accepted: The revised clause to be read as "Switch should support minimum 48 Gbps
per slot switching bandwidth with minimum 150 Mpps forwarding rate. There should
not be any drop in above mentioned performance in case of any
switching/routing engine failure"
19 General / Physical Requirements: The proposed switch should support Net flow or J-flow or S-Flow.
They have requested to modify the specification as: The proposed switch should have Net flow or J-flow or S-Flow from day 1. If the same is supported
through additional modules then two modules to be provided for redundancy.
They have also provided justification for the same as follows:Request to kindly consider Flow monitoring from day 1 with proper redundancy to ensure that it is
highly available and can be used without any commercial impact.
As per RFP
20 Layer-2 Requirements: Shall have 32,000 MAC addresses They have requested to modify the specification as: Shall have 64,000 MAC addresses
They have also provided justification for the same as follows:Asked MAC addresses are very less and not aligned with the asked performance parameters. Hence
request to kindly consider 64,000 MAC addresses.
As per RFP
21 Layer 3 Requirements: Shall have basic Routing-Static IP routing and
RIP v1/v2, hardware enabled advance IP routing protocols like OSPF, OSPFv3, BGPv4, , RIPng and policy based
routing, Multicast routing features like PIM-SM, PIM-DM and PIM-SSM, multicast features like PIM RP accept filter,
PIM neighbor filter, multicast route limit, multicastmultipath and IGMP v1, v2, v3
They have requested to modify the specification as: Shall have basic Routing-Static IP routing and RIP v1/v2, hardware enabled advance IP routing
protocols like OSPF, OSPFv3 , RIPng and policy based routing, Multicast routing features like PIM-SM, PIM-DM and PIM-SSM, multicast features like PIM RP accept filter, PIM neighbor filter, multicast
route limit, multicast multipath and IGMP v1, v2, v3
They have also provided justification for the same as follows:Based on the network architecture, all the swiches would be placed in LAN environment, Thus BGP
is not required. Request to kindly remove the same.
BGP is normally required at the WAN Gateway Router/Switch.
Accepted: The revised clause to be read as "Shall have basic Routing-Static IP routing and RIP v1/v2, hardware enabled advance
IP routing protocols like OSPF, OSPFv3, BGPv4, , RIPng and policy based routing,
Multicast routing features like PIM-SM, PIM-DM and PIM-SSM, multicast features like PIM RP accept filter, PIM neighbor filter,
multicast route limit, multicast multipath or ECMP and IGMP v1, v2, v3"
22 Layer 3 Requirements: Should support minimum 128 K IPv4 & IPv6 route & 32 K multicast entries.
They have Request for clarificationPlease clarify if 32 K multicast routes asked are for IPv4 and IPv6?
Revised Clause to be read as: Layer 3 Features: Switch should support
32K IPv4, 32K IPv6 unicast & 32K multicast routes for both IPV4 & IPv6.
23 Availability: Switch should have the capability to extend the control plane across two active switches making it a virtual chassis, enabling interconnected switches to be managed
as a single common fabric with one IP address with support for stateful switch over in case of a failure of the
Active Fabric/Supervisor.
They have Requested to remove the clause
Request to kindly remove the clause and allow leading OEM's to participate.
The required feature is not supported by all OEM's on chassis based switches.
Clause stands deleted
24 Security Requirements: Should be able to shut down Spanning Tree
Protocol Port Fast-enabled interfaces when BPDUs are received to avoid accidental topology oops
They have requested to modify the specification as:Should be able to shut down Spanning Tree Protocol Port interfaces when BPDUs are received to
avoid accidental topology loops
They have also provided justification for the same as follows:Fast-enabled interfaces are specific and not supported by all leading OEM's, hence request to kindly
relax the clause and consider standard interfaces.
Accepted. Revised clause to be read as:Security Requirements: Should be able to shut down Spanning Tree Protocol Port
enabled interfaces when BPDUs are received to avoid accidental topology oops
Section: 5 Technical
Specifications Page no. 41
Section: 5 Technical
Specifications Page no. 42
4 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 25 Interface Requirements: Fourteen (14) 10G ports spread across multiple
line cards for card level redundancy, Forty (40) no of 1G SFP based ports & Eight (8) 1GE ports spread across
multiple line cards.
They have Requested for ClarificationKindly clarify if we need to populate the SFP's for mentioned interfaces or SFP count mentioned in
Form F-1 on page 47 is final?
Also clarify is the populated interfaces need to be non-blocking wirepeed.
Clause modified as: Interface Requirements: Four(4) 10G ports spread across multiple line cards for card level redundancy from day 1 and scalable to 12 for future use , Forty (40) no of 1G SFP based ports & Eight (8) 1GE ports
spread across multiple line cards. 10G & 1G ports should work on line rate.
10G SFP is not required to be supplied currently for Building Aggregation Switches.
Once fiber cabling modification is completed, GoG will procure 10G SFP's on
need basis.
26 Section: 5 Technical
Specifications Page no. 42
General / Physical Requirements: Switch should have minimum 24
10/100/1000 Base-T ports. withadditional 4 Nos. of SFP Based ports and additional 2
stacking ports with all accessories for stacking purpose
They have requested to modify the specification as:Switch should have minimum 24 10/100/1000 Base-T ports. With additional 2 Nos. of SFP Based
ports and additional 2 stacking ports with all accessories for stacking purpose
They have also provided justification for the same as follows:Two SFP based ports are more than enough to suffice the requirement, even if we consider
redundant uplink from each switch. Hence request to kindly consider the same.
As above.Floor Access Switch
5 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 27 General / Physical Requirements: Switch should be 1 RU rack mountable in nature, stackable with 40Gbps of
throughput with minimum of 4 switches in a stack with single IP management.
They have requested to modify the specification as:Switch should be 1 RU rack mountable in nature, stackable with 40Gbps of throughput with
minimum of 9 switches in a stack with single IP management.
They have also provided justification for the same as follows:For better scalability and easy management, it is recommended to have minimum 9 Switches in a
tack with single IP management.
Accepted: The revised clause to be read as "Switch should be 1 RU rack mountable in
nature, stackable with 40Gbps of throughput with minimum of 8 switches in
a stack with single IP management."
28 General / Physical Requirements: The switch should have IPV4 & IPv6
support from day one
They have requested to modify the specification as:The switch should have IPV4 & IPv6 support from day one. Basic Static Routing, RIP, RIPnG from
day 1 and upgradable to OSPF, OSPFv3, PIM and MLD in future.
Request to kindly consider Basic routing like Static Routing, RIP, RIPnG from day 1 to ensure no commercial impact while using the same and upgradable to OSPF, OSPFv3, PIM and MLD in future
to ensure no hardware change in future while enabling the same.
Not Accepted. As per Bid.
29 Performance Requirements: Switch should have minimum 168 Gbps
switching bandwidth capacity (Gbps)per switch
They have requested to modify the specification as:Switch should have minimum 88 Gbps switching bandwidth capacity (Gbps) per switch
They have also provided justification for the same as follows:For standard 24 port switch with 2 x 10G uplink ports, the switching bandwidth should be 24x2 +
2x2x10 = 48+40=88 Gbps
As above.
30 Performance Requirements: Switch should have minimum 40 Mpps
throughput per switch
They have requested to modify the specification as:Switch should have minimum 65 Mpps throughput per switch
They have also provided justification for the same as follows:For standard 24 port switch with 2 x 10G uplink ports, the throughput should be 88/2*1.488 = 65
Mpps
Accepted. The Revised Clause to be read as: Switch should have minimum 65 Mpps
throughput per switch
31 Layer-2 Requirements:Should support IEEE 802.1Q VLANencapsulation and up to 250 active
VLANs per switch
They have requested to modify the specification as:Should support IEEE 802.1Q VLAN encapsulation and up to 1000 active VLANs per switch
They have also provided justification for the same as follows:Asked VLAN's are very less. Hence considering future scalability, it is recommended to have
minimum 1000 VLAN's
Accepted. The Revised Clause to be read as: Layer-2
Requirements : Should support IEEE 802.1Q VLAN encapsulation and up to
1000 active VLANs per switch
32 Layer-2 Requirements: Switch should support link aggregation for minimum 8 GE ports and minimum 40 LAG
groups.
They have requested to modify the specification as:Switch should support link aggregation for minimum 8 GE ports and minimum 24 LAG groups.
They have also provided justification for the same as follows:In a 24 port switch even if we make each LAG of 2 ports, then we can have total 12 LAG's. Even if we consider 100% scalability, the total number of LAG's required would be 24. Hence request to
kindly consider the same.
Accepted. The Revised Clause to be read as: Layer-2
Requirements: Switch should support link aggregation for minimum 8 GE ports and
minimum 24 LAG groups.
33 Interface Requirements: Two (2) 1G Single Mode (SM) SFP should be supplied with the switch
They have Requested for Clarification
Kindly clarify if we need to populate the mentioned SFP's or SFP count mentioned in Form F-1 on page 47 is final?
This is as per Form F-1
34 Article 42: Installation
Requirements Page no.35
Clause no. 42.2
The necessary Civil & Electrical work has to be carried out by the Vendor.
The GOG will not reimburse any cost towards the same. The Vendor need
to take necessary permission if require from concern authority.
On Page 15 it is written that "GoG will provide all civil, electrical, passive infrastructure". Request for clarification.
No civil work is required. If required, electric work and Lan cabling is required
to be carried out.
Section: 5 Technical
Specifications Page no. 43
6 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 35 QoS Features: Shall have strict priority queuing or high strict priority queue, QoS/Security ACLs
Shall have strict priority queuing or high strict priority queue, minimum 64K or above QoS/Security ACLs
Security ACL plays a vital role in the network.There would be a lot of traffic generated from building access & building aggregation layer switches towards SDC Core switches. RU distribution switches
act as aggregation point where on an average 12-16 Building aggregation switches would get terminate. Rather than forwarding all traffic towards SDC core, it is highly advisable to filter traffic at
RU distribution layer. They have requested to add the suggested clause.
As per RFP
36 Interface Requirements: The switch should have minimum 12 10-Gigabit
Ethernet Ports spread across multiple line cards for card level redundancy, 40 no’s of 1G Fiber (SFP based) ports
spread across multiple line cards for card level redundancy.
The switch should have minimum 20 10-Gigabit Ethernet Ports spread across multiple line cards for card level redundancy, 40 no’s of 1G Fiber (SFP based) ports spread across multiple line cards for
card level redundancy.
There would be a lot many numbers of building access & aggregation switches intern get connect to RU distribution switches. To handle such huge amount of data, RU distribution switches must
have more number of 10G ports.
As above.
37 Addition Requested: Switch Security: Switch should support Data Confidentially & Integrity
Justification: MACsec, defined in 802.1AE, provides MAC-layer encryption over wired networks by using out-of-band methods for encryption keying. The MACsec Key Agreement (MKA) Protocol
provides the required session keys and manages the required encryption keys.
Accepted: The clause stands as "Security Requirements: Switch should support Data
Confidentially & Integrity"
38 Addition Requested: Switch Security: Switch should be EAL2 certified
Justification: The Evaluation Assurance Level of an IT product or system is a numerical grade assigned following the completion of a Common Criteria security evaluation.The increasing
assurance levels reflect added assurance requirements that must be met to achieve Common Criteria certification. The intent of the higher levels is to provide higher confidence that the system's
principal security features are reliably implemented.
Addition accepted: The clause stands as " Security Requirements: Switch should be
EAL2 or higher certified "
39 Addition Requested:Security Requirements: Switch should support Data Confidentially & Integrity
Justification: MACsec, defined in 802.1AE, provides MAC-layer encryption over wired networks by using out-of-band methods for encryption keying. The MACsec Key Agreement (MKA) Protocol
provides the required session keys and manages the required encryption keys.
Accepted: The clause stands as "Security Requirements: Switch should support Data
Confidentially & Integrity"
40 Security Requirements: Switch Should support VLAN Based, Port Based
ACLs.
Switch Should support VLAN Based, Port Based & Time based ACLs
Justification: Time-based ACLs are useful when you want to restrict traffic based on the time of day. For example, you might employ time-based ACLs if you want to only allow web surfing during a
particular time of day or allow access to a particular server only during work hours.
As per RFP
41 Addition Requested: Security Requirements: Switch should be EAL2 certified
Justification: The Evaluation Assurance Level of an IT product or system is a numerical grade assigned following the completion of a Common Criteria security evaluation.The increasing
assurance levels reflect added assurance requirements that must be met to achieve Common Criteria certification. The intent of the higher levels is to provide higher confidence that the system's
principal security features are reliably implemented.
Addition accepted: The clause stands as " Security Requirements: Switch should be
EAL2 or higher certified "
42 General / Physical Requirements: Switch should be 1 RU rack mountable
in nature, stackable with 40Gbps ofthroughput with minimum of 4 switches in a stack with
single IP management.
Switch should be 1 RU rack mountable in nature, stackable with 64 Gbps of full duplx throughput with minimum of 8 switches in a stack with single IP management.
Justification: There would be a need of stacking more than 4 switches into a single stack to connect more number of users/end machines.
As above.
Section: 5 Technical
Specifications Page no. 39
RU Distribution
Switch
Section: 5 Technical
Specifications Page no. 42
Building Aggregation
Switch
Section: 5 Technical
Specifications Page no. 43
Floor Access Switch
7 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 43 General / Physical Requirements: Switch should support external
redundant power supply
Switch should support internal/ external redundant power supply
Justification: Internal redundant power supply is always better than external ones. With external redundant power supply external power source also needs to be provisioned that comes with an
additional cost.
Clause modified as: General / Physical Requirements: Switch should support
external/internal redundant power supply
44 Security Requirements: Switch Should support VLAN Based, Port Based
ACLs.
Switch Should support VLAN Based, Port Based & Time based ACLs
Justification: Time-based ACLs are useful when you want to restrict traffic based on the time of day. For example, you might employ time-based ACLs if you want to only allow web surfing during a
particular time of day or allow access to a particular server only during work hours.
As per RFP
45 Addition Requested: Switch should be EAL2 certified
Justification: The Evaluation Assurance Level of an IT product or system is a numerical grade assigned following the completion of a Common Criteria security evaluation.The increasing
assurance levels reflect added assurance requirements that must be met to achieve Common Criteria certification. The intent of the higher levels is to provide higher confidence that the system's
principal security features are reliably implemented.
Addition accepted: The clause stands as " Security Requirements: Switch should be
EAL2 or higher certified "
46 Section 2: Eligibility Criteria
Page no. 8
Clause no. 14
No Consortium will be allowed. The bidder must meet all the eligibility criteria by itself
Consortium with in Group Companies Should be allowed Not Accepted. As per Bid.
47 Article 23: Evaluation
Methodology Page no.24
SI Capability Evaluation
5. Proposed OEM in latest Gartner Magic Quadrant for Enterprise
LAN Infrastructure for last three consecutive yearsLeader's Quadrant in last three consecutive years - 15
marksNot in Leader's Quadrant in last three consecutive years - 0
marks
They have requested to modify the specification as: Proposed OEM in latest Gartner Magic Quadrant for Enterprise LAN Infrastructure for last three
consecutive yearsLeader's/Visionary Quadrant in last three consecutive years - 15 Marks
Challangers Quadrant in last three consecutive years - 10 MarksAny Other Quadrant - 0 Marks
They have also provided justification for the same as follows:Request to kindly relax the clause and consider clause as this is restricting only two OEM's to have
advantage.
As above.
48 Switch Features: The Switch should support hot-swappable fan
trays & power supplies & should be supplied with 1:1 power supply. One power supply should be able to run the
switch in case any power supplyfails.
They have requested to modify the specification as: The Switch should support hot-swappable fan trays and power supplies & should be supplied with
N+N redundant power supply.
They have also provided justification for the same as follows:Different OEM's have different architecture and may require more than one power supply to run the Complete chassis. Hence request to kindly relax the clause. Also consider N+N redundancy instead
of 1+1 redundancy.
As Above
49 Switch Features: The Switch should support 1 Gbps , 10 Gbps & 40 Gbps interfaces
They have requested to modify the specification as: The Switch should support 1 Gbps & 10 Gbps interfaces
They have also provided justification for the same as follows:Asked support of 40Gbps interface is not aligned with the switch performance, per slot bandwidth
and network architecture. Hence request to kindly remove the same.
As Above
50 Switch Performance: Switch should support minimum 80 Gbps per slot
switching bandwidth with minimum 255 Mpps forwarding rate for IPV4 & IpV6, There should not be any performance
degradation in case of any switching/routing engine failure.
They have requested to modify the specification as: Switch should support minimum 80 Gbps per slot switching bandwidth with minimum 833 Mpps forwarding rate for IPV4 & IpV6, There should not be any performance degradation in case of any
switching/routing engine failure.
They have also provided justification for the same as follows:Chassis should have 7 slots for Line/payload slots where per slot bandwidth is 80Gbps. Total for 7
slots = 80*7=560Gbps = 833 Mpps for IPv4 and IPv6 (1Gbps=1.488Mpps). Request to kidly consider the same .
As Above
Section: 5 Technical
Specifications Page no. 38
RU Distribution
Switch
8 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 51 Layer 3 Features: Shall have basic Routing-Static IP routing, RIP v1/v2, RIPng, policy based routing, hardware
enabled advance IP routing protocols OSPF, OSPFv3, BGPv4, IGMP V1, V2, V3, MLD V1, V2, PIM-SM, PIM-DM ,
PIM-SSM etc
They have requested to modify the specification as: Shall have basic Routing-Static IP routing, RIP v1/v2, RIPng, policy based routing, hardware enabled advance IP routing protocols OSPF, OSPFv3, IGMP V1, V2, V3, MLD V1, V2, PIM-SM, PIM-DM , PIM-
SSM etc
They have also provided justification for the same as follows:Based on the network architecture, all the swiches would be placed in LAN environment, Thus BGP
is not required. Request to kindly remove the same.
BGP is normally required at the WAN Gateway Router/Switch.
As Above
52 Layer 3 Features: Should support MPLS VPN, MPLS mVPN (Multicast
VPN), MPLS Class of Service (CoS), VRF-Aware Services (Telnet, ICMP, Syslog), VPLS with minimum VRF support
upto 8K
They have requested to remove the clause
They have also provided justification for the same as follows:Request to kindly remove the clause and allow leading OEM's to participate.
MPLS not required here and is normally required at the WAN Gateway Router/Switch, while making own MPLS Cloud.
As Above
53 Availability: Switch should have the capability to extend the control plane across two active switches making it
a virtual chassis, enabling interconnected switches to be managed as a single common fabric with one IP address with support for stateful switch over in case of a failure of
the Active Fabric/Supervisor.
They have requested to remove the clause
They have also provided justification for the same as follows:Request to kindly remove the clause and allow leading OEM's to participate.
The required feature is not supported by all OEM's on chassis based switches.
As Above
54 Availability: The Virtual switch should support the fabric/Controller in one chassis as the Active
fabric/Controller and the fabric/Controller in the other chassis as the Standby supervisor
They have requested to remove the clause
They have also provided justification for the same as follows:Request to kindly remove the clause and allow leading OEM's to participate.
The required feature is not supported by all OEM's on chassis based switches.
As Above
55 Interface Requirements: The switch should have minimum 12 10-Gigabit
Ethernet Ports spread across multiple line cards for card level redundancy, 40 no’s of 1G Fiber (SFP based) ports
spread across multiple line cards for card level redundancy.
They have Requested for ClarificationKindly clarify if we need to populate the SFP's for mentioned interfaces or SFP count mentioned in
Form F-1 on page 47 is final?
Also clarify is the populated interfaces need to be non-blocking wirepeed.
As Above
56 General / Physical Requirements: The Switch should support hot-swappable
power supplies & should be supplied with 1:1 power supply. One power supply should be able to run the switch
in case any power supply fails.
They have requested to modify the specification as: The Switch should support hot-swappable power supplies & should be supplied with N+N power
supply.
They have also provided justification for the same as follows:Different OEM's have different architecture and may require more than one power supply to run the Complete chassis. Hence request to kindly relax the clause. Also consider N+N redundancy instead
of 1+1 redundancy.
As Above
57 General / Physical Requirements: Switch should support minimum 48 Gbps per slot switching bandwidth with
minimum 110 Mpps forwarding rate. There should not be any performance degradation in case of any
switching/routing engine failure.
They have requested to modify the specification as: Switch should support minimum 48 Gbps per slot switching bandwidth with minimum 357
Mpps forwarding rate for IPv4 and IPv6. There should not be any performance degradation in case of any switching/routing engine failure.
They have also provided justification for the same as follows:Chassis should have 5 slots for Line/payload slots where per slot bandwidth is 48Gbps. Total for 5
slots = 48*5=240Gbps = 357 Mpps for IPv4 and IPv6 (1Gbps=1.488Mpps). Request to kidly consider the same performance for IPv4 and IPv6 as IPv6 protocols are asked in the specification
and performance in Distribution switch is mentioned for both IPv4 and IPv6.
As Above
Section: 5 Technical
Specifications Page no. 39
Section: 5 Technical
Specifications Page no. 40
Building Aggregation
Switch
9 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 58 General / Physical Requirements: The proposed switch should support Net flow or J-flow or S-Flow.
They have requested to modify the specification as: The proposed switch should have Net flow or J-flow or S-Flow from day 1. If the same is supported
through additional modules then two modules to be provided for redundancy.
They have also provided justification for the same as follows:Request to kindly consider Flow monitoring from day 1 with proper redundancy to ensure that it is
highly available and can be used without any commercial impact.
As Above
59 Layer-2 Requirements: Shall have 32,000 MAC addresses They have requested to modify the specification as: Shall have 64,000 MAC addresses
They have also provided justification for the same as follows:Asked MAC addresses are very less and not aligned with the asked performance parameters. Hence
request to kindly consider 64,000 MAC addresses.
As Above
60 Layer 3 Requirements: Shall have basic Routing-Static IP routing and
RIP v1/v2, hardware enabled advance IP routing protocols like OSPF, OSPFv3, BGPv4, , RIPng and policy based
routing, Multicast routing features like PIM-SM, PIM-DM and PIM-SSM, multicast features like PIM RP accept filter,
PIM neighbor filter, multicast route limit, multicastmultipath and IGMP v1, v2, v3
They have requested to modify the specification as: Shall have basic Routing-Static IP routing and RIP v1/v2, hardware enabled advance IP routing
protocols like OSPF, OSPFv3 , RIPng and policy based routing, Multicast routing features like PIM-SM, PIM-DM and PIM-SSM, multicast features like PIM RP accept filter, PIM neighbor filter, multicast
route limit, multicast multipath and IGMP v1, v2, v3
They have also provided justification for the same as follows:Based on the network architecture, all the swiches would be placed in LAN environment, Thus BGP
is not required. Request to kindly remove the same.
BGP is normally required at the WAN Gateway Router/Switch.
As Above
61 Layer 3 Requirements: Should support minimum 128 K IPv4 & IPv6 route & 32 K multicast entries.
They have Request for clarificationPlease clarify if 32 K multicast routes asked are for IPv4 and IPv6?
As Above
62 Availability: Switch should have the capability to extend the control plane across two active switches making it a virtual chassis, enabling interconnected switches to be managed
as a single commonfabric with one IP address with support for stateful switch over in case of a failure of the Active Fabric/Supervisor.
They have Requested to remove the clause
Request to kindly remove the clause and allow leading OEM's to participate.
The required feature is not supported by all OEM's on chassis based switches.
As Above
63 Security Requirements: Should be able to shut down Spanning Tree
Protocol Port Fast-enabled interfaces when BPDUs are received to avoid accidental topology oops
They have requested to modify the specification as:Should be able to shut down Spanning Tree Protocol Port interfaces when BPDUs are received to
avoid accidental topology loops
They have also provided justification for the same as follows:Fast-enabled interfaces are specific and not supported by all leading OEM's, hence request to kindly
relax the clause and consider standard interfaces.
As Above
64 Interface Requirements: Fourteen (14) 10G ports spread across multiple
line cards for card level redundancy, Forty (40) no of 1G SFP based ports & Eight (8) 1GE ports spread across
multiple line cards.
They have Requested for ClarificationKindly clarify if we need to populate the SFP's for mentioned interfaces or SFP count mentioned in
Form F-1 on page 47 is final?
Also clarify is the populated interfaces need to be non-blocking wirepeed.
As Above
65 Section: 5 Technical
Specifications Page no. 42
General / Physical Requirements: Switch should have minimum 24
10/100/1000 Base-T ports. withadditional 4 Nos. of SFP Based ports and additional 2
stacking ports with all accessories for stacking purpose
They have requested to modify the specification as:Switch should have minimum 24 10/100/1000 Base-T ports. With additional 2 Nos. of SFP Based
ports and additional 2 stacking ports with all accessories for stacking purpose
They have also provided justification for the same as follows:Two SFP based ports are more than enough to suffice the requirement, even if we consider
redundant uplink from each switch. Hence request to kindly consider the same.
As Above
Section: 5 Technical
Specifications Page no. 41
Section: 5 Technical
Specifications Page no. 42
Floor Access Switch
10 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 66 General / Physical Requirements: Switch should be 1 RU rack mountable in nature, stackable with 40Gbps of
throughput with minimum of 4 switches in a stack with single IP management.
They have requested to modify the specification as:Switch should be 1 RU rack mountable in nature, stackable with 40Gbps of throughput with
minimum of 9 switches in a stack with single IP management.
They have also provided justification for the same as follows:For better scalability and easy management, it is recommended to have minimum 9 Switches in a
tack with single IP management.
As Above
67 General / Physical Requirements: The switch should have IPV4 & IPv6
support from day one
They have requested to modify the specification as:The switch should have IPV4 & IPv6 support from day one. Basic Static Routing, RIP, RIPnG from
day 1 and upgradable to OSPF, OSPFv3, PIM and MLD in future.
Request to kindly consider Basic routing like Static Routing, RIP, RIPnG from day 1 to ensure no commercial impact while using the same and upgradable to OSPF, OSPFv3, PIM and MLD in future
to ensure no hardware change in future while enabling the same.
As Above
68 Performance Requirements: Switch should have minimum 168 Gbps
switching bandwidth capacity (Gbps)per switch
They have requested to modify the specification as:Switch should have minimum 88 Gbps switching bandwidth capacity (Gbps) per switch
They have also provided justification for the same as follows:For standard 24 port switch with 2 x 10G uplink ports, the switching bandwidth should be 24x2 +
2x2x10 = 48+40=88 Gbps
As Above
69 Performance Requirements: Switch should have minimum 40 Mpps
throughput per switch
They have requested to modify the specification as:Switch should have minimum 65 Mpps throughput per switch
They have also provided justification for the same as follows:For standard 24 port switch with 2 x 10G uplink ports, the throughput should be 88/2*1.488 = 65
Mpps
As Above
Section: 5 Technical
Specifications Page no. 43
11 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 70 Layer-2 Requirements:Should support IEEE 802.1Q VLANencapsulation and up to 250 active
VLANs per switch
They have requested to modify the specification as:Should support IEEE 802.1Q VLAN encapsulation and up to 1000 active VLANs per switch
They have also provided justification for the same as follows:Asked VLAN's are very less. Hence considering future scalability, it is recommended to have
minimum 1000 VLAN's
As Above
71 Layer-2 Requirements: Switch should support link aggregation for minimum 8 GE ports and minimum 40 LAG
groups.
They have requested to modify the specification as:Switch should support link aggregation for minimum 8 GE ports and minimum 24 LAG groups.
They have also provided justification for the same as follows:In a 24 port switch even if we make each LAG of 2 ports, then we can have total 12 LAG's. Even if we consider 100% scalability, the total number of LAG's required would be 24. Hence request to
kindly consider the same.
As Above
72 Interface Requirements: Two (2) 1G Single Mode (SM) SFP should be supplied with the switch
They have Requested for Clarification
Kindly clarify if we need to populate the mentioned SFP's or SFP count mentioned in Form F-1 on page 47 is final?
As Above
73 Section 2: Eligibility Criteria
Page no.7
Clause no. 4
The bidder should have demonstrableexpertise and experience in executing at least ONE project
inGovernment/PSU/Corporate for Network Integration /
Systems Integration in last five years each value more than 10 Crs in India.
The scope should include Supply,Installation and Commissioning of
Campus Area Network Infrastructureincluding Data Switches
They have requested to allow the Bidder to showcase multiple project experiences amounting to INR 10 Cr
Please see the revised bid.
74 Existing Network
Infrastructure
Figure 2: Low Level Existing Network Setup with Switch Model for New Sachivalaya
Please explain the current physical connectivity of the ground floor access switch to the 2nd floor Aggregation switch as the diagram shows that it is connected to 3 switches.
RFP is self explanatory
75 Existing Network
Challenges:
Current Fiber Optic Connectivity in the backbone is done through Fiber
transceivers due to non-availability of connecting Fiber Modules directly on the switches. GSCAN is facing connectivity issues because of the failure of these
transceivers. The failure of these transceivers could cause major downtime in the network. Upgradation of the
switches in the network with support for connecting fiber optics directly into the switches would eliminate the need for transceivers & hence reduce downtime in the network
& provide higher SLA to the network.
As per the current solution, SFPs(Small Form Factor Pluggable) will be required in switches for connecting the LC Patch cords. The ref. to the transceivers failure is a bit ambiguous , is GOG
referring to Fibre to Copper Converter as existing Transceivers?
RFP is self explanatory
76 Dimension Data recommends 10Gig connectivity even from Access switches to Bldg Aggregation switches. Would GOG consider this recommendation?
As per RFP
77 Each Building aggregation switch will be connected with 2 different RU switches in form a redundant RING
architecture over 10G, also every building aggregation switch will have redundant 10G links towards North & South bound Building aggregation switch to provide
additional layer of redundancy. Also keeping in mind future scalability sufficient a minimum no of 12 10G ports should be available from day one in the chassis so that whenever
required in future, GoG does not have to spend much except the transceiver costs.
Would multiple Bldg Agg switches will be connected to each other?
To provide additional level of redundany to individual building aggregation switches,
GoG may go for a ring architecture by connecting multiple building aggregation
switches in future on need basis.
Section 3: Scope of Work
Page no. 12
Proposed Network
12 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 78 Article 13: Bid Security/Earnest Money Deposit Page no. 21
Clause 13.1 The Bidder shall furnish, as part of the Bid, a Bid security for the amount of
Rs.36,00,000/- by demand draft, in favor of Gujarat Informatics Ltd.,
payable at Gandhinagar/Ahmedabad in India in a separate envelope. The
un-priced bid will be opened subject to the confirmation of valid Bidsecurity.
They have requested to also accept EMD in the form of Bank Guarantee, as it solves the same purpose and also proves the financial credibility of the Bidding organization
Not Accepted. As per Bid.
79 1. Past Project Experience of executing System Integration Projects
in last five years of the value INR 10 Cr from Government /PSU/Corporate customers in India.
They have requested to reduce the value of the previous project experiences to INR 5 Cr.
They have requested to accept projects that are under progress / under implementation also.
Please see the revised bid.
80 3. Turnover in each of last three financial years the last being
financial year ending March 2013
They have requested that, Bidders having Turnover of more than INR 500 Cr in 2 of the last 3 financial years should also be given full marks (15 Marks)
Please see the revised bid.
81 4. Profit in each of last three financial years the last being financial
year ending March 2013
They have suggested that Bidders having profits in each of the last 3 financial years should be given full marks (15 Marks). Irrespective of the Amount of Profit
Please see the revised bid.
82 Article 32: Taxes & Duties Page
no.28
Vendor is liable for all taxes and duties etc. They have requested that any change (increase / decrease) in Taxes and duties to be applicable mutually. i.e GIL to pay the Bidder any difference of amount due to increase in taxes, and similarly,
The Bidder shall discount the differential amount arising due to reduction in Taxes.
Not Accepted. As per Bid.
83 Article 38.2: Operational
Penalties Page no.32
They have requested to cap the operational penalties at the value of the PBG. Not Accepted. As per Bid.
84 Article 47: Limitation of
Vendor's Liability Page no.36
Notwithstanding anything contained in the Contract, Vendor’s liability
will be only for actual direct damages and shall be capped and limited to
double the charges or the amounts paid or due and payable to Vendor for
the Services that are the subject of the claim.
They have suggested to cap the Vendor's liability at the value of the contract. Not Accepted. As per Bid.
85 2. Building Aggregation switch - 64 nos. Why 64 bldg-agg switches are required? While floor access switches are only 19. Is this a typo? Please let us know to prepare the BOM.
As per RFP
86 6. Gigabit Ethernet SFPs* Please let us know why Gibabit SFPs(GLC-T) are required when the connectivity is over fiber and the Aggregation switch natively also supports Rj-45 ports.
To connect building access switches to building aggregation switches residing on
the same floor, Ethernet could be an option.
87 5. Multi mode SFPs* Please let us know if these Multimode SFPs will be used at the access switch side? We assume that the distance between the access switch and an Aggegation switch will not be more than 500 mts.
Depending upon distance between building access & building aggregation switches &
available fiber type, multimode SFP's would be required.
88 New proposed Clause - Site Not Ready In order to enable the Supplier to commence work and meet its obligations under the contract, we request GIL to provide physical possession of the site and access thereto, and making the site ready
complete in all respect.
We suggest that the Supplier should not in any manner be liable for any delay under the terms of this contract, if such delay is attributable to Purchaser’s failure to make the site ready within seven
(7) days of Supplier’s direction in this regard.
Depending upon circumstances, end-user department may cosider on merit.
Article 23: Evaluation
Methodology Page no.24
SI Capability Evaluation
Section 6: Schedule of Requirement Page no.47
13 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 89 New Proposed clause - Deemed Acceptance We suggest that the goods / software which require acceptance test shall be deemed accepted for the purpose of release of payment and for start of the warranty period and otherwise, on occurrence
of any one of following events, whichever occurs earliest:
a. if GIL fails to conduct or does not provide a written notice of any rejection / confirmation of acceptance test, within seven (7) days from the date of Test readiness notification by the Supplier,
or
b. if GIL puts the material into operational / productive/ normal use prior to acceptance test.
c. if goods / software have been installed but, due to reasons beyond the control of the Supplier, it has not been possible during a period of three (3) days from the date of notice by the Supplier, to
proceed with the acceptance tests.
Not Accepted. As per Bid.
90 High Capacity 10 Gig Backbone link between RU Distribution & SDC core
switches.
Will this be Day one requirement or future requirement? Connectivity between RU distribution switches & SDC core switches are on 10G currently. We expect to have 10G connection between new RU switches & SDC core switches.
91 Each block will have fiber cabling extended till 5th floor where new building aggregation layer switch will be
provisioned.
Our understanding is that the fibre cabling is not in vendor's scope and will be provided by GoG. Please confirm this understanding.
yes
92 The bidder should pro-actively monitor the health of equipments installed.
Our understanding is that this would be done using GOG provided management tools. Please confirm this understanding. Does bidder have to provide any tool for management? In case bidder needs to factor for the Management tool, please let us know the number of deivces to be managed
using the tool.
No tool has to be separately quoted by the bidder. However, bidder should actively
monitor the health status of all to be deployed devices using existing tool.
93 Section 3: Scope of Work
Page no. 15
Site Preparation:
The Successful bidder is solely responsible for Site preparation as
per the local requirements. GoG will provide all civil, electrical, passive infrastructure.
Since GoG will be providing all civil, electrical , passive infrastructure, what is expected from bidder in terms of Site preparation?
Vendor has to carry our the required electric work & LAN cabling.
94 Article 13: Bid Security/Earnest Money Deposit Page no. 21
Clause no. 13.1
The Bidder shall furnish, as part of the Bid, a Bid security for the amount of
Rs.36,00,000/- by demand draft, in favor of Gujarat Informatics Ltd.,
payable at Gandhinagar/Ahmedabad in India in a separate envelope. The
un-priced bid will be opened subject to the confirmation of valid Bidsecurity.
They have requested that Bid Security be allowed in form of Bank Guarantee instead of Demand Draft.
Not Accepted. As per Bid.
95 Article 25: Notification of
Award & Signing of Contract
Page no. 25
Clause 25.2 Within Six (6) working days of receipt of the Contract Form, the successful
Bidder shall sign and date the Contract and return it to the GOG/GIL. The contract Performance guarantee has to be
submitted within seven (07)working days of receipt of award. The Bank guarantee
(Performance) shallbe equal to 10% of the value of contract. The Bank
Guarantee shall be valid for duration of 180 days beyond the expiry of contract.
We are ok with the clause. However, we would like to submit that Article 13.4 on Page 22 of the RFP mentions that failure to sign the Agreement in time would lead to forfeiture of the Bid Security. In
view of this clause, we request that "Six (6) working days" be ammended to "Six (6) working days or as mutually agreed at time of Contracting".
We also request that GoG provide us with a copy of the Agreement so that we have more clarity on the Agreement to be signed as this would lead to less lead time to sign the Agreement.
Not Accepted. As per Bid.
96 Article 32: Taxes & Duties
Page no. 28
Vendor is liable for all taxes and duties etc. Noted. Our prices will be exclusive of Taxes and Duties and all Taxes and Duties would be extra as applicable. We would mention the Taxes and Duties applicable as required in the Form F-1 of the
RFP. Please confirm.
Not Accepted. As per Bid.
97 Article 36: Payment Terms
Page no. 29
On receipt of deliveries FOR destination And Successful Installation, commissioning, Integration & acceptance -
70%On Successful UAT and FAT - 30%
They have requested that GoG/ GIL consider the following payment terms:* 80% on delivery of the equipment
* Balance 20% on successful installation, commissioning, integration & acceptance.
Not Accepted. As per Bid.
Section 3: Scope of Work
Page no. 13
Proposed Network
14 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 98 Article 38: Penalty Clause Page no. 31
Clause 38.2 The Bidder shall be responsible for maintaining the desired performance and availability of the system/services.
Vender should ensure the prompt service support during Guarantee period. If complain is made before 4 pm of the
working day, the same should be attended & resolved within 24 hours.
We understand that Hardware replacement has to be NBD (Next Business Day) from the time the hardware is declared faulty/ dead. But any isses would need to be addressed and resolved within
24 hours. Please confirm.
Not Accepted. As per Bid.
99 Clause 42.1 The Vendor needs to pull necessary cables up to required place, using
approved PVC Piping/Channel/RF/CAT5 or CAT6 Cable.
Please elaborate on this point. This should be GOG scope
Vendor has to carry our the required electric work & LAN cabling.
100 Clause 42.2 The necessary Civil & Electrical work has to be carried out by the Vendor.
The GOG will not reimburse any cost towards the same. The Vendor need
to take necessary permission if require from concern authority.
This statement is clashing with statement on Page 15 which says that "GoG will provide all civil, electrical, passive infrastructure". Please clarify.
This should be GOG scope
No civil work is required. If required, electric work and Lan cabling is required
to be carried out.
101 Article 47: Limitation of
Vendor's Liability Page no. 36
Notwithstanding anything contained in the Contract, Vendor’s liability
will be only for actual direct damages and shall be capped and limited to
double the charges or the amounts paid or due and payable to Vendor for
the Services that are the subject of the claim.
They have requested that this clause be ammended to the following:"Regardless of the nature of claim, Vendor’s aggregate liability for direct damages under this
Contract shall not exceed the charges paid by Customer to Vendor for the individual product or service (or, 12 months charges, in the event of recurring payments) that is the subject of claim. The above limit on liability shall not apply to damages for bodily injury (including death) and damage to
real property and tangible personal property for which Vendor is legally liable. Under no circumstances shall Vendor be liable for indirect, consequential, incidental or special damages, loss of/damage to, data, loss of profits and business and any third party claim, even if Vendor has been
advised of possibility of such damages."
Not Accepted. As per Bid.
102 Layer 3 Features: Shall have strict priority queuing or high strict priority queue, QoS/Security ACLs
Shall have strict priority queuing or high strict priority queue, minimum 64K or above QoS/Security ACLs
Justification: Security ACL plays a vital role in the network.There would be a lot of traffic generated from building access & building aggregation layer switches towards SDC Core switches. RU
distribution switches act as aggregation point where on an average 12-16 Building aggregation switches would get terminate. Rather than forwarding all traffic towards SDC core, it is highly
advisable to filter traffic at RU distribution layer. hence we request to add the suggested clause.
Not Accepted. As per Bid.
103 Interface Requirements: The switch should have minimum 12 10-Gigabit Ethernet Ports spread across multiple line cards for card level redundancy, 40 no’s of 1G Fiber (SFP
based) ports spread across multiple linecards for card level redundancy.
The switch should have minimum 20 10-Gigabit Ethernet Ports spread across multiple line cards for card level redundancy, 40 no’s of 1G Fiber (SFP based) ports spread across multiple line cards for
card level redundancy.
Justification: There would be a lot many numbers of building access & aggregation switches intern get connect to RU distribution switches. To handle such huge amount of data, RU distribution
switches must have more number of 10G ports.
As above.
104 Addition Requested: Security : Switch should support Data Confidentially & Integrity
Justification: MACsec, defined in 802.1AE, provides MAC-layer encryption over wired networks by using out-of-band methods for encryption keying. The MACsec Key Agreement (MKA) Protocol
provides the required session keys and manages the required encryption keys.
As above.
105 Addition Requested: Switch should be EAL2 certified
Justification: The Evaluation Assurance Level of an IT product or system is a numerical grade assigned following the completion of a Common Criteria security evaluation.The increasing
assurance levels reflect added assurance requirements that must be met to achieve Common Criteria certification. The intent of the higher levels is to provide higher confidence that the system's
principal security features are reliably implemented.
As above.
Article 42: Installation
Rerquirements Page no. 35
Section 5: Technilcal
Specifications Page no. 39
RU Distribution
Switch
15 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 106 Security Requirements Addition Requested: Switch should support Data Confidentially & Integrity
Justification: MACsec, defined in 802.1AE, provides MAC-layer encryption over wired networks by using out-of-band methods for encryption keying. The MACsec Key Agreement (MKA) Protocol
provides the required session keys and manages the required encryption keys.
As above.
107 SecurityRequirements: Switch Should support VLAN Based, Port
Based ACLs.
Switch Should support VLAN Based, Port Based & Time based ACLs
Justification: Time-based ACLs are useful when you want to restrict traffic based on the time of day. For example, you might employ time-based ACLs if you want to only allow web surfing during a
particular time of day or allow access to a particular server only during work hours.
As above.
108 Addition Requested: Switch should be EAL2 certified
Justification: The Evaluation Assurance Level of an IT product or system is a numerical grade assigned following the completion of a Common Criteria security evaluation.The increasing
assurance levels reflect added assurance requirements that must be met to achieve Common Criteria certification. The intent of the higher levels is to provide higher confidence that the system's
principal security features are reliably implemented.
As above.
109 General / PhysicalRequirements: Switch should be 1 RU rack mountable in
nature, stackable with 40Gbps of throughput with minimum of 4 switches in a stack with
single IP management.
Switch should be 1 RU rack mountable in nature, stackable with 64 Gbps of full duplx throughput with minimum of 8 switches in a stack with single IP management.
Justification: There would be a need of stacking more than 4 switches into a single stack to connect more number of users/end machines.
As above.
110 General / PhysicalRequirements: Switch should support external
redundant power supply
Switch should support internal/ external redundant power supply
Justification: Internal redundant power supply is always better than external ones. With external redundant power supply external power source also needs to be provisioned that comes with an
additional cost.
As above.
111 Security Requirements: Switch Should support VLAN Based, Port Based ACLs.
Switch Should support VLAN Based, Port Based & Time based ACLs
Justification: Time-based ACLs are useful when you want to restrict traffic based on the time of day. For example, you might employ time-based ACLs if you want to only allow web surfing during a
particular time of day or allow access to a particular server only during work hours.
As above.
112 Addition Requested: Switch should be EAL2 certified
Justification: The Evaluation Assurance Level of an IT product or system is a numerical grade assigned following the completion of a Common Criteria security evaluation.The increasing
assurance levels reflect added assurance requirements that must be met to achieve Common Criteria certification. The intent of the higher levels is to provide higher confidence that the system's
principal security features are reliably implemented.
As above.
113 1. RU Distribution switch2. Building Aggregation3. Floor Access switch
Please provide the location for installation of the switches within the campus In Sachivalaya Campus
114 4. Single Mode SFPs*5. Multi mode SFPs*
10G SFP and 1G SFP ? 10G SFP between RU distribution switch & SDC core switch using single mode.
Multimode SFP to be used between RU distribution switch & building aggregation
switch115 Section 6:
Schedule of Requirement Page no.53
Note 2: Successful Vendor will have to supply/provide goods with an Invoice
from a place located within State of Gujarat
This may not be possible as we don't have billing from Gujarat. Note 2: It is recommanded that Successful Vendor can supply/provide goods with an
Invoice from a place located within State of Gujarat.
116 Article 36: Payment Terms
Page no. 29
On receipt of deliveries FOR destination And Successful Installation, commissioning, Integration & acceptance -
70%On Successful UAT and FAT - 30%
Please chaange to "On receipt of deliveries FOR destination - 70%; Installation/commissioning and acceptance - 20%; Within 30 days of successful acceptance test - 10%"
Not Accepted. As per Bid.
Section 6: Schedule of Requirement Page no.47
Section 5: Technilcal
Specifications Page no. 42
Building Aggregation
Switch
Section 5: Technilcal
Specifications Page no. 43
Floor Access Switch
16 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 117 Article 34: Warranty Terms
Page no. 29
The Vendor shall warrantthat every work executed under the contract shall be free
from all defectsand faults in material, workmanship etc. for a period of
Five years for fromthe date of Acceptance test.
Please consider warranty start date from the date of delivery of Goods at Gandhinagar. Because the installation of equipments and getting FAT depends on the site readiness.
Not Accepted. As per Bid.
118 Article 13: Bid Security/Earnest Money Deposit
Page no. 21
Clause 13.1 The Bidder shall furnish, as part of the Bid, a Bid security for the amount of
Rs.36,00,000/- by demand draft, in favor of Gujarat Informatics Ltd.,
payable at Gandhinagar/Ahmedabad in India in a separate envelope. The
un-priced bid will be opened subject to the confirmation of valid Bidsecurity.
We request you to also accept EMD in the form of Bank Gaurantee (BG) from any scheduled/commercialized bank along with the draft BG format of same to be shared.
Not Accepted. As per Bid.
119 Article 32: Taxes & Duties Page
no. 28
Vendor is liable for all taxes and duties etc. We request you to consider and pay any future variation in statutory levies as per the then prevailing rates.
As above.
120 Article 35: Performance
Guarantee Page no. 29
Clause 35.2 The performance guarantee will be in the form of bank guarantee for the
amount equal of 10% of the value of the Order / LOI towards faithful
performance of the contract obligation, and performance of the
equipments during Warranty period. In case of poor and unsatisfactory
field services, GoG shall invoke the PBG.
Can we issue PBG valid for one year and then renew it on yearly basis till completion of five years or warranty period
Not Accepted. As per Bid.
121 Clause 35.3 The Performance Guarantee shall be valid for a period of 180 days
beyond Warrantee period and shall be denominated in Indian Rupees
and shall be in the form of an unconditional Bank Guarantee issued by all Public Sector Banks and private
banks namely IDBI Bank, UTIBank, HDFC Bank, ICICI Bank and scheduled bank namely
KalupurCommercial Co-Operative bank having branch in
Gandhinagar\Ahmedabad in the format provided by GoG to be
submitted Within 7 working days of receipt of award.
The Performance Guarantee shall be valid for a period of 180 days beyond Warrantee period and shall be denominated in Indian Rupees and shall be in the form of an unconditional Bank
Guarantee issued by all Public Sector Banks and private banks namely IDBI Bank, UTI Bank, HDFC Bank, ICICI Bank and scheduled bank namely Kalupur Commercial Co-Operative bank having branch in Gandhinagar\Ahmedabad in the format provided by GoG to be submitted Within 15
working days of receipt of award.
Not Accepted. As per Bid.
122 Article 40: Project
Implementation Page no. 32
Clause 40.3 The Vendor will implement the project strictly as per the plan approved
by GoG. The Vendor shall install and implement the proposed system at
such locations as may be selected by GoG within 120 days from the date of
the Agreement, which will be considered as a ‘Kick Off’ date.
The Vendor shall install and implement the proposed system at such locations as may be selected by GoG within 180 days from the date of the Agreement, which will be considered as a ‘Kick Off’
date.
Please see the revised bid.
123 Section 3: Scope of Work Page
no.15
Site Preparation: The Successful bidder is solely responsible for Site preparation as per the local
requirements. GoG will provide all civil, electrical, passive infrastructure.
124 Article 42: Installation
Requirement Page no. 35
The necessary Civil & Electrical work has to be carried out by the Vendor.
The GOG will not reimburse any cost towards the same. The Vendor need
to take necessary permission if require from concern authority.
Both clause are contradictory, Please clarifyVendor has to carry our the required
electric work & LAN cabling.
17 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 125 Article 23: Evaluation
Methodology Page no. 24
5. Proposed OEM in latest Gartner Magic Quadrant for Enterprise
LAN Infrastructure for last three consecutive yearsLeader's Quadrant in last three consecutive years - 15
marksNot in Leader's Quadrant in last three consecutive years - 0
marks
Proposed OEM in latest Gartner Magic Quadrant for Enterprise LAN Infrastructure for last three consecutive years Leader's/Visionary Quadrant in last three consecutive years - 15 Marks;
Challangers Quadrant in last three consecutive years - 10 Marks; Any Other Quadrant - 0 Marks
Request to kindly relax the clause and consider clause as this is restricting only two OEM's to have advantage.
As Above
126 3. Turnover in each of last three financial years the last being
financial year ending March 2013
Average Turnover in last three financial years the last being financial year ending March 2013 Please see the revised bid.
127 4. Profit in each of last three financial years the last being financial
year ending March 2013
Average Profit in last three financial years the last being financial year ending March 2013 Please see the revised bid.
128 Switch Features: The Switch should support hot-swappable fan
trays & power supplies & should be supplied with 1:1 power supply. One power supply should be able to run the
switch in case any power supply fails.
The Switch should support hot-swappable fan trays and power supplies & should be supplied with N+N redundant power supply.
Different OEM's have different architecture and may require more than one power supply to run the Complete chassis. Hence request to kindly relax the clause. Also consider N+N redundancy instead
of 1+1 redundancy.
As above
129 Switch Features: The Switch should support 1 Gbps , 10 Gbps & 40 Gbps interfaces
The Switch should support 1 Gbps & 10 Gbps interfacesAsked support of 40Gbps interface is not aligned with the switch performance, per slot bandwidth
and network architecture. Hence request to kindly remove the same.
As above
130 Switch Performance: Switch should support minimum 80 Gbps per slot switching bandwidth with minimum 255
Mpps forwarding rate for IPV4 & IpV6, There should not be any performance degradation in case of any
switching/routing engine failure.
Switch should support minimum 80 Gbps per slot switching bandwidth with minimum 833 Mpps forwarding rate for IPV4 & IpV6, There should not be any performance degradation in case of any
switching/routing engine failure.
Chassis should have 7 slots for Line/payload slots where per slot bandwidth is 80Gbps. Total for 7 slots = 80*7=560Gbps = 833 Mpps for IPv4 and IPv6 (1Gbps=1.488Mpps). Request to kidly
consider the same .
As above
131 Layer 3 Features: Shall have basic Routing-Static IP routing, RIP
v1/v2, RIPng, policy based routing, hardware enabled advance IP routing protocols OSPF, OSPFv3, BGPv4, IGMP V1, V2, V3, MLD V1, V2, PIM-SM, PIM-DM , PIM-SSM etc
Shall have basic Routing-Static IP routing, RIP v1/v2, RIPng, policy based routing, hardwareenabled advance IP routing protocols OSPF, OSPFv3, IGMP V1, V2, V3, MLD V1, V2, PIM-SM, PIM-
DM , PIM-SSM etc
Based on the network architecture, all the swiches would be placed in LAN environment, Thus BGP is not required. Request to kindly remove the same.
BGP is normally required at the WAN Gateway Router/Switch.
As above
132 Layer 3 Features:: Should support MPLS VPN, MPLS mVPN (Multicast VPN), MPLS Class of Service (CoS), VRF-Aware Services (Telnet, ICMP, Syslog), VPLS with minimum VRF
support upto 8K
Request to remove the clause
Request to kindly remove the clause and allow leading OEM's to participate.
MPLS not required here and is normally required at the WAN Gateway Router/Switch, while making own MPLS Cloud.
As above
133 Availability: Switch should have the capability to extend the control plane across two active switches making it a virtual chassis, enabling interconnected switches to be managed
as a single common fabric with one IP address with support for
stateful switch over in case of a failure of the Active Fabric/Supervisor.
Request to remove the clause
Request to kindly remove the clause and allow leading OEM's to participate.
The required feature is not supported by all OEM's on chassis based switches.
As above
134 Availability:The Virtual switch should support the fabric/Controller in one chassis as the Active
fabric/Controller and the fabric/Controller in theother chassis as the Standby supervisor
Request to remove the clause
Request to kindly remove the clause and allow leading OEM's to participate.
The required feature is not supported by all OEM's on chassis based switches.
As above
Section 5: Technical
Specification Page no. 38
RU Distribution
Switch
18 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 135 Interface Requirements: The switch should have minimum 12 10-Gigabit
Ethernet Ports spread across multiple line cards for card level redundancy, 40 no’s of 1G Fiber (SFP based) ports
spread across multiple linecards for card level redundancy.
Request for Clarification
Kindly clarify if we need to populate the SFP's for mentioned interfaces or SFP count mentioned in Form F-1 on page 47 is final?
Also clarify is the populated interfaces need to be non-blocking wirepeed.
As above
136 Section 5: Technical
Specification Page no. 40
General / Physical Requirements: The Switch should support hot-swappable
power supplies & should be supplied with 1:1 power supply. One power supply should be able to run the switch
in case any power supply fails.
The Switch should support hot-swappable power supplies & should be supplied with N+N power supply.
Different OEM's have different architecture and may require more than one power supply to run the Complete chassis. Hence request to kindly relax the clause. Also consider N+N redundancy instead
of 1+1 redundancy.
As above.
137 General / Physical Requirements: Switch should support minimum 48 Gbps per slot switching bandwidth with
minimum 110 Mpps forwarding rate. There should not be any
performance degradation in case of any switching/routing engine failure.
Switch should support minimum 48 Gbps per slot switching bandwidth with minimum 357Mpps forwarding rate for IPv4 and IPv6. There should not be any performance degradation in case
of any switching/routing engine failure.
Chassis should have 5 slots for Line/payload slots where per slot bandwidth is 48Gbps. Total for 5 slots = 48*5=240Gbps = 357 Mpps for IPv4 and IPv6 (1Gbps=1.488Mpps). Request to kidly
consider the same performance for IPv4 and IPv6 as IPv6 protocols are asked in the specification and performance in Distribution switch is mentioned for both IPv4 and IPv6.
As above
138 General / Physical Requirements: The proposed switch should support Net flow or J-flow or S-Flow.
The proposed switch should have Net flow or J-flow or S-Flow from day 1. If the same is supported through additional modules then two modules to be provided for redundancy.
Request to kindly consider Flow monitoring from day 1 with proper redundancy to ensure that it is highly available and can be used without any commercial impact.
As above
139 Layer-2 Requirements: Shall have 32,000 MAC addresses Shall have 64,000 MAC addresses
Asked MAC addresses are very less and not aligned with the asked performance parameters. Hence request to kindly consider 64,000 MAC addresses.
As above
140 Layer 3 Requirements: Shall have basic Routing-Static IP routing and
RIP v1/v2, hardware enabled advance IP routing protocols like OSPF, OSPFv3, BGPv4, , RIPng and policy based
routing, Multicast routingfeatures like PIM-SM, PIM-DM and PIM-SSM, multicast features like PIM RP accept filter, PIM neighbor filter,
multicast route limit, multicastmultipath and IGMP v1, v2, v3
Shall have basic Routing-Static IP routing and RIP v1/v2, hardware enabled advance IP routing protocols like OSPF, OSPFv3 , RIPng and policy based routing, Multicast routing features like PIM-
SM, PIM-DM and PIM-SSM, multicast features like PIM RP accept filter, PIM neighbor filter, multicast route limit, multicast multipath and IGMP v1, v2, v3
Based on the network architecture, all the swiches would be placed in LAN environment, Thus BGP is not required. Request to kindly remove the same.
BGP is normally required at the WAN Gateway Router/Switch.
As above
141 Layer 3 Requirements: Should support minimum 128 K IPv4 & IPv6 route & 32 K multicast entries.
Request for clarification
Please clarify if 32 K multicast routes asked are for IPv4 and IPv6?
As above
142 Availability: Switch should have the capability to extend the control plane across two active switches making
it a virtual chassis, enabling interconnected switches to be managed as a single common
fabric with one IP address with support for stateful switch over in case of a failure of the Active Fabric/Supervisor.
Request to remove the clause
Request to kindly remove the clause and allow leading OEM's to participate.
The required feature is not supported by all OEM's on chassis based switches.
As above
143 Security Requirements: Should be able to shut down Spanning Tree
Protocol Port Fast-enabled interfaces when BPDUs are received to avoid accidental topology oops
Should be able to shut down Spanning TreeProtocol Port interfaces when BPDUs are received to avoid accidental topology loops
Fast-enabled interfaces are specific and not supported by all leading OEM's, hence request to kindly relax the clause and consider standard interfaces.
As above
Building Aggregation
Switch
Section 5: Technical
Specification Page no. 41
19 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 144 Interface Requirements: Fourteen (14) 10G ports spread across multiple
line cards for card level redundancy, Forty (40) no of 1G SFP based ports & Eight (8) 1GE ports spread across
multiple line cards.
Request for Clarification
Kindly clarify if we need to populate the SFP's for mentioned interfaces or SFP count mentioned in Form F-1 on page 47 is final?
Also clarify is the populated interfaces need to be non-blocking wirepeed.
As above
145 Section 5: Technical
Specification Page no. 42
General / Physical Requirements: Switch should have minimum 24
10/100/1000 Base-T ports. withadditional 4 Nos. of SFP Based ports and additional 2
stacking ports with all accessories for stacking purpose
Switch should have minimum 24 10/100/1000 Base-T ports. With additional 2 Nos. of SFP Based ports and additional 2 stacking ports with all accessories for stacking purpose
Two SFP based ports are more than enough to suffice the requirement, even if we consider redundant uplink from each switch. Hence request to kindly consider the same.
As above
146 General / Physical Requirements: Switch should be 1 RU rack mountable
in nature, stackable with 40Gbps ofthroughput with minimum of 4 switches in a stack with
single IP management.
Switch should be 1 RU rack mountable in nature, stackable with 40Gbps of throughput with minimum of 9 switches in a stack with single IP management.
For better scalability and easy management, it is recommended to have minimum 9 Switches in a tack with single IP management.
As above
147 General / Physical Requirements: The switch should have IPV4 & IPv6 support from day one
The switch should have IPV4 & IPv6 support from day one. Basic Static Routing, RIP, RIPnG from day 1 and upgradable to OSPF, OSPFv3, PIM and MLD in future
Request to kindly consider Basic routing like Static Routing, RIP, RIPnG from day 1 to ensure no commercial impact while using the same and upgradable to OSPF, OSPFv3, PIM and MLD in future
to ensure no hardware change in future while enabling the same.
As above
148 Performance Requirements: Switch should have minimum 168 Gbps
switching bandwidth capacity (Gbps)per switch
Switch should have minimum 88 Gbps switching bandwidth capacity (Gbps) per switch
For standard 24 port switch with 2 x 10G uplink ports, the switching bandwidth should be 24x2 + 2x2x10 = 48+40=88 Gbps
As above
149 Performance Requirements: Switch should have minimum 40 Mpps
throughput per switch
Switch should have minimum 65 Mpps throughput per switch
For standard 24 port switch with 2 x 10G uplink ports, the throughput should be 88/2*1.488 = 65 Mpps
As above
150 Layer-2 Requirements: Should support IEEE 802.1Q VLANencapsulation and up to 250 active
VLANs per switch
Should support IEEE 802.1Q VLAN encapsulation and up to 1000 active VLANs per switch
Asked VLAN's are very less. Hence considering future scalability, it is recommended to have minimum 1000 VLAN's
As above
151 Layer-2 Requirements: Switch should support link aggregation for minimum 8 GE ports and minimum
40 LAG groups.
Switch should support link aggregation for minimum 8 GE ports and minimum 24 LAG groups.
In a 24 port switch even if we make each LAG of 2 ports, then we can have total 12 LAG's. Even if we consider 100% scalability, the total number of LAG's required would be 24. Hence request to
kindly consider the same.
As above
152 Interface Requirements: Two (2) 1G Single Mode (SM) SFPshould be supplied with the switch
Request for Clarification
Kindly clarify if we need to populate the mentioned SFP's or SFP count mentioned in Form F-1 on page 47 is final?
As above
153 Article 23: Evaluation
Methodology Page no. 24
5. Proposed OEM in latest Gartner Magic Quadrant for Enterprise
LAN Infrastructure for last three consecutive yearsLeader's Quadrant in last three consecutive years
6. Bidder's Association with the Proposed OEM in terms ofExpertise and Certification on the Technology Offered
consistently in last 3 years
Should say Gartner or Equivalent study; Cisco and HP Only are in the Leaders Quadrant. Please remove this point as Gartner is never considered in govt tender. Gartner says it is based on
Gartner perception and NOT fact! Request you to include all vendors in Gartner quadrant. This will ensure that marginal/sub-standard vendors will not qualify
As above
Floor Access Switch
Section 5: Technical
Specification Page no. 43
20 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 154 Switch Features: The switch should support new technologies like MPLS, EoMPLS/Metro Ethernet in
hardware with firmware upgrade only without upgrading the switching fabric and line modules.
Requesting you to relax the points saying that - Not a relevant feature on enterprise switches. Needed on the WAN side OR on the 6513
As per RFP
155 Switch Performance: The switch should have in-built capability for the
below functionalities using features likeSflow/Netflow etc :
• Voice-over-IP (VoIP), video network monitoring• SLA Monitoring
• Network performance monitoring &performance visibility
• IP Service network health readiness orassessment
• Edge- to –edge network availability monitoring• Troubleshooting of network operation
Requesting you to relax the points saying that - SLA Monitoring or equivalent; IP service network health readiness or assessment OR equivalent
Switch Performance: The switch should have in-built capability for the
below functionalities using features likeSflow/Netflow etc :
• Voice-over-IP (VoIP), video network monitoring
• SLA Monitoring• IP Service network health readiness or
assessment or equivallent• Edge- to –edge network availability
monitoring• Troubleshooting of network operation
156 Availability: Switch should have the capability to extend the control plane across two active switches making it
a virtual chassis, enabling interconnected switches to be managed as a single common fabric with one IP address with support for stateful switch over in case of a failure of
the Active Fabric/Supervisor.
Only one vendor in industry can provide you this feature / technology so requesting you to delete the said point
As above
157 Availability:The Virtual switch should support the fabric/Controller in one chassis as the Active
fabric/Controller and the fabric/Controller in the other chassis as the Standby supervisor
Only one vendor in industry can provide you this feature / technology so requesting you to delete the said point
As above
158 Layer 3 Features: Should support MPLS VPN, MPLS mVPN (Multicast
VPN), MPLS Class of Service (CoS), VRF-Aware Services (Telnet, ICMP, Syslog), VPLS withminimum VRF support upto 8K
Please relax this point saying that - Please reduce VRF from 8k to 400 as 8k VRF is specific to one vendor. Please delete Multicast VPN as this is a WAN technology and is not needed on the
distribution switch
As above
159 Interface Requirements: The switch should have minimum 12 10-Gigabit
Ethernet Ports spread across multiple line cards for card level redundancy, 40 no’s of 1G Fiber (SFP based) ports
spread across multiple linecards for card level redundancy.
Please revise this point to read as 12 wirespeed distributed forwarding 10G ports and 40 nos of wirespeed distributed forwarding 1G fiber ports.
As above
160 Layer 3 Requirements: Have VRF-Lite for L3 virtualization with minimum
64 or above VRF-Lite instances from day one
Please reduce VRF-Lite support to 16 from 64 as 64 is specific to a vendor. 16 VRF-Lite is more than enough
As per RFP
161 Availability: Switch should have the capability to extend the control plane across two active switches making it a virtual chassis, enabling interconnected switches to be managed
as a single common fabric with one IP address with support for stateful switch over in case of a failure of the
Active Fabric/Supervisor.
Specific to one vendor. Please delete. As above
162 General / Physical Requirements: Switch should have minimum 24
10/100/1000 Base-T ports. withadditional 4 Nos. of SFP Based ports and additional 2
stacking ports with all accessories for stacking purpose
Suits a particular vendor. Requesting you to relax this point saying - 24 10/100/1000 Base-T ports with additional 4 Nos. of 1G/10G ports for uplinks / stacking purpose with all accessories for
stacking. Interface requirement according to specification is only 2 1G ports.
As above
163 Performance Requirements: Switch should have minimum 168 Gbps
switching bandwidth capacity (Gbps)per switch
Requesting you to relax this point saying - Switch should support non-blocking architecture, wirespeed with 128Gbps switching bandwidth capacity per switch.
As above
Section 5: Technical
Specifications Page no. 38
RU Distribution
Switch
Section 5: Technical
Specifications Page no. 41
Building Aggregation
Switch
Section 5: Technical
Specifications Page no. 42
Floor Access Switch
21 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 164 Section 3: Scope of Work
Centralized monitoring and management Request you to give details about the existing monitoring tool deployed Details can be provided at the time of installation
165 The RU Distribution switches will be connected via multiple 10G uplinks to SDC Core Switches which is Cisco Catalyst
6513-E running in Virtualized Switching System architecture that is providing network stability, availability
& throughput.
Are these cisco 6500 switches already deployed? If yes , what are the line cards configured? Do these line cards support 10G modules?
6500 Switches as SDC core are already installed with 16 no of 10G ports. There
are 2 such switches at SDC.
166 Passive Work Kindly clarify passive cabling scope of work This has been clarifed in pre-bid167 Section 5:
Technical Specifications Page no. 40
RU Distribution
Switch
Interface Requirements: The switch should have minimum 12 10-Gigabit
Ethernet Ports spread across multiple line cards for card level redundancy, 40 no’s of 1G Fiber (SFP based) ports
spread across multiple linecards for card level redundancy.
Please clarify the exact number of ports /line cards required in distribution switch. As above
168 Section 5: Technical
Specifications Page no. 42
Building Aggregation
Switch
Interface Requirements: Fourteen (14) 10G ports spread across multiple
line cards for card level redundancy, Forty (40) no of 1G SFP based ports & Eight (8) 1GE ports spread across
multiple line cards.
Please clarify the exact number of ports /line cards required in distribution switch. As above
169 Article 36: Payment Terms
Page no. 29
On receipt of deliveries FOR destination And Successful Installation, commissioning, Integration & acceptance -
70%On Successful UAT and FAT - 30%
Request you to change Payment Terms as :70% on Delivery,30% on Installation commissioning and Integration
Not Accepted. As per Bid.
170 Submission Date Request you to give atleast 15 days for submission after prebid response Please see the revised bid.171 Section 2:
Eligibility Criteria Page no. 8
Bidder should not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of
Gujarat or any of the PSU in the State of Gujarat.
We declare:"Wipro Limited is not under declaration of ineligibility for corrupt and fraudulent practices issued by
Government of Gujarat or any of the PSU in the State of Gujarat."
As per RFP
172 Section 3: Scope of Work Page
no.15
Site Preparation: - The Successful bidder is solely responsible for Site preparation as per the local
requirements. GoG will provide all civil, electrical, passive infrastructure.
Request GIL to consider: Customer hereby agrees to make the site ready as per the agreed specifications, within the agreed timelines. Customer agrees that Wipro shall not be in any manner be liable for any delay arising out of Customer's failure to make the site ready within the stipulated
period, including but not limited to levy of liquidated damages for any delay in performance of Services under the terms of this Agreement.
As above
173 Warranty Support: - The bidder shall be responsible for the 24x7 warranty support during the entire warranty period of
5 years.
We request GIL to kindly amend as below:The bidder shall be responsible for the 24x7 warranty support during the entire warranty period of 5
years with 4hours response time on-site. Bidder to also furnish the warranty/care-pack activation certificate along with the support-backlining confirmation letter from the respective OEM on their
company letterhead to be submitted by the Bidder along with the Bid.
Bidder has to furnish the warranty/care-pack activation certificate along with the
support-backlining confirmation letter from the respective OEM on their company
letterhead to be submitted by the Bidder along with the Bid.
174 Article 11: Bid Price Page no.
21
Clause no. 11.2
Offered price should be inclusive of all applicable taxes and levis
applicable such as Excise, Sales Tax, Service Tax, Octroi (If applicable),
Packing/ Forwarding, Insurance, FOR destination (any where in the
Gujarat state).
The Price offered here is exclusive of taxes, all taxes & duties will be charged extra as per the current rate of taxation in force. Any increase in taxes and duties will be passed on to customer.
Any change in statutory taxes, duties and levies shall be borne by the customer on sufficient documentary proof is submitted by the Wipro.
Not Accepted. As per Bid.
175 Clause no. 11.5
Unit rates should be quoted separately for each item. Quantities can be
increased or decreased by GoG and bidder has to supply deviated
quantities at the rates prescribed and approved by the GoG in the tender
document.
1. It should be restricted to +/-10% maximum of the quantity quoted as per RFP.2. Wipro agrees to provide the increased quantity at the same terms and conditions. However
additional prices shall be charged for the goods supplied over the contracted quantity.
Not Accepted. As per Bid.
22 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 176 Article 14: Period Validity of Bids
Page no. 22
Clause 14.1 Bids shall remain valid for 180 days after the date of Bid opening
prescribed by GOG / GIL. A Bid valid for a shorter period shall be
rejected as non-responsive.
Wipro will quote with a bid validity of 180 days from the date of submission of the BID. However, the prices mentioned in the tender will be capped at the USD-Re conversion rate prevailing on the due date of submission. Any currency movement amounting to over 1.5% in USD-Re conversion will be charged as actual and revised rates will be submitted at the time of award of contract in the event
of Wipro being awarded the contract.
Not Accepted. As per Bid.
177 Article 30: Assignment & Sub Contracts Page no. 22
The Vendor shall notify the GoG in writing of all subcontracts awarded
under the Contract Agreement. Such notification shall not relieve the
Vendor from any liability or obligation under the Agreement. The Vendor
shall fully indemnify GoG for any claims/damages whatsoever arising out of the Sub contracts.
Request GIL to amend as below: The Vendor shall notify GoG in writing of all subcontracts awarded under the Contract Agreement. Such notification shall not relieve the Vendor from any liability or obligation under the Agreement.
Not Accepted. As per Bid.
178 Article 36: Payment Terms
Page no. 29
On receipt of deliveries FOR destination And Successful Installation, commissioning, Integration & acceptance -
70%On Successful UAT and FAT - 30%
We request GIL to kindly amend the same as below:80% payment upon delivery of material on-site
20% payment upon installation & Project Installation Report sign-off
Not Accepted. As per Bid.
179 Article 38: Penalty Cluase
Page no. 30
We request GIL to kindly cap the total penalty including LD if any, to 2% of order value and not beyond.
Not Accepted. As per Bid.
180 Article 40: Project
Implementation Page no. 32
Clause 40.4 Wipro will deliver the material within 12weeks from the date of the receipt & acceptance of firm Purchase order duly sealed and signed by the authorized signatory. Further, Wipro will complete the implementation within 8weeks from the date of material delivery on-site subject to all the site pre-requisites being met by the customer prior to material delivery and all the necessary approvals on
downtime etc. being provided by the customer in-line with the detailed implementation plan submitted by Wipro during the project kick-off meeting in the event of award of contract
please see the revised bid.
181 Clause 40.15
In the event of the delay in delivery of contracted services or services is
not satisfactory the GoG may procure goods from else ware as prescribed
in bid and Vendor shall be liable without limitations for the difference
between the cost of such substitution and the price set forth in the contract
for the goods involved i.e. at the risk and cost of the Vendor.
Vendor shall be required to bear only the Excess Cost for procurement of goods and/or services similar to those undelivered. The Term “Excess Cost” as referred herein shall mean cost at which alternative arrangements shall be providing the undelivered goods and/ or services of equivalent specification to the Purchaser under this project minus the cost on which the Vendor agreed to
provide the undelivered goods and/or services under this project. Provided further that the Vendor shall not be liable to Excess Cost in excess of (ten) 10 percent of the price of undelivered goods or
services for which such option is exercised by the Purchaser.
Not Accepted. As per Bid.
182 Article 48: Risk of Loss Page no. 36
Risk of loss of equipment shall pass on to GoG at the time it is handed
over to the designated carrier for shipment to GoG site. The Vendor shall however provide for transit insurance on
GoG’s behalf till delivery to GoG site.
The risk, title and ownership of the products shall be transferred to the customer upon dispatch of such products to the customer
Noted
183 Article 47: Limitation of
Vendor's Liability Page no. 36
Notwithstanding anything contained in the Contract, Vendor’s liability
will be only for actual direct damages and shall be capped and limited to
double the charges or the amounts paid or due and payable to Vendor for
the Services that are the subject of the claim.
Notwithstanding anything contained in the Contract, Vendor’s maximum aggregate liability will be only for actual direct damages and shall be capped and limited to double the charges or the
amounts paid or due and payable to Vendor for the Services that are the subject of the claim. All indirect and consequential damages shall be excluded.
Not Accepted. As per Bid.
184 Form E: FORMAT FOR BID LETTER
FORM
In case of breach of any tender terms and conditions or deviation from bid specification other than already
specified as mentioned above, the decision of GIL Tender Committee
for disqualification will be accepted by us.
Request GIL to delete the clause. Not Accepted. As per Bid.
23 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 185 Site Not Ready: To be added in the RFP & ContractCustomer hereby agrees to make the site ready as per the agreed specifications, within the agreed timelines. Customer agrees that Wipro shall not be in any manner be liable for any delay arising
out of Customer's failure to make the site ready within the stipulated period, including but not limited to levy of liquidated damages for any delay in performance of Services under the terms of
this Agreement.
As above.
186 Savings Clause: To be added in the RFP & ContractBidder’s failure to perform its contractual responsibilities, to perform the services, or to meet agreed service levels shall be excused if and to the extent Bidder's performance is effected ,
delayed or causes non-performance due to Customer's omissions or actions whatsoever.
As per RFP
187 Deemed Acceptance: To be added in the RFP & ContractServices and/or deliverables shall be deemed to be fully and finally accepted by Customer in the event when Customer has not submitted its acceptance or rejection response in writing to Bidder
within 15 days from the date of installation/commissioning or when Customer uses the Deliverable in its business, whichever occurs earlier. Parties agree that Bidder shall have 15 days time to
correct in case of any rejection by Client.
As per RFP
188 Layer 3 Features: Shall have strict priority queuing or high strict priority queue, QoS/Security
ACLs
Request GIL to consider: Shall have strict priority queuing or high strict priority queue, minimum 64K or above QoS/Security ACLs
Justification: Security ACL plays a vital role in the network. There would be a lot of traffic generated from building access & building aggregation layer switches towards SDC Core switches. RU
distribution switches act as aggregation point where on an average 12-16 Building aggregation switches would get terminate. Rather than forwarding all traffic towards SDC core, it is highly advisable to filter traffic at RU distribution layer. Hence, we request GIL to add the suggested
clause.
As Above
189 Interface Requirements: The switch should have minimum 12 10-Gigabit Ethernet Ports spread across multiple line cards for card level redundancy, 40 no’s of 1G Fiber (SFP
based) ports spread across multiple linecards for card level redundancy.
The switch should have minimum 20 10-Gigabit Ethernet Ports spread across multiple line cards for card level redundancy, 40 no’s of 1G Fiber (SFP based) ports spread across multiple line cards for
card level redundancy.
Justification: There would be a lot many numbers of building access & aggregation switches intern get connect to RU distribution switches. To handle such huge amount of data, RU distribution
switches must have more number of 10G ports.
As Above
190 Switch: Security: Addition Requested: Switch should support Data Confidentially & Integrity
Justification: MACsec, defined in 802.1AE, provides MAC-layer encryption over wired networks by using out-of-band methods for encryption keying. The MACsec Key Agreement (MKA) Protocol
provides the required session keys and manages the required encryption keys.
As Above
191 Addition Requested: Switch should be EAL2 certified
Justification: The Evaluation Assurance Level of an IT product or system is a numerical grade assigned following the completion of a Common Criteria security evaluation.The increasing
assurance levels reflect added assurance requirements that must be met to achieve Common Criteria certification. The intent of the higher levels is to provide higher confidence that the system's
principal security features are reliably implemented.
As Above
Section 5: Technical
Specifications: Page no. 39
RU Distribution
Switch
24 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 192 Switch: Security Requirements: Addition Requested: Switch should support Data Confidentially & Integrity
Justification: MACsec, defined in 802.1AE, provides MAC-layer encryption over wired networks by using out-of-band methods for encryption keying. The MACsec Key Agreement (MKA) Protocol
provides the required session keys and manages the required encryption keys.
As Above
193 SecurityRequirements: Switch Should support VLAN Based, Port
Based ACLs.
Switch Should support VLAN Based, Port Based & Time based ACLs
Justification: Time-based ACLs are useful when you want to restrict traffic based on the time of day. For example, you might employ time-based ACLs if you want to only allow web surfing during a
particular time of day or allow access to a particular server only during work hours.
As Above
194 Addition Requested: Switch should be EAL2 certified
Justification: The Evaluation Assurance Level of an IT product or system is a numerical grade assigned following the completion of a Common Criteria security evaluation.The increasing
assurance levels reflect added assurance requirements that must be met to achieve Common Criteria certification. The intent of the higher levels is to provide higher confidence that the system's
principal security features are reliably implemented.
As Above
195 General / PhysicalRequirements: Switch should be 1 RU rack mountable in
nature, stackable with 40Gbps of throughput with minimum of 4 switches in a stack with single IP
management.
Switch should be 1 RU rack mountable in nature, stackable with 64 Gbps of full duplx throughput with minimum of 8 switches in a stack with single IP management.
Justification: There would be a need of stacking more than 4 switches into a single stack to connect more number of users/end machines.
As Above
196 General / PhysicalRequirements: Switch should support external redundant
power supply
Switch should support internal/ external redundant power supply
Justification: Internal redundant power supply is always better than external ones. With external redundant power supply external power source also needs to be provisioned that comes with an
additional cost.
As Above
197 Security Requirements: Switch Should support VLAN Based, Port Based ACLs.
Switch Should support VLAN Based, Port Based & Time based ACLs
Justification: Time-based ACLs are useful when you want to restrict traffic based on the time of day. For example, you might employ time-based ACLs if you want to only allow web surfing during a
particular time of day or allow access to a particular server only during work hours.
As Above
198 Addition Requested: Switch should be EAL2 certified
Justification: The Evaluation Assurance Level of an IT product or system is a numerical grade assigned following the completion of a Common Criteria security evaluation.The increasing
assurance levels reflect added assurance requirements that must be met to achieve Common Criteria certification. The intent of the higher levels is to provide higher confidence that the system's
principal security features are reliably implemented.
As Above
199 Section2 : Eligibility Criteria
Page no. 7
3. The bidder must have positive networth and should be profit making for each of the last three financial years as
on 31st March, 2013.
We request GIL to change the clause as Bidder should have a positive networth in each of the last three financial years, Bidder
Relevant pages from Bidders to provide Audited Annual Report or Certificate from Auditor
As per RFP
200 Article 36: Payment Terms
Page no. 29
On receipt of deliveries FOR destination And Successful Installation, commissioning, Integration & acceptance --
70 % On Successful UAT and FAT 30%
We request GIL to accept the changes in clause as below: PAYMENT TERMS: On delivery --70%
Successful Installation, commissioning, Integration & acceptance -- 20% On Successful UAT and FAT -- 10%
Not Accepted. As per Bid.
Section 5: Technical
Specifications: Page no. 42
Building Aggregation
Switch
Section 5: Technical
Specifications: Page no. 43
Floor Access Switch
25 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 201 If the Operator fails to complete the Supply / Installation / Commissioning / Acceptance within the time period (s) specified in the implementation plan, GoG may, without
prejudice to its other remedies under the Agreement, levy as Penalties, a sum equivalent to 1 % of the algebraic sum of the cost of the non-executed portion of the equipments
installed at that particular site / sites, for each week or part thereof of delay, until actual delivery of performance. The maximum penalty for delay shall not exceed 10% of
the algebraic sum of the cost for the equipments installed at that particular site. If the delay continues beyond 20
weeks, GoG may terminate the Agreement.
Not Accepted. As per Bid.
202 Operational Deficiencies shall apply: Site / Location Penalty after 24 to 48 hrs (delay of 24 hrs or part) --Rs.10,000/ Penalty beyond 48 hrs with a
cap of 10% of order value Rs.20,000/-Per each subsequent day (to a max cap of 5% of the order value)
Not Accepted. As per Bid.
203 New Proposed Clause : Change of taxWe request GIL to accept the changes in clause as below:
In case any national or state statute or any local law or regulation or by-law of any duly constituted authority is changed or comes into force which results in extra costs/tax in relation to the
provision of the Goods/Services, the consequential effect shall be to the account of the Owner and the same shall be borne by the Owner. We request NTPC to accept the same as the changes in the
taxes by government is not know to the bidder at the time of bidding.
Not Accepted. As per Bid.
204 New Proposed Clause: Termination: We request GIL to accept the changes in clause as below:
Without prejudice to any rights that have accrued to the Bidder, the Bidder may terminate this agreement by giving written notice to the NTPC , if NTPC commits a material breach of any term of the SPC and fails to remedy that breach within a period of 30 days after being notified in writing to
do so.
Not Accepted. As per Bid.
205 New Proposed Clause: Deemed Acceptance We request GIL to accept the changes in clause as below:
The hardware/software which requires acceptance test shall be deemed to be accepted, for the purpose of release of payment and for start of the warranty period and otherwise, on occurrence of
any one of following events, whichever occurs earliest:a. if Owner fails to conduct or attend the acceptance test or does not provide a written notice of any
rejection/confirmation of acceptance test, within one month from the date of test readiness notification by the Bidder, or
b. if Owner puts the hardware/ software into operational/ productive/ normal use prior to successful acceptance test.
Not Accepted. As per Bid.
206 New Proposed Clause: Site Not Ready: We request GIL to accept the changes in clause as below:
In order to enable the Bidder to commence work and meet its obligations under the contract, NTPC shall be responsible for providing access to the site, and also all other areas reasonably required for
the proper execution of the scope of work of the Bidder and making the site ready complete in all respect in accordance with the Bidder’s specifications for site readiness. NTPC agrees that the
Bidder shall not in any manner be liable for any delay in supply of deliverables under the terms of the SPC or GPC, if such delay is attributable to NTPC’s failure to make the site ready within seven
days of the Bidder’s direction in this regard.
Not Accepted. As per Bid.
Article 38: Penalty Clause
Page no. 29
Penalties for delay in implementation: If the Operator fails to complete the Supply / Installation / Commissioning / Acceptance within the
time period (s) specified in the implementation plan, GoG may, without prejudice to its other remedies under the Agreement, levy as Penalties, a sum equivalent to 0.5 % of the algebraic sum
of the cost of the non-executed portion of the equipments installed at that particular site / sites, for each week or part thereof of delay, until actual delivery of performance. The maximum penalty for
delay shall not exceed 5% of the algebraic sum of the cost for the equipments installed at that particular site. If the delay continues beyond 20 weeks, GoG may terminate the Agreement by giving
a notice period of 30 days Operational Deficiencies shall apply:Penalty after 24 to 48 hrs (delay of 24 hrs or part)
Rs.5,000/-per day Penalty beyond 48 hrs with a cap of 10% of order valueRs.10,000/-Per each subsequent day (to a
max cap of 5% of the order value)
26 of 27
Page no./clause no
Item RFP Specs/Clause
Response to Queries
Bid for Supply, Installation and Commissioning of Active Network Switches and other Network Components for Gujarat Sachivalaya Campus Area Network (GSCAN) and to Integrate the same with existing GSWAN Infrastructure
Sr. No.
RFP Reference Query/Suggestion from Bidders Response to Bidders
RU 207 Section 2: Eligibility Criteria
Page no. 7
3. The bidder must have positive networthand should be profit making for each of thelast three financial years as on 31st March,
2013.
Since RFP is asking about positive net worth, we request you to remove profitability part and change clause to The bidder must have positive networth
208 Section 2: Eligibility Criteria
Page no. 7
3. The bidder must have positive networthand should be profit making for each of thelast three financial years as on 31st March,
2013.
They have requested have to wave off the clause.Not Accepted. As per Bid.
27 of 27